Loading...
HomeMy WebLinkAboutPermit D18-0254 - Z TILE AND STONE - STORAGE RACKSZ TILE AND STONE 1067 INDUSTRY DR APN: 2523049071 EXPIRED 04/01/2021 D18-0254 Parcel No: Address: )Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Scheduling: https://tukw-egov.aspgov.com/BP/index.html Web site: http://www.TukwilaWA.gov City of Tukwila DEVELOPMENT PERMIT 2523049071 Permit Number: D18-0254 1067 INDUSTRY DR Project Name: Z TILE AND STONE Issue Date: 12/4/2018 Permit Expires On: 4/1/2021 Owner: Name: Address: Contact Person: Name: Address: BKM TUKWILA 1701 QUAIL ST STE 100, NEWPORT BEACH, WA, 92660 JACK SLOBODEN PO BOX 1139, MILTON, WA, 98354 Contractor: Name: PACIFIC CONSTRUCTION MLTN INC Address: PO BOX 1139, MILTON, WA, 98354 License No: PACIFCM012RH Lender: Name: Address: N/A - UNDER $5000 Phone: (206) 595-6921 Phone: (253) 826-2727 Expiration Date: 11/17/2021 DESCRIPTION OF WORK: INSTALL NEW SELECTIVE PALLET RACK Project Valuation: $1,670.00 Type of Fire Protection: Sprinklers: Fire Alarm: Type of Construction: Electrical Service Provided by: Tukwila Fees Collected: $227.27 Occupancy per IBC: Water District: Tukwila Sewer District: Tukwila Current Codes adopted by the City of Tukwila: International Fire Code Edition: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Volumes: Cut: 0 Fill: 0 Number: 0 No 0 All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 5: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. 6: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 7: All rack storage requires a separate permit issued through the City of Tukwila Permit Center. Rack storage over 8 -feet in height shall be anchored or braced to prevent overturning or displacement during seismic events. The design and calculations for the anchorage or bracing shall be prepared by a registered professional engineer licensed in the State of Washington. Periodic special inspection is required during anchorage of storage racks 8 feet or greater in height. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 12: The total number of fire extinguishers required for an ordinary hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 1,500 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (3A, 40B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 5.4) 9: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand- held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand-held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 10: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 11: Fire extinguishers require monthly and yearly inspections. They must have a tag or label securely attached that indicates the month and year that the inspection was performed and shall identify the company or person performing the service. Every six years stored pressure extinguishers shall be emptied and subjectec to the applicable recharge procedures. If the required monthly and yearly inspections of the fire extinguisher(s) are not accomplished or the inspection tag is not completed, a reputable fire extinguisher service company will be required to conduct these required surveys. (NFPA 10, 7.2, 7.3) 13: Maintain fire extinguisher coverage throughout. 15: Maintain fire alarm system audible/visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of audible/visual notification devices. (City Ordinance #2437) 14: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 16: Clearance between ignition sources, such as light fixtures, heaters and flame -producing devices, and combustible materials shall be maintained in an approved manner. (IFC 305.1) 17: Where storage height exceeds 15 feet and ceiling sprinklers only are installed, fire protection by one of the following methods is required for steel building columns located within racks: (a) one-hour fire proofing, (b) sidewall sprinkler at the 15 foot elevation of the column, (c) ceiling sprinkler density minimums as determined by the Tukwila Fire Prevention Bureau. (NFPA 13-16.1.4) 18: Flue spaces shall be provided in accordance with International Fire Code Table 3208.3. Required flue spaces shall be maintained. 19: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 20: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Scheduling: https://tukw-egov.aspgov.com/BP/index.html 1700 BUILDING FINAL** 4046 SI-EPDXY EXP CONC Parcel No: Address: CR.) 2 City of Tukwila �o 3 Project Name: Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 2523049071 1067 INDUSTRY DR Z TILE AND STONE DEVELOPMENT PERMIT Permit Number: Issue Date: Permit Expires On: D18-0254 12/4/2018 6/2/2019 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: BKM TUKWILA 1701 QUAIL ST STE 100 , NEWPORT BEACH, WA, 92660 JACK SLOBODEN PO BOX 1139 , MILTON, WA, 98354 PACIFIC CONSTRUCTION MLTN INC PO BOX 1139 , MILTON, WA, 98354 PACIFCM012RH N/A - UNDER $5000 Phone: (206) 595-6921 Phone: (206) 870-1176 Expiration Date: 11/17/2019 DESCRIPTION OF WORK: INSTALL NEW SELECTIVE PALLET RACK Project Valuation: $1,670.00 Type of Fire Protection: Sprinklers: Fire Alarm: Type of Construction: Electrical Service Provided by: TUKWILA Fees Collected: $227.27 Occupancy per IBC: Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: r Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Volumes: Cut: 0 Fill: 0 Number: 0 No Permit Center Authorized Signature: Date: /4,77(/://6 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: /46 -r - ?c /1— Date: / Z/ �kr This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 5: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. 6: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 7: All rack storage requires a separate permit issued through the City of Tukwila Permit Center. Rack storage over 8 -feet in height shall be anchored or braced to prevent overturning or displacement during seismic events. The design and calculations for the anchorage or bracing shall be prepared by a registered professional engineer licensed in the State of Washington. Periodic special inspection is required during anchorage of storage racks 8 feet or greater in height. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 12: The total number of fire extinguishers required for an ordinary hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 1,500 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (3A, 40B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 5.4) 9: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand- held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand-held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 10: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 11: Fire extinguishers require monthly and yearly inspections. They must have a tag or label securely attached that indicates the month and year that the inspection was performed and shall identify the company or person performing the service. Every six years stored pressure extinguishers shall be emptied and subjected to the applicable recharge procedures. If the required monthly and yearly inspections of the fire extinguisher(s) are not accomplished or the inspection tag is not completed, a reputable fire extinguisher service company will be required to conduct these required surveys. (NFPA 10, 7.2, 7.3) 13: Maintain fire extinguisher coverage throughout. 15: Maintain fire alarm system audible/visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of audible/visual notification devices. (City Ordinance #2437) 14: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 16: Clearance between ignition sources, such as light fixtures, heaters and flame -producing devices, and combustible materials shall be maintained in an approved manner. (IFC 305.1) 17: Where storage height exceeds 15 feet and ceiling sprinklers only are installed, fire protection by one of the following methods is required for steel building columns located within racks: (a) one-hour fire proofing, (b) sidewall sprinkler at the 15 foot elevation of the column, (c) ceiling sprinkler density minimums as determined by the Tukwila Fire Prevention Bureau. (NFPA 13-16.1.4) 18: Flue spaces shall be provided in accordance with International Fire Code Table 3208.3. Required flue spaces shall be maintained. 