Loading...
HomeMy WebLinkAboutPermit D18-0084 - GRAINGER - FLAGPOLEGRAINGER 6725 TODD BLVD DI 8-0084 Parcel No: Address: \_ City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov DEVELOPMENT PERMIT 7888900060 Permit Number: 018-0084 6725 TODD BLVD Project Name: GRAINGER Issue Date: 5/29/2018 Permit Expires On: 11/25/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: GRAINGER W W INC 18818 TELLER AVE STE 277 C/O MARVIN F POER & CO, IRVINE, WA, 92612 KEITH HARRIS 3635 S LAWRENCE ST - SUITE J , TACOMA, WA, 98409 FLAGS A FLYING LLC 3635 S LAWRENCE ST - #.1, TACOMA, WA, 98409 FLAGSFLO31RP N/A - LESS THAN $5,000 Phone: (425) 890-0660 Phone: (253) 471-7880 Expiration Date: 3/23/2019 DESCRIPTION OF WORK: PROVIDE AND INSTALL (10 25 FT EXPOSED HEIGHT ALUMINUM FLAGPOLE WITH 5' X 8' US FLAG Project Valuation: $2,833.00 Type of Fire Protection: Sprinklers: Fire Alarm: Type of Construction: VB Electrical Service Provided by: TUKWILA Fees Collected: $270.92 Occupancy per IBC: U Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Volumes: Cut: 0 Fill: 0 Landscape Irrigation: Sanitary Side Sewer: Number: 0 Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: No 1 Permit Center Authorized Signature: Date: — a" -I -( 8 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Date: So71ig Print Name: l , fa77/els This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: Preparation before concrete placement: Water shall be removed from place of deposit before concrete is placed unless a tremie is to be used or unless otherwise permitted by the building official. All debris and ice shall be removed from spaces to be occupied by concrete. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0201 FOOTING I/041 - CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov l '1 Building Permit No. Project No. coo Date Application Accepted: J —2")-1 Date Application Expires: (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: 7888900Q 60 Site Address: 47:25— 75P4.) ✓t� T kL) • c.01- Cri/t{ Suite Number: Floor: Tenant Name: C-R1/V6E2 SLA PPty 48/86 PROPERTY OWNER Name: ,f tint 1biRR1, fide reel- /Itew,9-6 en Name: iil, C(/ d_Ril l vf e.R. Si,.l L . Address: S, € As ABevi- City: City: State: Zip: CONTACT PERSON — person receiving all project communication Name: ,f tint 1biRR1, fide reel- /Itew,9-6 en Address: / SANAG ft -$ ua.c L City: State: Zip: Phone: A26--. two -d 6 40 Fax: cu..) Email: & t .n40 6_44$ Afg.al IN _, ea+K GENERAL CONTRACTOR INFORMATION Company Name: Fitt C 5 4 t Fir M G LL e- Address: 3L3 5 s 1.4,0,2E -we- STS Su ifs j City: • ReCKR State: oily Zipetb40q Phoned 47/ „,7 Q Fax:07 3 471.. 7038 838 Contr Reg No.: a/i'Cr5,..` 3 r i, ,xp Date: /z 017 Tukwila Business License No.: I-1:\ApplicationsTorms-Applications On Line \2011 Applications\Permit Application Revised - 8-9-11.docx Revised: August 2011 bh New Tenant: ❑ Yes ARCHITECT OF RECORD Company Name: `/ Company Name: Engineer Name: sci.g Address: e i O 1 60Rr cdg `RD/ 3,:z ATF ave l5 Architect Name: �/ ' Y T Email: gJt+CDe fRRRISCN a-NCYR. Cow. Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Company Name: `/ Address: Engineer Name: sci.g Address: e i O 1 60Rr cdg `RD/ 3,:z ATF ave l5 City: ;a ldD12%Jt State: •Tx Zip: y(Aom `77 Phone: i 75-... a �, 5F'ax: 7� Email: gJt+CDe fRRRISCN a-NCYR. Cow. LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Address: City: State: Zip: Page 1 of 4 BUILDING PERMIT INFORMATION - 206-431-3670 Valuation of Project (contractor's bid price): $ 33 — Existing Building Valuation: $ Describe the scope of work (please provide detailed information): 00./t3d' /Ha) //V Tn.L C') a s ',Expo set, Her G f -Fr— /9-Ltt it �+Co-Poc,t.4) trij •5 45 1,1C -1 -- Will there be new rack storage? ❑ Yes �No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\ApplicationsiFonns-Applications On Line \2011 Applications\Pennit Application Revised - 8-9-11.docx Revised: August 2011 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1St Floor 2nd Floor 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\ApplicationsiFonns-Applications On Line \2011 Applications\Pennit Application Revised - 8-9-11.docx Revised: August 2011 bh Page 2 of 4 r� f 1 PUBLIC WORKS PERMIT INFOhMATION — 206-433-0179 Scope of Work (please provide detailed information): Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ ...Tukwila 0 ...Water District #125 ❑ ...Water Availability Provided Sewer District ❑ ...Tukwila ❑ ...Sewer Use Certificate ❑ .. Highline ❑...Valley View 0 ..Renton ❑ ... Sewer Availability Provided ❑ .. Renton ❑ .. Seattle Septic System: 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): 2r.Civil Plans (Maximum Paper Size — 22" x 34") ❑ ...Technical Information Report (Storm Drainage) ❑ ...Bond 0 .. Insurance 0 .. Easement(s) Proposed Activities (mark boxes that apply): ❑ ...Right-of-way Use - Nonprofit for less than 72 hours 0 ...Right-of-way Use - No Disturbance ,/ 7Construction/Excavation/Fill - Right-of-way ❑ Non Right-of-way E ..Total Cut 0 ...Total Fill cubic yards cubic yards ❑ ...Sanitary Side Sewer ❑ ...Cap or Remove Utilities 0 ...Frontage Improvements 0 ...Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic Water 0 .. Geotechnical Report ❑ .. Maintenance Agreement(s) ❑ ...Traffic Impact Analysis ❑ ... Hold Harmless — (SAO) 0 ...Hold Harmless — (ROW) ❑ .. Right-of-way Use - Profit for less than 72 hours ❑ .. Right-of-way Use — Potential Disturbance ❑ .. Work in Flood Zone 0 .. Storm Drainage ❑ .. Abandon Septic Tank ❑ .. Curb Cut ❑ .. Pavement Cut ❑ .. Looped Fire Line ❑ .. Grease Interceptor ❑ .. Channetization ❑ .. Trench Excavation ❑ .. Utility Undergrounding ❑ ...Permanent Water Meter Size... WO # 0 ...Temporary Water Meter Size .. WO # ❑ ...Water Only Meter Size WO # 0 ...Deduct Water Meter Size ❑ ...Sewer Main Extension Public 0 Private 0 ❑ ...Water Main Extension Public 0 Private 0 11 FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) 0 ...Water 0 ...Sewer 0 ...Sewage Treatment Monthly Service Billing to: Name: Day Telephone: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: City State Zip Day Telephone: City State Zip H:\Applications\Forms-Applications On Line t20! 1 Applications Permit Application Revised - 8-9-11.docx Revised: August 2011 bh Page 3 of 4 PERMIT APPLICATION NOTES — / \ \ Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: r�jdL QC I _arcs !� 7rEir X41 Signature: Print Name: Faimic/ QOS Y /%4r Date: 5/22/10 as -3 -7' - 7E3&, ed Fc) Day Telephone: • 2'5 er11 6,o e -c) Sr, Su rEs3 ' ifeerzot lcM- 11407 City State Zip Mailing Address: .3 t 35 J % ' /k-NCe 11:\Applications\Forms-Applications On Line \2011 Applications\Permit Application Revised - 8-9-1 l.docx Revised: August 2011 bh Page 4 of 4 / Cash Register Receipt Receipt Number City of Tukwila R14064 DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY I PAID $270.92 D18-0084 Address: 6725 TODD BLVD Apn: 7888900060 $270.92 Credit Card Fee $7.89 Credit Card Fee I R000.369.908.00.00 0.00 $7.89 DEVELOPMENT $255.43 PERMIT FEE R000.322.100.00.00 0.00 $152.08 PLAN CHECK FEE R000.345.830.00.00 0.00 $98.85 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $7.60 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R14064 R000.322.900.04.00 0.00 $7.60 $270.92 Date Paid: Thursday, March 22, 2018 Paid By: KEITH HARRIS Pay Method: CREDIT CARD 612295 Printed: Thursday, March 22, 2018 2:59 PM 1 of 1 .. SYSTEMS INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: (r1;(tc te.,4e— Type of Inspection: s c i e ..l.i, N 18 , Frvi Address: t,7Z6" T 4 BLvct9 Date Called: Special Instructions: / X" Eta pcLc Date Wanted:// _ CCS ����� am. .m. Requester: N / '4j Phone No: _ /.-ems -= h7f5 .. f LJ pproved per applicable codes. Corrections required prior to approval. COMMENTS: --31,6w1y16y\il Inspector:.___>aCtt Date: 13_245,- REINSPECTION 3,2l5, - REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD �{ Retain a copy with permit C$`�� / INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: ♦ LDrocin2er Type of Inspection: Foo Address:'` 672 S �oc ' it ELv'c , Date Calle -... Special Instructions: FL a J q to e, FG04t V Date Wanted:a 5 — rrr , 201 p.m. Requester: Phone No: .Z5.-- 11 Z5. -- 61,-.O6 Approved per applicable codes. Corrections required prior to approval. COMMENTS: r-0124-, Inspector: Date: 2o) REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call. to schedule reinspection. PLANNING- APPROVED No changes can be made to these plans without approval from the Planning Division of DCD , ,Approved By:_L, Data: 2 -X71 FILt COPY Permit No. I SES- r . ATE PERMIT j REQUIRED FOR: cvbchanical Q'E ectrical &as lumbing Piping amity of Tukwila ELr41.Ol7,1G DIVISION REVISIONS No changes shall be made to the scone of t.aoiA voithc ° 4t i-r•or approval of Bulking Division `s T2. ns wiil rcquire a new plan submittal c.nd may include additional plan review fees. Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Cop and conditions is acknowledged: By: Date: City of Tukwila BUILDING DIVISION � 15-008y REVIEWED FOR CODE COMPLIANCE APPROVED MAY 242818 City of Tukwila BUILDING DIVISION Cover Harrison Engineering LLC 8101 Boat Club Rd, Ste 240-195 Fort Worth, TX 76179 817-585-2585 Digitally signed by Edsel R. Harrison, Jr. Date: 2018.03.09 09:56:27 CST Serving the Entire United States! Ifee Washington Finn COA #: 2851 This document and the ideas and information incorporated herein, as an instrument of professional service, are the property of Harrison Engineering LLC (H.E.) and are not to be copied or used in whole or in part without written authorization of H.E. Prepared for: Scope of Work: Project Name: Location: Pole: Bldg Code: References: STRUCTURAL CALCULATIONS for Flags A' Flying for Keith Harris 253-471-7880 (ofc) Flagpole and Foundation Analysis for 25 ft High Flagpole with Standard In -ground Embed W. W. Grainger, Inc. 6725 S Todd Blvd, Tukwila, WA 98108 See Drawing #DR6545 by Client IBC 2015 as amended and adopted by the State of WA ASCE 07, IBC 2015, (NAAM FP1001 Method Exception 4 of Section NAAMM FP 1001-07, Guide Specifications for Design of Metal Flag NAAMM Metal Flagpole Design Job Code: WABELLVU18004 ***LIMITATIONS*** THE ENGINEERING DESIGN & ANALYSIS CONTAINED HEREIN IS BASED UPON INFORMAT BY THE CLIENT, WHO IS SOLELY RESPONSIBLE FOR ACCURACY OF SAME. NO RESPONSIBILITY AND/OR LIABILITY IS ASSUMED BY, OR IS TO BE ASSIGNED TO THE ENGINEER FOR ITEMS BEYOND THAT SHOWN ON THESE SHEETS. s 9FVIEWED FOR pPDE COMPLIANCE APPROVED MAY 242018 City of Tukwila BUILDING DIVISION The total number of pages in this calculation set is 5. bL9OO9L! Cover- 1 RECEIVED CITY OF TUKWILA MAR 22 2018 PERMIT CENTER Forces on Pole Forces on Pole Client: Flags A' Flying for Keith Harris Prepared By: ERH Date: Project: W. W. Grainger, Inc. Job No: WABELLVU18004 Notes: This document and the ideas and information incorporated herein, as an instrument of professional service, are the property of Harrison Engineering LLC (H.E.) and are not to be copied or used in whole or in part without written authorization of H.E. General: Pole: See Drawing #DR6545 by Client General Building Code: IBC 2015 as amended and adopted by the State of WA References: ASCE 07, IBC 2015, (NAAM FPI001 Method Exception 4 of Section 1609.1.1) NAAMM FP 1001-07, Guide Specifications for Design of Metal Flagpoles NAAMM Metal Flagpole Design Manufacturer/Model See Drawing #DR6545 by Client Installation Type =[Standard in -ground embedment Material =Aluminum Alloy 606346 (non -welded) Material Density = 0.09751bs/in^3 Ultimate Wind Speed (V) = 110 mph based on ASCE 7-10, IBC 2012, 2015 Estimated Self Weight of Pole & Appurtenances= 93 Ibs Nominal Wind Speed (V^sD)= Risk Category = Total Length of Pole = Exposed Length of Pole = Butt Diameter = Wall Thickness Straight = Subject to Ice Load = 85 mph Wind speed conversion to 'ASCE 7-05 values' per Equation 16-32 of IBC 2012. (Use NAAMM FP 1001 method; see Exception 4 of Section 1609.1.1) 1.00 Exposure Category = C Gust Factor = 1.14 28.00 FT 25.00 FT 6.0 inches Top Dia = 0.156 inches Wall of Taper = Y (Y=Yes, N=No) Distance from ground to bottom of exposed pole = Taper Length = 16.92 FT Taper starts @ 3.5 inches (nominal) 0.156 inches Taper = find Drag Forces from t=lay(s), - Material 1 (P=Polyester, F N=Nylon) P 0 <- should be '0' unless wall mount or pedestal mount. 8.1 FT above bottom 0.1478 inches/FT 21.8 psf ice load (around entire pole surface) Distance from Length Ground to Flag Drag Factor Width (L), Middle of Flag Flag Area Material Coeff of DF = (b), FT FT 1(ft) (SF) Coeff. (k)1Height, Chi A*(k*Ch)2 i 6 10 22.0 60.0 0.0014 0.92! 9.957E-0051 0.0' 0.0 D.000do.o0 6 0.0 0.0 0.0000 0.00 0 au o.o 0.0� 60 0.0000 0.00 0 0.d o.0000 0.o6r 0; Total Total = 0.00009957; Total Flag Drag (Wf) = (Total DF)'° * V7* G Total Flag Drag (Wf) = 82.189 lbs Ice Loads on Pole (if applicable) Ice Thickness, t (in) = Height factor, 1, = Topo Factor, Kzt Imp Factor, 1i = Design Ice Thickness, td = 22.0 Ft, .- Avg Moment Arm Flag Drag Moment = 1808.2 ft -lbs 0.25 0.973 1.00 0.8 0.389 Ice Volume, Vi = 14.15 56 792 Ice Density, pcf = Ice Weight, lbs= PSF load = 21.8 Vertical Forces on Flay Pole Self Weight = 93 Ibs ) Ice Load = 7921bs Total Vertical Load = 8851bs total Wind Forces on Pole Wind 1 r Distance from 'Bendingl Area of Surface Coeff of Coeff of Wind Wind Force Ground to I Moment Length of Avg Pole Segment Area of Drag Height Pressure (Wp = PxA), Centroid of (M), ft - Segment From ToSegment (FT) t Dia (in) (SF) Pole (SF) V x d (Cd) (Ch) (P) lbs Segment, ft lbs 1 '"t 0 15 15.00 4 6.00 7.50 1 23.56 42.50 0.98556- 0.86 17.87 134.0 ' 7.5 1005.3 2 15 20 5.00 5.26 2.19 + 6.89 + 37.27 i 1.10000 0.88• 20.34 44.6 17.5 780.2 3 20 25 5.00 4.52 1.88 5.92 32.03. 1.10000. 0.92 21.441 40,4 i 22.5 I 909.1 4 25 30 0.00 0.00 0.00 0.00 0.00 0.00000 0.'00 0.00 0.0 1 0.0 0.0' 5 30 40 0.00 0.00 0.00 0.00 0.00 0.00000 0.00 0.00 0.0 0.0 0.0 6 , 40 I 50 It 0.00 0.00 0.00 0.00 0.00 , 0.00000 0.00 0.00 0.0 - 0.0 0.0 - - - - 7 50 60 0.00 0.00 0.00 0.00 0.00 0.00000 0.00} 0.00 0.0 0.0 0.0 8 60 70 0.00 0.00 0.00 0.00 0.00 0.00000 0.00 0.00 0.0 0.0 0.0, 9 70 80 0.00 0.00 0.00 0.00 0.00 0.00000 0.00 0.00 0.0 0.0 0.0' 10 80 90 0.00 0.00 0.00 0.00 . 