HomeMy WebLinkAboutOrd 1064 - 1979-1984 Comprehensive Street ProgramCITY OF TUKW
Ap•roved as to Form:
9
WASHINGTON
ORDINANCE NO.
AN ORDINANCE ADOPTING A REVISED AND EXTENDED
COMPREHENSIVE STREET PROGRAM IN ACCORDANCE WITH
R.C.W. 35.77 AND R.C.W. 36.81.
Attest:
City Attorney
Published: Reeord hroa Lct.., guy 23, 1978
gi 4dad
Mayor
Dat pprov d
1
COUNCIL ACTION
MEETING I 0A F ICBM'
ACTION
TYPE IIEM
OA) 16 -26 3 I PN 7 /'7
1 3 PI I 7 /,ry19(LI P
L�
WHEREAS, The City of Tukwila has previously adopted a
Comprehensive Street Program pursuant to R.C.W. 35.77 and R.C.W. 36.81, and
WHEREAS, The City is required annually to review the work
accomplished under said Program and to determine current City street
needs, and
WHEREAS, A public hearing was held on the Comprehensive Street
Program on Monday, July 17, 1978 at 7:00 P.M. in the Tukwila City Hall
before the Tukwila City Council,
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
DO ORDAIN AS FOLLOWS:
Section 1. Pursuant to R.C.W. 35.77 and R.C.W. 36.81 and
the public hearing on July 17, 1978, the attached documents, incorporated
herein by reference as Exhibit A, are declared and adopted as the Revised
Six Year Comprehensive Street Program for the City of Tukwila.
Section 2. This Ordinance and Exhibit shall be filed with the
Director of Transportation of the State of Washington no later than
July 30, 1978 after its adoption as required by R.C.W. 35.77 and R.C.W.
36.81.
Section 3. This Ordinance and Exhibit shall be submitted to the
r. Urban Arterial Board as required by R.C.W. 35.77.
Section 4. This Ordinance and Exhibit shall be submitted to the
Puget Sound Council of Governments as the designated Metropolitan Planning
E Organization pursuant to the FHWA Federal -aid Highway Program Manual Vol. 4,
Chapter 4, Section 6.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a
regular meeting thereof this 7 day of tjLt ILA 1978.
/f /97f;
City Clerk
Ci..t Comity TUKWILA
City No.
County No.
Route
or
Road
E Log No.
1 2 3 4
1 9005 302 Southcenter Blvd. 65th Ave. So. to SR 181
Grading, drainage, illumination, paving, sidewalks
2
3 9007 301 South 152nd Street Macadam Rd. to 700' east of
57th Ave. So.*
Grading, drainage, illumination, sanitary sewer,
paving, sidewalks
4 9009 301 57th Ave. So. So. 152nd St. to 350' south
Grading, drainage, illumination, paving, sidewalks
5
6
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19 79 to 19 84
PROJECT IDENTIFICATION
Titie, Locution /Termini, Description of work
303 Southcenter Blvd. 62nd Ave. So. to 65th Ave. So.
Grading, drainage, illumination, paving, sidewalks
301 South 147th Street 57th Ave. So. to 58th Ave. So.
Grading, drainage, paving, sidewalk
301 57th Ave. So. 56th Place So. to So. 149th St.
Grading, drainage, paving, sidewalk
7 001 So. 141st St. 56th Ave. So. to 57th Ave. So.
Grading, drainage, paving, sidewalk
8 9024 001 Southcenter Parkway Strander Blvd. to So. 180th St.
Curbs, planing, overlay
Ccpy: Chairman, Urban Arterial Board, Olympia *Indicates local improvement district.
N
_o Y Work
a 3 Code
wt
5 6 7
2 A,C,D,
E,I,L,
N
2 A,C,D,
E,I,L,
N
2 A,C,D,
E,I,L,
N
2 A,C,D,
E,I,L,
N
2 A,C,D,
E,I,L,
N
2 A,C,D,
E,I,L,
N
2 A,C,D,
E,I,L, NN
3 B,D
9 001 62nd Ave. So. So. 153rd St. to Southcenter Blvd.* 2 A,C,D,
Grading, drainage, curb, gutter, sidewalk, paving, E,I,L,
sanitary sewer N
10 301 So. 153rd St. 65th Ave. So. to 62nd Ave. So. 2 A,C,D,
Grading, drainage, lighting, curb, gutter, sidewalk, F
paving
DISTRIBUTION i
I Copy: District Engineer, Dept. of Transportion (All Money Entered to (,000 S)
