HomeMy WebLinkAboutPermit M18-0117 - SEATTLE CHILDRENS - AIR HANDLER UNIT, DIFFUSERS AND DUCTWORKSEATTLE CHILDREN'S
3355 S 120 PL 120
M18-0117
Parcel No:
Address:
r1
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
MECHANICAL PERMIT
1023049082 Permit Number:
3355 S 120TH PL 120
Project Name: SEATTLE CHILDRENS
Issue Date:
Permit Expires On:
M18-0117
10/3/2018
4/1/2019
Owner:
Name:
Address:
Contact Person:
Name:
Address:
Contractor:
Name:
Address:
License No:
Lender:
Name:
Address:
SABEY CORPORATION
12201 TUKWILA INTL BLVD 4TH FL,
SEATTLE, WA, 98168
KAYLENE NELSON
1221 SECOND AVE N , KENT, WA,
98032
HERMANSON COMPANY LLP
(GENERAL)
1221 2ND AVE N , KENT, WA, 98032-
2945
H E R MACL005 BJ
Phone: (253) 359-7147
Phone: (206) 575-9700
Expiration Date: 8/25/2020
DESCRIPTION OF WORK:
1 VAV, RELOCATE ^' 20 DEFFUSERS. MODIFY DUCT AS NEEDED
Valuation of Work: $32,000.00
Type of Work: REPLACEMENT
Fuel type: ELECT
Fees Collected: $749.23
Electrical Service Provided by: SEATTLE CITY LIGHT
Water District: 125
Sewer District: VALLEY VIEW
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
International Fuel Gas Code:
Permit Center Authorized Signature:
2015
2015
2015
2015
2015
National Electrical Code:
WA Cities Electrical Code:
WAC 296-46B:
WA State Energy Code:
2017
2017
2017
2015
Date: 10 \ 15
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development permit and agree to the conditions attached to this permit.
Signature.
Print Name:
19 .NI_ `ScAf
Date: 10 1.)k
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
2: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
3: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
on satisfactory completion of this requirement.
5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
8: ***MECHANICAL PERMIT CONDITIONS***
9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center (206/431-3670).
10: Manufacturers installation instructions shall be available on the job site at the time of inspection.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
0703 MECH EQUIP EFF
1800 MECHANICAL FINAL
0609 PIPE/DUCT INSULATION
0705 REFRIGERATION EQUIP
0701 ROUGH -IN MECHANICAL
CITY OF TUKJ( 'A
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
hap: www.TukwitaWA.go\-
Mechanical Permit No.
IlkA (6'olio
Project No.
Date Application Accepted:
Date Application Expires:
111
4
(For office u e only)
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**please print**
SITE LOCATION
King Co Assessor's Tax No.: 1023049082
Site Address: 3355 S 120TH Place Suite Number: Floor: 1
Tenant Name:
Seattle Childrens
PROPERTY OWNER
Name: Sabey
Address: 12201 Tukwila International BLVD
City: Tukwila State: WA Zip: 98168
CONTACT PERSON — person receiving all project
communication
Name: Kaylene Nelson
Address: 1221 2nd Avenue N
City: Kent State: WA Zip: 98032
Phone: (253) 359-7147 Fax:
Email: Kaylene.nelson@hermanson.com
New Tenant: El Yes ❑ .. No
MECHANICAL CONTRACTOR INFORMATION
Company Name: Hermanson Company
Address: 1221 2nd Avenue N
City: Kent State: WA Zip: 98032
Phone: (253) 359-7147 Fax:
Contr Reg No.: HERMACLOO5BJ Exp Date: 08/25/2018
Tukwila Business License No.: BUS -0994464
Valuation of project (contractor's bid price): $ 32,000
Describe the scope of work in detail:
1 VAV, Relocate —20 diffusers. Modify duct as needed and i
