Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit D18-0236 - BOULEVARD AT SOUTH STATION / BUILDING I - REROOF
BOULEVARD AT SOUTH STATION -BLDG 4520 SOUTHCENTER BLVD BLDG 1 D18-0236 Parcel No: Address: Project Name: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov DEVELOPMENT PERMIT 2223049003 Permit Number: 4520 SOUTHCENTER BLVD BLDG I Issue Date: Permit Expires On: BOULEVARD AT SOUTH STATION - BLDG I D18-0236 8/24/2018 2/20/2019 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: MG ACRES APARTMENTS LP 10505 SORRENTO VALLEY RD , SAN DIEGO, WA, 92121 DAVE LALONDE 10029 S TACOMA WAY - SUITE E-5 , LAKEWOOD, WA, 98499 GORMAN ROOFING SERVICES INC 2229 E UNIVERSITY DR , PHOENIX, AZ, 85034 GORMARS983LL LIVCOR 233 S WACKER DR - SUITE 4200 , CHICAGO, IL, 60606 Phone: (253) 722-7661 Phone: (602) 262-2423 Expiration Date: 7/12/2020 DESCRIPTION OF WORK: REMOVE EXISTING SHINGLES, UNDERLAYMENT AND FLASHINGS. INSTALL NEW 15LB FELT IN FIELD, SELF ADHERING UNDERLAYMENT ON ROLL RUNS, NEW FLASHINGS, VENTS AND 30 YEAR LAMINATE SHINGLES. Project Valuation: $27,842.00 Type of Fire Protection: Sprinklers: Fire Alarm: Type of Construction: VB Electrical Service Provided by: TUKWILA Fees Collected: $1,180.09 Occupancy per IBC: R-2 Water District: 125 Sewer District: VALLEY VIEW,TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Volumes: Cut: 0 Fill: 0 Number: 0 ,-1 Permit Center Authorized Signature: Date: 3 -or— v I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permi nd agree t the conditions attached to this permit. Signature: Print Name: Ja VC This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: Prior to final inspection for this building permit, a copy of the roof membrane manufacturer's warranty certificate shall be provided to the building inspector. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0103 PRE-REROOF CITY OF TUKfl A Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Permit No. Q Project No. Date Application Accepted: 1--1 g Date Application Expires: 2^-1 (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Jew ) k� �/ `V6-t.'Gh J� (3 S 1 "1`,. Kingrt.o,Assessor'sI/Tax No.: .1ijO T 1 �J / S I UV �(,t 1 cul / 1 RO Suite Number: Floor: RIC))1 Li<1 X11 -) Site A dress: center Tenant Name: PROPERTY OWNER Name: r v'e /L.c4t! chd iR AddressyIGGa/ 7,,� /? Name: JAG 1 isweri i,Qs. 6,,0 \s. City: LGl t CeW -CJ State: / / Zip:1 / q jj Address]OSG S SC r�re r''� tic( G nl ) R ��1* 3 City:'in I31p�G� State: Zi: Cab, CONTACT PERSON - person receiving all project communication Name: r v'e /L.c4t! chd iR AddressyIGGa/ 7,,� \ S(ni E S \s. City: LGl t CeW -CJ State: / / Zip:1 / q Phone: IS3 v 722- KG -7 Fax: —5i/-Q� C Sly, Email. :d / @ e(1r1oC.tnIt() , wviiXes . e.Gln GENERAL CONTRACTOR INFORMATION Company Name: GGYMq rA Pozf rY Tery i ceS Address: O.9 S' 'T �� (tee)(t Q E-5 11/4t VZip City: 61A1C(f) State: KM l -t 1 Phone: GIST O...C{(13c Fax 1 _ s -o l3 C Contr Reg No.:G& S.9 1 % Exp Date:7/) /XZ0 `' / Tukwila Business License No.:_I H:Wpplications\Forms-Applications On Line \2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh 0 New Tenant: ❑ Yes El .. No ARCHITECT OF RECORD Name: Liv Cce_ Address233 L4Ac Company Name: City: Chi CQG1C State: / t, ZipGCV% Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Name: Liv Cce_ Address233 L4Ac Company Name: City: Chi CQG1C State: / t, ZipGCV% Engineer Name: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Liv Cce_ Address233 L4Ac :r 0 - S �1 City: Chi CQG1C State: / t, ZipGCV% Page 1 of 4 I BUILDING PERMIT INFORMATIC )- 206-431-3670 U Valuation of Project (contractor's bid price): $ U Exis tng Build'ng Valuation: ^^$��..