Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M18-0078 - SOUTHCENTER PROFESSIONAL PLAZA - COOLING TOWER REPLACEMENT
SOUTHCENTER PROFESSIONAL PLAZA 411 STRANDER BLVD BLDG MI 8-0078 Parcel No: Address: Project Name: r City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 0223200052 Permit Number: 411 STRANDER BLVD BLDG SOUTHCENTER PROFESSIONAL PLAZA Issue Date: Permit Expires On: M18-0078 11/14/2018 5/13/2019 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: MEDICAL CENTERS CO LLC 411 STRANDER BLVD STE 108 , TUKWILA, WA, 98188 RICHARD SINNEMA PO BOX 1268 , CARNATION, WA, 98014 HEATTRANSFER CO Address: PO BOX 1268 , CARNATION, WA, 98014-1268 License No: Lender: Name: Address: HEATT**206Q0 Phone: (425) 885-3247 Phone: (425) 885-3247 Expiration Date: 9/11/2019 DESCRIPTION OF WORK: REPLACE EXISTING COOLING TOWER "LIKE -FOR -LIKE" WITH NEW TOWER. NO WORK IN INTERIOR OF BLDG. TOWER ENCLOSURE PROVIDES TOTAL VISUAL SCREENING Valuation of Work: $49,450.00 Type of Work: REPLACEMENT Fuel type: ELECT Fees Collected: $889.67 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 1 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: Date: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued byt:he City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ***MECHANICAL PERMIT CONDITIONS*** 10: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 11: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0701 ROUGH -IN MECHANICAL CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov f Mechanical Permit No. IV 4 P N 0011ro�ect o. o Date Application Accepted: rt \ Date Application Expires: / (For office u_ e only MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** ' SITE LOCATION King Co Assessor's Tax No.: 0223200052 Site Address: 411 Strander Blvd Suite Number: Roof Floor: Roof Tenant Name: SA G 4 [,e. 1321p. P/4' 0- New Tenant: ❑ Yes ® ..No PROPERTY OWNER Name: MEDICAL CENTERS CO LLC Address: 411 STRANDER BLVD STE 108 City: Tukwila State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: Richard Sinnema Company Name: Heattransfer Co. Address: P.O. Box 1268 Address: P.O. Box 1268 City: Carnation State: WA zip: 98014 Phone: (425) 885-3247 Fax: (425) 333-6545 Email: heattransferl@aol.com Phone: (425) 885-3247 Fax: (425) MECHANICAL CONTRACTOR INFORMATION Company Name: Heattransfer Co. Address: P.O. Box 1268 City: Carnation State: WA Zip: 98014 I Phone: (425) 885-3247 Fax: (425) 333-6545 Contr Reg No.: HEATT**206Q0 Exp Date: Tukwila Business License No.: 22128 Valuation of project (contractor's bid price): $ 49,450 Describe the scope of work in detail: Replace existing cooling tower "Like -for -Like" with new tower. No work on interior of bldg. Tower enclosure provides total visual screening. Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement Fuel Type: Electric Gas ❑ Other: 11-.Applications\Forms-Applical ions On Line\2016 Applications \Mechanical Permit Application Revised 1-4-16.docs Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace :>100k btu Floor furnace Suspended/wall/floor mounted heater Appliance ent Repair or addition to heat/refrig/cooling system Air handling unit -_10.000 cthi Unit Type Qty Air handling unit Residential, Nighttime >10.000 cfm Industrial Evaporator cooler 55 dB(A) Ventilation fan connected to single duct 57 dB(A) Ventilation system Commercial Hood and duct 1 Incinerator — domestic 65 dB(A) Incinerator — comm/industrial 60 dB(A) Unit Type I Qty Fire damper Residential, Nighttime Diffuser Industrial Thermostat 55 dB(A) Wood/gas stove 57 dB(A) Emergency generator Commercial Other mechanical equipment 1 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, sec TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-IOPM. Monday through Friday and 8AM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • V arning devices; • (onstruction and property maintenance during the daytime hours (7am-10pm); • Testing of backup generators during the day. ; PERMIT APPLICATION NOTES - i Value of construction — in all cases. a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods notto exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PFNA1 TY OF PERJIIRY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. Bl ILDING OW Signature: lUTHORIZED AGENT: Print Name: Richard Sinnema Mailing Address: P.O. Box 1268 N • Appl teauons,Forms-Applications On Linc 2()16 Applications \Mechanical Permit Application Revised 1-4-16.docs; Krt :d Ian ar 2016 ort Date: 06/12/2018 Day Telephone: (425) 885-3247 Carnation WA 98014 City State Zip Page 2 of 2 Page 1 of 2 CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA 0017340000802374464500 Date: 06/14/2018 07:43:55 AM CREDIT CARD SALE VISA CARD NUMBER: **********4353 K TRAN AMOUNT: $961.38 APPROVAL CD: 63489D RECORD #: 000 CLERK ID: Rachelle X {CARDHOLDER'S SIGNATURE} I AGREE TO PAY THE ABOVE TOTAL AMOUNT ACCORDING TO THE CARD ISSUER AGREEMENT (MERCHANT AGREEMENT IF CREDIT VOUCHER) Thank you! Merchant Copy https: //classic. convergepay. com/V irtualMerchant/transaction. do?dispatchMethod=printTra... 6/14/2018 Page 2 of 2 CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA Date: 06/14/2018 07:43:55 AM CREDIT CARD SALE VISA CARD NUMBER: **********4353 K TRAN AMOUNT: $961.38 APPROVAL CD: 63489D RECORD #: 000 CLERK ID: Rachelle Thank you! Customer Copy https://classic.convergepay.com/VirtualMerchant/transaction.do?dispatchMethod=printTra... 6/14/2018 � 1 4 J eceipt Number xs R14718 City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $961.38 EL18-0551 Address: 411 STRANDER BLVD BLDG Apn: 0223200052 $71.71 Credit Card Fee $2.09 Credit Card Fee R000.369.908.00.00 0.00 $2.09 ELECTRICAL $66.30 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $66.30 TECHNOLOGY FEE $3.32 TECHNOLOGY FEE R000.322.900.04.00 0.00 $3.32 M18-0078 Address: 411 STRANDER BLVD BLDG Apn: 0223200052 $889.67 Credit Card Fee $25.91 Credit Card Fee R000.369.908.00.00 0.00 $25.91 MECHANICAL $830.54 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $631.28 PLAN CHECK FEE R000.322.102.00.00 0.00 $166.11 TECHNOLOGY FEE $33.22 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R14718 R000.322.900.04.00 0.00 $33.22 $961.38 Date Paid: Thursday, June 14, 2018 Paid By: RICHARD SINNEMA Pay Method: CREDIT CARD 63489D Printed: Thursday, June 14, 2018 7:44 AM 1 of 1 J SYSTEMS INSPECTION RECORD Retain a copy with permit 4/$ 4156 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: ->a-r2. f s 1- Type of Inspection: /IIErlilit), 74;4 - Address: 41/�+TigAj ,z QL/.a. Date Called: Special Instructions: Date Wanted: /2,20 <117 p.m. Requester: rB/l0C.., Phone No: /14 22/ 4.