19: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 20: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 1400 FIRE FINAL 4046 SI-EPDXY/EXP CONC CITY OF TUK Community DevelopniDepartment Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov �uilding Pct No. Project No. Date Application Accepted: Date Application Expires: 0 )„,/13 /1/ (For office use only) CONSTRUCTION PERMI APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** KinkCo Assessor's Tax No.: X4 6 7 d s Site Address: Suite Number: Floor: Tenant Name: ' 2 - T/ L -4-- -570 Yl New Tenant: ❑.....Yes ..No PROPERTY OWNER Name: —Sti_c k s* -10 bo( Address: PD lgOv //3 / Nave:) n�+ i A,/0 /16,11,-)47 Address: Email: JaLkse,,t.CCan.-us City: City' State: Zip: CONTACT PERSON — person receiving all project 4 communication Name: —Sti_c k s* -10 bo( Address: PD lgOv //3 / Address: po Box- ((39 Phone: Fax: City: MI Ifo n State: am. Zip: ,m357 Phone: 25C1 J _IR Z� Fax: Email: JaLkse,,t.CCan.-us GENERAL CONTRACTOR INFORMATION ' Company Name: l pi�La 1= t t_ eprS�^toct.+torJ Address: PD lgOv //3 / City: Mt l km State: GiO� Zip:G, 3s'� [x Phone: Fax: 26342(0_7421 Contr Reg No.: ,pisevCM ctiZ Exp Date: \' In/ 1,\ Tukwila Business License No.: om- cfi 4 5&) i H:1Applications\Forms-Applications On Line\2012 ApplicationsiPermit Application Revised - 2-7.12.docx Revised: February 2012 bh :ARCHITECT OF RECORD Company Name: St r u au r.1� ...t...13..tt A Engii leer Name: In ,I IA) 6 glifat O 214 rJ I CJ Company Name: City t.,4 4 1 tr n C State: c_yi Zip: q1 75L Phone:00g) sod - t33 i Fax:(YO P, ��( - 7/76 !! Architect Name: I Add'''ress: City' State: Zip: Phone: Fax: Email: I ENGINEER OF RECORD Company Name: St r u au r.1� ...t...13..tt A Engii leer Name: In ,I IA) 6 glifat O 214 rJ I CJ Address: ! 4 is wets ii ,tel/ } - City t.,4 4 1 tr n C State: c_yi Zip: q1 75L Phone:00g) sod - t33 i Fax:(YO P, ��( - 7/76 !! Email: ILENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Address: City: State: Zip: Page 1 of 4 BUILDING PERMIT INFORMATION+ 206-431-3670I1 �{ (� Valuation of Project (contractor's bid price): $ l 0 O v Existing Bu'lfiing Valuation: $ Describe the scope of work (please provide detailed information): )1 ;p,.,-G,,�, 4 -e. N -e PP- e -t Will there be new rack storage? VI...Yes Yes ..No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Will there be a change in use? 0 Yes FIRE PROTECTION/HAZARDOUS MATERIALS: 0 Sprinklers 0 Automatic Fire Alarm LJ Compact: Handicap: No If"yes", explain: 0 None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes 0 No If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system provide 2 copies of a current septic design approved by King County Health Department. H:Wpplications\Forms-Applications On Line\2012 Applications\Pennit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1St Floor 2nd Floor 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Will there be a change in use? 0 Yes FIRE PROTECTION/HAZARDOUS MATERIALS: 0 Sprinklers 0 Automatic Fire Alarm LJ Compact: Handicap: No If"yes", explain: 0 None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes 0 No If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system provide 2 copies of a current septic design approved by King County Health Department. H:Wpplications\Forms-Applications On Line\2012 Applications\Pennit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 • PUBLIC WORKS PERMIT INFOIRMATION — 206-433-0179 Scope of Work (please provide detailed information): Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ .. Tukwila ❑ ...Water District #I25 ❑ .. Water Availability Provided Sewer District ❑ .. Tukwila ❑ .. Sewer Use Certificate ❑... Highlin� ❑ ...Valley View 0... Renton ❑ ...Sewer Availability Provided 0... Renton 0... Seattle Septic System: ❑ On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ❑ .. Civil Plans (Maximum Paper Size — 22" x 34") ❑ .. Technical Information Report (Storm Drainage) 0 .. Bond 0...Insurance 0... Easement(s) Proposed Activities (mark boxes that apply): ❑ .. Right-of-way Use - Nonprofit for Tess than 72 hours ❑ .. Right-of-way Use - No Disturbance ❑ .. Construction/Excavation/Fill - Right-of-way 0 Non Right-of-way 0 ❑ .. Total Cut cubic yards ❑ .. Total Fill cubic yards ❑ .. Sanitary Side Sewer ❑ .. Cap or Remove Utilities ❑ .. Frontage Improvements ❑ .. Traffic Control ❑ .. Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ .. Permanent Water Meter Size (1) ❑ .. Temporary Water Meter Size (I) ❑ .. Water Only Meter Size 0 .. Sewer Main Extension ❑ .. Water Main Extension 0... Geotech tical Report 0...Maintenance Agreement(s) ❑ .. Traffic Impact Analysis ❑ .. Hold Harmless — (SAO) ❑ .. Hold Harmless — (ROW) 0...Right-of-way Use - Profit for less than 72 hours 0...Right-of-way Use — Potential Disturbance 0... Work in rlood Zone 0... Storm Drainage 0...Abandon Septic Tank ❑...Curb Cut 0... Pavement Cut 0...Looped Fire Line 71 Public 0 Public 0 WO # WO # WO # Private 0 Private 0 ❑...Grease Interceptor 0... Channelization 0...Trench Excavation 0...Utility Undergrounding (2) " WO # (3) " WO # (2) " WO # (3) " WO # 0 .. Deduct Water Meter Size FINANCE INFORMATION Fire Line Size at Property Line ❑ .. Water 0 .. Sewer Monthly Service Billing to: Name: Number of Public Fire Hydrant() 0 .. Sewage Treatment Mailing Address: Day Telephone: Water Meter Refund/Billing: Name: Mailing Address: City State Zip Day Telephone: City State Zip H:\Applications\Forms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-I2.docx Revised: February 2012 bh Page 3 of 4 PERMIT APPLICATION NOTES — C6i.) Value of Construction — In all cases, a value of construction am unt should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current ee schedules. Expiration of Plan Review — Applications for which no permit i issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWN OR AUTHORIZED AGENT: Signature: Print Name: "`"7:i 4 e Mailing Address: 1 ilq_54 S Date: e//3//8 - Day Telephone: 053) Cif ye' 3 7 kN ci H:Wpplications\Forms-Applications On Line\2012 Applications\Fermit Application Revised - 2.7-12.docx Revised: February 2012 bh City State Zip Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $227.27 D18-0254 Address: 1067 INDUSTRY DR Apn: 2523049071 $227.27 DEVELOPMENT $221.32 PERMIT FEE R000.322.100.00.00 0.00 $118.98 PLAN CHECK FEE R000.345.830.00.00 0.00 $77.34 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $25.00 TECHNOLOGY FEE $5.95 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R15145 R000.322.900.04.00 0.00 $5.95 $227.27 Date Paid: Monday, August 13, 2018 Paid By: PACIFIC CONSTRUCTION -MILTON IN Pay Method: CHECK 33481 Printed: Monday, August 13, 2018 2:01 PM 1 of 1 CPWSYSTEMS Structural Engineering EE Design, Inc 1815 WrightAve La Verne, Ca. 91750 Tel: 909-596-1351 Fax 909-596-7186 Project Name : Z 11LE AND STONE Protect Number : LV -070918-7 Date : 07/20/18 Street Address: 1007 INDUSTRY DRIVE CIty/State : TULWILA, WA 98188 Scope of Work : SELECTIVE REVIEWED FOR CODE COMPLIANCE APPROVED NOV 3 0 2018 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA AUG 1 w 2018 PERMIT CENTER 07/22/2018 Dl'('O4 Structural Engineering & Design Inc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 By: Bob Project: Z Tile & Stone TABLE OF CONTENTS Project #: LV -070918-7 Title Page 1 Table of Contents 2 Design Data and Definition of Components Critical Configuration •Seismic Loads Column 3 4 5 to 6 7 Beam and Connector 8 to 9 Bracing 10 Anchors 11 Base Plate 12 Slab on Grade 13 Other Configurations 14 type A select -Z Tile SR. Page 2 of l 7/20/2018 Structural Engineering & Design Inc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 By: Bob Project: Z Tile & Stone Design Data Project #: LV -070918-7 1) The analyses herein conforms to the requirements of the: 2012 IBC Section 2209 2016 CSC Section 2209A ANSI MH 16.1-2012 Specifications for the Design of Industrial Steel Storage Racks 2012 RMI Rack Design Manual" ASCE 7-10, section 15.5.3 2) Transverse braced frame steel conforms to ASTM A570, Gr.55, with minimum strength, Fy=55 ksi Longitudinal frame beam and connector steel conforms to ASTM A570, Gr.55, with minimum yield, Fy=55 ksi All other steel conforms to ASTM A36, Gr. 36 with minimum yield, Fy= 36 ksi 3) Anchor bolts shall be provided by installer per ICC reference on plans and calculations herein. 