DEVELOPMENT PERMIT
2523049010 Permit Number: D18-0297
16711 WEST VALLEY HWY
Project Name: NC MACHINERY
Issue Date: 10/18/2018
Permit Expires On: 4/16/2019
Owner:
Name:
Address:
HARNISH GROUP INC
17035 W VALLEY HWY , TUKWILA, WA,
98188
Contact Person:
Name: JASON WELLS
Address: 22757 72 AVE S - SUITE E-104 , KENT,
WA, 98032
Contractor:
Name: COLUMBIA CONSTRUCTION INC
Address: PO BOX 621, DONALD, OR, 97020
License No: COLUMCI877L5
Lender:
Name: HARNISH GROUP INC
Address: 17035 W VALLEY HWY, TUKWILA, WA,
98188
Phone: (206) 379-7090
Phone: (503) 427-0304
Expiration Date: 8/26/2019
DESCRIPTION OF WORK:
TPO REROOF
Project Valuation: $132,055.00
Type of Fire Protection: Sprinklers:
Fire Alarm:
Type of Construction: VB
Electrical Service Provided. by: TUKWILA
Fees Collected: $3,132.50
Occupancy per IBC: B
Water District: TUKWILA
Sewer District: TUKWILA
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
International Fuel Gas Code:
2015
2015
2015
2015
2015
National Electrical Code:
WA Cities Electrical Code:
WAC 296-46B:
WA State Energy Code:
2017
2017
2017
2015
Public Works Activities:
Channelization/Striping:
Curb Cut/Access/Sidewalk:
Fire Loop Hydrant:
Flood Control Zone:
Hauling/Oversize Load:
Land Altering:
Landscape Irrigation:
Sanitary Side Sewer:
Sewer Main Extension:
Storm Drainage:
Street Use:
Water Main Extension:
Water Meter:
Volumes: Cut: 0 Fill: 0
Number: 0
No
Permit Center Authorized Signature:
0
Date: (0(/////''
1 hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development per rry� and agr to t %conditions attached to this permit.
Signature:
Print Name:
kit
/At De)
Date: /0 --7(fir
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: ***BUILDING PERMIT CONDITIONS***
2: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
3: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
4: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
on satisfactory completion of this requirement.
6: Prior to final inspection for this building permit, a copy of the roof membrane manufacturer's warranty
certificate shall be provided to the building inspector.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1700 BUILDING FINAL**
0103 PRE-REROOF
CITY OF TUKWILA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
I�
Building Permit No. 1 3 (L - q j
Project No.
Date Application Accepted: 9,10 • 10
Date Application Expires:
(For office use only)
CONSTRUCTION PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**Please Print**
SITE LOCATION
Site Address: I G/1 I wen" " V Au..E
Tenant Name: f IC_- 1/1/14c4:1(,0
King Co Assessor's Tax No.:
Suite Number:
New Tenant:
PROPERTY OWNER
Company Name: Co l� M,e, ► of C,► S'ri2UC.T1ot
Name: J „A._(4,1(„).9_41,
Name::NIL MALN ►t.) C 21 C 0
.