0.00 _ 0.00000_ 0.00 0.00 0.0 0.0 0.0 25 Subtotal = 36._4 Subtotal = 219.03 12.30 ' 2694.6 Flag Drag Force = 82.2 - ^ Overall 1808.2 Total = 301.2 _ Centroid , 4502.8, of Pole Seismic Forces on Pole Site Soil Class = D Seismic Design Category = W V 0.7E Moment, M (0.7E) D SS = S1 = 1.419 SMS = 1.419 SDS = 0.529 SM1 = 0.794 SD1 = 0.946 0.529 Maximum Moment= Maximum Shear= 93 Ibs 58.6 lbs, Total Design Lateral Seismic Base Shear Force, V = CsW (Equiv Lat Force Procedure), where Cs = Sds / (R/I) 41.0 ft -lbs, equivalent lateral force of 41 lbs acting at approximately 12.3 ft above the ground 505 Wind Governs Forces on Pole - 2 4,503 ft -lbs 301 Ibs Client: Flags A' Flying for Keith Harris Project: W. W. Grainger, Inc. Forces on Pole Forces on Pole Prepared By: ERH Date: Job No: WABELLVU18004 Notes: This document and the ideas and information incorporated herein, as an instrument of professional service, are the property of Harrison Engineering LLC (H.E.) and are not to be copied or used in whole or in part without written authorization of H.E. [Properties of Pole r _ Moment ` Section ----1 Height Height Length of I Pole O.D. Pole I.D. Radius of X-Secn of Inertia Modulus Weight Segment From To Segment (FT) �(in) _(in) !Gyration, ri Area 01'02) (in^4) ' (inA3) I (lbs) I 1 0.00 -15.00 15.00 6.00 5.69 2.07 2.86 1.2.24 4.08 50 15. x 00 ' 20.00 5.00 _5.26 4.95 1.81 2.50 8.16. 3.10, 15 20.00 25.00 ! 5.00 4.52 i 4.21 J 1.54jT 2.141 5.111 2.26 13 0.00 0.00 r 6 0.00 25.00 30.00- 30.00 40.00 40.00 150.00 7 50.00 ' 60.00 8 60.00 70.00 9 70.00 80.00 10 80.00 90.00 Axial Load (Pole Wt) = Ice Load = Total Axial Load on Pole = Slenderness Ratio (R/t) = Modulus of Elasticity (E) = Yield Stress (Fy) = Tensile Yield Stress (Fb) = Shear Yield Stress (Fsy) _ Axial Allowable Compressive Stress (Fa) _ Coefficient of Amplification (Ca) = 0.00 0.00 0.00 0.00 Average = 931bs 7921bs 885lbs 18.73 10.0E+06 psi 25,000 psi 24,000 psi 11,330 psi 513 psi 0.97970 5.56 5.24 1.91 Calculated Bending Moment (Mb) = 4,503 Ft -lbs Shear Force (Fv) = 301.2lbs Axial Compressive Stress (fa) = 32.4 psi Bending Stress (fb) = 13,248 psi Shear Stress (fv) = 210.3 psi Combined Stress Ratio (CSR) = 0.5660 Forces on Pole - 3 77 < (ok) < (ok) < (ok) < (ok) Allowable 513 psi 24,000 psi 11,330 psi 1.0 Pole is acceptable Stress Ratio 6.3% 55.2% 1.9% 56.6% Footing Flagpole Foundation Client: Flags A' Flying for Keith Harris Prepared By: ERH Date: Project: W. W. Grainger, Inc. Job No: WABELLVU18004 Notes:[ This document and the ideas and information incorporated herein, as an instrument of professional service, are the property of Harrison Engineering LLC (H.E.) and are not to be copied or used in whole or in part without written authorization of H.E. [General Analysis Is footing restrained @ grade level ? (1=yes,0=no) 0 no Equivalent lateral force @ top of pole P = 0.180 kips Height of pole above grade H = 25.0 ft Diameter of pole footing B = 2.50 ft Lateral soil bearing capacity S = 0.100 ksf / ft Vertical Soil Bearing Capacity BC = 1.500 ksf / ft Isolated pole factor F = 2 First trial depth D = 4 ft Weight of Concrete w 145 Ib/cf Concrete Strength fc' 3.0 ksi Insallation Type: Standard in -ground embedment P Area (sf) Height (ft) Volume (cf) Weight (lb)Bearing Pressure on Soil = 791 psf Okay ' Concrete Footing: 4.9$ 4.33'. 21.3 3,084.1 Flagpole Void: 0.20 3.00 0.59' 85'' Net Total: 2,999 Flagpole & Appurtenances: Total: Lateral bearing @ bottom : Lateral bearing @ d/3 : S,=ISD S = 0.335, A = 2.341' BS1 885 3,884',. Requird depth : D= 2 Ll+ 61 J , for nonconstrained LL ]+ 7 J , for constrained NONCONSTRAINED CONSTRAINED Lateral force @ top of pole P => 0.18 kips 0.18 kips Height of pole above grade H => 25.0 ft 25.0 ft Diameter of pole footing B => 2.50 ft 2.50 ft Lateral soil bearing capacity FS => 0.20 ksf / ft 0.20 ksf / ft 1ST TRIAL TRY D1 => 4.00 ft 4.00 ft LAT SOIL BEARING @ 1/3 D S1 => 0.26 ksf 0.26 ksf LAT SOIL BEARING @ 1.0 D S3 => 0.80 ksf 0.80 ksf CONSTANT 2.34P/(BS1) A => 0.64 - REQD FOOTING DEPTH RQRD 0 => 4.50 ft 3.09 ft 2ND TRIAL : TRY D2=> 4.25 ft 3.55 ft LAT SOIL BEARING @ 1/3 D S1 => 0.28 ksf 0.23 ksf LAT SOIL BEARING @ 1.0 D S3 => 0.85 ksf 0.71 ksf CONSTANT 2.34P/(BS1) A => 0.60 - REQD FOOTING DEPTH RQRD D => 4.36 ft 3.29 ft 3RD TRIAL : TRY D3=> 4.30 ft 3.42 ft LAT SOIL BEARING @ 1/3 D Si => 0.28 ksf 0.23 ksf LAT SOIL BEARING @ 1.0 D S3 => 0.86 ksf 0.68 ksf CONSTANT 2.34P/(BS1) A => 0.59 - REQD FOOTING DEPTH RQRD D => 4.33 ft 3.35 ft 4TH TRIAL : TRY D4=> 4.32 ft 3.38 ft LAT SOIL BEARING @ 1/3 D S1 => 0.28 ksf 0.22 ksf LAT SOIL BEARING @ 1.0 D S3 => 0.86 ksf 0.68 ksf CONSTANT 2.34P/(BS1) A => 0.59 - REQD FOOTING DEPTH RQRD D => 4.32 ft 3.36 ft 5TH TRIAL : TRY 05=> 4.32 ft 3.37 ft LAT SOIL BEARING @ 