Loading...
HomeMy WebLinkAboutPermit D18-0005 - SAHALE SNACKS - NEW WINDOWThis record contains information which is exempt from public disclosure pursuant to the Washington State Public Records Act, Chapter 42.56 RCW as identified on the Digital Records Exemption Log shown below. D18-0005 SAHALE SNACKS 3411 S 120TH PL #100 THE ABOVE MENTIONED Page # DIGITAL Code RECORDS PERMIT FILE INCLUDES Exemption, (DR) EXEMPTION LOG THE FOLLOWING REDACTED INFORMATION Brief Explanatory Description Statute/Rule Personal Information — The Privacy Act of 1974 evinces Congress' intent that social security numbers are a private concern. As such, individuals' social security numbers are redacted to protect those Social Security Numbers individuals' privacy pursuant to 5 U.S.C. sec. 5 U.S.C. sec. DR1 Generally — 5 U.S.C. sec. 552(a), and are also exempt from disclosure 552(a); RCW 552(a); RCW under section 42.56.070(1) of the Washington 42.56.070(1) 42.56.070(1) State Public Records Act, which exempts under the PRA records or information exempt or prohibited from disclosure under any other statute. Redactions contain Credit card numbers, debit card numbers, electronic check numbers, credit Personal Information — expiration dates, or bank or other financial RCW 16 DR2 Financial Information — RCW 42.56.230(4 5) account numbers, which are exempt from disclosure pursuant to RCW 42.56.230(5), except when disclosure is expressly required by or governed by other law. 42.56.230(5) (7a) Redactions contain information used to prove identity, age, residential address, social security number or other personal information Personal Information — Driver's License. RCW required to apply for a driver's license or RCW DR3 — identicard. 42.56.230 42.56.230 (7a & c) (7c) Any record pertaining to a vehicle license plate, driver's license, or identicard issued under (7a & c) RCW 46.08.066 that, alone or in combination with any other records, may reveal the identity of an individual. Redacted content contains a communication between client and attorney for the purpose of obtaining or providing legal advice exempt from RCW DR4 Attorney -Client Privilege — RCW 5.60.060(2)(a); RCW disclosure pursuant to RCW 5.60.060(2)(a), which protects attorney-client privileged 5.60.060(2)(a); RCW 42.56.070(1) communications, and RCW 42.56.070(1), which protects, under the PRA, information exempt or prohibited from disclosure under another statute. 42.56.070(1) SAHALE SNACKS 3411 S 120T" PL 100 DI 8-0005 Parcel No: Address: C City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 1023049069 3411 S 120TH PL 100 Project Name: SAHALE SNACKS DEVELOPMENT PERMIT Permit Number: D18-0005 Issue Date: 1/26/2018 Permit Expires On: 7/25/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: SABEY CORPORATION 12201 TUKWILA INTL BLVD 4THFL, SEATTLE, WA, 98168 ANNA KRASINSKAYA 12201 TUKWILA INT'L BLVD , TUKWILA, WA, 98168 SABEY CONSTRUCTION INC 12201 TUKWILA INTL BLVD 4TH FLOOR, TUKWILA, WA, 98168-5121 SABEYCI033KM SABEY CORPORATION 12201 TUKWILA INT'L BLVD , TUKWILA, WA, 98168 Phone: (206) 281-8700 Phone: (206) 281-4200 Expiration Date: 1/12/2019 DESCRIPTION OF WORK: PLACING A NEW WINDOW INTO AN EXISTING NON-STRUCTURAL EXTERIOR WALL Project Valuation: $2,500.00 Type of Fire Protection: Sprinklers: YES Fire Alarm: YES Type of Construction: VB Electrical Service Provided by: TUKWILA Fees Collected: $270.92 Occupancy per IBC: S-1 Water District: 125 Sewer District: VALLEY VIEW Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: 0 Volumes: Cut: 0 Fill: 0 Number: 0 Permit Center Authorized Signature: Date: 1—.210—.