Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit D18-0235 - BOULEVARD AT SOUTH STATION / BUILDING H - REROOF
BOULEVARD AT SOUTH STATION -BLDG H 4530 SOUTHCENTER BLVD BLDG H D18-0235 Parcel No: Address: Project Name: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.Rov DEVELOPMENT PERMIT 2223049003 Permit Number: 4530 SOUTHCENTER BLVD BLDG H Issue Date: Permit Expires On: BOULEVARD AT SOUTH STATION - BLDG H D18-0235 8/24/2018 2/20/2019 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: MG ACRES APARTMENTS LP 10505 SORRENTO VALLEY RD , SAN DIEGO, WA, 92121 DAVE LALONDE Phone: (253) 722-7661 10029 S TACOMA WAY - SUITE E-5 , LAKEWOOD, WA, 98499 GORMAN ROOFING SERVICES INC Phone: (602) 262-2423 2229 E UNIVERSITY DR , PHOENIX, AZ, 85034 GORMARS983LL Expiration Date: 7/12/2020 Lender: Name: LIVCOR Address: 233 S WACKER DR - SUITE 4200 , CHICAGO, IL, 60606 DESCRIPTION OF WORK: REMOVE EXISTING SHINGLES, UNDERLAYMENT AND FLASHINGS. INSTALL NEW 15LB FELT IN FIELD, SELF ADHERING UNDERLAYMENT ON ROLL RUNS, NEW FLASHINGS, VENTS AND 30 YEAR LAMINATE SHINGLES. Project Valuation: $27,842.00 Type of Fire Protection: Sprinklers: Fire Alarm: Type of Construction: VB Electrical Service Provided by: TUKWILA Fees Collected: $1,180.09 Occupancy per IBC: R-2 Water District: 125 Sewer District: VALLEY VIEW,TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 �1 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Volumes: Cut: 0 Fill: 0 Number: 0 Permit Center Authorized Signature: Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit/ d agree to the conditions attached to this permit. Signature: Date: /.)-4/1/ Print Name: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: Prior to final inspection for this building permit, a copy of the roof membrane manufacturer's warranty certificate shall be provided to the building inspector. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0103 PRE-REROOF CITY OF TUKTA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Permit No. Project No. Date Application Accepted: Date Application Expires: -461 (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION ( deur2.Y,( SOd' „mkt., J (3163�� ! Kin Co Assessor's Tax No.: 3Qg9 003 /�3 Site Address: '15CCn Com' �U' itc(,ti;,' q, 1 �U Suite Number: Floor: Tenant Name: PROPERTY OWNER Name: Dain LaLOhcJQ Name: CS e 1 TG(1) . " / 1 Address:) 0 soc Sor'i G (,/a //et/ SSt�c�< City: Sat\ kyle c, State: /' A 'Zip: 7j/0). I CONTACT PERSON — person receiving all project communication Name: Dain LaLOhcJQ Address:/00 1 CI kk.CvMcn WA.Ni \Sac,,'I I., - S e' ]_ City: L4.rel _ State: (JJ,/ Zip:9,y(1Gc1 L.4 Phone:lc3_7) _ 7(J Fax: g3`S " 02? c Email:C)cwicd 1 '9o-"IVA1-00 vi,1'ervr'Q,C • COM J GENERAL CONTRACTOR INFORMATION Company Name: Gorm4eN ,r'� , ,,,,Ce,, Address: 1 V S. 7;,,fm� tjC�,, Jt��1T�r_s \\ City: �4 /co., State: kJ Zip: ct I, yl.M Phone:lv,..g9 -QZ 3S Fax:)...v_ &M_ 0,13c Contr Reg No.:� ) SLL3 LL Exp Date:7//1/1010 Tukwila Business License No.: H:\Applications\Forms-Applications On Line\2012 Applications\Fermit Application Revised - 2-7-12.docx Revised: February 2012 bh New Tenant: ❑ Yes .. No ARCHITECT OF RECORD Name: L; C0 . Company Name: Address: 133 lAkcikee, 11 \'.-4. Architect Name: City: G4, CAA() State: JL Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Name: L; C0 . Company Name: Address: 133 lAkcikee, 11 \'.