Contr Reg No.: Exp Date:
Address: l o 's \tJEST vAt_t..0 y
r1 vJ'i
Phone: zig.(0 -41 4.0 Fax:
City: "L) l4 -W ►L p State: wA
Zip: cii t
w
CONTACT PERSON — person receiving all project
communication
Company Name: Co l� M,e, ► of C,► S'ri2UC.T1ot
Name: J „A._(4,1(„).9_41,
City: 1 / r,,NT State: W A Zip: Cma.Z
Address: zi 3 2 4s'Atibr 3 .F.l 6-r oil
fZZii"p:
Contr Reg No.: Exp Date:
City: 1(4,1- State: w A. (1
Z
Phone: zig.(0 -41 4.0 Fax:
Address:
Email: L� GU e I I / J l� It-('2cv ( v1- i.J , uvvi
asp n
GENERAL CONTRACTOR INFORMATION
Company Name: Co l� M,e, ► of C,► S'ri2UC.T1ot
Address: 2215-1 12? " AVE 5 SvtzE E-1(
City: 1 / r,,NT State: W A Zip: Cma.Z
Phone: 253 _23 (0_ 79114Fax: 253- 2v • 2S€ S
Contr Reg No.: Exp Date:
Tukwila Business License No.:
H:\Applications\Fornxt-Applications On Line \2011 Applications\Permit Application Revised - 8-9-11.docx
Revised: August 2011
bh
2vS
Floor:
0 Yes ..No
ARCHITECT OF RECORD
Name: N AR ) IS
(7) OvP
Company Name:
VAu.ey lAw `I
City: 'rV K ...i t LA
Architect Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Email:
ENGINEER OF RECORD
Name: N AR ) IS
(7) OvP
Company Name:
VAu.ey lAw `I
City: 'rV K ...i t LA
Engineer Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Email:
LENDER/BOND ISSUED (required for projects $5,000 or
greater per RCW 19.27.095)
Name: N AR ) IS
(7) OvP
Address: no..,_ WEST
VAu.ey lAw `I
City: 'rV K ...i t LA
State: W ix Zip: c1 t l $ g
Page 1 of 4
BUILDING PERMIT INFORMATION — 206-431-3670
Valuation of Project (contractor's bid price): $ 1,3Z1 ()cc Existing Building Valuation: $
Describe the scope of work (please provide detailed information): TP® r-ei2 rovE
Will there be new rack storage? D Yes
g No If yes, a separate permit and plan submittal will be required.
Provide All Building Areas in Square Footage Below
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft):
Floor area of principal dwelling:
Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard:
Compact: Handicap:
Will there be a change in use? ❑ Yes ❑ No If "yes", explain:
FIRE PROTECTION/HAZARDOUS MATERIALS:
❑ Sprinklers 0 Automatic Fire Alarm 0 None ❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes 0 No
If "yes attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H:\Applications\Forms-Applications On Line \2011 Applications\Fermit Application Revised - 8-9-11 .docx
Revised: August 2011
bb
Page 2 of 4
Existing
Interior Remodel
Addition to
Existing
Structure
New
Type of
Construction per
LBC
Type of
Occupancy per
IBC
1St Floor
2nd Floor
3rd Floor
Floors thru
Basement
Accessory Structure*
Attached Garage
Detached Garage
Attached Carport
Detached Carport
Covered Deck
Uncovered Deck
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft):
Floor area of principal dwelling:
Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard:
Compact: Handicap:
Will there be a change in use? ❑ Yes ❑ No If "yes", explain:
FIRE PROTECTION/HAZARDOUS MATERIALS:
❑ Sprinklers 0 Automatic Fire Alarm 0 None ❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes 0 No
If "yes attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H:\Applications\Forms-Applications On Line \2011 Applications\Fermit Application Revised - 8-9-11 .docx
Revised: August 2011
bb
Page 2 of 4
PERMIT APPLICATION NOTES —
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING 0 R MUT ZED AGENT: /� `G f
Signature: Date: `� /4'
Print Name: Jk 21 (/" e/($ Day Telephone: ZiP6 Zs%
774
Mailing Address: ZZ � fi �Z " �S J *Pit / f W 4`
H:\Applications\Forms-Applications On Linc\2011 Applications\Permit Application Revised - 8-9-1 I.docx
Revised: August 2011
bh
141 /4 1 32--
City State
Zip
Page 4 of 4
Cash Register Receipt
City of Tukwila
DESCRIPTIONS
PermitTRAK
ACCOUNT I QUANTITY
PAID
$3,132.50'
D18-0297 Address: 16711, WEST VALLEY HWY Apn: 2523049010
$3,132.50
DEVELOPMENT
$3,041.10
PERMIT FEE
R000.322.100.00.00
0.00
$1,827.94
PLAN CHECK FEE
R000.345.830.00.00
0.00
$1,188.16
WASHINGTON STATE SURCHARGE
8640.237.114
0.00
$25.00
TECHNOLOGY FEE
$91.40
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R15471
R000.322.900.04.00 0.00
$91.40
$3,132.50
Date Paid: Tuesday, September 25, 2018
Paid By: COLUMBIA CONSTRUCTION SERVICES
Pay Method: CHECK 55901
Printed: Tuesday, September 25, 2018 11:04 AM 1 of 1
SYSTEMS
A
ET ROOFING & COLUMBIAST
REVISIONS
No ch npFr sh911 he made to th
of ,Airy' : th' t t prior approv
' , i••.; 7�1 6u-Iriing Division
'Lig will require a new plan submittal
i.J1j may include additional plan review fees. ( CAT
16711 West Valley Highway
CPT
FILE COPY
Permit No. 5-0)4
Plan review approval is subject to errors and omissions.
