Loading...
HomeMy WebLinkAboutPermit M18-0081 - BOEING #9-064 NETWORK - AIR HANDLING UNIT AND DUCT WORKBOEING #9-064 NETWORK 9725 E MARGINAL WAY S BLDG 9-064 MI 8-0081 Parcel No: Address: City of Tukwila f --y1 Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 0003400018 Permit Number: M18-0081 9725 E MARGINAL WAY S BLDG 9-064 Issue Date: 7/10/2018 Permit Expires On: 1/6/2019 Project Name: BOEING #9-064 NETWORK Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: BOEING COMPANY THE PO BOX 3707 M/C 20-59 PROPERTY TAX DEPT, SEATTLE, WA, 98124 JARROD DIAMOND 3051 E VALLEY RD , RENTON, WA, 98057 APOLLO MECHANICAL CONTRACTORS 1133 W COLUMBIA DR, KENNEWICK, WA, 99336 APOLLMC864JQ /11 Phone: (253) 872-5151 Phone: (509) 586-1104 Expiration Date: 4/18/2020 DESCRIPTION OF WORK: DEMO OF DUCT WORK SPLIT UNIT, ASSOCIATED PIPING. INSTALL OF NEW AIR HANDLING UNIT (2) AND DUCT WORK AND CONDENSATE LINES. DDC CONTROLS ALSO. Valuation of Work: $222,584.00 Type of Work: REPLACEMENT Fuel type: ELECT Fees Collected: $2,902.61 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: VALLEY VIEW,TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: Date: 1 2017 2017 2017 2015 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: / 1 • / � Date: / 0 P 3/ Print Name: / f /4-77 %Z_ D A-72- S/ This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ***MECHANICAL PERMIT CONDITIONS*** 10: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 11: Manufacturers installation instructions shall be available on the job site at the time of inspection. 22: TO SCHEDULE ALL FIRE INSPECTIONS CALL 206-575-4407. 12: The attached set of mechanical plans have been reviewed by The Tukwila Fire Marshals Office and are acceptable with the following concerns: 13: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2437) 14: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) r r� �/ 15: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2437) 16: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2437) 17: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 18: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 19: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 20: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 21: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 FIRE FINAL 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL 0702 SMOKE DETECTOR TEST CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov r� Mechanical Permit No. Project No. Date Application Accepted: Date Application Expires: M1%CO4 (For office use o ly) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION King Co Assessor's Tax No.: Site Address: q /ZS- IA)y S-e4,tde 0 r Suite Number: Floor: New Tenant: ❑ Yes er..No Tenant Name: BOe-! i'! q q" b q PROPERTY OWNER Name: J/a1vrod p/ii' Address:3 0S / s l'O{,(e j £d Name: I1.� /_ _ 20.e1'Yi q e0 �/ Tukwila Business License los _ 0995v/ 0 Address: J City: State: Zip: CONTACT PERSON - person receiving all project communication Name: J/a1vrod p/ii' Address:3 0S / s l'O{,(e j £d City: 'Wvl l` 5/tate:tA) A Zip: 4 s.o57 Phone:_ SISI Fax: h /4- Email: Jar rod , of I. a ►n a>-, d 00 l !0 mech. caw MECHANICAL CON TRACTOR INFORMATION Company Name:0 ab "neck � £ c�tL Address: 3067 E veuZ y /1 City: /2".../try) State: 6.0 ,c} Zip:9 SrOS 7 Phone: ZSs -g 12-s7s-1 Fax: 4J If_ Contr Reg No.: w�4APoGLmC t.�4pc�D ate: /�/8,/zz Tukwila Business License los _ 0995v/ 0 Valuation of project (contractor's bid price): $ ZZ l 8y `2' Describe the scope of work in detail:'' U E DiA C �- �- z- �.(/1'/ l� , assoc,Q ITCVn l/� ' it/154150 v'd � tO a.l �- Cvvt of o vi l v^ 1 +shj 2) Cvvt dd u c (A) oY 12- N- Com, c -111 1 �> c Gaut. 4-1-015 -ta rots t so �`� Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement Fuel Type: Electric ja Gas ❑ Other: H:\Applications\Forms-Applications On Line\2016 ApplicationsWlechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu Industrial Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit 65 dB(A) <10,000 cfm 60 dB(A) Unit Type Qty Air handling unit Residential, Nighttime >10,000 cfm Industrial Evaporator cooler 55 dB(A) Ventilation fan connected to single duct 57 dB(A) Ventilation system Commercial Hood and duct 47 dB(A) Incinerator — domestic 65 dB(A) Incinerator — conurt/industrial 60 dB(A) Unit Type Qty Fire damper Residential, Nighttime Diffuser Industrial Thermostat 55 dB(A) Wood/gas stove 57 dB(A) Emergency generator Commercial Other mechanical equipment 47 dB(A) 60 dB(A) 65 dB(A) Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytim A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (7am-lOpm); • Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDIN G OWNER ORiTRIZ ED AGENT: GENT: `yam,t- Signature: Print Name: a:1Z r 7cYsf Mailing Address: 057 2,v0 G !2c H:\Applications\Forms-Applications On Line\2016 Applications\Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh Date: // 'J l r Day Telephone: Z45-•-• O 7 Z s/ S7 r?€ IA) '3T7 City State Zip Page 2 of 2 r � 7 ;ash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT I QUANTITY PAID PermitTRAK $2,785.86 M18-0081 Address: 9725 E MARGINAL WAY 5 BLDG 9-064 Apn: 0003400018 $2,344.41 Credit Card Fee $68.28 Credit Card Fee R000.369.908.00.00 0.00 $68.28 MECHANICAL $2,167.74 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $2,134.59 TECHNOLOGY FEE $108.39 TECHNOLOGY FEE R000.322.900.04.00 0.00 $108.39 M18-0082 Address: 8701 E MARGINAL WAY S BLDG 14-01 Apn: 0007400033 $441.45 Credit Card Fee $12.86 Credit Card Fee R000.369.908.00.00 0.00 $12.86 MECHANICAL $408.18 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $375.03 TECHNOLOGY FEE $20.41 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R14895 R000.322.900.04.00 0.00 $20.41 $2,785.86 Date Paid: Tuesday, July 10, 2018 Paid By: HEATHER DARST Pay Method: CREDIT CARD 02167D Printed: Tuesday, July 10, 2018 11:37 AM 1 of 1 SYSTEMS Page 2 of 2 CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA Date: 07/10/2018 11:37:38 AM CREDIT CARD SALE VISA CARD NUMBER: **********6939 K TRAN AMOUNT: $2,785.86 APPROVAL CD: 02167D RECORD #: 000 CLERK ID: Rachelle Thank you! Customer Copy https://classic.convergepay.comNirtualMerchant/transaction.do?dispatchMethod=printTra... 7/10/2018 Page 1 of 2 CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA 0017340000802374464500 Date: 07/10/2018 11:37:38 AM CREDIT CARD SALE VISA CARD NUMBER: **********6939 K TRAN AMOUNT: $2,785.86 APPROVAL CD: 02167D RECORD #: 000 CLERK ID: Rachelle X {CARDHOLDER'S SIGNATURE} I AGREE TO PAY THE ABOVE TOTAL AMOUNT ACCORDING TO THE CARD ISSUER AGREEMENT (MERCHANT AGREEMENT IF CREDIT VOUCHER) Thank you! Merchant Copy https://classic.convergepay.com/VirtualMerchant/transaction.do?dispatchMethod=printTra... 7/10/2018 Cash Register Receipt DESCRIPTIONS I ACCOUNT PermitTRAK QUANTITY PAID $558.20 M18-0081 Address: 9725 E MARGINAL WAY S BLDG 9-064 Apn: 0003400018 $558.20 Credit Card Fee $16.26 Credit Card Fee R000.369.908.00.00 0.00 $16.26 MECHANICAL $541.94 PLAN CHECK FEE R000.322.102.00.00 TOTAL FEES PAID BY RECEIPT: R14749 0.00 $541.94 $558.20 Date Paid: Tuesday, June 19, 2018 Paid By: HEATHER DARST Pay Method: CREDIT CARD 05523D Printed: Tuesday, June 19, 2018 12:59 PM 1 of 1 SYSTEMS Page 1 of 2 CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA 0017340000802374464500 Date: 06/19/2018 12:58:50 PM CREDIT CARD SALE VISA CARD NUMBER: **********6939 K TRAN AMOUNT: $558.20 APPROVAL CD: 05523D RECORD #: 000 CLERK ID: Rachelle X {CARDHOLDER'S SIGNATURE} I AGREE TO PAY THE ABOVE TOTAL AMOUNT ACCORDING TO THE CARD ISSUER AGREEMENT (MERCHANT AGREEMENT IF CREDIT VOUCHER) Thank you! Merchant Copy https://classic.convergepay. comNirtualMerchant/transaction.do?dispatchMethod=printTra... 6/19/2018 Page 2 of 2 CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA Date: 06/19/2018 12:58:50 PM CREDIT CARD SALE VISA CARD NUMBER: **********6939 K TRAN AMOUNT: $558.20 APPROVAL CD: 05523D RECORD #: 000 CLERK ID: Rachelle Thank you! Customer Copy https://classic.convergepay.comNirtualMerchant/transaction.do?dispatchMethod=printTra... 6/19/2018 INSPECTION NO. INSPECTION RECORD Retain a copy with permit [NS oaf PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: (�, ! 1 " 814 q Type of Inspe tion: a� c444-- ,1� v v ,-. Address: / D e Called: Special Instructions:ate 9- / Wanted: �2�' % 30' // a.m. p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: ae fI , c j c_ 4PrvrA7cv-- Inspector ,Z C Date: /7.70-20/ REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPEC NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 NO f Project: 2219/& WV- t:2 ? Type of Inspection: erW�'< •i,./ Address: ?1Z e 744L � Date ailed: Special Instructions: 0/J .siK Date Wanted: /-*- f9 3.131- p.m. Requester: �� Phone No: Z©6 9Z2gz.-- Approved per applicable codes. Corrections required prior to approval. COMMENTS: ittt Arc -nit) A Vrietor- 12— ,,te f-yuc,t Inspector: '7 1 o cE Date:O /6 J. REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 P ect: a t oei r13 B TOO Ty a of Inspection: Nec ,� i C, r r.� L. Address: J 9725 E. I" I ;� ' J � Date Called: Special Instructions: l%�o-_ mYlsrvi spb�- T _ I _ AlioRequester: seek Date Wanted: a.m. 1,0 - z`- Lj j P.m. !i nrel ' o04 i +N/ w rte_ i c. (S 5-86-//054 hone No: 25%3-87Z-5151 EiApproved per applicable codes. corrections required prior to approval. COMMENTS: f11 zo2G?-S 32 Argos 44)- Inspector: Date:i0 3/ 0`� REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Its -oast Project:eiy-1 701- O-10 9 T f of Inspection: bd. xwazahmir ate C lied: Address: Special Instructions: Date WantedAO -Z3 40 fry— . ! Re uester: (Prey CeiliVE. Phone o: 2134, -91.,0(099... Approved per applicable codes. Corrections required prior to approval. COMMS AC+ TAL5 " (f) (24 Inspector:3,sQ Date/V2-3/2 g REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. EPINSPECTION RECORD Retain a copy with permit INSP NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Proj ��e1 It9-� 1/ T e of Inspection: I"k ° Addr s: 9725 Es 1,1L19\s Special Instructions: b° -MO/ GIG is -XINIS It "i' Z '' Atwt Date Wanted:"--='n.a.m. 10-9 -�L� p.m. Requester 1 D//n ii/ .,L..ur Pho a No: Z5-3- 7Z -..5/5/ Approved per applicable codes. Corrections required prior to approval. COMMENTS: ExrtAtoA DUCT NsO' /f77oN Al bU, I-i"0e, FAfl0-IC 6N E 77-1- vit117 ,$ /91Rb>C Ce " et IRIsJI-t-Ti-o ) /s /tio% Inspector: Date: /6 _1_16 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION Mrs -00g) 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 43t-3670 P ect: 9 --ALJ pe of Inspection: QT Address:A ir Gate Iled: Special Instructions: Date Wanted: 9. a.m. /� ���� p.m. Requester: ((-t Phone No: v 2�%-92.0-4tLi2 73 Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: FoRcA _VA) — phcte _per Cc,t)4— • Inspector:3- Date: 9- /k , REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit filf- erg l PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pr ect: oe� 9-©&y ititilovi Typ of Inspection: . 