`t /(v Approved per applicable codes. LJ Corrections required prior to approval. MMENTS*�l�` Inspector: /Z0/ � REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Sold To : r---- ACEICCEL COMPANY WASHINGTON AIR REPS 3290 146TH PL S.E., BLDG A Bellevue, WA 98007 United States Submittal Data Form 5-3-2018 Project: Purchase Order No: Engineer. BAC Order # Representative: All Information is per Unit South Center Professional Bldg 118564 Replacement Tower U187866101 AIR REPS, LLC Quantity: 1 Model VF1-018-12HH CLOSED CIRCUIT COOLING TOWER Certified Capacity: 105.00 USGPM of Water from 100.00°F to 90.00°F at 68.00°F entering air wet bulb and 3.33 PSIG fluid pressure drop. Fan Motor(s): One (1) 5 HP fan motor(s): Totally Enclosed, Fan Cooled (TEFC), 1 Speed/1 Winding - Premium Efficiency (Inverter Duty), suitable for 460 volt, 3 phase, 60 hertz electrical service and Space Heater. Drives are based on 0 inches ESP. NOTE: Inverter Duty fan motors, furnished in accordance with NEMA Standard Mg.1 -- Part 31, are required for applications using variable frequency drives for fan motor control. Pump(s): One (1) 0.5 HP pump motor: 1 Speed/1 Winding - Standard Efficiency, suitable for 460 volt, 3 phase, 60 hertz. Submittal Information BAC Terms and Conditions of Sale Mechanical Specifications Submittal Drawings/Diagrams BAC -11600A BAC -15839A BAC-10183AX BAC -13010A BAC-BGGJ000000A BAC -11490A BAC -17491A BAC -13251A Unit Print — RH Unit Support Basin Heater Location EWLC Location EWLC and Heater Wiring VCOS Location VCOS Wiring PCD Hood Wiring Diagram Equipment Summary Forced Draft, Counterflow Closed Circuit Cooling Tower Quality Assurance - ISO 9001 Certified Unit Energy Efficiency per ASHRAE Standard 90.1-2016 CTI Certified Thermal Performance Steel Panels and Structural Members are Constructed of Galvanized Steel Protected with a Thermosetting Hybrid Polymer Galvanized Steel Fan Wheel(s) Protected with the Thermosetting Hybrid Polymer Galvanized Steel, Full Circuit Coil Polyvinyl Chloride (PVC) Drift Eliminators Standard Unit Anchorage Integral Pump(s) with Standard Make -Up, Drain and Overflow Connections PVC Spray Branches Electric Water Level Control Package Electric Immersion Heater(s) Sized to Maintain +40°F water at a 0°F Ambient with Electrical Requirements Matching Fan Motor(s) Copper Heater Elements Electric Immersion Heater Controls Mechanical Vibration Cutout Switch Tapered Discharge Hood Constructed of Galvanized Steel with Galvanized Positive Closure Dampers and Damper Actuator THANK YOU FOR YOUR BUSINESS! R gging and Installation Instructions, as well as Operating and Maintenance Instructions are available at www.baltimoreaircoil.com REVIEWED FOR CODE COMPLIANCE APPROVED JUN 21 2018 City of Tukwila BUILDING DIVISION © 2014 Baltimore Aircoil Corporate Headquarters: 7600 Dorsey Run Road, Jessup, MD 2 RECEIVED CITY OF TUKWILA JUN 1 4 2018 PERMIT CENTER IIMILAREOFIE !U:LICC[L COMPANY Terms and Conditions of Sae Pricing: Prices set forth in Seller's quotation shall remain firm for thirty (30) days. Within such period, the quotation shall convert into an order provided that all of the following have occurred: (1) Buyer submits either a purchase order or a copy of Seller's quotation displaying an authorized signature of Buyer within that thirty (30) -day period; (2) Buyer provides a release for fabrication; and (3) Buyer requests a shipment date that is no later than twelve (12) weeks from the date of Buyer's submission of a purchase order or signed quotation. In the event Buyer's requested shipment date is later than twelve (12) weeks beyond such submission date, Seller's price in effect twelve (12) weeks prior to such shipment date shall apply. In the event that Buyer requests for its convenience that Seller delay delivery of products subject to an order beyond the scheduled shipment date, pricing shall be subject to the same adjustment. Payments: Terms of payment shall be net cash in thirty (30) days from date of invoice, subject to Seller's prior credit approval. If the Buyer shall fail to make any payments in accordance with the terms and conditions of sale, the Seller, in addition to its other rights and remedies but not in (imitation thereof, may, at its option, without prior notice, cancel this order as to any undelivered products or defer shipments or deliveries hereunder, or under any other agreement between Buyer and Seller, except upon Seller's receipt of cash before shipment or such security as Seller considers satisfactory. Seller reserves the right to impose an interest charge (not exceeding the lawful maximum) on the balance of each invoice not paid on its due date for the period from the due date to the date of receipt of payment by Seller. In the event Buyer's failure to make timely payments to Seller results in Seller incurring additional costs, including but not limited to collection expenses and attorneys' fees, said costs shall be added to the amount due Seller from Buyer. Buyer shall have no right to any discount or retainage and shall not withhold payment as a set-off on Seller's invoice in any amount. Taxes: Unless listed on the front (reverse) side of this document, prices do not include any federal, state or local sales, use or value-added taxes payable in connection with this order. All such taxes shall be paid by Buyer. Buyer shall indemnify Seller from and against such taxes, plus interest and penalties thereon, including, but not limited to, tax, interest and penalties resulting from a failure to collect such taxes because of Seller's reliance upon an invalid exemption certificate provided to Seller. Allocation of Risk: Deliveries shall be considered made when the products subject to this order are loaded on the carrier. At such time, title to the goods and all risk of loss, damage or shortage shall pass to Buyer, and any claims based thereon must be filed by Buyer with the carrier. Force Majeure: Seller shall under no circumstances be liable for any loss or damage resulting from delay or failure in the performance of its obligations under this contract to the extent that such performance is delayed or prevented by: fires, floods, war, terrorist activities, riots, strikes, freight embargoes or transportation delays, shortage of labor, inability to secure fuel, material, supplies or power at current prices, or on