1/3 D S1 => 0.29 ksf 0.22 ksf LAT SOIL BEARING @ 1.0 D S3 => 0.86 ksf 0.67 ksf CONSTANT 2.34P/(BS1) A => 0.59 - - REQD FOOTING DEPTH RQRD D => 4.32 ft 3.37 ft Footing - 4 Footing Flagpole Foundation Client: Flags A' Flying for Keith Harris Prepared By: ERH Date: Project: W. W. Grainger, Inc. Job No: WABELLVU18004 Notes:1 This document and the ideas and information incorporated herein, as an instrument of professional service, are the property of Harrison Engineering LLC (H.E.) and are not to be copied or used in whole or in part without written authorization of H.E. FOUNDATION SPECIFICATIONS A = 30 Inches C = 36 Inches D = 16 Inches E = 12 Inches F = fi Inches G = 10 Inches P = 1 Inches Concrete strength = 3.0 ksi F G H Outside Diameter Inside Inches Inches (Inches) diameter (square) (square) (Inches) Upto5-1/2 8 10-12 6 5-9/16 thru 7 10 12-14 1 6 7-5/8 thru 8-5/8 12 14-16 6 9-5/8 thru 12 15 17-19 6 12-3/4 thru 1.4 18 20-22 + 6 15 and 16 20 22-24 6 J 17 thru 20 24 26-18 6 2 Key '#' DIAMETER (A) Footing - 5 Note Caulk between the flash collar 1 and the pole with a waterproof sealant (clear silicone caulk) 2 2" Elastomeric sealant 3 Hardwood or plastic wedges for centering pole 4 Finish grade ' Concrete foundation: concrete 5 shall be minimum 3000 psi @ 28 days per ASTM C94 Foundation sleeve: 16ga 6 Galvanized steel corrugated casing. Tamped dry sand between sleeve1 and flagpole 8 (3) Steel centering wedges at 120° o.c., welded in place 9 • 3/16" (min) Steel base plate welded to sleeve 3/16" (min) Steel support plate 10 welded to 3/4" diameter grounding spike 11 13/4" diameter lightning / grounding spike 12 Flagpole. Set plumb. 13 1 Metal base or flash collar 14 Trowel finish away from pole 15 : Undisturbed native soil (7) #5 Vertical rebar equally spaced around perimeter; and #3 Circular ties @ 10" o.c. max and 16 terminate ends with a standard hook or overlap ends 18" I minimum. 3" clearance typical all around. Keith Harris From: Keith Harris Sent: Thursday, March 22, 2018 11:03 AM To: Keith Harris Cc: Kim Hoskins Subject: Ultimate Vs Nominal Wind Speed Explanation As It Relates To Permitting Per information provided by Professional Engineer Ed Harrision, Harrison Engineering, LLC, a currently licensed WA PE, on 3/21/2018: In the newer versions of the building Code, I believe in 2012 is when this started, they started using what is called "Ultimate Wind Speed", instead of "Nominal Wind Speed". From 2012 and on, the Ultimate Wind Speeds are greater than the historical 2009 (and earlier) Nominal Wind Speeds. However, during the calculation process, the Ultimate Wind Speeds are reduced down to equivalent 2009 Nominal Wind Speeds. In fact, a 85 mph 2009 Nominal Wind Speed is the exact equivalent to a 2012 (or later) Ultimate Wind Speed. So, when talking to the local building official you need to ask if the 110 mph is the Ultimate Wind Speed, or Nominal Wind Speed. If they say "Ultimate Wind Speed" then we are fine. In fact, in my calculations package, on page 2, I make a reference to this. It says, "Wind speed conversion to 'ASCE 7-05 values' per Equation 16-32 of IBC 2012. (Use NAAMM FP 1001 method; see Exception 4 of Section 1609.1.1)". The reason we have to make a conversion to the Nominal Wind Speeds is based upon the fact that the NAAMM FP 1001 method requires the use of Nominal Wind Speeds, not Ultimate Wind Speeds. And, in fact, the IBC (2012 and newer) even provides an equation for such instances when the Ultimate Wind Speed cannot be used and the historical Nominal Wind Speeds must be used (as is the case with NAAMM FP 1001). See below example screen shot of my calculations... Manufacturer/Model See Drawing #DR6545 by Client Installation Type = Standard in -ground embedment Material j Aluminum Alloy 6063-T6 (non -welded) Ultimate Wind Speed (V) = 110 mph based on ASCE 7-10, IBC 2012, 2015 Estimated Self VI Nominal Wind Speed (Vaso)= 85 m • h i Wind speed conversion to 'ASCE 7-05 values' per Equation 16-32 of IBC 20 and here is the screenshot reference from the IBC code (pay close attention to the Wind Speed Conversion section below)... 1 1609.3 Basic wind speed. The ultimate design wind speed, Vutt, in mph, for the determination of the wind loads shall be determined by Fl . design wind speed, Vint, for use in the design of Risk Category I1 buildings and structures shall be obtained fro speed, Vutt, for use in the design of Risk Category III and IV buildings and structures shall be obtained from Fig Vutt, for use in the design of Risk Category I buildings and structures shall be obtained from Figure 1609C. Th( wind regions indicated near mountainous terrain and near gorges shall be in accordance with local jurisdiction Vint, determined by the local jurisdiction shall be in accordance with Section 26.5.1 of ASCE 7. In nonhurricane-prone regions, when the ultimate design wind speed, Vutt, is estimated from regional cli shall be determined in accordance with Section 26.5.3 of ASCE 7. 