772s . rip4l Date Called: nstructions4725 viha Special Instructions: 46- (Av) A%. Spl`tRequW ate Wanted: :Address: -zve . Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: [ p lects3.0 zrowe Aktolk- _56e()Ca Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 M wY-oaf( Proj • .> 9-06 li of Inspection: .iv ktee-fnovew Address: Date Call Special Instructions: Jf (/ (%%( � . 1 / y tf " Date Wanted: 8 -30-OritQ' a.m.' Requester: Phone No: LIApproved per applicable codes. Corrections required prior to approval. COMMENTS: /t/w • /I/ -4 u t •ed<, In Aff Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NUMBER INSPECTION RECORD Retain a Coo Oith perp it' /f( -o z) [(4 -F -72.4 - PERMIT ( -F -724 - PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 206-575-4407 Project: 4- 96e( t45 2-- 6 A Type of Inspection: tY14 - - - - -c- Address:Contact Suite #: `� 725 tw r•k_j s Person: Special Instructions: Phone No.: Approved per applicable codes. nCorrections required prior to approval. COMMENTS: .._ '1 Hrs.: / _. Hood & Duct: Monitor: '7-'y (,p Pre -Fire: /t/ ( 14p p-fuv-e d/ / p Sid .b.0 5 — 1 lv.e. C% SZ ' Q- �2 /5:ev /j �. Com+ '- (tL. - (inS e p.4 l 0 Y P 7 t.247-tr i Needs Shift Inspection: tiSprinklers: '1 Hrs.: / Fire Alarm: Y Hood & Duct: Monitor: '7-'y (,p Pre -Fire: /t/ . Permits: Occupancy Type: 5 — Inspector: .1-744 Date: /6 t23! I e( Hrs.: / n $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. CaII to schedule a reinspection. Billing Address Attn: Company Name: Address: City: State: Zip:: Word/Inspection Record Form.Doc 3/14/14 T.F.D. Form F.P. 113 'eese er n ineers. n = Consulting Engineers Scuttle Portland www. HeudorterEngin Air Handling Unit PROJECT: Boeing Bldg. 9-64 1 Network LOCATION: SEATTLE, WA PROJECT #: 2018-0627 DATE: 1/10/2019 CONTACT: AUTHOR: Andy Eaden SYSTEM/UNIT: AHU-01 AREA: Boeing Bldg 9-64 Network Room Unit Data Unit Manufacturer Unit Model Number Unit Serial Number Unit Discharge Fan Rotation AHU-01/SF Filter Bank Filter Type Filter Quantity - Size 1 Filter Dimensions - Size 1 TRANE THH150G4ROBOFOBB100060 007000000000000000 182910640D Horizontal Counterclockwise Pleated 8 20x25x2 AHU-01/Supply Fan Starter Manufacturer Starter Data Trane/VFD Test Data Total Design Flow Total Actual Flow OA Design Flow RA Design Flow AHU-01/Supply Fan Fan RPM Design Fan RPM Actual Motor RPM Actual VFD Setting Motor Volts T1-T2 Motor Amps T1 5000 CFM (1) CFM (2) CFM (2) CFM 780 RPM 682 RPM 1757 RPM 60 (3) Hz 460 (3) Volts 4.52 (3) Amps Log: Tested By: Andy Eaden Date: 1/10/2019 Motor Data AHU-01/Supply Fan Drive Type Motor Manufacturer, Motor Frame Motor HP Motor RPM Motor Rated Volts Motor Phase Motor Hertz Motor FL Amps Motor Service Factor Motor Efficiency; ' Belt Drive Marathon 56HZ 3 HP 1725 RPM 208-230/460 Volts 3 60 Hz 9.4-9.2/4.6 Amps 1.15 85.5 % Sheave Data AHU-01/Supply Fan Motor Sheave MFG Motor Sheave Model Motor Sheave Bore Motor Sheave Type Fan Sheave MFG Fan Sheave Model Fan Sheave Bore Number of Belts Belt Size Sheave Center Line Motor to Extend Motor to Retract Browning 1BK45H H 7/8 in. Fixed Browning BK110 1 3/16 in. 1 BX77 (4) in. 1 in. 1 in. Test Pressures Final Filter Inlet SP Final Filter Outlet SP Clg Coil Inlet SP Clg Coil Outlet SP SF Suction SP SF Discharge SP SF Actual Total SP SF Design Extemal SP SF Actual External SP OA Damper Pos RA Damper Pos -0.43 in. wc - 0.48 in. we -0.48 in. we - 0.57 in. wc - 0.57 in. wc 0.73 in. wc 1.30 in. wc 1.50 in. wc 1.16 in. wc (2) % (2) % AHU-01 AHU-01 AHU-01/Supply Fan AHU-01/Supply Fan 1/9/2019 Andy Eaden 1/9/2019 Andy Eaden 1/9/2019 Andy Eaden 12/12/2018 Andy Eaden (1) AHU-1 and AHU-2, share the same duct work. The supply grills were proportioned with AHU-2 running. NEI did obtained another total air round duct traverse with just AHU-1 running. Refer to duct traverse sheet T-01, for further details. (2) No Design CFM's provided on the mechanical schedule. The outside air damper modulates depending on the outside air temperature. (3) Data was obtained from the VFD. (4) This fan has a tensioner pulley, so the center line can not be established. Not winrfor Fnninoorc !nr eu. a er ngineers. e a Con$ulling Engineers Seattle Portland wwK.t4eudarterEngin :.com Air Handling Unit PROJECT: Boeing Bldg. 9-64 1 Network LOCATION: SEATTLE, WA PROJECT #: 2018-0627 DATE: 1/10/2019 CONTACT: AUTHOR: Andy Eaden SYSTEM/UNIT: AHU-02 AREA: Boeing Bldg 9-64 Network Room Unit Data Unit Manufacturer Unit Model Number Unit Serial Number Unit Discharge Fan Rotation AHU-02/SF Filter Bank Filter Type Filter Quantity - Size 1 Filter Dimensions - Size 1 TRANE THH150G4ROBOFOBB100060 007000000000000000 182910633D Horizontal Clockwise Pleated 8 20x25x2 Starter Data AHU-02/Supply Fan Starter Manufacturer Trane / VFD Test Data Total Design Flow Total Actual Flow OA Design Flow RA Design Flow AHU-02/Supply Fan Fan RPM Design Fan RPM Actual Motor RPM Actual VFD Setting Motor Volts T1-T2 Motor Amps T1 5000 CFM 5155 (1) CFM (2) CFM (2) CFM 780 RPM 670 RPM 1757 RPM 60 (3) Hz 459.2 (3) Volts 3.99 (3) Amps Log: Tested By: Andy Eaden Date: 1/10/2019 Motor Data AMU-02/Supply Fan Drive Type Motor Manufacturer Motor Frame Motor HP Motor RPM Motor Rated Volts Motor Phase Motor Hertz Motor FL Amps Motor Service Factor Motor Efficiency Belt Drive Marathon 56HZ 5 HP 1725 RPM 208-230/460 Volts 3 60 Hz 9.4-9.2/4.6 Amps 1.15 85.5 % Sheave Data AHU-02/Suooly Fan Motor Sheave MFG Motor Sheave Model Motor Sheave Bore Motor Sheave Type Fan Sheave MFG Fan Sheave Model Fan Sheave Bore Number of Belts Belt Size Sheave Center Line Motor to Extend Motor to Retract Browning 1BK45 7/8 in. Fixed Browning BK110 1 3/16 in. 1 BX77 (4)in. 1 in. 1 in. Test Pressures Final Filter Inlet SP Final Filter Outlet SP CIg Coil Inlet SP CIg Coil Outlet SP SF Suction SP SF Discharge SP SF Actual Total SP SF Design External SP SF Actual Extemal SP OA Damper Pos RA Damper Pos -0.39 in. wc -0.45 in. wc - 0.45 in. wc - 0.54 in. wc -0.54 in. wc 0.72 in. wc 1.26 in. wc 1.5 in. wc 1.11 in. we (2) % (2) % AHU-02 AHU-02 AHU-02/Supply Fan AHU-02/Supply Fan 1/9/2019 Andy Eaden 1/9/2019 Andy Eaden 1/9/2019 Andy Eaden 1/9/2019 Andy Eaden (2) No Design CFM's provided on the mechanical schedule. The outside air damper modulates depending on the outside air temperature. (1) A total air round duct traverse was obtained. Refer to duct traverse sheet T-01, for further details. (4) This fan has a tensioner pulley, so the center line can not be established. (3) Data was obtained from the VFD. NNiirinrfPr FnninPPrc /nr Duct Traverse PROJECT: Boeing Bldg. 9-64 1 Network LOCATION: SEATTLE, WA PROJECT #: 2018-0627 DATE: 1/10/2019 CONTACT: AUTHOR: Andy Eaden SYSTEM/UNIT: T-07frotal supply air for outlets #5 and #6 AREA: Boeing Bldg 9-64 Network Room Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 18 in. 0 in. 1.77 sq. ft. 2 10 20 Log: Tested By: Andy Eaden Date: 1/10/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 21850 1093 FPM 1870 CFM 1935 CFM 0.07 in. T-07/Total supply air for outlets #5 and 12/12/2018 Andy Eaden #6 A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Hole 1 901 1 726 685 Traverse Data Points 793 N d 0 1881 1221 11074 1192 1021 1143 1190 999 815 1207 I 1201 total 889 18 675 1073 2154 o f Nnsidnrfar FnninAArc lnr Duct Traverse PROJECT: Boeing Bldg. 9-64 1 Network LOCATION: SEATTLE, WA PROJECT #: 2018-0627 DATE: 1/10/2019 CONTACT: AUTHOR: Andy Eaden SYSTEM/UNIT: T-08/Total supply air for outlet #7 AREA: Boeing Bldg 9-64 Network Room Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 18 in. 0 in. 1.77 sq. ft. 2 10 20 Log: Tested By: Andy Eaden Date: 1/10/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 10619 531 FPM 935 CFM 940 CFM 0.30 in. T-08/Total supply air for outlet #7 12/12/2018 Andy Eaden A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Hole 1 Traverse Data Points N 0 O 18 N i,rinrfar Fnninaarc Inr Duct Traverse PROJECT: Boeing Bldg. 9-64 1 Network LOCATION: SEATTLE, WA PROJECT #: 2018-0627 DATE: 1/10/2019 CONTACT: AUTHOR: Andy Eaden SYSTEM/UNIT: T-05/Total supply air for outlet #3 AREA: Boeing Bldg 944 Network Room Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 18 in 0 in. 1.77 sq. ft. 2 10 20 Log: Tested By: Andy Eaden Date: 1/10/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 10942 547 FPM 935 CFM 968 CFM 0.17 in. T-05/Total supply air for outlet #3 12/12/2018 Andy Eaden A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Hole 1 Traverse Data Points O S 19 CO 11 fllaurinrfnr Fnning rc Inr' Duct Traverse PROJECT: Boeing Bldg. 9-64 1 Network LOCATION: SEATTLE, WA PROJECT #: 2018-0627 DATE: 1/10/2019 CONTACT: AUTHOR: Andy Eaden SYSTEM/UNIT: T-06/Total supply air for outlets #3 and #4 AREA: Boeing Bldg 9-64 Network Room Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 18 in. 0 in. 1.77 sq. ft. 2 10 20 Log: Tested By: Andy Eaden Date: 1/10/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 21881 1094 FPM 1870 CFM 1936 CFM 0.10 in. T-06/Total supply air for outlets #3 and 12/12/2018 Andy Eaden #4 A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Hole 1 Traverse Data Points I\ CO NPIIrInrfPr FnninpPrc Inr Duct Traverse PROJECT: Boeing Bldg. 9-64 1 Network LOCATION: SEATTLE, WA PROJECT #: 2018-0627 DATE: 1/10/2019 CONTACT: AUTHOR: Andy Eaden SYSTEM/UNIT: T-03/Total supply air for outlet #1 AREA: Boeing Bldg 9-64 Network Room Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 6 in. 0 in. 0.20 sq. ft. 2 10 20 Log: Tested By: Andy Eaden Date: 1/10/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 10705 535 FPM 100 CFM 107 CFM 0.01 in. T-03/Total supply air for outlet #1 12/12/2018 Andy Eaden A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Hole 1 Traverse Data Points O Z 6 A I Nnnrinrfcr Inninonrc Inr