Approval of construction documents does not authorize
the violation of any adopted coda or ordinance. Receipt
of approved Field Copy and conditions is acknowledged:
By:
Date:
City of Tukwila ;
BUILDING DIVISION
OREGON CCB: 116607 WASHINGTON L & I: CCCD COLUMRS883RL
.'npat
_ Ja i . J FOR.
172 4�: chanicall
i `� 1: acts icai
_�'1 mbing
i'as Piping
City of Tukwila
B1N NG DIVISION
REVIEWED FOR
CODE COMPLIANCE
APPROVED
OCT 102018
/11- 144
City of Tukwila
BUILDING DIVISION
RECEIVED
CITY OF TUKWILA
SEP 1 8 2018
PERMIT CENTER
`6•0110
Presented By:Jake McMurchie
Columbia Roofing and Sheet Metal
CALIFORNIA CCB: C39934544
18525 SW 126th Place, Tualatin, OR 97062 oHi.
503.684-9123 tax 503-218-4006
EN.'" ROOFING & COLUMBIAS
Columbia Construction Service, Inc.
Jake McMurchie
253-204-1266
1•iakem@r'eroofnow.com
3
RE: NC Machinery
Thank you for the opportunity to submit this proposal. I hope you find everything in order.
You will find serval documents that follow this letter.
These include:
• Team introduction
• Core values
• Pictures that discuss the current condition of the roof
• Solutions
• Roof Condition Grade
Logistics '
• Roofing System
• Warranty ,,.t ti_z t
• Proposal with Pricing
�:: Awards and References
Please take a look through all of the options and feel free to contact me with any
questions or concerns. We look forward to working with you ondhis proj!cf l
r ,
Best Regards,
Jake M Mur'
�e
Comme ciao RodIir'Co
OREGON CCB: 1 16607
•
4 `
✓ r • •
WASHINGTON L & I: CCCD COLUMRS883RL CALIFORNIA CCB: C39934544
18525 SW 126th Place, Tualatin, OR 97062 r,: 503.684-9123 in. 503-218-4006
ET ROOFING & COLUMBIAST
CORE VALUES
Safety First!
Work free from harm and communicate issues. We build safety into everything we do. We
care about our customers' safety too. We do background checks and drug screening.
Integrity
Honesty in all we do. Walk the talk.
Respect
Treat each other with dignity, valuing and benefiting from personal differences. It takes all
types to build a performing team!
Relationships
We value strong relationships in all areas; with employees, clients (internal and external),
and our vendors.
Results
We strive to achieve excellent results. We accept personal responsibility and
accountability. This means meeting goals, completing jobs on time, controlling costs,
delivering the proper scope, all without sacrificing quality.
OREGON CCB: 116607
WASHINGTON L & I: CCCD COLUMRS883RL
REVIEWED FOR
CODE COMPLIANCE
APPROVED
OCT 10 2018
Cila
BUILD GTukwDIVIS ON
CALIFORNIA CCB: C39934544
18525 SW 126th Place, Tualatin, OR 97062 affice 503.684-9123 Fax 503-218-4006
� COLUMBIAs
flD:UF EIDNDiTIUN R'EPDT
Columbia Roof Rating System
A+ - The roof system is in excellent condition with no defects. The roof
system should be expected to perform for an additional 15-25 years*.
A - The roof system is in very good condition with very minimal defects.
The roof system should be expected to perform for an additional 12-18
years*.
B - The roof system is in good condition with minor defects. The roof
system should be expected to perform for an additional 10-15 years*.
C - The roof system is in fair condition with noted defects that could
decrease the life of the roof if not properly maintained. The roof system
should be expected to perform for an additional? -10 years*.
D - The roof system is in poor condition with various defects and is at
potential risk of failure if the defects are not remedied. The roof system
should be expected to maintain watertight integrity for an additional 4-7
years with proper maintenance*.