- J v I.., Describe the scope of w rk lease provide d tailed }'�format n): L mar e, I itb- ,S t' (,tnc erIct •, A ,�!aA. . i 74/thew iS )loreCt ,n e - •Fade C (Al ek men on M hAn s1 new Yc� �A� k J je tais 4rnc) 20 ✓e- %ml'n,t'-k��'t,, e,� z Will there be new rack storage? ❑ ....Yes ..No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? 0 Yes ❑ No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: 0 Sprinklers ❑ Automatic Fire Alarm 0 None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes 0 No If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms•Applications On Line\2012 ApplicationsWennit Application Revised - 2-7-I2.docx Revised: February 2012 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1' Floor 2nd Floor 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? 0 Yes ❑ No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: 0 Sprinklers ❑ Automatic Fire Alarm 0 None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes 0 No If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms•Applications On Line\2012 ApplicationsWennit Application Revised - 2-7-I2.docx Revised: February 2012 bh Page 2 of 4 LPERMIT APPLICATION NOTES — �✓ Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OW R OR�RIZED AGENT: Signature: Ai*/ ( Date: 7/? Or? Print Name: OaVR � `-'� Day Telephone: a-5? 707-2-76—C/ Mailing Address: 100 V 74,CGh1C( U hty L I/�Vt ;c) V i 1' /cP79 H:Wpplications\Forms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February2012 bh City State Zip Page 4 of 4 PUBLIC WORKS PERMIT INFO V1ATION — 206-433-0179 Scope of Work (please provide detailed information): Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ .. Tukwila 0 ...Water District # 125 ❑ .. Water Availability Provided Sewer District ❑ .. Tukwila ❑ .. Sewer Use Certificate ❑... Highline ❑...Valley View ❑... Renton ❑ ...Sewer Availability Provided 0... Renton 0... Seattle Septic System: 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which applv): ❑ .. Civil Plans (Maximum Paper Size — 22" x 34") ❑ .. Technical Information Report (Storm Drainage) ❑ .. Bond 0...Insurance 0... Easement(s) Proposed Activities (mark boxes that apply): ❑ .. Right-of-way Use - Nonprofit for less than 72 hours ❑ .. Right-of-way Use - No Disturbance ❑ .. Construction/Excavation/Fill - Right-of-way 0 Non Right-of-way 0 ❑ .. Total Cut ❑ .. Total Fill cubic yards cubic yards 0... Geotechnical Report 0...Maintenance Agreement(s) ❑ .. Traffic Impact Analysis ❑ .. Hold Harmless — (SAO) ❑ .. Hold Harmless — (ROW) 0...Right-of-way Use - Profit for less than 72 hours 0...Right-of-way Use — Potential Disturbance 0... Work in Flood Zone 0... Storm Drainage ❑ .. Sanitary Side Sewer 0...Abandon Septic Tank 0...Grease Interceptor ❑ .. Cap or Remove Utilities 0...Curb Cut 0... Channelization 0 .. Frontage Improvements 0... Pavement Cut 0...Trench Excavation ❑ .. Traffic Control 0...Looped Fire Line 0... Utility Undergrounding ❑ .. Backflow Prevention - Fire Protection " Irrigation " Domestic Water " ❑ .. Permanent Water Meter Size (1) " WO # (2) " WO # (3) " WO # ❑ .. Temporary Water Meter Size (1) " WO # (2) " WO # (3) " WO # ❑ .. Water Only Meter Size WO # ❑ .. Deduct Water Meter Size " ❑ .. Sewer Main Extension Public 0 Private 0 ❑ .. Water Main Extension Public 0 Private 0 FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) 0 .. Water ❑ .. Sewer ❑ .. Sewage Treatment Monthly Service Billing to: Name: Day Telephone: Mailing Address: City State Zip Water Meter Refund/Billing: Name: Mailing Address: Day Telephone: City State Zip H:\Applications\Forms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 3 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT PermitTRAK QUANTITY PAID $8,125.92 D18-0235 Address: 4530 SOUTHCENTER BLVD BLDG H Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0236 Address: 4520 SOUTHCENTER BLVD BLDG I Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0243 Address: 4708 SOUTHCENTER'BLVD OFFICE Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0244 , Address: 4510 SOUTHCENTER BLVD BLDG J Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 1 0.00 $32.96 Date Paid: Friday, August 24, 2018 Paid By: DAVE LALONDE Pay Method: CREDIT CARD 314234 Printed: Friday, August 24, 2018 11:44 AM 1 of 3 CRWSYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT 1 QUANTITY PAID PermitTRAK $8,125.92 D18-0245 Address:4706 SOUTHCENTER BLVD BLDG G Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0246 Address: 4710 SOUTHCENTER BLVD BLDG F Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0247 Address: 4714 SOUTHCENTER BLVD BLDG E Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0248 Address: 4718 SOUTHCENTER BLVD BLDG D Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 Date Paid: Friday, August 24, 2018 Paid By: DAVE LALONDE Pay Method: CREDIT CARD 314234 Printed: Friday, August 24, 2018 11:44 AM 2 of 3 SYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK PAID $8,125.92 D18-0249 Address: 4722 SOUTHCENTER BLVD BLDG C Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0250 Address: 4726 SOUTHCENTER BLVD BLDG B Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 D18-0251 Address: 4732 SOUTHCENTER BLVD BLDG A Apn: 2223049003 $738.72 Credit Card Fee $21.52 Credit Card Fee I R000.369.908.00.00 0.00 $21.52 DEVELOPMENT $684.24 PERMIT FEE R000.322.100.00.00 0.00 $659.24 WASHINGTON STATE SURCHARGE 6640.237.114 0.00 $25.00 TECHNOLOGY FEE $32.96 TECHNOLOGY FEE R000.322.900.04.00 0.00 $32.96 TOTAL FEES PAID BY RECEIPT: R15242 $8,125.92 Date Paid: Friday, August 24, 2018 Paid By: DAVE LALONDE Pay Method: CREDIT CARD 314234 Printed: Friday, August 24, 2018 11:44 AM 3 of 3 CligiWYSTEMS CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA 0017340000802374464500 Date: 08/24/2018 11:43:21 AM CREDIT CARD SALE VISA CARD NUMBER: **********2256 K TRAN AMOUNT: $8,125.92 APPROVAL CD: 314234 RECORD #: 000 CLERK ID: Bill X {CARDHOLDER'S SIGNATURE} I AGREE TO PAY THE ABOVE TOTAL AMOUNT ACCORDING TO THE CARD ISSUER AGREEMENT (MERCHANT AGREEMENT IF CREDIT VOUCHER) Thank you! Merchant Copy Page 1 of 2 https://classic.convergepay.com/V irtualMerchant/transaction.do?dispatchMethod=printTra... 