Loading...
HomeMy WebLinkAboutPP - 1000 SOUTHCENTER MALL - ZALES JEWELERS - PERMITS AND PLANS1000 SOUTHCENTER MALL ASSOCIATED PERMITS 13-S-208 CROWN FIRE PROTECTION 43113144 4 tri SITE LOCATION CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East Tukwila, WA 98188 206-575-4407 Date application accepted: FIRE PROTECTION SYSTEMS PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. **PLEASE PRINT** ` (' King Co. Assessor's Tax No.: Site Address: \( . LD C 4 Tilek\\Suite Number: Floor: Tenant Name: \ New Tenant? 111 - Yes No Property Owner's Name: \ 1P - -E 1 ncAryiw rio C-D-r-cl Mailing Address: CONTACT PERSON-if^`there are questions about the submittal. 1\_5..1`- V 11 lJ l Day Telephone: IA2-C-Y L\Sl •7(0(431 Company Name: C©V,YV \ 1 E -sc1C*\0Y1 AYNC. Mailing Address: O 12_ l ` • \1111\ l JCf , t i c9 E-mail Address: Name: City State Zip Ci S at 51. 9s Fax Number: • Total number of new/relocated devices or sprinkler heads: ~.C\ _ (7) \ 2S Valuation of Project (contractor's bid price): $ 2 Scope of Work (please provide detailed information): CP \VOA( C _\\ Wcx& D 1 C7T v' ecx PERMIT APPLICATION NOTES Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Fire Marshal to comply with current fee schedules. Expiration of Plan Review -Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The Fire Marshal is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OR WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING Signature: Print Name: WNER OR AUTHORIZED AGENT: Plan Permit App.doc Date: '`D•g Day Telephone: q2 -C-3- ! [ 61/4.99 1/2/13 TFD FP Form 8 FIRE DEPARTMENT SPRINKLER PLAN REVIEW COMMENTS Project Name: Zales '1000 Southcenter Mall Permit No.: 13-S-208 Date: Septemberl6, 2013 Reviewer: Al Metzler Fire Protection Project Coordinator (206) 575-4407 option # 2 (Inspection Requests) (206) 971-8718 (Plan Review Questions) • Lateral sway bracing is required at a maximum spacing of 40' for all mains, cross mains, and branch lines 2.5" and larger. Bracing is provided for the last length of pipe but within 6' of the end of a feed or cross main. Bracing is required unless all the pipe is supported by rods less than 6" or by 30 ° wrap-around U -hooks for any size pipe, 9.3.5.3. • Minimum clearance around pipes: 2 " for 1"-3.5", 4" for 4" and larger, see 4 exceptions, 9.3.4. • Longitudinal sway bracing is a maximum of 80' for mains and cross mains and within 40 ' of the end of the line, 9.3.5.4. • Provide lateral and longitudinal bracing for changes in pipe direction per section 9.3.5.11.2 for pipe size 2 % inches and larger. • Restrain branch lines at the end sprinkler of each line, restrain against vertical and lateral movement, 9.3.6.3. • Restraints for branch lines shall be at intervals per table 9.3.6.4 and section 9.3.6.4, and restrain sprig ups greater than 4', 9.3.6.6. • Comply with ASCE 7-05, section 13.5.6.2.2. • Provide sprinkler protection beneath all obstructions greater than 4 ft. in width. • Extend sprinkler protection to all combustible concealed spaces. • Comply with NFPA 13 obstruction tables. • All valves controlling the water supply for automatic sprinkler systems and waterflow switches on all sprinkler systems shall be electrically supervised. • Comply with obstructed/non-obstructed construction rules for sprinkler head placement. • Sprinkler heads spaced closer than 6 ft. apart must be baffled. • Modifications involving 20 or more heads require hydrostatic test and system isolation if necessary. • For dry pipe and double interlock preaction systems, in addition to the standard hydrostatic test, an air pressure leakage test at 40 psi shall be conducted for 24 hours. Any leakage that results in a loss of pressure in excess of 1.5 psi for the 24 hours shall be corrected. • These conditions apply to all sprinkler piping exposed as necessary to accomplish the permitted scope of work. All code references are NFPA 13, 2013 Edition. CENTER LIGHT IN CEILING 1.q (l f\ v `. • It` • a CENTER LIGHT IN CEILING BELOW BELOW II=O"AFF. P 10'-.0" AFF. GYP. BD. Q c, NW( c.►,►r IOC-O"AFF CDREFLECTED GE I L. I NCS PLANGYP. BD. Ifo" = ILO" RCP=0455-PLN: . IOC- 0" AFF GYP. BD.. 10'- 0' Al, GYP. BD. Design per NFPA 13, Ordinary Hazard Group 2 All materials to be new, U.L. listed, and F.M. approved All fire sprinkler heads to remain unobstructed by lightings, ceilings, or any other means All heads to be at least 6' apart o 18 — Relocate Reliable Model G5-56 Standard Response 165° Concealed Pendents 1/2 x '/2 (white) • 7 — Add Reliable Model G5-56 Standard Response 165° Concealed Pendents 1/2 x 1/2 (white) RETAINER STRAP WHERE REQUIRED IN SEISMIC AREAS TOP BEAM/ C -CLAMP WITH SET SCREW 3/8' ALL THREAD RDD PIPE SWIVEL RING STEEL JOIST/TRUSS HANGER DETAIL NTS - TUKWILA FIRE DEPARTMENT Please call 206-5754407 and the this Fire Permit No. and exact address for shut- dOW I or r or.;tbn approval i O Without Comments O As Noted in Red Per The Attached Letter These plans have been reviewed by The Tukwila Fire Prevention Bureau for conformance with current City sr-:ndards. Acceptance is subject to errors and omissions which do:not authorize violations of adopted s andards and ordinances. The responsibility for the adequacy of design rests totally with the designer. Additions, deletions or revisions to these drawings after this date will void i hs acceptance and will require a resubmittal of revised drawings for subsequent,, approval. Final acceptance is sub:pct to field test and Inspection by The Tukwila Fire Prevention Bureau. Dated_L_ke i _ By: KEY PLAN CROWN FIRE PROTECTION INCORPORATED PA. BOX 12113 MILL CREEK, WASHINGTON 98082-0113 PH. (425) 481-7669 Tio ZALES SOUTHGENTER MALL SOUTHGENTER MALL TUKIALILA, yyA ci8ISS PAID SEP 16 2013 • • TUKWILA FIRE 277 DATE: DRAWN: f SCALE: Dcl BPS, ZALES FIRE A ARM SYSTEM ADDITION TUKWILA, WASHINGTON SHEET NUMBER SHEET TITLE FA -01 SYSTEM INFORMATION FA -02 TYPICAL WIRI \G AND MOUNTING DETAILS FA -03 SYSTEM CALCULATIONS AND SI G LE LI \E DIAGRAM FA -04 REFLECTED CEILING PLAN - FRE ALARM SHEET INDEX wi hr�4;t Comments p As Noted !,,-1 Red 0 Per Inct-;cr e Letter These Mans have bcei I i °:.1 :c/ ed by The Tukwila Fire Prevention Bureau fci, ;onformar.0 ,,•i,th current city -5-7,:ndardS. Ac:�=i. ss.1i;:'tto