Loading...
HomeMy WebLinkAboutOrd 1064 - 1979-1984 Comprehensive Street ProgramCITY OF TUKW Ap•roved as to Form: 9 WASHINGTON ORDINANCE NO. AN ORDINANCE ADOPTING A REVISED AND EXTENDED COMPREHENSIVE STREET PROGRAM IN ACCORDANCE WITH R.C.W. 35.77 AND R.C.W. 36.81. Attest: City Attorney Published: Reeord hroa Lct.., guy 23, 1978 gi 4dad Mayor Dat pprov d 1 COUNCIL ACTION MEETING I 0A F ICBM' ACTION TYPE IIEM OA) 16 -26 3 I PN 7 /'7 1 3 PI I 7 /,ry19(LI P L� WHEREAS, The City of Tukwila has previously adopted a Comprehensive Street Program pursuant to R.C.W. 35.77 and R.C.W. 36.81, and WHEREAS, The City is required annually to review the work accomplished under said Program and to determine current City street needs, and WHEREAS, A public hearing was held on the Comprehensive Street Program on Monday, July 17, 1978 at 7:00 P.M. in the Tukwila City Hall before the Tukwila City Council, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Pursuant to R.C.W. 35.77 and R.C.W. 36.81 and the public hearing on July 17, 1978, the attached documents, incorporated herein by reference as Exhibit A, are declared and adopted as the Revised Six Year Comprehensive Street Program for the City of Tukwila. Section 2. This Ordinance and Exhibit shall be filed with the Director of Transportation of the State of Washington no later than July 30, 1978 after its adoption as required by R.C.W. 35.77 and R.C.W. 36.81. Section 3. This Ordinance and Exhibit shall be submitted to the r. Urban Arterial Board as required by R.C.W. 35.77. Section 4. This Ordinance and Exhibit shall be submitted to the Puget Sound Council of Governments as the designated Metropolitan Planning E Organization pursuant to the FHWA Federal -aid Highway Program Manual Vol. 4, Chapter 4, Section 6. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a regular meeting thereof this 7 day of tjLt ILA 1978. /f /97f; City Clerk Ci..t Comity TUKWILA City No. County No. Route or Road E Log No. 1 2 3 4 1 9005 302 Southcenter Blvd. 65th Ave. So. to SR 181 Grading, drainage, illumination, paving, sidewalks 2 3 9007 301 South 152nd Street Macadam Rd. to 700' east of 57th Ave. So.* Grading, drainage, illumination, sanitary sewer, paving, sidewalks 4 9009 301 57th Ave. So. So. 152nd St. to 350' south Grading, drainage, illumination, paving, sidewalks 5 6 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19 79 to 19 84 PROJECT IDENTIFICATION Titie, Locution /Termini, Description of work 303 Southcenter Blvd. 62nd Ave. So. to 65th Ave. So. Grading, drainage, illumination, paving, sidewalks 301 South 147th Street 57th Ave. So. to 58th Ave. So. Grading, drainage, paving, sidewalk 301 57th Ave. So. 56th Place So. to So. 149th St. Grading, drainage, paving, sidewalk 7 001 So. 141st St. 56th Ave. So. to 57th Ave. So. Grading, drainage, paving, sidewalk 8 9024 001 Southcenter Parkway Strander Blvd. to So. 180th St. Curbs, planing, overlay Ccpy: Chairman, Urban Arterial Board, Olympia *Indicates local improvement district. N _o Y Work a 3 Code wt 5 6 7 2 A,C,D, E,I,L, N 2 A,C,D, E,I,L, N 2 A,C,D, E,I,L, N 2 A,C,D, E,I,L, N 2 A,C,D, E,I,L, N 2 A,C,D, E,I,L, N 2 A,C,D, E,I,L, NN 3 B,D 9 001 62nd Ave. So. So. 153rd St. to Southcenter Blvd.