( 8 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permitnd agree to the conditions attached to this permit. Signature: l i ,�� / Date: Print Name: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0409 FRAMING 0606 GLAZING CITY OF TUKIWA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov josio Building Pertriit-No. 1)5 -OOOq Project No. li Date Application Accepted: n1 V Date Application Expires: I l b (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: 1023049069 Site Address: 3411 S. 120TH PLACE, TUKWILA, WA 98168 Suite Number: 100 Tenant Name: SAHALE SNACKS PROPERTY OWNER Name: INTERNATIONAL GATEWAY EAST LLC Address: 12201 TUKWILA INT'L BLVD City: TUKWILA State: WA Zip: 98168 CONTACT PERSON — person receiving all project communication Name: ANNA KRASINSKAYA Address: 12201 TUKWILA INT'L BLVD City: TUKWILA State: WA Zip: 98168 Phone: (206) 281-8700 Fax: (206) 282-9951 Email: ANNAK@SABEY.COM GENERAL CONTRACTOR INFORMATION Company Name: SABEY CONSTRUCTION Address: 12201 TUKWILA INT'L BLVD City: TUKWILA State: WA Zip: 98168 Phone: (206) 281-8700 Fax: (206) 282-9951 Contr Reg No.: SABEYCI033KM Exp Date: 01/12/2019 Tukwila Business License No.: BUS -0102122 H:'Applications\Forms-Applications On Line \2011 Applications\Permit Application Revised - 8-9-11.docx Revised: August 2011 bh New Tenant: Floor: ❑ Yes j..No 1 ARCHITECT OF RECORD Company Name: SABEY ARCHITECTURE Architect Name: KARA ANDERSON Address: 12201 TUKWILA INT'L BLVD City: TUKWILA State: WA Zip: 98168 Phone: (206) 281-8700 Fax: (206) 282-9951 Email: ANNAK@SABEY.COM ENGINEER OF RECORD Name: SABEY CORPORATION Address: 12201 TUKWILA INT'L BLVD Company Name: N/A Engineer Name: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: SABEY CORPORATION Address: 12201 TUKWILA INT'L BLVD City: TUKWILA State: WA Zip: 98168 Page 1 of 4 BUILDING PERMIT INFORMATIOPC06-431-3670 Valuation of Project (contractor's bid price): $ 2,500 Describe the scope of work (please provide detailed information): Win \M NJ Will there be new rack storage? ❑ Yes Existing Building Valuation: $ 0.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes © No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: Sprinklers Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If "yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system. provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line \2011 Applications \Permit Application Revised - 8-9-11.docx Revised: August 2011 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC ls` Floor 98,570 V -B S-1 2nd Floor 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes © No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: Sprinklers Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If "yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system. provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line \2011 Applications \Permit Application Revised - 8-9-11.docx Revised: August 2011 bh Page 2 of 4 PUBLIC WORKS PERMIT INFOCATION — 206-433-0179 Scope of Work (plea* provide detailed information): 44 a VAMOO. Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ ...Tukwila ❑... Water District #125 ❑ ...Water Availability Provided Sewer District ❑ ...Tukwila ❑ ...Sewer Use Certificate ❑ .. Highline ❑ ... Valley View ❑ .. Renton ❑ ... Sewer Availability Provided ❑ .. Renton ❑ .. Seattle Septic System: 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ❑ ...Civil Plans (Maximum Paper Size — 22" x 34") O ...Technical Information Report (Storm Drainage) 0 ...Bond ❑ .. Insurance ❑ .. Easement(s) Proposed Activities (mark boxes that apply): ❑ ...Right-of-way Use - Nonprofit for less than 72 hours ❑ ...Right-of-way Use - No Disturbance ❑ ...Construction/Excavation/Fill - Right-of-way ❑ Non Right-of-way 0 ❑ ...Total Cut ❑ ...Total Fill cubic yards cubic yards ❑ ...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑ ...Frontage Improvements ❑ ...Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ .. Geotechnical Report ❑ .. Maintenance Agreement(s) ❑...Traffic Impact Analysis ❑ ...Hold Harmless — (SAO) ❑ ...Hold Harmless — (ROW) ❑ .. Right-of-way Use - Profit for Tess than 72 hours ❑ .. Right-of-way Use — Potential Disturbance ❑ .. Work in Flood Zone ❑ .. Storm Drainage ❑ .. Abandon Septic Tank ❑.. Curb Cut ❑ .. Pavement Cut ❑ .. Looped Fire Line ❑ .. Grease Interceptor ❑ .. Channelization ❑ .. Trench Excavation ❑ .. Utility Undergrounding 0 ...Permanent Water Meter Size... , WO # ❑ ...Temporary Water Meter Size .. WO # ❑ ...Water Only Meter Size WO # ❑ ...Deduct Water Meter Size ❑ ...Sewer Main Extension Public ❑ Private 0 0 ...Water Main Extension Public ❑ Private ❑ FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) ❑ ... Water ❑ ...Sewer ❑ ...Sewage Treatment Monthly Service Billing to: Name: Day Telephone: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: City State Zip Day Telephone: City State Zip H:\Applications\Forms-Applications On Line \2011 Applications\Permit Application Revised - 8-9-11.docx Revised: August 2011 bh Page 3 of 4 PERMIT APPLICATION NOTES — Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNE'O c THORIZED AGENT: Signature: / % /1,� i,�i Print Name:Y�lr y\Y-04sAL6W Day Telephone: (206) 281-8700 Date: 01 loqir Mailing Address: 12201 TUKWILA INT'L BLVD H:\Applications\Forms-Applications On Line \2011 Applications\Permit Application Revised - 8-9-11.docx Revised: August 2011 bh TUKWILA WA 98168 City State Zip Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $270.92 D18-0005 ' Address: 3411 S 120TH PL 100 Apn: 1023049069 $270.92 Credit Card Fee $7.89 Credit Card Fee I R000.369.908.00.00 0.00 $7.89 DEVELOPMENT $255.43 PERMIT FEE R000.322.100.00.00 0.00 $152.08 PLAN CHECK FEE R000.345.830.00.00 0.00 $98.85 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $7.60 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R13203 R000.322.900.04.00 0.00 $7.60 $270.92 Date Paid: Friday, January 05, 2018 Paid By: KARA ANDERSON Pay Method: CREDIT CARD 013853 Printed: Friday, January 05, 2018 2:36 PM 1 of 1 SYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 DIS -000C Project: SA h A Lf . S t t& s T e fat Ins ection: �� 1 f � >�iL Address: 'j1 3q11 S. l2_4. loo Date Called: Special Instructions: Date Wanted: (.f h `� i v ' �/ a.m. P.m. Requester: Phone No: 2°6-39/ 370/ Approved per applicable codes. Corrections required prior to approval. COMMENTS: tdC, ,c\? F `1Go S Ail -L. dA) `fie 1-1/9/2-0/8- — Inspector: Date: i /. ^ 2.0/e REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit M-Ov3 INSPECTION N0. PERMIT NO. 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 CITY OF TUKWILA BUILDING DIVISION Permit Inspection Request Line (206) 438-9350 Project?... Ji4 ehr I e.c. ir� Type of Insp ction: f7'1M� �C4r2JI/ ANAL A ryr i St `Ze, I i s .e Special Instructions: Date Wanted: a.m. p.m. `��Q�Za/B /r c4LL- Fi Y S + Requester: 6 be,r Phone No: Z 311 ^ C) 7o / Approved per applicable codes. Corrections required prior to approval. COMMENTS: /IA 2; FttiA-1_ I nspector:`"C�� Date: 2o1( REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMITNO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 bIS -0305 Project: T.= of Inspection: _ t.:,1Cctl)V /- ivaL` a. - '., Address: .1}} 3yi 1 Sr I.2o FL /OD Date Called: v Special Instructions: Ske.,1 Date Wanted: _ 5 2d/g- p.m. Requester: / ' 4S!Av ACJC_..]c Phone No: Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: (€.0.3-e -s4Ard,kle, 8±..0a -e_ prV J pew) Inspector—F .ti Date: % S.......z.c,v15/ REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. U Q PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D18-0005 PROJECT NAME: SAHALE SNACKS SITE ADDRESS: 3411 S 120TH PL 100 X Original Plan Submittal Response to Correction Letter # DATE: 01/08/18 Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: AT NC 1-&Oi g Building Division ❑ /k Nkk Ila\ Pubfic Works on14A-614 Fire Prevention Structural N/ Planning Division ❑ ❑ Permit Coordinator ❑ PRELIM! NARY REVIEW: Not Applicable (no approval/review required) REVIEWERS INITIALS: DATE: 01/09/18 Structural Review Required DATE: APPROVALS OR CORRECTIONS: DUE DATE: Approved ❑ Approved with Conditions Corrections Required ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: 02/06/18 REVIEWERS INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 SABEY CONSTRUCTION INC c IIorne Espanol Contact Safety & Health 0 Washington State Department of Labor & Industries Claims & Insurance Search L&I A -Z Latex Help Workplace Rights SABEY CONSTRUCTION INC Owner or tradesperson Principals SABEY, DAVID ARTHUR, PRESIDENT SEWELL, PATRICIA ANNE, SECRETARY POOLE, LAURENT D, SECRETARY (End: 01/19/2011) . HARMON, JAMES N, TREASURER (End: 01/19/2011) Doing business as SABEY CONSTRUCTION INC WA UBI No. 601 532 164 12201 TUKWILA INT'L BLVD 4TH FLOOR SEATTLE, WA 98168-5121 206-281-4200 KING County Business type Corporation Governing persons SABEY CORPORATION DAVID A SABEY; JOHN D SABEY; PATRICIA SEWELL; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. SABEYCI033KM Effective — expiration 05/14/1997— 01/12/2019 Bond ...... _...... HARTFORD FIRE INSURANCE CO Bond account no. 52BSBCQ3983 Received by L&I 12/20/2004 Insurance ....................... National Fire Ins of Hartford Policy no. 2094061165 Received by L&I $12,000.00 Effective date 12/31/2004 Expiration date Until Canceled $1,000,000.00 Effective date Page 1 of 2 A My L&L Trades & Licensing Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601532164&LIC=SABEYCI033KM&SAW= 1/26/2018 SABEY CONSTRUCTION INC 11/03/2016 Insurance history Savings ......................... (in lieu of bond) Received by L&I Release date N/A Savings account ID 11/01/2016 Expiration date 04/30/2018 $6,000.00 Effective date 04/21/1994 Impaired date N/A Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts .......................................... No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 331,221-02 ................................. Doing business as SABEY CONSTRUCTION Estimated workers reported Quarter 3 of Year 2017 "11 to 20 Workers" L&I account contact TO / JULIE SUR (360)902-4715 - Email: SURJ235@Ini.wa.gov Account is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes .............................................. _....... No strikes have been issued against this contractor. Contractors not allowed to bid ............._......................................................................... No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 07/02/2015 Inspection no. 317936768 Location 2200 M St. NE Quincy, WA 98848 No violations Page 2 of 2 Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601532164&LIC=SABEYCI033KM&SAW= 1/26/2018 GENERAL NOTES 1. CONTRACTOR SHALL COMPLY WITH THE CURRENT "GENERAL CONDITIONS," AND BUILDING STANDARDS AS PROVIDED BY THE BUILDING OWNER. 2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF DIFFERENT TRADES.TUKWILA, 3. DO NOT SCALE DRAWINGS. CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS. 4. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE OWNER AND ARCHITECT FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES SHOWN ON SHOP DRAWING ONLY. WILL NOT SATISFY THIS REQUIREMENT. 5. ALL MODIFICATIONS, REQUIRING OWNER OR ARCHITECT APPROVAL WILL NOT BE VALID UNLESS AUTHORIZED IN WRITING BY OWNER AND/OR ARCHITECT. 6. WITHIN FIVE (5) BUSINESS DAYS OF START OF CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY IN WRITING BOTH H I HE ARCHITECT AND OWNER OF ANY ITEMS EMS WHOSE ESTIMATED I tU DELIVERY TO THE SITE t WOULD BE LATER THAN THAT REQUIRED FOR TIMELY INSTALLATION IN THE CONSTRUCTION SEQUENCE SUBSTITUTION OF ALTERNATE ITEMS WITH SHORTER LEAD TIMES, PAYMENT OF RUSH FABRICATION OR DELIVERY CHARGES OUT OF SEQUENCE INSTALLATION, OR DELAY OF INSTALLATION OPTIONS TO BE AT THE SOLE APPROVAL OF OWNER OR ARCHITECT. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL WORK AND MATERIALS IN ACCORDANCE WITH THE LATEST LOCAL BUILDING CODES AND ORDINANCES. 8. CONTRACTOR SHALL VERIFY ALL FIELD DIMENSIONS AND CONDITIONS AND SHALL REPORT ANY CONFLICTS OR QUESTIONS FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK. DO NOT SCALE THE DRAWINGS. 9: THE USE OF WORD "PROVIDE" SHALL ALWAYS MEAN,"FURNISH AND INSTALL, CONNECT, OR SECURE" AS REQUIRED. 10. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURERS WRITTEN INSTRUCTIONS AND TRADE ASSOCIATES ACCEPTED STANDARDS. 11. CONTRACTOR SHALL PROVIDE A WRITTEN CONSTRUCTION SCHEDULE. THIS SCHEDULE SHALL INCLUDE DELIVERY LEAD TIMES OF CONSTRUCTION ITEMS, AND START AND COMPLETION DATES OF EACH PHASE. THE CONTRACTOR SHALL UPDATE AND PROVIDE SUCH SCHEDULE ON A BIWEEKLY BASIS. 12. WORK MUST BE SCHEDULED WITH THE BUILDING MANAGEMENT TO AVOID DISRUPTION TO THE TENANTS. 13. ACCESS TO AND FROM THE PROJECT SITE, SPECIAL CONDITIONS, NOISY WORK, TIMING OF WORK, INTERRUPTION OF MECHANICAL AND ELECTRICAL SERVICES, RELOCATION OF EXISTING EQUIPMENT, CASEWORK, FIXTURES, FITTINGS, ETC., MUST BE COORDINATED WITH THE BUILDING MANAGEMENT. 14. ADEQUATE CLEANUP, PROTECTION AND PLACEMENT OF ANY CEILING TILES AND/OR OTHER DISRUPTION TO THE ADJACENT TENANT IMPROVEMENTS MUST BE REPLACED BEFORE BUSINESS HOURS OF THAT TENANT IN ORDER THAT THE OCCUPANT WILL NOT BE INCONVENIENCED IN THE NORMAL CONTINUATION OF THEIR OFFICE HOURS. CONTINUATION 15. EACH SUBCONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO ADJACENT WORK AND SHALL REPAIR;. SAID DAMAGE AT THEIR OWN EXPENSE. THIS INCLUDES ALL AREAS ON THE PREMISES SUCH AS: COMMON HALLWAYS, FREIGHT ELEVATOR VESTIBULES, ETC. 16. SCHEDULE THE USE OF THE ELEVATOR WITH BUILDING MANAGEMENT. 17. UPON COMPLETION OF ALL CONSTRUCTION, THE CONTRACTOR SHALL SUPPLY THE LANDLORD WITH ONE SET OF "RECORD" AS -BUILT DRAWINGS.G 18. ALL MATERIALS TO BE NEW UON. 19. PATCH ALL DISTURBED AND/OR DAMAGED AREAS AS REQUIRED TO ACCOMPLISH NEW WORK AND AS REQUIRED FOR FINISHED APPEARANCE. 20. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY BACKING, BLOCKING, AND FRAMING FOR LIGHT FIXTURES, ELECTRICAL FIXTURES, CASEWORK ANU ALL O I MLR I I EMS KtQUIKING 1 I . A.. 21. CONTRACTOR TO COORDINATE ALL FIRE ALARM WORK WITH BUILDING OWNER. 22. ALL PAINT AND FINISH MATERIAL COLORS SHALL MATCH ARCHITECT'S CONTROL SAMPLES AND ' INSTALLATION. SUBMIT TO ARCHITECT THREE(3)COPIES FOR REQUIRE ARCHITECT'S REVIEW PRIOR TO REVIEW. 23. CONTRACTOR SHALL FURNISH SHOP DRAWINGS FOR REVIEW ON CABINETWORK, MILLWORK AND ANY OTELSWREQUIRINGHER CUSTOM SHOP FABRICATION. SUBMIT TO ARCHITECT AT LEAST THREE 24. REPETITIVE FEATURES NOT FULLY SHOWN OR NOTED ON THE DRAWINGS SHALL BE COMPLETELY PROVIDED AS IF DRAWN IN FULL. 25. THROUGHOUT THE DRAWINGS ARE ABBREVIATIONS WHICH ARE IN COMMON USE. THE LIST OF ABBREVIATIONS PROVIDED IS NOT INTENDED TO BE A COMPLETE LIST. THE ARCHITECT WILL DEFINE THE INTENT OF ANY IN QUESTION. INTENT ARCH / INTERIOR ABBREVIATIONS ADJ - ADJUSTABLE MECH - MECHANICAL AFF - ABOVE FINISH FLOOR MEZZ - MEZZANINE ALT - ALTERNATE MFR - MANUFACTURER ALUM -ALUMINUM MIN -MINIMUM APC - ACOUSTICAL PANEL CEILING MISC - MISCELLANEOUS APPROX - APPROXIMATE MTD - MOUNTED ARCH - ARCHITECTURAL MTL - METAL ACT - ACOUSTICAL CEILING TILE N/A - NOT APPLICABLE AV -AUDIO VISUAL NIC - NOT IN CONTRACT BLDG -BUILDING NTS - NOT TO SCALE BOT - BOTTOM CAB - CABINET OC - ON CENTER OFF . - OFFICE CL - CENTER LINE CLG -CEILING OPNG - OPENING CLR -CLEAR OVHD - OVERHEAD COL -COLUMN P - PAINT PART - PARTITION CONC - CONCRETE CONF - CONFERENCE PERF -PERFORATED PERIM - PERIMETER DEMO - DEMOLITION PERP - PERPENDICULAR