account of shortages thereof; acts of God or of the public enemy; any existing or future laws or acts of the federal, state or local government (including specifically, but not exclusively, any orders, rules or regulations issued by any official or agency of any such government) affecting the conduct of Seller's business with which Seller in its judgment and discretion deems it advisable to comply as a legal or patriotic duty, or to any case beyond the Seller's reasonable control. Warranties: Seller warrants that the equipment sold under this contract shall be free from defects in material and workmanship for a period of twelve (12) months from the date of equipment startup or eighteen (18) months from the date of shipment, whichever occurs first. The following original equipment components only are warranted against defects in materials and workmanship for a period of five (5) years from date of shipment: fans, fan shafts, fan motors, bearings, sheaves, gearboxes, driveshafts, couplings, and mechanical equipment support. Details of option -specific warranties follow: Original Equipment Fan Motors are warranted against defects in materials and workmanship for a period of seven (7) years from date of shipment when space heaters are field -wired at time of initial installation per the motor nameplate. Replacement Parts provided by Seller under its original equipment warranty obligations are warranted against defects in materials and workmanship for a period of twelve (12) months from date of shipment or until expiration of their original warranty, whichever occurs first. Parts purchased after expiration of the original equipment warranty are warranted against defects in materials and workmanship for a period of twelve (12) months from date of shipment. Written notice of any defect shall be given to Seller immediately upon discovery by Buyer, and shall fully describe the claimed defect. Defective parts shall be repaired or replaced F.O.B. point of shipment, provided that inspection by Seller verifies the claimed defect(s). This shall be Buyer's exclusive remedy. This warranty does not cover the costs of removing, shipping or reinstalling the equipment. Repairs made without the prior written approval of Seller shall void all warranties covering material and workmanship. Any descriptions of the product(s) in the contract are for the sole purpose of identification and do not constitute a warranty. In the interest of product improvement, Seller reserves the right to change specifications and product design without incurring any liability therefore. The foregoing express warranties or those set forth elsewhere on this document are the only warranties of Seller applicable to the product(s) sold under this contract. All other warranties, whether verbal or written, and all warranties implied by law, including any warranties of merchantability or fitness for a particular purpose, are hereby excluded. Failure on the part of Buyer or of other parties to properly maintain the product(s) sold under this contract, or the operation of such product(s), by Buyer and/or other parties under conditions more severe than those for which such product(s) were designed, shall void all warranties covering materials and workmanship. Seller's warranties do not apply to defects in product(s) for which payment in full has not been received by Seller, and said warranties do not cover normal wear and tear or the erosion, corrosion and/or deterioration of the product(s) from unusual causes. No warranties by Seller shall apply to accessories manufactured by others, inasmuch as they are warranted separately by their respective manufacturers, except as stated above. Buyer assumes liability for and shall bear the costs of compliance with all laws, regulations, codes standards or ordinances applicable to the location, operation and maintenance of the product(s) sold under this contract, including those requirements pertaining to the distances between such product(s) and air-conditioning system duct intakes. No representative or agent of Seller is authorized to enlarge upon the express warranties of Seller. Corporate Headquarters: 7600 Dorsey Run Road, Jessup, MD 20794 — Tele: (410) 799-6200 / Fax: (410) 799-6416 Cancellation/Changes/Returns: Cancellation of or changes in any order by Buyer shall not be effective without Buyer's notice thereof received, agreed to, and confirmed in writing by Seller. If Seller, in its absolute discretion, approves Buyer's cancellation of an order, Buyer agrees to pay a reasonable cancellation charge. Seller's prior written consent must be obtained before Buyer returns any products, and when so returned will be subject to a handling charge and transportation costs payable by Buyer. Liability/Indemnification: Seller shall not be liable for any damages caused by delay in delivery of the products. Buyer shall hold harmless and indemnify Seller from and against all liability, claims, losses, damages, and expenses (including attorneys' fees) for personal injury and property damage arising out of Buyer's improper unloading, handling, or use of the products subject to this order, and for Buyer's infringement of another's property rights. The Seller's maximum liability from any causes whatsoever, whether in breach of contract, tort (including negligence), strict liability, or otherwise, shall not exceed the contract price. Neither Buyer nor Seller shall in any event be liable to the other, whether such liability arises out of breach of contract, tort (including negligence), strict liability or any other cause or form of action, for any consequential, special, indirect or incidental damages, including but not limited to loss of actual or anticipated profits or loss of use arising out of this contract, other than such damages resulting from the willful misconduct of Buyer or Seller. Storage: In the event that Buyer is unable to accept delivery of goods and the Seller is required to hold goods beyond two (2) working days from fabrication completion, a storage fee equal to the greater of $200/day or 0.20% of the total order value/day will be assessed by Seller for every day beyond two (2) working days from fabrication date which it is required to store goods on behalf of Buyer. Storage will be assessed monthly and will need to be paid in full prior to a new shipment date being scheduled. Government Contracts: If Buyer's purchase order is for products to be used in the performance of a U.S. Government