* 2 A,C,D, Grading, drainage, curb, gutter, sidewalk, paving, E,I,L, sanitary sewer N 10 301 So. 153rd St. 65th Ave. So. to 62nd Ave. So. 2 A,C,D, Grading, drainage, lighting, curb, gutter, sidewalk, F paving DISTRIBUTION i I Copy: District Engineer, Dept. of Transportion (All Money Entered to (,000 S) SCHEDULE PROJECT PHASE AND Tot I o a ESTIMATED COSTS M P to MP Length o a (Miles) a ANNUAL Year c 0 s ELEMENT FEDERAL STATE 44 UAB 2nd 3rd 4,586th 8 9 1011 12 13 1 14 15 16 17 18 19 0.4 SJ A 199.0' 158.3 1.0 0.2 SU P 231.5. 0.3 AU P 305.0 0.1 AU P 42.0 0.1 AU P 54.0 0.6 AU P 171.1 0.1 AU P 59.4 0.5 SU P 72.0 0.2 AU P 52.8 0.2 AU P 52.8 URBAN ARTERIAL BOARD SUPPLEMENTAL SECTION Hearing Date `/idu /?78' Adoption Adoption Dote Sulu ,""t 14 7% 14esekAiou Dote Z' /7J3'7S Ordinance. Na )04,'IJ FUNDING SOURCE 271.4 LOCAL TOTAL FUNDS 20 1 21 39.7 199.0 184.2 1.1 46.2 231.5 33.E 305.0 37.8 4.2 42.0 54.0 54.0 171.1 170 59.4 59.4 72.0 72.0 52.E 52.E 52.E 52.0 TUKWII -A y No' ?only No. Roule 0 or z Rood Log No. G 0 t 01 PROJ ECT �17 0 Title, AMOS N tMPRa� EM A ��PpP CATIO IX YEAR TR__ S, 1DENTIFICAT1oN_ of work 1,.ocotion /Termini Description a ti Work c Code 'a o 2 4 A C inns 5 q �to southerly sedewalk� N,1,L, So. 153rd curb, gutter, Avenuearainage, lighting, 3 B,p Grading Chr istensen Road avin9 r Park West to n ken Blvd• overlay to Stranger Blvd. curbs, a kw� r Park ove S outh 500 X01 Andover curbs Planing, Southerly terminu South 1101 53th Ave. 50 New street construction surv eying Way Bridge rings \0 Brady e ngineer ing, 0 t Andover d a01 Ba planing, 'la Parkway West -Tu 1 0 Preliminary e south City t So. 1$0th St• sidewalk ter Parkway curb, gutter, X01 Southcen lighting l i m its dra i n age Grading, terminus paving st Ave. S easterly to terly to term South 164th St. 51 51st Ave. So urbs� gu tters h 163rd pl pavi 3fl1 South drainag to 53rd Ave. Grading 51st Ave. So u tters 160th S ai n age, pav curbs, g 10011 South dr 5o. 3B4O MP to MP E AND c P ROJEC T S ,.AT .0 COSTS 3. TE 9 Year FEDERAL STA a� u- 3rd A NNUAL 2nd 1 ELEmot a a 711:-\--- -r l7 13� 26: Toto L Opp'sl on ...0 money Entered to _k 0.3 NIP 38.2. 10.4C04, 49.9 0.1 F1.1 P 64.6 0.3 I A U P 300.0 3700.t 1 cU P 600.0 61. 47.0 69. Adoption Dote Resolution Number 1 4 SUPPLEMENTAL SECTION BOARD u RgAN AR TERIAL FUNDING SOURCE TOTAL FUNDS 4#1.3 AB LOCAL 1 2 6. 2 6 4° 26 26 38.2 33.2 49.9 49.9 64.8 64'8 1000.0 96.0 24.0 60110 61.9 9' 61. 47.0 47.0 69. 69., 4 /t0 04 Y No untY No. _y,.,. ATION work T tD ENTIFIC,1,.1 ofi PR Termini, Descripti Route Location/ Termini Of z 0 z 20 1 21\ 22 1 1 1,3 24 Rood c Log No. 25 25 27 2 3t to u tters 0 1 -S}ad c ubs'g So g 5 Ave. So. 54t Ave. gutters SD 1 th Str enage, paving curbs 160th Street Grading, drainage, 30th Stre )01 S Southce 01 54th Avenue drainage, paving, 5t to S0. 