8/24/2018 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $882.74 D18-0235 Address: 4530 SOUTHCENTER BLVD BLDG H Apn: 2223049003 $441.37 Credit Card Fee $12.86 Credit Card Fee R000.369.908.00.00 0.00 $12.86 DEVELOPMENT $428.51 PLAN CHECK FEE R000.345.830.00.00 0.00 $428.51 D18-0236 Address: 4520 SOUTHCENTER BLVD BLDG 1 Apn: 2223049003 $441.37 Credit Card Fee $12.86 Credit Card Fee R000.369.908.00.00 0.00 $12.86 DEVELOPMENT $428.51 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R15067 R000.345.830.00.00 0.00 $428.51 $882.74 Date Paid: Wednesday, August 01, 2018 Paid By: DAVE LALONDE Pay Method: CREDIT CARD 511013 Printed: Wednesday, August 01, 2018 1:32 PM 1 of 1 YSTEMS "age 1 of 2 CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA 0017340000802374464500 Date: 08/01/2018 01:31:54 PM CREDIT CARD SALE VISA CARD NUMBER: **********2256 K TRAN AMOUNT: $882.74 APPROVAL CD: 511013 RECORD #: 000 CLERK ID: Bill X {CARDHOLDER'S SIGNATURE} I AGREE TO PAY THE ABOVE TOTAL AMOUNT ACCORDING TO THE CARD ISSUER AGREEMENT (MERCHANT AGREEMENT IF CREDIT VOUCHER) Thank you! Merchant Copy https://classic.convergepay.com/VirtualMerchant/transaction.do?dispatchMethod=printTran... 8/1/2018 INSPECTION RECORD Retain a copy with permit Dig —0231 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 P,et�1Gtlt7'r1 Ty.4A tA.vcId `ion: F1 L Address:'� "� 520 r�rn t.OAder R �-a/rb Date Called: Special Instructions: Date nted:a.m. �, „ri., P.m. Requester: PC 3 .-1:11(4, ,.Phone No: w3— — 72 Z--7( I Approved per applicable codes. Corrections required prior to approval. COMMENTS: �u(c 541ivviL ko— gast2 Inspector: Date e.2g 2.13 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division NOTE: tete vfsicns will require a new plan submittal and may include additional plan review fees. FILE COPY Permit No. b 04)-%;6 Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field py and conditions is acknowledged: By: -47 Date: City of Tukwila BUILDING DIVISION SEPAPIATE FL.F1i,9IT REQU9 QED FOR: annechanical lectricat L Plumbing Las Piping City of Tukwila BUILD,RG DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED AUG 0 9 2018 City of Tukwila BUILDING DIVISION DSS- 023 k• SECTION 01010 - SCOPE OF WORK 1.01 LOCATION A. The roof replacement shall occur at: 1.02 SUMMARY OF WORK 01010 -1 BOULEVARD AT SOUTH STATION 4708 SOUTHCENTER BOULEVARD TUKWILA, WA 98188 A. This project shall include but not be limited to: 1. Removal of existing shingles, underlayment and flashings to the roof de 2. Repairs to the roof decking. 3. Installation of self -adhered underlayment at all walls. 4. Installation of new shingles. 5. Installation of new metal edge flashing. 6. Installation of new metal cap flashing. 7. Installation of new wall flashing at all rake walls and head walls. 8. Installation of fiber -cement trim and counter flashing at all rake walls and head walls. 9. Installation of new flashings at roof penetrations. 10. Installation of new static roof vents at existing locations. 11. Repairs to existing gutters and downspouts. 12. Related work, including sheet metal work and sealant work, as required for watertight roofing system. 13. Painting of roof accessories. 14. Issuance of roof guarantees. REVIEWED FOR CODE COMPLIANCE APPROVED AUG 092018 City of Tukwila ILDING DIVISION B. No more than two buildings shall be under construction at any one time. Work will not commence to Other buildings until 100% completion. 