SCHEDULE
PROJECT PHASE AND
Tot I o
a ESTIMATED COSTS
M P to MP Length o a
(Miles) a ANNUAL Year
c 0 s ELEMENT FEDERAL STATE 44 UAB
2nd 3rd 4,586th
8 9 1011 12 13 1 14 15 16 17 18 19
0.4 SJ A 199.0' 158.3 1.0
0.2 SU P 231.5.
0.3 AU P 305.0
0.1 AU P 42.0
0.1 AU P 54.0
0.6 AU P 171.1
0.1 AU P 59.4
0.5 SU P 72.0
0.2 AU P 52.8
0.2 AU P 52.8
URBAN ARTERIAL BOARD SUPPLEMENTAL SECTION
Hearing Date `/idu /?78'
Adoption Adoption Dote Sulu ,""t 14 7%
14esekAiou Dote Z' /7J3'7S
Ordinance. Na )04,'IJ
FUNDING SOURCE
271.4
LOCAL
TOTAL
FUNDS
20 1 21
39.7 199.0
184.2 1.1 46.2 231.5
33.E 305.0
37.8 4.2 42.0
54.0 54.0
171.1 170
59.4 59.4
72.0 72.0
52.E 52.E
52.E 52.0
TUKWII -A
y No'
?only No.
Roule
0
or z
Rood
Log No.
G
0
t
01
PROJ ECT
�17 0
Title,
AMOS
N tMPRa� EM
A ��PpP CATIO
IX YEAR TR__
S,
1DENTIFICAT1oN_ of work
1,.ocotion /Termini Description
a ti Work
c Code
'a o
2
4 A C
inns 5
q �to southerly sedewalk� N,1,L,
So. 153rd curb, gutter,
Avenuearainage, lighting, 3 B,p
Grading
Chr istensen Road
avin9 r Park West to
n
ken Blvd• overlay to Stranger Blvd.
curbs, a
kw�
r Park ove S outh 500
X01 Andover curbs
Planing, Southerly terminu South
1101 53th Ave. 50
New street construction
surv eying
Way Bridge rings
\0 Brady e ngineer ing,
0
t
Andover
d
a01 Ba planing, 'la Parkway West -Tu
1
0 Preliminary e south City
t
So. 1$0th St• sidewalk
ter Parkway curb, gutter,
X01 Southcen lighting
l i m its dra i n age
Grading, terminus
paving st Ave. S easterly to
terly to term
South 164th St. 51
51st Ave. So urbs� gu tters
h 163rd pl pavi
3fl1 South drainag to 53rd Ave.
Grading
51st Ave. So u tters
160th S ai n age, pav curbs, g
10011 South dr
5o.
3B4O
MP to MP
E AND
c P ROJEC
T S ,.AT .0 COSTS
3. TE
9 Year FEDERAL STA
a� u- 3rd
A NNUAL 2nd 1
ELEmot
a a 711:-\---
-r l7
13�
26:
Toto
L
Opp'sl
on
...0 money Entered to _k
0.3 NIP 38.2.
10.4C04, 49.9
0.1 F1.1 P 64.6
0.3 I A U P 300.0 3700.t
1
cU P
600.0
61.
47.0
69.
Adoption Dote
Resolution Number
1 4
SUPPLEMENTAL SECTION BOARD
u RgAN AR TERIAL
FUNDING SOURCE TOTAL
FUNDS
4#1.3 AB LOCAL 1
2 6. 2 6 4°
26 26
38.2 33.2
49.9 49.9
64.8 64'8
1000.0
96.0 24.0 60110
61.9 9'
61.
47.0 47.0
69. 69.,
4
/t0 04
Y No
untY No.
_y,.,. ATION work
T tD ENTIFIC,1,.1 ofi
PR Termini, Descripti Route Location/
Termini
Of z
0
z
20
1 21\
22
1 1 1,3
24
Rood c
Log No.
25
25
27
2 3t
to u tters
0 1 -S}ad c ubs'g
So g
5 Ave. So.
54t Ave. gutters
SD 1 th Str enage, paving curbs
160th Street
Grading, drainage,
30th Stre
)01 S
Southce
01 54th Avenue drainage, paving,
5t to S0. 163th St
)a1
,dI
FROORAM
IMP EM
YRAR T RAN
S�EDUL
pN0 D cp5
PROJECT ES TISE MATET5
.o. Year
r
3r 4,5BGAt∎
d
a
ANNUAL r-
16
E V3 14 15
84.2
4 166th S treet
So. 166th u tters
3r d Avenue So. paving, curbs' g
drainage, p to 53rd A
Grading e. So. ter
ra 54th Ave. So. to curbs gutters
Slade
Way drainage, paving,
ter P arkway S0. 1
G
ion �j01 Intersection
Wes t to Sou thcenter
Signal modification
Strander Blvd. ^Andover
V01
P
Parkway curbs, overlay
149th St.
cur St to S avin9
lanin97 So 141st sidewalk, P
dra i n age'
6t h Ave. So curb, gutter place So.