4) All welds shall conform to AWS procedures, utilizing E70xx electrodes or similar. AH such welds -shall be performed in shop, with no field welding allowed other than those supervised by a licensed deputy inspector. 5) The existing slab on grade is 6" thick with minimum 3500 psi compressive strength. Allowable Soil bearing capacity is 750 psf. The design of the existing slab is by others. 6) Load combinations for rack components correspond to 2012 RMI Section 2.1 for ASD level load criteria Definition of Components Frame Height -Z Product A Beam Beam Length Beam Spacing Front View: Down Aisle (Longitudinal) Frame Column Beam to Column Connector Base Plate and Anchors Panel Height H Frame Depth Section A: Cross Aisle (Transverse) Frame Horizontal Brace Diagonal Brace type A select -Z Tile SR Page J of l 7/20/2018 • Structural Engineering & Design Inc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 By: Bob Project: Z Tile & Stone Configuration & Summary: Type A Selective SR Project #: LV -070918-7 192' 60" 60" 60" 96" N 1 74" 192' 52" 52" 36"�T **RACK COLUMN REACI70NS ASD LOADS AXIAL DL= 113lb AXIAL LL= 6,000 Ib SEISMIC AXIAL Ps=t/- 9,024 /b BASEIVOMENT= -8,000 in -Ib Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Frame Type Ss=1.438, Fa=1 3 36 in 192.0 in 3 96 in Beam Component Description STRESS Column Fy=55 ksi INTLK LU75/3x3x13ga P=6113 Ib, M=24319 in -Ib 0.89 -OK Column & Backer None None None N/A Beam Fy=55 ksi Intlk 45E 4.5Hx2.75Wx0.063Thk Lu=96 in Capacity: 5781 Ib/pr 0.69 -OK Beam Connector Fy=55 ksi Lvl 1: 3 pin OK Mconn=14599 in -Ib Mcap=15230 in -Ib 0.96-0K Brace -Horizontal Fy=55 ksi Intlk 1-1/2x1-1/4x3/8x16ga 0.23 -OK Brace -Diagonal Fy=55 ksi Intlk 1-1/2x1-1/4x3/8x16ga 0.92 -OK Base Plate Fy=36 ksi 8x8x3/8 Fixity= 8000 in -Ib 0.75-0K Anchor 4 per Base 0.5" x 3.25" Embed Hilti 17 ESR 1917 Inspection Reqd (Net Seismic Uplift=6096 Ib) 0.733 -OK Slab & Soil 6" thk x 3500 psi slab on grade. 750 psf Soil Bearing Pressure 0.6 -OK Level Load** Per Level Beam Spcg Brace Story Force Transv _ Story Force Longit. Column Axial Column Moment Conn. Moment Beam Connector 1 4,000 Ib 60.0 in 52.0 in 330 Ib 189 Ib 6,113 Ib 24,319 "# 14,599 "# 3 oin OK 2 3 4,000 Ib 60.0 in 52.0 in 4,000 Ib 60.0 in 74.0 in 660 Ib 378 Ib 4,075 Ib 14,175 "# 9,064 "# 3 pin OK 991 Ib 567 Ib 2,038 Ib 8,505 "# 4,102 "# 3 pin OK ** Load defined as product weight per pair of beams Total: 1,981 Ib 1,134 Ib Notes type A select -Z Tile SR Page ce of c y 7/20/2018 SrLictura 1 Engineering & Design Inc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 By: Bob Project: Z Tile & Stone Seismic Forces Configuration: Type A Selective SR Project #: LV -070918-7 Lateral analysis is performed with regard to the requirements of the 2012 RMI ANSI MH 16.1-2012 Sec 2.6 &ASCE 7-10 sec 15.5.3 Transverse (Cross Aisle) Seismic Load V= Cs*Ip*Ws=Cs*Ip*(0.67*P*Prf+D) Csl= Sds/R = 0.2397 Cs2= 0.044*Sds = 0.0422 -Cs3=-0 5*S1/R = 0.0669 Cs -max= 0.2397 Base Shear Coeff=Cs= 0.2397 Level 1 2 3 PRODUCT LOAD P 4,000 Ib 4,000 Ib 4,000 Ib Cs -max * Ip= 0.2397 Vmin= 0.015 Eff Base Shear=Cs= 0.2397 Tran verse Elevation Ws- (0.67*PLRf1 * PL)+DL-(RMI vt = 8,265 Ib Vtransv=Vt= 0.2397 * (225 Ib + 8040 Ib) Etransverse= 1,981 Ib Limit States Level Transverse seismic shear per upright P*0.67*PRFI DL 2,680 Ib 75 Ib 2,680 Ib 75 Ib 2,680 Ib 75 Ib hi 60 in 120 in 180 in wi*hi 165,300 330,600 495,900 Ss= 1.438 51= 0.535 Fa= 1.000 Fv= 1.500 Sds=2/3*Ss*Fa= 0.959 Sd1=2/3*S1*Fv= 0.535 Ca=0.4*2/3*Ss*Fa= 0.3835 (transverse, Braced Frame Dir.) -R=-4:0 Ip= 1.0 PRF1= 1.0 Pallet Height=hp= 48.0 in DL per Beam Lvl= 75 Ib Fi Fi*(hi+hp/2) 330.2 Ib 27,737-# 660.3 Ib 95,083-# 990.5 Ib 202,0624 sum: P=12000 Ib 8,040 Ib Longitudinal (Downaisle) Seismic Load 225 Ib W=8265 Ib 991,800 1,981 Ib 2=324,882 Similarly for longitudinal seismic loads, using R=6.0 Cs1=Sd1/(T*R)= 0.1372 Cs2= 0.0422 Cs3= 0.0446 Cs -max= 0.1372 Level PRODUC LOAD P 1 4,000 Ib 2 4,000 Ib 3 4,000 Ib Ws= Cs=Cs-max*Ip= (0.67 * PLRF2 * P) + DL 8,265 Ib 0.1372 PRF2= 1.0 (Longitudinal, Unbraced Dir.) R= 6.0 T= 0.65 sec Vlong= Elongitudinal= 0.1372 * (225 Ib + 8040 Ib) 1,134 Ib Limit States levelLangit seismic shear per upright P*0.67*PRF 2,680 Ib 2,680 Ib 2,680 Ib DL 75 lb 75 lb 75 lb hi 60 in 120 in 180 in wi*hi 165,300 330,600 495,900 Fi 189.0 Ib 378.0 Ib 567.0 Ib Front View sum: 8,040 Ib 225 1b W=8265 1b 991800 .1,134 lb type A select -Z The SR Page 5 -of (cif 7/20/2018 Structural Engineering & Design Inc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 By: Bob Project: Z Tile & Stone Downaisle Seismic Loads Configuration: Type A Selective SR Project #: LV -070918-7 Determine the story moments by applying portal analysis. The base plate is assumed to provide partial fixity. Seismic Story Forces Vlong= 1,134 Ib Vco1=Vlong/2= 567 Ib F1= 189 lb F2= 378 Ib F3= 567 Ib Seismic Story Moments Typical frame made Tributary area oftwo columns of rack frame =41 - 4 -4 14— 96 Front View Conceptual System Side View Typical Frame maw of two columns Top View 1 cit Mbase-max= 8,000 in -Ib <__= Default capacity Mbase-v= (Vcol*hleff)/2 = 16,160 in -Ib <__= Moment going to base Mbase-eff= Minimum of Mbase-max and Mbase-v = 8,000 in -Ib M 1-1= [Vcol * hieff]-Mbase-eff M 2-2= [Vcol-(F1)/2] * h2 = (567 Ib * 57 in) -8000 in -Ib = [567 Ib - 189 Ib]*60 in/2 = 24,319 in -Ib = 14,175 in -Ib hl-eff= hl - beam clip height/2 = 57 in Vcol Mseis= (Mupper+Mlower)/2 Mseis(1-1)= (24319 in -Ib + 14175 in-Ib)/2 Mseis(2-2)= (14175 in -Ib + 8505 in-Ib)/2 = 19,247 in -Ib = 11,340 in -Ib Beam to Column Elevation rho= 1.0000 COl Summary of Forces LEVEL hi Axial Load Column Moment** 1 60 in 6,113 Ib 24,319 in -lb 2 60 in 4,075 Ib 14,175 in -Ib 3 60 in 2,038 Ib 8,505 in -Ib Mseismic** 19,247 in -Ib 11,340 in -Ib 4,253 in -Ib Mend -fixity 1,60& in -Ib 1,608 in -Ib 1,608 in -Ib Mconn** 14,599 in -Ib 9,064 in -Ib 4,102 in -Ib Beam Connector 3 pin OK 3 pin OK 3 pin OK Mconn= (Mseismic + Mend-fixity)*0.70*rho Mconn-allow(3 Pin)= 15,230 in -Ib **all moments based on limit states level loading type A select -7 Tile SR Page Cr of 1 7/20/2018 Structural Engineering & Design Inc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596 7186 By: Bob Project: Z Tile & Stone Column (Longitudinal Loads) Configuration: Type A Selective SR Project #: LV -070918-7 Section Properties Section: INTLK LU75/3x3x13ga Aeff = 0.757 in^2 Iy = 0.871 in^4 Kx = 1.7 - Ix = 1.320 in^4 Sy - 0.574-in^3 Lx = 57.8 in Sx = 0.879 in^3 ry = 1.080 in Ky = 1.0 rx = 1.320 in Fy= 55 ksi Ly = 52.0 in 52f= 1.67 Cmx= 0.85 Cb= 1.0 E= 29,500 ksi Loads Considers loads at level 1 COLUMN DL= 112 Ib COLUMN PL= 6,000 Ib Mcol= 24,319 in -Ib Sds= 0.9587 1+0.105*Sds= 1.1007 1.4+0.14Sds= 1.5342 1+0.14Sds= 1.1342 0.85+0.14*Sds= 0.9842 B= 0.7000 rho= 1.0000 Axial Analysis Critical load cases are: RMI Sec 2.1 Load Case 5: : (1 #0.105*Sds)D # 0,75*(1.4#0.14Sds)*8*P # 0.75*(0,7*rho*E)<= 1.0, ASD Method axial load coeff: 0.80546445 * P seismic moment coeff: 0.5625 * Mcol Load Case 6: : (1+0.14*Sds)D + (0.85+0.14Sds)*B*P + (0.7*rho*E)<= 1.0, ASD Method axial load coeff: 0.68895 seismic moment coeff: 0.7 * Mcol By analysis, Load case 6 governs utilizing loads as such Axial Load=Pax= 1.134218*112 lb + 0.984218*0.7*6000 Ib = 4,261 Ib Moment=Mx= 0.7*rho*Mcol = 0.7 * 24319 in -Ib = 17,023 in -Ib KxLx/rx = 1.7*57.75"/1.3196" KyLy/ry = 1*52"/1.08" = 74.4 = 48.1 Fe= n^2E/(KL/r)max^2 = 52.6ksi Pn= Aeff*Fn = 30,752 Ib P/Pa= 0.27 > 0.15 Bending Analysis Fy/2= 27.5 ksi 52c= 1.92 Fe > Fy/2 Fn= Fy(1-Fy/4Fe) = 55 ksi*[1-55 ksi/(4*52.6 ksi)] = 40.6 ksi Pa= Pn/S2c = 30752 Ib/1.92 = 16,017 Ib Check: Pax/Pa + (Cmx*Mx)/(Max*px) <- 1.0 P/Pao + Mx/Max <_ 1.0 Pno= Ae*Fy = 0.757 in^2 *55000 psi = 41,635 Ib Max= My/52f = 48345 in-Ib/1.67 = 28,949 in -Ib px= {1/[1-(52c*P/Pcr)]}^-1 = {1/[1-(1.92*4261Ib/39874lb)]}^-1 = 0.79 Combined Stresses Pao= Pno/Qc = 416351b/1.92 = 21,685 Ib Myield=My= Sx*Fy = 0.879 in^3 * 55000 psi = 48,345 in -Ib Pcr= n^2EI/(KL)max^2 = nA2*29500 ksi/(1.7*57.75 in)^2 = 39,8741b (4261 1b/16017 Ib) + (0.85*17023 in-Ib)/(28949 in-Ib*0.79) = (4261 Ib/21685 Ib) + (17023 in-Ib/28949 in -Ib) = 0.89 < 1.0, OK 0.78 <1.0,OK (EQ C5-1) (EQ C5-2) ** For comparison, total column stress computed for load case 51s: 80.0% w loads 4956.061012 /b Axial and M= 12767 in -lb type A select -Z Tile SR. Page 7 of I y 7/20/2018 Structural Engineering & Design Inc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 By: Bob