Loading...
HomeMy WebLinkAboutPermit D18-0132 - BOULEVARD AT SOUTH STATION APARTMENT - BUILDING E SIDING AND WINDOW FRAMINGBOULEVARD AT SOUTH STATION APTS -BLDG E 4714 SOUTHCENTER BLVD BLDG E D18-0132 Parcel No: Address: Project Name: 1 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov DEVELOPMENT PERMIT 2223049003 Permit Number: 4714 SOUTHCENTER BLVD BLDG E Issue Date: Permit Expires On: BOULEVARD AT SOUTH STATION APTS - BLDG E D18-0132 5/29/2018 11/25/2018 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: MG ACRES APARTMENTS LP 10505 SORRENTO VALLEY RD , SAN DIEGO, WA, 92121 ISAIAH PARK 4913 70 AVE W , UNIVERSITY PLACE, WA, 98467 STEADFAST CONSTRUCTION INC. 1057 ANDOVER PK E , TUKWILA, WA, 98188 STEADCI984J7 Expiration Date: 4/30/2019 Phone: (253) 579-5505 Phone: (253) 805-7725 MG PROPERTIES GROUP 10505 SORRENTO VALLEY RD - SUITE 300 , SAN DIEGO, CA, 92121 DESCRIPTION OF WORK: REMOVE & HAUL AWAY SELECTED AREAS OF EXISTING SIDING. INSTALL (1) LAYER OF FORTIFIED SUPER JUMBO TEX 60 MINUTE WRB & FLASH AROUND WINDOWS AND OTHER OPENINGS WITH SELF ADHERED MEMBRANE AND METAL HEAD FLASHING. INSTALL PRE -PRIMED CEDAR CHANNEL SIDING, LIKE FOR LIKE, WHERE REMOVED. APPROXIMATELY 2940 SQ FT. Project Valuation: $30,193.00 Type of Fire Protection: Sprinklers: Fire Alarm: Type of Construction: VB Electrical Service Provided by: TUKWILA Fees Collected: $1,218.59 Occupancy per IBC: R-2 Water District: 125 Sewer District: VALLEY VIEW,TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Volumes: Cut: 0 Fill: 0 Number: 0 Permit Center Authorized Signature: Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws re • ulating const ctio• o the erformance of work. I am authorized to sign and obtain this development p�j nd agree t f he on. tio attached to this permit. Signature: > ' / Print Name: � IGL Date: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: All wood to remain in placed concrete shall be treated wood. 6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 7: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be obtained at City Hall in the office of the City Clerk. 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0409 FRAMING 0601 WALL INSULATION 0413 WALL SHEATHING/SHEAR - �..... \_J CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov l� Building Permit No. Project No. Date Application Accepted: 6 Date Application Expires: t (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION ^� �.���/y ,,"� King Co Assessor's Tax No.: 2 27-3 0 9 df OC 3 Site Address:'ONN Sovt% -7 BUILDING PERMIT INFORMATION — 206-431-3670 Valuation of Project (contractor's bid price): $ 30 /''3 ' Existing Building Valuation: $ i%A Describe the scope of work (please provide detailed information): /eaft41i /rekci a/eptS Orif/Lr -41;j, /nsfall (1) l erg' 1 Stec' Jumbo 7era77ni/nde 1NRS f Ftus� Gtvvv�o� cu'ilutows and .ir ii -'4 fe, udl.wed mem,/ , /as4/no. C�da,e- dian n.e/ .f?I[4j / >/! k'e —1 / e� /Uwe (ecce. evx. 2, q4' 7 %vet` feePA Will there be new rack storage? ❑ ....Yes %..No if yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes „krNo If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8-1/2"x II" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per 1BC 1't Floor rd Floor 3rd Floor Floors thru Basement Accessory Structure* OLI Attached GarageA. Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes „krNo If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8-1/2"x II" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 t1 PUBLIC WORKS PERMIT INFORMATION — 206-433-0179 Scope of Work (please provide detailed information): Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ .. Tukwila 0 ...Water District #125 ❑ .. Water Availability Provided Sewer District ❑ .. Tukwila ❑ .. Sewer Use Certificate 0...Highline 0 ...Valley View 0...Renton ❑ ...Sewer Availability Provided ❑... Renton 0... Seattle Septic System: ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ❑ .. Civil Plans (Maximum Paper Size — 22" x 34") ❑ .. Technical Information Report (Storm Drainage) 0... Geotechnical Report ❑ .. Bond 0...Insurance 0...Easement(s) 0...Maintenance Agreement(s) Proposed Activities (mark boxes that apply): ❑ .. Right-of-way Use - Nonprofit for less than 72 hours 0 .. Right-of-way Use - No Disturbance ❑ .. Construction/Excavation/Fill - Right-of-way 0 Non Right-of-way 0 0 .. Total Cut ❑ .. Total Fill cubic yards cubic yards 0 .. Sanitary Side Sewer ❑ .. Cap or Remove Utilities ❑ .. Frontage Improvements ❑ .. Traffic Control 0 .. Backflow Prevention - Fire Protection Irrigation Domestic Water 0. 0. ❑. 