Use:
Fuel Type:
Residential: New ❑ Replacement ❑
Commercial: New ❑ Replacement
Electric
Gas ❑
Other:
H: Applications Forms -Applications On Linc 201 1 Applications Mechanical Permit Application Revised S-9-11.docx
Revised: August 2011
bh
Page 1 of 2
/
/
Indicate type of mechanical work being installed and the quantity below:
Unit Type
Qty
Furnace <100k btu
Furnace >100k btu
1
Floor furnace
Suspended/wall/floor
mounted heater
Appliance vent
Repair or addition to
heat/refrig/cooling
system
Air handling unit
<10,000 cfm
Unit Type
Qty
Air handling unit
>10,000 cfm
1
Evaporator cooler
Ventilation fan
connected to single duct
Ventilation system
Hood and duct
Incinerator — domestic
Incinerator —
comm/industrial
Unit Type
Qty
Fire damper
Diffuser
20
Thermostat
Wood/gas stove
Emergency generator
Other mechanical
equipment
Boiler/Compressor
Qty
0-3 hp/100,000 btu
3-15 hp/500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/1,750,000 btu
50+ hp/1,750,000 btu
PERMIT APPLICATION NOTES -
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING 0 ' I R AUTH RIZE AGENT:
Signature:
Date: 09/11/2018
Print Name: aylene Nelson Day Telephone: (253) 359-7147
Mailing Address: 1221 2nd Avenue N
H: Applications Forms -Applications On Line 2011 Applications Mechanical Permit Application Revised 8-9-1 1.docx
Revised: August 22011
bh
Kent WA 98032
City State Zip
Page 2 of 2
r�
DESCRIPTIONS
PermitTRAK
ACCOUNT
QUANTITY
PAID
$109.80
M18-0117 Address: 3355 5 120TH PL 120
Apn: 1023049082
$109.80
Credit Card Fee
$3.20
Credit Card Fee
R000.369.908.00.00
0.00
$3.20
MECHANICAL
$102.50
PERMIT FEE
R000.322.100.00.00
0.00
$102.50
TECHNOLOGY FEE
$4.10
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R15540
R000.322.900.04.00
0.00
$4.10
$109.80
Date Paid: Wednesday, October 03, 2018
Paid By: KAYLENE NELSON
Pay Method: CREDIT CARD 543927
Printed: Wednesday, October 03, 2018 1:10 PM 1 of 1
1 SYSTEMS
Page 1 of 2
CO TUKWILA ETRAKIT
6200 SOUTHCENTER BLVD
TUKWILA, WA 98188
206-433-1870
CITY OF TUKWILA
0017340000802374464500
Date: 10/03/2018 01:10:19 PM
CREDIT CARD SALE
VISA
CARD NUMBER: **********0057 K
TRAN AMOUNT: $109.80
APPROVAL CD: 543927
RECORD #: 000
CLERK ID: Bill
X
{CARDHOLDER'S SIGNATURE}
I AGREE TO PAY THE ABOVE TOTAL AMOUNT
ACCORDING TO THE CARD ISSUER AGREEMENT
(MERCHANT AGREEMENT IF CREDIT VOUCHER)
Thank you!
Merchant Copy
https://classic.convergepay.com/VirtualMerchant/transaction. do?dispatchMethod=printTra... 10/3/2018
Page 1 of 2
CO TUKWILA ETRAKIT
6200 SOUTHCENTER BLVD
TUKWILA, WA 98188
206-433-1870
CITY OF TUKWILA
0017340000802374464500
Date: 09/17/2018 12:29:25 PM
CREDIT CARD SALE
VISA
CARD NUMBER: **********0057 K
TRAN AMOUNT: $532.83
APPROVAL CD: 256941
RECORD #: 000
CLERK ID: Rachelle
X
{CARDHOLDER'S SIGNATURE}
I AGREE TO PAY THE ABOVE TOTAL AMOUNT
ACCORDING TO THE CARD ISSUER AGREEMENT
(MERCHANT AGREEMENT IF CREDIT VOUCHER)
Thank you!
Merchant Copy
http s ://classic.convergepay. com/V irtualMerchant/transaction. do?dispatchMethod=printTra... 9/17/2018
Page 2 of 2
CO TUKWILA ETRAKIT
6200 SOUTHCENTER BLVD
TUKWILA, WA 98188
206-433-1870
CITY OF TUKWILA
Date: 09/17/2018 12:29:25 PM
CREDIT CARD SALE
VISA
CARD NUMBER: **********0057 K
TRAN AMOUNT: $532.83
APPROVAL CD: 256941
RECORD #: 000
CLERK ID: Rachelle
Thank you!