1.03 RELATED DOCUMENTS A. The roofing material Manufacturer's current specification manual shall be considered a portion of these Specifications. B. National Roofing Contractor's Association (NRCA): NRCA Roofing and Waterproofing Manual, Fourth Edition, 1996. C. Sheet Metal And Air Conditioning Contractors National Association (SMACNA): Architectural Sheet Metal Manual 6th Edition. D. Asphalt Roofing Manufacturers Association (ARMA): ARMA Residential Asphalt Roofing Manual. E. Submittal of a bid by the Contractor shall be considered evidence that the Contractor is familiar with the above material manuals and requirements. 1.04 CONTRACTOR RESPONSIBILITIES A. The Contractor shall procure and pay for all permits, licenses and fees necessary for the execution of work. B. The contractor shall furnish all labor, materials, insurance, services, taxes and incidentals, and to perform all reroofing and related work necessary for the completion of the project specified to provide a good, reliable, leak free, and functional installation, in strict accordance with the project Specifications. RECEIVED CITY OF TUKWILA AUG 01 2018 PERNWIPCENTER b et- oz.3� BOULEVARD AT SOUTH STATION O) p AW Nr'Z W DmZOZ(7' C 9 0m>71-imbwmv1smwc zq m -7O-00,On=rOr=rr z q, D D DDD mwV2T0mzrOrzrrzoA pD (<OG)c"OOczOtn4 OM -Imm. ziSmOr^Vrn- rz mo ZOZrnm zcmo•Dn C���Z Q -I mm005 _,Mz=Om ›.-TI -0Omz mOODTtM 0 W w uZmi ) w.t.oimOT mn� Zto 00 nZWC0)" xl? Q=MCZ iTiOnZ m - -i0oo, -mxmwi 5i 0 z O 0�mi, aicz�m-D m GZ) n>7OC�m Om 0Dr O W gr,m`� �Q0 D,?Zm ZW�mZm m -t r -i ce '� 0 r NCS ��� Co 3 0 z�2 O m cm O m DO O DZ rmr m0 m o � � M Z = p my m = v to Or Q 3NN e° s SlTdM it DNIHSd33 R .411111- m r1 C' X rl - I r m ZI tl D t=1 O = Z r1 - al '-'_ t7 Ci F9 _ n�- z Zr N m zz 1N3W.Ad133QNN I11 z F9 S31DNIHS 3NIHSV13 >1DI> 3 ri -H H D z rv) n D ©r zr my r D Z 77 z rl C t7 �n ro z S -H zm C1'n CITY bF TUKWILA AUG 01 2018 PERMIT CENTER 5" 1:t' W N -z 922222-12DmO °°��-1om-1u CMDDZDmmD• mmrrW.- Zr 0� r r r O r �rm�z?zmm tnr-im• > O Omrm I 0D(n No v0'a MvMrT, mmZ • Cm)ZD yrcn =MCS r>m m_zZ <Tm 70t) mZC mN73, m6) -I » 2 —< ►'-iz v Kr - >0'n m zo v 0 a r -i• vr„• � c cmi� -4 m m cn E Z D _ (n r r -I > cri 1-5 0 Z m m 0 D 7 .�aganN 6UPM0 Q co Q CD ry 00 -H O 0 N❑IlISNVal 01 z d 01 01 r 1< 01 z z r<1 _ D Fu 0 _ t7 Z 171 01 01 rrl 01 Tl 1 -I 1 U D RECEIVED D 7 CITY OF TUKWILA z z AUG 01 2018 z x PERMIT CENTER >Izi❑M DNIQIS [1NIHSd7- DNIMddG RJ ONON .),Js 3 rN MdN 11d1SNI DNIHS1d dOIS P1 m n 77.z -n m P1 1N3HJCd1d3QNri z nJ P1 P1 z z p1 Z C1 O D r' l X X —1 Z z C � X O D Tl " coz cl SOlDNIHS dOGNN RECEIVED CITY OF TUKWILA AUG 01 2018 PERMIT CENTER -12=m*210.9S»277§-Jr�?5mww_ XzmOM M >comr%6§ R°°'Q-0«2-12/m m� zMoCDmco2=z kk�o97/COM§�d,.§ C8§/Dm m Zm0mk W•o.=®2q q%mw<kki,§§§d4 WM11>mWmOococ2 •--4N-i[ 0M,,M073k c-mlm )Z@�k 855K 0\Z ot$>1 Cr-XMcK a »o0 W 04,3 k -n z�>CZ ®® o,m>2 P 29-, r/k%O 0> 02*= MKS;o em M. >/ nk'c° F om%mG179_,2> �\k z mom,0 mica 5 k/°° K§, gS„ §§o m co 93 o2Z com > n om am wmc, �k ■z >o»cp-»� wm omwno�(o»-um m�Q_omz oP /§( 0E_imm-->m %x 22§m3G '_m oz . zio-i >k) (mo zz=o-I x..— n moc>MM c-� ■® mm@x� $2m ®#m o.Mk(k m -x \>0 _ , m§�§k� I S. $§� \z --m ¢ z »0®�R# m 0 m»? 0m[o>r o zom A�zR§m q § 0, 4> A2 § o 42� )°2KM m0 Xm OZ 2 m §qz §m- 20 m 0= p -Am> �g ? _ §?_, co o �Jm M m$ 2 aqunN 6ux°- C2, 3N❑N 8T/EI/ �0 ❑NIHSd1Li 17VP1 Qd3H DNIHSV1J 11VMQd3H M3N RECEIVED art OF TUKWILA AUG 01 2018 PERMIT CENTER F, e -z 2 zzzk2q�Eq mmmm�§mi-JAt mww-mmkm Ia.. �_,m omFnn1-_->zr 2m2&Izooe>zkrom 0-1.z 5 zzomO>$$ > ?2$-1>5@-Nm2c . 