0 .. Traffic Impact Analysis 0 .. Hold Harmless — (SAO) ❑ .. Hold Harmless — (ROW) 0...Right-of-way Use - Profit for less than 72 hours ❑...Right-of-way Use —Potential Disturbance 0... Work in Flood Zone 0... Storm Drainage .. Abandon Septic Tank .. Curb Cut .. Pavement Cut . Looped Fire Line ❑.. ❑ .. Permanent Water Meter Size (1) " ❑ .. Temporary Water Meter Size (1) " 0 .. Water Only Meter Size " 0 .. Sewer Main Extension Public 0 0 .. Water Main Extension Public 0 0...Grease Interceptor 0... Channelization ❑...Trench Excavation 0...Utility Undergrounding WO # (2) " WO # (3) " WO # WO # (2) " WO # (3) " WO # WO # ❑ .. Deduct Water Meter Size " Private 0 Private 0 FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) ❑ .. Water ❑ .. Sewer 0 .. Sewage Treatment Monthly Service Billing to: Name: Day Telephone: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: City State Zip Day Telephone: City State Zip H: Applications Forms -Applications On Line12012 ApplicationsU'eimit Application Revised - 2-7-12.ducx Revised: February 2012 bh Page 3 of 4 PERMIT APPLICATION NOTES — Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OW Signature: O • AUTHOR ED Print Name: /64iah Day Telephone: Mailing Address: g'(73 A ' V iliveis/* Aze_ ft AppliwtionslForms-Applications On Line120t2 Applications \Permit Application Revised - 2-7-12.docx Revised: Febnia-y 2012 bh Date: 9/W1(sss z-.5-ssas w� 9g� ity State Zip Page 4 of 4 eceipt Number 114600 DESCRIPTIONS ACCOUNT QUANTITYI PAID PermitTRAK $7,498.85 D18-0128 Address: 4732 SOUTHCENTER BLVD BLDG A Apn: 2223049003 $500.02 DEVELOPMENT $476.42 PERMIT FEE R000.322.100.00.00 0.00 $471.92 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $23.60 TECHNOLOGY FEE 1 R000.322.900.04.00 I 0.00 I $23.60 D18-0129 Address: 4726 SOUTHCENTER BLVD BLDG B Apn: 2223049003 $991.73 DEVELOPMENT $944.72 PERMIT FEE R000.322.100.00.00 0.00 $940.22 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $47.01 TECHNOLOGY FEE R000.322.900.04.00 0.00 $47.01 D18-0130 Address: 4722 SOUTHCENTER BLVD BLDG C Apn: 2223049003 $745.87 DEVELOPMENT $710.57 PERMIT FEE R000.322.100.00.00 0.00 $706.07 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $35.30 TECHNOLOGY FEE R000.322.900.04.00 0.00 $35.30 D18-0131 Address: 4718 SOUTHCENTER BLVD BLDG D Apn: 2223049003 $500.02 DEVELOPMENT $476.42 PERMIT FEE R000.322.100.00.00 0.00 $471.92 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $23.60 TECHNOLOGY FEE R000.322.900.04.00 0.00 $23.60 D18-0132 Address: 4714 SOUTHCENTER BLVD BLDG E Apn: 2223049003 $745.87 DEVELOPMENT $710.57 PERMIT FEE 8000.322.100.00.00 0.00 $706.07 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $35.30 TECHNOLOGY FEE 1 R000.322.900.04.00 I 0.00 I $35.30 Date Paid: Tuesday, May 29, 2018 Paid By: STEADFAST CONSTRUCTION INC. Pay Method: CHECK 25422 Printed: Tuesday, May 29, 2018 1:23 PM 1 of 2 ,.4 .. ! l_SYSTEMS sh Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $7,498.85 D18-0133 Address: 4710 SOUTHCENTER BLVD BLDG F Apn: 2223049003 $374.08 DEVELOPMENT $356.48 PERMIT FEE R000.322.100.00.00 0.00 $351.98 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $17.60 TECHNOLOGY FEE R000.322.900.04.00 0.00 $17.60 D18-0134 Address: 4706 SOUTHCENTER BLVD BLDG G Apn: 2223049003 $311.11 DEVELOPMENT $296.51 PERMIT FEE R000.322.100.00.00 0.00 $292.01 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $14.60 TECHNOLOGY FEE R000.322.900.04.00 0.00 $14.60 D18-0135 Address: 4530 SOUTHCENTER BLVD BLDG H Apn: 2223049003 $1,318.63 DEVELOPMENT $1,256.05 PERMIT FEE R000.322.100.00.00 0.00 $1,251.55 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $62.58 TECHNOLOGY FEE R000.322.900.04.00 0.00 $62.58 D18-0136 Address: 4520 SOUTHCENTER BLVD BLDG 1 Apn: 2223049003 $1,216.47 DEVELOPMENT $1,158.76 PERMIT FEE R000.322.100.00.00 0.00 $1,154.26 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $57.71 TECHNOLOGY FEE R000.322.900.04.00 0.00 $57.71 D18-0137 Address: 4510 SOUTHCENTER BLVD BLDG J Apn: 2223049003 $795.05 DEVELOPMENT $757.40 PERMIT FEE R000.322.100.00.00 0.00 $752.90 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $37.65 TECHNOLOGY FEE R000.322.900.04.00 0.00 $37.65 TOTAL FEES PAID BY RECEIPT: R14600 $7,498.85 Date Paid: Tuesday, May 29, 2018 Paid By: STEADFAST CONSTRUCTION INC. Pay Method: CHECK 25422 Printed: Tuesday, May 29, 2018 1:23 PM 2 of 2 A , SYSTEMS rp,..- 0 J as Register Register •Recei City of Tukwila ceipt Number R14405 DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK PAID $4,752.73 D18-0128 Address: 4732 SOUTHCENTER BLVD BLDG A Apn: 2223049003 $315.95 Credit Card Fee $9.20 Credit Card Fee R000.369.908.00.00 0.00 $9.20 DEVELOPMENT $306.75 PLAN CHECK FEE R000.345.830.00.00 0.00 $306.75 D18-0129 Address: 4726 SOUTHCENTER BLVD BLDG B Apn: 2223049003 $629.47 Credit Card Fee $18.33 Credit Card Fee R000.369.908.00.00 0.00 $18.33 DEVELOPMENT $611.14 PLAN CHECK FEE R000.345.830.00.00 0.00 $611.14 D18-0130 Address: 4722 SOUTHCENTER BLVD BLDG C Apn: 2223049003 $472.72 Credit Card Fee $13.77 Credit Card Fee R000.369.908.00.00 0.00 $13.77 DEVELOPMENT $458.95 PLAN CHECK FEE R000.345.830.00.00 0.00 $458.95 D18-0131 Address: 4718 SOUTHCENTER BLVD BLDG D Apn: 2223049003 $315.95 Credit Card Fee $9.20 Credit Card Fee R000.369.908.00.00 0.00 $9.20 DEVELOPMENT $306.75 PLAN CHECK FEE R000.345.830.00.00 0.00 $306.75 D18-0132 Address: 4714 SOUTHCENTER BLVD BLDG E Apn: 2223049003 $472.72 Credit Card Fee $13.77 Credit Card Fee R000.369.908.00.00 0.00 $13.77 DEVELOPMENT $458.95 PLAN CHECK FEE