Loading...
HomeMy WebLinkAboutPermit D18-0351 - ABDI ADAN - INTERIOR DEMOLITIONABDI ADAN DEMO 3425 S 146TH ST EXPIRED 05/12/2019 018-0351 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 0040000827 3425 S 146TH ST Project Name: ABDI ADAN DEMO DEVELOPMENT PERMIT Permit Number: Issue Date: Permit Expires On: D18-0351 11/13/2018 5/12/2019 Owner: Name: Address: JOYA JORGE & MARIA 2130 S DUPONT DR ROOF CORP OF WA, ANAHEIM, WA, 92806 Contact Person: Name: SCOTT BOYER Phone: (206) 235-0935 Address: 12216 CORLISS AVE N , SEATTLE, WA, 98133 Contractor: Name: AFFIDAVIT - ABDI ADAN Phone: Address: License No: Expiration Date: Lender: Name: Address: I 11 DESCRIPTION OF WORK: EXTERIOR SHELL (WALLS AND WINDOWS TO REMAIN). REMOVAL OF ALL INTERIOR NON -LOAD BEARING WALLS, DOORS, TRIM, PHONE/DATA LINES, ELECTRICAL POWER AND LIGHTING AND DUCTWORK. Project Valuation: $3,000.00 Type of Fire Protection: Sprinklers: Fire Alarm: Type of Construction: VB Electrical Service Provided by: TUKWILA Fees Collected: $265.03 Occupancy per IBC: B Water District: 125 Sewer District: VALLEY VIEW Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Volumes: Cut: 0 Fill: 0 Number: 0 No Permit Center Authorized Signature: 1h41L fl Date: Il I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local lawn regulating construction or the performance of work. I am authorized to sign and obtain this development p rmit and agree the conditions attached to this permit. Signature: Print Name: PAA/1" Date: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 4: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 5: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 6: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 7: ***BUILDING PERMIT CONDITIONS*** 8: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 9: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 10: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 11: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 12: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0101 PRE -CONSTRUCTION CITY OF TUA�..ILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building P .nit No. Project No. CI= Date Application Accepted: Date Application Expires: q• For ojtce use onl CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: L70¢c'Q9 -O e ?"r Site Address:IA-Z.<S . ) 4 (o�'1d ST 11)kUlMtA) 14/4 11S Suite Number: Tenant Name: Agri A i2A ) PROPERTY OWNER Name: �.��oK0,1„A 7taa,r,:c4xt, Address: Z t 3 DS, ni`,turf- t' . City: ANA N Cl 1--1 State: CA Zipoosc CONTACT PERSON - person receiving all project communication Name: ��.t.� � &,,i,64. Address: t zz 1 G C.o✓1-Lt 55 A/- A ) City: SFA- State:w4 Zip: st;; Phone: 2Q(:), Z 35 -, c x: 2- p . 6,z3. -7605- 7a S Email: Email:.+4 1 c 1, co , iv bo�/ers co , J GENERAL CONTRACTOR INFORMATION Company Name: H ALL,612 Aac+4I "(i c:Ts «-c. Company Name: Address: 1221.6 GO . .iss. 74-V.g_ ../j APS C, Address: 1PN17 /*l PJ ? D r L WOTE'1 City:SPC State: Zip: kllAN- tom' Phone�,O14 q i 1 Contr Reg No.: Exp Date: State: Tukwila Business License No.: Phone: H:'Applications\Forms-Applications On Line\20I2 Applications\Permit Application Revised - 2-7-]2.docx Revised: February 2012 bh Floor: I New Tenant: $1 Yes ❑ .. No ARCHITECT OF RECORD Company Name: H ALL,612 Aac+4I "(i c:Ts «-c. Architect Name: < T o`t,1tJt Address: 1221.6 GO . .iss. 74-V.g_ ../j City: sf4_rrLt StatewAt Zip:c ,133 Phone: go/ • Z7 7-' oc S Fax:Z"b - 6 a3. 700 s - Email: ba YE v -s Cc,++ -lt19 61 wto:t 1 • Ge,2-1 ENGINEER OF RECORD Name: Address: Company Name: Engineer Name: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Address: City: State: Zip: Page 1 of 4 - BUILDING PERMIT INFORMATIer"`- 206-431-3670 Valuation of Project (contractor's bid price): $ .79)600 Existing Building Valuation: $ Describe the scope of work (please provide detailed information): 5><- 11.4 e S) -(6.(_L (Aort.