-4. Engineer Name: City: G4, CAA() State: JL Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: L; C0 . Address: 133 lAkcikee, 11 \'.-4. 1-0.0Q City: G4, CAA() State: JL ZipG 'Q6 Page 1 of 4 BUILDING PERMIT INFORMATIr \- 206-431-3670 G iYh Valuation of Project (contractor's bid price): _,7) ',L ,CL1 Existing!Building Valuation: 1_1 Describe the scope of w�P°rk (please provide detaaiile inform tion): PC11YL' Ql,rr' I1) TA + j/�s unded4yrrrIi) 6PICJ fict�rilv4i•, Tnsem//) el") 1SIb fe t' Veld ,�' r' - a Aehe(� >���crrAv mens O>1 tr.G l/ 1-0,1\)5 i e(A) "l7tt,r 4' P veilf 6-7110 ?0 \ ''' Joani'/ , (' J"/& Will there be new rack storage? ❑ ....Yes ..No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? 0 Yes 0 No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers 0 Automatic Fire Alarm 0 None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes 0 No If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. HAApplications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1a Floor 2nd Floor 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? 0 Yes 0 No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers 0 Automatic Fire Alarm 0 None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes 0 No If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. HAApplications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 0 PUBLIC WORKS PERMIT INFIINATION — 206-433-0179 O Scope of Work (please provide detailed information): Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ .. Tukwila 0 ...Water District #125 ❑ .. Water Availability Provided Sewer District ❑ .. Tukwila ❑ .. Sewer Use Certificate ❑ ... Highline ❑ ...Valley View 0...Renton ❑ ...Sewer Availability Provided 0... Renton ❑... Seattle Septic System: ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ❑ .. Civil Plans (Maximum Paper Size — 22" x 34") ❑ .. Technical Information Report (Storm Drainage) 0... Geotechnical Report ❑ .. Traffic Impact Analysis ❑ .. Bond 0... Insurance 0... Easement(s) 0... Maintenance Agreement(s) ❑ .. Hold Harmless — (SAO) ❑ .. Hold Harmless — (ROW) Proposed Activities (mark boxes that apply): ❑ .. Right-of-way Use - Nonprofit for less than 72 hours ❑ .. Right-of-way Use - No Disturbance ❑ .. Construction/Excavation/Fill - Right-of-way 0 Non Right-of-way 0 ❑ .. Total Cut ❑ .. Total Fill cubic yards cubic yards ❑ .. Sanitary Side Sewer ❑ .. Cap or Remove Utilities ❑ .. Frontage Improvements ❑ .. Traffic Control ❑ .. Backflow Prevention - Fire Protection Irrigation Domestic Water O ...Right-of-way Use - Profit for less than 72 hours 0...Right-of-way Use — Potential Disturbance 0... Work in Flood Zone ❑ ... Storm Drainage O ...Abandon Septic Tank ❑...Curb Cut O ...Pavement Cut O ...Looped Fire Line 75 EJ... Grease Interceptor ❑ ... Channelization ❑ ...Trench Excavation O ...Utility Undergrounding ❑ .. Permanent Water Meter Size (1) >5 WO # (2) " WO # (3) " WO # ❑ .. Temporary Water Meter Size (1) " WO # (2) " WO # (3) " WO # ❑ .. Water Only Meter Size 17 WO # 0 .. Deduct Water Meter Size " ❑ .. Sewer Main Extension Public 0 Private ❑ ❑ .. Water Main Extension Public ❑ Private 0 FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) ❑ .. Water ❑ .. Sewer 0 .. Sewage Treatment Monthly Service Billing to: Name: Day Telephone: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: City State Zip Day Telephone: City State Zip H: Applications\Forms-Applications On Line\2012 Applications'Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 3 of 4 PERMIT APPLICATION NOTES — -1 Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWN,R ORA THO IZED AGENT: Ac.."