DEPT -DEPARTMENT PLAN/ - PLASTIC LAMINATE DF = DRINKING FOUNTAIN PLYWD - PLYWOOD DIA - DIAMETER QTY - QUANTITY DIFF - DIFFUSER DIM - DIMENSION (R) - RELOCATED DTL - DETAIL RA - RETURN AIR DW - DISHWASHER RCP - REFLECTED CEILING PLAN DWG - DRAWING REC - RECESSED EA - EACH REF - REFERENCE EL - ELEVATOR REFR : - REFRIGERATOR ELEC - ELECTRICAL REL - RELOCATE ELEV - ELEVATION REV - REVISION OR REVISED EQ - EQUAL RM -ROOM EQUIP - EQUIPMENT RIC) -ROUGH OPENING EXT - EXTERIOR RTD - RATED FA - FIRE ALARM SCHED - SCHEDULE FD - FLOOR DRAIN SF - SQUARE FEET/FOOT FE - FIRE EXTINGUISHER SHT - SHEETG FEC - FIRE EXTINGUISHER CABINET SIM - SIMILAR FFE - FINISH FLOOR ELEVATION SPEC - SPECIFICATION FIN - FINISH - SPRINKLER FLUOR _FLUORESCENT SPKR _SPEAKER FLR _FLOOR SQ -SQUARE FO -FACE OF STD - STANDARD FDIC -FURNISHED BY OWNER, INSTALLED STL - STEEL BY CONTRACTOR FTIC - FURNISHED BY TENANT, INSTALLED STOR -STORAGE BY CONTRACTOR STRL - STRUCTURAL FURR -FURRING STRUC -STRUCTURAL GA - GAUGE SYMM - SYMMETRICAL GC - GENERAL CONTRACTOR TBD - TO BE DETERMINED GL - GLASS TEL - TELEPHONE OR TELECOM GWB - GYPSUM WALLBOARD TEMP - TEMPERED HC - HANDICAPPED THK - THICKNESS HDW -HARDWARE. TO - TOP OF HM - HOLLOW METAL (STEEL FRAME) TOS - TOP OF SLAB TYP- - TYPICAL HR - HOUR UNLESS OTHERWISE NOTED INCL -INCLUDED OR INCLUDING UON - INFO - INFORMATION UPS - UNINTERRUPTED POWER SUPPLY INSUL -INSULATION VCT -VINYL COMPOSITION TILE LAV - LAVATORY VlF -VERIFY IN FIELD 1 C 1 IAICA� G!+l+T - \AflTI-t LF - LINEAR FOOT 'yy/ - I MAXMAT- MATERIAL -MAXIMUM WC _WATER CLOSET WD WOOD MDF - MEDIUM DENSITY FIBERBOARD W/O - WITHOUT BUILDING SUMMARY 1. PROJECT ADDRESS: INTERGATE.EAST BLDG. 1 3411 S. 120TH PLACE SUITE 100 TUKWILA, WA 98168 2. APPLICABLE CODES: BUILDING CODE: 2015 INTERNATIONAL BUILDING CODE (WAC 51-50) MECHANICAL CODE: 2015 INTERNATIONAL MECHANICAL CODE (WAC 51-52) PLUMBING -CODE: 2015 UNIFORM PLUMBING CODE (WAC 51-56) ELECTRICAL CODE 2015 INTERNATIONAL ELECTRICAL CODE WITH WASHINGTON STATE AMENDMENTS ENERGY CODE: 2015 WASHINGTON STATE ENERGY CODE (WAC 51-11C) FIRE CODE: 2015 INTERNATIONAL FIRE CODE (WAC 51-54A) FUEL GAS CODE: 2015 INTERNATIONAL FUEL GAS CODE ACCESSIBILITY CODES: WASHINGTON STATE ACCESSIBILITY CODE (WAC 51-50) 3. GENERAL BUILDING DESCRIPTION: TYPE OF CONSTRUCTION: V-8 FIRE RESISTIVE SYSTEM: SPRINKLERED OCCUPANCY TYPE: STORAGE GROUP S-1 4. FIRE RESISTIVE CONSTRUCTION REQUIREMENTS: CORRIDORS: 1 HR 6. PROJECT DESCRIPTION: TENANT IMPROVEMENT TO EXISTING WAREHOUSE PORTION OF SUITE 100, BUILDING 1, INTERGATE EAST CAMPUS. THE WORK INCLUDES PLACING A NEW WINDOW INTO AN EXISTING NON-STRUCTURAL EXTERIOR WALL. PROJECT TEAM TENANT: GENERAL CONTRACTOR: SAHALE SNACKS SABEY CONSTRUCTION IGE BLDG. 1 12201 TUKWILA INTERNATIONAL BLVD. 3411 S. 120TH PLACE SUITE 100 SEATTLE, WA 98168 WA 98168 Tel 206.281.8700 Fax: 206.281.0920 ARCHITECT/DESIGNER: ATTN: PAUL SWANSON SABEY ARCHITECTURE 12201 TUKWILA INTERNATIONAL BLVD. PLUMBING ENGINEER: SEATTLE, WA98168TBD -Bidder Build G.C. Designby T'el: 206.281.8700 Fax: 206.281.0920 MECHANICAL ENGINEER: ATTN: ANNA KRASINSKAYA TBD - Bidder Design Build by G.C. BUILDING OWNER: ELECTRICAL ENGINEER: INTERNATIONAL GATEWAY EAST LLC TBD - Bidder Design Build by G.C. 1.2201 TUKWILA INTERNATIONAL BLVD. FOURTH FLOOR FIRE/LIFE SAFETY ENGINEER: SEATTLE, WA 98168 TBD - Bidder Design Build by G.C. Tel 206.281.8700 ATTN: ANNA KRASINSKAYA PLUMBING, MECHANICAL, ELECTRICAL, LIFE SAFETY PERMITS UNDER SEPARATE SUBMITTALS. S + - EP SEPARATE PERMIT REQUIRED FOR: , +l...i' Mechan cal L tectncal `p �numbing xzaS' NOM f City of Tulauita nivis STREET MAP ..