Project: Z Tile & Stone BEAM Configuration: Type A Selective SR Project #: LV -070918-7 DETERMINE ALLOWABLE MOMENT CAPACITY A) Check compression flange for local buckling (B2.1) w= c - 2*t -2*r = 1.75 in - 2*0.063 in - 2*0.063 in = 1.498 in w/t= 23.78 1=lambda= [1.052/(k)A0.5] * (w/t) * (Fy/E)A0.5 = [1.052/(4)A0.5] * 23.78 * (55/29500)^0.5 = 0.54 < 0.673, Flange is fully effective B) check web for local buckling per section b2.3 fl(comp)= Fy*(y3/y2)= 50.47 ksi f2(tension)= Fy*(y1/y2)= 102.24 ksi Y= f2/f1 = -2.026 k= 4 + 2*(1-Y)A3 + 2*(1-Y) Eq. B2.3-4 = 65.47 flat depth=w= yl+y3 = 4.248 in w/t= 67.42857143 OK 1=lambda= [1.052/(k)A0.5] * (w/t) * (fl/E)A0.5 = [1.052/(65.47)^0.5] * 4.248 * (50.47/29500)A0.5 = 0.363 < 0.673 be=w= 4.248 in b2= be/2 bl= be(3-Y) = 2.12 in = 0.845 bl+b2= 2.965 in > 1.404 in, Web is fully effective Determine effect of cold working on steel yield point (Fya)per section A7.2 Fya= C*Fyc + (1-C)*Fy (EQ A7.2-1) Lcorner=Lc= (p/2) * (r + t/2) 0.148 in C= 2*Lc/(Lf+2*Lc) Lflange-top=Lf= 1.498 in = 0.165 in m= 0.192*(Fu/Fy) - 0.068 (EQ A7.2-4) = 0.1590 Bc= 3.69*(Fu/Fy) - 0.819*(Fu/Fy)A2 - 1.79 = 1.427 since fu/Fv= 1.18 < 1.2 and r/t= 1 < 7 OK then Fyc= Bc * Fy/(R/t)Am (EQ A7.2-2) = 78.485 ksi Thus, Fya-top= 58.88 ksi (tension stress at top) Fya-bottom= Fya*Ycg/(depth -Ycg) = 114.29 ksi (tension stress at bottom) Check allowable tension stress for bottom flange Lflange-bot=Lfb= Lbottom - 2*r*-2*t = 2.498 in Cbottom=Cb= 2*Lc/(Lfb+2*Lc) = 0.106 Fy-bottom=Fyb= Cb*Fyc + (1-Cb)*Fyf = 57.49 ksi Fya= (Fya-top)*(Fyb/Fya-bottom) = 29.62 ksi if F= 0.95 Then F*Mn=F*Fya*Sx= Eq. B2.1-4 4.500 in Eq. B2.1-1 t1.75in 2.75 in Eq. B2.3-5 Beam= Intik 45E 4.5Hx2.75Wx0.063"Thk Eq B2.3-2 depth (EQ A7.2-3) 26.02 in -k Ix= Sx= Ycg= t= Bend Radius=r= Fy=Fyv= Fu=Fuv= E_ top flange=b= bottom flange= 2.195 inA4 0.925 inA3 2.970 in 0.063 in 0.063 in 55.00 ksi 65.00 ksi 29500 ksi 1.750 in 2.750 in Web depth= 4.F(r , Fy^ fl(comp) f2(tension) yl= Ycg-t-r= 2.844 in y2= depth-Ycg= 1.530 in y3= y2 -t -r= 1.404 in 'Structural Engineering & Design Inc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 By: Bob Project: Z Tile & Stone Project #: Lv-070918-7 BEAM Configuration: Type A Selective SR RMI Section 5.2, PT II Section Beam= Intlk 45E 4.5Hx2.75Wx0.063" Thk Ix=Ib= 2.195 inA4 Sx= 0.925 inA3 t= 0.063 in E= 29500 ksi Fy=Fyv= 55 ksi F= 150.0 Fu=Fuv= 65 ksi Fya= 58.9 ksi 1. Check Bending Stress Allowable Loads L= 96 in Beam Level= 1 P=Product Load= 4,000 Ib/pair D=Dead Load= 75 Ib/pair Mcenter=F*Mn= W*L*W*Rm/8 W=LRFD Load Factor= 1.2*D + 1.4*P+1.4*(0.125)*P RMI2,2, item 8 FOR DL=2% of PL, W= 1.599 Rm= 1 - [(2*F*L)/(6*E*Ib + 3*F*L)] 1 - (2*150*96 in)/[(6*29500 ksi*2.195 inA3)+(3*150*96 in)] = 0.933 if F= 0.95 Then F*Mn=F*Fya*Sx= 51.74 in -k Thus, allowable load per beam pair=W= F*Mn*8*(# of beams)/(L*Rm*W) = 51.74 in -k * 8 * 2/(96in * 0.933 * 1.599) = 5,781 Ib/pair allowable load based on bending stress Mend= W*L*(1-Rm)/8 = (5781 lb/2) * 96 in * (1-0.933)/8 = 2,324 in -Ib @ 5781 Ib max allowable load = 1,608 in -Ib @ 4000 Ib imposed product load 2. Check Deflection Stress Allowable Loads 4.500 in 2.75 in 1.75 in 11111111111111111111111111111111111111111111111111111111 Dmax= Dss*Rd Rd= 1 - (4*F*L)/(5*F*L + 10*E*Ib) = 1 - (4*150*96 in)/[(5*150*96 in)+(10*29500 ksi*2.195 inA4)] = 0.920 in if Dmax= L/180 Based on L/180 Deflection Criteria and Dss= 5*W*LA3/(384*E*Ib) L/180= 5*W*LA3*Rd/(384*E*Ib*# of beams) solving for W yields, W= 384*E*I*2/(180*5*LA2*Rd) = 384*2.195 inA4*2/[180*5*(96 in)A2*0.92) = 6,517 Ib/pair allowable load based on deflection limits Thus, based on the least capacity of item 1 and 2 above: Allowable Deflection= L/180 = 0.533 in Deflection at imposed Load= 0.369 in Allowable load= 5,781 !b/pair Imposed Product Load= 4,000 Ib/pair (Beam Stress= 0.69 Beam at Level 1 Structural Engineering & Design Inc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 By: Bob Project: Z Tile $ Stone Project #: LV -07091 8-7 3 Pin Beam to Column Connection Type A Selective SR i he beam end moments shown herein show the result of the maximum induced fixed end monents torm seismic + static loads and the code mandated minimum value of 1.5%(DL+PL) Mconn max= (Mseismic + Mend-fixity)*0.70*Rho = 14,599 in -Ib Load at level 1 P1 0 P2 1" t1' rho= 1.0000 Connector Type= 3 Pin Shear Capacity of Pin P3 1/2 1/2" Pin Dam= 0.44 in Fy= 55,000 psi Ashear= (0.438 in)^2 * Pi/4 = 0.1507 in^2 Pshear= 0.4 * Fy * Ashear = 0.4 * 55000 psi * 0.1507in^2 = 3,315 Ib Bearing Capacity of Pin tcol= 0.090 in Omega= 2.22 Fu= 65,000 psi a= 2.22 Pbearing= alpha * Fu * diam * tcol/Omega = 2.22 * 65000 psi * 0.438 in * 0.09 in/2.22 = 2,562 Ib < 3315 Ib Moment Capacity of Bracket Edge Distance=E= 1.00 in Pin Spacing= 2.0 in Fy= 55,000 psi C= P1+P2+P3 tclip= 0.18 in = P1+P1*(2.5"/4.5")+P1*(0.5"/4.5") = 1.667 * P1 Mcap= Sclip * Fbending =0.127in^3*0.66*Fy = 4,610 in -Ib Pclip= Mcap/(1.667 * d) = 4610.1 in-lb/(1.667 * 0.5 in) = 5,531 Ib C*d= Mcap = 1.667 Thus, P1= 2,562 Ib Mconn-allow=[P1*4.5"+P1*(2.5"/4.5")*2.5"+P1*(0.5"/4.5")*0.51 = 2562 LB*[4.5"+(2.574.5")*2.5"+ (0.5"/4.5")*0.5"] = 15,230 in -Ib > Mconn max, OK Sclip= 0.127 in^3 d= E/2 = 0.50 in type A select -7 Tile SR Page `l of l / 7/20/2018 • Structural Engineering & Design Inc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 By: Bob Project: Z Tile & Stone Transverse Brace Configuration: Type A Selective SR Project #: LV -070918-7 Section Properties Diagonal Member= Intik 1-1/2x1-1/4x3/8x16ga Area= 0.258 in^2 1.500 in r min= 0.460 in Ey- 55,000 psi K= 0.8 Sk= 1.92 Frame Dimensions o 4 _-1 -1-1 0.375 in Horizontal Member= Intlk 1-1/2x1-1/4x3/8x16ga Area= 0.258 in^2 r min= 0.460 in Fy- 55,000 psi 1.250 in K= 0.8 14- 0.375 Bottom Panel Height=H= 74.0 in Frame Depth=D= 36.0 in Column Width=B= 3.0 in Diagonal Member Clear Depth=D-B*2= 30.0 in X Brace= NO rho= 1.00 0 Load Case 6:: (1 f0 f MSAs 85+0.14Sds)*B*P t [0.7*rho*EJ<= 1.0, ASD Method Vtransverse= 1,981 Ib Vb=Vtransv*0.7*rho= 1981 Ib * 0.7 * 1 = 1,387 Ib Ldiag= [(D-B*2)^2 + (H-6")^2]^1/2 = 74.3 in Pmax= V*(Ldiag/D) * 0.75 = 2,146 Ib axial load on diagonal brace member Pn= AREA*Fn = 0.258 in^2 * 17442 psi = 4,498 Ib Pallow= Pn/4 = 4498 Ib /1.92 = 2,343 Ib Pn/Pallow= Horizontal brace 0.92 <= 1.0 OK (kl/r)= (k * Ldiag)/r min = (0.8 x 74.3 in /0.46 in ) = 129.2 in Fe= pi^2*E/(kl/r)^2 = 17,442 psi Since Fe<Fy/2, Fn= Fe = 17,442 psi 44. Typical Panel Configuration Check End Weld Lweld= 3.0 in Fu= 65 ksi tmin= 0.060 in Weld Capacity= 0.75 * tmin * L * Fu/2.5 = 3,510 Ib OK Vb=Vtransv*0.7*rho= 1,387 Ib (kl/r)= (k * Lhoriz)/r min = (0.8 x 36 in) /0.46 in = 62.6 in Since Fe>Fy/2, Fn=Fy*(1-fy/4fe) = 44,821 psi Pn/Pallow= 0.23 <= 1.0 OK Fe= pi^2*E/(kl/r)^2 Fy/2= 27,500 psi = 74,297 psi Pn= AREA*Fn = 0.258in^2*44821 psi = 11,5591b Pallow= Pn/Qc = 11559 Ib /1.92 = 6,021 Ib type A select -Z Tile SR Page it o of t •y 7/20/2018 Structural Engineering & Design Inc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 By: Bob Project: Z Tile & Stone Single Row Frame Overturning Configuration: Type A Selective SR Loads Project #: LV -070918-7 Critical Load case(s): 1) RMI Sec 2.2, item 7: (0.9-0.2Sds)D + (0.9-0.20Sds)*B*Papp - E*rho Sds= 0.9527 Vtrans=V=E=Qe= 1,981 Ib (0.9-0.2Sds)= 0.7083 DEAD LOAD PER UPRIGHT=D= 225 Ib (0.9-0.2Sds)= 0.7083 .PRODUCT LOAD.PER-UPRIGHT-=P-= 12,000 lb B= 1,0000 Papp=P*0.67= 8,040 Ib rho= 1.0000 Wst LC1=Wst1=(0.70826*D + 0.70826*Papp*1)= 5,853 Ib Product Load Top Level, Ptop= 4,000 Ib DL/Lvl= 75 Ib Seismic Ovt based on E, E(Fi*hi)= 324,882 in -Ib height/depth ratio= 5.0 in Frame Depth=Df= 36.0 in Htop-Iv1=H= 180.0 in # Levels= 3 # Anchors/Base= 4 hp �-Df� N— U.0 111 A) FuIIy Loaded Rack h=H+hp/2= 204.0 in Load case 1: Movt= E(Fi*hi)*E*rho Mst= Wstl * Df/2 = 324,882 in -Ib = 5853 Ib * 36 in/2 = 105,354 in -Ib T= (Movt-Mst)/Df = (324882 in -Ib - 105354 in-lb)/36 in = 6,098 Ib Net Uplift per Column Net Seismic Uplift= 6,098 Ib B) Top Level Loaded Only Load case 1: 0 V1=Vtop= Cs * Ip * Ptop >= 350 Ib for H/D >6.0 = 0.2397 * 4000 Ib = 959 Ib Vleff= 959 Ib Critical Level= 3 V2=VDL= Cs*Ip*D Cs*Ip= 0.2397 = 54 Ib Mst= (0.70826*D + 0.70826*Ptop*1) * 36 in/2 = 53,863 in -Ib Movt= [V1*h + V2 * H/2]*0.7*rho = 140,314 in -Ib T= (Movt-Mst)/Df = (140314 in -Ib - 53863 in-lb)/36 in = 2,401 Ib Net Uplift per Column Net Seismic