HomeMy WebLinkAboutPP - 4385 S 133RD ST BLDG #F - FOSTORIA PARK BUILDING #F - PERMITS AND PLANS4385 S 133RD ST BLDG #F
ASSOCIATED PERMITS
12-F-036
09-S-146
SITE LOCATION
CITY OF TUKWILA
FIRE DEPARTMENT
444 Andover Park East
Tukwila, WA 98188
206-575-4407
Date application
accepted:
FIRE PROTECTION SYSTEMS PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
**PLEASE PRINT**
33`-
Site Address: 11,SC---- T s s
King Co. Assessor's Tax No.:
Suite Number: Floor:
New Tenant? ❑ - Yes [3'No
Tenant Name: 1;0 A MAIL 13
Property Owner's Name: SEl W 1 NC—
Mailing Address: 4Ot'. �= W OU.St3 J
11
City
CONTACT PERSON -if there are questions about the submittal.
Name: S V6N) \S
Company Name: 1 VFk.; 1 � ,WACO
Nu( (J.k 9c 1(2
Day Telephone:
State Zip
20. 7V2 141-6
Mailing Address: CVO S LUCA Sr
E-mail Address:
51��'� %1�"S�� l , ml�.can�lty
Sa IIU6 Bt
Fax Number:
Valuation of Project (contractor's bid price): $ "I
Scope of Work (please provide detailed information): — of j (Slt\ cNO _CCAN
w \ vu, j� s R(�Ol o i �ll�- vc-rvc i mCMIAV4 (uo COMM, Chi -An (ANL -1
PERMIT APPLICATION NOTES
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Fire Marshal to comply with current fee schedules.
Expiration of Plan Review -Every permit issued shall become invalid unless the work on the site authorized by such permit
is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or
abandoned for a period of 180 days after the time the work is commenced. The Fire Marshal is authorized to grant, in
writing, one or more extensions of time,f or periods not more than 180 days each. The extension shall be requested in writing
and justifiable cause demonstrated.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE
UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OR WASHINGTON, AND I AM AUTHORIZED TO APPLY
FOR THIS PERMIT.
BUILDING OWN
Signature:
OR AUTHORIZED AGENT:
Print Name:
Plan Permit App doc
PAID
FEB 21 2012
TUKWILA FIRE
7 3 //G7i
5/14/10
Date:
Day Telephone:
TFD FP Form 8
s ,c4r1
FIRE DEPARTMENT SPRINKLER PLAN REVIEW COMMENTS
Project Name:
Bay Valve
4385 S 133rd St
Permit No.: 09-S-146
Date: September 22, 2009
Reviewer: Al Metzler
Fire Protection Project Coordinator
(206)575-4407
• Lateral sway bracing is required at a maximum spacing of 40' for all mains, cross
mains, and branch lines 2.5" and larger. Bracing is provided for the last length of
pipe but within 6' of the end of a feed or cross main. Bracing is required unless
all the pipe is supported by rods less than 6" or by 30 ° wrap-around U -hooks for
any size pipe, 9.3.5.3.
• Minimum clearance around pipes: 2 " for 1"-3.5", 4" for 4" and larger, see 4
exceptions, 9.3.4.
• Longitudinal sway bracing is a maximum of 80' for mains and cross mains and
within 40 ' of the end of the line, 9.3.5.4.
• Provide lateral and longitudinal bracing for changes in pipe direction per section
9.3.5.11.2 for pipe size 2'/ inches and larger.
• Restrain branch lines at the end sprinkler of each line, restrain against vertical
and lateral movement, 9.3.6.3.
• Restraints for branch lines shall be at intervals per table 9.3.6.4 and section
9.3.6.4, and restrain sprig ups greater than 4', 9.3.6.6.
• Comply with ASCE 7-05, section 13.5.6.2.2.
• Provide sprinkler protection beneath all obstructions greater than 4 ft. in width.
• Extend sprinkler protection to all combustible concealed spaces.
• Comply with NFPA 13 obstruction tables.
• Comply with obstructed/non-obstructed construction rules for sprinkler head
placement.
• Sprinkler heads spaced closer than 6 ft. apart must be baffled.
• Modifications involving 30 or more heads require hydrostatic test and system
isolation if necessary.
• These conditions apply to all sprinkler piping exposed as necessary to
accomplish the permitted scope of work.
All code references are NFPA 13, 2007 Edition.
(C NO 1 7 r1ri-u w' -r -vv r -q
FOSTCRIA PARK
/
386. — 1/389 S. /3 3 5-r
1/y 3s- - gy97 5. / 31/ PC.
cri
N
Fostoria Park Building #B
4475-4485 South 134th Place
Owner:
425-828-6300
8"
1/389
/00
% 4439
340 ALL RISERS
8„
/ = GO4e1Rq;s LooP /NGC. HO RANTS Z /40
ALL. BUILDINGS
w^
Oct 20 2009 3:27PM FSI
nyyrrirrn
FSI Confidence Plus, Inc
1014 North St., Suite 200
Sumner, WA. 98390
253-826-0099 1 253-826-1033 Fax
www.fsicpi.com
253 826 1033 p . 1 0
Protecting against
loss of property and life ...