----k G --� o LEGAL D E V C R PARCEL NO: 1023 049069 LEGAL DESCRIPTION: PORTION OF GOV 1,/4 THS 01-46-02 W 107.22 FT TH S 87-33-12 TH N 78-40-52 E 415.05 FT TO WLY MARGIN 104.42 FT TH S 17-01-47 E 100.50 FT TH I PT LOT 15 E 512.24 OF S 11-19-15 I O N /PARCEL N U M B E R IN SW 1/4 OF SECTION 10-23-04 BEGINi NW CORNER OF SW FT TO POINT OF BEGINNING THS 87-33-12 E 214.16 FT E MARGINAL WAY TH S 16-31-41 E 241.92 FT TH S 28-02-57 E E 13.28 FT TH N 58-13-58 W 473.87 FT TH S 01-46-02 W 37 FT (..3 w > � D 4S t wamlSII Rive T'H N 88-13-58 W 307.80 FT TH N 01-46-02 E 373.93 FT TO POINT OF BEGINNING - LOT 1 OF CITY OF TUKWILA BOUNDARY LINE ADJUSTMENT NO L2000-042 RECORDING NO 20000828900001 r � �,,s, REVISIONS - � Hwy 599 sk* Y• Y„xGpnxnR � reN NO Chant e S ShBt(b tle t0 the SCO - pg Df work lvith©ttt rror 8 Tttl P hAroval of c�✓1►a f�ullding ivisin- �.�r><:: P �r- R:tr��lol�s will re a n urd ma Ing Quire " Y es✓plan submitta+ Jude additional plan revrew fees. rtr; 120th P w.. DRAWING IND E / \ GO.0 COVER SHEET i PROJECT INFORMATION A . �+�Y SITE r 1 Q C�O.1 SITE PLAN A1.0 ARCHITECTURAL ELEVATIONS ��irnl �. C�(� ' S 124 -ti Pian raviaw a royal iS s. PP to errors and y •• l Q u .subject omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy and conditions is acicnow ledged. BY: 0I 14/1\ S( f -- A %I k ...= Qj Date: ��..L�.a,,,i, „�/ ,,G//0 or City of Tukwila BUILDING DIVISION DEFINITIONS AND DIMENSIONS A. DEFINITIONS: KEY PLAN / FLOOR PLATE -,:1 " WORK _ 40'_0" REVIEWED FOR CODE COMPLIANCE APPROVED � `� JAN �, 7 �0�� � City of Tukwila ®I I -. SlL Il i y \/l r . SYMBOLS ELEVATION REFERENCE SYMBOL 1 1 INDICATES FINISHED 1. 'TYPICAL" OR "TYP" INDICATES IDENTICAL COMPLETE SYSTEM FOR THE CONDITION NOTED: " LAR" OR "SIM." INDICATES COMPLETE SYSTEM AND COMPONENTS COMPARABLE TO THE 2. "SIMILAR" CHARACTERISTICS FOR THE CONDITION NOTED.AREAOF 3. AS REQUIRED"INDICATES CONTRACTOR SHALL PROVIDE COMPONENTS REQUIRED TO COMPLETE THE NOTED SYSTEM AS INDICATED IN THE PROJECT DOCUMENTS. 4. "ALIGN" INDICATES ACCURATELY PROVIDE FINISH FACES OF MATERIALS IN STRAIGHT,TRUE,AND PLUMB RELATION ADJACENT MATERIALS. ' . 5. "CLEAR" INDICATES CRITICAL DIMENSION AND SHALL SET PRECEDENT FOR LAYOUT OF PARTITIONS. P B. DIMENSIONS: 1 SURFACES TO ALIGN U DETAIL ID DRAWING TITLE BAR L :t R A.06.XX SHEET NO. DETAIL D IDENTIFICATION DRAWING TITLE GRAPHICAL 0 1 SCALE 2 3 4 TITLE o Q a a J1_y� .� . a SYMBOL SECTION REFERENCE Y DTL FLOOR �r e„ \\ I .._ `\ 5H1 ELEVATION SYMBOLS 92'--0" +1'-0" NOMINAL FLOOR 1. DIMENSIONS ARE INDICATED TO THE FACE OF FINISHED SURFACE AT ALL NEW AND EXISTING " CONSTRUCTION, CENTER OF COLUMNS OR GRID LINES UNLESS OTHERWISE NOTED. 2. ALIGNMENT OF PARTITIONS AND FINISHES AS SCHEDULED SHALL BE STRAIGHT, TRUE &PLUMB. DIMENSIONAL LAYOUT SHALL BE IN THE FOLLOWING PRIORITY ORDER. A. STRUCTURAL DRAWINGS BLARGE SCALE DETAILS B. C. SMALL SCALE DETAILS D. ENLARGED PLANS AND SECTIONS E. FLOOR PLANS 3. MINIMUM DIMENSIONS FOR ACCESSIBILITY CLEARANCES AND BUILDING CODE REQUIREMENTS SHALL BE MAINTAINED. - 4. FLOOR ELEVATIONS ARE INDICATED AT THE FACE OF THE STRUCTURAL SLAB, UNLESS OTHERWISE NOTED: 5. VERTICAL DIMENSIONS ARE INDICATED FROM THE FLOOR ELEVATION TO FACE OF FINISHED MATERIAL, UNLESS NOTED ABOVE FINISH FLOOR - "AFF"; 6. CEILING HEIGHTS ARE INDICATED FROM THE FLOOR ELEVATION TO THE FACE OF SUSPENDED ACOUSTIC CEILING GRID OR FACE OF FINISH MATERIAL FOR OTHER CEILING TYPES, UNLESS OTHERWISE NOTED: - 7. DOCUMENTS ARE DRAWN DIAGRAMATICALLY, AND SCALED DIMENSIONS ARE APPROXIMATE. DIMENSIONS SHALL INDICATE REQUIRED SIZE, CLEARANCES, AND RELATIONSHIPS ARE INDICATED BY DIMENSIONS AS NOTED. DETAIL REFERENCE SYMBOL BUILDING OIL „r-- ELEVATION HEIGHT (ABOVE/BELOW) SPACE / ROOM ID ° ° ° ° ° .1 SUITE 80 SUITE 100 El :. - OFFICE --iii-- SPACE NAME - ° ° ° � SHT 1127 --�- SPACE NUMBER° DOOR COLUMN AND/OR GRID LINE SYMBOL DIMENSION LINE: SYMBOL ¢ o o 4 ° ° If iii . SUITE 110 i i i t 201 I, 1 '1 l � 1 I .