E - The roof system is in very poor condition and is showing signs of
potential failure. These problems may or may not be repaired depending
upon the severity. The roof system should be expected to maintain
watertight integrity for an additional 1-3 years with proper maintenance*.
F - The roof system is failing and is in need of replacement.
*Please note that life expectancy is based upon proper maintenance.
Maintenance and repairs should be performed by a professional roofing
contractor. The statements made herein are of opinion and observation
only and do not represent exact life expectancy.
OREGON CCB: 116607
Solution Scope of Work
WASHINGTON L & I: CCCD COLUMRS883RL
CALIFORNIA CCB: C39934544
4,
18525 SW 126th Place, Tualatin, OR 97062 Uff<« 503-684-9123 +oA 503-218-4006
Er ROOFING & COLUMBIAST
TPO Mechanically Attached Systems
1. Tear off and dispose of base flashings along parapet wall and around curb penetrations to
allow for the proper installation of the new roofing system.
2. Furnish and install a Y2" EPS fan fold recover board over the existing roof system and
mechanically attach. This will maintain the existing fire rating for the new roof assembly.
3. Over the recover board, furnish and install a new 60 mil reinforced TPO roof membrane and
mechanically attach to the substrate.
4. All field and base flashing seams will be cleaned before being hot air welded.
5. Furnish and install newTPO base flashings around all curb penetrations.
6. Furnish and install newTPO base flashings around the roof hatch.
7. Fabricate and install a new standard color 26 -gauge metal hatch flashing under the metal
flashing flange of the roof hatch to hold the TPO membrane in place.
8. Furnish and install pre -manufactured inside/outside TPO corner flashings at curb
penetrations, thru wall scupper drains, pitch pans and wall flashings.
9. Furnish and install new pre -manufactured pipe boots on all pipes up to 6" in diameter
complete with a new stainless-steel clamps and sealant.
10. All pipes larger than 6" in diameter will be field wrapped with unreinforced TPO membrane
complete with a new stainless-steel pipe clamp and sealant.
11. All pipes where a pre -manufactured pipe boot is not feasible will be field wrapped with
unreinforced TPO membrane complete with a new stainless-steel pipe clamp and sealant.
12. Furnish and installTPO patches at alt T -Joints in the field membrane.
13. At all gas and electrical lines, furnish and install pre -manufactured TPO pitch pans.
14. Furnish and install pre -manufactured TPO pitch pans around the line sets off the condensing
units.
15. Furnish and install a one -part poly -urethane rubberized pitch pan sealant in each pitch pan.
16. Furnish and install newTPO base flashings at all parapet walls that will extend up and across
the top of all walls.
17. Furnish and install a metal anchor bar to the top of the flashing and mechanically attach every
12" on center.
18. Furnish and install newTPO membrane in the roof drain assemblies and set in water cut off
mastic. Install the clamping ring to the drain body compressing the TPO membrane into the
water cut off mastic to insure a watertight seal. Reinstall drain bolts complete with washers.
replacing as needed on a time and materials basis.
19. Reinstall the drain screens back in place once the drain rings are installed.
20. Fabricate and install new 26 -gauge galvanized clip metal to be installed along t e o D FOR
all parapet walls. Mechanically attach the clip to the wall. CODE COMPLIANCE
21. Fabricate and install new pre -painted standard color 26 gauge galvanized stan h ing seArliPROVED
coping cap around the perimeter of all parapet walls. All new metal coping cap will be
installed by hooking the front face into the clip metal to secure the face of the m tal to tijaT 10 2018
building. Mechanically attach to the wall with new neoprene gasketed fastener
22. Fabricate and install new pre -painted standard color 26 -gauge metal counter f ashings
around each HVAC unit and mechanically attach to the curb with new neoprene askeektity of Tukwila
fasteners. BUILDING DIVISION
23. Upon completion of all the work we will have the manufacturer's representativ
roof for completeness and for the issuance of the factory warranty.
OREGON CCB: 116607
WASHINGTON L & I: CCCD COLUMRS883RL CALIFORNIA CCB: C39934544.