Duct Traverse PROJECT: Boeing Bldg. 9-64 1 Network LOCATION: SEATTLE, WA PROJECT #: 2018-0627 DATE: 1/10/2019 CONTACT: AUTHOR: Andy Eaden SYSTEM/UNIT: T-04ITotal supply air for outlet #2 AREA: Boeing Bldg 9-64 Network Room Unit Data Type of Traverse Rectangular Outer Height 8 in. Outer Width 10 in. Insulation Width 0 in. Air Flow Area 0.56 sq. ft. Number Of Rows 5 Readings Per Row 4 Total Readings 20 Location of Holes 1 Bottom CoI 4 Col 3 CoI 2 CoI 1 Tested By: Andy Eaden Date: 1/10/2019 Final Data Sum of Readings 8582 Average Reading 429 FPM Design Total Flow 225 CFM Actual Total Flow 240 CFM Static Pressure 0.01 in. Traverse Data Points 551 544 560 514 538 489 463 537 401 311 360 458 310 381 434 435 333 334 319 310 3 3 0 a t; ao Naiirinrfar Fnninaarc Inc Duct Traverse PROJECT: Boeing Bldg. 9-64 1 Network LOCATION: SEATTLE, WA PROJECT #: 2018-0627 DATE: 1/10/2019 CONTACT: AUTHOR: Andy Eaden SYSTEM/UNIT: T-01/Total supply air for AHU-1 AREA: Boeing Bldg 9-64 Network Room Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 26 in. 0 in. 3.69 sq. ft. 2 10 20 Log: Tested By: Andy Eaden Date: 1/10/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 29394 1470 FPM 5000 CFM 5424 CFM 0.41 in. T-01/Total supply air for AHU-1 1/10/2019 Andy Eaden T-01/Total supply air for AHU-1 1/9/2019 Andy Eaden VFD was set to 60 Hertz. A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Traverse Data Points N Cl 0 1< 26 cv �>t Aloi,rinrfor Pnninoorc lnr• Duct Traverse PROJECT: Boeing Bldg. 9-64 1 Network LOCATION: SEATTLE, WA PROJECT #: 2018-0627 DATE: 1/10/2019 CONTACT: AUTHOR: Andy Eaden SYSTEM/UNIT: T-02ITotal supply air for AHU-2 AREA: Boeing Bldg 9-64 Network Room Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 26 in. 0 in. 3.69 sq. ft. 2 10 20 Log: Tested By: Andy Eaden Date: 1/10/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 28329 1416 FPM 5000 CFM 5225 CFM 0.37 in. T-02/Total supply air for AHU-2 12/12/2018 Andy Eaden VFD was set to 60 Hertz. T-02/Total supply air for AHU-2 12/12/2018 Andy Eaden A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Hole 1 Traverse Data Points N Naeirinrfar Fnninaarc Inr MECHAN1CAI. CON 1 RAC lOR FILE WA Reg. No. APOLLOMC864JQ 3051 E. Valley Rd. OR CCB No. 56241 Renton, Wa 98057 CO Plumbing Lic: PC.0003009 www.apollomech.com MT CRN: 149670 253-872-5151 phone 253-872-5930 fax PROPOSAL April 10, 2018 To: Clements General Construction Attention: Jeff Landstrom Project: Boeing 9-64 1Network Location: Tukwila, WA Apollo Mechanical Contractors is pleased to provide you with the HVAC on the Building XYZ project. Proposal is based on the following documents: • Issue For Construction Drawings March 22, 2018 REVIEWED FOR CODE COMPLIANCE APPROVED JUL 03 2018 City of Tukwila stitiottlaativtal bing and Addendums: 1, 2 RECEIVED CITY OF TUKWILA Project Specific Clarifications / Inclusions: JUN 1 9 2018 • General Notes as shown on MIA PERMIT CENTER • HVAC Equipment Schedules as shown on M2A • HVAC Removal as shown on 1 M 1 OR. o Existing Liebert Unit to be left in place and used for Temporary Cooling o Four (4) hours for a Service Technician to check refrigerant charge and operation of the Liebert Unit has been budgeted. Any added refrigeration or repair parts will be an additional fee o A supplemental 5 ton MovinCool rental cooling unit will be installed • Miscellaneous Removal Sections and Details as shown on M501 R • HVAC Equipment, Ducting, GRDs, and Controls as shown on 1M10 • Plumbing (Condensate Piping) as shown on 1M110 (see Alternate Add for provision of Heat Trace — installation will be by others) • Control System Diagram and Sequence of Operation as shown on M310 • Miscellaneous Sections and Details as shown on M500 and M501 • Mechanical Insulation on Apollo installed systems • Testing, Adjusting, & Balancing by Neudorfer Engineers • HVAC Commissioning by Neudorfer Engineers • Controls by Siemens • Start and test with Owner instruction • Permits as required Mvk00�61 >4 ..Sada, peote 2U4 gccid 9'zeat 746(94, An equal opportunity employer Page 1 of 3 TRANE° Prepared For: Design Eng: Sazan Group Sold To: Apollo Mechanical Heather Darst & Jarrod Diamond Submittal Date: June 6, 2018 Customer P.O. Number: Customer Project Number: Job Number: Job Name: Boeing 09-064 1 NETWORK Trane U.S. Inc. dba Trane is pleased to provide the enclosed submittal for your review and approval. Product Summary Product Packaged Air Conditioning Units tags: AHU-1 & AHU-2 Qty 2 NOTES 1. The Trane model number scheduled on plan sheet M2A appears to be incorrect designer. Trane model THH150 is submitted. 2. The Trane economizer damper does not show in drawing detail C on plan sheet 3. and not as intended by the M501. Refer to the detail on page 11 of this submittal and allow for this 7" deep damper when locating AHU-2 Control drawing plan sheet M310 refers to a discharge air temperature setpoint. temperature sensor provides a data point not a setpoint. This submittal assumes temperature. The Trane discharge air the setpoint is the indoor room 4. I have included temperature sensors for hard wire wall mounting in the conditioned space. These sensors will allow operation during construction before the central control system is completely operational. These sensors can also be used for back-up operation. If digital communication is interrupted an AHU can switch to the wall sensor using default setpoints. Normal operation is commanded by the central control system to satisfy indoor room temp. If these wall mounted sensors remain after job completion then they should be labeled as back-up to avoid confusion. RECEIVED CITY OF TUKWILA JUN 1 9 2018 PERMIT CENTER Jeff Meyer Trane 2333 158th Court NE Bellevue, WA 98008 Phone: (425) 643-4310 Cell: (206) 234-3600 J:IJOBSI125110835013Isub 2.doc The attached informitionREVIEWKWORte pnpose to furnish for this projettOODE O UA to „A,, APPROVED JUL032018 City of Tukwila p BUILDING DIVISION ,111 ('OOS( Boeing 09-064 1NETWORK June 6, 2018 Tag Data - Packaged Cooling Rooftop Units (Qty: 2 Item Tag(s) Qty Description Model Number Al AHU-1, AHU-2 2 Packaged Air Conditioning Unit 12.5 Ton THH150G4 High efficiency unit built for horizontal duct connections 460/60/3 electrical power VFD driven supply fan motor (for 2 -speed operation if used) 3 horsepower supply fan motor with grounding ring Pleated filters, 2" thick, MERV 8 Condenser coil with hail guard louvered panels for protection and appearance BACnet communications interface Clogged filter switch, Fan failure switch and Discharge air temperature sensor Outside air economizer with low leak dampers and comparative enthalpy control (FId) Indoor wall mount temperature sensors (thermostats) for temporary and back-up use (FId) Mounting curb — seismic rated Performance Data - Packaged Cooling Rooftop Units Tags AHU-1, AHU-2 Design Airflow (cfm) 5000 Design ESP (in H2O) 1.500 Supply fan speed at design (rpm) 810 Supply fan motor load at design (bhp) 3.13 Ambient Temp (F) 85.00 Cooling Entering Dry Bulb (F) 85.00 Cooling Entering Wet Bulb (F) 67.00 Evap Coil Leav Air Temp (DB) (F) 58.70 Evap Coil Leav Air Temp (WB) (F) 56.14 Sensible Capacity (MBh) 142.01 Latent Capacity (MBh) 24.32 Total Capacity (MBh) 166.34 EER @ AHRI Conditions (EER) 12.1 IEER Rating () 15.0 IPLV @ AHRI (IPLV) 15.0 Mini circuit ampacity MCA (Amps) 30.00 Max overcurrent protection MOP (Amps) 40.00 FLD = Furnished by Trane U.S. Inc. dba Trane / Equipment Submittal Page 2 of 10 Installed by Others Boeing 09-064 1NETWORK 'Mechanical Specifications - Packaged Cooling Rooftop Units Item: Al Qty: 2 Tag(s): AHU-1, AHU-2 June 6, 2018 General — Horizontal Duct Configuration The units shall be dedicated Horizontal airflow. The operating range shall be between 115°F and 0°F in cooling as standard from the factory for all units. Cooling performance shall be rated in accordance with ARI testing procedures. All units shall be factory assembled, internally wired, fully charged with R -410A, and 100 percent run tested to check cooling operation, fan and blower rotation and control sequence, before leaving the factory. Wiring internal to the unit shall be colored and numbered for simplified identification. Units shall be UL listed and labeled, classified in accordance to UL 1995/C 22.2, 236-05 3rd Edition. Packaged Rooftop units cooling, heating capacities, and efficiencies are AHRI certified within scope of AHRI Standard 340/360 (I -P) and ANSIZ21.47 and 10 CFR Part 431. Casing - Horizontal Unit casing shall be constructed of zinc coated, heavy gauge, galvanized steel. Exterior surfaces shall be cleaned, phosphatized, and finished with a weather -resistant baked enamel finish. Unit's surface shall be tested 672 hours in a salt spray test in compliance with ASTM B117. Cabinet construction shall allow for all maintenance on one side of the unit. In order to ensure a water and air tight seal, service panels shall have lifting handles and no more than three screws to remove. All exposed vertical panels and top covers in the indoor air section shall be insulated with a 1/2", 1 pound density foil -faced, fire-resistant, permanent, odorless, glass fiber material. The base of the unit shall have provisions for forklift and crane lifting. Unit Top The top cover shall be one piece, or where seams exist, double hemmed and gasket sealed to prevent water leakage. Filters Two inch thick pleated type (MERV 8). Compressors All units shall have direct -drive, hermetic, scroll type compressors with centrifugal type oil pumps. Motor shall be suction gas-cooled and shall have a voltage utilization range of plus or minus 10 percent of nameplate voltage. Internal overloads shall be provided with the scroll compressors. All models shall have crankcase heaters, phase monitors and low and high pressure control as standard. Dual compressors allow for efficient cooling utilizing 3 stages of compressor operation. Crankcase Heaters These band heaters provide improved compressor reliability by warming the oil to prevent migration during off -cycles or low ambient conditions. Refrigerant Circuits Each refrigerant circuit shall have service pressure ports, and refrigerant line filter driers factory installed as standard. An area shall be provided for replacement suction line driers. Evaporator and Condenser Coils Evaporator Coils - Microchannel evaporator coils will