1609.3.1 Wind speed conversion. When required, the ultimate design wind speeds of Figures 1609A, 1609B and 1609C shall be converted 1609.3.1 or Equation 16-33. Void = Vat,,, ti.E; (Equation 16-33) where: VBSd=nominal design wind speed applicable to methods specified in Exceptions 1 through 5 of Section 1609.1 Vu1t =ultimate design wind speeds determined from Figures 1609A, 1609B or 1609C. TABLE 1609.3.1 WIND SPEED CONVERSIONS", b, c Vo 100 110 120 130 140 150 160 1 Vesd 78 85 93 101 108 116 124 1 For SI: 1 mile per hour = 0.44 m/s. a. Linear interpolation is permitted. b. VaSd = nominal design wind speed applicable to methods specified in Exceptions 1 through 5 of Section 160 c. Vu/t= ultimate design wind speeds determined from Figures 1609A, 1609B, or 1609C. Ed Harrison, PE Flagpole Analysis and Foundation Designs - Nationwide! by Harrison Engineering, LLC 8101 Boat Club Rd, Suite 240 #195 Fort Worth, TX 76179 Tel: 817-585-2585 Fax: 815-301-3319 www.FlagpoleFoundations.com Flagpole Foundations provided hr Harrison Engineering LLC' CONFIDENTIALITY STATEMENT: The information contained in this a -mail. including any attachments, contains confidential and/or proprietary information and is intended only for use by the recipient to whom it is addressed. If you have received this information in error please notify the sender immediately by return e-mail and destroy at copies of the original message. 2 28'-0" OVERALL POLE HEIGHT 12'-11" STRAIGHT 0 valmont Valmont Industries, Inc. Structures Division 20805 Eaton Ave Farmington, Minnesota 55024-7932 Phone: (651) 463-8990 (800) 899-7577 Fax: (651) 463-3349 3 1/2" CAST ALUMINUM PLUG W/ 1 1/4" NPT HOLE ON CENTER 3 1/2" O.D. POLE SHAFT FABRICATED FROM 6063-T4 ALUMINUM ALLOY TUBE (POLE ASSEMBLY IS HEAT TREATED TO T6 CONDITION AFTER WELDING) POLE RATING (PER ANSUNAAMM FP 1001-07): 3 -SEC. GUST WIND SPEED: 85 MPH MAX. FLAG SIZE: 12' x 18' MAX. (ASSUMES 25'-0" EXPOSED HEIGHT) 6" O.D. x .156" WALL 3" x 5" REINFORCED ALUMINUM HANDHOLE OPENING WITH A LOCKING FLUSH -FITTING ALUMINUM DOOR TITLE: S DO NOT SCALE ALUMINUM POLE MODEL NO.: 28003560581 MATERIAL: ALUMINUM ALLOY FINISH: 100 GRIT SATIN POLISH PROJECT: SOLD TO: SHIP TO: P.O. NO: REP: FLAGS A FLYING OTY: 1 bWN BY: PTP CHK'D BY: APPR BY• DATE: 05-24-16 "CONFIDENTIAL"' The information contained in this drawing is privileged and confidential, and may be protected from disclosure. Please be aware that any use or dissemination of Ibis drawing may be subject to legal restriction or sanction. DWG NO: DR6545 A 'PAGE: 1/1 REV DATE REVISION DESCRIPTION BY valmont � STRUCTURES FPA - INPUT VERIFICATION DATE RUN FLAGPOLE ANALYSIS PROGRAM - v1.0 RUN DESC. - DR6545 - 25' Exp. Flagpole RUN BY - JRB MATERIAL CODE - FIXED - AL (ALUMINUM SPECIFIED) (6063-T6) BENDING ALLOWABLE (PSI) SHEAR ALLOWABLE (PSI) YIELD STRENGTH (PSI) MOUNTING POLE LENGTH (FT) TAPER LENGTH (FT) BOTTOM DIA./SQ (IN) TOP DIA./SQ (IN) WALL THICKNESS (IN) HEIGHT ABOVE GRADE TO BASE (FT) WIND VELOCITY (MPH) FLAG SIZE FPA - PROGRAM OUTPUT BASED ON ANSI/NAAMM FP 1001-07 RUN DESC. - DR6545 - 25' RUN BY - JRB AREA AT THE POLE BASE WEIGHT OF THE POLE MOMENT OF INERTIA SECTION MODULUS POLE SHEAR FORCE POLE MOMENT MAX. OVERTURN MOMENT COMBINED STRESS RATIO (CSR) ONE COTTON/NYLON 12' x 18' FLAG FLAG MOMENT TOTAL MOMENT TOTAL SHEAR COMBINED STRESS RATIO (CSR) ONE POLYESTER 12' x 18' FLAG FLAG MOMENT TOTAL MOMENT TOTAL SHEAR COMBINED STRESS RATIO (CSR) REV DATE RUN Exp. Flagpole (IN2) (LB) (IN4) (IN3) (LB) (FT -LB) (FT -LB) (FT -LB) (FT -LB) (LB) (FT -LB) (FT -LB) (LB) THE MAXIMUM UNFLAGGED CONDITION THE 3 -SECOND GUST WIND VELOCITY (MPH) 5/25/2016 18000 8500 25000 Embedded 25.00 15.08 6.00 3.50 0.156 0.00 85 12' x 18' 1/15/2014 5/25/2016 2.8641 73.34 12.2356 4.0785 210 2498 8157 0.31306 2174 4672 324 0.58411 3044 5542 370 0.69256 233 NOTE: THIS CALCULATION IS FOR FLAGPOLES, AS PROVIDED BY VALMONT STRUCTURES WITHOUT FURTHER CHANGES OR MODIFICATIONS. (7) 3 Z 0 9 �•—�`L� ;rte.! Y &J 0 valmont STRUCTURES SUBMITTAL OF CALCULATIONS FOR VALMONT ALUMINUM POLE ASSEMBLY 28 FT SHAFT INTENDED FOR FLAGPOLE USE REVIEWED FOR CODE COMPLIANCE APPROVED MAY 24 2018 City of Tukwila BUILDING DIVISION PROJECT: WW GRAINGER SUPPLY TUKWILA, WA CUSTOMER: FLAGS A' FLYING VALMONT JOB #: A419190 PREPARED BY: JAY BAUMGARTNER DATE: APRIL 30, 2018. Structures — North America Valmont Industries, Inc. 20805 Eaton Avenue Farmington, Minnesota 55024-7932 USA 651-463-8990 '800-899-7577 Fax 651-463-7379 valmont.com valmontstructures.com