18525 SW 126th Place, Tualatin, OR 97062 o81ce 503-684-9123 tax 503-218-4006
� COLUMBIA
24. Upon completion of the above work, remove all tools and debris and leave the site in a clean
and orderly condition.
• OREGON CCB: 116607
ABOUTTHE PRODUCT (TPO)
WASHINGTON L & I: CCCD COLUMRS883RL
CALIFORNIA CCB: C39934544
18525 SW 126th Place, Tualatin, OR 97062 oitcv 503-684-9123 tar 503-218-4006
ET ROOFING & COLUMBIAST
EXPERIENCE THE CARLISLE DIFFERENCE
'Sure Weld TPO
Mechanically Fastened Roofing Systems
Typical Applications
O Sure -Weld TPQ Reinforced Membrane
0 Carlisle Insulation Fasteners and Plates
0 Acceptable InsulaUan
0 Appraysd Raaf asci►
O Membrane Fasteners and Plates
System Features & Benefits:
3t-NSlo] a membranes
Carlisle's Sure -Weld TPO reinforced membrane is a; premium, heat weldable, single -ply
thermoplastic polyolefin (TPO) sheet designed for new roof construction and re -roofing
applications. Physical properties of the membrane are enhanced by a strong polyester
fabric that is encapsulated between the TPO-based top and bottom plies. The combination
of the fabric and TPO plies provides high breaking and tearing strength, as well as
excellent puncture resistance. The relatively smooth surface of the membrane produces
a total surface fusion weld that results in a consistent, watertight, monolithic roof
assembly. The membrane is environmentally friendly and safe to install.
REVIEWED FOR
DE COMPLIANCE
APPROVED
OCT 10 2018
City of Tukwila
ILDING DIVISION
OREGON CCB: 116607
WASHINGTON L & I: CCCD COLUMRS883RL
CALIFORNIA CCB: C39934544
18525 SW 126th Place, Tualatin, OR 97062 O- 503.684-9123 fax 503-218-4006
Er COLUMBIAs
We can install a new roof over your current system, this is called a re-cover. It gives you an
opportunity to add insulation, delete abandoned penetrations, and furnish the building with
new sheet metal coping cap. Here are the steps.
STEP#1=MEASURE ROOF
STEP#2= LOAD THE PROPER AMOUNT OF MATERIAL
STEP#3= FASTEN COVER BOARD/INSOLATION PACKAGE OVER EXISTING ASSEMBLY
OREGON CCB: 116607
WASHINGTON L & I: CCCD COLUMRS883RL CALIFORNIA CCB: C39934544
18525 SW 126th Place, Tualatin, OR 97062 4 . 503-684-9123 503-218-4006
Er ROOFING & COLUMBIAST
STEP#4= INSTALL TPO OVER THE COVER BOARD
STEP#5= HEATWELD THE PENETRATIONS AND BUTTON EVERYTHING UP
REVIEWED FOR
CODE COMPLIANCE
APPROVED
OCT 102c8
City of Tukwila
BUILDING DIVISION
*THIS PROJECT IS BID AS A RECOVER, MECHANICALLY ATTACHED TPO SYTEM OVER
FANFOLD MOISTURE BARRIER. AFTER PROPER INSTALLATION THE MANUFACTURER
WILL GRANT.A 20 YEAR NDL WARRANTY.