Inspection Location: Fostoria Industrial Park Inspection Date: 10/6/09
Address: 4439 S 134th PL Tukwila, WA
Contact Person: Kim Bentz Phone: 425-828-6300
Site Private Service Firemain
! i
,..-- " ' . - - -elm •(:.,
; .. NoKii Supp\1 \ \
\ \
- — --- -,-, ....T..'
tN•
., .„,...,\
1 i •N ."\,....
\
, ...- ,,,,. • - "‘ 's.., , '.
r -, nem '-..•._,•
, ,—. ‘•M\ IL-IPINE .
.-/ ../,
1
.-.... •' 7 ...
., #
4
'A •/ , -L,r.
/'L,r,,....,
..
_
// I I.
t/\. /":------, OMI
.,4
.a,./.
i..?
.,
/
/.
/
•
.....-„-. / 1 .
\ (2\ 6 1i /,,,, /
\ \\ A 74144 „.. ,„ •-..,.-,
\.N<A/ 7/ /
\\ //. i 4i4
1.1M- 01
rN./,4.,. / )
h0C114;/t/
.7
/
/
7les/ •/
/ :7
fr"f
/•
/.
.
/
‘\\\ / . ., •// 1/7/Hydrant4j:X
.„ :/ ,/
...• ,/ / '/ Yi / / ,/
\, N) NN iw)..i\ 7 ,
/
--..-
4 -/Yd 1 #3 t‘ At /I
/ ..,,_
/7
'--- At
-„ita g, 4
7
, , , '''• .. `-../,
1-, 1 \
'' '‘.•, '-•--.
\
,11,414-1141111
The Safety Team Inc.
670 S. Lucile St. Seattle, WA. 98108 PO Box 81246
Phone (206) 762-1450 Fax (206) 762-1799
www.thesafetyteaminc.com
To: Tukwila Fire Prevention 206 575 4407
Attn: Al Metzler
From: The Safety Team Inc 206 762 1450
Steve Paris steve@thesafetyteaminc.com
Re: Monitoring change -out from "Scan -Alert" to AES Radio Frequency
Al:
At Fostoria Park ("Bldg F" 4385 — 4389 S 113th St), we will be changing out the old
scan -alert monitoring communicator panel for a AES Radio -Frequency monitoring panel.
The old "Scan- Alert" panel transmitted (ZN-1)-Water Flow
(ZN-2) Sprinkler tampers
(ZN-3) PIV Tamper
The new AES Radio Frequency panel will transmit the same zones.
The Monitoring company will remain "The Alarm Center".... Lacey, Wa.
We are including a cut sheet in the submittal
Battery calculations are unnecessary ( Only 1 size of battery is require a -cut sheet).
If you have any questions please call — Thank You
Steve Paris
The Safety Team Inc.
206 762 1450
ACCEPTED
E' Without Comments
0 As Noted in Red
O Per The Attached Letter
-n plans have been reviewed by The Tukwila Fire
,fltion Bureau rr;• f -o eormance with current City
:::'ards. Accepts,lce is subject to errors and
. ;=;ions which do not aL_tnorize violations of adopted
,,dards and ordinances. The responsibility for the
quacy of design rests totally with the designer.
itions, deletions or revisions to these drawings after
: Ess date will void this acceptance and will require a
esubmlttal of revised drawings for subsequent approval.
Final acceptance is subject to field test and inspection by
'rhe Tukwila Fire Prevention Bureau.
1 Date: i -1 ')-- By:
,)1I
TUKWILA FIRE DEPARTMENT
Please call 206-575-4407 and
give this Fire Permit No.
and exact address for shut-
down
hutdown or restoration approval.
NOTICE
A completed, signed, Tukwila
Fire Department Pre-test
Certificate must be presented
to the Inspector prior to
commencement of Acceptance
Testing of any Fire Alarm
and Detection Systems.
Failure of test will result
in a Re -inspection Fee and
termination of the testing.