-. 7�,/ % Signature: Date: 713 J /d Print Name: Dati. Lct Ct1C/ ay Telephone:1Q — 71)1 766/ MailingAddress: Oaf' 1 S ��CO Y�"� L ���1� T/ 1 w� 9� 9 City State Zip H:Wpplications'Forms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $8,125.92 D18-0235 Address: 4530 SOUTHCENTER BLVD BLDG H Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT '" $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0236 Address: 4520 SOUTHCENTER BLVD BLDG I Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT ` $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0243 Address: 4708 SOUTHCENTER BLVD OFFICE Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0244 Address: 4510 SOUTHCENTER BLVD BLDG J Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 Date Paid: Friday, August 24, 2018 Paid By: DAVE LALONDE Pay Method: CREDIT CARD 314234 Printed: Friday, August 24, 2018 11:44 AM 1 of 3 CRWSYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT 1 QUANTITY I PAID PermitTRAK $8,125.92 D18-0245 Address: 4706 SOUTHCENTER BLVD BLDG G Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0246 Address: 4710 SOUTHCENTER BLVD BLDG F Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0247 Address: 4714 SOUTHCENTER BLVD BLDG E Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0248 Address: 4718 SOUTHCENTER BLVD BLDG D Apn:<2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 Date Paid: Friday, August 24, 2018 Paid By: DAVE LALONDE Pay Method: CREDIT CARD 314234 Printed: Friday, August 24, 2018 11:44 AM 2 of 3 SYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT PermitTRAK QUANTITY PAID $8,125.92 D18-0249 Address: 4722 SOUTHCENTER BLVD BLDG C Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0250 Address: 4726 SOUTHCENTER BLVD BLDG B Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0251 Address: 4732 SOUTHCENTER BLVD BLDG A Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 TOTAL FEES PAID BY RECEIPT: R15242 $8,125.92 Date Paid: Friday, August 24, 2018 Paid By: DAVE LALONDE Pay Method: CREDIT CARD 314234 Printed: Friday, August 24, 2018 11:44 AM 3 of 3 SYSTEMS CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA Date: 08/24/2018 11:43:21 AM CREDIT CARD SALE VISA CARD NUMBER: **********2256 K TRAN AMOUNT: $8,125.92 APPROVAL CD: 314234 RECORD #: 000 CLERK ID: Bill Thank you! Customer Copy Page 2 of 2 https : //classic. convergepay.com/V irtualMerchant/transaction. do?dispatchMethod=printTra... 8/24/2018 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK 1 ACCOUNT I QUANTITY ( PAID $882.74 D18-0235 Address: 4530 SOUTHCENTER BLVD BLDG H Apn: 2223049003 $441.37 Credit Card Fee $12.86 Credit Card Fee R000.369.908.00.00 0.00 $12.86 DEVELOPMENT $428.51 PLAN CHECK FEE R000.345.830.00.00 0.00 $428.51 D18-0236 Address: 4520 SOUTHCENTER BLVD BLDG 1 Apn: 2223049003 $441.37 Credit Card Fee $12.86 Credit Card Fee R000.369.908.00.00 0.00 $12.86 DEVELOPMENT $428.51 