OREGON CCB: 116607
WASHINGTON L & I: CCCD COLUMRS883RL
CALIFORNIA CCB: C39934544
18525 SW 126th Placa, Tualatin, OR 97062 off c 503-684-9123 fax 503-218-4006
ErCOLUMBIA
ROOFING & SHEET METAL
CARLISLE'S CARLISLE'S
PERFECTJN'PERFECT/CM
2015 Perfection Award Recipients
k BROOKS PAORNG INC. PALMYRA NJ
MR OF NOIR C4RFNJkA, RX. I�RNERSVILIE NG
A.CADEUYROORNG,RIC. W;ROFA CO
ALL AMERICAN QrERPRLSE&, RE. A.BLIDJEAOUE NM
ALL AS.ATHETI WATERPRODF01G INC. MORRAY UT
ALLIANCE ROOFING Go,. Ana SANTA CLARA CA
fJ.Pi°NE RODFIE CO.. RIC. SPARKS Ira
' AMERICA ROOF SOLUTIONS VIC_ MANOR Tx
AMERICAN ROOFING & SBM AIC. WEST RAF.'FIaO FIY
ANMNOJOHIiSONCOMPANY CRY DF INDUSTRY CA
'ARRCAV ROOFING & SUPPLY COKIPAIN Y Y01OIAG MI
9&LGElETWLCOINTPACTOF :INC LOGANYRLE GA
BEST COI.;RALiUNSSG CES. INC GARDENA CA
BEST R00FI% FORT LAUDERDALE FL
I NGHAM-TAYLOR ROOFING CO-, INC. HAYWARD CA
*BLACK HAW ROOF CO, INC. CEDAR FALLS W
BLACK HAWK ROCP OF R„ WC. FLtRTAHOME FL
BLOOM HOOD SYSTEMS, INC. BRIGHTON MI
BOSI.ICK ROOFING. VC. UNIVERSITY PLACE WA
' 9ROX INDUSTRIES, INC.LAIVTOPI OK
BUCKLEY ROOFING COMPANY. INC WICHITA. KS
BURNS &SCALG- OHIO, RC. MARJON OH
1.MS. ROOFING. INC. FORT WAYNE IN
CO. RECK & SONS ROORNG & SHEET METAL WATGW ILLS ME
COREY OAKIEY & COMPANY SANDSTDN VA
CGS CO/PALCTIOS LTD 000100000 AB
MRS ANDERSEN ROOFING & MTIC CO..I1C. HOPELAWIT NJ
CHRISTENSEN & MCLFAN ROOFING EDMONTON A9
COLLIER ROOFING COMPANY INC. NASHIILLE TN
COLLIHS 100FUIG, INC LBI UT
c0UMiBIAICF1116'&SHEET METAL TLWLAIIN OR
COMMERCIAL ROOFERS, 110. LAS VEGAS NV
COMMERCIAL SOLUTIONS INC RALEIGH NC
CATTEHMPJI & COMPANY, INC. MINSTER ON
TRAM ROOFING COMPANY SAN ANTONIO TX
CUDAHY ROOFING & SWAY, Di:. CUDAHY W9
D.C. TAYLOR CO. CO10OR0 CA
DELTA COINSTRUCTION CO. INC. MENOMONEE FALLS WI
GEWALD 110001110 COMPANY RIC. CENTRAL SOIIARE NY
'00N LARGE}IT ROOFING N0.RRISONBl1RG VA
DONALD B.5011TH,INC. HANOWR PA
DUSTY GREER 1000100 INC 1.101'HDE GA
OM COMMEP.CIALROOFING LCC EAST HARTFORD OT
'EAGLE >ONrNNGCOMPANY BEND OR
EAGLE ROOFING, LLC TUCSON AZ
'KAYO ROOFING. INCORPORATED
MERIT ROOFING SYSTEMS INC.
MID -MIAMI ROOFING. INC.
MIDWEST ROOFING & INSULATION °DURAIN
PAILCON CONSTRUCTION CORP.
*MISSOURI 001100R5 SERVICE
MOIAHAN & LOU"GHLIN. INC.
PADRE CONTRACTING & CO NSULTING. I14C.
MORRISTOWN ROOnIX COMPANY. INC.
'MOUNTAIN ROOFING INC.
MOUNTAIN STATES MORNS. INC.
NATIONS 10CF
NATIONS ROOF CEhTPot. LLG
UMW' ROOFING
FiO0ADAARCHITECTI.AL METALS INC
INC INC.
P. CWOLLI I WC.
PACIFIC TECH CONSTRICTION
'PAUL'S SHEET METAL.010.
'PERFORMANCE R000NG SYSTEMS. 010
"PERKES 100FIA5INC.
PORTER ROOFING CONTRACTORS. INC.
PREFERRED, RIC.
PREMILDA ROOFING SYSTEMS
00000N, INC.
PYRAMID ROOFING COMPANY, INC.
114011EY ROOFING COMPANY. INC.
'RANK PROOF ROOMS
R#OIIOW ROOFING COMPANY 11C.
RAPPAHANNOCK000014000MRANY
'RAUIR WORK LIMITED
'RIVET! RO0FI40(S41SKI Lill.