355•
Design per NFPA 13 - Ordinary Hazard Occupancy -130 sq ft per sprinkler
All materials to be new, U.L. listed, and F.M. approved
Allheadsto be a minimum of 6' apart and to be unobstructed by any means
• 6 - Add Reliable Model FI 155° Standard Response Brass Upright Sprinkler Heads %2 x %2
6 - Total
NNW
(
r
/
0
Ova
�.P
FIG. 58
THREADED SIDE BEAM BRACKET
Sire Runge • 3/8- fled • pipe si'es 1/2" thru
4„
brawled • Carboi, 5ttil
Function`• Practical end economical bracket
used to support piping Irom wood„ concrete or
steel beams ,
Features • Unique design allows rod to be easily
•.^'threaded into bracket
Offset design permits unlimited rod adjust-
ment
Center mounting hole will accept 3/8" & 1/2"
fastener bolts. Pet N F.P.A. y13: 1/2° dsru 2"
pipe requires 3/8" fastener, 2 1/2" flint 4" pipe
requires 1/2" fastener'
Approvals • Underwn:ers Laboratories listed,
Canadian Underwriters Laboratories Listed and
Factory Mutual Engineering Approved through
4" pips
'Nat. U.L and F level the Fig 58 utilizing 2
• 016 x2" drive screws(F:g. , 125). iris fastening
method was found to be adequate for use on 2"
pipe and smaller in wo,:i construction
Finish • Plain and Electro -Galvanized
Order By • Figure flumes and finish
PATENT PP1rDtNci
u
Hou
Sere
tire SUE A
C Ui 01 I f c
—lir
. WEiGII1
PER 100
1/2 TIIRU 4 2.314- 3/8" 1.1/8" 33/64" 17/64" 7/16" 1.7/8" 1.1/2"
MECHANICAL -T ASSEMBLY
Style 920 Mechanical -T
and Style 929 FIT
Outlet/Mechanical T*
OLISTED
Approved Approved as noted in listings
pages 107-111.
ALWAYS CHECK GASKET SUPPLIED TO BE CERTAIN IT IS SUITED FOR
THE SERVICE INTENDED. REFER TO PAGES 8 AND 9.
ALWAYS LUBRICATE GASKET FOR PROPER COUPLING ASSEMBLY.
REFER TO PAGE 8.
PiPE MUST ALWAYS BE PREPARED IN ACCORDANCE WITH VICTAULIC®
SPECIFICATIONS. REFER TO PAGES 32-33.
1. PREPARE TO ASSEMBLE: To prepare
or assembly, remove one nut and bol
fron housing. Loosen the other nut unti
t, i5 flush with the end of the bolt. Do
not remove. Remove the tape and lift the
gasket from Mechanical -T.
2. CHECK GASKET ANO LUBRICATE:
Apply a thin coat of Victaulic® Lubri-
cant or silicotie lubricant to all surfaces
of the gasket. This is essential toinsure
proper sealing. Other compatible lubri-
cants may be used, however do not use
a petroleum base lubricant.
Reposition gasket into housing using
alignment tabs on sides for properposi-
tioning.
3. POSITION MECHANICAL -T: To as
semble the coupling on the pipe first
rotate the lower housing approximately
90 degrees away from the upper hous-
ing Place the upper, or outlet, section
on to the face of the pipe In Hnewith the
outlet hole. Rotate the lower section
around the pipe and close the two
halves.
"See pages 72 & 73 tor FIT outlet pipe
aes mhly_
4. INSERT BOLT: insert bolt in its hole
and finger tighten both nuts: Be certain
oval -neck of bolt engages recess in
housing. Make sure that the locating
collar is in the outlet hole. This may be
checked by rocking the upper housing
in the hole. Also make sure that the
positioning lugs are properly aligned.
GR
14
5. TIGHTEN NUTS: Tighten bolt nuts
uniformly until the upper housing Is in
complete surface contact in the gasket
pocket area and the assembly is rigid.
Nuts must be tightened to 50 Ib -ft. with
even gaps between the bolt pads for
Styles 920 and 929. Torque in excess of
50 Ib. ft. is not desirable.
NOTE: Increased bolt torque will not
improve sealing.
nee
so'
• STYLE 920 -
MECHANICALT®
PERFORMANCE DATA
enaece
159
TYPICAL APPLICATIONS FOR FiG. 58
THREADED SiDE BEAM BRACKET
Shown I'lere flanging up to
4" Pipe with Lag Bolt
MECHANICAL -T "CROS"
Cross connections can be achieved
with Style 920 or 929 Mechanical -T. my
by utilizing two Upper Housings of the
same size, with the same or differing
branch size connections. Assemble as
. above, being certain that Locating Col-
lar on each side is securely positioned
Inside the hole. Nuts must be tightened
to 50 Ib -ft. with even gaps between the
bolt pads.
NOTE: Alternate length bolts may be
required for certain cross -type combi-
nations. Contact Victaulic for details.
IMPORTANT: R branch connection has been
made to upper housing prior to Mechanical -1'
assembly, make certain this connection is et
90° to run prior to final tightening or Style 920
or 929 Mechanlcal•T. When Mechanical -Ts
are used es transition pieces between two
runs, they must be assembled onto the runs
before the branch connections are made.
STYLE 929 -
FIT OUTLET/
' MECHANICAL -T .