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R15067 R000.345.830.00.00 0.00 $428.51 $882.74 Date Paid: Wednesday, August 01, 2018 Paid By: DAVE LALONDE Pay Method: CREDIT CARD 511013 Printed: Wednesday, August 01, 2018 1:32 PM 1 of 1 SYSTEMS Page 1 of 2 CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA 0017340000802374464500 Date: 08/01/2018 01:31:54 PM CREDIT CARD SALE VISA CARD NUMBER: **********2256 K TRAN AMOUNT: $882.74 APPROVAL CD: 511013 RECORD #: 000 CLERK ID: Bill X {CARDHOLDER'S SIGNATURE} I AGREE TO PAY THE ABOVE TOTAL AMOUNT ACCORDING TO THE CARD ISSUER AGREEMENT (MERCHANT AGREEMENT IF CREDIT VOUCHER) Thank you! Merchant Copy https://classic.convergepay.comNirtualMerchant/transaction.do?dispatchMethod=printTran... 8/1/2018 INSPECTION NO, INSPECTION RECORD Retain a copy with permit bis -oar - PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd.., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 Project: C_ f , -/ 3%VOI , cS//r/ J,j4/ ,Rt4: Ic i/V 1 /IJ,L dress: �is� es. �- 3wd Date Called: Special Instructions: '----L,AA.ci t IQRequester: `- 1/ _ Date Wanted: g:24-- 2-Cfc am: hvt_ Phone No: 2.63- 722- 76l¢.1- 0 Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: Inspector: ale ag_ Date: gZB,zv/ REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division I NOTE: Revisions will require a new plan submittal 1 and may include additional plan review fees. FIELD COPT Permit Na 1 97" Q S This set of construction documents shat! l - k^pt at the site of work and shall be LLeri to inspection by the Building OfficLt or a duly authorized representative. City Of Tukwila BUILDING DIVISION �f:-y,gr'rq^-tom „""",,�j�!t SE <d E�,1PE li'Jil1 i k.a4::.U1R i.L tiOR. OXICchanical t1icctricaf dumbing Qas Piping City of Tukwila el)UJY 'C DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED AUG 0 9 2018 City of Tukwila BUILDING DIVISION bia- OZ3s SECTION 01010 - SCOPE OF WORK 1.01 LOCATION A. The roof replacement shall occur at: 1.02 SUMMARY OF WORK 01010-1 BOULEVARD AT SOUTH STATION 4708 SOUTHCENTER BOULEVARD TUKWILA, WA 98188 A. This project shall include but not be limited to: 1. Removal of existing shingles, underlayment and flashings to the roof decking. 2. Repairs to the roof decking. 3. Installation of self -adhered underlayment at all walls. 4. Installation of new shingles. 5. Installation of new metal edge flashing. 6. Installation of new metal cap flashing. 7. Installation of new wall flashing at all rake walls and head walls. 8. Installation of fiber -cement trim and counter flashing at all rake walls and head walls. 9. Installation of new flashings at roof penetrations. 10. Installation of new static roof vents at existing locations. 11. Repairs to existing gutters and downspouts. 12. Related work, including sheet metal work and sealant work, as required for watertight roofing system. 13. Painting of roof accessories. 14. Issuance of roof guarantees. REVIEWED FOR CODE COMPLIANCE APPROVED AUG 092018 City of Tukwila BUILDING DIVISION B. No more than two buildings shall be under construction at any one time. Work will not commence to Other buildings until 100% completion. 