be burst tested by the manufacturer. Internally finned, 5/16"copper tubes mechanically bonded to a configured aluminum plate fin shall be standard for evaporator coils. Coils shall be leak tested to ensure the pressure integrity. The evaporator coil shall be leak tested to 225 psig and pressure tested to 450 psig. Condenser Coils - Microchannel condenser coils shall be standard on all units. Coils shall be leak tested to ensure the pressure integrity. The condenser coil shall be leak tested to 225 psig and pressure tested to 450 psig. FLD = Furnished by Trane U.S. Inc. dba Trane / Equipment Submittal Page 3 of 10 Installed by Others Boeing 09-064 1NETWORK June 6, 2018 Outdoor Fans The outdoor fan shall be direct -drive, statically and dynamically balanced, draw -through in the vertical discharge position. The fan motor(s) shall be permanently lubricated and shall have built-in thermal overload protection. Indoor Fan Units above shall have belt driven, FC centrifugal fans with adjustable motor sheaves. Units have an adjustable idler -arm assembly for quick -adjustment of fan belts and motor sheaves. All motors shall be thermally protected. Oversized motors shall be available for high static application. All indoor fan motors meet the U.S. Energy Policy Act of 1992 (EPACT). Multi -Speed Indoor Fan System Multi -speed indoor fan system is designed for use in applications for meeting the minimum requirement of CA Title 24. This system incorporates a multi -speed fan control to change the speed of the fan to 67% of full airflow based off of compressor stages. Variable Frequency Drive Variable Frequency Drives are factory installed and tested to provide supply fan motor speed Modulation. All VFDs are designed to allow bypass if required. Bypass control will simply provide full nominal airflow in the event of drive failure. Bypass mode is indicated in the unit wiring manual. Controls Unit shall be completely factory wired with necessary controls and contactor pressure lugs or terminal block for power wiring. Unit shall provide an external location for mounting a fused disconnect device. ReliaTel controls shall be provided for all 24 volt control functions. The resident control algorithms shall make all heating, cooling, and/or ventilating decisions in response to electronic signals from sensors measuring indoor and outdoor temperatures. The control algorithm maintains accurate temperature control, minimizes drift from set point, and provides better building comfort. A centralized control shall provide anti -short cycle timing and time delay between compressors to provide a higher level of machine protection. Discharge Line Thermostat A bi-metal element discharge line thermostat is installed as a standard option on the refrigerant compressor discharge line of each system. This standard option provides extra protection to the compressors against high discharge temperatures in case of loss of charge, extremely high ambient and other conditions which could drive the discharge temperature higher. Discharge line thermostat is wired in series with high pressure control. When the discharge temperature rises above the protection limit, the bi-metal disc in the thermostat switches to the off position, opening the 24 VAC circuit. When the temperature on the discharge line cools down, the bi-metal disc closes the contactor circuit, providing power to the compressor. When the thermostat opens the fourth time, the ReliaTel control must be manually reset to resume operation on that stage. BACnet Communications The BACnet communications interface allows the unit to communicate directly with a generic open protocol BACnet MS/TP Network Building Automation System Controls. Clogged Filter/Fan Failure Switch A dedicated differential pressure switch is available to achieve active fan failure indication and/or clogged filter indication. These indications will report to the building's central control system. Hail Guards Tool -less, hail protection quality coil guards are included for condenser coil protection. Discharge Air Temperature Sensing This provides true discharge air temperature sensing. This sensor is a status indicator readable through the BACnet communication interface. FLD = Furnished by Trane U.S. Inc. dba Trane / Equipment Submittal Page 4 of 10 Installed by Others Boeing 09-064 1NETWORK June 6, 2018 Accessory - Low Leak Economizer This accessory meets low leak requirements for ASHRAE90.1, IECC, and Title 24 standards; Allows 100 percent outdoor air supply from 0-100 percent modulating dampers; Comes standard with Barometric Relief; can be paired with Powered exhaust for additional building evacuation; Can be paired with Fault Detection (FDD) to meet current mandatory Title 24 requirements; Dry Bulb; And, available for down flow applications. Economizer Comparative Enthalpy Kit Comparative Enthalpy measures and communicates humidity for both outdoor and return air conditions, and return air temperature. The unit receives and uses this information to maximize use of economizer cooling, and to provide maximum occupant comfort control. FLD = Furnished by Trane U.S. Inc. dba Trane / Equipment Submittal Page 5 of 10 Installed by Others Boeing 09-064 1NETWORK Unit Dimensions - Packaged Cooling Rooftop Units Item: Al Qty: 2 Tag(s): AHU-1, AHU-2 h...,. 56 3/16" 8 5/8" m 5 15/16" June 6, 2018 NOTES: 1. VERIFY WEIGHT, CONNECTION, AND ALL DIMENSION WITH INSTALLER DOCUMENTS BEFORE INSTALLATION SINGLE POINT POWER ENTRY 50 5/8" 55 7/8" PACKAGED COOLING - HORIZONTAL ISOMETRIC DRAWING 121 11/16" 84 3/4" SUPPLY RETURN 46 1/2" 0 26 1/2" 24 1/16" PACKAGED GAS/ELECTRIC -HORIZONTAL 6 1/16" 27 9/16"-5 15/16" 2" AIR FLOW SIDE 2" DIA. HOLE (UNIT POWER WIRE) 7/8" DIA. HOLE (UNIT CONTROL WIRE) END PANEL FILTER ACCESS DOOR HORIZONTAL CONDENSATE DRAIN CONNECTION (1") NPT HORIZONTAL CONDENSATE DRAIN AND FILTER ACCESS SIDE VIEW FLD = Furnished by Trane U.S. Inc. dba Trane / Equipment Submittal Page 6 of 10 Installed by Others --NZ - _ TAJ.:7) FILTER ACCESS DOOR HORIZONTAL CONDENSATE DRAIN CONNECTION (1") NPT HORIZONTAL CONDENSATE DRAIN AND FILTER ACCESS SIDE VIEW FLD = Furnished by Trane U.S. Inc. dba Trane / Equipment Submittal Page 6 of 10 Installed by Others Boeing 09-064 1NETWORK •Unit Dimensions - Packaged Cooling Rooftop Units Item: Al Qty: 2 Tag(s): AHU-1, AHU-2 June 6, 2018 ELECTRICAL / GENERAL DATA GENERAL Model (Tons): 'THH150G (12.5) Unit Operating Voltage Range: 414-506 Unit Primary Voltage: 460 Unit Secondary Voltage: Unit Hertz: 60 Unit Phase: 3 EER: (5) '12.1 Standard Motor 111131 Minimum Circuit Ampacity: '30.0 Maximum Fuse Size: 40.0 Maximum (HACR) Circuit Breaker: 40.0 Standard Oversized Motor (1) (4) Accessory Oversized Motor (1)(4) Minimum Circuit Ampacity: Minimum Circuit Ampacity: Maximum Fuse Size: Maximum Fuse Size: Maximum (HACR) Circuit Breaker: Maximum (HACR) Circuit Breaker: COMPRESSOR Circuit(s) Number: 2 Horsepower: 5.6/3.67 Phase: 3 Rated Load Amps: 12.8/6.1 Locked Rotor Amps: 100.0/41.0 OUTDOOR MOTOR Number: '2 Horsepower: 0.5 Motor speed (RPM): 1100 Phase: 3 Full Load Amps: 1.35 Locked Rotor Amps: 4.82 INDOOR MOTOR Standard Motor (3) Number: '1 Horsepower: 3.0 Motor Speed (RPM): - Phase: 3 Full Load Amps: 4.8 Locked Rotor Amps: 40.5 Standard Oversized Motor (4) Accessory Oversized Motor (4) Number: Number: ' Horsepower: Horsepower: Motor Speed (RPM): Motor Speed (RPM): Phase: Phase: Full Load Amps: Full Load Amps: Locked Rotor Amps: Locked Rotor Amps: POWER EXHAUST ACCESSORY (Field Installed Power Exhaust) Horsepower: Motor Speed (RPM): Phase: Full Load Amps: Locked Rotor Amps: FILTERS Type •Throwaway Fumished: Yes Number: 8 Recommended Size: 20"x25"x2" REFRIGERANT (2) Circuit #1 / 2 Type: 'R -410A Factory Charge Circuit #1 / 2: 12.5 Ib / 7.1 Ib NOTES: 1. Maximum (HACR) Circuit Breaker sizing is for installations in the United States only. 2. Refrigerant charge is an approximate value. For a more precise value, see unit nameplate and service instructions. 3. Value include Standard Motor. 4. Value include Oversized Motor 5. EER is rated at AHRI conditions and in accordance with DOE test procedures. FLD = Furnished by Trane U.S. Inc. dba Trane / Equipment Submittal Page 7 of 10 Installed by Others Boeing 09-064 1NETWORK June 6, 2018 Weight, Clearance & Rigging Diagram - Packaged Cooling Rooftop Units Item: Al Qty: 2 Tag(s): AHU-1, AHU-2 ,20 -\O Base Unit and Corner Weights only Base unit weights Corner Weights Center of Gravity SHIPPING NET O O © OD E F 2299 1868.0 Ib 632.0 Ib 503.0 Ib 345.0 Ib 391.0 Ib 55" 33" 1. All weights are approximate. 2. The actual weight are listed on the unit nameplate. 3. Refer to unit nameplate and installation guide for weights before scheduling transportation and installation of unit. 4. The weight shown represents the typical unit operating weight for the configuration selected. Estimated at +/_ 10 % of the nameplate weight.. 5. Verify weight, connection, and all dimension with installer documents before installation. 6. Corner weights are given for information only. 7. Net/Shipping weight of optional accessories should be added to unit weight when ordering factory or field installed accessories. Installed Options Net Weight Data Accessory Weight Economizer, Manual and Motorized Outside Air Damper 250.0 Ib Power Exhaust Roof Curb Oversized Motor Hail Guard 43.0 Ib Hinged Access Doors Power Conv. Outlet Through the Base Electrical Circuit Breaker Disconnect Smoke Detector Novar Zone Sensor 1.0 lb High/Low Static Drive Kit High Efficiency Motor Heater Stainless Steel Drain Pan VFD 34.0 Ib 1. Weights for options are approximate. 2. Weights for options that are not list refer to Installation guide. PACKAGED COOLING RIGGING AND CENTER OF GRAVITY FLD = Furnished by Trane U.S. Inc. dba Trane / Equipment Submittal Page 8 of 10 Installed by Others Boeing 09-064 1NETWORK • Accessory - Packaged Cooling Rooftop Units Item: Al Qty: 2 Tag(s): AHU-1, AHU-2 END PANEL June 6, 2018 ECONOMIZER HOOD ‘--- FILTER ACCESS PANEL ECONOMIZER AIR DAMPER ACCESSORY DRAWING FLD = Furnished by Trane U.S. Inc. dba Trane / Equipment Submittal Page 9 of 10 Installed by Others Boeing 09-064 1NETWORK Field Wiring - Packaged Cooling Rooftop Units Item: Al Qty: 2 Tag(s): AHU-1, AHU-2 RTRM(J6) June 6, 2018 14 0 12 0 11 0 10 0 9 0 8 0 7 0 6 0 5 0 40---4 30--3 J 20--2 1 0— — 1 / ZONE SENSOR WIRE TABLE WIRE SIZE MAXIMUM WIRE LENGTH 22 GAUGE 1800" 20 GAUGE 3000" 18 GAUGE 4500" 16 GAUGE 7200" 14 GAUGE 11700" NOTE: 1. ALL WIRING AND DEVICES SHOWN DASHED TO BE SUPPLIED AND INSTALLED BY THE CUSTOMER IN WITH NATIONAL AND LOCAL ELECTRICAL CODES. 