R000.345.830.00.00 0.00 $458.95 D18-0133 Address: 4710 SOUTHCENTER BLVD BLDG F Apn: 2223049003 $235.65 Credit Card Fee $6.86 Credit Card Fee R000.369.908.00.00 0.00 $6.86 DEVELOPMENT $228.79 PLAN CHECK FEE 1 R000.345.830.00.00 I 0.00 $228.79 Date Paid: Wednesday, May 02, 2018 Paid By: ISAIAH PARK Pay Method: CREDIT CARD 02284G Printed: Wednesday, May 02, 2018 2:17 PM 1 of 2 I ! SYSTEMS DESCRIPTIONS = PermitTRAK ACCOUNT QUANTITY PAID $4,752.73 D18-0134 Address: 4706 SOUTHCENTER BLVD BLDG G Apn: 2223049003 $195.50 Credit Card Fee $5.69 Credit Card Fee R000.369.908.00.00 0.00 $5.69 DEVELOPMENT $189.81 PLAN CHECK FEE R000.345.830.00.00 0.00 $189.81 D18-0135 Address: 4530 SOUTHCENTER BLVD BLDG H Apn: 2223049003 $837.92 Credit Card Fee $24.41 Credit Card Fee R000.369.908.00.00 0.00 $24.41 DEVELOPMENT $813.51 PLAN CHECK FEE R000.345.830.00.00 0.00 $813.51 D18-0136 Address: 4520 SOUTHCENTER BLVD BLDG 1 Apn: 2223049003 $772.78 Credit Card Fee $22.51 Credit Card Fee R000.369.908.00.00 0.00 $22.51 DEVELOPMENT $750.27 PLAN CHECK FEE R000.345.830.00.00 0.00 $750.27 D18-0137 Address: 4510 SOUTHCENTER BLVD BLDG J Apn: 2223049003 $504.07 Credit Card Fee $14.68 Credit Card Fee R000.369.908.00.00 0.00 $14.68 DEVELOPMENT $489.39 PLAN CHECK FEE R000.345.830.00.00 TOTAL FEES=PAJID BY RECEIPT: R14405 0.00 $489.39 $4,752.73 Date Paid: Wednesday, May 02, 2018 Paid By: ISAIAH PARK Pay Method: CREDIT CARD 02284G Printed: Wednesday, May 02, 2018 2:17 PM 2 of 2 l SYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 w2 Project: Rot/WORD Type of Inspection: Bu/ 1 -49/N6 - Address: t7/9 �ovr{/cdVRRSO Date Called: Special( Instructions: p L�T ¢ Date Wanted: 6-157z9 a.m. p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: 1501DAN'- 0/4/11— Inspector: Date: 8,.../67/6 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 DW -0132 Project: is S 5th Type of Inspection: 'k[.c.,� \ Au . Address S Date Called: Spec /IIIInstructions: n i_/ eL'Ic . 3 LA l''' E_ Date Wanted: 7-�3 - c a.m ; p.m. Requester: Phone No: 1 Approved per applicable codes. Corrections required prior to approval. COMMENTS: (A/ALL TA7S 4.1.4r,10%t-v h Date' 7-2?-ze,e REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 D13 -0132_. 1t3-le-CIct: cit 41/1 ` T, yptt of_In cti Addrreess :Date isR Called: pe al Instructions: Date Wanted: �,f 7--17-2oLif a.m. p.m. !-9_ �1 Requester: Viwnle Phone No: 0453--823- 75,4 des. Corrections required prior to approval. thl 6111, Inspector: Date: 71 Z REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. ESTEAD FAST CONSTRUCTION INC IP5343 22 Mar 2018 MAILING: JOBSITE: ATTN: Rich Sorensen 10811 Southeast 239th Place Kent,Washington 98031 Phone: work:619-372-8214 E-mail: work:rsorensen@mgproperties.com Boulevard at South Station Apartments 4708 Southcenter Boulevard Tukwila,Washington 98188 We have inspected the property and hereby submit a bid provided all labor, materials, equipment, and supervision to perform the work within the description of this document: A. Scope: Selected Siding Repairs and Replacement 1. Remove & haul away existing cedar channel siding at selected locations. 2. Install (1) layer of Fortifiber Super Jumbo -Tex 60 -minute weather resistive barrier. 3. Windows and other openings at the selected walls shall be flashed with self -adhered membrane on all four sides and metal head flashing. 4. Install new pre -primed cedar channel siding and exterior trim where removed from the selected walls. 5. All wood shall be pre -primed prior to install. 6. Caulk and seal all nail holes and seams/joints. 7. Remove & replace 28' linear feet of fascia at Locations #7 (building H) and #29 (Cabana). 8. Remove & replace damaged soffits at Locations #16 (building I), and #23, 25, 27 (building J). • Take all necessary precautions but not limited to safety devices to prevent any accidents. • Jobsite will be cleaned of all trash, debris, and excess material, etc. daily to the satisfaction of the Property Manager. • REVI ! -.) FOR CODE CO;. i,=LANCE APt-RCVLD MAY182018 City of Tukwila BUILDING DIVISION RECEIVED CITY OF T i KW LA MAY 02 2018 PERMIT CENTER t18-OU32 H 4 0 H 5 0 (;) 1-4 cd co Cc) co 0 o0 ,4 r— cd cd ON P4k-i—i 0\ o <:1 UQ CD 0 0 4 4- ori co N (-1 _CENTER' CENTER WINDOW FLASHING A GUIDE TO NSTALLATION METHOD "A" SELF ADHE IVE FLASHING The "Method A" installation guide is designed for integral flanged win- dow applications, where the window is installed before the weather resis- tive barrier is applied. Compliance with the building code and proper installation are critical in reducing potential water leakage points. Under adverse weather conditions, the installer may consider using "Method B" with mechanically attached flashing. Consideration should be given to preparing the substrate for best adhesion. For some substrates, a primer may be required. The following Fortifiber Building Systems Group® flexible window flashing products are acceptable for this method: • Moistop E -Z Seal® Self Adhesive Flashing 6, 9 and 12 inch x 75' rolls • FortiFlash® Waterproof Flashing 4, 6, 9, 12, 18 and 36 inch x 75' rolls • FortiFlash® Commercial Waterproof Flashing 6, 9, 12 and 18 inch x 75' rolls • FortiFlash® Butyl Waterproof Flashing 4, 6, 9 and 12 inch x 75' rolls • Moistop® Sealant (Exceeds AAMA Standards) THIS INSTALLATION GUIDE REFERENCES THE AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION PUBLICATION 2400-02. O Head flashing RE ...NEC Carr ( T ''BILA MAY 02 2019 We suggest you review Forti-Facts Technical sheet available at www.fortifiber.ca. ann CENTER Or for further assistance, please call our technical hotline at (800) 773-4777. 