REi1BLE ROOFING - COMMERCIAL WC.
' 00141110 L SEFAEFAG COMPANY
' BONGO, INC.
R5S ADORNS SERVICES & SOLUTIONS
RUFF ROOFERS. RIG.
S.D. CARP1Ri1ERS SONS. INC.
SA4 43015 %OFIN& & SOWS
SBR CONSTRUCTION, INC
scIlwlcKERrs TECTA AMERICA
SEAL NESS 5YSTEMS.INC
SHAVER ROOFING SEANCES LLC
SKYLINE C00TRACTXTG & ROOFING CORP.
SKIER R000NG OF OREGON. LLC
CON0RD
RICNARDSON
MONROE
EVANSVILLE
WEST BABYLON
JEFFERSON CrTY
HUDSON FALLS
PORT JEFFERSON STATION
WHRE50URG
ROANOKE
GARDEN CITY
WAUKESHA
ROWLETT
BRESLAIU
GALT LAKE CRY
HARRISBURG
DOVER
KELSO
RICE TAKE
OICHRELO
OGDEN
MCMINNVIUE
FORT WAYTE
HOUSTON
RANBLEMAN
SIKESTON
MIRAGE
444040RAGE
READING
FREDEiICKSBURG
WM050R
REGINA
LEXINGTON
EPHRATA
MAPLEWOOD
SAINT LOUIS
BALTIMORE
ARGYLE
WEST 5ENECA
ORANGE
MANKATO
MEMPHIS
HIGH POINT
TAUNTON
TIGARD
4111
Tx
014
114'
MO
NY
NY
TN
KA
IO
111
TX
014
NT
N1
WA
WI
119
UT
TN
01
TX
11C
MO
TNN
440
Pit
VA
074
SK
KY
114
Ill
!AO
MD
4N
PN
rA
MN
114
PIC
MA
OR
COLUMBIA ROOFING IS REGARDED AS ONE OFTHE PREMIER CONTRACTORS IN THE
PACIFIC NORTHWEST. WE HANG OUR HAT ON A JOB WELL DONE
iimimmearminiummorgourntm
ilit®■ ■■■■1■■j :-� iliti i 9 21
INAS' 911F7
•
PERFECT/kik!
wip:a I■■!itE!! " ®■ e
...
■■■ - ".. :;i �■®ELT®■
■■■moi ■■■■■ ■®■�■®�
Carlisle SynTec Systems' Perfection Award and Perfection Council were established in 2011 as a way to recognize those
authorized applicators who demonstrate a commitment to perfection on every Carlisle installation.
Each year, the Perfection Award honors contractors whose exceptional installation quality results in a warranty claim
performance that ranks in the top 5% of all U.S. and Canadian applicators. A small number of Perfection Award winners are
selected to serve on Carlisle's Perfection Council for a one-year period, acting as an advisory board to help determine how
Carlisle can best support its contractor network. Perfection Council membership is determined by a contractor's participation in
Carlisle training activities, a low incident rating of warranty claims, and a high percentage of "walk-offff" inspection approvals.
OREGON CCB: 116607
WASHINGTON L & I: CCCD COLUMRS883RL
CALIFORNIA CCB: C39934544
18525 SW 126th Place, Tualatin, OR 97062 office 503-684-9123 fox 503-218-4006
�4 COLUMBIAROOFING & ST
Our Awards & Accomplishments
Carlisle Perfection Award 2013, 2014, 2015, 2016, 2017
Carlisle Perfection Council 2014, 2016, 2017
Carlise ESP Award Winner 2016, 2017, 2018
GAF Master Select Contract
RoofConnect Key Link Award Winner for 2011
2013 and 2014 Fastest Growing Private Companies in Oregon
OHCA Endorsed partner since 2011
IREM "Sponsor of the Year" 2013
IREM "Friend of the Year" 2011
OHCA/OCAL Innovative Product/Service Award 2001
Certificate of Achievement, Roof Asset Management 1999, presented to Mark Carpenter
Certificate of Achievement, Roofing Technologist 1999, presented to Mark Carpenter
Community Involvement
Vital Life Foundation
Ronald McDonald House
Mittens and More
Oregon Health Care Foundation
REVIEWED FOR
American Cancer Society CODE COMPLIANCE
APPROVED
Little league team sponsor OCT 10 2018
OREGON CCB: 116607
WASHINGTON L & I: CCCD COLUMRS883RL
City of Tukwila
BUILDING DIVISION
CALIFORNIA CCB: C39934544
18525 SW 126th Place, Tualatin, OR 97062 .ff.c, 503-684-9123 tax 503-218-4006
COLUMBIAROOFING & ST
CARLISLE'S
PERFECT
A W A R D
"Columbia Roofing & Sheet Metal receives industry's most prestigious award"
June 7th, 2013 Portland Business Journal
"Columbia Roofing and Sheet Metal received the 2013 Perfection Award from Carlisle
SynTec Systems, a leading manufacturer of single -ply roofing materials. The award,
determined by a number of installation quality metrics, recognizes only Carlisle's most
dedicated and quality -minded authorized contractors."