163th St )a1 ,dI FROORAM IMP EM YRAR T RAN S�EDUL pN0 D cp5 PROJECT ES TISE MATET5 .o. Year r 3r 4,5BGAt∎ d a ANNUAL r- 16 E V3 14 15 84.2 4 166th S treet So. 166th u tters 3r d Avenue So. paving, curbs' g drainage, p to 53rd A Grading e. So. ter ra 54th Ave. So. to curbs gutters Slade Way drainage, paving, ter P arkway S0. 1 G ion �j01 Intersection Wes t to Sou thcenter Signal modification Strander Blvd. ^Andover V01 P Parkway curbs, overlay 149th St. cur St to S avin9 lanin97 So 141st sidewalk, P dra i n age' 6t h Ave. So curb, gutter place So. Lighting S to 56th walk, pavan X 01 5 Work Code 0 9 56 ut r, drainage' side So. 139th St�rb gutter, St' L �Ol 5 g 139t side S drainag 56th Avenue n4 curb, gutter, nn neY O1 g htin9� cu to 5 o• paving 141s St. sidewalk, p curb, gutter, drainage' 137th 6th Place St' Lighting h St. t0 S sidewalk, pavan 2 A,C,D E� 2 A,C ,D ti,l,tr N 2 A,C,D, 2 A,C,D 6 G 3 8,0 Totol MP to MP ttAilet1 2 A,C,C 2 A,C,D 2 A,C,D 2 A,C,D ed t o l, Dpp s1 nter 0.2NU 0 2NJP 49. c 40.L 52.` 60. 53.2 23. 4e Adoption Dote Resolution Number PL1 23. 0.1N 0.1 P_1 57.0 o.2� MENTAL SECTION R BOARD SUPPLE URBAN ARTERIAL FUNDING SOURCE ?DIAL 7 1- FuNDs I LOCAL STATE le 20 18 84.2 49.9 49.9 40. 40.0 52.5 52 5 1 60.0 60.0 53.2 53. 28.5' 28'b 23.5 23.5\ 20.5 23.` 57. 57 23. City eoxinkyc TUKWILA City No. County No. SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1979 to 19 84 Hearing Date Adoption Date Resolution Number Route N SCHEDULE PROJECT IDENTIFICATION H c 2 PROJECT PHASE AND FUNDING SOURCE or o e Y Work Toto l u a s O Rood ESTIMATED COSTS TOTAL o c Title, Location /Termini, Description of work c3 Code MP to MP I^elegt, o.m Year FUNDS E Log No. a o ANNUAL FEDERAL STATEUAB LOCAL r n fire (C4•ELEMENT 2nd 3rd 4,5 &6th I 2 3 4 5 6 7 8 9 k0 II 12 13 14 15 16 17 18 19 20 21 30 00] 55th Ave. So. So, 144th St. to So. 140th St. 2 A,C,C, 0.3 FU P 20.8 85.6 T.u6.4iui.4 Lighting, curb, gutter, drainage, sidewalk, paving E,I,L, N 31 00] So. 140th St. 55th Ave. So. to 53rd Ave. So. 2 A,C,C, 0.1 PU P 17.1 28.5 45.6 45.6 Lighting, curb, gutter, drainage, sidewalk,, paving E.I.L, N 32 00] So. 139th St. 53rd Ave. So. to 55th Ave. So. 2 A,C,D, 0.1 PU P 13.7 28.5 42.2 42.2 Lighting, grading, paving, sidewalk, curb, gutter E,I,L, N 33 00] Macadam Road So. 152nd St. to So. 144th St. 2 A,C,D, 0.3 (U P 58.6 85.6 144.2 144.2 Lighting, grading, paving, sidewalk, curb, gutter E,I,L, N 34 00] So. 142nd St. 58th Ave. So. to 57th Ave. So. 2 A,C,D, 0.1 PU P 26.4 26.4 26.4 Grading, paving, sidewalk, curb, gutter E,I,L, N 35 00] 59th Ave. So. So. 147th St. to 58th Ave. So. 2 A,C,C, 0.3 PU P 79.2 79.2 79.2 Grading, paving, sidewalk, curb, gutter E,I,L, N 36 00] Southcenter Blvd. 62nd Ave. So. over I -405 1 H 0.2 NU P 150.0 133,5 16.5 !PC Pedestrian Bridge 37 00] Andover Park East Strander Blvd. to So. 180th St. 3 C,D 1.4 CU P 192.0 192.0 192.0 Planing, curbs, overlay DISTRIBUTION I Copy: District Engineer, Dept. of Tronsportion I Copy: Chairman, Urban Arterial Board, Olympia (All Money Entered to 1,0001s) URBAN ARTERIAL BOARD SUPPLEMENTAL SECTION