1 SILL FLASHING After cleaning surface press firmly into place with adhesive edge flush with top of rough opening. CA.) Sill flashing • Sill flashing length is RO width + (2x flashing width). Staple... When flashing sill with FortiFlash or FortiFlash Butyl ... Or partially pull release paper Cut the sill flashing the width of the rough opening + 2x the width of the flashing. Wipe the exterior sheathing or wall with a clean rag to ensure proper adhesion. Remove the release paper and press the sill flashing in place so that the top edge of the flash- ing's adhesive is level with the top edge of the rough opening. Once pressed in place, use a J" roller (or wallpaper seaming tool) to seal the flashing to the sheathing. Note: when using Forti- Flash or FortiFlash Butyl, partially remove the release paper or staple to allow for integration with weather -resistive barrier (la). Once the weather barrier has been tucked under the sill flashing, remove the remaining release paper and press firmly in place. 2 INSTALL WINDOW _ Window _—_, Apply continuous 3/s" inch - bead of sealant on window flange c Window flange Before installing the window, apply a continu- ous 3/8" bead of Moistop Sealant to the back- side (interior) of the mounting flange. Install the window according to the window manufactur- er's instructions. CONTINUED... CONTINUED FROM FRONT ... 3 JAMB FLASHING lamb flashing length is RO height + (2x flashing width, minus 1'). Align the flashing flush against the window frame with1 the adhesive strip covering the entire window flange. SILL JUNCTION 0 Place adhesive edge of flashing against window and fully cover window flange. / / / /0 / /// — O Startjamb flashing even with bottom of sill flashing. i HEAD JUNCTION 0 Using the jamb flashing formula RO height + (2x flashing width, minus 1") will bring the jamb flashing within 1" of the top of the head flashing. See Step 4 for details on installing the head flashing. Prior to installing the jamb flashing, wipe the window jamb flange and exterior walls with a clean rag to ensure proper adhesion. Cut the jamb flashing to the height of the rough opening + 2x the width of the flashing, minus 1" (see 3a and 3b). Remove the release paper and place the jamb flashing against the window flange and firmly press into place in a single direction to prevent voids. Once pressed in place, use a "J" roller (or wallpaper tool) to seal the flashing to the window flange. Repeat this procedure for the other side of the window. 4 HEAD FLASHING Head flashing length is' RO width + (2x flashing width, plus 2"). e.� Align the flashing flush against the window frame with the adhesive strip covering the entire window flange. • • Start head flashing 1" beyond jamb flashing. 0 Wipe the head flange, jamb flashing and sheathing with a clean rag. Cut the head flashing to twice the width of the rough opening + 2x the width of the flashing plus 2". Install the head flashing by pressing firmly in place in one direction to prevent voids. CaII 1-800-773-4777 for Technical Assistance www.fortifiber.com Limitations: For optimum adhesion, Moistop E -Z Seal, FortiFlash and FortiFlash Commercial flashings should be applied at temperatures between 40° F (4.4° C) and 120° F (48.9° C); FortiFlash Butyl may be applied at temperatures between 25° F (3.9° C) and 125° F (51.7° C). Be cautious about using FortiFlash where it can be exposed to temperatures above its Service Temperature such as hot climates or behind fiber cement and metal sidings that absorb a significant amount of heat. FortiFlash, FortiFlash Commercial and FortiFlash Butyl are the only Fortifiber flashing products that can be installed horizontally or at a slope of less than 60°. Where installed horizontally or with a slope of less than 60° do not use fasteners. Product should be covered as soon as possible. Inspect product to insure it is free of any protrusions or damage which may compromise its moisture -resistive properties. FortiFlash is not compatible with EPDM or flexible (plasticized) Polyvinyl Chloride (PVC) based products. FortiFlash and Moistop E -Z Seal are not compatible with some sealants. Consult with sealant manufacturer for compatibility information. Direct exposure of sealant to the adhesive side of FortiFlash or Moistop E -Z Seal can be detrimental if the amount of sealant exceeds what is specified above. Please follow these recommendations regarding location and amount of sealant to be used. Fortifiber strongly recommends against the practice of using a "knockdown bead of sealant," or "buttering the flange" with sealant, because this amount of sealant is excessive and unnecessary. OVERVIEW To properlyintegratesTh' and jamb flashing tuq; the weather resistive,(,:.. barrier underneath Fortifiber recommends the use ofa well integrated weather -resistive barrier with all of its `' flashing systems. 