1.03 RELATED DOCUMENTS A. The roofing material Manufacturer's current specification manual shall be considered a portion of these Specifications. B. National Roofing Contractor's Association (NRCA): NRCA Roofing and Waterproofing Manual, Fourth Edition, 1996. C. Sheet Metal And Air Conditioning Contractors National Association (SMACNA): Architectural Sheet Metal Manual 6th Edition. D. Asphalt Roofing Manufacturers Association (ARMA): ARMA Residential Asphalt Roofing Manual. E. Submittal of a bid by the Contractor shall be considered evidence that the Contractor is familiar with the above material manuals and requirements. 1.04 CONTRACTOR RESPONSIBILITIES A. The Contractor shall procure and pay for all permits, licenses and fees necessary for the execution of work. B. The contractor shall furnish all labor, materials, insurance, services, taxes and incidentals, and to perform all reroofing and related work necessary for the completion of the project specified to p EYED reliable, leak free, and functional installation, in strict accordance with the project TUKWILA b113 -o).31/45 AUG 01 2018 PERMIT CENTER BOULEVARD AT SOUTH STATION 01010 - SCOPE OF WORK rn to Aw Nr'z P DTzOZTZZ""TnYi zlz mcn E0mzrOrzrrzvm. pD 0<00m - Omzvcnmi m-Omx1n 7-0m0ma rz Z�z�Oc 710 rnx --1 wm . vmz=o-i Dx1 -n�viv m00>mx c oo comz730 w.t.mmOm _O . zco 00 22 >20c2 mo0.romi ,mi 3-40.0gv� m>m- -1�m X00) m 0 v�m�p ,ODm'n� 0 Qp mpx m zWcm�m m 0 �. zz�' mDVD MO r • M O Z -o= r '{ cm o • 0 0 z Amo Oz Z �P m .1c -1 2 z a P A c°i, 'z = G) v� m = v E O v m ro z r) z 0 Z CD LI R) co S11dM IV DNIHSV1A z ✓ 1N3W V1d3GN(1 1133 S319NIHS MIN 9NIHSd13 >CI> INSTALL CEMENT FIRER TRIM 3 rl 3>z no o C r zr - 9 Z_ S z o Cl d J 0 0 moi] -a En n 0 Z z mc -1 e d -< O d 0 r1t=1 �Z 0 Cl K \\\\\\\A\\\\\\\.. \\\\\\�\\\\\\K..\\\\\\.A\\.\\ AUG 01 2018 PERMIT CENTER z Cl Q N 0 z P1 3 z N W n p DNIHSdid NOIiISNV Jl S 3H1N /CE NNIHSd11 RECEIVED CITY OF TUKWILA AUG 01 2018 PERMIT CENTER z P1 SH-IDNIHS 9NIHSb'-1� 3 W EC) CO 70 v 1N3NAV-H3QNr T1 -I f D b7 0 z0 Z1-1= ci z 0 n 0 rl rl zz 0 S319NIHS M3N D rl X 3 -I zP1 Z z 3 C TI 3 C O .c1 z r1 70 z 0 rl CITY OF TUKWILA AUG 01 2018 PERMIT CENTER UAbb p N -z 12xm*z( p-a*2cnQOO mC)0OrN�mxDl=TrDPr D SaW- ums mzcn r gjcri, z ci 7mo�o"'c��mE{-I2?mWm= 0mcc''oce-ImOu''1 10 Op-IZTIEIMmzi.z3vm 08O -4m0DND=omo omm�0gxwm0DAZ UG) ' 0 <m Ozoz-i map-O_lmzO 00 o mco_ocxmi5cOcz ()moo,- <gp000w atoo>r mTnm,mD zowm z=rT,. On VZxz O 0 m x >>3P02Dvz m�D�mzmT vZmDZ tmii�OZN� m_>,z O mx 3�SnOvMm >0 0mvZo -)C o D -+ mmm,0 mmm v zm Om 0-1* n> � N O c m „mv chm m m O V W 03 D Tr z O z o, O T z vmDT•'4TDN r TiovmooxpogmAST m�{_0mzi-o --{z� mow OmD-imm. Etmmmo xm-{= > 0m10 ry-m mOZ pcd�z O., *mo mzxo-i D. T o MOODTM 0-m PDM m - m0m m�,"CI Trm lI1 CA fix- s zm�TN u ; SDO Oma• ..mmx m =v0 m C p o z T D Er_. r_10000 Z r p-0.) -Tmx(n 5 O _,>7 lA(0,1g1zD m z AZn ,e-, ,, r" v m mom 0 rmv pzvzmn m mq mmz*g0on D 0 O 0 Dy Km m0TzvOz mo m moz **9mr m 20 mr x x o_i m to p ozm mm 3 n' Z Z n 0 Z 01 9NIHSd13 11VM Qd3H q121 , A3311 3❑❑a iN3Wl.V1a3GNf1 1N3W30 11d1SNI WId1 a3EI3 m z D rn or - c -13 z73 mm I m .r1 I- D L7 M S U ❑NIGIS DDNIISIX3 z 3NIHSV13 11b'MQd3H M3N Y OF TUKW CITILA AUG 01 2018 PERMIT CENTER (7 :14-P N Z p vd zDDCZX>mM294 710-11,,,m., c _,nZm__�cmi. D " mTmal2m11ZZnF�CDZF ZmZwmm-�iooc>iZMr.o 6 -)61 -co DDZ SOD*Z = z*r-z OmmomR T(22,..n5. -r;.% . mrSimmz=Zm mmmOr-cm0 -oK; zcooOKm ptnMcmZG) cmn ?zovmm�m-is�m 8 O*OT0-0-zr-mm . 