OREGON CCB: 116607
WASHINGTON L & I: CCCD COLUMRS883RL
CALIFORNIA CCB: C39934544
18525 SW 126th Placa, Tualatin, OR 97062 off ce 503-684-9123 Fax 503-218-4006
3/1/2019
City of Tukwila
Department of Community Development
JASON WELLS
22757 72 AVE S - SUITE E-104
KENT, WA 98032
RE: Permit No. D18-0297
NC MACHINERY
16711 WEST VALLEY HWY
Dear Permit Holder:
Allan Ekberg, Mayor
Jack Pace, Director
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric
Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null
and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if
the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 4/16/2019.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each
inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire.
Address your extension request to the Building Official and state your reason(s) for the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 4/16/2019, your permit will become null and void
and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
Bill Rambo
Permit Technician
File No: D18-0297
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
PERMIT COORD COPY c5
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: D18-0297 DATE: 09/18/18
PROJECT NAME: NC MACHINERY
SITE ADDRESS: 16711 WEST VALLEY HWY
X Original Plan Submittal
Response to Correction Letter #
Revision # before Permit Issued
Revision # after Permit Issued
DEPARTMENTS:
AwC
Building Division
Public Works
11111111111111
n
Am
Fire Prevention
Structural
Planning Division
nPermit Coordinator
n
at
PRELIMINARY REVIEW:
Not Applicable
(no approval/review required)
DATE: 09/20/18
Structural Review Required
REVIEWER'S INITIALS: DATE:
n
APPROVALS OR CORRECTIONS:
Approved
Approved with Conditions
Corrections Required Denied
(corrections entered in Reviews) (ie: Zoning Issues)
DUE DATE: 10/18/18
n
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg 0 Fire ❑ Ping 0 PW 0 Staff Initials:
12/18/2013
COLUMBIA CONSTRUCTION IN
Home Espanol Contact
Safety & Health Claims & Insurance
Washington State Department of
40 Labor & Industries
Search L&I
Page 1 of 2
'VtArt
A -Z index Help My.l.,&1
Workplace Rights Trades & Licensing
COLUMBIA CONSTRUCTION INC
Owner or tradesperson
PLACEK, DARREN TODD
Principals
PLACEK, DARREN TODD, PRESIDENT
DIRKS, SHERRY ANN, SECRETARY
WA UBI No.
603 307 245
PO BOX 621
DONALD, OR 97020
503-427-0304
Business type
Corporation
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor Active.
Meets current requirements.
License specialties
GENERAL
License no.
COLUMCI877L5
Effective — expiration
07/05/2013— 08/26/2019
Bond
._...........
Developers Surety & Indem Co $12,000.00
Bond account no.
662304C
Received by L&I Effective date
06/24/2013 06/07/2013
Expiration date
Until Canceled
Insurance
...........................
Ohio Security Ins Co $1,000,000.00
Policy no.
BKS57305669
Received by L&I Effective date
05/03/2018 05/13/2017
Expiration date
05/13/2019
Insurance history
Savings
.........._..._.......
No savings accounts during the previous 6 year period.
Lawsuits against the bond or savings
No lawsuits against the bond or savings accounts during the previous 6 year period.
L&I Tax debts
No L&I tax debts are recorded for this contractor license during the previous 6 year period, ut some debts
may be recorded by other agencies.