Customer Copy
https://classic.convergepay.comNirtualMerchant/transaction.do?dispatchMethod=printTra... 9/17/2018
INSPECTION RECORD
Retain a copy with permit (18`0/1 / JS
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Project: -
S CRI
Type of I spection:
F,a
Address: IS
3-355_S• 12o
00
Date Calle :
Special Instructions:
Date Wanted:L(r
l 0'`I
a.m:
Hermanson
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, WA 98032
tel 206-575-9700
fax 206-575-9800
Project: 3355 S 120th Place Tukwila, WA
Date: 09/04/2018
r
September 7, 2018
2018.09.07 08:11:11-07'00'
Document approved,
mechanical design pages
REVIEWED FOR
CODE COMPLIANCE
APPROVED
SEP 2 7 2018
City of Tukwila
BUILDING DIVISION
REr,EM .D
CITY OF TUK ilLA
SEP 17 2018
PERMIT CENTER
HVAC SYSTEM COOLING/HEATING CALCS
CARRIER HAP VERSION: 5.11
PERMIT SUBMITTAL PACKAGE
N11�� b111
Mechanical Construction,
Engineering and Service
www.hermanson.com
Hermanson
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, WA 98032
tel 206-575-9700
fax 206-575-9800
Project: 3355 S 120th Place Tukwila, WA
Date: 09/04/2018
Hermanson
Building Today, Defining Tomorrow
HVAC SYSTEM COOLING/HEATING CALCS
CARRIER HAP VERSION: 5.11
ENVELOPE INPUTS
Mechanical Construction,
Engineering and Service
www.hermanson.com
TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
HERMANSON COMPANY LLP
Wall Constructions
09/06/2018
03:44PM
Existing Wall
Wall Details
Outside Surface Color
Absorptivity
Overall U -Value
Wall Lavers Details (Inside to Outside
Medium
0.675
0.114 BTU/(hr•ft2•°F)
Layers
Thickness
in
Density
Ib/ft3
Specific Ht.
BTU / (Ib•°F)
R -Value
(hr•ft2•°F)/BTU
Weight
Ib/ft2
Inside surface resistance
0.000
0.0
0.00
0.68500
0.0
Gypsum board
0.625
50.0
0.26
0.56000
2.6
R-11 batt insulation
3.500
0.5
0.20
6.50000
0.1
8 -in HW concrete
8.000
140.0
0.20
0.66667
93.3
Outside surface resistance
0.000
0.0
0.00
0.33300
0.0
Totals
12.125
-
8.74467
96.1
Hourly Analysis Program v5.11 Page 1 of 1
Hermanson
J Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, WA 98032
tel 206-575-9700
fax 206-575-9800
Project: 3355 S 120th Place Tukwila, WA
Date: 09/04/2018
Hermanson
Building Today, Defining Tomorrow
HVAC SYSTEM COOLING/HEATING CALCS
CARRIER HAP VERSION: 5.11
SPACE INPUTS
Mechanical Construction,
Engineering and Service
www.hermanson.com
TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/06/2018
03:45PM
01-01 Office
1. General Details:
Floor Area 125.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
3. Walls, Windows, Doors:
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office Lights/Elec
0.00 W/ft2
None
145.0 Watts
90.1 Office Lights/Elec
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent
Schedule
Exp.
Wall Gross Area (ft2)
Window 1 Qty.
Window 2 Qty.
Door 1 Qty.
N
156.0
0
0
0
3.1. Cons ruction Types for Exposure N
Wall Type
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
Existing Wall
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Slab Floor On Grade
Floor Area 0.0 ft2
Total Floor U -Value 0.420 BTU/(hrft2-°F)
Exposed Perimeter 11.0 ft
Edge Insulation R -Value 10.00 (hrft2•°F)/BTU
7. Partitions:
(No partition data).