errors and " ;�• r. aotho(ize Vicl,`tions of adopted ,.:�i;siGnS which �.,Mdards a: _ and Or a.i i ?Ces T I e responsibility for the adequacy c . e designer. Addltitns, (rawin� after Mic require a resubmittai`ir Vl approval. �I cc en enc st.011,7 is 'co nlct l=' c and inspection by fiC ul;uoti i'Ir f''i ;Jt;;lt..t ii L,tit itl, 1 f NOTICE 4 completed, signed, Tukwila Fire Department Pre-test Certificate must be presented to the Inspector prior to commencement of Acceptance Testing of any Fire Alarm and Detection Systems. Failure of test will result in a Re -inspection Fee and termination of the testing, TUKWILA FIRE DEPARTMENT Please cal 06-575-407 and give the Fire Permit it No. and exact address for shut - D UL 1 °Airr6tIonC rrhT FILL CHART WIRE DESIGNATI❑N SYMBOL DESCRIPTION NUMBER OF CONDUCTORS SIZE TYPE COLOR CODE C STROBE SYNC TWISTED PAIR WITH SHIELD #14 FPL/FPLR RED (JACKET) D DATA LINE -ADDRESSABLE LOOP TWISTED PAIR WITH SHIELD #16 FPL/FPLR RED (JACKET) P DEVICE POWER - 24VDC TWO #16 FPL/FPLR RED (JACKET) S STROBE CIRCUIT - FEED TWISTED PAIR W/ SHIELD #14 FPL/FPLR RED (JACKET) S' STROBE CIRCUIT - RETURN TWISTED PAIR W/ SHIELD #14 FPL/FPLR RED (JACKET) V SPEAKER CIRCUIT - FEED TWISTED PAIR #14 FPL/FPLR RED (JACKET) V' SPEAKER CIRCUIT - RETURN TWISTED PAIR #14 FPL/FPLR RED (JACKET) I REMOTE INDICATION LIGHT TWO #18 FPL/FPLR RED (JACKET) CONDUIT FILL CHART NO. OF CONDUCTORS VOLTS WIRE SIZE TYPE DIMENSIONS AREA TWO 600V #12 AWG THHN/THWN .244 0.D. .0467 TWO 600V #14 AWG THHN/THWN TWISTED .210 0.D. .0346 TWO CONDUCTOR 300V #18 AWG FPL TW CABLE .156 0.D. .0191 CONDUIT FILL CALCULATE THE TOTAL AREA OF THE WIRE BEING RUN IN THE CONDUIT FROM THE TABLE ABOVE. CHOOSE THE SIZE OF CONDUIT BASED ON THE MAXIMUM FILL DIMENSION FROM THE TABLE BELOW THAT DOES NOT EXCEED THE TOTAL AREA OF THE WIRE. CONDUIT SIZE MAXIMUM FILL 1/2" .12 SQUARE INCH 3/4" .21 SQUARE INCH 1" .34 SQUARE INCH 1-1/8" .60 SQUARE INCH 1-1/2" .82 SQUARE INCH 2" 1.34 SQUARE INCH FIGURES ARE BASED ON 40% CONDUIT FILL AND ARE TAKEN FROM N.E.C., CHP. 9, TABLE 4. SHIELDED WIRE TO BE GROUNDED AT P❑INT OF ORIGIN PUNCHED THROUGH EACH DEVICE WRAPPED WITH TAPE AND TAPED AT END FOR SIEMENS SYSTEM: DO NOT INSTALL ADDRESSABLE INITIATING DEVICES UNTIL PREPROGRAMMED WITH DEVICES ADDRESS. 1. NUMBERS ADJACENT TO DEVICE SYMBOL DENOTE DEVICE CIRCUIT/ADDRESS DEVICE 01-1-02 WOULD BE THE SECOND DEVICE ON ADDRESSABLE LOOP 1. 2. DETECTOR AND AUDIBLE CIRCUIT POLARITY SHALL BE OBSERVED. 3. AUDIBLE/VISUAL CIRCUIT WIRING IS SUPERVISED. NO PARALLE_ BRANCHING IS PERMISSIBLE 4. INSTALLATION SHALL BE IN STRICT CONFORMANCE WITH THE NATIONAL ELECTRIC CODE, NFPA 72, LOCAL CODE(S), AND/OR AUTHORITY HAVING JURISDICTION. 5. INSTALLATION MATERIALS (I.E. CONDUIT, WIRE, FITTINGS, HANGERS, STANDARD BOXES, FIBER OPTICS CABLE, FITTINGS, AND ASSOCIATED EQUIPMENT) ARE NOT SUPPLIED BY SIEMENS CERBERUS DIVISION. 6. DETECTORS SHALL NOT BE MOUNTED IN DIRECT AIR STREAM OF AIR SUPPLY OUTLETS. PER NFPA 72 2-3.5.1 7. WIRING SHALL BE PER PLAN WITH RESPECT TO CONDUCTOR SIZE, & OR CABLE TRAY, TYPE, QUANTITY AND COLOR CODE. CONDUCTORS SHALL BE PERMANENTLY, AND UNIQUELY MARKED FOR FUTURE IDENTIFICATION. 8. INSTALLING CONTRACTOR SHALL RETURN ONE SET OF ACCURATELY MARKED DRAWINGS FOR "AS BUILT" PURPOSES. 9. FOR ADDITIONAL INSTALLATION INSTRUCTIONS, REFER TO CATALOG CUT SHEETS AND/OR INSTALLATION INSTRUCTIONS. 10. THE 120vac POWER ELECTRICAL WORK SUPPLYING FIRE ALARM SYSTEM PANELS MUST COMPLY WITH ARTICLE 725 AND 760 OF NFPA 70, N.E.C. AND NFPA 72, SPECIFICALLY SECTION 1-5.2.5.2: IN REFERENCE TO DEDICATED BRANCH POWER SOURCES. 120vac POWER SHALL NOT BE APPLIED TO FIRE ALARM PANEL WITHOUT DIRECT SUPERVISION OF FIRE ALARM TECHNICIAN. 11. ALL HORN/STROBE AND STROBE DEVICES SHALL BE MOUNTED AT A HEIGHT OF 80" A.F.F. OR 6" BELOW DROPPED CEILING, WHICHEVER IS LESS. 12. ALL MANUAL PULL STATIONS SHALL BE MOUNTED AT 48" A.F.F. TO THE ACTIVATION DEVICE. 13. ALL PANEL NUMBERS AND CIRCUITS WILL BE ON THE RECORD DRAWINGS SET. 14. ALL 120VAC CIRCUITS ARE FROM DEDICATED CIRCUITS FROM THE EMERGENCY GENERATOR. 15. PER NFPA 72 SECTION 5-3.6.1.3 DETECTORS SHALL NOT BE INSTALLED UNTIL AFTER THE CONSTRUCTION CLEAN-UP OF ALL TRADES IS COMPLETE AND FINAL. EXCEPTION: WHERE REQUIRED BY THE AUTHORITY HAVING JURISDICTION FOR PROTECTION DURING CONSTRUCTION. DETECTORS THAT HAVE BEEN INSTALLED PRIOR TO FINAL CLEAN-UP BY ALL TRADES SHALL BE CLEANED OR REPLACED IN ACCORDANCE WITH NFPA 72 CHAPTER 7. 16. WIRING SHALL RUN CONTINUOUS FROM FACP TO FIRST DEVICE ON A CIRCUIT AND THEN FROM DEVICE TO DEVICE WITHOUT SPLICING IN PULL BOXES OR OTHER BACK BOXES OF DIFFERENT CIRCUITS. 17. ALL WIRING SHALL BE METERED, VERIFIED TO BE CONTINUOUS, FREE OF GROUND AND FREE OF SHORTS BETWEEN CONDUCTORS AND OTHER CIRCUITS PRIOR TO FINAL EQUIPMENT TRIM. 18. ALL CABLES SHALL BE MARKED AS INDICATED ON FIRE ALARM RISER WITH A PERMANENT LABEL AT ALL DEVICES, JUNCTION BOXES AND FACP. 19. THE ELECTRICAL CONTRACTOR SHALL CLEAN ALL DIRT AND DEBRIS FROM THE OUTSIDE AND INSIDE OF THE FIRE ALARM BACK BOXES AND JUNCTION BOXES AFTER COMPLETION OF THEIR INSTALLATION. 20. DETECTORS MUST BE RATED FOR TEMPERATURE IN THE ENVIRONMENT IN WHICH IT IS LOCATED. 21. ALL WIRING BETWEEN FLOORS SHALL BE LOCATED IN CONDUIT. 22. 23. NFPA 72 2007 6.4.2.2.2 ALL STYLES OF CLASS A CIRCUITS USING PHYSICAL CONDUCTORS (E.G., METALLIC, OPTICAL FIBER) SHALL BE INSTALLED SUCH THAT THE OUTGOING AND RETURN CONDUCTORS, EXITING FROM AND RETURNING TO THE CONTROL UNIT, RESPECTIVELY, ARE ROUTED SEPARATELY. THE OUTGOING AND RETURN (REDUNDANT) CIRCUIT CONDUCTORS SHALL NOT BE RUN IN THE SAME CABLE ASSEMBLY (LE., MULTI -CONDUCTOR CABLE), ENCLOSURE, OR RACEWAY. NFPA 72 2007 A.6.4.2.2.2 A GOAL OF 6.4.2.2.2 IS TO PROVIDE ADEQUATE SEPARATION BETWEEN THE OUTGOING AND RETURN CABLES. THIS SEPARATION IS REQUIRED TO HELP ENSURE PROTECTION OF THE CABLES FROM PHYSICAL DAMAGE. THE RECOMMENDED MINIMUM SEPARATION TO PREVENT PHYSICAL DAMAGE IS 305 MM (1 F) WHERE THE CABLE IS INSTALLED VERTICALLY AND 1.22 M (4 FT) WHERE THE CABLE IS INSTALLED QUANTITY EX EX 1 1 2 3 1 SYMBOL DESCRIPTION MODEL MANUFACTURER BACKBOX MOUNTING HEIGHT REMOTE BOOSTER POWER SUPPLY PAD -3 SIEMENS PAD-3-ENCL 66" A.F.F. TO TOP SMOKE DETECTOR