2. LOW VOLTAGE CONTROL WIRING MUST NOT BE RUN IN CONDUIT WITH POWER WIRING 3. CUT WIRE JUMPER ADJACENT TO THE TERMINAL 1 ON ZONE SENSOR BAYSENS106 ZONE SENSOR 1234 c Y v \ „1. .2^3JV4I5J TB1 0 O Q FLD = Furnished by Trane U.S. Inc. dba Trane / Equipment Submittal Page 10 of 10 Installed by Others 'JH v0 LO 9 t LOZ18/> :p2D11J0 L OZ/ZL/L :031Nwd 0 0 ri i cc 0 0 0 0 (1;<0—cep= 0 N2wOoo t_ CURB END DETAI m CO J - - W U❑ 0 WCa W Z J W 0 �U Wm 20 mw w= w Pm 0)? <U (0 x x M ww0 mmom =00 1-032 a< JPO 00 OWW HM J 0� w 2 GA CURB FR ww 0m o, z0 uw ww as Mow 00 Z00 2=2 K6z500 w52 i -J JM IM U2 U Q0 m3 0 0 MAX UNIT WEIGHT 3502 Ib m )mm J� JJ N 30O M )M J 30 CRBW-VOYHCFA-08 S :« •HF •aa •rN 0 U O O 0 w z O O 0 za 0 0 ..I m U 1,4 WOOD ATTACHMENT: (REF. DOUGLAS FIR) _m 0V 2 00 Zo Om w -(5z ZmU v W (WO Q U O .-NZw((00�i1) 0<<-111 ..II II BJGA 20160065 8 0 0 U 5 5 5 z tiz O m 0.1 N 1-0 0- 6 OW 5.2 CIU w 0 w00 o<n2 0 Q W z 20< O 0 C 0 z F- 2 0 a a J • ff co Q C R Sparks, NV. (800) 884-4662 Longview, TX. (903) 248-4800 W J 2p . ©2 • • �0- 5 b3 I b3 I b3 I of ami it U 0 N 0 ID 0 tN- 2 DRAWN BY GENERAL NOTES r 1. THE FULL SCOPE OF THE MECHANICAL WORK IS THE TOTAL OF WORK SHOWN ON THE PLANS AND CALLED FOR IN THE SPECIFICATIONS. IN CASE OF CONFLICT, THE SPECIFICATIONS SHALL GOVERN. PROVIDE A COMPLETE AND FUNCTIONAL SYSTEM. 2. PERFORM ALL WORK IN ACCORDANCE WITH LOCAL CODES AND ORDINANCES. OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND PAY FOR ALL FEES REQUIRED BY AUTHORITIES HAVING JURISDICTION. PAY ALL ROYALTIES OR FEES REQUIRED IN CONNECTION WITH THE USE OF PATENTED DEVICES AND SYSTEMS. 3. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL CONSTRUCTION INCLUDING LOUVERS, CONCRETE EQUIPMENT PADS, FLASHING DETAILS, ETC. REFER TO ARCHITECTURAL DRAWINGS FOR ROOM ELEVATIONS, LOCATE MECHANICAL DEVICES SUCH AS TEMPERATURE SENSORS, HUMIDISTATS, PANELS, ETC. SO THAT THEY DO NOT CONFLICT WITH GENERAL CONSTRUCTION NOR WITH ELECTRICAL SYSTEM (UGHT SWITCHES, SPEAKERS, OUTLETS, ETC.). 4. COORDINATE WITH OTHER TRADES: A. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF MECHANICAL EQUIPMENT (VOLTAGE, PHASE, HZ, ETC.) B. PROVIDE ADEQUATE CLEARANCE OF MECHANICAL WORK FROM ELECTRICAL FTEMS. MAINTAIN MINIMUM ACCESS OF 6 -INCHES ABOVE ELECTRICAL CABLE TRAYS AND 18 -INCHES TO THE SIDE OF CABLE TRAYS. C. ARRANGE EQUIPMENT SO THAT ACCESS CLEARANCES INDICATED BY DRAWINGS, REQUIRED BY CODES, OR RECOMMENDED BY MANUFACTURER ARE PROVIDED. D. INSTALL MATERIALS AND SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND ACCEPTED SUBMITTALS. INSTALL MATERIAL IN PROPER RELATION TO ADJACENT CONSTRUCTION AND WITH UNIFORM APPEARANCE FOR EXPOSED WORK. E. THOROUGHLY EXAMINE ALL AREAS WHERE EQUIPMENT, DUCTWORK, AND PIPING WILL BE INSTALLED AND REPORT ANY CONDITION THAT PREVENTS THE PROPER INSTALLATION OF THE MECHANICAL WORK. F. COMPLY WITH WASHINGTON STATE ENERGY CODE SECTION C408.1.3 DOCUMENTATION REQUIREMENTS. INCLUDE THE DEVELOPMENT OF CONSTRUCTION AND AS -BUILT DRAWINGS, PROJECT MANUALS, AND SYSTEM BALANCING REPORTS. G. PERTINENT TO SECTION C408.1.3 OF THE SAME CODE, THE HVAC CONTROL SYSTEM SHALL BE TESTED TO ENSURE THAT THE CONTROL DEVICES, EQUIPMENT AND SYSTEMS ARE CALIBRATED, ADJUSTED, AND OPERATE IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. H. THE COMMISSIONING SPECIFICATION, INCLUDING ALL FUNCTIONAL TEST PROCEDURES, SHALL BE PROVIDED AND ENFORCED BY THE CONTRACTOR. I. PROVIDE SEISMIC RESTRAINT IN ACCORDANCE WITH IBC AND ASCE STANDARD 7. SUBMIT CALCULATIONS BY LICENSED STRUCTURAL ENGINEER. PRODUCTS MAY CONFORM TO SMACNA SEISMIC RESTRAINT GUIDELINES. J. PROVIDE A SINGLE SUBMITTAL OF ALL MECHANICAL EQUIPMENT AS SPECIFIED. AS A MINIMUM, SUBMIT PRODUCT DATA FOR ALL EQUIPMENT AND FIXTURES USTED IN ACCOMPANYING SCHEDULES FOR APPROVAL. K. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. L. ARRANGEMENT OF SYSTEMS INDICATED ON THE DRAWINGS IS DIAGRAMMATIC, AND INDICATES THE MINIMUM REQUIREMENTS FOR PMECHANICAL WORK. SITE CONDITIONS SHALL DETERMINE THE ACTUAL ARRANGEMENT OF THE WORK. TAKE FIELD MEASUREMENTS BEFORE PREPARING SHOP DRAWINGS, OBTAIN APPROVAL OF SHOP DRAWINGS BEFORE BEGINNING FABRICATION. BE RESPONSIBLE FOR ACCURACY OF DIMENSIONS AND LAYOUT. OVERHEAD PIPING AND DUCTWORK SHALL BE ARRANGED TO OBTAIN MAXIMUM HEAD ROOM. SHOP DRAWINGS SHALL BE STAMPED BY A LICENSED ENGINEER. M. CLEAN AND PROTECT WORK FROM DAMAGE. RESTORE DAMAGED FINISHES. COVER ENDS OF PIPING AND DUCTWORK NOT ACTIVELY BEING WORKED ON. N. MODIFY AND EXTEND EXISTING SERVICE TO ACCOMMODATE REVISION 9-64 1NETWORK W5539184 eY SAZAN/ON APPROVED NEW WORK. RELOCATE EXISTING COMPONENTS AS REQUIRED FOR NEW SYSTEM. COORDINATE WITH BUILDING MANAGEMENT. 0. PROVIDE PRODUCTS OF ACCEPTABLE MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE YEARS. DELIVER, HANDLE, AND STORE MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. P. DO NOT CUT STRUCTURAL ELEMENTS WITHOUT PRIOR WRITTEN APPROVAL. Q. INSTRUCT OWNER IN PROPER OPERATION OF SYSTEMS. R. DRAWINGS DO NOT SHOW ALL OFFSETS WHICH MAY BE REQUIRED. MAKE OFFSETS WITH FITTINGS WITH AS SMALL ANGLE OF OFFSET AS POSSIBLE; DO NOT USE TURNING VANES UNLESS SPECIFICALLY SHOWN. DUCTWORK AND PIPING SHALL BE ROUTED TO AVOID ALL STRUCTURAL SUPPORTS, AND COORDINATE ALL WORK WITH WORK OF OTHER TRADES. S. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE LATEST EDITION OF THE FOLLOWING CODES AS ADOPTED BY THE STATE OF WASHINGTON AND CITY OF TUKWILA CODE NOTES THE GOVERNING CODES AND STANDARDS ARE THE CURRENT EDITIONS OF THE IBC, IMC, IFC AND APPUCABLE NFPA STANDARDS WITH WITH WASHINGTON STATE AMENDMENTS AND ANY ADOPTED AMENDMENTS OF THE PROJECT JURISDICTION. THE AUTHORITY HAVING JURISDICTION FOR CODE COMPUANCE IS THE CfTY OF TUKWILA. THE PROJECT IS ALSO SUBJECT TO APPROVAL BY BOEING FIRE PROTECTION ENGINEERING AND FM GLOBAL. INTERNATIONAL BUILDING CODE (IBC) AMENDEMNTS INTERNATIONAL MECHANICAL CODE (IMC) UNIFORM PLUMBING CODE (UPC) INTERNATIONAL FIRE CODE (IFC) WASHINGTON STATE ENERGY CODE (WSEC) WASHINGTON CRIES ELECTRICAL CODE (NEPA 70) MECHANICAL CODE NOTES 1. HVAC PROVIDE 7 -DAY THERMOSTAT PROGRAMMABLE AND NIGHT SETBACK FUNCTION WITH THE DDC SYSTEM. MINIMUM DEADBAND 5 DEGREE F. PER 1412 OF THE WSEC. OUTSIDE AIR EXHAUST AND RELIEF DAMPERS TO COMPLY WITH 1412.4.1 OF THE WSEC. 2. ECONOMIZERS ALL ECONOMIZERS SHALL PROVIDE 100% OF THE DESIGN SUPPLY AIR AS OUTSIDE AIR PER 1413.1 OF THE WSEC SYSTEMS WITH ECONOMIZERS SHALL ALLOW THE ECONOMIZER OPERATION AS WELL AS ADDITIONAL MECHANICAL COOUNG TO MEETING THE COOLING LOAD. 3. DUCT SYSTEMS ALL DUCTWORK TO BE SEALED AND PER 1414 OF THE WASHINGTON STATE ENERGY CODE. COMPLETION REQUIREMENTS - DRAWINGS AND MANUALS TO BE PROVIDED PER 1416 OF WSEC. ENERGY CODE NOTES 1. THE OUTPUT CAPACITY OF HEATING AND COOLING EQUIPMENT AND SYSTEMS DO NOT EXCEED CALCULATED LOADS PER SECTION C403.2.2 OF THE WSEC. 2. MECHANICAL VENTILATION SHALL BE PROVIDED PER SECTION 401.2 OF THE INTERNATIONAL MECHANICAL CODE WITH FLOW REDUCTION CAPABILITY TO THE CODE MINIMUM. 3. EACH HVAC SYSTEM WITH TOTAL FAN MOTOR NAMEPLATE HORSEPOWER EXCEEDING 5 HORSEPOWER SHALL MEET THE PROVISIONS OF SECTION C4032.10 OF THE WSEC. 4. NEW MECHANICAL SYSTEMS SHALL COMPLY WITH THE SYSTEM COMMISSIONING AND COMPLETION REQUIREMENTS PER SECTION C403.2.9 OF THE WSEC. 5. PROVIDE 7 DAY PROGRAMMABLE, MANUAL OVERRIDE TEMPORARY OPERATION UP TO TWO HOURS FUNCTIONS WITH THE DDC SYSTEM PER C4.3.2.4.3 OF THE WSEC. DATE s»4 REVISION 6. ALL DUCT AND PIPING SYSTEMS SHALL BE INSULATED PER SECTION C403.2.7.2 & TABLE C403.2.8 OF THE WSEC. PROTECTION OF PIPE INSULATION EXPOSED TO WEATHER SHALL COMPLY WITH SECTION C403.2.8.1 OF THE WSEC. 7. AIR HANDLING SYSTEMS SHALL HAVE OPTIMUM START CONTROLS PER SECTION C4.32.2.4.3.3 OF WSEC. 8. ALL DUCTWORK SHALL BE CONSTRUCTED AND SEALED PER SECTION C403.2.7.3, C402 LEAKAGE REQUIREMENTS AND INTERNATIONL BUILDING CODE VAPOR RETARDER REQUIREMENTS. 9. ALL LOW PRESSURE DUCT SYSTEMS SHALL BE SEALED TO A LEAKAGE RATE NOT TO EXCEED 6% OF THE FAN FLOW. 10.OUTSIDE AIR INTAKES AND EXHAUST DUCTS SERVING CONDITIONED SPACE SHALL BE EQUIPPED WITH MOTORIZED DAMPERS WHICH CLOSE AUTOMATICALLY WHEN SYSTEM IS OFF OR UPON POWER FAILURE. DAMPER LEAKAGE RATE SHALL COMPLY WITH SECTION C402.4.5.2 OF THE WSEC. 11. ECONOMIZER HEATING SYSTEM IMPACT SHALL COMPLY WITH SECTION C403.1.4 OF THE WSEC. 12. INTEGRATED ECONOMIZER CONTROL SHALL COMPLY WITH SECTION C403.1.3 OF THE WSEC. SHEETMETAL NOTES PERFORM ALL SHEETMETAL WORK IN ACCORDANCE WITH CURRENT SMACNA STANDARDS. 2. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS AND REPRESENTATIVE OF THE INSIDE EQUIVALENT FREE AREA REQUIRED TO MAINTAIN THE AIR FLOW SPECIFIED. IF DUCT LINING IS REQURED, INCREASE DUCT SIZE TO MAINTAIN ORIGINAL INSIDE DIMENSIONS, IF DUCT SIZES NEED TO BE ALTERED FOR SPACE REQUIREMENTS, ENSURE THE ORIGINAL INSIDE DUCT EQUIVALENT FREE AREA IS MAINTAINED. 3. DUCT SEAUNG SHALL MEET REQUIREMENTS LISTED IN CHAPTER 6 OF IMC AND WASHINGTON STATE ENERGY CODE. IN ADDITION, PROVIDE SEAL CLASS A FOR ALL DUCTWORK. 4. CONSTRUCT DUCTS WITH G-60 OR BETTER GALVANIZED STEEL (ASTM 527) LFQ, CHEM TREAT IN GENERAL. 5. CONSTRUCT RECTANGULAR DUCTWORK TO MEET ALL FUNCTIONAL CRITERIA DEFINED IN CHAPTER 11, OF THE SMACNA HVAC DUCT CONSTRUCTION STANDARDS. PROVIDE DIAGONAL CREASING OR BEADING ON ALL PANELS WIDER THAN 18 -INCHES, AND PANELS LESS THAN 18 GAGE. CONSTRUCT ROUND AND FLAT OVAL DUCTWORK IN ACCORDANCE WITH CHAPTER 3 OF SMACNA HDCS. 6. DUCTMATE, METZ, OR W.D.C.I. DUCT CONNECTION SYSTEMS ARE ACCEPTABLE. DUCTS CONSTRUCTED USING THESE SYSTEMS WILL COMPLY WITH THE MANUFACTURER'S GUIDELINES FOR SHEET GAGE, INTERMEDIATE REINFORCEMENT SIZE, SPACING, AND JOINT REINFORCEMENT. 7. PROVIDE COLLARS WHEREVER AN EXPOSED DUCT PASSES THROUGH A WALL, SLAB, OR CEIUNG 1 -INCH WIDE, 18 -GAGE ANGLE WITH MITERED CORNERS & SEAL WITH FIBERGLASS AND MASTIC. 8. ELBOWS IN RECTANGULAR OR SQUARE DUCTWORK SHALL HAVE AN INSIDE RADIUS EQUAL TO DIMENSION OF ELBOW IN THE PLANE OF THE TURN; OTHERWISE USE SQUARE ELBOWS WITH TURNING VANES. 