1.0 Person
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
90.1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Hourly Analysis Program v5.11 Page 1 of 10
TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/06/2018
03:45PM
01-02 Conference
1. General Details:
Floor Area 260.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
3. Walls, Windows, Doors:
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office Lights/Elec
0.00 W/ft2
None
145.0 Watts
90.1 Office Lights/Elec
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent
Schedule
Exp.
Wall Gross Area (ft2)
Window 1 Qty.
Window 2 Qty.
Door 1 Qty.
N
318.0
0
0
0
3.1. Construction Types for Exposure N
Wall Type
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
Existing Wall
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Slab Floor On Grade
Floor Area 0.0 ft2
Total Floor U -Value 0.420 BTU/(hrft2•°F)
Exposed Perimeter 22.0 ft
Edge Insulation R -Value 10.00 (hrft2•°F)/BTU
7. Partitions:
(No partition data).
10.0 People
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
90.1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Hourly Analysis Program v5.11 Page 2 of 10
TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/06/2018
03:45PM
01-03 Open Office
1. General Details:
Floor Area 330.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
3. Walls, Windows, Doors:
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office Lights/Elec
0.00 W/ft2
None
1015.0 Watts
90.1 Office Lights/Elec
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent
Schedule
Exp.
Wall Gross Area (ft2)
Window 1 Qty.
Window 2 Qty.
Door 1 Qty.
N
394.0
0
0
0
3.1. Construction Types for Exposure N
Wall Type
4. Roofs, Skylights:
(No Roof or Skylight data).
Existing Wall
5. Infiltration:
Design Cooling 0.00 CFM
Design Heating 0.00 ACH
Energy Analysis 0.00 CFM
Infiltration occurs at all hours.
6. Floors:
Type Slab Floor On Grade
Floor Area 0.0 ft2
Total Floor U -Value 0.420 BTU/(hr•ft2•°F)
Exposed Perimeter 27.0 ft
Edge Insulation R -Value 10.00 (hr•ft2•°F)/BTU
7. Partitions:
(No partition data).
7.0 People
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
90.1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Hourly Analysis Program v5.11 Page 3 of 10
TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/06/2018
03:45PM
01-04 Hallway
1. General Details:
Floor Area 110.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule ..
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office Lights/Elec
0.00 W/ft2
None
0.0 Watts
90.1 Office Lights/Elec
3. Walls, Windows, Doors:
(No Wall, Window, Door data).
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Slab Floor On Grade
Floor Area 0.0 ft2
Total Floor U -Value 0.420 BTU/(hrft2•°F)
Exposed Perimeter 0.0 ft
Edge Insulation R -Value 10.00 (hrft2•°F)/BTU
7. Partitions:
(No partition data).
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent
Schedule
0.0 Person
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
None
0 BTU/hr
None
0 BTU/hr
None
Hourly Analysis Program v5.11 Page 4 of 10
TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/06/2018
03:45PM
01-05 Open Office
1. General Details:
Floor Area 935.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 lb/ft2
1.1. OA Ventilation Requirements:
Space Usage ... User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type Recessed (Unvented) Occupancy 11.0 People
Wattage 0.89 W/ft2 Activity Level Office Work
Ballast Multiplier 1.08 Sensible 245.0 BTU/hr/person
Schedule 90.1 Office Lights/Elec Latent 205.0 BTU/hr/person
Schedule 90.1 Office Occupants
2.2. Task Lighting: 2.5. Miscellaneous Loads:
Wattage 0.00 W/ft2 Sensible 0 BTU/hr
Schedule None Schedule None
Latent 0 BTU/hr
Schedule _ None
2.3. Electrical Equipment:
Wattage
Schedule
1600.0 Watts
90.1 Office Lights/Elec
3. Walls, Windows, Doors:
(No Wall, Window, Door data).
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Slab Floor On Grade
Floor Area 0.0 ft2
Total Floor U -Value 0.420 BTU/(hrft2•°F)
Exposed Perimeter 0.0 ft
Edge Insulation R -Value 10.00 (hrft2•°F)/BTU
7. Partitions:
(No partition data).