HFP-1 1 W/ SIEMENS (PHOTO -ADDRESSABLE) DB -11 BASE 4S DEEP W/ 1 G RING CEILING DUCT DETECTOR D AD2-P W/ SIEMENS HFP-11 DET. DUCT HOUSING VERIFY IN FIELD TSM DUCT DETECTOR TEST SWITCH TSM -1 SIEMENS 1 -GANG BOX VERIFY IN FIELD HT -R INTERFACE MODULE HTRI-R WITH RELAY SIEMENS 4S DEEP BOX VERIFY IN FIELD FIRE ALARM HORN STROBE (CEILING MOUNT) ZH-MC-CW SIEMENS 4S DEEP BOX CEILING FIRE ALARM STROBE (CEILING MOUNT) ZR -MC -CW SIEMENS 4S DEEP BOX CEILING A.F.F. ABOVE FINISHED FLOOR N/A N/A N/A N/A EX EXISTING DEVICE N/A N/A N/A N/A F.B.O. FURNISHED BY OTHERS N/A N/A N/A N/A N/A NOT APPLICABLE N/A N/A N/A N/A RED AS BUILT ADD OR CHANGE N/A N/A N/A N/A GREEN AS BUILT REMOVE N/A N/A N/A N/A BLUE AS BUILT NOTES TO CAD N/A N/A N/A N/A SYMBOLS LEGEND \\1 NORDSTROM 3 II 3 LEVELS 171, 275sf 0 wet rargux n„ 4uA,3 macys 4 LEVELS 250,40'tsf ZALES #1000 (s.APeJds .HA2 u KF I s,4 ru.,oRA p RArc iA: URr1SRSTY u31E" STOP gain, 714 IMRE GATE ti INTP 5 Ex SING JCPenney 3 LEVELS 276,468sf PAID SEP 2 7 2013 TUKWILA FIRE FAX (206) 628-4990 TEL. (206) 622-651+5 RELEASE/REVISIONS REV. BY: DMG DESCRIPTION SHOP DRAWINGS DATE M N 0 0 J Z -co o<� 0 Mz W W zZ ~CCcn- aC W TD !t. W �CALE: NOT TO SCALE DRAWN BY: D. GARCIA DESIGNED BY: R. VEZZANI DATE:09/26/13 BACKROUND PLAN PROVIDED BY: JOB NUMBER: 6071-1i WIRE DESIGNATION GENERAL NOTES SITE PLAN Cc 'QZao- Proprietary and Confidential, Copyright 2012 by Guardian Security Systems, Inc. All Rights Reserved SHEET \ FA-01 4 THE DUCT SMOKE DETECTOR ASSEMBLY SHOULD BE INSTALLED IN ACCORDANCE WITH NFPA 72. THE PREFERRED INSTALL LOCATION OF THE HOUSING IS IN A LENGTH OF STRAIGHT DUCT AT LEAST SIX DUCT WIDTHS FROM ANY BEND OR OTHER OBSTRUCTIONS AS INDICATED. NOTE: FOR ADDITIONAL SPECIFICATIONS SEE PRODUCT DOCUMENTATION. PUCK OVER 3' WIDE; SAMPLE TUBE MUST GO THRU THE DUCT AND BE CAPPED. TUBE OUTLET SAMPLING TUBE INLET SAMPLING AT LEAST SIX DUCT WIDTHS FROM BEND DUCT DETECTOR MOUNTING DETAIL 120VAC-60NZ DEDICATED EMERGENCY -4 FOR AOOIIXINAL SPECIIGU10NS SEE PRODUCT DOp1NENTAIKON. *CONTACT RATINGS: 4.0A 0 125VAC 4.0A 0 3046C ASL FRON TO NEXT ADIIKESSABLE (+ DEVICE STIPIF LAST DEVICE - FRlD1 XLS CONTROL PANEL OR PREVIEWS ADDRESSABLE DEVICE 0 GROUND J a 0 0 HTRI-R 0 O ° O NOTE: FOR ADDITIONAL SPECIFICATIONS SEE PRODUCT DOCUMENTATION. C—CABLE C—CABLE 0 FROM PREVIOUS > (+) CRD N O 00 IV a PAD -3 00 INPUT INPUT TROUBLE NAC1 NAC2 NAC3 NAC4 AUX 1+1- 1 2+2- 2 NC C NO + - + - + - + - + - 0 s 0 IQ m� 3.6k EOL (-) (+) SPARE SPARE SPARE ADDRESSABLE DEVICE (—) NOTE: FOR ADDITIONAL SPECIFICATIONS SEE PRODUCT DOCUMENTATION. s,„rrs zs Z xi mm �mmo� o F= o m ii 0 N (=)(-) (+)(+) (+) 0 WIRE DESIGNATION: NUMBEROFCONDUCTORS SIZE TYPE COLOR CODE TWISTED PAIRWITHSHIELD #18 FPUFPLR RED (JACKET) *CONTACT RATINGS: 4.0A 0 125VAC 4.0A 0 30VDC FOR ADDITIONAL SPECIFICATIONS SEE PRODUCT DOCUMENTATION. O 0 GROUND F t- B;I L!J 0 0 HTRI-R 114 ® (-) (-) (+)> TO NEXT DEVICE OR STOP IF LAST DEVICE DRY CONTACTS TO VAV FAN SHUTDOWN PROVIDED BY MECH/ELEC. DUCT DETECTOR, TEST SWITCH & RELAY MODULE WIRING DETAIL (+) HORN STROBE OR STROBE ONLY 80" A.F.F. (OR UNLESS OTHERWISE SPEC FIED) 4S DEEP BOX HORN STROBE & STROBE WALL MOUNTING DETAIL U �l HORN/STROBE OR STROBE ONLY + u HORN/STROBE OR STROBE ONLY + u HORN/STROBE OR STROBE ONLY POWER SUPPLY & RELAY MODULE WIRING DETAIL HONR STROBES & STROBES ONLY WIRING DETAIL TO NEXT DEVICE OR END OF LINE TYPICAL WIRING AND MOUNTING DETAILS CEILIN TILE NOTE FOR ADDITIONAL SPECIFICATIONS SEE PRODUCT DOCUMENTATION. OPER TIN TEMPERA RE +32' F (O' C) TO 100' F�3g C) HUMIDITY: 0-9 % RELATIVE HUMIDITY, NON -CONDENSING HFP-11 SMOKE DETECTOR -4i" FROM PREVIOUS ADDRESSABLE DEVICE OR POWER SOURCE DATA IN (—) >— DATA IN (+) > DEVICE IS LISTED FOR AIR VOLOCITY APPUCATIONS OF 300-4000 FT/MIN WHEN USED IN CONJUNCTION WITH DUCT HOUSINGS AD -11P OR AD-11XPR DB -11 STANDARD SMOKE DETECTOR BASE REAR VIEW (-) (+) SMOKE DETECTOR WIRING DETAIL SUPPORT BRIDGE 4' SQUARE DEEP BOX CEILING HORN STROBE STROBE ONLY DROP CEILING MOUNTING HARD LID CEILING TO NEXT ADDRESSABLE DEVICE SUPPORT BRIDGE 4' SQUARE DEEP BOX CEILING HORN STROBE STROBE ONLY HARD LID MOUNTING HORN STROBE & STROBE CEILING MOUNTING DETAIL JUNCTI❑N BOX MOUNTED ON CEILING FLEX JUNCTION BOX MOUNTED AGAINST CEILING SUPPORT SMOKE/HEAT DETECTOR TO NEXT DEVICE CADDY BAR SUSPENDED ILLUMINATED CEILING SMOKE/HEAT DETECTOR MOUNTING DETAIL t� co 16111111:O F— F- Z N Iii S� la yw J F— LU 14 —t C/7 to L11 N Q Lig w ro •J CI5 ~ F— RELEASE/REVISIONS IREV. BY: DMG DESCRIPTION SHOP DRAWINGS LLI o M co rn 0 2 <<< << Z .,c O J 00 2z QW O 1-0 W wcn zz < c/J —1 Lu 0 L � W D 0 z 0 0 Z EEC'3 Z J 0 �CALE: NOT TO SCALE DRAWN BY: D. GARCIA DESIGNED BY: R. VEZZANI DATE: 09/26/13 BACKROUND PLAN PROVIDED BY: .JOB NUMBER: 6071-1i C SHEET ''' FA -02 Proprietary and Confidential, Copyright 2012 by Guardian Security Systems, Inc. All Rights Reserved �' f,;�, "i r „ii fi d+, k;,' ,,,( 5 r },!, t. 1 d �L �'� �.}�<t Gk,P a � '. 61 p L $ y g�^'�,��'� + f ff} 'nnµµ��p y i� x d}"14"Mik� SM}r"}'f .` di1.VA ',I 'i Rdh,,! tr,��', f7 7 '"fi � f � 3'P"j1�{ Y➢�'��f �by 1w F{ w� �fr x k i M1 r „ f45 . f a t Ca r b§ 8 w„ f ^e ! 4{ �� dS 4 1 w 5 ➢i• yYl,t� w�yeY4% .I^„' ,". � • AC' „, A d y,,i Y Y 1� � �` 'Y n.' DESCRIPTION SHOP DRAWINGS t :lti, r ;m ➢$ Current Load: ; ° SSI"idb w ,_ Standby: Alarm: ;, 2 <«<)‹. Device Type Qty Amps Total Amps Total HFP-11 0.0022 0.0022 0.0023 0.000 AD2-P 1 0.0635 0.0635 0.064 0.064 HTR -R 2 0.009600 0.0096 0.021 0.042 ZH-MC-CW @30CD 5 0.131 ZH-MC-CW @75CD 7 0.222 al -MC -CW @95CD 3 0.0731 Amps 0.106 Amps � �YJ➢. y'; d fir: L,r.:'3?%{ '�. ' s$ � 'r' ➢ '`r}�d .r'4,` f� ➢§t; 7 S'.a f : yt 1, , :4 4( °' ? a t '' ';,y ,5'^o 'i', '.� �,w, y .,, 'r,. '•,v"' w E' fi',';,r, ,. ..., a'. 9., ,r Y9 "¢, }", ,A�,.r �'+iY w�. 11' "a'tx rv, r.,.. �,,,, �L�, 4 � F, � :," � «�� .: .,� w�r,'� 0�7 � 9 7 �, « ...a. � ��, ,,, �. a �:, � .,� , r•fi ��,,4R; 4 �,.., . �, 1 ,^ � ,. w'„.