contract, those clauses of applicable procurement regulations mandatorily required by federal law to be included in U.S. Government subcontracts shall be incorporated herein by reference. Export Transactions: Buyer shall comply with all applicable export laws and regulations of the U.S. Government, and shall hold harmless and indemnify Seller from and against all liability, damages, and expenses (including attorneys' fees) incurred by Seller as a result of Buyer's violation of any U.S. Government export and/or international antiboycott laws or regulations. Buyer certifies that it will be the recipient of the products to be delivered by seller. Buyer acknowledges that products are subject to export/import control laws of various countries, including the Export Administration Regulations of the United States. Products sold by seller cannot be transferred, sold or re-exported to any party on the Entity List or Restricted Persons list of the US Department of Commerce Bureau of Industry and Security, any party designated by the US Treasury Department Office of Foreign Asset Control and any party debarred or sanctioned for proliferation or terrorism reasons by the US State Department. Agreement of Sale: Buyer's order is accepted on the terms and conditions stated herein and Seller's acceptance of Buyer's order is expressly made conditional upon Buyer's assent to such terms and conditions, including any of Seller's terms and conditions which may be additional to or different from those contained in Buyer's purchase order or otherwise. Such assent shall be deemed to have been given unless written notice of objection to any such terms and conditions (including inconsistencies between Buyer's purchase order and this acceptance) is given by Buyer to Seller promptly upon receipt of this acknowledgment. Any agreement or understanding, oral or written, which modifies or waives the terms and conditions herein (whether contained in Buyer's purchase order or other documentation) shall be deemed material and shall be rejected unless hereafter agreed to in writing and signed by Seller's authorized officer. Waiver by Seller of any breach or default hereunder shall not be deemed a waiver by Seller of any other or subsequent breach or default which may thereafter occur. Neither the rights nor the obligations of either Buyer or Seller are assignable without the prior written consent of the other party. This agreement of sale and all rights and obligations of Buyer and Seller shall be governed by and construed in accordance with the laws of the State of Maryland. Electronic copy of the latest version is available online at http://baltimoreaircoil.com/english/terms. (Revised — 06/26/2014) Corporate Headquarters: 7600 Dorsey Run Road, Jessup, MD 20794 — Tele: (410) 799-6200 / Fax: (410) 799-6416 f,LTIMORE [CRCCCL CO ANY Mechanical Specifications 5-3-2018 Customer: WASHINGTON AIR REPS Project: South Center Professional Bldg Purchase Order No: 118564 Engineer: Replacement Tower BAC Order # U187866101 All Information is per Unit Quantity: 1 Model VF1-018-12HH CLOSED CIRCUIT COOLING TOWER Unit Type: Factory fabricated, forced draft, counterflow closed circuit cooling tower with vertical discharge. Quality Assurance: Each unit is manufactured under closely -controlled conditions using standardized parts to ensure each unit is built precisely to the same high-quality design and construction standards. The design, manufacture, and business processes of Baltimore Aircoil Company are ISO 9001:2008 certified. Unit Efficiency: The unit(s) will comply with the energy efficiency requirements established by ASHRAE Standard 90.1-2016. CTI Certification: The thermal performance of this BAC unit has been certified through performance tests conducted by the Cooling Technology institute in accordance with their standard STD -201 RS. Your equipment may be selected for factory -testing to verify CTI certified performance. Such certification by an independent third party assures engineers and users that the published thermal capacities accurately reflect the actual unit performance. CTI certification eliminates the additional costs of on-site, individual unit testing, oversizing the equipment or operating cost penalties from deficient equipment. Materials of Construction: All steel components are constructed from G-235 (Z700 metric) hot -dip galvanized steel with a Thermosetting Hybrid Polymer. vircular access doors provided for interior inspection, cleaning, and adjustments are constructed of G-235 (Z700 metric) hot -dip galvanized steel protected with a Thermosetting Hybrid Polymer and are held in place with phenolic knob screws. The heat transfer casing section(s) is (are) removable from the pan/fan section to facilitate rigging. a Thermosetting Hybrid Polymer applied by Baltimore Aircoil Company consists of: 1) G-235 (Z700 metric) hot -dip galvanized steel 2) parts prepared in a four -step (clean, pretreat, rinse, dry) process 3) electrostatically sprayed thermosetting hybrid polymer, fuse bonded to the hot -dip galvanized substrate during a thermally activated curing stage 4) quality assurance inspection program including 23 steps throughout polymer application and unit fabrication. The centrifugal fans and motors are located in the dry entering airstream beneath the sloping side of the pan. Fan discharge cowls constructed of G-235 (Z700 metric) hot -dip galvanized steel, protected with a Thermosetting Hybrid Polymer, are provided on each fan. They extend within the pan to protect the fans from falling water. G-235 (Z700 metric) hot -dip galvanized steel fan guard screens protected with a Thermosetting Hybrid Polymer are provided. On models VF1-009 through VF1-036 a solid fan shaft of ground and polished steel with exposed surface coated with a rust preventative is utilized. Self -aligning, heavy-duty, grease -packed, ball bearings with eccentric locking collars are provided on each end of the fan shaft. Where split intermediate bearing (Models VF1-036) or intermediate bearings are required, self -aligning, oil lubricated, sleeve type bearings with split, cast iron, pillow -block housing are furnished. All other models a hollow steel fan shaft, protected with two part epoxy, with bearing journals at Corporate Headquarters: 7600 Dorsey Run Road, Jessup, MD 20794 —Tele: (410) 799-6200 / Fax: (410) 799-6416 each end is utilized. Solid polished steel journals are coated with a rust preventative. Self -aligning, heavy-duty, grease -packed ball bearings with eccentric locking collars are furnished at each end of the shaft. V -belt sheaves, selected for 150% motor nameplate horsepower, are mounted and aligned at the factory. The fan(s), fan shaft(s), bearings, mechanical equipment support and fan motors are warranted against defects in materials and workmanship for five (5) years from date of shipment. Fan Wheels: Forwardly curved, centrifugal, squirrel cage type fan wheels are constructed from G-235 (Z700 metric) hot -dip galvanized steel protected with the Thermosetting Hybrid Polymer. Fan wheels are statically and dynamically balanced. Fan housings have curved inlet rings for efficient air entry. Coil Type: Coil(s) will be constructed with continuous 1.05" O.D. all prime surface steel tubes encased in steel framework. Additionally, in models configured with two segments, (models ending with -2), the two segments will be joined by an external crossover pipe to allow the fluid to flow through the two segments in series. The entire assembly is hot -dip galvanized after fabrication. Tubes wit be sloped for liquid drainage. Coil is tested at 375 psig (2685 kPa) air pressure under water without Class 150 flange connections. Coil with Class 150 flange connections has a maximum allowable working pressure of 230 psig (1585 kPa). Drift Eliminators: Drift eliminators are constructed of polyvinyl chloride (PVC), and are removable in easily handled sections. They impart three distinct changes in air direction to effectively strip entrained moisture from the leaving airstream with minimum air resistance. PVC eliminators are not a working surface. A working platform by others may be required to service the water distribution system. Unit Anchorage: When supported as recommended, the unit has anchorage to resist windloads up to 30 psf (146.6 kg/m^2) acting on the full vertical projected area with 16 psf (78.1 kg/m^2) acting simultaneously on the full horizontal projected area or seismic forces of 112% of the operating weight acting in the horizontal direction, and 14% of the operating weight acting in the vertical direction applied at the center of gravity. Spray Water Pump Assembly: Basin has integral pump(s) with large area, lift out, steel strainer screen(s) including perforated openings sized smaller than the water distribution nozzle orifices. Strainers include anti-vortexing baffles to prevent air entrainment. Close -coupled, bronze -fitted pump(s) with mechanical seal is mounted on the basin. The pump motor(s) are totally enclosed, fan cooled (TEFC). A water bleed line with a metering valve to control the bleed rate is installed between the pump discharge and the overflow connection. Electrical requirements match fan motor. Spray Distribution System: Spray header with schedule 40 PVC branches. Removable branches and 360° spray pattern plastic spray nozzles are held in place with snap -in rubber grommets. Basin Water Level Control: Probe -type electric water level control package including solid-state relay, electrode head, stainless steel electrodes, and a solenoid valve in the make-up water connection. The electrodes are make-up on, make-up off, and ground. Field wiring is by others. Basin Heater(s): A minimum number of high -watt -density electric immersion heater elements, sized to maintain +40°F (+4°C) basin water at 0°F (-18°C) ambient with a 10 mph (16 km/h) wind speed, is provided. Electrical requirements match fan motor. Wiring is not included. Heater Element Material of Construction: The unit is supplied with copper heater elements. Basin Heater Control: An electric immersion heater control package, including thermostat(s) and low water cutout switch(es) or probe(s), is provided. Disconnect switch, contactor, and wiring are not included. Vibration Cutout Switch: Fan system is provided with an appropriate number of vibration cutout switches to limit collateral damage to the unit in the event of a catastrophic fan failure. The vibration switch(es) is mechanically tripped with a frequency range of 0 to 3,600 RPM and trip point of 0.2 to 2.0 g's. No input power is required. Switch rating is 10 amperes at a maximum 480 VAC, and 1/4 ampere at 250 Vdc. Corporate Headquarters: 7600 Dorsey Run Road, Jessup, MD 20794 — Tele: (410) 799-6200 / Fax: (410) 799-6416 Air Discharge Option: Tapered discharge hood is constructed of G-235 (Z700 metric) hot -dip galvanized steel. The hood(s) includes access doors and galvanized positive closure dampers (PCD's) with damper actuator(s), and actuator end switch(es). Corporate Headquarters: 7600 Dorsey Run Road, Jessup, MD 20794 — Tele: (410) 799-6200 / Fax: (410) 799-6416 COIL CONNECTIONS GROOVED FOR MECH. COUPLING THREAD (MPT) FLANGED (SEE NOTES) COPPER SWEAT FITTING ACCESS DOOR 0 0 % trl 203D@ Baltimore Nrco:'. Com 0 d *9 w UJ m N M M (0 M 00 DIMENSION 0 N 10 (0 N N) N N M 00 M 10 03 M 00 10 M 10 J W 0 z 0 N N N N N M 1 1 1 1 00)0)0) 0000 0000 1 1 1 1 LEb » » AIR INLET SIDE (n w J 0 (.0 Z PM z 0 00 NN y OUTLINE OF UNIT N NN N N 0 N M .4- 0001000010olp 00000 1 1 1 1 1 wwwww »>>> N N N N N M M 1 1 1 1 1 1 N N N N N N N N N N N N 000000 1 1 1 1 1 1 t�wi,-www »»>> (n w 1- 0 Z N • N N NNMMd'�t� 1 1 1 1 1 1 1 (0(0(0(0(0(0(0 M M M M M M 0000000 1 1 1 1 1 1 1 L�wwwwww »»»> W OMUW 0 OO] O w w m Q J 0MCC 1-'(21_2 w J w (n ZOO < N m o Z O 011 -0 -111 - 'MO }w=mON¢nw LU zw�Q m0(~n~ 0 DC CC =D 00 o F- W 2ZW =,10(x0> Z Z LL WW JQaZ�O=W W W= 0w mwzW =()��QQ W O oz z (NwQ 0Z0 Z o CO w 2 E3 Ow uo= H ��wOZL0CDwO- (n0 CpZ JO-JZCOO(L)mr= ctF-OwWoa-OW r -WW zw w W Q O J Q Z Q 0_ cL 0° oWg w WQw W -l- 0 ¢ M M<MOZ=ocZw(.� 0 NW0E-0214-W�ZW O m JmWZO- Ba> OJaoZW 0 0-001=0 D-=I0uCj JJLWF- II omOz >-zm mJOocKoQWoi-pO_F-JWOzwQ OQ=0_owwmm0 zF- QJ12CQ �wQ00 z�0<wOrzW0j WOOJWoL-OW��>P5W4-W =ZJO_WZ== J wo>�= 1- <<0(0v)F-'* <=M<O0- N N M M 1 1 1 1 1 1 MWMWMM 000000 1 1 1 1 1 1 U- U_ L Lt_ U- >>>>>> »»» Ow<l oQ=M(n o ~ (3 o w _ W o z O~Q=Q zctZ o W O 2 N o NOor-O ooz¢(0 SFO -U1 <_10 Zl--w OZ17]F-0 Z W Z w Q O W<0000_ �UWZ- Q00_wo0 0] � 00 CtDWW 1- CC 0 t2 tZ in I- J z W D 0 11-- 0 (w w 0 0 D 0 W co N 03 O z O W Q o cL 030 03 0 N 0) to Cil F- 0 0 BAC -10183A F AMBIENT TEMPERATURE. Z CC CC 1/2" FPT THERMO. PROBE • - ti/£ 8l --.