Hourly Analysis Program v5.11 Page 5 of 10
TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/06/2018
03:45PM
02-01 Open Office
1. General Details:
Floor Area 1154.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 lb/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office Lights/Elec
0.00 W/ft2
None
1.00 W/ft2
90.1 Office Lights/Elec
3. Walls, Windows, Doors:
(No Wall, Window, Door data).
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
6. Floors:
Type
Floor Area
Total Floor U -Value
Exposed Perimeter
Edge Insulation R -Value
7. Partitions:
(No partition data).
0.00 CFM
0.00 ACH
0.00 CFM
Slab Floor On Grade
0.0 ft2
0.420 BTU/(hr•ft2•°F)
0.0 ft
10.00 (hr•ft2•°F)/BTU
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent
Schedule
143.00 ft2/person
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
90.1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Hourly Analysis Program v5.11 Page 6 of 10
TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/06/2018
03:45PM
03-01 Open Office
1. General Details:
Floor Area 2393.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 lb/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office Lights/Elec
0.00 W/ft2
None
1.00 W/ft2
90.1 Office Lights/Elec
3. Walls, Windows, Doors:
(No Wall, Window, Door data).
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Slab Floor On Grade
Floor Area 0.0 ft2
Total Floor U -Value 0.420 BTU/(hrft2•°F)
Exposed Perimeter 0.0 ft
Edge Insulation R -Value 10.00 (hrft2•°F)/BTU
7. Partitions:
(No partition data).
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent
Schedule
143.00 ft2/person
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
90.1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Hourly Analysis Program v5.11 Page 7 of 10
TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/06/2018
03:45PM
04-01 Open Office
1. General Details:
Floor Area 734.0 ft'
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 lb/ft'
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 .. 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office Lights/Elec
0.00 W/ft2
None
1.00 W/ft2
90.1 Office Lights/Elec
3. Walls, Windows, Doors:
(No Wall, Window, Door data).
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Slab Floor On Grade
Floor Area 0.0 ft'
Total Floor U -Value 0.420 BTU/(hrft2•°F)
Exposed Perimeter 0.0 ft
Edge Insulation R -Value 10.00 (hrft2•°F)/BTU
7. Partitions:
(No partition data).
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent
Schedule
143.00 ft2/person
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
90.1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Hourly Analysis Program v5.11 Page 8 of 10
TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/06/2018
03:45PM
05-01 Open Office
1. General Details:
Floor Area 1451.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office Lights/Elec
0.00 W/ft2
None
1.00 W/ft2
90.1 Office Lights/Elec
3. Walls, Windows, Doors:
(No Wall, Window, Door data).
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
6. Floors:
Type
Floor Area
Total Floor U -Value
Exposed Perimeter
Edge Insulation R -Value
7. Partitions:
(No partition data).
0.00 CFM
0.00 ACH
0.00 CFM
Slab Floor On Grade
0.0 ft2
0.420 BTU/(hr•ft2•°F)
0.0 ft
10.00 (hr•ft2•°F)/BTU
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent
Schedule
143.00 ft2/person
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
90.1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Hourly Analysis Program v5.11 Page 9 of 10
TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/06/2018
03:45PM
06-01 Open Office
1. General Details:
Floor Area 1334.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office LightslElec
0.00 W/ft2
None
1.00 W/ft2
90.1 Office Lights/Elec
3. Walls, Windows, Doors:
(No Wall, Window, Door data).
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at ail hours.
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Slab Floor On Grade
Floor Area 0.0 ft2
Total Floor U -Value . 0.420 BTU/(hrft2•°F)
Exposed Perimeter 0.0 ft
Edge Insulation R -Value 10.00 (hrft2•°F)/BTU
7. Partitions:
(No partition data).