� � 1r „��S : 1~ V., "1Vyy , �, i,4 rl, y :1 0 rvk,, }, ",, ��',:$ .P W}5' n "p � ,,'����e, '� 1��'t'e�'�,� y DESCRIPTION SHOP DRAWINGS t :lti, r ;m ➢$ ; ° SSI"idb w ,_ DATE '�I` . ;, 2 <«<)‹. Device Type Qty Amps Total Amps Total Main System Board 1 0.03 0.03 0.030 0.030 Z1 -1 -MC -CW , @15CD 14 0.0875 ZH-MC-CW @30CD 5 0.131 ZH-MC-CW @75CD 7 0.222 al -MC -CW @95CD 3 0.292 0.876 ZH-HMC-CW @115CD 0.371 ZR -MC -CW @15CD 14 0.069 0.966 ZR MC -W @'15CD 3 0.064 0.192 0.03 Amps 2.064 Amps Standby Current Load: 0.03 Amps For 24 Hours = 0.720 Amp -hours Alarm Current Load: 2.064 Amps ° For 5 Minutes= 0.173 Amp -hours 25% Derating= 1.117 Amp -hours Total System Current Load: 1.117 Amp -hours *: P w 'B `ryn> f Battery4 a i to be Used. 12VDC �� R Ahip-h C Ir ~ Notification Appliance Circuit Detail PROJECT: '; ZALES Panel: EXISTING PAD -3 POWER SUPPLY Date: ; September 26, 2013 Wire Resistance 2.58 CURRENT TOTAL=1600.00 1 ZH-MC-CW @15cd " �ZH-MC-CW @30cd 2,ZH-MC-CW @75cd ,ZN-MC-CW _@95cd_.� 71 -MC -CW @115cd ZR-MC-CWµ@15cd DEVICES 4 87, 87 131 0 222 444: . �,.. 292 371; 69 TOTAL mA= 600; 14 216 23.33 j 600 !Total Wire Resistance ( R ) TotalDe_vice Load; Amps (I) a ?Volta Drop p(E ) EOL Voltage (WL*2)*(R/ft) t J (Total, Cct" Loail) (E=I*R) 24-E 1.11 0.60 0.67 23.33 SYSTEM CALCULATIONS TO NEAREST EXISTING POWER SUPPLY TO NEAREST EXISTING DATA LOOP S b D 2S EOL S3 S3-1 15cd HT -R S3-2 S3-3 15cd 75cd D,I 1 HT -R zi TSM SINGLE LINE DIAGRAM b S3-4 75cd FLAG NOTES: FIELD LOCATE RELAY MODULE FOR BACKGROUND MUSIC INTERFACE. DUCT DETECTOR, RELAY MODULE FOR FAN SHUTDOWN & TEST SWITCH. LOCATIONS TO BE FIELD VERIFIED BY MECHANICAL, ELECTRICAL AND FIRE ALARM CONTRACTORS. FIELD LOCATE TENANT JUNCTION BOX IN BACKHOUSE CORRIDOR. Proprietary and Confidential, Copyright 2012 by Guardian Security Systems, Inc. All Rights Reserved RELEASE/REVISIONS IREV. BY: I DMG DESCRIPTION SHOP DRAWINGS DATE 09/26/13 2 <«<)‹. oQco co 0 2Z WO W w ZZ J U= �-< cc 0 [C �' Q LU�� cc n IL- 1 -- cc 0 w z w y— (1) ‘CALE: NOT TO SCALE DRAWN BY: D. GARCIA DESIGNED BY: R. VEZZANI DATE: 09/26/13 BACKROUND PLAN PROVIDED BY: .OB NUMBER: 6071-1 C SHEET FA -03 i TO NEAREST TO NEAREST EXISTING EXISTING DATA LOOP POWER SUPPLY BELC W (P'� 8'— 0' GYP. AFF 3D. LIG- \'lEC- TI\G AND L -°END S160L04-092711 SYMBOL DESORPTION EMERGENCY LIGHTING • (CEILING—MOUNTED) 1 V///1 EXIT LIGHTING ( =4 l'ill RECESSED ACCENT LIGHTING RECESSED LIGHTING 13 rim o foo 01I 0 RECESSED GENERAL AREA UGHTING 0 RECESSED LIGHTING ON NIGHT LIGHT CIRCUIT SURFACE MOUNTED LIGHTING • .,=,,,,,„, RECESSED 1x4 LIGHT U TRACK LIGHTING 0 > TRACK ACCENT UGHT1NG UNDER COUNTER LIGHTING; LIGHTING UNDER CLG BELOW I WALL SCONCE 0 SUPPLY AIR GRILLES —I I(—/i Ft RETURN AND/OR EXHAUST AIR GRILLES 121 ACCESS PANEL SPRINKLER HEAD Notes: Not all symbols are used on all stores. Refer to the Mechanical and Electrical Schedules and Leaends for additional symbols and descriptions. 4'-4" — 0' 7/8" MARK I -CI -D C ►�C A\ \OTk-S SO1 ON12-102111 KEYED NOTES: 1. ACCESS PANEL BY TGC. STEALTH TR—AP024 24"x24" TO BE INSTALLED PER MANUFACTURER SPECIFICATIONS. FINISH: TEXTURE AND PAINT TO MATCH CEILING. GENERAL NOTES: • If conflict occurs, do not adjust light fixture locations or any ceiling elements without approval from Zale project manager. • Lighting location dimensions shown are for reference only. REfer to detail for actual light placement. * Surface mounted light fixtures in work areas to be mounted 10 ceiling grid, unless noted otherwise. * Speakers and other ceiling elements to be installed in line with adjacent objects/fixtures. * In ceilings adjacent to a non—conditioned space with a ducted return, T.G.C. shall install insulation with R-19 value or equal. Install non—combustible fibrous batt insulation with c vapor barrier on corditioned side. No insulation to be placed above recessed light fixtures. 4'-7 1/4" / 4'-0 7/8" 4'-0 7/8" / 4'-0 7/8" 4'-6 7/8" / 5'-0 7/8" 5'-0 7/8" 5'-0 7/8" 3'-9 1/4" S3-1 15cd CENTER _IGHT IN CEILING {BELOW c' -2S i 325 L —I EO (A1) 14'— 0" AFF LAY—IN CENTER LIGHT IN CEILING BELOW BELOW 8'— 0" AFF S3-2 15cei 41111111 r Y1 N A H -R 1.21 of roofs uoorl 2S 0 S3-3 75cd 0 HT -R TSM 11'— 0" AFF GYP. BD. io u U It 2S 0 1 �' GYP. BD. 1777 �II L o -1, 16== J S3-4 75cd X 0 Li 0 of o� z 0 E— a- it LU o r o� (f o, • .,=,,,,,„, 0 351 (P1) 10'— 0" AFF 125 v 10'— 0" AFF GYP. BD. 4i. 10'— 0" AFF] GYP. BD. REFLECTED CEILING PLAN - FIRE ALARM 325 (Pi) 10'— 0" AFF GYP. BD. GYP. BD. Pro FLAG NOTES: FIELD LOCATE RELAY MODULE FOR BACKGROUND MUSIC INTERFACE. DUCT DETECTOR, RELAY MODULE FOR FAN SHUTDOWN & TEST SWITCH. LOCATIONS TO BE FIELD VERIFIED BY MECHANICAL, ELECTRICAL AND FIRE ALARM CONTRACTORS. FIELD LOCATE TENANT JUNCTION BOX IN BACKHOUSE CORRIDOR. rieta and Confidential, Co. ri•ht 2012 b Guardian Securit S stems, Inc. All R' hts Reserved C I %. 1743 IST AVE FAX (206) 628-4990 TEL. (206) 622-654.5 REV. BY: DMG z 0 E— a- it LU SHOP DRAWINGS 0 DATE M co N 0) 0 o <C«< Z �co omz 9 o W U)W z z W v= J HiQ 1 O� cc W 0irLLi w LL z z 0 D W LL W CC �CALE: 1/4"=1'0" DRAWN BY: D. GARCIA DESIGNED BY: R. VEZZANI DATE: 09/26/13 BACKROUND PLAN PROVIDED BY: \0B NUMBER: 6071-1 SHEET FA -04 SITE LOCATION CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East Tukwila, WA 98188 206-575-4407 Date application accepted: FIRE PROTECTION SYSTEMS PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. **PLEASE PRINT** King Co. Assessor's Tax No.: 9202470010 Site Address: 1000 Southcenter Mall, Tukwila, 98188 Suite Number: Floor: Tenant Name. Zales New Tenant? 0 - Yes ❑ - No Property Owner's Name: Westfield Property Tax Dept. Mailing Address: POB 130940, Carlsbad, CA 92013 City State Zip CONTACT PERSON -if there are questions about the submittal. Name: Karina Veliz Day Telephone: 206.349.5889 Company Name: Guardian Security Systems Mailing Aaaress:1743 First Ave South, Seattle, WA 98134 E-mail Address: kveliz@guardiansecurity.com City State Zip Fax Number: 206.628.4990 Total number of new/relocated devices or sprinkler heads: 8 Valuation of Project (contractor's bid price): ?AL Scope of Work (please provide detailed information): Adding 8 devices to existing FACP PERMIT APPLICATION NOTES Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Fire Marshal to comply with current fee schedules. Expiration of Plan Review -Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The Fire Marshal is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OR WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OR R AUTHOR ZAGENT: S- • l Signature: Date: Print Name: Karina Veliz Day Telephone: 206.349.5889 Plan Permit App.doc 1/2/13 TFD FP Form 8 1000 SOUTHCENTER MALL ASSOCIATED PERMITS 13-S-208 43113144 4 tri SITE LOCATION CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East Tukwila, WA 98188 206-575-4407 Date application accepted: FIRE PROTECTION SYSTEMS PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. **PLEASE PRINT** ` (' King Co. Assessor's Tax No.: Site Address: \( . LD C 4 Tilek\\Suite Number: Floor: Tenant Name: \ New Tenant? 