Uplift= 2,401 Ib Check (4) 0.5" x 3.25" Embed Hilti TZ anchor(s) per base p Special inspection is required per ESR 1917. Pullout Capacity=Tcap= 1,961 Ib Shear Capacity=Vcap= 2,517 Ib Fully Loaded: Top Level Loaded: late. L.A. City Jurisdiction? NO Phi= 1 (1524 Ib/1961 Ib)^1 + (247 Ib/2517Ib)^1 = 0.88 (600 Ib/1961 Ib)^1 + (119 Ib/2517 Ib)^1 = 0.35 Tcap*Phi= 1,961 Ib Vcap*Phi= 2,5171b <= 1.2 OK <= 1.2 OK type A select -Z Tile SR Page f( of e y 7/20/201 8 Siructural Engineering & Design Inc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 By: Bob Project: Z Tile & Stone Base Plate Configuration: Type A Selective SR Project #: LV -070918-7 Section Baseplate= 8x8x3/8 Eff Width=W = 8.00 in Eff Depth=D = 8.00 in Column Width=b = 3.00 in Column-Depth=dc-=-3.00 in L = 2.50 in Plate Thickness=t = 0.375 in a = 3.00 in Anchor c.c. =2*a=d = 6.00 in N=# Anchor/Base= 4 Fy = 36,000 psi Downaisle Elevation Down Aisle Loads Load Case 5: : (1+0.105*Sds)D + 0.75*[(1.4+0.14Sds)*B*P + 0.75*[0.7*rho*EJ<= 1.0, ASD Method COLUMN DL= COLUMN PL= Base Moment= 1+0.105*Sds= 1.4+0.14Sds= B= Axial stress=fa = Moment Stress=fb = Moment Stress=fbl = M3 = S -plate = fb/Fb = Tanchor = Cross Aisle Loads 113 Ib 6,000 Ib 8,000 in -Ib 1.1007 1.5342 '0.7000 P/A = P/(D*W) 77 psi M/S = 6*Mb/[(D*BA2] 49.2 psi fb-fb2 18.5 psi (1/2)*fb2*L*(2/3)*L = (1/3)*fb2*LA2 64 in -Ib (1)(t -2)/6 0.023 inA3/in Mtotal/[(S-plate)(Fb)] 0.57 OK (Mb-(PLapp*0.75*0.46)(a))/[(d)*N/2] Axial=P= 1.1006635 * 112.5 Ib + 0.75 * (1.534218 * 0.7 * 6000 Ib) = 4,9571b Mb= Base Moment*0.75*0.7*rho = 8000 in -Ib * 0.75*0.7*rho = 4,200 in -Ib Axial Load P = 4,957 Ib Mbase=Mb = 4,200 in -Ib = -1,113 Ib No Tension M1= wLA2/2= fa*LA2/2 = 242 in -Ib Moment Stress=fb2 = 2 * fb * L/W = 30.8 psi M2= fb1*LA2)/2 = 58 in -Ib Mtotal = M1+M2+M3 = 364 in-Ib/in Fb = 0.75*Fy = 27,000 psi Fp= 0.7*F'c = 2,450 psi OK Tallow= 1,961 Ib Cr tca/bad case Oil Sec 2.1, item 4: (1+0,11Sds)DL + (1+0.145D5)PL V.75+ELt'.75 <= 1.0, 450 Method Pstatic= 4,957 Ib Movt*0.75*0.7*rho= 170,563 in -Ib Frame Depth= 36.0 in P=Pstatic+Pseismic= 9,694 Ib b =Column Depth= 3.00 in L =Base Plate Depth -Col Depth= 2.50 in fa = P/A = P/(D*W) = 151 psi Sbase/in = (1)(tA2)/6 = 0.023 inA3/in fb/Fb = M/[(S-plate)(Fb)] = 0.75 OK Pseismic= Movt/Frame Depth = 4,738 Ib M= wLA2/2= fa*LA2/2 = 473 in-Ib/in Fbase = 0.75*Fy = 27,000 psi OK Check uplift load on Baseplate Efft Effe Check uplift forces on baseplate with 2 or more anchors per RMI 7.2.2. When the base plate configuration consists of two anchor bolts located on either side the column and a net uplift force exists, the minimum base plate thickness hall be determined based on a design bending moment in the plate equal o the uplift force on one anchor times 1/2 the distance from he centerline of the anchor to the nearest edge of the rack column" Ta IF c+ Mu T b Ta Elevation Uplift per Column= 6,096 Ib Qty Anchor per BP= 4 Net Tension per anchor=Ta= 1,524 Ib c= 2.50 in Mu=Moment on Baseplate due to uplift= Ta*c/2 = 1,905 in -Ib Splate= 0.188 inA3 fb Fb *0.75= 0.282 OK type A select -2 Tile SR, Page Pj.__ of ( 7/20/2018 Structural Engineering & Design Inc. 1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186 By: Bob Project: Z Tile & Stone Slab on Grade Configuration: Type A Selective SR 1111111111111111111111111111111111111111111 1111111111111111111111111111111111H1111 Project #: LV -070918-7 Concrete fc= 3,500 psi tslab=t= 6.0 in - -teff=-6.0 in p111; 0= 0.6 Soil fsoil= 750 psf Movt= 227,417 in -Ib Frame depth= 36.0 in Sds= 0.959 0.2*Sds= 0.192 R.= 0600 8=B/D= 1.000 F'c^0.5= 59.2 L SLAB ELEVATION Base Plate Effec. Baseplate width=B= 8.00 in Effec. Baseplate Depth=D= 8.00 in Column Loads Down Aisle Baseplate Plan View width=a= 3.00 in depth=b= 3.00 in midway dist face of column to edge of plate=c= 5.50 in midway dist face of column to edge of plate=e= 5.50 in DEAD LOAD=D= 113 Ib per column Load Case 1) (1.2+0.2Sds)D + (1.2+0.2Sds)*B*P+ rho*E RMI SEC 2.2 EQTN 5 unfactored ASD load = 1.39174 * 113 Ib + 1.39174 * 0.7 * 6000 Ib + 1 * 6317 lb PRODUCT LOAD=P= 6,000 Ib per column = 12,320 Ib unfactoredASD load Load Case 2) (0.9-0.2Sds)D + (0.9-0.2Sdsy*B*Papp + rho*E RMI SEC 2.2 EQTN 7 Papp= 4,020 Ib per column = 0.70826 * 113 Ib + 0.70826 * 0.7 * 4020 Ib + 1 * 6317 Ib P-seismic=E= (Movt/Frame depth) = 8,390 Ib = 6,317 Ib per column Load Case 3) 1.2*D + 1.4*P RMI SEC 2.2 EQTN 1,2 unfactoredLimit State load = 1.2*113 Ib + 1.4*6000 Ib B 0.7000 = 8,535 Ib rho=,1.0000 Load Case 4) 1.2*D + 1.0*P + 1.0E ACI31811 Sec 92.1, EP 95 Sds= 0.9587 = 12,453 Ib 1.2 + 0.2*Sds= 1.3917 Effective Column Load=Pu= 12,453 Ib per column 0. 9 - 0.20Sds= 0.7083 Puncture Apunct= [(c+t)+(e+t)]*2*t = 276.0 in^2 Fpunctl= [(4/3 + 8/(3*(3)] *), *(F'c^0.5) = 142.1 psi Fpunct2= 2.66 * * (F'c^0.5) = 94.5 psi Fpunct eff= 94.5 psi Slab Bending fv/Fv= Pu/(Apunct*Fpunct) = 0.478 < 1 OK Pse=DL+PL+E= 12,453 Ib Asoil= (Pse*144)/(fsoil) = 2,391 inA2 x= (L -y)/2 = 15.7 in Fb= 5*(phi)*(fc)^0.5 = 177.48 psi L= (Asoil)^0.5 = 48.90 in M= w*x^2/2 = (fsoil*x^2)/(144*2) = 641.8 in -Ib y= (c*e)^0.5 + 2*t = 17.5 in S -slab= 1*teff^2/6 = 6.0 in^3 fb/Fb= M/(S-slab*Fb) = 0.603 < 1, OK type A select -Z Tile SR Page /3 of / C..1 7/20/2018 Structural Engineering & Design Inc. By: Bob 1815 Wright Ave La Verne, CA 91750 Tel 909.596.1351 Fax: 909.596.7186 Project: Z Tile & Stone Configuration & Summary: Type B Selective DR Project #: LV -070918-7 Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length T Ss=1.438, Fa=1 3 36 in 192.0 in 3 96 in Beam Fy=55 ksi **RACK COLUMN REACTIONS 60" Capacity: 5781 Ib/pr 0.73 -OK Beam Connector 1 74" Lvl 1: 3 pin OK Mconn=14227 in -Ib Mcap=15230 in -Ib 0.93 -OK Brace -Horizontal Fy=55 ksi ASD LOADS AXIAL DL= 113 /b AXIAL LL= 6,300 /b 0.24 -OK Brace -Diagonal Fy=55 ksi Intlk 1-1/2x1-1/4x3/8x16ga 0.96 -OK Base Plate Fy=36 ksi 8x5x3/8 Fixity= 5000 in -Ib 0.92 -OK Anchor SEISMIC AXIAL Ps=t/- 9,461 /b 19T 0.592 -OK Slab & Soil 6" thk x 3500 psi slab on grade. 750 psf Soil Bearing Pressure 0.69 -OK Level Load** Per Level Beam Spcg Brace Story Force Transv BASE -MOMENT ---5,-000 in -lb 60" Column Moment Conn. Moment 192.. 52.. 60" 52" 'l \ ' 4( 96" 4' I 36" -f' II 36" �f Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Frame Type Ss=1.438, Fa=1 3 36 in 192.0 in 3 96 in Beam Component Description STRESS Column Fy=55 ksi INTLK LU75/3x3x13ga P=6413 Ib, M=24384 in -Ib 0.92 -OK . Column & Backer None None None N/A Beam Fy=55 ksi Intlk 45E 4.5Hx2.75Wx0.063"Thk Lu=96 in Capacity: 5781 Ib/pr 0.73 -OK Beam Connector Fy=55 ksi Lvl 1: 3 pin OK Mconn=14227 in -Ib Mcap=15230 in -Ib 0.93 -OK Brace -Horizontal Fy=55 ksi Intik 1-1/2x1-1/4x3/8x16ga 0.24 -OK Brace -Diagonal Fy=55 ksi Intlk 1-1/2x1-1/4x3/8x16ga 0.96 -OK Base Plate Fy=36 ksi 8x5x3/8 Fixity= 5000 in -Ib 0.92 -OK Anchor 2 per Base 0.5" x 3.25" Embed Hilti TZ ESR 1917 Inspection Reqd (Net Seismic Uplift=1972 Ib) 0.592 -OK Slab & Soil 6" thk x 3500 psi slab on grade. 750 psf Soil Bearing Pressure 0.69 -OK Level Load** Per Level Beam Spcg Brace Story Force Transv Story Force Longit. Column Axial Column Moment Conn. Moment Beam Connector 1 4,200 Ib 60.0 in 52.0 in 346 Ib 172 Ib 6,413 Ib 24,384 "# 14.227 "# 3 nin ( 2 3 4,200 Ib 60.0 in 4,200 Ib 60.0 in 52.0 in 692 Ib 74.0 in 1,039 Ib 344 Ib 4,275 Ib 12,888 "# 8,399 "# 5161b 2,138lb 7,733 "# 3,888 "# 3 pin OK 3 pin OK ** Load defined as product weight per pair of beams Notes Total: 2,077 Ib 1,031 Ib type B select -2 Tile DK Page % Y of (4 7/20/20 18 r 7, L h f 00 M N co 7 REVIEWED FOR CODE COMPLIANCE APPROVED NOV 30 2018 City of Tukwila BUILDING DIVISION CORRECTION LTR# 1 RECEIVED CITY OF TUKWILA NOV 16 2C18 PERMIT CENTER COMBUSTIBLE STOCK STORAGE QUESTIONNAIRE (Please print the information clearly.) Business Name: 2 Coziber/eili REVIEWED FOR CODE COMPLIANCE APPROVED NOV 30 2018 City of Tukwila BUILDING DIVISION Business Address: /06? Avala.srAy DA, rue taioi.-4 to ?Per The purpose of this questionnaire is to assist in determining the Fire Code requirements for the storage of "High - Piled Combustible Stock" at your facility, These requirements will be based on the 1FC and NFPA 13. This form should be completed and signed by a qualified person having the necessary code knowledge required for Combustible Stock Storage, e.g,, architect or engineer of record, code consultant, insurance underwriter or fire protection engineer. 