9. ELBOWS IN ROUND DUCTWORK SHALL HAVE THE INSIDE RADIUS EQUAL TO DIMENSION OF ELBOW IN THE PLANE OF THE TURN. USE SEGMENTED, STANDING SEAM, PLEATED, OR STAMPED ELBOWS. ADJUSTABLE ELBOWS ARE ALLOWED IF RADIUS CONFORMS TO ABOVE. - 10. SQUARE CORNER INSERTS (TURNING VANES) SHALL BE SMACNA FIG. 4.3 DOUBLE THICKNESS, RUNNER TYPE 2 WITH 2 -1/8 -INCH SPACING. 11. VOLUME DAMPERS ARE NOT SHOWN GENERALLY, INCLUDE .A DAMPER IN THE DUCT TO EACH SUPPLY, EXHAUST, OR RETURN OPENING; ALSO IN EACH BRANCH DUCT WHERE THREE OR MORE OPENINGS ARE ASSOCIATED WITH THE BRANCH. LOCATE DAMPERS AT A POINT WHERE THE DUCT IS ACCESSIBLE; AS FAR FROM THE OUTLET AS POSSIBLE. 12. THOROUGHLY CLEAN ALL DEBRIS FROM THE INSIDE OF ALL DUCTWORK AND PLENUMS. BLOW FREE ALL SMALL PARTICLES OF RUBBISH AND DUST. 13. PROVIDE A COMPLETE TEST AND BALANCE FOR HVAC SYSTEM. AIR BALANCE SHALL BE WITHIN 5% OF SCHEDULED AIRFLOWS.. PROVIDE COMPLETED REPORT TO BOEING CONSTRUCTION MANAGER.. er APPROVED DATE 03.22.18 ELLE C� Pel at Moo [L 1 ° 008 Flan review approval is subject to errors and omissions. Approval of construction documents does not authorize tha violation of any adopted code or ordinance. Receipt of approvod Field Copy and conditions is acknowledged: By: /4712 Date: 7 // 0l/ City of Tukwila BUILDING DIVISION rNREVISIONS o changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. 1 i SEPARATE PERMIT REOU:RED FOR: 0 Mechanical l lectrical Iumbin� aS Pkere City of TukwrilI BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED JUL 032018 144 City of Tukwila BUILDING DIVISION LEGEND GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES RECEIVED CITY OF TUKWILA JUN 1 9 2018 PERMIT CENTER SA2AN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 ACCEPTABILITY THIS DESIGN AND/0R SPECIFICATION IS APPROVED DRAWN ON CHECKED ON DATE 03.22.18 03.22.18 SU8117LE GENERAL NOTES CURRENT REVISION W5539184 SYMBOL Tel 206.267.1700 Fax 206.267.1701 SAZAN # 543-1771 DATE 03.22.18 APPROVED BY ` DEPT. DATE GNCNUM CK CHECKED CK 03.22.18 03.22.18 APPROVED APPROVED TTTLE 9-64 1NETWORK MECHANICAL MASTER BUILDING 09-064 DEVELOPMENT CENTER, WA. SHEET M1A JOB N0. COMP N0. OWG NO. 09-064-M1A LH790E 1/13/2017 10:54:13 AM PACKAGED AIR CONDITIONING UNIT SCHEDULE MARK NUMBER AREA SERVED HEATER FAN REMARKS MARK NUMBER LOCATION AREA SERVED (ROOM NUMBER) BASIS OF DESIGN/ MANUFACTURER/ MODEL FAN COOLING CAPACITY ELECTRICAL OPERATING WEIGHT (LBS) 680 0.10 REMARKS 1/10 1550 120 SUPPLY AIRFLOW (CFM) ESP (IN AWG) RPM MOTOR (HP) COOLING LOAD AIR REFRIGERANT MCA MOCP V/PH/HZ TOTAL LOAD (MBH SENSIBLE LOAD (MBH) EAT DB (DEG F) EAT WB (DEG F) LAT DB (DEG F) LAT WB (DEG F) R410A (LB) EER COP AHU-1 OUTSIDE (NORTH) BUILDING EXTERIOR SWITCH ROOM TRANE WSH150 5,000 1.50 780 3.0 160.3 135.3 85.0 67.0 52.71 46.0 12.5/7.1 - - 33.0 45.0 460/60/3 2155 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 AHU-2 OUTSIDE (NORTH) BUILDING EXTERIOR SWITCH ROOM TRANE WSH150 5,000 1.50 780 3.0 160.3 135.3 85.0 67.0 52.71 46.0 12.5/7.1 - - 33.0 45.0 460/60/3 2155 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 REMARKS: 1. ELECTRICAL DISCONNECT BY ELECTRICAL CONTRACTOR. 6. STANDARD PANELS, STANDARD FILTERS. 2. 2" MERV 8 FILTER. 7. PROVIDE WEATHERPROOF, INSULATED CASING. 3. AIR SIDE ECONOMIZER, LOW LEAK DAMPERS. 8. BUILDING AUTOMATION CONTROL NETWORK COMMUNICATIONS 4. HORIZONTAL DISCHARGE/ RETURN CONFIGURATION. INTERFACE. 5. PREMIUM EFFICIENCY MOTOR. 9. 8" SEISMIC MICROMETL CRBW-VOYHCFA-08 SERIES CURB 10. MIXED AIR SENSOR ON SUPPLY. UNIT HEATER SCHEDULE MARK NUMBER AREA SERVED HEATER FAN REMARKS KW VOLTS PHASE HP VOLTS PHASE EF -1 MECH. ROOM 680 0.10 1550 1/10 1550 120 1 PENN "P -10R" UH -2 SWITCH ROOM 2.6 277 1 1/50 277 1 CHROMALOX LUH-02-71, WITH INTEGRAL T'STAT. WALL EXHAUST FANS SCHEDULE MARK LOCATION LOCATION CFM STATIC PRESSURE INCH W.G. RPM MOTOR REMARKS HP RPM VOLTS PHASE EF -1 MECH. ROOM 680 0.10 1550 1/10 1550 120 1 PENN "P -10R" WHITE 48X48 40 .085 5,000 48X48 FACE TITUS 23RL AIR DIFFUSER / REGISTER / GRILLE (AIR) SCHEDULE MARK NUMBER TYPE MATERIAL FINISH (ENAMEL) INLET/NECK SIZE, INCHES MAX. NOISE COEFFICENT MAX. TP INCH WG MAXIMUM SET CFM REMARKS SD -1 SQ. CEILING DIFFUSER ALUM WHITE 15"0 27 .072 1,000 24X24 FACE TITUS TMS, WITH OPPOSED BLADE DAMPER AND EQUALIZING GRID RG -1 RETURN GRILLE ALUM WHITE 48X48 40 .085 5,000 48X48 FACE TITUS 23RL LEGEND GENERAL NOTES REFERENCE DRAWINGS SOURCE DRAWING 109-064-4001-M1 CONSTRUCTION NOTES RECEIVED CITY OF TUKWILA JUN 1 9 2018 PERMIT CENTER REVIEWED FOR CODE COMPLIANCE APPROVED JUL 0 3 2018 City of Tukwila BUILDING DIVISION ISSUE FOR CONSTRUCTION MARCH 22, 2018 SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 543-1771 REVISION BY ROVED DATE REVISION Br APPROVED DATE 9-64 1NEIWORK W5539184 SAZAN/0N 03.22.18 Z)LA PA rEZA f4e' r2tr /92/2(11A ACCEPTABILITY THIS DESIGN AND/0R SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN CLW CHECKED GHM ATE SUBTULE HVAC EQUIPMENT SCHEDULES CURRENT REVISION W5539184 SYMBOL A DATE 03.22.18 ENGINEER CLW CHECKED K. RAMSEY APPROVED K. RAMSEY APPROVED ccv kl 111110 OA MFCHANICAI MACTFR 9-64 1NETWORK BUILDING 09-064 INVFI CIPMFNT (:FNTFR WA SHEET M2A JOB NO. DWG NO. 86063 nQ-(184-M9A COMP N0. OUTLINE OF FENCE 1 OUTLINE OF CONCRETE WALL AND FENCE TO BE REMOVED / / / / / / / / / / / / / AIR CONDITION UNIT OUTDOOR COMPRESSOR CONDENSER SECTIONS, TYP. 2 OUTLINE OF FENCE 3'-4"W X 6'-8"H OUTSIDE AIR INTAKE OA INTAKE PLENUM 4'-0"W X 6'-8"H EMERGENCY GEN. OUTSIDE AIR LOUVER W/ M.O.D TOP; 24"X24' DUCT ON BOTTOM DAY TANK FUEL PUMP 150AT 100KW EMERGENCY ERATOR IfyROOM 102 4'-0"W X -8" DISCHARGE LOUVE W/ M.O.D. 18"X48" BYPASS M.O.D EA. SIDE NOTE 12 HP RAINHOOD WITH FILTERS 64"X32" EXH. DISCHARGE LOUVER 2 TYP.ah tar411177 NC 1!i=m7eit AMP" 1� I�l�Ri ?i.n dlimmu■. RAINHOOD WITH FILTERS THERMOSTAT TO CLOSE BYPASS DAMPERS WHEN TEMPERATURE IS 85 F AND ABOVE AND OPEN DISCHARGE DAMPERS NOTE 9 SETPOINT 60 F (NOTE 8) CLOSED DAMPER 16"X24" UNIT HEATER, HORIZ, TYP. (UH -2) (DISABLED AND ABANDONED IN PLACE.) 6"X24" DISCHARGE PLENUM 12"X12" WALL EXHAUST GRILLE 300CFM +12'-6" CABLE VAULT 6" DIAMETER DOWN THRU CABLE VAULT COVER EXHAUST FAN 0 WALL EXHAUST FAN (EF -2) ABANDONED IN PLACE (CLOSE DAMPER) HIGH TEMP. ALARM THERMOSTAT TEMPERATURE SENSOR HUMIDITY TRANSMITTER PLAN VIEW SCALE: 1/4"=1'-0" O CONSTRUCTION NOTES 1. CONTRACTOR TO PROVIDE TEMPORARY COOLING FOR SPACE DURING CONSTRUCTION. THE 5 -TON LIEBERT UNIT IS TO REMAIN IN OPERATION UNTIL NEW AHU'S ARE INSTALLED AND COMMISSIONED. THREE 1 -TON A/C PORTABLE UNITS FROM BOEING MAINTENANCE SHALL BE USED. THE CONTRACTOR SHALL RENT A 3 -TON A/C UNIT TO COVER 10 -TON COOLING NOMINAL LOAD. DISCONNECT AND REMOVE OUTDOOR AIR CONDENSING UNIT (AC -1, AND AC -2). REMOVE ASSOCIATED REFRIGERATED PIPING. VERIFY WITH RESPECTIVE INDOOR UNIT AS REQUIRED. DISCONNECT AND REMOVE INDOOR FAN COIL UNIT, AC -1 AND AC -2. ® REMOVE ROBERTSHAW CONTROL PANELS, WIRE AND CONDUIT FROM AC -1 AND AC -2, RESPECTIVELY. REMOVE DUCTWORK, DAMPERS, ACTUATORS, CAP DUCTWORK AT MAIN AS SHOWN TO REMAIN FOR PHASE 2 DEMOLITION. REMOVE CONTROL CONDUIT/CONDUCTOR BACK TO CONTROL PANEL. REFER TO ARCHITECTURAL PLANS FOR WALL PENETRATION PATCHING. © REMOVE CONDENSATE DRAIN PIPING TO DRAIN POINT. REMOVE CEIUNG MOUNTED AIR TRANSFER GRILLES AS PART OF CEILING REMOVAL REMOVE FILTERS FROM EXHAUST AIR LOUVERS. REMOVE WALL MOUNTED SENSORS AND CONTROL WIRE AND CONDUIT BACK TO PANEL. COORDINATE WITH WALL REMOVAL. REMOVE CEILING MOUNTED UNIT HEATER. SEE 1M10 PLAN FOR REPLACEMENT. REMOVE WALL EXHAUST FAN, DAMPER AND WALL LOUVER. SEE ARCHITECTURAL PLAN FOR WALL PATCHING. REMOVE WALL LOUVER AND DAMPER. SEE ARCHITECTURAL PLAN FOR WALL PATCHING. REMOVE ROBERTSHAW CONTROL PANELS, WIRE AND CONDUIT. REMOVAL SHALL BE COORDINATED WITH CONTROLS INSTALLATION. DISCONNECT AND REMOVE OUTDOOR LIEBERT AIR CONDENSING UNIT. REMOVE ASSOCIATED REFRIGERATED PIPING. VERIFY WITH RESPECTIVE INDOOR UNIT AS REQUIRED. DISCONNECT AND REMOVE INDOOR UEBERT AIR HANDLER UNIT AND CONTROLS CABINET. REMOVE 1/2"CW AND CAP BACK AT MAIN. 16. REFER TO M501 R FOR ADDITIONAL DEMOLITION DETAILS. REMOVAL REVIEWED FOR CODE COMPLIANCE APPROVED JUL 0 3 2018 City of Tukwila BUILDING DIVISION ISSUE FOR CONSTRUCTION MARCH 22, 2018 LEGEND GENERAL NOTES 1. 36"X24" RETURN GRILLE AT BASE 3600CFM PRESENT 4000CFM FUTURE. 2. 24"X24" CEIUNG DIFFUSER 15"DIAMETER NECK; 825CFM PRESENT 1175CFM FUTURE. TITUS MODEL TMS 3. REFRIGERANT LINES 18/8" SUCTION, 1/2" LIQUID LINES FOR EACH UNIT. 4. 24"X24" EXHAUST GRILLE 0-2000CFM. 5. 12"X8" SUPPLY GRILLE 225 CFM. TITUS MODEL SERIES 270 6. EXHAUST CEILING GRILLES SHALL BE TITUS MODEL 28MRL 7. WALL EXHAUST/RETURN GRILLES SHALL BE TITUS MODEL 23RL 8. THERMOSTAT SETPOINT OF 80 DEG F TO FIRST OPEN INTAKE LOUVER AND THEN AFTER A 15 SECOND DELAY THE MAINTENANCE SHOP EF -2 SHALL START. 9. THERMOSTAT SETPOINT OF 80 DEG F TO FIRST OPEN EMERGENCY GENERATOR O.A LOWER AND AFTER A 15 SECOND DELAY THE MECH/ELEC RM EF -1 SHALL START. 10. FUEL TANK CONTAINMENT ALARM PANEL. 11. FUEL TANK LEVEL PANEL. 