RECEIVED CITY OF TUKWILA MAY 1 2018 PERMIT CENTER CORRECTION LTR# r valmont STRUCTURES FPA - INPUT VERIFICATION DATE RUN FLAGPOLE ANALYSIS PROGRAM - v1.0 4/30/2018 RUN DESC. - A419190 - WW Grainger Supply, WA - 25' Exp. Flagpole RUN BY - JRB MATERIAL CODE - FIXED - AL (ALUMINUM SPECIFIED) (6063-T6) BENDING ALLOWABLE (PSI) SHEAR ALLOWABLE (PSI) YIELD STRENGTH (PSI) MOUNTING POLE LENGTH (FT) TAPER LENGTH (FT) BOTTOM DIA./SQ (IN) TOP DIA./SQ (IN) WALL THICKNESS (IN) HEIGHT ABOVE GRADE TO BASE (FT) WIND VELOCITY (MPH) FLAG SIZE FPA - PROGRAM OUTPUT BASED ON ANSI/NAAMM FP 1001-07 RUN DESC. - A419190 - WW RUN BY - JRB AREA AT THE POLE BASE WEIGHT OF THE POLE MOMENT OF INERTIA SECTION MODULUS POLE SHEAR FORCE POLE MOMENT MAX. OVERTURN MOMENT COMBINED STRESS RATIO (CSR) ONE COTTON/NYLON 12' x 18' FLAG FLAG MOMENT TOTAL MOMENT TOTAL SHEAR COMBINED STRESS RATIO (CSR) ONE POLYESTER 12' x 18' FLAG FLAG MOMENT TOTAL MOMENT TOTAL SHEAR COMBINED STRESS RATIO (CSR) 18000 8500 25000 Embedded 25.00 15.00 6.00 3.50 0.156 0.00 85 12' x 18' REV - 1/15/2014 DATE RUN - 4/30/2018 Grainger Supply, WA - 25' Exp. Flagpole (IN2) (LB) (IN4) (IN3) (LB) (FT -LB) (FT -LB) (FT -LB) (FT -LB) (LB) (FT -LB) (FT -LB) (LB) THE MAXIMUM UNFLAGGED CONDITION THE 3 -SECOND GUST WIND VELOCITY (MPH) 2.8641 73.40 12.2356 4.0785 210 2501 8157 0.31341 2174 4675 324 0.58447 3044 5545 370 0.69292 233 NOTE: THIS CALCULATION IS FOR FLAGPOLES, AS PROVIDED BY VALMONT STRUCTURES WITHOUT FURTHER CHANGES OR MODIFICATIONS. 110 MPH 3 -SEC. GUST "ULTIMATE" WIND SPEED CONVERTED TO 85 MPH 3 -SEC. GUST "ALLOWABLE STRESS" WIND SPEED FOR USE WITH NAAMM SPECIFICATIONS. • valmont STRUCTURES SUBMITTAL OF DRAWINGS FOR VALMONT ALUMINUM POLE ASSEMBLY 28 FT SHAFT INTENDED FOR FLAGPOLE USE PROJECT: WW GRAINGER SUPPLY TUKWILA, WA CUSTOMER: FLAGS A' FLYING VALMONT JOB #: A419190 DRAWING PAGE 1-1 PREPARED BY: JAY BAUMGARTNER DATE: APRIL 30, 2018 Structures — North America Valmont Industries, Inc. 20805 Eaton Avenue Farmington, Minnesota 55024-7932 USA 651-463-8990 800-899-7577 Fax 651-463-7379 valmont.com valmontstructures.com 28'-0" OVERALL POLE HEIGHT 12'-11" STRAIGHT 0 bo 3 1/2" CAST ALUMINUM PLUG W/ 1 1/4" NPT HOLE ON CENTER valmont , Valmont Industries, Inc. Structures Division 20805 Eaton Ave Farmington, Minnesota 55024-7932 Phone: (651) 463-8990 (800) 899-7577 Fax: (651) 463-3349 3 1/2" O.D. POLE SHAFT FABRICATED FROM 6063-T4 ALUMINUM TUBE (POLE ASSEMBLY IS HEAT TREATED TO T6 CONDITION AFTER WELDING) 3" x 5" REINFORCED ALUMINUM HANDHOLE OPENING AND FLUSH FITTING ALUMINUM DOOR ATTACHED WITH LOCKING STYLE CLOSURE 6" O.D. x .156" WALL DO NOT SCALE TITLE: S EMBEDDED POLE POLE RATING (PER ANSI/NAAMM FP 1001-07): 3 -SEC. GUST WIND SPEED: 85 MPH MAX. FLAG SIZE: 12' x 18' MAX. (ASSUMES 25'-0" EXPOSED HEIGHT) QTY: 1 MODEL NO.: 280035605B1 MATERIAL: ALUMINUM ALLOY FINISH: 100 GRIT SATIN FINISH PROJECT: WW GRAINGER SUPPLY SOLD TO: SHIP TO: P.O. NO: REP: FLAGS A FLYING DWN BY: HJT CHKD BY: APPR BY: JRB DATE: 04-26-18 **CONFIDENTIAL** The information contained in this drawing is privileged and confidential, and may be protected from disclosure. Please be aware that any use or dissemination of this drawing may be subject to legal restriction or sanction. A REV DWG NO: A419190 DATE REVISION DESCRIPTION BY PAGE: 1/1 April 04, 2018 \ City of Tukwila Department of Community Development KEITH HARRIS 3635 S LAWRENCE ST - SUITE J TACOMA, WA 98409 RE: Correction Letter # 1 DEVELOPMENT Permit Application Number D18-0084 GRAINGER - 6725 TODD BLVD Dear KEITH HARRIS, f Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (GENERAL INFORMATION NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size. "New revised" plan sheets shall be the same size sheets as those previously submitted.) "STAMP AND SIGNATURES" (If applicable) For Engineers: "Every page of a plan set must contain the seal/stamp, signature of the licensee(s) who prepared or who had direct supervision over the preparation of the work, and date of signature. Specifications that are prepared by or under the direct supervision of a licensee shall contain the seal/stamp, signature of the licensee and the date of signature. If the "specifications" prepared by a licensee are a portion of a bound specification document that contains specifications other than that of an engineering or land surveying nature, the licensee need only seal/stamp that portion or portions of the documents for which the licensee is responsible." It shall not be required to have each page of "specifications" (calculations) to be stamped and signed; Front page only will be sufficient (WAC 196-23-010 & 196-23-020). Architects: "date" only not required (WAC 308-12-081). (BUILDING REVIEW NOTES) 1. Please provide engineer's specifications that include the "Date" of the engineer's signature. See Notes above. Note: Contingent on response to these corrections, further plan review may request for additional corrections. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206)433-7165. 6300 Snuthcenter Rnulevard.Suite #100 • Tukwila Wachinotnn 9R1RR • Phnno 71M-Q31_3K7n • Fin- 71M..411-?KA'S Sincerely, liqt achelle Ripley Permit Technician File No. D 18-0084 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 0 PERMIT COORD COPVO PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D18-0084 PROJECT NAME: GRAINGER SITE ADDRESS: 6725 TODD BLVD Original Plan Submittal DATE: 05/21/18 Revision # before Permit Issued X Response to Correction Letter # 1 Revision # f after Permit Issued DEPARTMENTS: A -T ASC S'-)-2-0 Building Division 111 Public Works ❑ Fire Prevention Structural Planning Division ❑ Permit Coordinator PRELIMINARY REVIEW: Not Applicable n (no approval/review required) REVIEWER'S INITIALS: DATE: 05/22/18 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required ❑ Approved with Conditions ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: DUE DATE: 06/19/18 REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: 12/18/2013 PERMIT COORS COPY PLAN REVIEW/ROUTING SLIP �J PERMIT NUMBER: D18-0084 PROJECT NAME: GRAINGER SITE ADDRESS: 6725 TODD BLVD X Original Plan Submittal Response to Correction Letter # DATE: 03/22/18 Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Al— Cow 2 ';-1-77-(15 Building Division 111 \ Work/s4- rks//�- ublic t(52,, kiy),. ke 1� Planning Division Fire Prevention Structural n Permit Coordinator p PRELIMINARY REVIEW: Not Applicable ri (no approval/review required) REVIEWER'S INITIALS: DATE: 03/27/18 Structural Review Required DATE: n APPROVALS OR CORRECTIONS: DUE DATE: 04/24/18 Approved Corrections Required Approved with Conditions ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg `l Fire ❑ Ping ❑ PW 0 Staff Initials: 12/18/2013 Date: i r City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. 5/5/20/ Plan Check/Permit Number: D18-0084 ❑ Response to Incomplete Letter # ❑ Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal # Project Name: GRAINGER Project Address: 6725 TODD BLVD Contact Person: ?f Summary of Revision: R4.) 10,1 P S'T/'1 uPe 0 5h vP D tJ — l..Ortin C!$LC 5 Fan. (9 025' zxPosth-P btc /�FFT ��/`�P, — C� SFTS PE72. / /5ladei Do v Sof T� CEtt- 4 25 - 7D - 0660 e/Tlf i149-P/Z/S Phone Number: g 5 3 4 7 /' 7 S ed CITU OF TUKWILA PERMIT CENTER Sheet Number(s): "Cloud" or highlight all areas of revision including d e of r viAi Received at the City of Tukwila Permit Center by: Entered in TRAKiT on 7 �I I1 H:\Saved Docs\Revision Submittal Form.doc Revised: August 2015 FLAGS A FLYING LLC Home Espanol Contact Safety & Health Claims & Insurance Washington State Department of 1164 Labor & Industries 0 Search L&I Page 1 of 2 A -Z Index Help Myt&I Workplace Rights Trades & Licensing FLAGS A FLYING LLC Owner or tradesperson Principals HARRIS, KATHRYN BARBARA, MEMBER BAILEY, KOURTNEY LYN, MEMBER HARRIS, KEITH ALEXANDER, MEMBER (End: 03/21/2013) Doing business as FLAGS A FLYING LLC WA UBI No. 601 748 192 3635 S LAWRENCE ST J TACOMA, WA 98409 253-471-7880 PIERCE County Business type Corporation Governing persons KEITH A HARRIS KALLIE M HARRIS; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. ............... _......................................... . Meets current requirements. License specialties INST EQUIP/STAT FURN/LAB T/LO License no. FLAGSFLO31RP Effective — expiration 12/17/1997— 03/23/2019 Bond ................ Nationwide Mutual Ins Co Bond account no. 7900393274 $6,000.00 Received by L&I Effective date 12/06/2012 12/10/2012 Expiration date Until Canceled Bond history Insurance ..................... Nationwide Mutual Ins Co Policy no. ACP7541492687 $1,000,000.00 Received by L&I Effective date 02/23/2018 03/23/2018 Expiration date 03/23/2019 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601748192&LIC=FLAGSFLO31 RP&SAW= 5/29/2018 FLAGS A FLYING LLC Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts ....................... No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations .......................... _ ....... _ ... No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 497,120-01 Account is current. Doing business as FLAGS A FLYING Estimated workers reported Quarter 1 of Year 2018 "4 to 6 Workers" L&I account contact T4 / STEPHEN TASSONI (360)902-4819 - Email: TASS235@lni.wa.gov Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health No inspections during the previous 6 year period. Page 2 of 2 ,jj) Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601748192&LIC=FLAGSFLO31 RP&SAW= 5/29/2018