�.. - 0 10 20' 40' 80' %4 BUILDING DOCUMENT SHEET SYMBOL / AAIP.Ir_ L_ MIV . LC O * --a- KEYED SHEET NOTES - G1 -+at- O - - - I - - - SCALE: 1/40" - 11-0" s . f r.,. U GLAZING SYMBOL AT - - CENTERLINE /1 *V REVISION NUMBER . w�v .qafr SABEY ARCHITECTURE seattle, washington 206.281.8700 sabey.com 6194 REGISTERED KARA M. ANDERSON STATE OF WASHINGTON TENANT IMPROVEMENT: SAHALE SNACKS IGE BLDG. 1 INTERGATE.EAST BLDG. 1 3411 S. 120TH PLACE SUITE 100 TUKWILA, WA 98168 MARK I DATE I DESCRIPTION ISSUE: PERMIT 01/05/18 PROGRESS DATE: 01/05/18 DRAWN BY: AK CHECKED BY: BH APPROVED BY: KA RECEIVED PROJECTNO:CITY OF TUKWILA FILE: JAN 0 5 2018 PERMIT CENTER All drawings and written material appearing herein constitute the original and unpublished work of the Sabey Corporation and the same may not be duplicated, used or disclosed without the written consent of the Sabey Corporation. COVER SHEET PROJECT INFORMATION spaces AREA OF WORK PARCEL NO: 1023 049069 LEGAL DESCRIPTION: PORTION OF GOV LOT 15 IN SW 1/4 OF SECTION 10-23-04 BEGIN NW CORNER OF SW 1/4 TH S 01-46-02 W 107.22 FT TH S 87-33-12 E 512.24 FT TO POINT OF BEGINNING TH S 87-33-12 E 214.16 FT TH N 78-40-52 E 415.05 FT TO WLY MARGIN OF E MARGINAL WAY TH S 16-31-41 E 241.92 FT TH S 28-02-57 E 104.42 FT TH S 17-01-47 E 100.50 FT TH S 11-19-15 E 13.28 FT TH N 58-13-58 W 473.87 FT TH S 01-46-02 W 37 FT TH N 88-13-58 W 307.80 FT TH N 01-46-02 E 373.93 FT TO POINT OF BEGINNING - LOT 1 OF CITY OF TUKWILA BOUNDARY LINE ADJUSTMENT NO L2000-042 RECORDING NO 20000828900001 ZONING: MMC/H MANUFACTURING INDUSTRIAL CENTER/ HEAVY AREA: 48. 20388 ACRES BUILDING AREA: BUILDING 1 98,564 S.F. BUILDING 2 107,489 S.F. BUILDING 3 201,360 S.F. BUILDING 4 115,010 S.F. BUILDING 5 217,355 S.F. BUILDING 6 5,352 S.F. TOTAL AREA: 745,130 S.F. (NO CHANGE) SEISMIC ZONE: 3 REVIEWED FOR COLE COMPLIANCE APPROVED JAN 17 2013 PARKING REQUIRED: OFFICE: MANUFACTURING: WAREHOUSE: TOTAL REQUIRED: 33,226 S.F. X 2.5 /1,000 88 STALLS 551,142 S.F. X 1 /1000 561 STALLS 154,179 S.F. X 1 /2000 77 STALLS 726 STALLS (NO CHANGE) SABEY SABEY ARCHITECTURE seattle, washington 206.281.8700 sabey.com \ KARA M. ANDERSON STATE OF WASHINGTON TENANT IMPROVEMENT: SAHALE SNACKS IGE BLDG. 1 INTERGATE.EAST BLDG. 1 3411 S. 120TH PLACE SUITE 100 TUKWILA, WA 98168 MARK I DATE I DESCRIPTION ISSUE: 01/05/18 PROGRESS DATE: 01/05/18 DRAWN BY: AK CHECKED BY: BH APPROVED BY: KA PROJECT NO: FILE: RECEIVED CITY OF TUKWILA JAN 052018 PERMIT CENTER All drawings and written material appearing herein constitute the original and unpublished work of the Sabey Corporation and the same may not be duplicated, used or disclosed without the written consent of the Sabey Corporation. SITE PLAN G0.1 EXISTING CONCRETE - WALL PANELS EXISTING METAL STUD WALL INFILL EQ. E O NORTH ELEVATION SCALE: 1/8" =11-0" PROJECT NOTES 1. NEW FIXED WINDOW: METAL FRAME, FIXED GLAZING TO MATCH EXISTING - .38 MAXIMUM U -FACTOR - .53 MAXIMUM SOLAR HEAT GAIN COEFFICIENT - PROVIDE FLASHING AT PERIMETER AI el 16' 2. PROVIDE NEW METAL STUD FRAMED OPENING AND HEADER TO MATCH EXISTING WALL CONSTRUCTION (PER ICC ES REPORT ESR -3064P) 3. PROVIDE NEW METAL PANEL TRIM AS REQUIRED AROUND NEW OPENING REVIEWED Ppb? CODE COMPLIANCE APPROVED JAN 1.7 2010 City of Tukwila CtnimSIS SArB EY SABEY ARCHITECTURE seattle, washington 206.281.8700 sabey.com 6194 KARA M. ANDERSON STATE OF WASHINGTON TENANT IMPROVEMENT: SAHALE SNACKS IGE BLDG. 1 INTERGATE.EAST BLDG. 1 3411 S. 120TH PLACE SUITE 100 TUKWILA, WA 98168 MARK I DATE I DESCRIPTION ISSUE: PERMIT 01/05/18 PROGRESS DATE: 01/05/18 DRAWN BY: AK CHECKED BY: 81-1 APPROVED BY: KA RECEIVED CITY OF TUKWILA JAN 0 5 2018 PERMIT CENTER PROJECT NO: FILE: All drawings and written material appearing herein constitute the original and unpublished work of the Sabey Corporation and the same may not. be duplicated, used or disclosed without the written consent of the Sabey Corporation. ARCHITECTURAL ELEVATIONS