1 This recommendation refers to the most common types of windows used (surface mounted). For other types of frames, special attention should be paid to the window manufacturer's instructions. �F Fortifiber Building Systems Group° Protecting Your World from the Elements NATIONAL SALES OFFICE - Fernley, NV (1016/15) INSTALLING JUMBO TEX° THIS GUIDE APPLIES TO ALL GRADES OF JUMBO TEX AND HYDRO TEXT' Fortifiber Building Systems Group provides this guide to assist installers by demonstrating an efficient and effective method for installing Jumbo Tex and the Jumbo Tex hybrid product Hydro Tex in common residential and light commercial settings. The back of this document has details regarding integrating these products with window flashing. Compliance with the building code and proper installation are critical in reducing potential water leakage points. It is the responsibility of the architect or builder to ensure that these standards are met. This guide applies to the following: • Super Jumbo Tex 60 minute 40" x 240 and 324 sq. ft. rolls • Two -Ply Super Jumbo Tex 60 minute 40" x 162 sq. ft. rolls • Jumbo Tex 40" x 324 and 500 sq. ft. rolls • Two -Ply Jumbo Tex 40"x 162 and 250 sq. ft. rolls • Hydro Tex 40" x 162 sq. ft. rolls C4 1 INSTALLING JUMBO TEX Install Jumbo Tex directly to studs or over an approved exterior sheath- ing. (When using HydroTex, install black side out.) Starting at the bottom of one end of the wall, place the Jumbo Tex roll horizontally (overlap- ping the corner by a minimum of 6") and roll out the first course evenly, integrating with flashing at window and door openings. Place the membrane so that it is tight and flat. Apply enough fasteners to hold Jumbo Tex in place until the final wall cladding is installed. ,•E� 2U1� r r= fats ' C ,N L 5,R 2 FASTENING 0 Fasten all comers 0 Y The size of fasteners used and the spacing required 1 is determined on the job site. Apply enough fasteners to hold • lumbo Tex in place until final cladding is applied 0 Under normal conditions, attaching Jumbo Tex with a quality exterior grade staple is acceptable. A higher grade of galvanized fastener, or large headed galva- nized nail may be required in certain settings or weather conditions. It is the responsibility of the architect, builder, or foreman to decide the type of exterior grade fastener that will best suit the job at hand and how many of these fasteners are required. . \ ° ° I Begin roll ° a minimum of 6" away° from comer ° ° ° ° ° d ,•E� 2U1� r r= fats ' C ,N L 5,R 2 FASTENING 0 Fasten all comers 0 Y The size of fasteners used and the spacing required 1 is determined on the job site. Apply enough fasteners to hold • lumbo Tex in place until final cladding is applied 0 Under normal conditions, attaching Jumbo Tex with a quality exterior grade staple is acceptable. A higher grade of galvanized fastener, or large headed galva- nized nail may be required in certain settings or weather conditions. It is the responsibility of the architect, builder, or foreman to decide the type of exterior grade fastener that will best suit the job at hand and how many of these fasteners are required. 3 SEAM OVERLAPS VERTICAL 6" minimum vertical overlap At vertical seams, apply a minimum 6" vertical over- lap. When going around corners, make sure Jumbo Tex is pulled tightly and properly fastened. HORIZONTAL Any succeeding course should be placed horizon- tally over the lower course in a weather -board fash- ion with a minimum hori- zontal overlap of 2" (3" is recommended). 4JUMBO TEX° AND WINDOWS • Upper layers of Jumbo Tex covers jamb flashing Tuck Jumbo Tex under sill window flashing When a layer of Jumbo Tex first crosses the path of any window, it needs to be properly integrated with the window sill and jamb flashing for quality moisture man- agement. To do this, tuck Jumbo Tex under the sill and jamb flashing as shown above. The layers above this point can butt into the window jamb. JUMBO TEX AND WINDOW FLASHING Windows, window flashings, and weather barriers must be properly integrated in order to form a comprehensive moisture control system. The windows shown in this guide follow the "High Performance Two -Step" method of win- dow flashing. A detailed guide for this method of flashing can be found at www.forfifiber.com. Also, you can find other detailed instructions on how to integrate weather barriers and window flashings at the Fortifiber web site. Listed below are some of the common settings that you'll encounter when installing Jumbo Tex. WHEN WEATHER -RESISTIVE BARRIER IS INSTALLED AFTER THE WINDOW Use one of the following guides that apply: Method A (self adhesive) Method B (mechanically attached) High Performance Two -Step WHEN WEATHER -RESISTIVE BARRIER IS INSTALLED BEFORE THE WINDOW Use the following guide: Method Al (self adhesive) WEATHER -RESISTIVE BARRIERS AND SPECIALTY WINDOWS Use one of the following guides that apply: Window and Door Flashing (Installing windows and doors with integral brick mold) Arched Window Flashing Recessed Window Flashing L Fortifiber provides four grades of Jumbo Tex, the hybrid HydroTex and a complete line of window flashing products to meet all your moisture management needs. 