111 - Yes No Property Owner's Name: \ 1P - -E 1 ncAryiw rio C-D-r-cl Mailing Address: CONTACT PERSON-if^`there are questions about the submittal. 1\_5..1`- V 11 lJ l Day Telephone: IA2-C-Y L\Sl •7(0(431 Company Name: C©V,YV \ 1 E -sc1C*\0Y1 AYNC. Mailing Address: O 12_ l ` • \1111\ l JCf , t i c9 E-mail Address: Name: City State Zip Ci S at 51. 9s Fax Number: • Total number of new/relocated devices or sprinkler heads: ~.C\ _ (7) \ 2S Valuation of Project (contractor's bid price): $ 2 Scope of Work (please provide detailed information): CP \VOA( C _\\ Wcx& D 1 C7T v' ecx PERMIT APPLICATION NOTES Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Fire Marshal to comply with current fee schedules. Expiration of Plan Review -Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The Fire Marshal is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OR WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING Signature: Print Name: WNER OR AUTHORIZED AGENT: Plan Permit App.doc Date: '`D•g Day Telephone: q2 -C-3- ! [ 61/4.99 1/2/13 TFD FP Form 8 FIRE DEPARTMENT SPRINKLER PLAN REVIEW COMMENTS Project Name: Zales '1000 Southcenter Mall Permit No.: 13-S-208 Date: Septemberl6, 2013 Reviewer: Al Metzler Fire Protection Project Coordinator (206) 575-4407 option # 2 (Inspection Requests) (206) 971-8718 (Plan Review Questions) • Lateral sway bracing is required at a maximum spacing of 40' for all mains, cross mains, and branch lines 2.5" and larger. Bracing is provided for the last length of pipe but within 6' of the end of a feed or cross main. Bracing is required unless all the pipe is supported by rods less than 6" or by 30 ° wrap-around U -hooks for any size pipe, 9.3.5.3. • Minimum clearance around pipes: 2 " for 1"-3.5", 4" for 4" and larger, see 4 exceptions, 9.3.4. • Longitudinal sway bracing is a maximum of 80' for mains and cross mains and within 40 ' of the end of the line, 9.3.5.4. • Provide lateral and longitudinal bracing for changes in pipe direction per section 9.3.5.11.2 for pipe size 2 % inches and larger. • Restrain branch lines at the end sprinkler of each line, restrain against vertical and lateral movement, 9.3.6.3. • Restraints for branch lines shall be at intervals per table 9.3.6.4 and section 9.3.6.4, and restrain sprig ups greater than 4', 9.3.6.6. • Comply with ASCE 7-05, section 13.5.6.2.2. • Provide sprinkler protection beneath all obstructions greater than 4 ft. in width. • Extend sprinkler protection to all combustible concealed spaces. • Comply with NFPA 13 obstruction tables. • All valves controlling the water supply for automatic sprinkler systems and waterflow switches on all sprinkler systems shall be electrically supervised. • Comply with obstructed/non-obstructed construction rules for sprinkler head placement. • Sprinkler heads spaced closer than 6 ft. apart must be baffled. • Modifications involving 20 or more heads require hydrostatic test and system isolation if necessary. • For dry pipe and double interlock preaction systems, in addition to the standard hydrostatic test, an air pressure leakage test at 40 psi shall be conducted for 24 hours. Any leakage that results in a loss of pressure in excess of 1.5 psi for the 24 hours shall be corrected. • These conditions apply to all sprinkler piping exposed as necessary to accomplish the permitted scope of work. All code references are NFPA 13, 2013 Edition. CENTER LIGHT IN CEILING 1.q (l f\ v `.� • It` • a CENTER LIGHT IN CEILING BELOW BELOW II=O"AFF. P 10'-.0" AFF. GYP. BD. Q c, NW( �c.►,►r� IOC-O"AFF CDREFLECTED GE I L. I NCS PLANGYP. BD. Ifo" = ILO" RCP=0455-PLN: . IOC- 0" AFF GYP. BD.. 10'- 0' Al, GYP. BD. Design per NFPA 13, Ordinary Hazard Group 2 All materials to be new, U.L. listed, and F.M. approved All fire sprinkler heads to remain unobstructed by lightings, ceilings, or any other means All heads to be at least 6' apart o 18 — Relocate Reliable Model G5-56 Standard Response 165° Concealed Pendents 1/2 x '/2 (white) • 7 — Add Reliable Model G5-56 Standard Response 165° Concealed Pendents 1/2 x 1/2 (white) RETAINER STRAP WHERE REQUIRED IN SEISMIC AREAS TOP BEAM/ C -CLAMP WITH SET SCREW 3/8' ALL THREAD RDD PIPE SWIVEL RING STEEL JOIST/TRUSS HANGER DETAIL NTS - TUKWILA FIRE DEPARTMENT Please call 206-5754407 and the this Fire Permit No. and exact address for shut- dOW I or r or.;tbn approval i O Without Comments O As Noted in Red Per The Attached Letter These plans have been reviewed by The Tukwila Fire Prevention Bureau for conformance with current City sr-:ndards. Acceptance is subject to errors and omissions which do:not authorize violations of adopted s andards and ordinances. The responsibility for the adequacy of design rests totally with the designer. Additions, deletions or revisions to these drawings after this date will void i hs acceptance and will require a resubmittal of revised drawings for subsequent,, approval. Final acceptance is sub:pct to field test and Inspection by The Tukwila Fire Prevention Bureau. Dated_L_ke i _ By: KEY PLAN CROWN FIRE PROTECTION INCORPORATED PA. BOX 12113 MILL CREEK, WASHINGTON 98082-0113 PH. (425) 481-7669 Tio ZALES SOUTHGENTER MALL SOUTHGENTER MALL TUKIALILA, yyA ci8ISS PAID SEP 16 2013 • • TUKWILA FIRE 277 DATE: DRAWN: f SCALE: Dcl BPS, ZALES FIRE A ARM SYSTEM ADDITION TUKWILA, WASHINGTON SHEET NUMBER SHEET TITLE FA -01 SYSTEM INFORMATION FA -02 TYPICAL WIRI \G AND MOUNTING DETAILS FA -03 SYSTEM CALCULATIONS AND SI G LE LI \E DIAGRAM FA -04 REFLECTED CEILING PLAN - FRE ALARM SHEET INDEX wi hr�4;t Comments p As Noted !,,-1 Red 0 Per Inct-;cr e Letter These Mans have bcei I i °:.1 :c/ ed by The Tukwila Fire Prevention Bureau fci, ;onformar.0 ,,•i,th current city -5-7,:ndardS. Ac:�=i. ss.1i;:'tto errors and " ;�• r. aotho(ize Vicl,`tions