0 �wzomvr�m O <m" -Omc)m O<2DZ 0 z� Pm -i m-1= m -r<m Zo m-ID(0 m ��ai= cm�O r cDiz �r z� OS`� < mm r D< Om�m o O� O�Dm n nOO�vx�O S�.ZO m zD mpow o mNOzD • n� n wmm D n mmO c,ml .2(0'173 g D•v 0) wm P3112m r q oo m A0D D OTZ O-° r O �1 0 C1 RECEIVED CITY OF TUKWILA 1d❑1J Sf❑fNI1N❑J 1> 1-9H P1 P1 P1 P3 AU6 01 2018 PERMIT CENTER d(1>I3dS 1N❑W b'1d❑JN1r P1 ❑NIHSV7 dV3 1d1❑N v) 2 9 r. -D- Z z 0 mz I I D -D 7 D d 0 P 1 ,~ 0 z , W Z c 0" ry 7 rji CO 0 C1 RECEIVED CITY OF TUKWILA 1d❑1J Sf❑fNI1N❑J 1> 1-9H P1 P1 P1 P3 AU6 01 2018 PERMIT CENTER d(1>I3dS 1N❑W b'1d❑JN1r P1 ❑NIHSV7 dV3 1d1❑N m 0 0 p vz - Z uv-0-1-Imm>mwx>-mw ..�y0..„..--i=07o m>z>mxmmz-<xcnO�m Z�_ 1->x0>>mOz i 1zJOcDo-I>� c n z -10»m c.oc xOr-�m_mT.(Z 0--0!HHFI m2DO>mmZOm 0=>mmom-vm>zRcn-1v 0my Oxonm_lOmz--1=r5jrzMZ c DO_� cn-zz 0 wwzOm0m01 A-0>m-gv 0 • Om�=m D•v cnx0 >c0 = 2;5m0=-iOZ�mmCzmccn D mx xcM0n>rc0= z wOoxxomxzCKOmmw =O mm 0n-<� 70 ommwZnOmw=0-0cmm O mDyv0=1_4J0mm007omcn 0 rmooF,"mOm zm7oxOom-l<y cn OZmu°00mmz r� 070 = r0-�mm710-1-i z m z 0cmni=Wmx �=-i70N r air"cnZz�x==z =z, -nm m Oy= rm�mOcmn mOtn� =m0 m<O=X0 022mm �' r -qm1-r-TzA= mrozz (n�z �*! r� zm Z11� -<z= z* 0cn xv worn ^'r m xm0 Ocn r z mtm 0) 3 Z 3 m 3NON BPDDs RECEIVED CITY OF TUKWILA AUG 01 2018 PERMIT CENTER ]d3H 1A'd1S d�nSodxd U► A ( —z _ '0 mmmzWDmmmD=zm ODD`=`0m-Ammw� mr=m),Z=�i-Azz 0- DDrcn>0Dm�m O,CzcncnTMF.Dm* FlocamyyZoxo7JK Dmmrro D Om -IZ• rrx-iO-I zD 003--xm mD Or Omm>�or m zr- w 0z m 00 --wom -4 Nmz-DrTm mo>0'-' ) mmXm r x< 73- mmr co Dm OK000 x r -z MZmXZm Z zC) MR-mD0cn 0 Dx DcuP' > FM <m0 xDr -I _<Nrn m- c0 - N mm 0 r m0�i om v Xn xm�Mm� 0 -i. mm�ZDcn m rnz O_c—zx z >zC 0Z 0 COM rr°=Cc ,0 m m 0 m 0 m JagwnN 61.1140.4a ONIHSV-Li 39Q3 DNI1SIX3 z n H—R.' n) w ( RECEIVED CITY OF TUKWILA AUG 01 2018 PERMIT CENTER DNI>I D J _dope! 1N3Wb'-d]QNn 11HH SHDNd1A Thldb'1S 7 0 D I z [- d z ST1DNIHS MSN M3IA 1NU2J3 M3IA jars z z m rU FLANGES SET IN FLASHING CEMENT C Z z m D z m D x.. t+S d £ r c m N A0 D = Z r -)r Z z m r - Z m P m v) Z 'l D r A D A v) O Z A 0r m D m 1' mz m Z 9 EXISTING SKYLIGHT CURB NI 13S S39NV13 -1m RECEPED CITY OF TUKWILA 4 AUG O 2018 PERMIT CENTER SELF-ADHEREING MODIFIED BITUMEN comm m m X Z X x x -IW-4- z d Z z z C b m 0 0 A N Z m F Z 4,1 M3IA N3VE • • CTA W ,.):-.Z ITI n C�m cn n v ai T< --zz� d C 0 ��-�WCOmD-im•v°zmcncnv�m C -I mr5M01 M-1-1 — c_mp0-1-c�DD� Tl O �c G)-- -pOrr I- < -0 (/) ,=„0 -i> 13Trr >M0.-00m-1D"mD=comOzzzOMzvm Z 77 O D 1-1 zvDmmm vpzz>mo>rm- -I o>�� CT)M T> m Ei Z cme)-cOi�mv1OT> imm_i_imzommxmxiom f'l D D 0 Cl v mzmvm�x� ,. -1< o=iTzm (') 0 Z C mOcvcp0WOZ5 COZ >zmpz*rT , -D 0 t7 ty fTl 0-1111 0 Omo m-iD� m� -1..1-lpm=mo _ Z (- D < z -{ mmo=� �rr�mc�ci vo mmZ-18P1 277 I� IG O rmm< -1<1T1mD xi- mz��^mvD'i O pi m EJ Z - mzMOmomoo DmZmp Fm z_=<mU0)F O AJ O D C -I cncn�mpc z�'D m O-zi DD=p==1zpZ I Tl M Tl 1 1 D -1 D z73 psi M co mc�gn>-tc- 1 - n=-9 1 �--a n Z Z Or �m nOOr m0 zv“'OmnimD Z F11 P1 z (tel d f ▪ l < • m- m OD =v,1p-i G� 3 Z D D G� 1 D M2 m0 v�p =O< On Zw=1 P1 r'l G1 z Z f �'-I (/) - 7'm �T no, m r0 ��r1� mDmO f7 z I- G1 I1 Pi z Irl 7 m '� z D p v mo- D cc9 <m.0-1 os, () -H P1 ITl P1 V) -H -H -< mm �rOT n m� m -i z'4 --Imo m O ZWx 7� %r '_ r mm mm Oz DD� O =z ▪ D� �oDZZ �• \\ \ m rcn -a mo ZO �00-� \ 00 • '= ren = E1± �Tmm m �.