4410 tilVinvi CaII 1-800-773-4777 Nationwide for Technical www.fortifiber. Limitations: Product should be covered as soon as possible. Inspect product to insure it is free of any protrusions or damage which may detract from the weather -resistive barrier integrity. Holes, tears or punctures should be sealed with Moistopm Sealant or Fortifiber Sheathing Tape. This product is not recommended for horizontal, roof- ing or below grade applications. MO sTOPf 1 a s Ni a ("n1o184oP3?3G; Assistance com or visit our Web site at Fortifiber Building Systems Group° Protecting Your World from the Elements® NATIONAL SALES OFFICE — Fernley, NV (09/11/15) 3" recommended o horizontal overlap 2" required ;E horizontal ,� w overlap - .1 I Any succeeding course should be placed horizon- tally over the lower course in a weather -board fash- ion with a minimum hori- zontal overlap of 2" (3" is recommended). 4JUMBO TEX° AND WINDOWS • Upper layers of Jumbo Tex covers jamb flashing Tuck Jumbo Tex under sill window flashing When a layer of Jumbo Tex first crosses the path of any window, it needs to be properly integrated with the window sill and jamb flashing for quality moisture man- agement. To do this, tuck Jumbo Tex under the sill and jamb flashing as shown above. The layers above this point can butt into the window jamb. JUMBO TEX AND WINDOW FLASHING Windows, window flashings, and weather barriers must be properly integrated in order to form a comprehensive moisture control system. The windows shown in this guide follow the "High Performance Two -Step" method of win- dow flashing. A detailed guide for this method of flashing can be found at www.forfifiber.com. Also, you can find other detailed instructions on how to integrate weather barriers and window flashings at the Fortifiber web site. Listed below are some of the common settings that you'll encounter when installing Jumbo Tex. WHEN WEATHER -RESISTIVE BARRIER IS INSTALLED AFTER THE WINDOW Use one of the following guides that apply: Method A (self adhesive) Method B (mechanically attached) High Performance Two -Step WHEN WEATHER -RESISTIVE BARRIER IS INSTALLED BEFORE THE WINDOW Use the following guide: Method Al (self adhesive) WEATHER -RESISTIVE BARRIERS AND SPECIALTY WINDOWS Use one of the following guides that apply: Window and Door Flashing (Installing windows and doors with integral brick mold) Arched Window Flashing Recessed Window Flashing L Fortifiber provides four grades of Jumbo Tex, the hybrid HydroTex and a complete line of window flashing products to meet all your moisture management needs. 4410 tilVinvi CaII 1-800-773-4777 Nationwide for Technical www.fortifiber. Limitations: Product should be covered as soon as possible. Inspect product to insure it is free of any protrusions or damage which may detract from the weather -resistive barrier integrity. Holes, tears or punctures should be sealed with Moistopm Sealant or Fortifiber Sheathing Tape. This product is not recommended for horizontal, roof- ing or below grade applications. MO sTOPf 1 a s Ni a ("n1o184oP3?3G; Assistance com or visit our Web site at Fortifiber Building Systems Group° Protecting Your World from the Elements® NATIONAL SALES OFFICE — Fernley, NV (09/11/15) Installing Lap or Channel Siding Installing Lap Siding • Stud House wrap Exterior sheathing Expansion gap 1/8" for dry siding Nails must penetrate soli wood 1Y," Cedar siding up to 6" wide (A) 6" and narrower lap siding Lap siding can be installed horizontal y or vertica y. For horizontal applications, start with the bottom course and work up with the channels pointing upwards. Allow a 1/8 inch expansion gap between pieces if the siding is air or kiln -dried. Do not nail through overlaps. For siding up to 6 inches wide, use one nail one inch up from the lap. Face nail with two nails per piece for 8 inches patterns and wider, keeping nails 2-1/2 to 3 inches apart to allow for dimensional movement without splitting. For vertical applications, siding should be nailed to horizontal blocking or furring strips. Expansion gap 1/8" for dry siding Nails must penetrate solid wood 1)14" RECEIVED CITY OF 1'UKWILA MAY 02 2018 PFRIWIti CENTER FILE COPY Permit No. tt6' Plan review approval is subject to errors and omissions. Approval of construction documents does not nutho:ize the violation of any adopted code or rdinnnco. iieccipt of approved Fie' - o ►y and c, " j chnzi.lcdged: By: Date: City of i uloai!a BUILD NG DIV;SION REVIS'ONS No changes shall h^ rel.