of adopted ,.:�i;siGnS which �.,Mdards a: _ and Or a.i i ?Ces T I e responsibility for the adequacy c . e designer. Addltitns, (rawin� after Mic require a resubmittai`ir Vl approval. �I cc en enc st.011,7 is 'co nlct l=' c and inspection by fiC ul;uoti i'Ir f''i ;Jt;;lt..t ii L,tit itl, 1 f NOTICE 4 completed, signed, Tukwila Fire Department Pre-test Certificate must be presented to the Inspector prior to commencement of Acceptance Testing of any Fire Alarm and Detection Systems. Failure of test will result in a Re -inspection Fee and termination of the testing, TUKWILA FIRE DEPARTMENT Please cal 06-575-407 and give the Fire Permit it No. and exact address for shut - D UL 1 °Airr6tIonC rrhT FILL CHART WIRE DESIGNATI❑N SYMBOL DESCRIPTION NUMBER OF CONDUCTORS SIZE TYPE COLOR CODE C STROBE SYNC TWISTED PAIR WITH SHIELD #14 FPL/FPLR RED (JACKET) D DATA LINE -ADDRESSABLE LOOP TWISTED PAIR WITH SHIELD #16 FPL/FPLR RED (JACKET) P DEVICE POWER - 24VDC TWO #16 FPL/FPLR RED (JACKET) S STROBE CIRCUIT - FEED TWISTED PAIR W/ SHIELD #14 FPL/FPLR RED (JACKET) S' STROBE CIRCUIT - RETURN TWISTED PAIR W/ SHIELD #14 FPL/FPLR RED (JACKET) V SPEAKER CIRCUIT - FEED TWISTED PAIR #14 FPL/FPLR RED (JACKET) V' SPEAKER CIRCUIT - RETURN TWISTED PAIR #14 FPL/FPLR RED (JACKET) I REMOTE INDICATION LIGHT TWO #18 FPL/FPLR RED (JACKET) CONDUIT FILL CHART NO. OF CONDUCTORS VOLTS WIRE SIZE TYPE DIMENSIONS AREA TWO 600V #12 AWG THHN/THWN .244 0.D. .0467 TWO 600V #14 AWG THHN/THWN TWISTED .210 0.D. .0346 TWO CONDUCTOR 300V #18 AWG FPL TW CABLE .156 0.D. .0191 CONDUIT FILL CALCULATE THE TOTAL AREA OF THE WIRE BEING RUN IN THE CONDUIT FROM THE TABLE ABOVE. CHOOSE THE SIZE OF CONDUIT BASED ON THE MAXIMUM FILL DIMENSION FROM THE TABLE BELOW THAT DOES NOT EXCEED THE TOTAL AREA OF THE WIRE. CONDUIT SIZE MAXIMUM FILL 1/2" .12 SQUARE INCH 3/4" .21 SQUARE INCH 1" .34 SQUARE INCH 1-1/8" .60 SQUARE INCH 1-1/2" .82 SQUARE INCH 2" 1.34 SQUARE INCH FIGURES ARE BASED ON 40% CONDUIT FILL AND ARE TAKEN FROM N.E.C., CHP. 9, TABLE 4. SHIELDED WIRE TO BE GROUNDED AT P❑INT OF ORIGIN PUNCHED THROUGH EACH DEVICE WRAPPED WITH TAPE AND TAPED AT END FOR SIEMENS SYSTEM: DO NOT INSTALL ADDRESSABLE INITIATING DEVICES UNTIL PREPROGRAMMED WITH DEVICES ADDRESS. 1. NUMBERS ADJACENT TO DEVICE SYMBOL DENOTE DEVICE CIRCUIT/ADDRESS DEVICE 01-1-02 WOULD BE THE SECOND DEVICE ON ADDRESSABLE LOOP 1. 2. DETECTOR AND AUDIBLE CIRCUIT POLARITY SHALL BE OBSERVED. 3. AUDIBLE/VISUAL CIRCUIT WIRING IS SUPERVISED. NO PARALLE_ BRANCHING IS PERMISSIBLE 4. INSTALLATION SHALL BE IN STRICT CONFORMANCE WITH THE NATIONAL ELECTRIC CODE, NFPA 72, LOCAL CODE(S), AND/OR AUTHORITY HAVING JURISDICTION. 5. INSTALLATION MATERIALS (I.E. CONDUIT, WIRE, FITTINGS, HANGERS, STANDARD BOXES, FIBER OPTICS CABLE, FITTINGS, AND ASSOCIATED EQUIPMENT) ARE NOT SUPPLIED BY SIEMENS CERBERUS DIVISION. 6. DETECTORS SHALL NOT BE MOUNTED IN DIRECT AIR STREAM OF AIR SUPPLY OUTLETS. PER NFPA 72 2-3.5.1 7. WIRING SHALL BE PER PLAN WITH RESPECT TO CONDUCTOR SIZE, & OR CABLE TRAY, TYPE, QUANTITY AND COLOR CODE. CONDUCTORS SHALL BE PERMANENTLY, AND UNIQUELY MARKED FOR FUTURE IDENTIFICATION. 8. INSTALLING CONTRACTOR SHALL RETURN ONE SET OF ACCURATELY MARKED DRAWINGS FOR "AS BUILT" PURPOSES. 9. FOR ADDITIONAL INSTALLATION INSTRUCTIONS, REFER TO CATALOG CUT SHEETS AND/OR INSTALLATION INSTRUCTIONS. 10. THE 120vac POWER ELECTRICAL WORK SUPPLYING FIRE ALARM SYSTEM PANELS MUST COMPLY WITH ARTICLE 725 AND 760 OF NFPA 70, N.E.C. AND NFPA 72, SPECIFICALLY SECTION 1-5.2.5.2: IN REFERENCE TO DEDICATED BRANCH POWER SOURCES. 120vac POWER SHALL NOT BE APPLIED TO FIRE ALARM PANEL WITHOUT DIRECT SUPERVISION OF FIRE ALARM TECHNICIAN. 11. ALL HORN/STROBE AND STROBE DEVICES SHALL BE MOUNTED AT A HEIGHT OF 80" A.F.F. OR 6" BELOW DROPPED CEILING, WHICHEVER IS LESS. 12. ALL MANUAL PULL STATIONS SHALL BE MOUNTED AT 48" A.F.F. TO THE ACTIVATION DEVICE. 13. ALL PANEL NUMBERS AND CIRCUITS WILL BE ON THE RECORD DRAWINGS SET. 14. ALL 120VAC CIRCUITS ARE FROM DEDICATED CIRCUITS FROM THE EMERGENCY GENERATOR. 15. PER NFPA 72 SECTION 5-3.6.1.3 DETECTORS SHALL NOT BE INSTALLED UNTIL AFTER THE CONSTRUCTION CLEAN-UP OF ALL TRADES IS COMPLETE AND FINAL. EXCEPTION: WHERE REQUIRED BY THE AUTHORITY HAVING JURISDICTION FOR PROTECTION DURING CONSTRUCTION. DETECTORS THAT HAVE BEEN INSTALLED PRIOR TO FINAL CLEAN-UP BY ALL TRADES SHALL BE CLEANED OR REPLACED IN ACCORDANCE WITH NFPA 72 CHAPTER 7. 16. WIRING SHALL RUN CONTINUOUS FROM FACP TO FIRST DEVICE ON A CIRCUIT AND THEN FROM DEVICE TO DEVICE WITHOUT SPLICING IN PULL BOXES OR OTHER BACK BOXES OF DIFFERENT CIRCUITS. 17. ALL WIRING SHALL BE METERED, VERIFIED TO BE CONTINUOUS, FREE OF GROUND AND FREE OF SHORTS BETWEEN CONDUCTORS AND OTHER CIRCUITS PRIOR TO FINAL EQUIPMENT TRIM. 18. ALL CABLES SHALL BE MARKED AS INDICATED ON FIRE ALARM RISER WITH A PERMANENT LABEL AT ALL DEVICES, JUNCTION BOXES AND FACP. 19. THE ELECTRICAL CONTRACTOR SHALL CLEAN ALL DIRT AND DEBRIS FROM THE OUTSIDE AND INSIDE OF THE FIRE ALARM BACK BOXES AND JUNCTION BOXES AFTER COMPLETION OF THEIR INSTALLATION. 20. DETECTORS MUST BE RATED FOR TEMPERATURE IN THE ENVIRONMENT IN WHICH IT IS LOCATED. 21. ALL WIRING BETWEEN FLOORS SHALL BE LOCATED IN CONDUIT. 22. 23. NFPA 72 2007 6.4.2.2.2 ALL STYLES OF CLASS A CIRCUITS USING PHYSICAL CONDUCTORS (E.G., METALLIC, OPTICAL FIBER) SHALL BE INSTALLED SUCH THAT THE OUTGOING AND RETURN CONDUCTORS, EXITING FROM AND RETURNING TO THE CONTROL UNIT, RESPECTIVELY, ARE ROUTED SEPARATELY. THE OUTGOING AND RETURN (REDUNDANT) CIRCUIT CONDUCTORS SHALL NOT BE RUN IN THE SAME CABLE ASSEMBLY (LE., MULTI -CONDUCTOR CABLE), ENCLOSURE, OR RACEWAY. NFPA 72 2007 A.6.4.2.2.2 A GOAL OF 6.4.2.2.2 IS TO PROVIDE ADEQUATE SEPARATION BETWEEN THE OUTGOING AND RETURN CABLES. THIS SEPARATION IS REQUIRED TO HELP ENSURE PROTECTION OF THE CABLES FROM PHYSICAL DAMAGE. THE RECOMMENDED MINIMUM SEPARATION TO PREVENT PHYSICAL DAMAGE IS 305 MM (1 F) WHERE THE CABLE IS INSTALLED VERTICALLY AND 1.22 M (4 FT) WHERE THE CABLE IS INSTALLED QUANTITY EX EX 1 1 2 3 1 SYMBOL DESCRIPTION MODEL MANUFACTURER BACKBOX MOUNTING HEIGHT REMOTE BOOSTER POWER SUPPLY PAD -3 SIEMENS PAD-3-ENCL 66" A.F.F. TO TOP SMOKE DETECTOR HFP-1 1 W/ SIEMENS (PHOTO -ADDRESSABLE) DB -11 BASE 4S DEEP