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent
Schedule
143.00 ft2/person
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
90.1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Hourly Analysis Program v5.11 Page 10 of 10
ilHermanson
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, WA 98032
tel 206-575-9700
fax 206-575-9800
Project: 3355 S 120th Place Tukwila, WA
Date: 09/04/2018
Hermanson
Building Today, Defining Tomorrow
HVAC SYSTEM COOLING/HEATING CALCS
CARRIER HAP VERSION: 5.11
SYSTEM INPUTS
Mechanical Construction,
Engineering and Service
www.hermanson.com
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
VAV Input Data
09/06/2018
03:44PM
1. General Details:
Air System Name
Equipment Type
Air System Type
Number of zones
VAV
Packaged Rooftop Units
VAV
6
2. Ventilation System Components:
Ventilation Air Data:
Airflow Control Constant Ventilation Airflow
Ventilation Sizing Method ASHRAE Std 62.1-2010
Unocc. Damper Position Closed
Damper Leak Rate
Outdoor Air CO2 Level
5 %
400 ppm
Economizer Data:
Control Integrated enthalpy control
Upper Cutoff 75.0 °F
Lower Cutoff 35.0 °F
Central Cooling Data:
Supply Air Temperature 55.0 °F
Coil Bypass Factor 0.100
Cooling Source Air -Cooled DX
Schedule JFMAMJJASOND
Capacity Control Cycled or Staged Capacity - Fan On
Supply Fan Data:
Fan Type
Configuration
Fan Performance
Overall Efficiency
Forward Curved with Variable Frequency Drive
Draw-thru
4.00 in wg
48 %
% Airflow
100
90
80
70
60
50
% kW
100
77
60
44
35
25
% Airflow
40
30
20
10
0
%kW
19
13
9
7
6
Duct System Data:
Supply Duct Data:
Duct Heat Gain
Duct Leakage
Return Duct or Plenum Data:
Return Air Via
Wall Heat Gain to Plenum
Roof Heat Gain to Plenum
Lighting Heat Gain to Plenum
3. Zone Components:
Space Assignments:
3 %
2 %
Return Air Plenum
20 %
80
30 %
Zone 1: Zone 1
01-02 Conference
x1
Zone 2: Zone 2
01-01 Office
x1
01-03 Open Office
x1
01-04 Hallway
x1
01-05 Open Office
x1
Zone 3: Zone 3
03-01 Open Office
x1
Zone 4: Zone 4
04-01 Open Office
x1
Zone 5: Zone 5
05-01 Open Office
x1
Zone 6: Zone 6
06-01 Open Office
x1
Hourly Analysis Program 5.11 Page 1 of 3
VAV Input Data
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:44PM
Thermostats and Zone Data:
Zone
Cooling T-Stat
Occ.
(°F)
Cooling T-Stat
Unocc.
(°F)
Heating T-Stat
Occ.
(°F)
Heating T-Stat
Unocc.
(°F)
T-Stat
Throttling
Range
(°F)
Diversity
Factor
(%)
Direct
Exhaust
Airflow
(CFM)
Direct
Exhaust Fan
(kW)
1
75.0
80.0
72.0
55.0
1.00
100
0.0
0.0
2
75.0
80.0
72.0
55.0
1.00
100
0.0
0.0
3
75.0
80.0
72.0
55.0
1.00
100
0.0
0.0
4
75.0
80.0
72.0
55.0
1.00
100
0.0
0.0
5
75.0
80.0
72.0
55.0
1.00
100
0.0
0.0
6
75.0
80.0
72.0
55.0
1.00
100
0.0
0.0
Thermostat Schedule
Unoccupied Cooling is
Supply Terminals Data:
90.1 Office HVAC
Available
Zone
Terminal Type
Air
Distribution
Air
Distribution
Effectiveness
Specification
Air
Distribution
Effectiveness
Minimum Airflow
Fan Performance
Fan
Efficiency
Design
Supply
Temp.