PERFORMANCE DATA
She
Ron x Branch
3x11',, x154, x2
4x155, x14, x2
Working
Pressure
PSI@
Standard/
Lightwell
Steel Pipe
Maximum
175
175
Bolt*
Torque
Required
For
Assembly
Lb. Fl.
50
50
'Boll torque applies only to bolts/nuts securing
Mechanical -7 to run. For assembly of branch to FR
outlet refer to pages 80 0 81.
@Total including equivalent external Mads.
Shown Here Hanging up to
2" Pipe with Drive Sciews
tl
Tukwila Fire
c:un,::ni Cry
`.:1d
.r.
.+'!"A,,.li Cr,i :t 0! adopted
t.t?e
ili✓`� i.i..�i C, �' t�
desiccn
Additions, de tions C I'i.v...'i t,^,. Hrr tt:°3 ?ir .mil; 1.., after
this date will void this acc:ept�:nce- and 401 rr:citaire 7
resubmittal of revised drawings for subsequent approval.
Final acceptance is subject to field test and inspection by
The Tukwila�3Fire Prevention Bureau.
7/(1A't
Date: -.11-o c1 By:
TUKWILA EIRE DEPARTMENT
Please call: 575-4407
and give this job
No. 0
and exact address for shut•
eown or restoration a rnroirt
• IJ
FILE COPY
•
COWN
FIRE PROTECTION
INCORPORATED
P.O. BOX 12113
MILL CREEK, WASHINGTON 98082-0113
PH. (425) 481-7669
BAY VALVE
438p 133rd Street
Tukwila, WA
PAS
SEP -C 200/'
ukwilaFirg(a
(50
/f �
DATE: 7- d j -01I DRAWN: J /I- I SCALE: ' f %�/
Working
Pressure
PSI@
Standard/
Bah
Lighten!!
Torque
Steel Pipe
Required
For
Size
Assembly
Run x Branch
Naxlmom
Lb. Fl.
30154,0155.52
500
50
44%, x155. xZ
500
50
x255, x3
500
5o
5x155, x2,12%.
500
50
03
500
50
Bxl55, x2, 12%,
x3, x4
500
500
50
50
13x21/2, x3, x4
500
so
159
TYPICAL APPLICATIONS FOR FiG. 58
THREADED SiDE BEAM BRACKET
Shown I'lere flanging up to
4" Pipe with Lag Bolt
MECHANICAL -T "CROS"
Cross connections can be achieved
with Style 920 or 929 Mechanical -T. my
by utilizing two Upper Housings of the
same size, with the same or differing
branch size connections. Assemble as
. above, being certain that Locating Col-
lar on each side is securely positioned
Inside the hole. Nuts must be tightened
to 50 Ib -ft. with even gaps between the
bolt pads.
NOTE: Alternate length bolts may be
required for certain cross -type combi-
nations. Contact Victaulic for details.
IMPORTANT: R branch connection has been
made to upper housing prior to Mechanical -1'
assembly, make certain this connection is et
90° to run prior to final tightening or Style 920
or 929 Mechanlcal•T. When Mechanical -Ts
are used es transition pieces between two
runs, they must be assembled onto the runs
before the branch connections are made.
STYLE 929 -
FIT OUTLET/
' MECHANICAL -T .
PERFORMANCE DATA
She
Ron x Branch
3x11',, x154, x2
4x155, x14, x2
Working
Pressure
PSI@
Standard/
Lightwell
Steel Pipe
Maximum
175
175
Bolt*
Torque
Required
For
Assembly
Lb. Fl.
50
50
'Boll torque applies only to bolts/nuts securing
Mechanical -7 to run. For assembly of branch to FR
outlet refer to pages 80 0 81.
@Total including equivalent external Mads.
Shown Here Hanging up to
2" Pipe with Drive Sciews
tl
Tukwila Fire
c:un,::ni Cry
`.:1d
.r.
.+'!"A,,.li Cr,i :t 0! adopted
t.t?e
ili✓`� i.i..�i C, �' t�
desiccn
Additions, de tions C I'i.v...'i t,^,. Hrr tt:°3 ?ir .mil; 1.., after
this date will void this acc:ept�:nce- and 401 rr:citaire 7
resubmittal of revised drawings for subsequent approval.
Final acceptance is subject to field test and inspection by
The Tukwila�3Fire Prevention Bureau.