- TOTAL HEATER (kw) O N NO. OF HEATERS MODEL NO. co O st N 1 1 1 i 1 1 001©Boltimore Ars END OPPOSITE PIPING CONNECTION BALTIMORE AIRCOIL COMPANY CO 0 un tj 0 BAC -13010A *SOLENOID VALVE WATER INLET O 2 2 PIPING CONNECTION MAKE-UP DETAIL MODEL NUMBERS - VC1-10 thru VC1-25 Vr0-12E thru Vr0-28-H VXT-10 thru VXT-25 § § ƒ VC1-30 thru VC1-65 VTO-32H thru VTO-57-K VXT-30 thru VXT-55 J § § \ VC1-72 thru VC1-90 VTO-65J thru VT0-88-L VXT-65 thru VXT-85 r-- § §§ § \ § ELECTRIC WATER LEVEL CONTROL PACKAGE 3 Iw c, oco zv O o ,( U� k m Baltimore Aircoil CO CO 00 00 0 6 � 2 � E .. 2 2 O F• 0 0 w 0 0 ¢ O co = w LL D LL (1) WLLI W 2 N_ a W• O 2 g W Z- W Z < M Q ~ 0 '0 0 W a � W< 0 H Z .- ~ Q z w m J w t Q 0 <,__=<z z OLLpt-torr a vi LLww W w Oa MOm¢wm0 M C7 N� w r-- a m w a> w W O a z a M w D 0 C LL WcAa U Fx- >= U Z ? Ul w Z w W 0 Zi > Q O U W J D a UU U a a< m d W w w z~ <20.' Q w � >i < p 1-= z 0 d x a' 0 O W m x J mu 0 J Q' J Q 0 0 0 1- W Q_ 0> V) F- Q LL Q w (n a' Z =0 1- - wz j0<W c')0 � <6LLO~oW 1- w n m,>.- ww= Qo uo 1:',...(7) n�a0 a w w W w W w U z, w> x w ? O x r �)�zi'ccQ( J > w02a> CC 0 U? 0OFw-mw w wN 1C -.j. < 00 ww 0 Wa' 0_.).-.,,,w0-�Z,-,_,_,W z0 a Q¢�QO F- Q- W¢ Z M a 0 J u 0> x w z w Q W w w w 0 w, 0 m z m W H m W 0> Y Q J> z O W ~Q m W a' O Q J (n W Z rc.) OQWawax xw 0¢LLgwF- F- D ;K05 a>xa0WaF- ow 0 m=OQOa W a m W Z a LL = Z D o w U) = Z O x U) O L.6 o 0 J O a w¢ W= O Q D Lil W W z =c1- 2,<ZO a. -Z JQ>z~>z 0 i -OZ OCK J�cDQ= n 300 >�O¢OU �¢OU ain ¢z Ucnw y F- J CC M0 a w 0 m> W 0> W O .0 0< J N a' a a w Z o= o w zcK.x N Fx Z 5> ‹ z w w 0-zLg; m x OM,,, , w< ¢0ZYwa'0 00 JOC7 �O�zH0— O Z a w s z p z W cn o Z= w Z w __ICC W WI - E -270 w w W w 0 w W U > O w J w= F- F-, x U 1---< m UO ~ H rx F.- cwi) 0 F=- Lw/) <a_ '-.2 U ~ 0_ _ (_/] Z = .- N 0) V LD (D (';r /9 W 0 cn Z u-� w w U 9,4 tri F Q w 2 CL Z0 Z O H S 00 w <n 0 STATUS C❑DE LED. D 0 U U F- 3- 0 O 3 U 0 O OVA Oar AlddflS 13MOd IOLI±N00 F- 0 U U a 0 -±k-- 0_ lx - M V mm W w J U 0 = O J Q Q p z 0 } W Q >-- m W CI_ CO r THERMOSTAT M O � w O > � til Q - > I- V) 0 F¢- c- ro O 1- 0 Y v),,, zocci OW2 �Z Wp 0 0 O�VW 0 0 1 --Lu v) 2 0 2 n L, aWQC(Zo o Z ~ Q Z J 7-w¢ ZUw w Z Q am - m 5 0 O m O z 0 co 5 0 w 0( 0 J W r W - J 0 w J � J O W W < W O 0 O zw I- w> � U W Z I- W O O O Oz LU co \- 50W CC a Y W m m w W 3.- 3.-w mw W Q X 1.1_2Z O a Z U• ✓ I=C0 OJw IMW WO Q x z J>O ��W O z Q w _ CO ww 5.w co U Q 2 W F- - MAKE UP VALVE OFF (BLACK) RESETTING POWER: INDICATES UNIT INOPERATIVE F- W U (.9z1- 0 .9zO U U U 0_1= CCZ WO <M z 0 F- d Ow 1.1_co OD z_ 00 z U W U � Z Oz 00 U w° w J J J MAKE UP VALVE ON (WHITE) HEATER CUTOUT (YELLOW) GROUND (GREEN) rn � 0 s U U U1 = Baltimore Aircoil ORDER NO: DATE: 5/9/2018 20000 Baffinore Ai=coil Company. All Rights Reserved. I OPERATING INSTRUCTIONS Follow the installation drawings and wiring diagram (see chart below) to ensure the proper operation of the vibration switch. Direct any questions to your local BAC Representative. NOTE Moisture inside the switch can lead to switch failure. Care must be taken when replacing the cover on the vibration switch to ensure that the proper watertight seal is obtained. CAUTION Before performing any maintenance, adjustment or inspection of the switch, make certain that all power has been disconnected and locked in the off position. WIRING DIAGRAM CHART BAC-17491A=Shut down with local reset BAC-17492A=Shut down & alarm, with remote or local reset & time delay on start (110 Vac) BAC-17493A=Shut down & alarm, with remote or local reset & time delay on start (220 Vac) BAC 11490A FAN GUARD (REMOVED) SWITCH LOCATION LOW PROFILE SERIES V MOUNTING BRACKET VIBRATION CUTOUT SWITCH SWITCH LOCATION SERIES V B.A.C. ORDER NO: U187866101 DATE. 5/9/2018 VIBRATION CUTOUT SWITCH BALTIMORE AIRCOIL I MECHANICAL VCOS LOCATION CENTRIFUGA`_ FAN UNITS COMPANY DRAYYNG NUMBER: BAC • 1 490A ECHANICAL VIBRATION CUT-OUT = CD r W ^ r Z W W cc O ¢ 6 J 3N� U W - 1- N 0 CO CO 0 0 w 0 a J z N ( w z O W 1- O z PUSH BUTTON RESET. 0 J SETPOINT ADJUSTMENT ti M 0CC OU 1- r O N CC 0 W LI -1 O W CD W ¢ O N A.J VILLJIIr 4 O 0 3 = Z O U C1= . 0 CC w cr w N m 2W2 (rnr O U N r mWr WFN >,z 1- WW 0 Z • $'N Z a' r J 3 O< Z 0 0 Dz W U J 1= I- I -U W O O 2 = O WOD WU AO0_ Z \Zn U OCO FC OF Sm La a' ,, >- U a<N O Z W U W ZMW U O a 0 l yUj a' 5 W Z ± a W W U Cn ZWW E0 0)- W z Z z= W U r m - 0 OU O w W z O o 0 W O CO CC W w O W CD rw < fn r- W < r S'- m p pOW J p W a \ZCD 0 z LI' m w U • > COW z m O r< S w w w/ w 0 r N O H a O U W P r p CO a' < N O= 0ToZ o c.) w0O Otril>� �� a�O� FOw zU } a w p\ U3 w W < d Q W w r u.i w i N w U p o 0w 0 Q Up D d CC CC > J WZI <OJ JInz NZU <� J O= 3 Q 0 00 z w r N w a z =w w _ trnD0 .mz cN1- oU"® r� za =50 �0z ce�a- Nr W Z r W U Y 0 O Si p N< O< ams �z 0_i ce p i- r= W O, J J O W N N\ 0 0 ix - m o W O 0 Z < 0 wFW°oo >W= °=Uj ZUO U* NNQaV)cZQ UVW7� 0 0VZWmN Z 0U W ( -)M C.) CD F06 rCW V)W ?UCCO rr yc O W 0=* d CC ° g&)6 U) N F-1 0Fw >- D 000D=Z DOL., z-� � Z zzmo rF NUJ F¢cr.7 m< FLa 0 U<m Oce O O N < W O>ce = Z< Z 0i..._< S< Z Z Z< p1 U >- M x 0 d S z e W W ▪ z W U J 3 U t n C C =pU UOS,- (rn U°b* NO < a0 =da 1WQ =<c mce z ▪ w U W O 0 < w o r U Z0 aooz fpr 1n� �Uj� FU M m z c,,1w W W 0= o r zo z Ow Or CC 00 O W< $i /=<7..)C.) U MOUNTING PLATE tr 0 Z_ 3 (ONE -SINGLE POLE DOUBLE THROW SWITCH - SEE NOTE 5) O z o - O 0 —e o\ 0 z 0 CC CD 9- W 3 O z W UJ N ADJUSTMENTS OF BAC MECHANICAL VIBRATIONCUTOUT SWITCH w Q- N IiJN LO O0wZ� cr) z ~U' W 0 5 < c/) Om U Z 0 r w w W Y o r OJ C 0 p Z z< 00 F U H U-1 0- La Nz zz 0 o V) ✓ p zz La W w �m <_ cz-7 3 <a z I- J z< �< z Z U z zCYO U 0 C Y a CC aM0 C 0 w 00 . m N z F - r W w C Or = x = O Z U I=- - - Q W z Z O F i-. 20 CL K �`r L.!!! U r J w < 1- , La w Q�N'Zt-N ((1 z on Z xrr 1,4 O J W p w W Q • Z O U ? = a y 0 FZ < = ¢ wi2w8v ow Z r a ce*02 W 0 r O O = MW"E 5 r:0 W po aw rZI- O I- N <Z0 I -W Z O O a ZU->..JOQ H a J W OUW ao wiQ<= W!W r m0<Fr02<• ZW Wpz< OaSce u0w O rWpY�0 DO U p2mw0 <0 0 0 ¢ 61 C ZOI- M W 1 .� W r W 2 d z �N < W D Ycn QH W Ori M w m W La 2 r o 0 M J m W w W U W r \ 0 --1 - W M 00 O W r _< O K m • r O >.