12. SEE ARCHITECTURAL DWGS FOR EXACT LOCATION. REFERENCE DRAWINGS SOURCE FILE: TIFF 109-064-4001-M1 RECEIVED CITY OF TUKWILA JUN 1 J 2018 PERMIT CENTER AZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 4' Fax 206.267.1701 SAZAN # 543-1771 SCALE: 1/4"=1'-0" rio R KEY PLAN O SCALE NONE N 2' 0 2' 4' 8' REASON ON BY APPROVED DATE REASON APPROVED DATE 9-64 1NETWORK W5539184 SATAN/ON 03.22.18 ci__AIFISFEZAIr.a K • n512212n R ACCEPTABILITY TH5 DESIGN AND/OR SPECIFlCATON 15 APPROVED APPROVED BY 1 DEPT. DATE ON CHECKED ON ENGINEER CK CHECKED CK APPROVED 03.22.18 03.22.18 03.22.18 03.22.18 SUBTITLE HVAC PLAN CURRENT REVISION W5539184 SYMBOL A DATE 03.22.18 9-64 1NETWORK BUILDING 09-064 MF(:HANICAI MACTFR (:n1 R—r/1—.1 nFVFI nPMFNT (:FNTFR WA SHEET 1M10R JOB NO. COMP NO. DWG NO. nQ-064-1M nR EXHAUST PIPE THIMBLE REFRIGERANT UNES 6°X36" MANUAL DAMPER 300 CFM, TYP. DISCHARGE PLENUM 24"X24" OUTSIDE AIR DUCT SEALED FIRE/SMOKE DAMPER, RUSKIN WITH ELECTRIC OPERATOR TIED INTO HALON ALARM SYSTEM 18"X48" BY PASS M.O.D EA. SIDE 4'X7' DISCHARGE LOUVER W/M.O.D 36"X6"H MANUAL DAMPER, TYP. 36"X16"H OUTSIDE AIR M.O.D., TYP. 36"X20"H RETURN AIR M.O.D., TYP. 36"X16"H 0.A. M.O.D, TYP. 36"X20" M.O.D SECTION SCALE: 3/8"=1'-0" MIXED AIR PLENUM 24"DX54"H X UNIT WIDTH STAND-BY GENERATOR 2° FUNNEL FLOOR DRAIN SECTION SCALE: 3/8"=1'-0" r105 1 1R EXISTING AC UNIT NO. 1 OUTSIDE AIR INTAKE PLENUM FOR A.0 UNITS REFRIGERANT UNES OUTSIDE AIR LOUVER AND M.O.D FOR EMERG. GEN. CAP 24X24 OUTSIDE AIR DUCTWORK 24"X24" OUTSIDE AIR DUCT 0 REVIEWED FOR CODE COMPLIANCE APPROVED JUL 0 3 2018 City of Tukwila BUILDING DIVISION REMOVAL LEGEND GENERAL NOTES REFERENCE DRAWINGS SOURCE DRAWING: 109-064-4001-M2.TIFF CONSTRUCTION NOTES 1. REMOVE EQUIPMENT AND PIPING AS SHOWN. COORDINATE DEMOLITION WITH PROJECT PHASING. RECEIVED CITY OF TUKWILA JUN 1 9 2018 PERIV1IT CENTER ISSUE FOR CONSTRUCTION MARCH 22, 2018 SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 543-1771 RE 100N BT APPROVED REVISION APPROVED DATE 9-64 1NETWORK W5539184 SAZAN/ON 03.22.18 ACCEPTABILITY THIS DESIGN AND/0R SPECIFICATION IS APPROVED 05/221951 R DRAWN ON CHECKED ON NI,INEER CK CHECKED CK APPROVED APPRO DATE 03.22.18 03.22.18 03.22.18 03.22.18 MISCELLANEOUS SECTIONS AND DETAILS CURRENT REVISION W5539184 SYMBOL A DATE 03.22.18 TITLE AfFf.HANInAM MACTFR 9-64 1NETWORK BUILDING 09-064 fFVFI nPE1 FNT (:ENTER WA SHEET M501 R JOB NO. COMP NO DWG N0. TLC-nR4-1.1.SUR OUTLINE OF FENCE OUTLINE OF NEW FENCE OUTLINE OF NEW FENCE x„, 1 10 M5'X OUTLINE OF FENCE x�! OUTSIDE AIR INTAKE 28"x24' 1 10 115.1 4'-0"W X 6'-8"H EMERGENCY GEN. OUTSIDE AIR LOUVER W/ M.O.D FUEL TANK LEVEL PANEL. FUEL ALARM PA DAY TANK FUEL PUMP kINMENT 26x26 UP RAIN HOOD NETWORK 1350 S 5 OGCUP� CLOS 1 10 DAMP RSA CAPPED SIEMENS CONTROL PANEL OIL CONTANME ECH ROOM CURB OUTINE 111E11111 1111111111111111111111 • SD -1 0 CFM 4'-0"W X 6 -8" DISCHARGE LOUVE W/ M.O.D. 18"X48" BYPASS M.0.0 EA. SIDE 64"X32" EXHAUST DISCHARGE LOUVE (TYP. 2) RAIN HOOD ._ - - 'UM MINN! PICAL maspommusi �1si/IIiuiriii,url I17It����i11n��t1i1 935 CFM 35 CFM DIFFERENTIAL PRESSURE SENSOR EXHAUST FAN THERMOSTAT TO CLOSE BYPASS DAMPERS WHEN TEMPERATURE IS 85F AND ABOVE AND OPEN DISCHARGE DAMPERS THERMOSTAT SETPOINT OF 80T TO FIRST OPEN EMERGENCY GENERATOR 0.A LOUVER AND AFTER A 15 SECOND DELAY THE MECH/ELEC ROOM EF -1 SHALL START. SDI --1 [II] 935 CF� 1 UNIT HEATER 6"X24" DISCHA PLENUI 12"X12" WALL EXHAUST GRILLE 300 CFM +12'-6" TITUS SERIES 270, 12"x8" SUPPLY GRILLE, 225 CFM 6” DIAMETER DOWN THRU CABLE VAULT COVER, 100 CFM REVIEWED FOR CODE COMPLIANCE APPROVED JUL 03 2018 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUN 1 9 2018 PERMIT CENTER ISSUE FOR CONSTRUCTION MARCH 22, 2018 LEGEND GENERAL NOTES 1. SEE SHEET M2A FOR EQUIPMENT SCHEDULES REFERENCE DRAWINGS SOURCE FILE: TIFF 109-064-4001-M1 CONSTRUCTION NOTES PROVIDE PACKAGED AIR CONDITIONING UNIT AS SHOWN. PROVIDE START UP AND COMMISSIONING, COMPLETE WITH TEST, ADJUST AND BALANCING. PROVIDE SUPPLY AND RETURN DUCTWORK, FITTINGS, DIFFUSER, RETURN GRILLES AND ACCESSORIES AS SHOWN. PROVIDE INSULATION PER WSEC, FIELD INSTALLED ALUMINUM JACKET WITH FACTORY FABRICATED FITTING COVERS FOR EXTERIOR DUCTWORK APPLICATION. SUPPORT AS REQUIRED. SEE SHEET M501 FOR ADDITIONAL DETAILS. PROVIDE TEMPERATURE AND HUMIDITY SENSORS. PROVIDE CONNECTION TO AHU-1 AND AHU-2 THROUGH SIEMENS CONTROLS. (BY CONTROLS CONTRACTOR) PROVIDE DIFFERENTIAL PRESSURE SENSOR. PROVIDE CONNECTION TO A1 -1U-1 AND AHU-2 THROUGH SIEMENS CONTROLS. (BY CONTROLS CONTRACTOR) REPLACE CONTROL DAMPER ACTUATOR ON EXHAUST AIR CONTROL DAMPERS WITH SIEMENS OPENAIR GCA SERIES, 24V MODULATING ACTUATOR, SEQUENCED BUILDING STATIC/RELIEF. COORDINATE TYPE WITH EXISTING DAMPER IN FIELD. PROVIDE CEILING MOUNT UNIT HEATER WITH INTEGRAL TEMPERATURE CONTROL. SET AT 40T. PROVIDE SIEMENS CONTROLS. CONTROLS INSTALLATION SHALL BE SEQUENCED AS TO MAINTAIN COOLING SYSTEM OPERATION ON EXISTING COOLING UNIT. SEE SHEET M310 FOR CONTROLS REQUIREMENTS. POC, PROVIDE CONNECTION TO (E) DUCTWORK WITH VOLUME DAMPER AS SHOWN. 9. SEE SHEET M2A FOR EQUIPMENT SCHEDULES 10. SEE SHEET M310 FOR CONTROLS DIAGRAM AND SEQUENCE OF OPERATION WORK. SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN #543-1771 4' Iwo KEY PLAN SCALE: NONE 2' 0 4' 8' SCALE: 1/4"=1'-0" WARM Br APPROVED OAIE APPROVED DATE 9-64 1NETWORK W5539184 SAZAN/ON 03.22.18 L4EFIW® Cr•- ACCEPTABILITY ON 1115 DESIGN AND/0R SPECIFICATION IS APPROVED ORA APPROVED BY DEPT. DATE ZIRECRED ON NGINELN CK 'CHECKED CK DATE 03.22.18 03.22.18 03.22.18 SUBTITLE HVAC PLAN CURRENT REVISION W5539184 SYMBOL DATE 03.22.18 03.22.18 APPROVED TILE 9-64 1NETWORK BUILDING 09-064 1JFC.HANIC.AI MASTER fnl R -C/1-..1 OFVFIOPUFNT CENTER WA SHEET 1M10 JOB N0. COMP N0. DWG NO. nQ-n14-1 X11 n 1" COLD WATER SERVICE 1/2" TEE BRANCH OUT WITH VALVE FOR ISOLATION PLAN VIEW SCALE: 1/4"=1'-0" O O O LEGEND GENERAL NOTES 1. FUNNEL FLOOR DRAIN (FFD) JOSAM MODEL 30000-E2 OR APPROVED EQUAL. (PRIMED) 2. FLOOR DRAIN (FD) 2" PRIMED FLOOR DRAIN JOSAM MODEL 32020-40 OR APPROVED EQUAL. 1 1 > RAYCHEM HEAT TRACE WITH 5XL1-CR - 5W/120V SELF-REGULATING HEATING CABLE, RAYCLIC-PC POWER CONNECTION AND END SEAL (RAYCLIC-SB-04), RAYCLIC-S SPLICE, RAYCLIC-LE LIGHTED END SEAL KITS, RTD -200 AMBIENT SENSING - 100T -300T, C910-485 RAYCHEM 1POINT CONTROLLER, 2 -POLE, 30A EMR, RS -485, GT -66 GLASS TAPE, EFL ELECTRIC -TRACED LABEL. REFERENCE DRAWINGS SOURCE DRAWING 109-064-4001-M1 CONSTRUCTION NOTES PROVIDE 4" MINIMUM DEEP TRAP AND 1" CONDENSATE COPPER PIPE DRAIN TO FLOOR DRAIN AS SHOWN. PROVIDE PENETRATION THROUGH WALL FOR 1"CD. COORDINATE WITH UNIT INSTALLATION AS REQUIRED. PROVIDE COMPLETE HEAT TRACING SYSTEM WITH SINGLE CONTROL PANEL AND INSULATION FOR EXTERIOR RUN OF CONDENSATE PIPE TRAP. PROVIDE PREFORMED CELLULAR GLASS INSULATION WITH ALUMINUM METAL JACKETS AND MANUFACTURER APPROVED FASTENERS. PROVIDE COOPER 8 -LINE DURA -BLOCK ADJUSTABLE PIPE SUPPORT OR APPROVED EQUAL. RECEIVED CITY OF TUKWILA REVIEWED FOR P CODE COMPLIANCE /APPROVED JUL 03 2018 City of Tukwila BUILDING DIVISION JUN 1 9 2018 RMIT CENTER ISSUE FOR CONSTRUCTION MARCH 22, 2018 SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 (D Tel 206.267.1700 Fax 206.267.1701 SAZAN # 543-1771 4' KEY PLAN SCALE: NONE 2' 0 2' 4' 8' SCALE: 1/4"=1'-0" SYM BY APPROVED DMZ SYM REVISION BY APPRDVED DATE ISSUE FOR REVIEW CLW KR 10.09.86 D 9-64 1NE1WORK W5539184 SAZAN/ON 03.22.18 2 ISSUE FOR 81D CLW KR 10.24.86 A ISSUE FOR CONSTRUCTION DJM KR 12.12.86 B RECORD DRAWING FB KR 09.16.87 C INSTALL AIR CONDDIONER JY737425-01 DMV EC 10.29.93 \V. KR mn7nnt R ACCEPTABILITY THIS DESIGN AND/OR SPECIF1CATON IS APPROVED DRAWN CLW CHECKED GHM ATE SUBTU E PLUMBING PLAN CURRENT REVISION W5539184 SYMBOL D DATE 03.22.18 APPROVED BY DEPT. DATE ENGINEER CLW CHECKED K. RAMSEY APPROVED K. RAMSEY UCKIKIC MFC.HANICAI MASTFR 9-64 1NETWORK BUILDING 09-064 DFVFI ()PAWN'!" CFNTFR WA SHEET 1M110 JOB N0. 86063 COMP N0. DWG NO. no-n04-1M11n AIR HANDLING UNIT CONTROLS SUPPLY SHUT-OFF MOTOR OPERATED DAMPER TYPICAL EA. UNIT AIR HANDLING UNIT CONTROLS ECONOMIZER OUTSIDE AIR MOTOR OPERATED DAMPER RETURN MOTOR OPERATED DAMPER DIFFERENTIAL PRESSURE SWITCH, TYP. EA. UNIT I I J EXHAUST DISCHARGE MOTOR OPERATED DAMPER - NORTH EXHAUST DISCHARGE MOTOR OPERATED DAMPER - SOUTH — J RETURN AIR THERMOSTAT RETURN AIR SUPPLY AIR L �1 I III 111 1 1 I III II CAT6 CONNECTION TO BOEING VLAN 1 Ilii \ - ECONOMIZER OUTSIDE AIR MOTOR OPERATED DAMPER ECONOMIZER AIR INTAKE TYP. EA. UNIT RETURN AIR THERMOSTAT RETURN AIR I I I I r—J SIEMENS BUILDING CONTROL PANEL L L RETURN MOTOR OPERATED DAMPER rr ----JJ JJ COMBINED ROOM TEMPERATURE AND HUMIDISTAT SENSOR BLDG. EXHAUST DIFFERENTIAL PRESSURE SENSOR L BLDG. C9-6 DECONTROL DIAGRAM SCALE: NONE SEQUENCE OF OPERATION GENERAL TWO UNITS SERVE THE SPACE. THE UNITS OPERATE IN A PRIMARY AND FAIL BACK METHOD (N+1). PRIMARY UNIT IS INDICATED ON THE GRAPHICS FROM THE APOGEE INSIGHT CMCS. BOTH AIR HANDLING UNIT CONTROLS HAVE FACTORY OEM CONTROLS INSTALLED WITH THE FOLLOWING POINTS HARDWIRED: DISCHARGE SET POINT (ANALOG OUTPUT) SYSTEM RUN PROOF (DIGITAL INPUT) SYSTEM FAILURE (DIGITAL INPUT) SYSTEM ENABLE ON/OFF (DIGITAL OUTPUT) ALL OTHER SYSTEM POINTS WILL BE READ OR COMMANDED THROUGH A BACNET MSTP COMMUNICATION BUS CONNECTION TO THE LOCAL CMOS PANEL THE PRIMARY UNIT WILL CONTROL TO THE SET POINT FROM THE SIEMENS CMCS. IF THE SPACE TEMP EXCEEDS THE SET POINT OF 80'F (ADJUSTABLE). THE BACK UP UNIT WILL BE ENABLED TO SUPPLEMENT UNMET COOLING. A HIGH TEMP ALARM WILL BE INITIATED. IF THE PRIMARY SYSTEM FAILS AN ALARM WILL INITIATE AT THE CMCS. BASED ON A PRESET INTERVAL (WEEKLY - ADJUSTABLE) THE SECONDARY UNIT WILL BE ENABLED TO SERVE THE SPACE AS THE PRIMARY UNIT, AND THE OTHER UNIT WILL BE SET TO BACK UP. THE DDC PANEL WILL CONTROL THE START/STOP OF THE AC UNITS WITH THE FOLLOWING EXCEPTION: FIRE SMOKE SHUTDOWN, MANUAL RESTART REQUIRED, (HARD WIRED BY OTHERS) WHEN EITHER OR BOTH AC UNITS ARE OFF THE SUPPLY DISCHARGE DAMPER AND OUTSIDE AIR DAMPER SHALL BE CLOSED AND THE RETURN AIR DAMPER OPEN. START-UP MODE THE DDC SHALL OPEN THE AC UNIT SUPPLY AIR AND RETURN AIR DAMPERS. THE OUTSIDE AIR DAMPER SHALL REMAIN CLOSED. AFTER A 15 -SECOND DELAY, THE PRIMARY AC UNIT SUPPLY FAN SHALL START AND THE COOUNG COIL SHALL BE ON UNTIL THE ROOM TEMPERATURE IS 80'F DEGREES OR LESS, THEN THE DDC CONTROL SHALL TRANSFER TO THE "NORMAL OPERATING MODE". CONTAINMENT PAN LEAKAGE SENSOR DAY TANK TANK LEVEL INDICATOR AND LOW LEVEL ALARM CONTAINMENT TANK LEAKAGE ALARM TEMPERATURE SENSOR, EF -1 TEMPERATURE SENSOR FOR EMERG. GEN. DAMPERS EMERG. GEN. EXHAUST AIR AND BY-PASS DAMPER EMERG. GEN. OUTSIDE AIR DAMPER TRAP PRIMER ATS STAND-BY GENERATOR VESDA OUTSIDE AIR TEMPERATURE SENSOR NORMAL OPERATING MODES COOLING THE UNIT WILL OPERATE IN THE ECONOMIZER MODE IF THE OUTSIDE AIR TEMPERATURE IS BELOW THE RETURN AIR TEMPERATURE AND MIXED AIR TEMPERATURE IS ABOVE A LOW LIMIT OF 45 DEG F (ADJUSTABLE) AND THERE IS A CALL FOR COOLING, ELSE THE OUTSIDE AIR DAMPERS WILL REMAIN CLOSED. ECONOMIZER DAMPERS WILL BE MODULATED FROM MINIMUM TO 100 -PERCENT OUTSIDE AIR. ECONOMIZER IS THE FIRST STAGE OF COOLING. IF THE OUTDOOR TEMPERATURE IS GREATER THAN THE INDOOR TEMPERATURE, THE RETURN AIR DAMPERS SHALL FULLY OPEN AND OUTSIDE DAMPERS SHALL CLOSE. WHEN THE INSIDE TEMPERATURE IS 80'F AND ABOVE, THE DX COOLING SYSTEM SHALL START. DEHUMIDIFICATION WHEN THE HUMIDITY AT THE ROOM HUMIDISTAT IS 65% (ADJUSTABLE) OR GREATER, THE DX COOUNG SYSTEM SHALL START, AND SHALL STOP WHEN HUMIDISTAT REACHES 50% (ADJUSTABLE). EXHAUST PRESSURIZATION IF THE DIFFERENTIAL PRESSURE BETWEEN THE OUTSIDE AND ROOM IS GREATER THAN 0.05 INCHES WATER GAGE, THE EXHAUST DISCHARGE DAMPER SHALL MODULATE OPEN TO MAINTAIN 0.05 INCHES WATER GAGE, MONTHLY TESTING: 1. AUTOMATED MONTHLY TESTING HAPPENS ON THE (WEEK DAY SPECIFIED ADJUSTABLE). 