7/(1A't
Date: -.11-o c1 By:
TUKWILA EIRE DEPARTMENT
Please call: 575-4407
and give this job
No. 0
and exact address for shut•
eown or restoration a rnroirt
• IJ
FILE COPY
•
COWN
FIRE PROTECTION
INCORPORATED
P.O. BOX 12113
MILL CREEK, WASHINGTON 98082-0113
PH. (425) 481-7669
BAY VALVE
438p 133rd Street
Tukwila, WA
PAS
SEP -C 200/'
ukwilaFirg(a
(50
/f �
DATE: 7- d j -01I DRAWN: J /I- I SCALE: ' f %�/
4385 S 133RD ST BLDG #F
ASSOCIATED PERMITS
12-F-036
09-S-146
SITE LOCATION
CITY OF TUKWILA
FIRE DEPARTMENT
444 Andover Park East
Tukwila, WA 98188
206-575-4407
Date application
accepted:
FIRE PROTECTION SYSTEMS PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
**PLEASE PRINT**
33`-
Site Address: 11,SC---- T s s
King Co. Assessor's Tax No.:
Suite Number: Floor:
New Tenant? ❑ - Yes [3'No
Tenant Name: 1;0 A MAIL 13
Property Owner's Name: SEl W 1 NC—
Mailing Address: 4Ot'. �= W OU.St3 J
11
City
CONTACT PERSON -if there are questions about the submittal.
Name: S V6N) \S
Company Name: 1 VFk.; 1 � ,WACO
Nu( (J.k 9c 1(2
Day Telephone:
State Zip
20. 7V2 141-6
Mailing Address: CVO S LUCA Sr
E-mail Address:
51��'� %1�"S�� l , ml�.can�lty
Sa IIU6 Bt
Fax Number:
Valuation of Project (contractor's bid price): $ "I
Scope of Work (please provide detailed information): — of j (Slt\ cNO _CCAN
w \ vu, j� s R(�Ol o i �ll�- vc-rvc i mCMIAV4 (uo COMM, Chi -An (ANL -1
PERMIT APPLICATION NOTES
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Fire Marshal to comply with current fee schedules.
Expiration of Plan Review -Every permit issued shall become invalid unless the work on the site authorized by such permit
is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or
abandoned for a period of 180 days after the time the work is commenced. The Fire Marshal is authorized to grant, in
writing, one or more extensions of time,f or periods not more than 180 days each. The extension shall be requested in writing
and justifiable cause demonstrated.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE
UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OR WASHINGTON, AND I AM AUTHORIZED TO APPLY
FOR THIS PERMIT.
BUILDING OWN
Signature:
OR AUTHORIZED AGENT:
Print Name:
Plan Permit App doc
PAID
FEB 21 2012
TUKWILA FIRE
7 3 //G7i
5/14/10
Date:
Day Telephone:
TFD FP Form 8
s ,c4r1
FIRE DEPARTMENT SPRINKLER PLAN REVIEW COMMENTS
Project Name:
Bay Valve
4385 S 133rd St
Permit No.: 09-S-146
Date: September 22, 2009
Reviewer: Al Metzler
Fire Protection Project Coordinator
(206)575-4407
• Lateral sway bracing is required at a maximum spacing of 40' for all mains, cross
mains, and branch lines 2.5" and larger. Bracing is provided for the last length of
pipe but within 6' of the end of a feed or cross main. Bracing is required unless
all the pipe is supported by rods less than 6" or by 30 ° wrap-around U -hooks for
any size pipe, 9.3.5.3.
• Minimum clearance around pipes: 2 " for 1"-3.5", 4" for 4" and larger, see 4
exceptions, 9.3.4.
• Longitudinal sway bracing is a maximum of 80' for mains and cross mains and
within 40 ' of the end of the line, 9.3.5.4.
• Provide lateral and longitudinal bracing for changes in pipe direction per section
9.3.5.11.2 for pipe size 2'/ inches and larger.
• Restrain branch lines at the end sprinkler of each line, restrain against vertical
and lateral movement, 9.3.6.3.
• Restraints for branch lines shall be at intervals per table 9.3.6.4 and section
9.3.6.4, and restrain sprig ups greater than 4', 9.3.6.6.
• Comply with ASCE 7-05, section 13.5.6.2.2.
• Provide sprinkler protection beneath all obstructions greater than 4 ft. in width.
• Extend sprinkler protection to all combustible concealed spaces.
• Comply with NFPA 13 obstruction tables.
• Comply with obstructed/non-obstructed construction rules for sprinkler head
placement.
• Sprinkler heads spaced closer than 6 ft. apart must be baffled.
• Modifications involving 30 or more heads require hydrostatic test and system
isolation if necessary.
• These conditions apply to all sprinkler piping exposed as necessary to
accomplish the permitted scope of work.
All code references are NFPA 13, 2007 Edition.
(C NO 1 7 r1ri-u w' -r -vv r -q
FOSTCRIA PARK
/
386. — 1/389 S. /3 3 5-r
1/y 3s- - gy97 5. / 31/ PC.
cri
N
Fostoria Park Building #B
4475-4485 South 134th Place
Owner:
425-828-6300
8"
1/389
/00
% 4439
340 ALL RISERS
8„
/ = GO4e1Rq;s LooP /NGC. HO RANTS Z /40
ALL. BUILDINGS
w^
Oct 20 2009 3:27PM FSI
nyyrrirrn
FSI Confidence Plus, Inc
1014 North St., Suite 200
Sumner, WA. 98390
253-826-0099 1 253-826-1033 Fax
www.fsicpi.com
253 826 1033 p . 1 0
Protecting against
loss of property and life ...