-1.de to the sop of work witho' rr,r, approval of Tukyv la ('tivE`.iion NOTE. _ b+h;i f�:: J'r<� ,' lR: � (''�(1 7!JiJrtiitf7! SIT, 4P.! tr REQU r -sr) 4Mec;ianical [v1 Eiecirical Qf 'Gnlbing ted C s Pin? City Bp i►...�'�': ! :'t" `0; d MG Properties Group® April 30, 2018 RE: Rehabilitative Construction Project — Boulevard at South Station (210 units) 4708 Southcenter Boulevard — Tukwila, WA 98188 To Whom It May Concern: The purpose of this correspondence is to confirm that planned reconstructive construction project at the above listed address will not total more than 5% of the assessed value of the building. Enclosed find recent Real Estate Excise Tax Affidavit showing a recent assessed value for the project at $ 33,400,000.00. The second enclosed document outlines the planned rehabilitative construction expenses for the subject property which total $ 301,926.00. Please contact me should there be any additional questions related to this issue. Thank you in advance for your time and consideration in this matter. Marc Wing MG Properties Group Management Company f BRE MG Boulevard at South Station 619.573.5486 10505 Sorrento Valley Road Suite 300 San Diego, California 92121 rr 858.366.6500 858.526.0800 ,ww.mgprope, ties corn REV i1. `D FOR CODE Co h= -LANCE APPFICVLD MAY 18 2018 City of Tukwila BUILDING DIVISION MG Properties Group® 10505 Sorrento Valley Road Suite 300 San Diego, California 92121 www mgproperties.corn Marc Wing 858.366.6548 619.573.5486 858.909.9084 • mwing@mgproperties.com RECEIVED CITY OF TUKWILA MAY 02 2018 PERMIT CENTER bI& 0132 Ennrhing lira t1n',,w'ii hr!irr t u,nnunitir.... • Zo$') Department of (10 Revenue Vaashngtdn Store REAL ESTATE EXCISE TAX AFFIDAVIT This form is your receipt PLEASE. TYPE: OR PRINT CHAPTER 82.45 RCW -. CHAPTER 458-61A WAC when stamped by cashier TIIIS AFFIDAVIT WILL NOT RE ACCEPTED UNLESS ALL AREAS ON ALL PAGES ARE FULLY COMPLETED (See back of Int pegs for instrument) 0 Cheek bot If gambit sale, indicate'/. sold. Litt .«earlr ofownershi. err wired rout In ach some. Aces Apartments L.P., a Ca7ramm hmaed pnnrnrah.p and ? h'amc ORE MG Boulevard al South Station LLC, d Delaware MG Park Piece A7artmenis LLC. a Delaware 1001100 4ablly company 1110100 roomy company -LL.0 2 Mnhne Adorns C)0 MG Properties Group, 10505 Sonan10 Ve'rey Rd00 x a AJJ:Add,„31S Parte Ayenaa . 03� � Mailing ti V CnyrSuic2ip San Dtogo CA 92:21 C Phone Nn. (including area code) (858) 366-0534 phone No. (inetud 04 un eodcl(212) 583.5740 Senn sit property sax romrpondener to: 1;1 Same as OuyrtlGnnlce Lisr all re) and tenons) progeny tan pond accuni numbeta-cluck box if personal propcny, Liv erusscd vducrs) 722304-903,Q1 0 22 543 000 00 Levy Codfl_2401 ❑ Coy/Siate-7in Now York. NY Name Meiling Address City!Si 'Z p POon< No (Including area code)_,_ L_ f1sheet amhesa orpropcns. 4708 Soulhcenler Blvd., Tukwila, WA 98188 Thn property o located or. ❑ unrcnipormut County OR v. mu: Melly or_ TL)Pw1)11 0 Check box if any of the hied parcels are being segrecsle1 front another parcel, are pan iota boundary line adtusturent or parcel, bong mora: d Legal dncoprron of psuperty cif more slat it n needed. you may auuch a aeinrate sheer to each pater nr Ins iffiavtl) SEE ATTACHED LEGAL DESCRIPTION Select Land Use Code(s)' � List all personal property (tangible and intangible) included in selling price. 13 enter any additional codes; (Sec back of last page for instructions) YES NO Was the sella roorising a property lax cxempuon or&feral undo 0 (0 clnptel 84.36, 84.37, or 84.38 RCW (nonprofit organization. senior citize x a d'snbled parson, homeowner with limited income)' YES 00 If claiming an exemption, list WAC number and reason for exempt ion - YE Is this rropeny designated as Tonal land pm darter 8433 RCW'i 0 (H WAC No (Sect ton/Subsection) Is dots property clusi Gal as cuoxcxn inc (arrant sttauc, Tann arca) 0 apiwhtrtl- or umber) Lender chapter 84.34 RCW.' Reason for exemption Is dots property receiving special valuation as historical pn,peny par cJaq,. 8426 RCN? If any anwers aro yes, templets as instructed (clow. (1) N(7T10E:OF CONTINUANCE (FOREST LAND OR CIJRRF_'NT USE) NEW OWNER(S): To continue the cum:nt designation as toren lend or ebssiftaunn as current use (open space, farm and ageculltue, or timber) land, you must sign on (3) below. The county assessor must glandes/mine if Lhc land transferred continues m qualify and will indicate by signing below. lithe land no longer qualifies or you do not wish to continue the designation or classification. n wilt be removed and the compcnsaung or additional taxes will be due and payable by the seller or transferor at the lime of sale. (RCW 84.33.140 ur RCW 8434.105). Prior to signing (3) below, yoo may contact your kcal cranny ass nsor for more information. 0 ID This land 0 duct 0 does not qualify for continuance DEPUTY ASSESSOR DATE' (3) NOTICE OF COMPLIANCF.