2. THE CONTROL CODE CREATES AN ALARM 3. THE ROOM GOES INTO FAIL OVER MODE TO BACK UP UNIT COOUNG 4. AN OPERATOR VERIFICATION OF THE ACTIVITY WILL SWITCH IT BACK TO NORMAL OPERATION. ALARMS: HIGH TEMPERATURE ALARM >85'F (ADJUSTABLE) GENERAL FAILURE ALARM TRENDING: ROOM TEMPERATURE DISCHARGE TEMPERATURE POWER CONSUMPTION LEGEND: GENERAL NOTES: REFERENCE DRAWINGS: SOURCE DRAWING: 109-064-4001-M3.TIF CONSTRUCTION NOTES PROVIDE CONTROL COMPONENTS AS REQUIRED TO FULLY INTEGRATE NEW AND EXISTING TO REMAIN EQUIPMENT TO BUILDING CONTROLS. EXCEPT AS NOTED, PROVIDE ALL SENSORS, COMPONENTS, HARDWARE AND PROGRAMMING REQUIRED FOR A COMPLETE AND FULLY FUNCTIONAL CONTROL SYSTEM THAT OPERATES AS DESCRIBED AND AS SHOWN ON THE DRAWINGS. PROVIDE 24VAC POWER CONDUCTOR AND CONDUIT TO CONTROL DAMPER (BY ELECTRICAL CONTRACTOR). 3. SUBMIT CONTROLS SHOP DRAWINGS AND DOCUMENTATION FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. 4. REFER TO CONTROLS AS -BUILT DRAWINGS BY CONTROLS CONTRACTORS, INC. (CCI), DATED 01/23/87 FOR EXISTING BUILDING CONTROLS POINT LIST. 5. SIEMENS TO PROVIDE DDC CONTROLS, PROGRAMMING AND GRAPHICS. COMMISSIONING TO BE COMPLETED BY SIEMENS WITH BOEING MAINTENANCE PARTICIPATION. REVIEWED FOR CODE COMPLIANCE APPROVED JUL 0 3 2018 City of Tukwila BUILDING DIVISION RECEIVED C!TY OF TUKWILA JUN 1 9 2018 PERMIT CENTER ISSUE FOR CONSTRUCTION MARCH 22, 2018 SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 CI Tel 206.267.1700 Fax 206.267.1701 SAZAN # 543-1771 SYM REVISION ey APPROVED DATE REVISION APPROVED DATE ISSUE FOR REVIEW CLW KR 10.09.86 2 ISSUE FOR BID CLW KR 10.24.86 A ISSUE FOR CONSTRUCTION DJM KR 12.12.86 B RECORD DRAWING FB KR 09.16.87 C 9-64 1NETWORK W5539184 SAZAN/ON 03.22.18 - �BOENG' w ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN CLW DAZE CHECKED CHM SUBTITLE CONTROL SYSTEM DIAGRAM AND SEQUENCE OF OPERATION CURRENT REVISION W5539184 SYMBOL DATE 03.22.18 APPROVED BY DEPT. DATE 'ENGINEER CLW CHECKED K. RAMSEY APPROVED K. RAMSEY APPROVED uruuCCOV 111 DO RC MFCHANICAI M4CTFR 9-64 1NETWORK BUILDING 09-064 nFVFI nPMFNT (:FNTFR WA SHEET M310 JOB NO. W5539184 DWG NO. no-ma-M;tn COMP NO. 1/2" X1/2" 1/2" TO DCM PANEL (TO OPERATE 30 SECONDS PER 241 -IRS) 1/2 METERING AIRGAP "JOSAM" BALANCING VALVE, 1801-2, 3 TYP. 1/2 GPM, EA. FLOOR DRAIN, TYP. FLOOR 3/4" UNION CAPPED 1/2" VALVE ELECTRIC CABLE VAULT TRENCH AUTOMATIC SOLENOID VALVE MODEL HS -400, 115-10 ELECTRIC OPERATED VALVE, 1/2" 3/4" HOSE BIBB 3/4" 3/4" PRESSURE REDUCING e VALVE WATTS MODEL NO. U5 3/4" SET AT 45PSIG SHUT-OFF VALVE TRAP PRIMER DETAIL SCALE: NOT TO SCALE 1M110 1" DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS THE DRAIN CONNECTION. 3/4"� MINIMUM PITCH DOWN TOWARDS DRAIN OPEN VENT CLEAN OUT DRAIN CONNECTION FLOOR CONDENSATE DRAIN TRAP DETAIL /2-), SCALE: NONE 1 0 LEVEL SENSOR FILL/SOUND 2" CONTAINMENT SIGHT PIPE —7 2" DRAIN PIPE VENT TO AIR FOS I I 1I I DIESEL OIL STORAGE TANK W/ 100% INTEGRAL CONTAINMENT DIKE 12'-0"L X 62"W X 52"H 675 GAL. CAP. DAY TANK SLOPE 1/8"/FT AERIAL SUPPORT J 1/2" CONTAINMENT VENT CONTAINMENT LEAKAGE SENSOR FOOR VALVE 6" FROM TANK BOTTOM GRADE CONCRETE EQUIPMENT PAD /- FLAME ARRESTOR 2'-0" ABOVE ROOF FLASH COUNTERFLOW THROUGH ROOF F.O. PUMP SIGHT GLASS J 1/2" DRAIN VALVE 25GAL DAY TANK 1/2" F.O. HAND PUMP 1/2" \I = 0- 4- f + 44. 1/4" VENT CMCS LO LEVEL ALARM CMCS HI LEVEL ALARM 3/8" EMERG. GENERATOR 1/2" FLOAT SWITCH TO START & STOP FUEL OIL PUMP 25 -GAL CONTAINMENT PAN rTh M500 EMERGENCY GENERATOR FUEL OIL PIPING DIAGRAM SCALE: NONE LEAKAGE SENSOR, FASTEN WITH 1 1/2" BUSHING NUTS ON INSIDE AND OUTSIDE OF PAN ATTACHMENT PLATE. HEIGHT = (5775 IN)+2" \L X W / 16" GAUGE GALVANIZED STEEL WITH ALL WELDED SEAMS. F.O. CONTAINMENT PAN DETAIL SCALE: NONE M500 M500 FRAME RUNNER CHANNEL, SEE NOTE 4-\ 1-1/2" (TYP.) 3/4" FLAT TRAILING EDGE (TYP.) FLOW CRIMP (TYP.) VANED ELBOW TURNING VANES NOTES: 1. MAXIMUM UNSUPPORTED VANE LENGTH 36" 2. VANES AND FRAMES - 24 GAUGE 3. DUCT INLET AND OUTLET DIMENSIONS TO BE EQUAL 4. FOR HIGH VELOCITY APPLICATIONS PROVIDE 18 GAUGE CHANNEL AND TACK WELD VANE EDGES TO CHANNEL, TYPICAL BOTH ENDS 5. FRAMES AND CHANNELS - BOLTED OR TACK WELDED TO ELBOW SINGLE—THICKNESS TURNING VANES FOR SQUARE ELBOW v b MOOIM5 SCALE: NONE FLEX CONN. LEGEND GENERAL NOTES REFERENCE DRAWINGS CAD CONVERSION FROM ORIGINAL TIFF FILE 109-064-4001-M3 109-064-M310 109-064-1M110 CONSTRUCTION NOTES PROVIDE FUSIBLE LINK VALVE ON FUEL LINE TO BUILDING. REVIEWED FOR CODE COMPLIANCE APPROVED JUL 0 3 2018 City of Tukwila BUI v SION CITY OF TUKWILAA JUN 1 9 2018 PERMIT CENTER ISSUE FOR CONSTRUCTION MARCH 22, 2018 SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 543-1771 SYM REVISION BY APPROVED DATE REVISION APPROVED DALE A 9-64 INEIWORK W5539184 SAZAN/ON 03.22.18 ci.ASIUSFEFIVAg® o- ACCEPTABILITY ON THIS DESIGN AND/0R CHECKED SPECIFICATION IS APPROVED ON ENGINEtR APPROVED BY DEPT. DATE CK CHECKED CK APPROVED 03.22.18 03.22.18 03.22.18 03.22.18 SUBTTO.E MISCELLANEOUS SECTIONS AND DETAILS CURRENT REVISION W5539184 SYMBOL A DATE 03.22.18 APPROVED MmHANINAI MACTFR 9-64 1NETWORK BUILDING 09-064 fFVFI C1PMFNT C.RNTFP WA SHEET M500 JOS NO. DWG NO. COMP NO. no-nfi4-E.15f1(1 EXHAUST PIPE THIMBLE DISCHARGE PLENUM 18"X48" BY PASS M.O.D EA. SIDE 4'X7' DISCHARGE LOUVER W/M.O.D LEGEND GENERAL NOTES REFERENCE DRAWINGS SOURCE DRAWING 109-064-4001-M2 1 2" ELECTRICAL CONDUIT 48"x48" RETURN PLENUM INSULATED DUCTWORK WITH METAL JACKET (TYP.) 28"x24 DUCT THROUGH WALL MOTOR OPERATED CONTROL DAMPER (•) 11 II all\Mir \i// \I - v 11 ,/I y I , i ii I 11 II all\Mir --,-; \ / \ / /(\ / \ / �\ 11 ROUTE DUCT AS HIGH AS POSSIBLE TO ALLOW BRANCH DUCT CROSSING UNDER BOTTOM OF TRUSS. COORDINATE DAMPER INSTALLATION WITH CONTROLS CONTRACTOR AS REQUIRED. COORDINATE DUCTWORK PENETRATIONS AND DUCTWORK WITH ELECTRICAL CONTRACTOR. REVIEWED FOR CODE COMPLIANCE APPROVED JUL 032018 City of Tukwila BUILIMIIVOION JUN 1 9 2018 PERMIT CENTER ISSUE FOR CONSTRUCTION MARCH 22, 2018 SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 543-1771 SYM REVISION Err APPROVED DATE REVISION APPROVED DATE A 9-64 1NETWORK W5539184 SAZAN/ON 03.22.18 1,„_AsrAsr,Ar.0' DR/99/901 R ACCEPTABIUTY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN ON MOMS ON ENGINEER CK CHECKED CK APPROVED APPROVED DATE 03.22.18 03.22.18 03.22.18 03.22.18 UBTRLE MISCELLANEOUS SECTIONS AND DETAILS CURRENT REVISION W5539184 SYMBOL DATE 03.22.18 Tniz9-64 1NETWORK BUILDING 09-064 MFCHANICAI MACTFR OFVFI C1PMFNT C.FNTFR WA EET M501 JOB NO. COMP NO. DWG NO. nQ-nM-MSni 2017 10:54:13 AM OERMIT COORD COPY 0 PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M18-0081 DATE: 06/22/18 PROJECT NAME: BOEING #9-64 NETWORK SITE ADDRESS: 9725 E MARGINAL WAY #9-64 X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Building Division Public Works Avc Fire Prevention Structural Planning Division ❑ Permit Coordinator PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 06/26/18 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required ❑ Approved with Conditions ❑ Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: DUE DATE: 07/24/18 REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping ❑ PW ❑ Staff Initials: 12/18/2013 APOLLO MECHANICAL CONTR-`�TORS Washington State Department of Labor & Industries Home Espanol Contact Safety & Health Claims & Insurance Search L&I A -Z Index Help Page 1 of 3 My L 1 Workplace Rights Trades & Licensing APOLLO MECHANICAL CONTRACTORS Owner or tradesperson Principals RATCHFORD, BRUCE W, PRESIDENT BRISCOE, DAN, VICE PRESIDENT RATCHFORD, RYAN B, VICE PRESIDENT HAISCH, ANGIE, SECRETARY HAISCH, ANGIE, TREASURER HIGHTOWER, BOB, VICE PRESIDENT (End: 04/06/2018) Doing business as APOLLO MECHANICAL CONTRACTORS 1133 W. COLUMBIA DRIVE KENNEWICK, WA 99336 509-586-1104 BENTON County WA UBI No. Business type 600 443 607 Corporation Parent company Governing persons APOLLO SHEET METAL INC BRUCE WAYNE RATCHFORD BOB HIGHTOWER; DAN BRISCOE; ANGIE HAISCH; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties GENERAL License no. APOLLMC864JQ Effective — expiration 04/18/2014— 04/18/2020 Bond Western Surety Co Bond account no. 58714750 Active. Meets current requirements. $12,000.00 Received by L&I Effective date 04/18/2014 04/08/2014 Expiration date Until Canceled Insurance Cincinnati Ins Co $1,000,000.00 Policy no. EPP0044685 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=600443607&LIC=APOLLMC864JQ&SAW= 7/10/2018 APOLLO MECHANICAL CONTRACTORS Received by L&I Effective date 09/20/2017 09/30/2013 Expiration date 09/30/2018 Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 442,528-00 Doing business as APOLLO SHEET METAL INC Estimated workers reported Quarter 1 of Year 2018 "Greater than 100 Workers" L&I account contact TO / JULIE SUR (360)902-4715 - Email: SURJ235@Ini.wa.gov Account is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 06/22/2017 Inspection no. 317944907 Location 2001 Saint St. Richland, WA 99354 Inspection results date 12/04/2015 Inspection no. 317938581 Location 4891 W. 27th Avenue Kennewick, WA 99336 Inspection results date 08/17/2015 Inspection no. 317937422 Location 3715 US State Hwy 97A Wenatchee, WA 98801 Inspection results date No violations No violations No violations Page 2 of 3 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=600443607&LIC=APOLLMC864JQ&SAW= 7/10/2018 APOLLO MECHANICAL CONTRRTORS 04/02/2015 Inspection no. 317935605 Location 3710 S. Kellogg Street Kennewick, WA 99338 Inspection results date 03/12/2015 Inspection no. 317935266 Location 5706 N. Rd 60 Pasco, WA 99301 Inspection results date 03/05/2015 Inspection no. 317934867 Location 22406 Pacific Highway S Des Moines, WA 98198 Inspection results date 02/09/2015 Inspection no. 317934841 Location 231 Wild Flower St. NE Royal City, WA 99357 Inspection results date 02/05/2015 Inspection no. 317934834 Location 3730 Plaza Way Kennewick, WA 99338 Inspection results date 10/22/2013 Inspection no. 316878313 Location Davis High School Yakima, WA 98902 Inspection results date 12/14/2012 Inspection no. 316563246 Location 3290 W. 32 Ave Kennewick, WA 99336 Violations No violations No violations No violations No violations No violations No violations Page 3 of 3 is Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. Help us improve httns://secure.lni.wa.gov/verify/Detail.aspx?UBI=600443607&LIC=APOLLMC864JQ&SAW= 7/10/2018