Lighting S to 56th walk, pavan
X 01 5
Work
Code
0
9
56 ut r, drainage' side
So. 139th St�rb gutter, St'
L
�Ol 5 g
139t side
S drainag
56th Avenue n4 curb, gutter,
nn neY
O1
g htin9� cu to 5 o• paving
141s St. sidewalk, p
curb, gutter, drainage' 137th
6th Place
St'
Lighting h St. t0 S sidewalk, pavan
2 A,C,D
E�
2 A,C ,D
ti,l,tr
N
2 A,C,D, 2 A,C,D
6
G
3 8,0
Totol
MP to MP ttAilet1
2 A,C,C
2 A,C,D
2 A,C,D
2 A,C,D
ed t o l, Dpp s1
nter
0.2NU
0
2NJP
49. c
40.L
52.`
60.
53.2
23.
4e
Adoption Dote
Resolution Number
PL1
23.
0.1N
0.1 P_1
57.0
o.2�
MENTAL SECTION
R BOARD SUPPLE
URBAN ARTERIAL
FUNDING SOURCE ?DIAL
7 1-
FuNDs
I LOCAL
STATE le 20
18 84.2
49.9 49.9
40. 40.0
52.5 52 5
1 60.0 60.0
53.2 53.
28.5' 28'b
23.5 23.5\
20.5 23.`
57. 57
23.
City eoxinkyc TUKWILA
City No.
County No.
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1979 to 19 84
Hearing Date
Adoption Date
Resolution Number
Route
N SCHEDULE
PROJECT IDENTIFICATION H c 2 PROJECT PHASE AND FUNDING SOURCE
or o e Y Work Toto l u a s
O Rood ESTIMATED COSTS TOTAL
o c Title, Location /Termini, Description of work c3 Code MP to MP I^elegt, o.m
Year FUNDS
E Log No. a o ANNUAL FEDERAL STATEUAB LOCAL
r n fire (C4•ELEMENT 2nd 3rd 4,5 &6th
I 2 3 4 5 6 7 8 9 k0 II 12 13 14 15 16 17 18 19 20 21
30 00] 55th Ave. So. So, 144th St. to So. 140th St. 2 A,C,C, 0.3 FU P 20.8 85.6 T.u6.4iui.4
Lighting, curb, gutter, drainage, sidewalk, paving E,I,L,
N
31 00] So. 140th St. 55th Ave. So. to 53rd Ave. So. 2 A,C,C, 0.1 PU P 17.1 28.5 45.6 45.6
Lighting, curb, gutter, drainage, sidewalk,, paving E.I.L,
N
32 00] So. 139th St. 53rd Ave. So. to 55th Ave. So. 2 A,C,D, 0.1 PU P 13.7 28.5 42.2 42.2
Lighting, grading, paving, sidewalk, curb, gutter E,I,L,
N
33 00] Macadam Road So. 152nd St. to So. 144th St. 2 A,C,D, 0.3 (U P 58.6 85.6 144.2 144.2
Lighting, grading, paving, sidewalk, curb, gutter E,I,L,
N
34 00] So. 142nd St. 58th Ave. So. to 57th Ave. So. 2 A,C,D, 0.1 PU P 26.4 26.4 26.4
Grading, paving, sidewalk, curb, gutter E,I,L,
N
35 00] 59th Ave. So. So. 147th St. to 58th Ave. So. 2 A,C,C, 0.3 PU P 79.2 79.2 79.2
Grading, paving, sidewalk, curb, gutter E,I,L,
N
36 00] Southcenter Blvd. 62nd Ave. So. over I -405 1 H 0.2 NU P 150.0 133,5 16.5 !PC
Pedestrian Bridge
37 00] Andover Park East Strander Blvd. to So. 180th St. 3 C,D 1.4 CU P 192.0 192.0 192.0
Planing, curbs, overlay
DISTRIBUTION
I Copy: District Engineer, Dept. of Tronsportion
I Copy: Chairman, Urban Arterial Board, Olympia
(All Money Entered to 1,0001s) URBAN ARTERIAL BOARD SUPPLEMENTAL SECTION