(NI.STORICPROPERT'Y) NEW OWNER(S): To continue special saluatiun as him ink progeny, sign (3) below. lithe new owner(s) does not wish to continue. all additional tau calculated pursuant to ciwpine 84.24 RCW, shall be due and payable by the seller or transferor at the time of sale (3) OWNER(S) SIGNATURE PRINT NAME Type of Document Grant Dean Date of Document Gross Selling Price S •Personal Property tdcductl S Exemption Claimed (deduct) $ Taxable Soiling Price 3 Excise Tax : State S Local 5 •Delinquent Interest State S Local 5 •Delinquent Penalty 5 Subtotals 593,398.60 -State Technology Fee S 5 00 'Affidavit Processing Fcc $ 0.00 Total Due i 593,403.60 RECER'ED !pi A 8l(NIM (l Nf OF ita.00 IS 1 (10 1N F0 .(S) ANI)IOA TAXCITY OF 1 L KWILA 33,400,000.00 63,000.00 0.0 e ,00 426,713.60 166,685.00 0.00 0.00 0.00 'SEE INSTRUCTIONS EI1 CERTIFY UNDER PENALTY OF PERJURY THAT THE FOREGOING IS TRUE AND CORRECT. MAY 02 2038 Signature of PLEASE SEE ATTACHED Signature of Grantor or Grantor's Agent Grantee or Grantee's Agent r [�[[jj�� Name (pens) NO= (print) Pr�FIW 1T CENTER ER Date & any of signing: Date & city of signing: Perjury: Perjury Is a class C felony which is punishable by anpnsonment In the state conecuonul Institution,, for a maximum tern of not more than Eve years. or by a fine in an amount fixed by the cram of not more than fine amuse.) dollars (55,000.00). or by both linens/milieu and fine (RCW 4A.20030 (1C)1. REY 84 00515 91 0 (1) PHIS SPACE - TREASURER'S USE ONLY COUNTY TREASURER Boulevard at South Station Bldg # of Units Value/Unit Bldg Value Value of Work % of Value J 12 $ 159,000.00 $ 1,908,000.00 $ 33,212.00 1.74% I 16 $ 159,000.00 $ 2,544,000.00 $ 63,405.00 2.49% H 12 $ 159,000.00 $ 1,908,000.00 $ 42,270.00 2.22% G 26 $ 159,000.00 $ 4,134,000.00 $ 9,057.00 0.22% F 14 $ 159,000.00 $ 2,226,000.00 $ 12,077.00 0.54% E 38 $ 159,000.00 $ 6,042,000.00 $ 30,193.00 0.50% D 14 $ 159,000.00 $ 2,226,000.00 $ 18,115.00 0.81% C 38 $ 159,000.00 $ 6,042,000.00 $ 30,193.00 0.50% B 26 $ 159,000.00 $ 4,134,000.00 $ 45,289.00 1.10% A 14 $ 159,000.00 $ 2,226,000.00 $ 18,115.00 0.81% Totals 210 $ 33,390,000.00 $ 301,926.00 RECEIVED CITY OF TuKWILA MAY 02 2018 PEWIT CENTER • 1 f.., ` PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D18-0132 DATE: 05/02/18 PROJECT NAME: BOULEVARD AT SOUTH STATION APTS - BLDG E SITE ADDRESS: 4714 SOUTHCENTER BLVD X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: fry kt s -8 - Building Division III AJA ( Public Works1111 AT /1-? 6 Fire Prevention Structural Planning Division ❑ Permit Coordinator 111 PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 05/03/18 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Corrections Required (corrections entered in Reviews) DUE DATE: 05/31/18 Approved with Conditions ❑ Denied (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg D Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 STEADFAST CONSTRUCTION INC - .J Home Espanol Contact Safety & Health Claims & Insurance Washington State Department of k, Labor & Industries [earth L&I Page 1 of 3 tt -'/.. Index Help My 1.,&1 Workplace Rights Trades & Licensing STEADFAST CONSTRUCTION INC Owner or tradesperson Principals PARK, YOUNG SIK, PRESIDENT PARK, ISAIAH, VICE PRESIDENT CHAMBERS, NINA, VICE PRESIDENT (End: 08/21/2002) Doing business as STEADFAST CONSTRUCTION INC WA UBI No. 602 032 300 4913 70TH AVE W UNIVERSITY PLACE, WA 98467 206-838-6550 PIERCE County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. ..................................._...._._.... Meets current requirements. License specialties GENERAL License no. STEADCI984J7 Effective — expiration 04/27/2002— 04/30/2019 Bond Lexon Ins Co Bond account no. 9812818 $12,000.00 Received by L&I Effective date 04/12/2012 05/12/2012 Expiration date Until Canceled Insurance ................ United Specialty Insurance Com $1,000,000.00 Policy no. ATN-SF1710939 Received by L&I Effective date 08/14/2017 08/15/2017 Expiration date 08/15/2018 Insurance history Savings Savings history Lawsuits against the bond or savings Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602032300&LIC=STEADCI984J7&SAW= 5/29/2018 STEADFAST CONSTRUCTION INC Cause no. 16-2-13930-2KNT - Complaint filed by VIEW AT THE LAKE LLC Complaint date 10/04/2016 Open Complaint against bond(s) or savings 9812818 Complaint amount $0.00 L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 993,689-00 Doing business as STEADFAST CONSTRUCTION INC Estimated workers reported Quarter 1 of Year 2018 "11 to 20 Workers" L&I account contact T3 / KENT ANDERSON (360)902-6963 - Email: ANDN235@Ini.wa.gov Account is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes ............................._........._. No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 05/03/2017 Inspection no. 317944371 Location 10811 S. E. 239 PI Kent, WA 98030 Inspection results date 12/10/2014 Inspection no. 317552578 Location 2111 SW 352nd ST. Federal Way, WA 98023 Inspection results date 07/13/2012 Inspection no. 315895425 Location 403 W. University Ellensburg, WA 98926 Violations Violations Violations Page 2 of 3 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602032300&LIC=STEADCI984J7&SAW= 5/29/2018