\m �m DZm cn m\-mmvzm mw �m ZDvcni� \ \\ \ Z m� m*� m �= WO -Im�z ro m* Ove r DZ tn= O �Z 0= Tzz' m zm mZ m --< �m D m� O m O Z ao = ? z z ✓ m v iZ - m o 0 z Pi rD CD INA ISIWHX3 DI1d1S \ N EC IVE CI OF UKILA 6 01\201 \\ V PE •� M EN ER •a \\<4. • \\ z 01 f @ @ R!,.,Zo m2mommk§\§mkmmkx mkk§z-< omoOk§m Mzm-<zm-1 ozzw /kj' 0> o® 2q MK 3R§Zcy< �q cmc 0-IwmO2 k� %_1/ %Rm\j§, m Mm oOmiI-$ �� ��< 2z��<\q mE >mC q0k-zM< Mmm m Zr0 2§7§\$k of >7m <?®�c®o 2r <om m_mco_m mz P< 2m0 kmr Z-1 mm xmq zom-r > omzm /., w�2 w >0 - @ a X OM k Z § dK M m0 E m \ k mm m 71 � -I m zo 7 z � % q § E 3 w % / 1N3A a3AdQ 2 S SilDNIHS m m y 9S y« »mw ZTS cww S»S 01±3 _mg Z 30970 SS w3S 701-9 S±2 S_w 2y» SDy Z Cl amn 13-1cn-iO*-10>> I z-IcnZ�7� w===m==cmmO rrr=momm_i Emzmomm-40,12m-1-imm 1:.r.-�Zv=c�o13 m -Z1 0mDm_-4MDW)-T.znmmz2m*-moi- D vD voxmZD(L)xO -1 _-, mm z vvv�O�i1< m m0 =wwvc mD�pmvz cor �clom-1 G�zOm`DD_ m m� m -�1=m-1O v -0-1>A lm v mcomm O-mX-..ow mzmv� 1. z�m[z 02 -m1 vo �m0 0 --io mv�p r mm osc07: vD=�OinO m_ m==mn 731,=c-tmn _1- < mw m_ wz m>D0)0 Om Z0 On�m= Dr'>0>g u ,--< vmO6z =mm mcmm0 �3-10gi cm oz mvmzz =,, m -13;0C Z�-1=m �2 00 n F Tm Om m zm O my WWmo c QM W 7J gi 71 m Z m m z 0 m zo m z z m cnO m z 11/—� VI \ \\ \. \\ \\ O Mr 7:1D 0 1 r M M v z r D z of a ago C7 7 T Z ▪ MHr FD 3 z D r m o z r� zr-c' ) -40m 0C C rim 11 - m z c1 r n 70 zD o ❑oma n zH -1 -H Z Z D M v zrr- -i-H-< c� � n 7 X z 770 P1 1 70 C cn D 71 -n 0 z z 0 T K114 P r, AUG 01 21:111) PERMIT CENTER 3dId 1N3A �NIISIX3, n M ox 7� M= IDW < 0101 z -H (,, I HEAT VENTS - R❑❑F JACK, Z 0 z m e 0 d Q o 3 co Z ,--• 3 rt_ D 1 �. m \) z 0 m zo m z z m cnO m z 11/—� VI \ \\ \. \\ \\ O Mr 7:1D 0 1 r M M v z r D z of a ago C7 7 T Z ▪ MHr FD 3 z D r m o z r� zr-c' ) -40m 0C C rim 11 - m z c1 r n 70 zD o ❑oma n zH -1 -H Z Z D M v zrr- -i-H-< c� � n 7 X z 770 P1 1 70 C cn D 71 -n 0 z z 0 T K114 P r, AUG 01 21:111) PERMIT CENTER 3dId 1N3A �NIISIX3, n M ox 7� M= IDW < 0101 z -H .co ti rn 51, mm w N r'm xD 22XmmXcOXmXzXDQZ D2Zmv-C m-AmZmomm-i .-IDmvmcnpvimZDv_roo mM-�rOMm-,imom07om0zmz=r=� c0 D m vm -Im -Imm mmom c �m-imzm _ G) z v �m�OmzmZrmmmZ�r�mz>0 rz�O°m zz -im vD 55 Omw Z fl ?Z-m-mvmm-�i-4m=0v rz_A m- <Mz OKO- c7ovzMOW. Tim Tmm m0 Wmc MMM !T�D�°MmvOv Tim �z �„ D0 m1-0 0z om�tnO-Im_, c)z o-+ mDD m D mDm =mo vv= rpwm� „�OWO D r z m O m z Mwmm �mOc 1 -1 ccz mzm o�m �z>z=�=m<O0 m 0 �m zip D01 mmr0G)zOm-im= ✓ -1 wx !Z mw MQM mm2 zwomm0nmm0m m c tnD <� m - G) �p �Drmzmx7o -6 z • zr <v� D0= DpO�vOz�c�0m0 z m mO om0 o2Di- omc' ›00 -Imc. o �m m r m�zm -i-i G) p cn� coXzrm Ov-m- iD rr 2 _m mzm m>z -1m-ITm m0 w m .-_ _oc r=m mm nm9 m m O �� �T �v �Dv m l `v v, m m0 cm my c\ \ m m* ozm m m -1\v. m m Adv A\ z \J 81/21/E0 NNIHSd1� 0 00 zo „z Z 0 —x mm (0O 0 m z D_ r 0) !xi D r9 {1 n J a C C Z -1 TI a 73 f < 73 t=1 (n D f'l F 17 i 73a -I Cl r- m-1 z c f'lDFri D ZCl )-0T1 z m �z U --, -D a '� u a Zf-D <v, zD_1 mm z m7.0 m . -1 a P1 70 -I 73 i=i70 #--, D d Orn 7 00 TI a 77U E D O Z 3 _ (lT-9 -r1 nZc Z z a -r- r -z r1ria 3d Cl 3 Z D D 3 D C0 f- P1fz Z P"1(/l-I 3 rrl z7D C17 2717 ,__,O (') -1 r9 ['1 7 (1 -I -I -< ,-9 \ \\ C f0 911-I C) CT A PN r'z 0 -vzmmgmi<mmmz;rTOmm>mw,m q,rD-mVr- 10vr minim m0x0- V6000 (agog DOmR mzD -Imoa Zwcn=S�T0=D0mm D„Nzxwnrm _IZr-,rF-2TDm�+_I mtoc,,)P�z�vmcn zD or> Cr O>° ww0somx Om 0.,.% .