3mmO cmomoW co a5Mzmzom=M=« 2 9®®0oCc m m2® n 203,1ocurc> mq)0>MJr. @71MWM° @ oorn omp,,z,amm>mom §W*gW Zmor73m \ rg-0 0Tag m <n 2q§� 2% k §t\\z �I0>02 R� P >< o,,me 0 /z o z_, 0/m< m 3% R )� mo=z » @% q � ��mm I>oo m0 §\ k �� KK-fd >• k m�mz ow mo m 2 /i Om P m RECEIVED CITY OF TUKWILA AUG 0 1 18 PERMIT CENTER Sf❑1NI1N❑3 n m m - P1 P1 1> df>13va 1NdHJlb'HddJNfl P1 DNIHSdUd dV3 n 0 CAP PLASHING Il 0 CI 07-1 7J 3 3 . ( RECEIVED CITY OF TUKWILA AUG 0 1 18 PERMIT CENTER Sf❑1NI1N❑3 n m m - P1 P1 1> df>13va 1NdHJlb'HddJNfl P1 DNIHSdUd dV3 P 0 oo >z o IOmrI>ZD-mmmzZ..<iwomm x0mxDz z-0o-Imocr mopon=Zy��cn _IOcmgmmm<vxx-onmr_r0� m,-Imcnm=ni=zmr-xv�-1zm mmD z mcompozDDmDz-lm X 'vmy O>mtDnmvpmmcalwrcl<W z woo G110 -*0nx m px�mmxom-om>zgcncY mmdv0-1v, xx c1 ODow omzx-qtr-rzxz C �o�ZDowZZ��orom m Zmwwz,imOXmmm�>m. v O�mn=�OzD�cDccnm cmj r c m m m<-mom D Oi =0nxxommnzoxoyzZ z'�OmmOrxOmm��G� v O m O r �mmrnzo 0)=0zc� gm m,pp-1-1DJOmm0Oxmcn cn--iZZ-o_mzm- 2 zmm=< 0zma'OOmmz r-.-0- r--O-Ocn==0mm �2,mu, <mxZ=mm, „ -1m,_nm cn_icn zmxxram mZrO OD= 0mmmOcn 0cnm y�'� w—^ -7J-1 73yzmZ rr= z— rG�Z mitK OzxPED cnnmm 0mz -OKmm� 73OMp Z�C r*� cn r zm >-im <zm z� O mmo Omm mr z mmm 0) Q 0 z P1 agwnN bUImoJa SH1IDNIHS m d n O ( , _\ %'r11 Itt*Al z c\ Z d tAtAiglAg ei NI1SVA RECEIVED CITY OF TUKWILA AUG 01 2018 PERMIT CENTER ]el3H 1 Jd1S 01 elfSodX Ch . WN —z •o mmmZWDm=my=zm OMDD-%c-Ow>mm�cn zmrmmOmr,rC72,_ vycnmmz -1cn>—r or>51-w>0>mOm OZT-zcnWmMPDm* mpaomDDZO=wxm Dmmrro D Om -1z• rr=<%Ozi zD QW—=m mD OF Zm . z• m OD ��073 - Gam) z* z-omm0-o m �m moDomo Dmm>>mmr W r -z Mzmizm Z r zC) m-tm>Ocn G) D= Dcmrm- > -M mm0=yr m; co ->N) n2 o m p r Dv-= =mm> m o Pnh Amimm�m 6)) C7mxzDcn m 0>mz zm Wn01CCz m x r = C M om mumi!11 O m m .4agwnN 6,gm0.4Q CC DNIHS'd1J 3`-1Q3 31 d DNIQIS DNIISIX3 d]DVI' J mI P1 73 z D F9 Cl r- `R. RECEIVED CITY OF TUKWILA AUG 01 2018 PERMIT CENTER IN3/0,V7elaiNl I i S3DNV-1A d31Jd1S SIT NIHS M]N Ja' 'N 6,,,V4 0,a ry CO DNIHSV-1 i SHDI1J �S FLANGES SET IN FLASHING CEMENT m D r/i m x eyS X %- Sz ▪ M o d m CI < Vr ti m S A r m D 0 r A S D A -I V) O_ C z m A c. r W n D m z m z z c. y ONIHSd1d NUddti M31A 1NOd3I m xr N D y 0 Z m z P1 -1 ut � m S A M Z c nn M 0 r a O Z VV) X. • RECEIVED CITY OF TLH(WILA CI AUG 01Oie Z PERMIT CENTER SELF-ADHEREING MODIFIED BITUMEN mmm m X 3 x x - CO 1-1 ZM Vt VI Z CJS C C7 0 A 3 V) Z rO m D r A r C, m 3 S = m n - A Z n m CO m r 3 D mv, Z ~ Z 1HOI1A>S ONI1SIX3 I113IA 312ISI M3IA >IOUB - T O'iA W N --Z • F m zmzmnimmO-AmOm-iwcOriMvvw m wm c_mm-iD-cnrpMn-v�c�D O x� mm�Mc G--rm0rr GmwMm-10>m Cz�wmmiTypcm?Cz-uv*<6mGm pmv-zcDw�pT01m�1Nin4rw mmzvmmmpmmm m. -i< mc'c,m>zPZmr(mccomcOpz- ==pm pWM �=D? 60 �O �m-QO-4mm mx ID �mmZ< mM<c-IC v= <mz-18 mzM1->m-05 Dmzmz Frr^ zr=)'<mcDnr mDZ>M;oO-immmmgcz o O �' mcw n (n Or *(nn hGG)pr m mO zOTOmmm> P m0 ow , x< G)n zcn=,m 7m Ozo -1 �O Zmm 7C >m -4 -I_-I-mG� Tcn oz r mO p>m 0� mG) DO �'oOzz, R„, m1� r'40 x O ro z mmm m m= � r O m% >m CAmm to zTJ mw oOmn cn -im moz m me mm-ir z>(wn� z m-zi m�� m �= wo -�m-iZ m* Ov� rcn cZ g z p cnZ O"� Tzz. m zo (nZ C =1-< *m D mm O 0 z • w -1z z O m x— z v -z m o Z 3 s LD INA 1Sfl HXDIN'S Z O - 1 m zp T z o z G) P mm �O m (\ ". \`\ \ \\ \ \ til Pi (-) C Tl D 7 I- 71 (/) D Pi I-- Z 2D D 7 D „ c r - 7Z M i727C ZZFFri -- U 7 D d d ZI-D <(A Z -1 Z D 7 F9„ < D P1 --I 0 d 27 Pi DI -9 r-1-9 DZ -9 0Aja D 0-I Gi -1 Tl (/ —I -1 I (-)I -1 - „ C7 ZZ z r'7 --+r- I- Z mt7m G1 3ZD DCI 1 D F- ML71Z ZI- Fl V) -I rn Z I- C-1 0111 Z mr (/) —I M P1 P1 v) —1 —1 -< \ \ \\ \\ \ \. Z P1 DD r r- ri - P1 " C D r- '-(:2) jj (/1 M rn to . wn»v -10n-1Og-4o-4mz-1DauZ.