W/ 1 G RING CEILING DUCT DETECTOR D AD2-P W/ SIEMENS HFP-11 DET. DUCT HOUSING VERIFY IN FIELD TSM DUCT DETECTOR TEST SWITCH TSM -1 SIEMENS 1 -GANG BOX VERIFY IN FIELD HT -R INTERFACE MODULE HTRI-R WITH RELAY SIEMENS 4S DEEP BOX VERIFY IN FIELD FIRE ALARM HORN STROBE (CEILING MOUNT) ZH-MC-CW SIEMENS 4S DEEP BOX CEILING FIRE ALARM STROBE (CEILING MOUNT) ZR -MC -CW SIEMENS 4S DEEP BOX CEILING A.F.F. ABOVE FINISHED FLOOR N/A N/A N/A N/A EX EXISTING DEVICE N/A N/A N/A N/A F.B.O. FURNISHED BY OTHERS N/A N/A N/A N/A N/A NOT APPLICABLE N/A N/A N/A N/A RED AS BUILT ADD OR CHANGE N/A N/A N/A N/A GREEN AS BUILT REMOVE N/A N/A N/A N/A BLUE AS BUILT NOTES TO CAD N/A N/A N/A N/A SYMBOLS LEGEND \\1 NORDSTROM 3 II 3 LEVELS 171, 275sf 0 wet rargux n„ 4uA,3 macys 4 LEVELS 250,40'tsf ZALES #1000 (s.APeJds .HA2 u KF I s,4 ru.,oRA p RArc iA: URr1SRSTY u31E" STOP gain, 714 IMRE GATE ti INTP 5 Ex SING JCPenney 3 LEVELS 276,468sf PAID SEP 2 7 2013 TUKWILA FIRE FAX (206) 628-4990 TEL. (206) 622-651+5 RELEASE/REVISIONS REV. BY: DMG DESCRIPTION SHOP DRAWINGS DATE M N 0 0 J Z -co o<� 0 Mz W W zZ ~CCcn- aC W TD !t. W �CALE: NOT TO SCALE DRAWN BY: D. GARCIA DESIGNED BY: R. VEZZANI DATE:09/26/13 BACKROUND PLAN PROVIDED BY: JOB NUMBER: 6071-1i WIRE DESIGNATION GENERAL NOTES SITE PLAN Cc 'QZao- Proprietary and Confidential, Copyright 2012 by Guardian Security Systems, Inc. All Rights Reserved SHEET \ FA-01 4 THE DUCT SMOKE DETECTOR ASSEMBLY SHOULD BE INSTALLED IN ACCORDANCE WITH NFPA 72. THE PREFERRED INSTALL LOCATION OF THE HOUSING IS IN A LENGTH OF STRAIGHT DUCT AT LEAST SIX DUCT WIDTHS FROM ANY BEND OR OTHER OBSTRUCTIONS AS INDICATED. NOTE: FOR ADDITIONAL SPECIFICATIONS SEE PRODUCT DOCUMENTATION. PUCK OVER 3' WIDE; SAMPLE TUBE MUST GO THRU THE DUCT AND BE CAPPED. TUBE OUTLET SAMPLING TUBE INLET SAMPLING AT LEAST SIX DUCT WIDTHS FROM BEND DUCT DETECTOR MOUNTING DETAIL 120VAC-60NZ DEDICATED EMERGENCY -4 FOR AOOIIXINAL SPECIIGU10NS SEE PRODUCT DOp1NENTAIKON. *CONTACT RATINGS: 4.0A 0 125VAC 4.0A 0 3046C ASL FRON TO NEXT ADIIKESSABLE (+ DEVICE STIPIF LAST DEVICE - FRlD1 XLS CONTROL PANEL OR PREVIEWS ADDRESSABLE DEVICE 0 GROUND J a 0 0 HTRI-R 0 O ° O NOTE: FOR ADDITIONAL SPECIFICATIONS SEE PRODUCT DOCUMENTATION. C—CABLE C—CABLE 0 FROM PREVIOUS > (+) CRD N O 00 IV a PAD -3 00 INPUT INPUT TROUBLE NAC1 NAC2 NAC3 NAC4 AUX 1+1- 1 2+2- 2 NC C NO + - + - + - + - + - 0 s 0 IQ m� 3.6k EOL (-) (+) SPARE SPARE SPARE ADDRESSABLE DEVICE (—) NOTE: FOR ADDITIONAL SPECIFICATIONS SEE PRODUCT DOCUMENTATION. s,„rrs zs Z xi mm �mmo� o F= o m ii 0 N (=)(-) (+)(+) (+) 0 WIRE DESIGNATION: NUMBEROFCONDUCTORS SIZE TYPE COLOR CODE TWISTED PAIRWITHSHIELD #18 FPUFPLR RED (JACKET) *CONTACT RATINGS: 4.0A 0 125VAC 4.0A 0 30VDC FOR ADDITIONAL SPECIFICATIONS SEE PRODUCT DOCUMENTATION. O 0 GROUND F t- B;I L!J 0 0 HTRI-R 114 ® (-) (-) (+)> TO NEXT DEVICE OR STOP IF LAST DEVICE DRY CONTACTS TO VAV FAN SHUTDOWN PROVIDED BY MECH/ELEC. DUCT DETECTOR, TEST SWITCH & RELAY MODULE WIRING DETAIL (+) HORN STROBE OR STROBE ONLY 80" A.F.F. (OR UNLESS OTHERWISE SPEC FIED) 4S DEEP BOX HORN STROBE & STROBE WALL MOUNTING DETAIL U �l HORN/STROBE OR STROBE ONLY + u HORN/STROBE OR STROBE ONLY + u HORN/STROBE OR STROBE ONLY POWER SUPPLY & RELAY MODULE WIRING DETAIL HONR STROBES & STROBES ONLY WIRING DETAIL TO NEXT DEVICE OR END OF LINE TYPICAL WIRING AND MOUNTING DETAILS CEILIN TILE NOTE FOR ADDITIONAL SPECIFICATIONS SEE PRODUCT DOCUMENTATION. OPER TIN TEMPERA RE +32' F (O' C) TO 100' F�3g C) HUMIDITY: 0-9 % RELATIVE HUMIDITY, NON -CONDENSING HFP-11 SMOKE DETECTOR -4i" FROM PREVIOUS ADDRESSABLE DEVICE OR POWER SOURCE DATA IN (—) >— DATA IN (+) > DEVICE IS LISTED FOR AIR VOLOCITY APPUCATIONS OF 300-4000 FT/MIN WHEN USED IN CONJUNCTION WITH DUCT HOUSINGS AD -11P OR AD-11XPR DB -11 STANDARD SMOKE DETECTOR BASE REAR VIEW (-) (+) SMOKE DETECTOR WIRING DETAIL SUPPORT BRIDGE 4' SQUARE DEEP BOX CEILING HORN STROBE STROBE ONLY DROP CEILING MOUNTING HARD LID CEILING TO NEXT ADDRESSABLE DEVICE SUPPORT BRIDGE 4' SQUARE DEEP BOX CEILING HORN STROBE STROBE ONLY HARD LID MOUNTING HORN STROBE & STROBE CEILING MOUNTING DETAIL JUNCTI❑N BOX MOUNTED ON CEILING FLEX JUNCTION BOX MOUNTED AGAINST CEILING SUPPORT SMOKE/HEAT DETECTOR TO NEXT DEVICE CADDY BAR SUSPENDED ILLUMINATED CEILING SMOKE/HEAT DETECTOR MOUNTING DETAIL t� co 16111111:O F— F- Z N Iii S� la yw J F— LU 14 —t C/7 to L11 N Q Lig w ro •J CI5 ~ F— RELEASE/REVISIONS IREV. BY: DMG DESCRIPTION SHOP DRAWINGS LLI o M co rn 0 2 <<< << Z .,c O J 00 2z QW O 1-0 W wcn zz < c/J —1 Lu 0 L � W D 0 z 0 0 Z EEC'3 Z J 0 �CALE: NOT TO SCALE DRAWN BY: D. GARCIA DESIGNED BY: R. VEZZANI DATE: 09/26/13 BACKROUND PLAN PROVIDED BY: .JOB NUMBER: 6071-1i C SHEET ''' FA -02 Proprietary and Confidential, Copyright 2012 by Guardian Security Systems, Inc. All Rights Reserved �' f,;�, "i r „ii fi d+, k;,' ,,,( 5 r },!, t. 1 d �L �'� �.}�<t Gk,P a � '. 61 p L $ y g�^'�,��'� + f ff} 'nnµµ��p y i� x d}"14"Mik� SM}r"}'f .` di1.VA ',I 'i Rdh,,! tr,��', f7 7 '"fi � f � 3'P"j1�{ Y➢�'��f �by 1w F{ w� �fr x k i M1 r „ f45 . f a t Ca r b§ 8 w„ f ^e ! 4{ �� dS 4 1 w 5 ➢i• yYl,t� w�yeY4% .I^„' ,". � • AC' „, A d y,,i Y Y 1� � �` 'Y n.' DESCRIPTION SHOP DRAWINGS t :lti, r ;m ➢$ Current Load: ; ° SSI"idb w ,_ Standby: Alarm: ;, 2 <«<)‹. Device Type Qty Amps Total Amps Total HFP-11 0.0022 0.0022 0.0023 0.000 AD2-P 1 0.0635 0.0635 0.064 0.064 HTR -R 2 0.009600 0.0096 0.021 0.042 ZH-MC-CW @30CD 5 0.131 ZH-MC-CW @75CD 7 0.222 al -MC -CW @95CD 3 0.0731 Amps 0.106 Amps � �YJ➢. y'; d fir: L,r.:'3?%{ '�. ' s$ � 'r' ➢ '`r}�d .r'4,` f� ➢§t; 7 S'.a f : yt 1, , :4 4( °' ? a t '' ';,y ,5'^o 'i', '.� �,w, y .,, 'r,. '•,v"' w E' fi',';,r, ,. ..., a'. 9., ,r Y9 "¢, }", ,A�,.r �'+iY w�. 11' "a'tx rv, r.,.. �,,,, �L�, 4 � F, � :," � «�� .: .,� w�r,'� 0�7 � 9 7 �, « ...a. � ��, ,,, �. a �:, � .,� , r•fi ��,,4R; 4 �,.., . �, 1 ,^ � ,. w'„.