- Y, O 0 0 0 o allo=<N N< w H \ H hZ Cn rNZ L, 0 cn Q rF J a OQ m Y Y W o Zce2=r� O r U U 0 m X w W< W U W N J Um N Q of • w¢c70aNJ 0z 5 OU W W a 0 Z 2' Z W p z W Zce J WO CD ce z Z I- /- - � cn D r So ,, 0 Nn:rzrzz • r <a < 0 00O o CJ=m,x W p (Un < O ozrzr<m I0 Z r r U >Y =J • Z Y W (C v O O N z U < Y \W w W DO N W < < ,0 z M < a W J J T N CL m F J N M< < < 0 SUI W ZOpa 0 lrn ((a Z c +-� U O V J W W< [r U < r LL - J< I- I- J U~ �j OW O Cr) - l' --N O 4*tom Z CO Or Z CV M 'd' to fH SHUT OFT WITH LOCAL lV M) x 3 R a 2 N ? > Z = vg . U N V n 5:O oo W N< < o C° 0 € z 5 y W0 z 8� NN < e w }O} �0 Wm 2G1 27 WOJ 2J Z= Ana Ya 0 b N 8. GROUND CONNECTION IS NOT REQUIRED. z b www 2 W 0.a gg afllA Co1ulu �x GO N t 1,E0 c2b s Z r xo< 6 o w 25TZ� N O m C URho O I I I ( j l� j J l w, I Op q. I Io Y x 1s NL M D id 2 lf, p n m -- I 0 aF"T w --- 1--J L I 1 I I ''' R 1 1 r L ---T --� N I 1 / 1 i 1 I NI I L--+ 1 I I I 1 1\ ig TI NJ_ \ c5m aT i3 I I I I 1 L -4 J on i1 Li_ Q � G ! ^ Q Q LLJ0 Cr CD (z 0- _J > 0 _ r Z 00 a. 11/1/2018 r i City of Tukwila Department of Community Development RICHARD SINNEMA PO BOX 1268 CARNATION, WA 98014 RE: Permit Application No. M18-0078 SOUTHCENTER PROFESSIONAL PLAZA 411 STRANDER BLVD BLDG Dear RICHARD SINNEMA, Allan Ekberg, Mayor Jack Pace, Director In reviewing our current application files, it appears that your permit applied for on 6/14/2018, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Currently your application has a status of APPROVED and is due to expire on 12/14/2018. If you still plan to pursue your project, you are hereby advised to do one of the following: 1) If the plan review is complete for the project and your application is approved, you may pick up the application before the date of expiration. At the time of permit issuance the expiration date will automatically be extended 180 days. -or- 2) If the plan review is not completed submit a written request for application extension (7) seven days in advance of the expiration date. Address your extension request to the Building Official and state your reason(s) for the need to extend your application. The Building Code does allow the Building Official to approve one extension of up to 90 days. If it is determined that your extension request is granted, you will be notified by mail. In the event that we do not receive your written request for extension or request is denied, your permit application will expire and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: M18-0078 �.P 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 =: �'ERMIi WORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M18-0078 DATE: 06/15/18 PROJECT NAME: SOUTHCENTER PROF. PLAZA SITE ADDRESS: 411 STRANDER BLVD X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: kJ ANG to T i`� Building Division Public Works n Aek Nle' b-(94 Fire Prevention Structural Planning Division riPermit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 06/19/18 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 01/17/18 Approved n Approved with Conditions n Corrections Required ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 11/14/2018 Washington State Department of Labor & industries / HEATTRANSFER CO ; dishy 8, `rdY�,i�l, „inns i��SGCe,nGC / Search L&I HEATTRANSFER CO Owner or tradesperson Principals MCCLOSKEY, THOMAS, PRESIDENT MCCLOSKEY, GRACE, SECRETARY Doing business as HEATTRANSFER CO WA UBI No. 600 353 103 PO BOX 1268 CARNATION, WA 98014 425-885-3247 KING County Business type Corporation Governing persons GRACE E MCCLOSKEY THOMAS G MCCLOSKEY; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties Heating/Vent/Air-Conditioning and Refrig (HVAC/R) License no. HEATT**206Q0 Effective — expiration 11/20/1980— 09/11/2019 Bond No bond accounts during the previous 6 year period. Active. Meets current requirements. Insurance American Hallmark Ins Co of Te $1,000,000.00 Policy no. 44C L604244 Received by L&I Effective date 03/05/2018 03/05/2018 Expiration date 03/05/2019 Ohio Security Ins Co $1,000,000.00 Policy no. BKS57902825 Received by L&I Effective date 03/02/2018 03/05/2017 Expiration date 03/05/2019 ls... Milts `rr 1 & L.censirg Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=600353103&LIC=HEATT**206Q0&SAW= 1/3 11/14/2018 I• HEATTRANSFER CO ,\ American Hallmark Ins Co of Te $1,000,000.00 Policy no. 44CL604244 Received by L&I Effective date 03/05/2018 03/01/2018 Expiration date 03/01/2019 Insurance history Savings .._......_............ (in lieu of bond) $6,000.00 Received by L&I Effective date 09/07/2001 09/07/2001 Release date Impaired date N/A N/A Savings account ID 00735026401 (in lieu of bond) $2,000.00 Received by L&I Effective date 05/09/1984 Release date Impaired date N/A N/A Savings account ID 00024763 (in lieu of bond) Received by L&I Release date N/A Savings account ID 00735986 $2,000.00 Effective date 11/05/1980 Impaired date N/A Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts ........................... No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID Account is current. 425,977-00 Doing business as HEATTRANSFER CO Estimated workers reported Quarter 3 of Year 2018 "11 to 20 Workers" L&I account contact TO / JULIE SUR (360)902-4715 - Email: SURJ235@lni.wa.gov Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid Help us pro https://secure.ini.wa.gov/verify/Detail.aspx?UB1=600353103&LIC=HEATT"20600&SAW= 2/3 11/14/2018 No debarments have been issued against th. „,ntractor. HEATTRANSFER CO Workplace safety and health No inspections during the previous 6 year period. i Washington State Dept, of Labor & Industries. Use of this site is subject to the laws of the state of Washington. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UB1=600353103&LIC=HEATT"206Q0&SAW= 3/3 COOLING TOWER HVAC TI PLAN SCALE: s' = 1' SCOPE OF WORK: REPLACE .1 ROOFTOP COOLING TOWER "LIKE -FOR -LIKE" FOR NEW TENANT. NO WORK ON INTERIOR OF BUILDING. TOWER ENCLOSURE PROVIDES TOTAL VISUAL SCREENING. EXISTING UNIT WEIGHT: 3400 LBS. NEW UNIT WEIGHT: 2955 LBS. No chan0�-:: tho scope of work approval of B:'ii ng Division. NOTE: Flevisions will require a new plan submittal and may include additional plan review fees. SEPARA FE.:? -1.111" REQUIP :0R: ❑ Mechanical MI/Electrical (, Iumbing I Gas Piping City of Tukwila BUILDING DIVISION H.V.A.C. GENERAL NOTES (AS APPLICABLE) 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW THE EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2015 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, UFC, SEATTLE MECHANICAL CODE AND OTHER LOCAL CODES AND ORDINANCES AND THE 2015 EDITIONS OF WASHINGTON STATE ENERGY CODE AND SEATTLE ENERGY CODE. REFERENCES TO ONE CODE SHOULD BE INTERPRETED AS ALSO APPLYING TO THE CORRESPONDING SECTION(S) OF THE MOST RESTRICTIVE CODE THAT APPLIES. 3. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH THE 2015 IMC, 2015 SMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 24" DIAMETER AND LARGER WHICH ARE SUSPENDED BY HANGERS 12" OR MORE IN LENGTH. PROVIDE EARTHQUAKE BRACING AT 30' ON CENTER MAXIMUM. FIBERGLASS DUCTBOARD SHALL NOT BE USED. 4. ALL CONCEALED DUCT SYSTEMS SHALL BE SEALED WITH LISTED MASTIC TYPE DUCT SEALANT AT ALL JOINTS. SEAL FITTINGS CONNECTIONS WITH DUCT SEALANT (NOT TAPE). EXPOSED DUCTS SHALL BE INTERNALLY SEALED. 