< __=1,==c0Xm=mvmwm mErnmc))rmx<cn2m23�cmOD< mOKmz=mppmvcn<Fm zwmz r c mw0><=r0-1 m>m:lm>r-zgmzmzZ- pD -<pm�ODO.z0—im.. 2-I mm2 vv5---ozC m0 mK0, mDmpcom �T me v-iw�vvz v7 vcOi mzmm-Wai DT =mco vom==wm P1 zm mm- O-mmm-rn cz mEm z_imw<om rri mo �-nO -10 -zM< mwzm� o c ��=��mz w> >z° r5r zG)-c-1 r-< Omz m0 -imm 0z* -1 mm mmm m>w=0 wm xmq zom 2� m-im ; Z ))ai m D� cn O to Dn -1 <rm- m o m vm l\\ mo C m Z 0 \ m rn \ P1 P1 P1 vl z O m Ov zO m O z -+ Om \� mX �O m D Nod F9 d '1 O < D m z7o C11-� F9Drn H V z F- CD o -AD O m a 20 T1 n z T7 P1 H 1- 5 z D F1 G9 z z P1 LI F9 F9 0 P1 7 P1 P1 7 z C1 P1 S31DNIHS D ~ �z C Z P1 <o P1 z-9 -I --1 z D fT1 z z d rel D m -1 P1 01 70 f'l 70 P1 z m 77 n z F9 O 3 S 0 r o 0) IN3A c v 9, CT AWN :-..T, mmmimmmcmm0x mmomm_q E mEmomm-40-mPm-I-Ivm< D�mO-mn=pw,_00-�rr0x4 zvp0mz=7c0c_=DW0Dzzm�a MMzm mzmn0?q�mzm*=Z.. D 0D 0OWr OD O m .z� _-1 mmZzW 000xQm< m m0 mmWOc mD(m041,2 x wm ,mcw-0 0-1 0DD_1 O 0= -000-10 mOmc0>2 m Dm =moil 0,-,m0wmm O zm mmomm O�m7�DD0o C ED �rl-Zw ziT[ZOZ • tiO >m020-1TwElom0 • mum) 06c,- 0>mA'Or((-n0 (0om > m-Oi)_c Zrol.c-wn r <G)0z0 Tl 00 mzz z 0m G 20 -1 z)0 r 1 DrDCD710 r< omO� (n=r-m-0 mm mCmmo --1 E <Mm o> xz>zm m0mzz�C D-1 0 00N eg D7�=!n 00 m 0m 0 0 cn� m* C -1 m z m m G) z 0 m 00 zp mz z O Om (n-0 O m z _ 'r'^ S31❑NIHS t53N dd��❑S C D rl Z 01-1 M" 23d r1 rz D C1 zr cl m m c Tfl O C C_1 I=10 M z Z0 P-1 r -I r, z D -1 L1 -1O O Z H TI -I nzz r1 r1 X Mr/1-1 z r1 r AUG 01 PERMIT CENTL 7d13W M3N INd1d3S Sf ❑f1NIIN❑d ❑NI1SIX3 3dId INA OM Tr, cn v U1 n 0 ti HEAT VENTS - R❑❑E JACKS Z 0 z P7 d Q h M G d o 3 W 3 1-1.3 M P0 z 0 m 00 zp mz z O Om (n-0 O m z _ 'r'^ S31❑NIHS t53N dd��❑S C D rl Z 01-1 M" 23d r1 rz D C1 zr cl m m c Tfl O C C_1 I=10 M z Z0 P-1 r -I r, z D -1 L1 -1O O Z H TI -I nzz r1 r1 X Mr/1-1 z r1 r AUG 01 PERMIT CENTL 7d13W M3N INd1d3S Sf ❑f1NIIN❑d ❑NI1SIX3 3dId INA OM Tr, cn v • • O) CTI ? W N -Q xm X2 x-n1Ic0.-mIzI>QZ0m2ZVTF3 'mvz_mmormm-owm X-m•IMM-MWmcn04!-<21-z M ZRvC-rOmm-uxmDmO70mOZmZ=I-=wmCc II p C mCsZwmz2mz-w0›.D�'n-_-Z-0- g - C C -I mMmrnD�m�m�mz�r �mzG)z�z*°0m o z mO. z-0 -<6m710vm'*1O >om>m �-IZZ n< 7D t1 0 yTD vD Omm zmwz�-i��m v)_irms., D M 01 I PZ� 2X I22z DK1571zZ770°ZeOWN110 Z7 T I7 x"MMm-x m oow mmm 00-100 0 C1 P1 Z �,-� �O �rrlc ptn !Ti�v)«mvO� mm M D f� D Zfl 7 mnz v-1 ��n m1-0 fftnnnzD)-1cn0-,m�.. v) z frl Z pxw mx �xm D-1 Drr•m�›.'m-1Dv= -, v� T 0 d u fT1 D 1-- ZT m ITI Ci pvm Zvmw -imoc Z L 0 T ri Z D o rr1 z OD mzm z>m OZDx=-i0)1<0 ,0 01 T1 < -I TI d 7U D d I- O �m Z'>00 Oz00 2-111'0Zw2mzT_ [1 Ti O D O ZZ 3 Z Mw mac mmi- cmmmmcGim��m /� TI T1 TI Z C TP Om Z00 =00 MDI-mDvi7 = L1 _ ml -1 01 z Z z C • xP <mcm/) mzm co-<momZO z P1 E 7 Z r-1 d m C t7 ? 00 Q�� vDi=� cDn�cO-1,<nm-Zimcv)� [1 M c1 D Z f r-1 c) D D mm mDO 11 r m�ZZ� �� T. ni z r L71 CI 01 z m f O �r- x-TH mrm 00--i __ -1M 01 r1 / < Tl z =-u mzx �zz ilmx= m m0 I- r 03 m om <mz 0m1- mOmOmm m m O <r m�O ND \ l '� m0 cm my '1 �-: \\ WZ \\ \\ m �� M -1y\ \\ \ \\ \ \; 'SJNIHSV1d a z 3 3 LAD 1-1 fU r-1 z 0 m v z0 ,1 z 0 OX m -u c/10lA m z r 0) \\\ \\ \ \\ \.