� � 1r „��S : 1~ V., "1Vyy , �, i,4 rl, y :1 0 rvk,, }, ",, ��',:$ .P W}5' n "p � ,,'����e, '� 1��'t'e�'�,� y DESCRIPTION SHOP DRAWINGS t :lti, r ;m ➢$ ; ° SSI"idb w ,_ DATE '�I` . ;, 2 <«<)‹. Device Type Qty Amps Total Amps Total Main System Board 1 0.03 0.03 0.030 0.030 Z1 -1 -MC -CW , @15CD 14 0.0875 ZH-MC-CW @30CD 5 0.131 ZH-MC-CW @75CD 7 0.222 al -MC -CW @95CD 3 0.292 0.876 ZH-HMC-CW @115CD 0.371 ZR -MC -CW @15CD 14 0.069 0.966 ZR MC -W @'15CD 3 0.064 0.192 0.03 Amps 2.064 Amps Standby Current Load: 0.03 Amps For 24 Hours = 0.720 Amp -hours Alarm Current Load: 2.064 Amps ° For 5 Minutes= 0.173 Amp -hours 25% Derating= 1.117 Amp -hours Total System Current Load: 1.117 Amp -hours *: P w 'B `ryn> f Battery4 a i to be Used. 12VDC �� R Ahip-h C Ir ~ Notification Appliance Circuit Detail PROJECT: '; ZALES Panel: EXISTING PAD -3 POWER SUPPLY Date: ; September 26, 2013 Wire Resistance 2.58 CURRENT TOTAL=1600.00 1 ZH-MC-CW @15cd " �ZH-MC-CW @30cd 2,ZH-MC-CW @75cd ,ZN-MC-CW _@95cd_.� 71 -MC -CW @115cd ZR-MC-CWµ@15cd DEVICES 4 87, 87 131 0 222 444: . �,.. 292 371; 69 TOTAL mA= 600; 14 216 23.33 j 600 !Total Wire Resistance ( R ) TotalDe_vice Load; Amps (I) a ?Volta Drop p(E ) EOL Voltage (WL*2)*(R/ft) t J (Total, Cct" Loail) (E=I*R) 24-E 1.11 0.60 0.67 23.33 SYSTEM CALCULATIONS TO NEAREST EXISTING POWER SUPPLY TO NEAREST EXISTING DATA LOOP S b D 2S EOL S3 S3-1 15cd HT -R S3-2 S3-3 15cd 75cd D,I 1 HT -R zi TSM SINGLE LINE DIAGRAM b S3-4 75cd FLAG NOTES: FIELD LOCATE RELAY MODULE FOR BACKGROUND MUSIC INTERFACE. DUCT DETECTOR, RELAY MODULE FOR FAN SHUTDOWN & TEST SWITCH. LOCATIONS TO BE FIELD VERIFIED BY MECHANICAL, ELECTRICAL AND FIRE ALARM CONTRACTORS. FIELD LOCATE TENANT JUNCTION BOX IN BACKHOUSE CORRIDOR. Proprietary and Confidential, Copyright 2012 by Guardian Security Systems, Inc. All Rights Reserved RELEASE/REVISIONS IREV. BY: I DMG DESCRIPTION SHOP DRAWINGS DATE 09/26/13 2 <«<)‹. oQco co 0 2Z WO W w ZZ J U= �-< cc 0 [C �' Q LU�� cc n IL- 1 -- cc 0 w z w y— (1) ‘CALE: NOT TO SCALE DRAWN BY: D. GARCIA DESIGNED BY: R. VEZZANI DATE: 09/26/13 BACKROUND PLAN PROVIDED BY: .OB NUMBER: 6071-1 C SHEET FA -03 i TO NEAREST TO NEAREST EXISTING EXISTING DATA LOOP POWER SUPPLY BELC W (P'� 8'— 0' GYP. AFF 3D. LIG- \'lEC- TI\G AND L -°END S160L04-092711 SYMBOL DESORPTION EMERGENCY LIGHTING • (CEILING—MOUNTED) 1 V///1 EXIT LIGHTING ( =4 l'ill RECESSED ACCENT LIGHTING RECESSED LIGHTING 13 rim o foo 01I 0 RECESSED GENERAL AREA UGHTING 0 RECESSED LIGHTING ON NIGHT LIGHT CIRCUIT SURFACE MOUNTED LIGHTING • .,=,,,,,„, RECESSED 1x4 LIGHT U TRACK LIGHTING 0 > TRACK ACCENT UGHT1NG UNDER COUNTER LIGHTING; LIGHTING UNDER CLG BELOW I WALL SCONCE 0 SUPPLY AIR GRILLES —I I(—/i Ft RETURN AND/OR EXHAUST AIR GRILLES 121 ACCESS PANEL SPRINKLER HEAD Notes: Not all symbols are used on all stores. Refer to the Mechanical and Electrical Schedules and Leaends for additional symbols and descriptions. 4'-4" — 0' 7/8" MARK I -CI -D C ►�C A\ \OTk-S SO1 ON12-102111 KEYED NOTES: 1. ACCESS PANEL BY TGC. STEALTH TR—AP024 24"x24" TO BE INSTALLED PER MANUFACTURER SPECIFICATIONS. FINISH: TEXTURE AND PAINT TO MATCH CEILING. GENERAL NOTES: • If conflict occurs, do not adjust light fixture locations or any ceiling elements without approval from Zale project manager. • Lighting location dimensions shown are for reference only. REfer to detail for actual light placement. * Surface mounted light fixtures in work areas to be mounted 10 ceiling grid, unless noted otherwise. * Speakers and other ceiling elements to be installed in line with adjacent objects/fixtures. * In ceilings adjacent to a non—conditioned space with a ducted return, T.G.C. shall install insulation with R-19 value or equal. Install non—combustible fibrous batt insulation with c vapor barrier on corditioned side. No insulation to be placed above recessed light fixtures. 4'-7 1/4" / 4'-0 7/8" 4'-0 7/8" / 4'-0 7/8" 4'-6 7/8" / 5'-0 7/8" 5'-0 7/8" 5'-0 7/8" 3'-9 1/4" S3-1 15cd CENTER _IGHT IN CEILING {BELOW c' -2S i 325 L —I EO (A1) 14'— 0" AFF LAY—IN CENTER LIGHT IN CEILING BELOW BELOW 8'— 0" AFF S3-2 15cei 41111111 r Y1 N A H -R 1.21 of roofs uoorl 2S 0 S3-3 75cd 0 HT -R TSM 11'— 0" AFF GYP. BD. io u U It 2S 0 1 �' GYP. BD. 1777 �II L o -1, 16== J S3-4 75cd X 0 Li 0 of o� z 0 E— a- it LU o r o� (f o, • .,=,,,,,„, 0 351 (P1) 10'— 0" AFF 125 v 10'— 0" AFF GYP. BD. 4i. 10'— 0" AFF] GYP. BD. REFLECTED CEILING PLAN - FIRE ALARM 325 (Pi) 10'— 0" AFF GYP. BD. GYP. BD. Pro FLAG NOTES: FIELD LOCATE RELAY MODULE FOR BACKGROUND MUSIC INTERFACE. DUCT DETECTOR, RELAY MODULE FOR FAN SHUTDOWN & TEST SWITCH. LOCATIONS TO BE FIELD VERIFIED BY MECHANICAL, ELECTRICAL AND FIRE ALARM CONTRACTORS. FIELD LOCATE TENANT JUNCTION BOX IN BACKHOUSE CORRIDOR. rieta and Confidential, Co. ri•ht 2012 b Guardian Securit S stems, Inc. All R' hts Reserved C I %. 1743 IST AVE FAX (206) 628-4990 TEL. (206) 622-654.5 REV. BY: DMG z 0 E— a- it LU SHOP DRAWINGS 0 DATE M co N 0) 0 o <C«< Z �co omz 9 o W U)W z z W v= J HiQ 1 O� cc W 0irLLi w LL z z 0 D W LL W CC �CALE: 1/4"=1'0" DRAWN BY: D. GARCIA DESIGNED BY: R. VEZZANI DATE: 09/26/13 BACKROUND PLAN PROVIDED BY: \0B NUMBER: 6071-1 SHEET FA -04 SITE LOCATION CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East Tukwila, WA 98188 206-575-4407 Date application accepted: FIRE PROTECTION SYSTEMS PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. **PLEASE PRINT** King Co. Assessor's Tax No.: 9202470010 Site Address: 1000 Southcenter Mall, Tukwila, 98188 Suite Number: Floor: Tenant Name. Zales New Tenant? 0 - Yes ❑ - No Property Owner's Name: Westfield Property Tax Dept. Mailing Address: POB 130940, Carlsbad, CA 92013 City State Zip CONTACT PERSON -if there are questions about the submittal. Name: Karina Veliz Day Telephone: 206.349.5889 Company Name: Guardian Security Systems Mailing Aaaress:1743 First Ave South, Seattle, WA 98134 E-mail Address: kveliz@guardiansecurity.com City State Zip Fax Number: 206.628.4990 Total number of new/relocated devices or sprinkler heads: 8 Valuation of Project (contractor's bid price): ?AL Scope of Work (please provide detailed information): Adding 8 devices to existing FACP PERMIT APPLICATION NOTES Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Fire Marshal to comply with current fee schedules. Expiration of Plan Review -Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The Fire Marshal is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OR WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OR R AUTHOR ZAGENT: S- • l Signature: Date: Print Name: Karina Veliz Day Telephone: 206.349.5889 Plan Permit App.doc 1/2/13 TFD FP Form 8