Inspection Location: Fostoria Industrial Park Inspection Date: 10/6/09
Address: 4439 S 134th PL Tukwila, WA
Contact Person: Kim Bentz Phone: 425-828-6300
Site Private Service Firemain
! i
,..-- " ' . - - -elm •(:.,
; .. NoKii Supp\1 \ \
\ \
- — --- -,-, ....T..'
tN•
., .„,...,\
1 i •N ."\,....
\
, ...- ,,,,. • - "‘ 's.., , '.
r -, nem '-..•._,•
, ,—. ‘•M\ IL-IPINE .
.-/ ../,
1
.-.... •' 7 ...
., #
4
'A •/ , -L,r.
/'L,r,,....,
..
_
// I I.
t/\. /":------, OMI
.,4
.a,./.
i..?
.,
/
/.
/
•
.....-„-. / 1 .
\ (2\ 6 1i /,,,, /
\ \\ A 74144 „.. ,„ •-..,.-,
\.N<A/ 7/ /
\\ //. i 4i4
1.1M- 01
rN./,4.,. / )
h0C114;/t/
.7
/
/
7les/ •/
/ :7
fr"f
/•
/.
.
/
‘\\\ / . ., •// 1/7/Hydrant4j:X
.„ :/ ,/
...• ,/ / '/ Yi / / ,/
\, N) NN iw)..i\ 7 ,
/
--..-
4 -/Yd 1 #3 t‘ At /I
/ ..,,_
/7
'--- At
-„ita g, 4
7
, , , '''• .. `-../,
1-, 1 \
'' '‘.•, '-•--.
\
,11,414-1141111
The Safety Team Inc.
670 S. Lucile St. Seattle, WA. 98108 PO Box 81246
Phone (206) 762-1450 Fax (206) 762-1799
www.thesafetyteaminc.com
To: Tukwila Fire Prevention 206 575 4407
Attn: Al Metzler
From: The Safety Team Inc 206 762 1450
Steve Paris steve@thesafetyteaminc.com
Re: Monitoring change -out from "Scan -Alert" to AES Radio Frequency
Al:
At Fostoria Park ("Bldg F" 4385 — 4389 S 113th St), we will be changing out the old
scan -alert monitoring communicator panel for a AES Radio -Frequency monitoring panel.
The old "Scan- Alert" panel transmitted (ZN-1)-Water Flow
(ZN-2) Sprinkler tampers
(ZN-3) PIV Tamper
The new AES Radio Frequency panel will transmit the same zones.
The Monitoring company will remain "The Alarm Center".... Lacey, Wa.
We are including a cut sheet in the submittal
Battery calculations are unnecessary ( Only 1 size of battery is require a -cut sheet).
If you have any questions please call — Thank You
Steve Paris
The Safety Team Inc.
206 762 1450
ACCEPTED
E' Without Comments
0 As Noted in Red
O Per The Attached Letter
-n plans have been reviewed by The Tukwila Fire
,fltion Bureau rr;• f -o eormance with current City
:::'ards. Accepts,lce is subject to errors and
. ;=;ions which do not aL_tnorize violations of adopted
,,dards and ordinances. The responsibility for the
quacy of design rests totally with the designer.
itions, deletions or revisions to these drawings after
: Ess date will void this acceptance and will require a
esubmlttal of revised drawings for subsequent approval.
Final acceptance is subject to field test and inspection by
'rhe Tukwila Fire Prevention Bureau.
1 Date: i -1 ')-- By:
,)1I
TUKWILA FIRE DEPARTMENT
Please call 206-575-4407 and
give this Fire Permit No.
and exact address for shut-
down
hutdown or restoration approval.
NOTICE
A completed, signed, Tukwila
Fire Department Pre-test
Certificate must be presented
to the Inspector prior to
commencement of Acceptance
Testing of any Fire Alarm
and Detection Systems.
Failure of test will result
in a Re -inspection Fee and
termination of the testing.