�t7�v m rZxg00$mrr- O° ZS�rn�r-mo 0 mc)��mmmm L moOTC) 1m RTf mmtJm m��0, Mmzmmzm z m pJ!: m �N m"mmDo m 0m0m mo �Sth 0m 0 m Dfry " gmzzD� vm) too. M z 0—c-zx m tnm > 3D �n1C0� m mm v 00 mmm 071 73tom 0 m m 5 2 71 m cn 383HM 3JVld38 r� 8T/?I/E0 GUTTER & METAL EDGE FLASHING 03,3,0 Mm A f1m x OM Mm- -+U 3m> v) -i Vtm A LZl 0m D p 0Z 0iE V'C7 A7 S A ❑ d > M O Z D D A 3 t1� U2 ri D ” A m m d ONIHSV13 3D03 /\3N 21 30NH13 1ItN -' 3531103 331dV1S 1N3WAV1d3QNf1 1133 ru rU ' 1 RECEIVED CITY OF TUKWILA AUG 01 2018 PERMIT CENTER PERMIT COORD COPY c PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D18-0235 DATE: 08/01/18 PROJECT NAME: BOULEVARD AT SOUTH STATION - BLDG H SITE ADDRESS: 4530 SOUTHCENTER BLVD X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: C Building Division Public Works • /UM Fire Prevention Planning Division Structural ❑ Permit Coordinator n m PRELIMINARY REVIEW: Not Applicable n (no approval/review required) DATE: 08/02/18 Structural Review Required REVIEWER'S INITIALS: DATE: n APPROVALS OR CORRECTIONS: DUE DATE: 08/30/18 Approved Corrections Required C Approved with Conditions ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg D Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 GORMAN ROOFING SERVICES INC 1-Lnnc Espanol Contact JSearch L&I A•Zindex Help Safety & Health Claims & Insurance Workplace Rights Washington State Department of k) Labor & Industries GORMAN ROOFING SERVICES INC Owner or tradesperson Principals GORMAN, DANIEL J, PRESIDENT Doing business as GORMAN ROOFING SERVICES INC WA UBI No. 602 208 941 2229 E UNIVERSITY DRIVE PHOENIX, AZ 85034 602-262-2423 Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. ......................................... _ .................... Meets current requirements. License specialties GENERAL License no. GORMARS983LL Effective — expiration 06/13/2002— 07/12/2020 Bond Contractors Bonding & Insurance Co Bond account no. AH8286 $12,000.00 Received by L&I Effective date 04/01/2014 06/03/2014 Expiration date Until Canceled Bond history Insurance ......... _............. Associated Industries Ins Co I Policy no. aes104878900 $1,000,000.00 Received by L&I Effective date 10/02/2017 09/21/2017 Expiration date 09/21/2018 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts ................. No L&I tax debts are recorded for this contractor license during the previous 6 year period, ut some debts may be recorded by other agencies. Page 1 of 2 My 1.41 Trades & Licensing Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602208941 &LIC=GORMARS983LL&SAW= 8/24/2018 GORMAN ROOFING SERVICES INC License Violations ................................................. No license violations during the previous ar period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 037,391-00 Doing business as GORMAN ROOFING SERVICES INC Estimated workers reported Quarter 2 of Year 2018 "11 to 20 Workers" L&I account contact T4 / TERRI MADISON (360)902-4654 - Email: KIRT235@Ini.wa.gov Account is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 11/21/2016 Inspection no. 317942462 Location 10811 SE 239TH PL Kent, WA 98031 Inspection results date 04/13/2015 Inspection no. 317935617 Location 3015 NW Market St. Seattle, WA 98107 No violations No violations Page 2 of 2 ©Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602208941 &LIC=GORMARS983LL&SAW= 8/24/2018