(i 5 4 Iti J 4 t.,rs 12 f J N) _ te6.410km-t_,. !AJ tut , )OA)- CDA -p 127v- 2.r/t.e? w.4 -U � 'o'rt 5) -r-j2 r ►-() til- i off/ ,pro --i9 1- M.45 6.t o- (C PGtnff,2_ L47t-1T►A. 6 P . Will there be new rack storage? ❑ ....Yes ❑ ..No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: 14 PC Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: 1 d Compact: Handicap: Will there be a change in use? Yes 0 No If "yes", explain: G str) t Mi FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers 0 Automatic Fire Alarm 12t None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes jSr No If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM NA - 0 On-site Septic System - For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC st 1 Floor 2) 7 k4 2SF Z) Zoo- A//A.-f a S� C- g 2nd Floor 1.4.)It.4-- t*... ($ I -ot.P At 3rd Floor (, AtZlcr Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: 14 PC Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: 1 d Compact: Handicap: Will there be a change in use? Yes 0 No If "yes", explain: G str) t Mi FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers 0 Automatic Fire Alarm 12t None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes jSr No If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM NA - 0 On-site Septic System - For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 PUBLIC WORKS PERMIT INIf.MATION — 206-433-0179 Scope of Work (please provide detailed information): Water District .. Tukwila .. Water Availability Provided Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. ❑ ...Water District #125 ❑... Highline ❑... Renton Sever District . Tukwila ❑ ...Valley View 0...Renton ❑... Seattle ❑ .. Sewer Use Certificate ❑ ...Sewer Availability Provided Septic System: N ❑ On-site Septic ystem — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ❑ .. Civil Plans (Maximum Paper Size — 22" x 34") ❑ .. Technical Information Report (Storm Drainage) ❑ .. Bond 0...Insurance 0... Easement(s) Proposed Activities (mark boxes that apply): 0 .. Right-of-way Use - Nonprofit for less than 72 hours .. Right-of-way Use - No Disturbance ❑ .. Construction/Excavation/Fill - Right-of-way 0 Non Right-of-way 0 ❑ .. Total Cut 0 .. Total Fill cubic yards cubic yards ❑ .. Sanitary Side Sewer ❑ .. Cap or Remove Utilities ❑ .. Frontage Improvements ❑ .. Traffic Control ❑ .. Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ .. Permanent Water Meter Size (1) ❑ .. Temporary Water Meter Size (1) ❑ .. Water Only Meter Size ❑ .. Sewer Main Extension ❑ .. Water Main Extension ❑.. 0.. ❑.. ❑.. ❑ ... Geotechnical Report 0... Maintenance Agreement(s) ❑ .. Traffic Impact Analysis ❑ .. Hold Harmless — (SAO) ❑ .. Hold Harmless — (ROW) 0...Right-of-way Use - Profit for less than 72 hours 0...Right-of-way Use — Potential Disturbance ❑... Work in Flood Zone 0... Storm Drainage . Abandon Septic Tank . Curb Cut . Pavement Cut . Looped Fire Line Public 0 Public 0 ❑...Grease Interceptor 0... Channelization 0...Trench Excavation 0... Utility Undergrounding WO # (2) " WO # (3) " WO # WO # (2) " WO # (3) " WO # WO # ❑ .. Deduct Water Meter Size " Private 0 Private 0 FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) ❑ .. Water ❑ .. Sewer ❑ .. Sewage Treatment Monthly Service Billing to: Name: Day Telephone: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: City State Zip Day Telephone: City State Zip `Applications\Forms-Applications On Line\2012 Applications\Permit Application Revised - 2-7-12.docx ^d: February 2012 Page 3 of 4 PERMIT APPLICATION NOTES Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER 0 . ' IZED GENT: Signature: Date: OA Print Name: Day Telephone:Z0 Z3S-093S Mailing Address: (Z2LG H:Wpplications\Forms-Applications On Line1.2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh City State Zip Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS I ACCOUNT QUANTITY I PAID PermitTRAK $265.03 D18-0351 Address: 3425 S 146TH ST Apn: 0040000827 $265.03 DEVELOPMENT $257.43 PERMIT FEE R000.322.100.00.00 0.00 $152.08 PLAN CHECK FEE R000.345.830.00.00 0.00 $98.85 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $6.50 TECHNOLOGY FEE $7.60 TECHNOLOGY FEE R000.322.900.04.00 I 0.00 I $7.60 TOTAL FEES PAID BY RECEIPT: R15827 $265.03 Date Paid: Tuesday, November 13, 2018 Paid By: CITY OF TUKWILA Pay Method: ACCOUNT Printed: Tuesday, November 13, 2018 3:35 PM 1 of 1 CSYSTEMS 4/1/2019 City of Tukwila Department of Community Development SCOTT BOYER 12216 CORLISS AVE N SEATTLE, WA 98133 RE: Permit No. D18-0351 ABDI ADAN DEMO 3425 S 146TH ST Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 5/12/2019. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 5/12/2019, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sigcerely, Kandace Nichols Permit Technician File No: D18-0351 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 c e PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D18-0351 DATE: 11/05/18 PROJECT NAME: ABDI ADAN- DEMO SITE ADDRESS: 3425 S 146 ST X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: 43 ANO Otit Building Division AV) Public Works AM Nrt- ►M� Fire Prevention Fire Prevention Structural WO Pry \\1\41N Planning Division Permit Coordinator 1111 PRELIMINARY REVIEW: Not Applicable (no approval/review required) REVIEWER'S INITIALS: DATE: 11/06/18 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved DUE DATE: 12/04/18 Approved with Conditions ❑ Corrections Required Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping 0 PW 0 Staff Initials: 12/18/2013 CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-367o FAX (206) 431-3665 E-mail: tukplanPci.tukwila.wa.us Permit Center/Building Division 206 431-3670 Public Works Department 206 433-0179 Planning Division 206 431-3670 AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION STATE OF WASHINGTON) ) ss. COUNTY OF KING ) [please print name] •341, states as follows: PERMIT NO: 1. I have made application for a permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this permit to be exempt under number `` , and will therefore not be performed by a registered contractor. 5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to persons making electrical installations on their own property or to regularly employed employees working on the premises of their employer. The proposed electrical work is not for the construction of a new building for rent, sale or lease. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. I 11111\VV01,\ briz Owner/Owner's Agent* Signed and sworn to before me this V1) day of I1OVvlr1I,9e' I :RIA)Le4) ARY PUBLIC,ini and for ktie State of Washington Residing at V-11(1 , County 1244dlo p.10.1171) 20&' Name as commissioned: My commission expires: 18.27.090 Exemptions. Ther stration provisions of this c 1. An authorized representative of the United States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The sale of any finished products, materials, or articles of merchandise that are not fabricated into and do not become a part of a structure under the common law of fixtures; 6. Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile/manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW who shall warranty service and repairs under chapter 46.7o RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9. Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts Less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; 10. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed hapter do not appy by a registered contractor; 11. An owner* who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; 12.* Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property; 13. An owner* who performs maintenance, repair, and alteration work in or upon his or her own properties, or who uses his or her own employees to do such work; 14. A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician certified under the laws of the state of Washington, or a plumber certified under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the person certified is operating within the scope of his or her certification; 15. Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; 16. Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17. A mobile/manufactured home dealer or manufacturer who subcontracts the installation, set-up, or repair work to actively registered contractors. This exemption only applies to the installation, set-up, or repair of the mobile/manufactured homes that were manufactured or sold by the mobile/manufactured home dealer or manufacturer; 18. An entity who holds a valid electrical contractor's license under chapter 19,28 RCW that employs a certified journeyman electrician, a certified residential specialty electrician, or an electrical trainee meeting the requirements of chapter 19.28 RCW to perform plumbing work that is incidentally, directly, and immediately appropriate to the like -in-kind replacement of a household appliance or other small household utilization equipment that requires limited electric power and limited waste and/or water connections. An electrical trainee must be supervised by a certified electrician while performing plumbing work. • Per Washington State Department of Labor and Industries lessee has been interpreted to be equivalent to owner for purposes of exemptions. SITE PLAN 1/16"= 1'-0" s. 0 8 16 32 S 143.54' PROPERTY LINE It E 210.00' PROPERTY LINE EXISTING 6'-0" H METAL FENCE EXISTING WAREHOUSE TRUCK ROUTE EXISTING 10 PARKING STALLS @ 9'-6" EA='95'-0" (RESERVED FOR NEW GROCERY TENANT IMPROVEMENT) E*ISTING BUILDING —J OVERALL = 7,090 SF pCISTING WAREHOUSE _ k800SF EXISTING WAREHOUSE TRUCK ROUTE UP FIRST FLOOR INTERIOR SPACE TO BE DEMOLISHED = 2,290 SF 1 MAY122fl 0 MINN •�l C C C C \ iHC EXISTING (5) +1 HC PARKIN( STALLS = 62'-0" GATE =INN MIN (RESERVED FOR NEW GROCERY TENANT IMPROVEOIENTrjr POWER / CABLE EXISTING 6'-0" H 1 LINES TO BUILDING METAL FENCE \ 1 GATE —1— — — — EXISTING 6'-0" y METAL FENCE POWER / UTILITY POLE 4. POWER / UTILITY POLE POWER LINE ABOVE (15'-20' ABOVE GROUND) SOUTH 146TH STREET::. FILE COPY Permit Mo. Obi 1 Plan review apprcvd is su'sject to errow and c:� L 3ions. Approval of construction (10 :un -:ants c3o3 r..: the violation of any adopted coxa or c;•;;arc »l;t of approved Fie d opy and crF J� ��il no b By: i► Au Date: City of Tukwila BUILDING DIVISION REVISIONS No changes shall bo rnP.d' to the scoop of Work \A/ithole prior P' orovnl of Tukwila Building tT vision NO' E: Revisions will require plan submit+ a :d may inciuda additional plan rev c',., f2e; �r MAY 1,c 26 f :01JiPD FOR: fiti:ccrianicat d Electrical lumbing Cas Piping City of Tukwila BUll_f?Ir" a DI\'ISIoN sl a • REVIEWED FOR CODE COMPLIANCE APPROVED NOV 1.32018 City of Tukwi a BUILDING DIVISION fECEIV * O CITY OF TU lWILA NOV 052013 PERMIT CENTER HALLER ARCHITECTS LLC 12216 Corliss Avenue North Seattle, WA 98133 TEL 206.235.0935 email: boyerscott1@gmail.com PROJECT: Fresh & Green Produce Market T. I. LOCATION: 3425 S 146th St Tukwila, WA 98168 PREPARED FOR: Abdi Adan 15006 Military Rd South Tukwila, WA 98188 KEY MAP NO. DATE REVISION 11 /3/18 DEMOLITION PERMIT PROJECT DIRECTOR SB PROJECT MANAGER SB PROJECT ARCHITECT SB PROJECT TEAM MEMBER CHECK ARCHITECT SE 8117 REGISTERED ARCHIj T ir- - - - SCOTT A. B leR STATE OF WASHINGTON TITLE SITE PLAN PROJECT NO. 18008.00 DATE NOVEMBER 3, 2018 PROJECT NETWORK PATH SHEET NUMBER A1.01 SET EXTERIOR WALL TO REMAIN TYP 0 INTERIOR SECOND FLOOR EXIT STAIR & ENCLOSURE WALLS TO REMAIN (FUTURE WALL & EXIT DOOR TO BE ADDED TO COMPLETE ENCLOSURE & EXIT TO EXTERIOR) FIRST FLOOR DEMOLITION PLAN M/('i221E3 60'-0" EXISTING WAREHOUSE (NO WORK THIS AREA) rock a DEMISING WALL TO REMAIN UP REMOVE EXISTING PLUMBING FIXTURES TYP REMOVE EXISTING NON -LOAD BEARING WALLS, DOORS & CASEWORK TYP II II II II II II II EXISTING GLULAM BEAMS ABOVE TO REMAIN EXTERIOR WINDOWS / DOOR TO REMAIN TYP - -4 -i SECOND FLOOR — -1 EXTERIOR EXIT STAIR TO REMAIN — J EXTERIOR WALL TO REMAIN TYP 141# 1,220/4 HALLER ARCHITECTS LLC 12216 Corliss Avenue North Seattle, WA 98133 TEL 206.235.0935 email: boyerscottl @gmail.com PROJECT: Fresh & Green Produce Market T. I. LOCATION: 3425 S 146th St Tukwila, WA 98168 PREPARED FOR: Abdi Adan 15006 Military Rd South Tukwila, WA 98188 REVIEWED FOR'' CODE COMPLIANCE APPROVED NOV13 2018 City of Tukwila BUILDING DIVISION 1/4' = 1'-0" 0 2 4 8 0\C RECEIVED CITY OF T U KWILA NOV 0 5 2018 PERMIT CENTER KEY MAP NO. DATE REVISION 11/3/18 DEMOLITION PERMIT PROJECT DIRECTOR SB PROJECT MANAGER SB PROJECT ARCHITECT SB PROJECT TEAM MEMBER CHECK ARCHITECT SE 8117 REGISTERED ARCHIT T .00 SCOTT A. Bi'R STATE OF WASHINGTON TITLE FIRST FLOOR DEMOLITION PLAN PROJECT NO. 18008.00 DATE NOVEMBER 3, 2018 PROJECT NETWORK PATH SHEET NUMBER A2.00 SET