355•
Design per NFPA 13 - Ordinary Hazard Occupancy -130 sq ft per sprinkler
All materials to be new, U.L. listed, and F.M. approved
Allheadsto be a minimum of 6' apart and to be unobstructed by any means
• 6 - Add Reliable Model FI 155° Standard Response Brass Upright Sprinkler Heads %2 x %2
6 - Total
NNW
(
r
/
0
Ova
�.P
FIG. 58
THREADED SIDE BEAM BRACKET
Sire Runge • 3/8- fled • pipe si'es 1/2" thru
4„
brawled • Carboi, 5ttil
Function`• Practical end economical bracket
used to support piping Irom wood„ concrete or
steel beams ,
Features • Unique design allows rod to be easily
•.^'threaded into bracket
Offset design permits unlimited rod adjust-
ment
Center mounting hole will accept 3/8" & 1/2"
fastener bolts. Pet N F.P.A. y13: 1/2° dsru 2"
pipe requires 3/8" fastener, 2 1/2" flint 4" pipe
requires 1/2" fastener'
Approvals • Underwn:ers Laboratories listed,
Canadian Underwriters Laboratories Listed and
Factory Mutual Engineering Approved through
4" pips
'Nat. U.L and F level the Fig 58 utilizing 2
• 016 x2" drive screws(F:g. , 125). iris fastening
method was found to be adequate for use on 2"
pipe and smaller in wo,:i construction
Finish • Plain and Electro -Galvanized
Order By • Figure flumes and finish
PATENT PP1rDtNci
u
Hou
Sere
tire SUE A
C Ui 01 I f c
—lir
. WEiGII1
PER 100
1/2 TIIRU 4 2.314- 3/8" 1.1/8" 33/64" 17/64" 7/16" 1.7/8" 1.1/2"
MECHANICAL -T ASSEMBLY
Style 920 Mechanical -T
and Style 929 FIT
Outlet/Mechanical T*
OLISTED
Approved Approved as noted in listings
pages 107-111.
ALWAYS CHECK GASKET SUPPLIED TO BE CERTAIN IT IS SUITED FOR
THE SERVICE INTENDED. REFER TO PAGES 8 AND 9.
ALWAYS LUBRICATE GASKET FOR PROPER COUPLING ASSEMBLY.
REFER TO PAGE 8.
PiPE MUST ALWAYS BE PREPARED IN ACCORDANCE WITH VICTAULIC®
SPECIFICATIONS. REFER TO PAGES 32-33.
1. PREPARE TO ASSEMBLE: To prepare
or assembly, remove one nut and bol
fron housing. Loosen the other nut unti
t, i5 flush with the end of the bolt. Do
not remove. Remove the tape and lift the
gasket from Mechanical -T.
2. CHECK GASKET ANO LUBRICATE:
Apply a thin coat of Victaulic® Lubri-
cant or silicotie lubricant to all surfaces
of the gasket. This is essential toinsure
proper sealing. Other compatible lubri-
cants may be used, however do not use
a petroleum base lubricant.
Reposition gasket into housing using
alignment tabs on sides for properposi-
tioning.
3. POSITION MECHANICAL -T: To as
semble the coupling on the pipe first
rotate the lower housing approximately
90 degrees away from the upper hous-
ing Place the upper, or outlet, section
on to the face of the pipe In Hnewith the
outlet hole. Rotate the lower section
around the pipe and close the two
halves.
"See pages 72 & 73 tor FIT outlet pipe
aes mhly_
4. INSERT BOLT: insert bolt in its hole
and finger tighten both nuts: Be certain
oval -neck of bolt engages recess in
housing. Make sure that the locating
collar is in the outlet hole. This may be
checked by rocking the upper housing
in the hole. Also make sure that the
positioning lugs are properly aligned.
GR
14
5. TIGHTEN NUTS: Tighten bolt nuts
uniformly until the upper housing Is in
complete surface contact in the gasket
pocket area and the assembly is rigid.
Nuts must be tightened to 50 Ib -ft. with
even gaps between the bolt pads for
Styles 920 and 929. Torque in excess of
50 Ib. ft. is not desirable.
NOTE: Increased bolt torque will not
improve sealing.
nee
so'
• STYLE 920 -
MECHANICALT®
PERFORMANCE DATA
enaece
159
TYPICAL APPLICATIONS FOR FiG. 58
THREADED SiDE BEAM BRACKET
Shown I'lere flanging up to
4" Pipe with Lag Bolt
MECHANICAL -T "CROS"
Cross connections can be achieved
with Style 920 or 929 Mechanical -T. my
by utilizing two Upper Housings of the
same size, with the same or differing
branch size connections. Assemble as
. above, being certain that Locating Col-
lar on each side is securely positioned
Inside the hole. Nuts must be tightened
to 50 Ib -ft. with even gaps between the
bolt pads.
NOTE: Alternate length bolts may be
required for certain cross -type combi-
nations. Contact Victaulic for details.
IMPORTANT: R branch connection has been
made to upper housing prior to Mechanical -1'
assembly, make certain this connection is et
90° to run prior to final tightening or Style 920
or 929 Mechanlcal•T. When Mechanical -Ts
are used es transition pieces between two
runs, they must be assembled onto the runs
before the branch connections are made.
STYLE 929 -
FIT OUTLET/
' MECHANICAL -T .
PERFORMANCE DATA
She
Ron x Branch
3x11',, x154, x2
4x155, x14, x2
Working
Pressure
PSI@
Standard/
Lightwell
Steel Pipe
Maximum
175
175
Bolt*
Torque
Required
For
Assembly
Lb. Fl.