1. Commodity Class: A.S.S' I Source: IFC NFPA Aerosol Level III: 0 Yes 12I No Class!, 0,10, IV, High Hazard (V) (lowest to highest): 2. Description of storage (if additional space is needed, attach additional page): tz 4.4R4pric r- "ORCeL '14L51-0106 )1( (check one) 0 Public Accessible or Private areas 3. Maximum height of storage: 0t0 - 0 feet (distance from floor to top of commodity) 4. Method of storage (check ail that apply) O Encapsulated in plastic 2K Wooden pallets O On racks with solid shelves 01 Bin box made of: (check one) 0 metal 0 wood 0 plastic 5. Types of racks: (check all that apply) X1 single row 1 double row 6. Area of storage: O 0-500 sq. ft. O 501-2,500 sq. ft. 2,501-12,000 sq. ft. tg Non -encapsulated CORRECTION O Plastic pallets LTR# I g On racks without solid shelves O Solid pile that is: (check one) 0 stable 0 unstable nEc:F.TED CITY OF IiiKWIA 0 multiple row NUV 16 2018 O 12,000-20,000 sq. ft. O 20,001-100,000 sq. ft. O 100,001-300,000 sq. ft. pia- ()act' PERMIT CENTER 0 300,001-500,000 sq. ft. O 500,001 sq. ft. and over O 2 hour separation DE "di -4 O a / 36 690 P.)..a Cay 'k Goeyj d T IC &Sell 7. Sprinkler information: a. Sprinkler density: s 3ci S 00 ,i.t? b. Rack sprinklers? 0 Yes {izt, No c. Temperature rating of sprinkler head in: figsCeiling 0 Racks d. Fire hose stations and hose connections: 0 Yes 0 No Number required: Size: e. Fire flow worksheet completed: ❑Yes 0 No Design cross-checked: 0 Yes 0 No f. Class 1 standpipes required: 0 Yes 0 No 8. Building height: feet 9. Distance from top of storage to fire sprinkler deflector: 4- feet 10. Smoke/Heat vents: 0 Yes 0 No Ratio: square feet 11. Draft curtains: 0 Yes 0 No sq. ft. sections Depth: 0 4 feet 0 6 feet 0 8 feet 12. Column/VNaII fire protection required: 0 Yes 0 No Additional fire sprinkler heads: 0 Yes 0 No Protected by listed/tested assay: 0 Yes 0 No Description: O.) (?) • it 2 13. Aisle width between racks and storage: All `4 .Dfeet 14. Smoke detection system: la Yes 0 No 15. Maximum cubic feet per pile: (choose one) f4 0-50,000 cubic feet 0 50,001-100,000 cubic feet 0 100,001-200,000 cubic feet ❑ 200,001-400,000 cubic feet 16. Access roadways within 150 feet of all portions of exterior walls: Yes 0 No 17. Access doors provided every 100 lineal feet on exterior walls which face access roadways: 181 Yes 0 No 18. Alternate materials/methods requested: 0 Yes IN No Combustible Stock Storage form Rev. 5119/17 Bill R mbo From: Zee Coleman <zee@ztilestone.com> Sent: Monday, September 28, 2020 4:29 PM To: Bill Rambo Cc: Jill Gregory Subjec : Re: Permit # D18-0254 Z Tile and Stone Hi Bill, Here is :heir info; PACIFI:. CONSTRUCTION MLTN INC Phone; 253.826.2727 Contra tor Reg #PACIFCM012RH Tukwila Business License# BUS.0995301 Addres PO Boy 1139 Milton, WA 98354 Contac person: Jack Sloboden jacks(ct:-,)accon.us Please et me know if I'm missing anything. And, congrats on your upcoming retirement! Thanks Zee Co42man CEO -Fc ander Z Colle;..tion 503.41::.9786 zcollec:.'on.com From:3ill Rambo <Bill.Rambo@TukwilaWA.gov> Date: .ilonday, September 28, 2020 at 2:53 PM To: Zeas Coleman <zee@ztilestone.com> Cc: Jil1.3regory <jill@ztilestone.com> Subject:: RE: Permit # D18-0254 Z Tile and Stone 5 Zee, I need •:o know the Washington State Contractors license number of the contractor you hired so I can verify their state license and city business license. We also will attach their information to your permit and print a new one that has the correct contractor on it. When I looked up Pacific Constr4_ction in the state website I saw more than 1 contractor with that name. Please respond ASAP a;., I am retiring and Wednesday is my last day. Bill Rambo From: Zee Coleman <zee@ztilestone.com> Sent: Friday, September 25, 2020 12:14 PM To: BiILRambo <Bill.Rambo@TukwilaWA.gov> Cc: Jill Gregory <jill@ztilestone.com> Subject: Re: Permit # D18-0254 Z Tile and Stone Hello BiII, I hope all is well. We hired Pacific Construction to anchor and install our racking and now the job is completed. We are ready to schedule our inspection. Please advise on the next steps. Much appreciated. Zee Coknman CEO -Founder Z Collection 503.419.9786 zcollection.com From: Bill Rambo <Bilt.Rambo@TukwilaWA.gov> Date: Monday, June 8, 2020 at 12:35 PM To: Zee Coleman <zee@ztilestone.com> Subject: RE: Permit # D18-0254 Z Tile and Stone Zee, The office is still closed to the public and we are working from home. Your permit has been extended to 10-1-2020 by the building official with the following notice: THIS PERMIT WAS DUE TO EXPIRE ON 4-1-2020 BUT BECAUSE OF THE CORONAVIRUS OUTBREAK (COVID-19) CRISIS THE FOLLOVVING APPLIES: DUE TO GOVERNOR JAY INSLEE'S MARCH 25, 2020 CONSTRUCTION GUIDANCE — STAY HOME, STAY HEALTHY PROCLAMATION (20-25) STATING "COMMERCIAL AND RESIDENTIAL CONSTRUCTION IS NOT AUTHORIZED UNDER THE PROCLAMATION BECAUSE CONSTRUCTION IS NOT CONSIDERED TO BE AN ESSENTIAL ACTIVITY". THEREFORE A ONE TIME 180 DAY EXTENSION HAS BEEN APPLIED TO THIS PERMIT. Bill Rambo From: Zee Coleman <zee@ztilestone.com> Sent: Thursday, June 4, 2020 3:25 PM To: Bill Rambo <BiII.Rambo@TukwilaWA.gov> Cc: Jill Gregory <iill@ztilestone.com>; Kyle Brown <kyle@ztilestone.com> Subject: Re: Permit # D18-0254 Z Tile and Stone Hi Bill, Are you back at the office? If yes, I would like to follow up on our request for extension below. Our head office is Portland, OR. Permit # D18-0254 2 Thanks! Zee Coleman Founder- CEO Z Collection 6650 N Basin Ave Suite i Portland OR, 97217 zee@zcollection.com orderdesk@zcollection.com 206.708.9620 J Direct Line 503.419.9786 J Order Desk zcollection.com j Website Follow us on Instagram! Follow us on Facebook! Please always contact orderdesk@zcollection.com regarding products, samples, pricing, orders and checking order status. From: Zee Coleman <zee@ztilestone.com> Date: Friday, March 20, 2020 at 10:05 AM To: "Bill.Rambo@TukwilaWA.gov" <Bill.Rambo@TukwilaWA.gov> Cc: Jill Gregory <jill@ztilestone.com>, Kyle Brown <kyle@ztilestone.com> Subject: Permit # D18-0254 Z Tile and Stone Hi Bill, Our permit extension expires on April 1st. Originally, we were planning to get our racks installed and inspected net week. However, our warehouse manager got the flu and we had to send him home for 14 days. This is a one man warehouse and I can't send any other staff to Tukwila. We are in Portland. Considering the difficult times we are going through, I would like to ask for another extension. Please let me know if you can make an exception and extend our deadline. Thanks in advance! Zee Coleman Founder- CEO Z Collection 6650 N Basin Ave Suite i Portland OR, 97217 zee@ztilestone.com orderdesk@ztilestone.com 206.708.9620 I Direct Line 503.419.9786 j Order Desk ztilestone.com j Website Follow us on Instagram! Please always contact orderdesk@ztilestone.com regarding products, samples, pricing, orders and checking order status. 3 3/5/2020 City of Tukwila Department of Community Development JACK SLOBODEN PO BOX 1139 MILTON, WA 98354 RE: Permit No. D18-0254 Z TILE AND STONE 1067 INDUSTRY DR Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 4/1/2020. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 4/1/2020, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: D18-0254 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 Kandace Nichols From: Sent: To: Subject: Hello Kandace, Accounting Paccon.US <accounting@paccon.us> Wednesday, May 22, 2019 7:57 AM Kandace Nichols FW: Permit D18-0254 The above permit was taken out by Pacific Construction but we ended up not doing the job. We need to remove ourselves as the GC so that the owner can file for an extension in their name and get all the work completed and inspected. The owner is Z Stone and Tile. Please let me know if you need anything else from me in order to get this processed. Nuala O'Boyle ( Bookkeeper 1574 Thornton Ave SW Pacific WA 98047 Office: 253-826-2727 accounting@paccon.us PRCIFIC Cofl"TRucTIOf CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click links from an unknown or suspicious origin. City of Tukwila Alcan Ekberg, Mayor Department of Community Development - Jack Pace, Director May 22, 2019 Don Durheim 1067 Industry Dr Tukwila, WA 98188 RE: Request for Extension #1 Permit Number D18-0254 Dear Mr. Durheim, This letter is in response to your written request for an extension to Permit D18-0254. The Building Official, Jerry Hight, has reviewed your letter and considered your request to extend the above referenced permit. It has been determined that the City of Tukwila Building Division will be granting an extension to the permit through December 2, 2019. If you should have any questions, please contact our office at (206) 431-3670. Sincerely, qc1,,,tca-ce Kandace Nichols Permit Technician File: Permit No. D I8-0254 Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov • 4v„ Kandace Nichols From: Don Durheim <Don@ztilestone.com> Sent: Wednesday, May 22, 2019 8:54 AM To: Kandace Nichols Subject: Extension Permit D18-0254 Attachments: Permit Extensionjpg Good Morning Kandace Please see attached request for an extension for permit D18-0254 at Z Collection 1067 Industry Dr. Tukwila WA 98188 Don Durheim Warehouse Manager 1067 Industry Dr. Tukwila Wa. 98188 Don@ztilestone.com 503.756.9240 1 Direct Line 503.419.9786 !Order Desk ztilestone.com 1 Website Follow us on Instagram! CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click links from an unknown or suspicious origin. Request for Extensio;# 1 Current Expiration Date: l.0 ' 2.-161 Extension Request: X Approved for (f() days Denied (provide explanation) Signature nitials4/ 1 l 1 0 0 r,. ♦ '✓ Permit Extension Request City of Tukwila May 17, 2019 This letter is to request an extension of permit D18-0254 for a period of 180 days. This permit is for work at 1067 Industry Dr. Tukwila WA 98188 I am asking for this extension due to financial reasons Z Collection will not be able to obtain the rest of the racking by June 2"d when the original permit will expire. Over the next 180 days Z Collection should be able to obtain the racking, install the anchors and schedule the final inspection to complete the work. Thank you. Don Durheim 17-7-;--DtAct, Warehouse Manager 5/2/2019 City of Tukwila Department of Community Development JACK SLOBODEN PO BOX 1139 MILTON, WA 98354 RE: Permit No. D18-0254 Z TILE AND STONE 1067 INDUSTRY DR Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 6/2/2019. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 6/2/2019, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, C,)/(AA_ itta Ka dace Nichols Permit Technician File No: D18-0254 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 City of Tukwila Department of Community Development September 06, 2018 JACK SLOBODEN PO BOX 1139 MILTON, WA 98354 RE: Correction Letter # 1 DEVELOPMENT Permit Application Number D18-0254 Z TILE AND STONE - 1067 1NDUSTRY DR Dear JACK SLOBODEN, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: FIRE DEPARTMENT: Al Metzler at 206-971-8718 if you have questions regarding these comments. • Please complete and return the attached combustible storage questionnaire. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Cor-ections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206)433-7165. Sincerely, Rachelle Ripley Permit Technician File No. DI 8-0254 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D18-0254 DATE: 11/16/18 PROJECT NAME: Z TILE AND STONE SITE ADDRESS: 1067 INDUSTRY DR Original Plan Submittal Revision # before Permit Issued X Response to Correction Letter # 1 Revision # after Permit Issued DEPARTMENTS: Building Division Public Works AtA Pg Pir Fire Prevention Planning Division Structural ❑ Permit Coordinator INN PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 11/20/18 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Corrections Required (corrections entered in Reviews) Denied (ie: Zoning Issues) DUE DATE: 12/18/18 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire D Ping ❑ PW 0 Staff Initials: I2/18/20I3 C4ERMIT COORD COPY 4 PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D18-0254 PROJECT NAME: Z TILE AND STONE SITE ADDRESS: 1067 INDUSTRY DR X Original Plan Submittal Response to Correction Letter # DATE: 08/14/18 Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Building Division Public Works ❑ ti6* Mirereventton Structural Planning Division ❑ Permit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 08/16/18 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required ❑ Approved with Conditions ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 09/13/18 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only I CORRECTION LETTER MAILED: rg" Departments issued corrections: Bldg ❑ Fire] Ping ❑ PW ❑ Staff Initials: 12/18/2013 City Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov C REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date:r_� &` v ` 2,04 Plan Check/PermitNumber: D18-0254 O Response to Incomplete Letter # • Response to Correction Letter # 1 O Revision # after Permit is Issued O Revision requested by a City Building Inspector or Plans Examiner O Deferred Submittal # Project Name: Z TILE AND STONE Project Address: 1067 INDUSTRY DR Contact Person: 4R Summary of Revision: Phone Number(25-3) 01- 'IR 37 Aiikc 15 1-4 4 ! co n, i"c. S ti b k 5-64‹ s-z,r�- e Qux. fi nice7v 21r. (1 RECEIVED CITY OF TUKWILA NOV 1 6 2018 PERMIT CENTER Sheet Number(s): "Cloud" or highlight all areas of revision includin� 'V4l� dat of revision 0 Received at the City of Tukwila Permit Center by: ?i.e.) 0 Entered in TRAKiT on W:\Permit Center (Brenda)Wonns\l'ermjt Center Documents (Word)\Revision Submittal Form.doc Revised: August 2015 PACIFIC CONSTRUCTION MLT NC Page 1 of 2 L&I regional offices are closed to public visits until further notice. Offices can still help you by phone from 8 a.m. to 5 p.m. weekdays (except state holidays). Use the phone number for your closest regional office (httos://Ini.wa.ciov/aciencv/contact/#office-locations), or you can call the Office of Information and Assistance at 360-902-5800. 4ia:Nnept, tiw:r IM.1.:11 JLabor & industries (httos://lni.wa.gov) PACIFIC CONSTRUCTION MLTN INC Owner or tradesperson Principals SLOBODEN, JACK RANDALL, PRESIDENT Doing business as PACIFIC CONSTRUCTION MLTN INC WA UBI No. 601 957 855 PO Box 1139 MILTON, WA 98354 253-826-2727 PIERCE County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active Meets current requirements. License specialties GENERAL License no. PACIFCM012RH Effective — expiration 01/10/2000— 11/17/2021 Bond CBIC Bodd account no. SC4887 Received by L&I 11/16/2001 Insurance Indian Harbor Ins Co Policy no. 6000000700-4 Received by L&I 11/15/2019 $12,000.00 Effective date 11/09/2001 Expiration date Until Canceled $1,000,000.00 Effective date 11/15/2019 Expiration date 11/15/2020 https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601957855&LIC=PACIFCM012RH&SAW= 9/29/2020 PACIFIC CONSTRUCTION MLTN,-INC Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&l Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Certifications & Endorsements OMWBE Certifications No active certifications exist for this business. Apprentice Training Agent Registered training agent. Check their eligible programs and occupations. Workers' Comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID Account is current. 901,207-01 Doing business as PACIFIC CONSTRUCTION MILTON IN Estimated workers reported Quarter 2 of Year 2020 "21 to 30 Workers" L&I account contact T3 / FEARAED FEROZE (360)902-4797 - Email: FERH235@lni.wa.gov Public Works Requirements Verify the contractor is eligible to perform work on public works projects. Required Training— Effective July 1, 2019 Exempt from this requirement. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace Safety & Health Check for any past safety and health violations found on jobsites this business was responsible for. No inspections during the previous 6 year period. Page 2 of 2 https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601957855&LIC=PACIFCM012RH&SAW= 9/29/2020 PACIFIC CONSTRUCTION MLT11C Horne Espanol Contact Safety & Health Claims & Insurance Washington State Department of 410 Labor & Industries A -Z Index Help My I.&1 Workplace Rights Trades & Licensing PACIFIC CONSTRUCTION MLTN INC Owner or tradesperson Principals SLOBODEN, JACK RANDALL, PRESIDENT Doing business as PACIFIC CONSTRUCTION MLTN INC WA UBI No. 601 957 855 PO Box 1139 MILTON, WA 98354 253-826-2727 PIERCE County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. .........._................................................ Meets current requirements. License specialties GENERAL License no. PACIFCM012R11 Effective — expiration 01/10/2000-11/17/2019 Bond CBIC Bond account no. SC4887 $12,000.00 Received by L&I Effective date 11/16/2001 11/09/2001 Expiration date Until Canceled Insurance Indian Harbor Ins Co $1,000,000.00 Policy no. 6000000700-3 Received by L&I Effective date 11/09/2018 11/15/2018 Expiration date 11/15/2019 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations ......................... No license violations during the previous 6 year period. Heip us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601957855&LIC=PACIFCM012RH&SAW= 12/04/2018 ELECTRICAL i- r 108'-1" 191-2" 13'-7" DN 14-0" OFFICE 18'-0" 15c11" OFFICE 12'-2" 1 38'-2" LABORATORY 24'-0" ERVE 1 14'-0" SUPPLY ROOM 11'-7" 13'-1" 15'-6"OFFICE 8'-6" 15'-2" OFFICE 13'-7" WAREHOUSE ON 49'-7" 15'-10" CONFERENC ROOM 141-3" 7'-5" 7-8" 1 r 11111-11 Er-6n 071-6" STAFF Li] 15"" • MEN'S LOCKER ROOM 101-2" 1 9'-5" OFFICE 11J-7" 20'-1" SUPPLY ROOM 43-4" 431-7" 21'-5" DN WAREHOUSE 4 491-7" r--- FEVISC9S No chan7r sh- '!1 , r ..-'1 to thP Ne:OOP Of i'ICY:( in '''''' . ' • TIL'ri tit 271-9" DN 108-0" .7! ' 4 +1--• DN 281-7" DN 25'-7" I .! !ILL. 471-7" RECEPTION 18' 7" 8J-0" ON 1 1'-7" OFFICE 10J-2" — 51-7" 86 79t ROOM '*ECEPTION 13'-7" 20.-0" 61-5" OFFICE 61-11" OFFICE 181-4" 15'-3" ZONE REV DESORPTION REVISIONS ON WAREHOUSE 12 AREA OF RACKING DN • • 95' 8" DN RECEPTION 13'-7" 20'-0" f 17-4" 11=11111MWEi OFFICE 13' 0" OFFICE 111-11" 24' 3" CONFERENCE ROOM 191-7" 07/22/2018 P. rm. • gm* 55 -6" DN 61 -7" 27'-3" REVIEWED FOR DE COMPLIANCE APPROVED NOV 30 21118 tt'L Pp I BUILDING DIVISION I Plan rcislcw ctfL12c!. ;3 CI7.2.72 kproval cf : :Z3 th3 VIC:tat:Ca C.1 ;07 ,J. cf approved c;;;;;;.:ons By: THE P.E. CERTIFICATION PROVIDED HEREIN PERTAINS TO THE SHELVING COMPONENTS ONLY. ALL OTHER COMPONENTS ARE OUTSIDE THE SCOPE OF THIS CERTIFICATION. Data: "rfv/it CI:y .' ;1 L.. ;LAI ORS DRAWING WIN rrs PRINCIPLES Of DESIGN COPCNNS PROPErtORY NIO CONFIDENT.N. INFORIMOON AND 5 OWNED SY TOTAL HANDLING SOLUPONS THIS OWNING IS NOT 70 REPRODUCED. COPIED OR DARED IN ANY row WIDOW' tHE co•SENT OK tom HAODIC SOLUTIONS. ALL RICNTS RESERVEL, GOO! N. LAGOON AVE POR7L4ND, OR 97217 CuSTONEN 7- ADDRESS 1067 INDUSTRY DRIVE TUKWILA, WA 98188 PROJECT RACK PROJECT SIZE D DATE 7/9/18 DWG NO. Z-COLLECTION-070918 REV 8 7 6 SCAE ve•wr-o- TEEL SHEET 1 b6t0'*KI 3" COLUMN NOTES: USE @ TYPE A S/R COLUMN/BASE LOCATIONS TYP. 3"T COLUMN NOTES: USE @ TYPE B D/R COLUMN/BASE LOCATIONS TYP. DESCRIPTION BASE PLATE: 8" x 8" DESCRIPTION COLUMN: INTLK LU75 DESCRIPTION BASE PLATE: 8" x 5° DESCRIPTION COLUMN: INTLK LU75 DESCRIPTION BRACING: HORIZ. & DIAG. MATERIAL STEEL YIELD 3/8" THICK PLATE ASTM A36, Fy=36,000 PSI MATERIAL STEEL YIELD 13 GAGE THK. ASTM A570, Fy=55,000 PSI MATERIAL 3/8" THICK PLATE STEEL YIELD j ASTM A36, Fy=36,000 PSI MATERIAL STEEL YIELD 13 GAGE THK. ASTM A570, Fy=55,000 PSI MATERIAL STEEL YIELD 16 GAGE THK. STEEL ASTM A570, Fy=55,000 PSI NOTES: USE @ ALL BRACE LOCATIONS TYP. t 1 5/8" r 7GA.4 5/16"0 SAFETY PIN 7/16" Q1 GR 55 RIVET 6" `2" 1 1 3 3/8" B r 4 DESCRIPTION 3-PIN CONNECTOR MATERIAL 7 GAGE STEEL YIELD ASTM A570, Fy=55,000 PSI NOTES: USE @ ALL BEAM TO COLUMN CONNECTION LOCATIONS. DESCRIPTION 4-1/2" BEAM (INTLK 45E) MATERIAL 1 5 GAGE STEEL YIELD ASTM A570, Fy=55,000 PSI TYPE A S/R, TYPE B D/R RACK t 96" t 60" 192" 60" 60" • 74' NOTES: USE @ ALL BEAM LOCATIONS TYP. 36" t t 12" 11 9/16" 12"MIN 1 9/16" fl L • 1)u -sir 0 3 1/4' DESCRIPTION MATERIAL ROW SPACER 14 GAGE STEEL YIELD ASTM A570, Fy=55,000 PSI 74" FRONT VIEW STORAGE RACK ELEVATIONS SIDE VIEW: D/R SIDE VIEW: S/R NOTES: ATTACH WITH (4) 7/16"0 GR. 5 BOLTS, (2) @ EACH END 07/22/2018 GENERAL PROJECT NOTES 1. DESIGNED PER REQUIREMENTS OF THE 2015 IBC, ASCE 7-10 AND THE 2012 RMI RACK DESIGN MANUAL 2. SEISMIC CRITERIA Ss = 1.438, S1 = 0.535, Fa = 1.00, Fs( = 1.50, Ip = 1.0 (NO PUBLIC ACCESS), Sds = 0.959, Sd1 = 0.535, OCC. CATAG. II, SITE CLASS D, SEISMIC DESIGN CATAG. D 3. STORAGE CAPACITY: TYPE A S/R = 4000# PER LEVEL TYP. TYPE B D/R = 4200# PER LEVEL TYP. 4. ANCHORS HILTI KWIK BOLT TZ ESR #1917 OR POWER SD2 ESR #2502, OR ICC & ENGINEER APPROVED EQUAL. 1/2"O x 3-1/4" MIN. EMBEDT. (4) ANCHOR PER 8X8 EASE PLATE (2) ANCHOR PER 8X5 EASE PLATE 5. PERIODIC SPECIAL INSPECTION IS REQUIRED DURING ANCHOR INSTALLATION. 6. EXISTING S.O.G. CONCRETE THICKNESS & COMPRESSIVE STRENGTH, 6' x 3500 PSI 7. SOIL BEARING PRESSURE 750 PSF @ GRADE OR BETTER 8. ALL RACK INSTALLATIONS AND RACKS MANUFACTURED IN CONFORMITY WITH THIS STANDARD SHALL DISPLAY IN ONE OR MORE CONSPICUOUS LOCATIONS A PERMANENT PLAQUE EACH NOT LESS THAN 50 SQUARE CLEAR, LEGIBLE PRINT. 9. ALL BOLTS GR. 5 OR BETTER. INSTALL TO SNUG TIGHT FIT WITH ALL PLYS IN FLAT CONTACT 10. ALL WELDING PERFORMED IN THE SHOP OF AN APPROVED FABRICATOR BY AWS CERTIFIED WELDERS USING E70XX ELECTRODE OR BETTER. FIELD WELDS, IF ANY, SHALL BE PROVIDED UNDER THE SUPERVISION OF A LICENSED DEPUTY INSPECTOR. 11. THE CLEAR SPACE BELOW SPRINKLERS SHALL BE A MIN. OF 18" BETWEEN TOP OF THE STORAGE AND THE CEILING SPRINKLER DEFLECTOR. 12. SHIMS MAY BE USED UNDER THE BASE PLATE TO MAINTAIN THE PLUMBNESS OF THE STORAGE RACK. THE SHIMS SHALL BE MADE OF A MATERIAL THAT MEETS OR EXCEED THE DESIGN BEARING STRENGTH (LRFD) OR ALLOWABLE BEARING STRENGTH (ASD) OF THE FLOOR. THE SHIM SIZE AND LOCATION UNDER THE BASE PLATE SHALL BE EQUAL TO OR GREATER THAN THE REQUIRED BASE PLATE SIZE AND LOCATION. SHIMS SHALL BE INTERLOCKED OR WELDED TOGETHER IN A FASHION THAT CAN TRANSFER ALL THE SHEAR FORCES AT THE BASE. BENDING IN THE ANCHOR ASSOCIATED WITH SHIMS OR GROUT UNDER THE BASE PLATE SHALL BE CONSIDERED IN THE DESIGN OF THE ANCHOR BOLTS. 13. THE PRODUCT SHOWN ON THE DETAILS HEREIN IS ASSUMED TO BE IN GOOD, UNDAMAGED CONDITION. THE PRODUCT MUST BE FREE OF ANY DAMAGE AND/OR FABRICATION DEFICIENCIES OR IRREGULARITIES IT IS THE RESPONSIBILITY OF THE OWNER, USER, PRODUCT PROVIDER AND/OR INSTALLER OF THE COMPONENTS TO NOTIFY SED, INC IN WRITING, OF ANY DAMAGE, DEFICIENCIES OR IRREGULARITIES. 14. IT IS THE RESPONSIBILITY OF THE OWNER AND/OR USER OF THE COMPONENTS SHOWN HEREIN TO NOTIFY SED, INC OF ANY DAMAGE OR DEFICIENCIES IN THE SYSTEM DURING USE. THIS INCLUDES SUCH OCCURRENCES SUCH AS IMPACT DAMAGE TO THE COMPONENTS FROM FORKLIFT OR HEAVY MACHINERY, IMPACT FROM DROPPED LOADS ON THE SYSTEM, DAMAGE TO SYSTEMS BY IMPROPER USE OR INSTALLATION, ETC. THE USER OF THE PRODUCT MUST NOTIFY SED, INC IN WRITING SHOULD ANY DAMAGE OR DEFICIENCY OCCUR TO THE PRODUCT SHOWN HEREIN. IT IS THE RESPONSIBILITY OF THE OWNER AND/OR USER TO MAINTAIN THE SAFETY AND PROPER USE OF THE STORAGE PRODUCT SHOWN HEREIN. 15. IT IS THE RESPONSIBILITY OF THE OWNER/USER OF THE STORAGE SYSTEM SHOWN HEREIN TO REPAIR OR REPLACE ANY COMPONENT THAT IS DAMAGED OR OTHERWISE DEFICIENT. 16. THE OWNER SHALL MAINTAIN THE STRUCTURAL INTEGRITY OF THE RACK SYSTEM BY ASSURING PROPER OPERATIONAL, HOUSE KEEPING AND MAINTENANCE PROCEDURES, BUT NOT LIMITED TO THE FOLLOWING: a. PROHIBIT ANY OVER LOADING OF ANY PALLET POSITIONS AND OF OVERALL RACK SYSTEMS. b. REGULARLY INSPECT FOR DAMAGE. IF DAMAGE IS FOUND, IMMEDIATELY UNLOAD THE AFFECTED AREA AND REPLACE OR REPAIR ANY DAMAGED COLUMNS, BEAMS, OR OTHER STRUCTURAL COMPONENTS. c. REQUIRE ALL PALLETS TO BE MAINTAINED IN GOOD, SAFE, OPERATING CONDITION. d. ENSURE THAT PALLETS ARE PROPERLY PLACED ONTO PALLET LOAD SUPPORT MEMBERS IN PROPERLY STACKED AND STABLE POSITION. e. REQUIRE THAT ALL GOODS STORED ON EACH PALLET TO BE PROPERLY STACKED AND STABLE. f. PROHIBIT DOUBLE STACKING OF ANY PALLET POSITION, INCLUDING THE TOP MOST POSITION, UNLESS THE RACK SYSTEM IS SPECIFICALLY DESIGNED FOR SUCH LOADING. g. THE OWNER AND/OR USER OF THE RACK SYSTEM MUST PROVIDE MEASURES TO MITIGATE DAMAGE TO THE STORAGE RACK BY USE OF IMPACT PROTECTIVE DEVICES IN AREAS WHERE FORKLIFT AND/OR HEAVY MACHINERY ARE IN USE. BASE PLATE F.F. 4 A A 3 1/4" MIN. EMBED. NOTES: CONFIRM O.A.L. OF ANCHORS WITH INSTALLER TO ENSURE REQUIRED EMBEDMENT IS OBTAINED. a Z O UN cc 1067 INDUSTRY DR. REVIEWED =OR TULWILA, WA 98188 CODE COMPL ANCE 6" APPROVED SLAB NOV 30:vs City of Tukwila BUILDING DIV SI( DESCRIPTION HILT! KWIK BOLT TZ ANCHOR SIZE I ESR# 0 .we NO. LV-07091 8-7 SHEET NO. 1/2" X 3-1/4" MIN. EMBED. NOTES: SED 1 OF 1 1917 SEE NOTE #4 ABOVE FOR ANCHOR SPECS j