5. DUCTS SHALL BE INSULATED AS REQUIRED. BY THE 2015 WASHINGTON STATE ENERGY CODE OR 2015 SEATTLE. ENERGY CODE: -DUCT WRAP IN CEILING PLENUM SPACE SHALL BE 1.5", 35 LBICU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUMINUM FOIL VAPOR BARRIER, MIN. R-3.3. -DUCT WRAP FOR FRESH AIR SUPPLY DUCTS SHALL BE 2", 1.5 LBICU FT FIBERGLASS INSULATION WITH A FACTORY APPLIED REINFORCED ALUMINUM FOIL VAPOR BARRIER. MIN. R-7. -SOUND LINING FOR SUPPLY DUCTS WITHIN BUILDING SHALL BE 1", 1.5 LBICU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 4000FPM. MIN. R-3.3. -SOUND LINING FOR SUPPLY DUCTS OUTSIDE BUILDING SHALL BE 2",1.5 LBICU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 4000 FPM. MIN. R-7. 6: PIPING SHALL BE INSULATED AS REQUIRED BY THE 2015 WASHINGTON STATE ENERGY CODE OR 2015 SEATTLE ENERGY CODE SECTION C403.2.9. 7. FLEXIBLE DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER, 1'/z" FIBERGLASS INSULATION (R-5) AND NON -PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE A UL 181 LISTED CLASS I AIR DUCT. FLEXIBLE DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 10' IN LENGTH UNLESS NOTED OTHERWISE. IN ROOF CEILING JOIST SPACE FLEXIBLE DUCTS SHALL HAVE AN R-8 INSULATION RATING. 8. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH THE 2015 IBC. 9. PROVIDE TURN VANES IN ALL MITERED 90'S AND TEES. 10.ELECTRICAL CONTRACTOR TO PROVIDE DISCONNECTS, MOTOR STARTERS, OVERLOADS AND POWER WIRING AS REQUIRED TO ALL EQUIPMENT 11.MECHANICAL CONTRACTOR SHALL PROVIDE AND MOUNT RETURN DUCT SMOKE DETECTORS CAPABLE OF AUTOMATIC SHUT DOWN OF ALL HEATING OR COOLING EQUIPMENT DELIVERING IN EXCESS OF 2000 CFM IN ACCORDANCE WITH THE 2015 IMC OR 2015 SMC. POWER WIRING AND INTERLOCK WITH THE BUILDING FIRE ALARM SYSTEM IS BY THE ELECTRICAL OR FIRE ALARM CONTRACTOR. MECHANICAL CONTRACTOR SHALL PROVIDE WEATHERPROOF ENCLOSURES FOR DUCT SMOKE DETECTORS WHERE NECESSARY ON ROOF DUCT SYSTEM- COORDINATE WITH ELECTRICAL OR FIRE ALARM CONTRACTOR. 12.MAINTAIN 10' BETWEEN OUTSIDE AIR INTAKES TO AC AND MUA UNITS AND EXHAUST FROM VENTILATION EQUIPMENT, COMBUSTION EQUIPMENT AND PLUMBING VENTS. 13.THE MECHANICAL CONTRACTOR SHALL LABEL ALL MECHANICAL EQUIPMENT, VALVES AND PIPING. COORDINATE WITH BUILDING ENGINEER. 14.THE MECHANICAL CONTRACTOR SHALL PROVIDE TEMPORARY FILTERS TO HVAC EQUIPMENT IN THE T.I. SPACE DURING CONSTRUCTION TO MINIMIZE DUST INFILTRATION TO THE BUILDING H.V.A.C: SYSTEM. 15.THERMOSTATS WILL BE 7 -DAY PROGRAMMABLE TYPE WITH OPTIMUM START MORNING WARMUP, NIGHT SETBACK AND CONFIGURABLE 5°F DEADBAND TO PREVENT SIMULTANEOUS HEATING AND COOLING. FOR HEAT PUMP CONTROL, THERMOSTAT WILL USE COMPRESSOR AS FIRST STAGE WITH VISIBLE INDICATOR WHEN SUPPLEMENTARY HEAT IS USED. PER WSEC C403.2.4.1.1, SUPPLEMENTARY ELECTRIC HEAT MAY NOT OPERATE WHEN OUTSIDE TEMPERATURES ARE ABOVE 40° F. PER SEC C403.2.4.1.1, SUPPLEMENTARY ELECTRIC HEAT MAY NOT OPERATE WHEN OUTSIDE TEMPERATURES ARE ABOVE 32° F. 16.COMBUSTION HEATING SHALL COMPLY WITH 2015 WSEC AND 2015 SEC AND INCLUDE INTERMITTENT IGNITION AND FLUE -DRAFT DAMPER. HEATING EQUIPMENT BELOW 225,000 BTUH TO COMPLY WITH TABLE C403.2.3(4) (MINIMUM AFUE .78). 17.ECONOMIZER AND ZONE DAMPERS SHALL MEET THE REQUIREMENTS OF 2015 WSEC OR 2015 SEC FOR DAMPER LEAKAGE AND CONTROL: =OA SUPPLY DAMPER(S) SHALL AUTOMATICALLY CLOSE DURING UNOCCUPIED PERIODS, DURING MORNING WARMUP AND WHEN UNIT IS OFF. -OA SUPPLY DAMPER(S) ARE ALLOWED, TO OPEN FOR ONE HOUR PRIOR TO OCCUPANCY. -OA SUPPLY DAMPER(S) SHALL COMPLY WITH AMCA STANDARD 500 FOR MAXIMUM ALLOWABLE LEAKAGE. 18.MECHANICAL CONTRACTOR WILLPROVIDEMECHANICAL SYSTEM COMMISSIONING AND COMPLETION AS REQUIRED BY THE WSEC C403.2.10 OR SEC C403.2.10 19.THE HEATING AND COOLING EQUIPMENT FOR THIS PROJECT IS SIZED WITHIN THE ALLOWABLE LIMITS. REQUIRED BY WSEC C403.2.2 OR SEC C403.2.2 HEATING AND COOLING CAPACITIES DO NOT EXCEED LOADS BY 50%. (LOAD CALC'S ATTACHED) 20.THIS IS A LOW-PRESSURE DUCT SYSTEM (2" W.C. OR LESS). THE CONTRACTOR WILL SEAL DUCTWORK AND PERFORM A DUCT PRESSURE TEST IN COMPLIANCE WITH WSEC C403.2.8 OR SEC C403.2.8. THE MAXIMUM ALLOWABLE DUCT LEAKAGE SHALL BE 6% FOR CONSTANT -VOLUME SYSTEMS SERVING LESS THAN 5000 SF. 21.BALANCING DAMPERS WILL BE INSTALLED ON ALL SUPPLY DIFFUSERS. A AFF BOD BOTUT BTUH CAP CFM CMB DMPR DN EC ELEV H.V.A.C. STANDARD ABBREVIATIONS COMPRESSED AIR LINE ESP AIR CONDITIONING UNIT EXH ABOVE FINISHED FLOOR FD BACKDRAFT DAMPER FLA BOT TOMM OF DUCT FO BRITISH THERMAL UNIT G BRITISH THERMAL UNIT PER HOUR GALV BOTTOM WALL GRILL BOTTOM WALL REGISTER CAPACITY CUBIC FEET PER MINUTE COMBUSTION DUCT BOARD DAMPER DOWN EGGCRATE ELEVATION GPM D MBH MIN MPG MT EXTERNAL STATIC PRESSURE EXHAUST FIRE DAMPER FULL LOAD AMPS FLAT ON BOTTOM FLAT ON TOP GAS LINE (LOW PRESSURE) GALVANIZED GENERAL CONTRACTOR GALLONS PER MINUTE HOT GAS LINE INSIDE DIMENSION THOUSAND BTUH MECHANICAL CONTRACTOR MINIMUM MEDIUM PRESSURE GAS MOUNT NOMINAL OSA OUTSIDE AIR OBD OPPOSED BLADE DAMPER OD OUTSIDE DIMENSION PD PRESSURE DROP RA RETURN AIR REG REGISTER (GRILL WIDAMPER) REQ'D REQUIRED RIO ROUGH IN ONLY SA. SUPPLY AIR SL SOUND LINING SM SHEET METAL SP STATIC PRESSURE SS STAINLESS STEEL TOD TOP OF DUCT TWG TOP WALL GRILL TWR TOP WALL REGISTER TYP TYPICAL UNO UNLESS NOTED OTHERWISE FIE: Ap the of a Heattransfer Co. P.O. Box 1268 Carnation, WA 98014-1268 PH: (425) 885.3247 FX: (425) 333-6545 Contractor # HEATT**206Q0 Electrical # HEATTC*OO9DA Tukwila # 22128 DRAWING DRAWN: RS CHECKED: TM DATE: 0610612018 ISSUED HVAC LEGENDS, NOTES, ELEV. PLAN, FLOOR PLANS AND SCHEDULES Southcenter Professional 411 Strander Blvd. Tukwila, WA 98188 PARCEL NUMBER 0223200052 LEGAL DESCRIPTION ANDOVER INDUSTRIAL PARK # 3 LESS N 137 FT OF E 165 FT LESS UP RR OPER RIW FILE CC27 ci Pc!rrn!... ' /({"pi� �L 0/00--1 U �, tl 'tee'. n revit'6J ; ,,"'' :i is cub ?,Lt to errors and omissToi ?royal of cjr , `'L` Jr1 CQ^L`monts dors not authc,l: viola ,n of any adopted codo cr ordin nco. Race pprovc d Fiold Copy and conditions is acknowlcdgc Ely: D ate: DIFFUSER AND GRILLE SCHEDULE DRAWING SYMBOL • MANUFACTURER SIZE TYPE • MOUNT COMMENTS X TITUS MCD PER CALLOUT SUPPLY DIFFUSER T -BAR MOUNT PER CALLOUT RETURN GRILLE T -BAR MOUNT 1/2 "x%" ALUMINUM EGG CRATE City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA AN °2018 PERMIT CENTER REVIEWED FOR O QOMPLIAN.CE. APPROVED JUN 21 2010 .130 City of Tukwila BUILDING DIVISION M-1 SHEET NO. VICINITY MAP