50
50
'Boll torque applies only to bolts/nuts securing
Mechanical -7 to run. For assembly of branch to FR
outlet refer to pages 80 0 81.
@Total including equivalent external Mads.
Shown Here Hanging up to
2" Pipe with Drive Sciews
tl
Tukwila Fire
c:un,::ni Cry
`.:1d
.r.
.+'!"A,,.li Cr,i :t 0! adopted
t.t?e
ili✓`� i.i..�i C, �' t�
desiccn
Additions, de tions C I'i.v...'i t,^,. Hrr tt:°3 ?ir .mil; 1.., after
this date will void this acc:ept�:nce- and 401 rr:citaire 7
resubmittal of revised drawings for subsequent approval.
Final acceptance is subject to field test and inspection by
The Tukwila�3Fire Prevention Bureau.
7/(1A't
Date: -.11-o c1 By:
TUKWILA EIRE DEPARTMENT
Please call: 575-4407
and give this job
No. 0
and exact address for shut•
eown or restoration a rnroirt
• IJ
FILE COPY
•
COWN
FIRE PROTECTION
INCORPORATED
P.O. BOX 12113
MILL CREEK, WASHINGTON 98082-0113
PH. (425) 481-7669
BAY VALVE
438p 133rd Street
Tukwila, WA
PAS
SEP -C 200/'
ukwilaFirg(a
(50
/f �
DATE: 7- d j -01I DRAWN: J /I- I SCALE: ' f %�/
Working
Pressure
PSI@
Standard/
Bah
Lighten!!
Torque
Steel Pipe
Required
For
Size
Assembly
Run x Branch
Naxlmom
Lb. Fl.
30154,0155.52
500
50
44%, x155. xZ
500
50
x255, x3
500
5o
5x155, x2,12%.
500
50
03
500
50
Bxl55, x2, 12%,
x3, x4
500
500
50
50
13x21/2, x3, x4
500
so
159
TYPICAL APPLICATIONS FOR FiG. 58
THREADED SiDE BEAM BRACKET
Shown I'lere flanging up to
4" Pipe with Lag Bolt
MECHANICAL -T "CROS"
Cross connections can be achieved
with Style 920 or 929 Mechanical -T. my
by utilizing two Upper Housings of the
same size, with the same or differing
branch size connections. Assemble as
. above, being certain that Locating Col-
lar on each side is securely positioned
Inside the hole. Nuts must be tightened
to 50 Ib -ft. with even gaps between the
bolt pads.
NOTE: Alternate length bolts may be
required for certain cross -type combi-
nations. Contact Victaulic for details.
IMPORTANT: R branch connection has been
made to upper housing prior to Mechanical -1'
assembly, make certain this connection is et
90° to run prior to final tightening or Style 920
or 929 Mechanlcal•T. When Mechanical -Ts
are used es transition pieces between two
runs, they must be assembled onto the runs
before the branch connections are made.
STYLE 929 -
FIT OUTLET/
' MECHANICAL -T .
PERFORMANCE DATA
She
Ron x Branch
3x11',, x154, x2
4x155, x14, x2
Working
Pressure
PSI@
Standard/
Lightwell
Steel Pipe
Maximum
175
175
Bolt*
Torque
Required
For
Assembly
Lb. Fl.
50
50
'Boll torque applies only to bolts/nuts securing
Mechanical -7 to run. For assembly of branch to FR
outlet refer to pages 80 0 81.
@Total including equivalent external Mads.
Shown Here Hanging up to
2" Pipe with Drive Sciews
tl
Tukwila Fire
c:un,::ni Cry
`.:1d
.r.
.+'!"A,,.li Cr,i :t 0! adopted
t.t?e
ili✓`� i.i..�i C, �' t�
desiccn
Additions, de tions C I'i.v...'i t,^,. Hrr tt:°3 ?ir .mil; 1.., after
this date will void this acc:ept�:nce- and 401 rr:citaire 7
resubmittal of revised drawings for subsequent approval.
Final acceptance is subject to field test and inspection by
The Tukwila�3Fire Prevention Bureau.
7/(1A't
Date: -.11-o c1 By:
TUKWILA EIRE DEPARTMENT
Please call: 575-4407
and give this job
No. 0
and exact address for shut•
eown or restoration a rnroirt
• IJ
FILE COPY
•
COWN
FIRE PROTECTION
INCORPORATED
P.O. BOX 12113
MILL CREEK, WASHINGTON 98082-0113
PH. (425) 481-7669
BAY VALVE
438p 133rd Street
Tukwila, WA
PAS
SEP -C 200/'
ukwilaFirg(a
(50
/f �
DATE: 7- d j -01I DRAWN: J /I- I SCALE: ' f %�/