\ \\ \\ \\ P ceV 0) 91 A WN z p mzmmi-mmmmzr=mD z m�m„.m= rDnimvr-1c-<„.Om,.m4. lwp*Ormm�zoomZ- D�zmr=mOmqA0aoz=TO=wxm ziK9m50Epm Dm,0m>°Om ›.NZ,u00.m _lz` rr=mDTD ommmwo ox= pff Um-.mDZ-m ,-z, 00=,- Op _�n_,34 0 mo=—. ow cm�mo- T m m mo o n m m = gym =m X” MTD- 0) 71 C -4 rZ �zmIzm z O WI 74 02-(51 �= m m>m0' 0 m m gy-1A Fm <cpr -Di m 0 P =�iIm =^ cTM 'D`i'm VCi m 0 0 Ov mmxmm0 r om-m m0 �-1I3om 00 A >,•02. mZ �mCZZ= WWcnm D 6T gonncOm 0 m m- o 0 mmm X tom 0 m m m 5 m m 383HM 33V1d321 GUTTER S METAL EDGE FLASHING O m m r 1 Mm arimX Om vv - -U 3rDr's.4r D '-' m D v'n A"' tin O 100 D m m £ D n m CZ D y _ 3 C7, rJm D , A M m U M X D m D t/)„, C T � mm nA zz 9NIHSVTJ 39Q3 7d1314 'J0 .-2T 39NV13 3Sdf109 931dVLS 1N3NAd1a3QNfl 113J rV RECEIVED CITY OF TUKWILA AUG 01 2018 PERMIT CENTER PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D18-0236 DATE: 08/01/18 PROJECT NAME: BOULEVARD AT SOUTH STATION - BLDG I SITE ADDRESS: 4520 SOUTHCENTER BLVD X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: A--1- Awe. eli-1,0 Building Division Building Division Public Works ❑ ktA ")/,1 Fire Prevention in Planning Division Structural Permit Coordinator II PRELIMINARY REVIEW: Not Applicable n (no approval/review required) DATE: 08/02/18 Structural Review Required REVIEWER'S INITIALS: DATE: n APPROVALS OR CORRECTIONS: Approved Corrections Required n Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 08/30/18 n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire ❑ Ping 0 PW 0 Staff Initials: 12/18/2013 GORMAN ROOFING SERVICES INC Horne Espanol Contact Safety & Health Claims & Insurance Washington State Department of 4) Labor & Industries Page 1 of 2 Search L&I A -Z Index Help My 1,&I Workplace Rights Trades & Licensing GORMAN ROOFING SERVICES INC Owner or tradesperson Principals GORMAN, DANIEL J, PRESIDENT Doing business as GORMAN ROOFING SERVICES INC WA UBl No. 602 208 941 2229 E UNIVERSITY DRIVE PHOENIX, AZ 85034 602-262-2423 Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. GORMARS983LL Effective — expiration 06/13/2002— 07/12/2020 Bond Contractors Bonding & Insurance Co Bond account no. AH8286 $12,000.00 Received by L&I Effective date 04/01/2014 06/03/2014 Expiration date Until Canceled Bond history Insu.rance .................... Associated Industries Ins Co I $1,000,000.00 Policy no. .aes104878900 • Received by L&I Effective date 10/02/2017 09/21/2017 Expiration date 09/21/2018 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts . _ ............. No L&l tax debts are recorded for this contractor license during the previous 6 year period, ut some debts may be recorded by other agencies. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602208941 &LIC=GORMARS983LL&SAW= 8/24/2018 GORMAN ROOFING SERVICES INC License Violations No license violations during the previous E j period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 037,391-00 Doing business as GORMAN ROOFING SERVICES INC Estimated workers reported Quarter 2 of Year 2018 "11 to 20 Workers" L&I account contact T4 / TERRI MADISON (360)902-4654 - Email: KIRT235@Ini.wa.gov Account is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 11/21/2016 Inspection no. 317942462 Location 10811 SE 239TH PL Kent, WA 98031 Inspection results date 04/13/2015 Inspection no. 317935617 Location 3015 NW Market St. Seattle, WA 98107 No violations No violations Page 2 of 2 .� Washington State Dept. of Labor & industries. Use of this site is subject to the laws of the slate of Washington. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UB.I=602208941 &LIC=GORMARS983LL&SAW= 8/24/2018