1
Series FPMBX
with reheat
Ceiling supply /
ceiling retum
ASHRAE 62.1
<auto>
30 %
0.30 in wg
70 %
86.9 °F
2
Series FPMBX
with reheat
Ceiling supply /
ceiling return
ASHRAE 62.1
<auto>
30 %
0.30 in wg
70 %
78.0 °F
3
Series FPMBX
with reheat
Ceiling supply /
ceiling return
ASHRAE 62.1
<auto>
30 %
0.30 in wg
°
70 /°
86.9 °F
4
Series FPMBX
with reheat
Ceiling supply /
ceiling retum
ASHRAE 62.1
<auto>
30 %
0.30 in wg
70 %
86.9 °F
5
Series FPMBX
with reheat
Ceiling supply /
ceiling return
ASHRAE 62.1
<auto>
30 %
0.30 in wg
70 %
86.9 °F
6
Series FPMBX
with reheat
Ceiling supply /
ceiling retum
ASHRAE 62.1
<auto>
30 %
0.30 in wg
70 %
86.9 °F
Reheat Coil Source
Reheat Coil Schedule
Zone Heating Units:
Zone Unit Heat Source
Zone Heating Unit Schedule
4. Sizing Data (Computer -Generated):
System Sizing Data:
Sizing Data:
Cooling Supply Temperature
Supply Fan Airflow
Ventilation Airflow
Hydronic Sizing Specifications:
Chilled Water Delta -T
Hot Water Delta -T
Safety Factors:
Cooling Sensible
Cooling Latent
Heating
Zone Sizing Data:
Zone Airflow Sizing Method
Space Airflow Sizing Method
Electric Resistance
JFMAMJJASOND
Electric Resistance
JFMAMJJASOND
55.0 °F
3003.2 CFM
876.2 CFM
10.0 °F
30.0 °F
0
0 %
0
Peak zone sensible load
Individual peak space Toads
Zone
Supply Airflow
(CFM)
Zone Htg Unit
(MBH)
Reheat Coil
(MBH)
FPMBX Fan
(CFM)
1
167.2
-
3.8
167.2
Hourly Analysis Program 5.11
Page 2 of 3
VAV Input Data
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11 09/06/2018
Prepared by: HERMANSON COMPANY LLP 03:44PM
Zone
Supply Airflow
(CFM)
Zone Htg Unit
(MBH)
Reheat Coil
(MBH)
FPMBX Fan
(CFM)
2
809.7
-
9.6
809.7
3
795.9
-
16.9
795.9
4
244.1
-
5.2
244.1
5
482.6
-
10.3
482.6
6
443.7
-
9.4
443.7
5. Equipment Data
Central Cooling Unit - Air -Cooled DX
Estimated Maximum Load
Design OAT
Equipment Sizing
Gross Cooling Capacity
Compressor & OD Fan Power
Conventional Cutoff OAT
Low Temperature Operation
116.0 MBH
95.0 °F
User -Defined
1.0 MBH
1.000 kW
55.0 °F
Not used
Hourly Analysis Program 5.11 Page 3 of 3
Hermanson
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, WA 98032
tel 206-575-9700
fax 206-575-9800
Project: 3355 S 120th Place Tukwila, WA
Date: 09/04/2018
//7
Hermanson
Building Today, Defining Tomorrow
HVAC SYSTEM COOLING/HEATING CALCS
CARRIER HAP VERSION: 5.11
SYSTEM OUTPUTS
Mechanical Construction,
Engineering and Service
www.hermanson.com
Air System Sizing Summary for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11 09/06/2018
Prepared by: HERMANSON COMPANY LLP 03:45PM
Air System Information
Air System Name
Equipment Class
Air System Type
VAV
PKG ROOF
VAV
Sizing Calculation Information
Calculation Months Jan to Dec
Sizing Data Calculated
Number of zones
Floor Area
Location
Zone CFM Sizing
Space CFM Sizing
6
7672.0 ft2
Seattle IAP, Washington
Peak zone sensible load
Individual peak space loads
Central Cooling Coil Sizing Data
Total coil load 9.7 Tons Load occurs at Jul 1500
Total coil load 116.0 MBH OA DB / WB .. 86.0 / 67.0 °F
Sensible coil load 94.9 MBH Entering DB / WB . 81.0 / 63.8 °F
Coil CFM at Jul 1500 3000 CFM Leaving DB / WB 51.3 / 49.8 °F
Max block CFM at Jul 2100 3003 CFM Coil ADP 48.0 °F
Sum of peak zone CFM 3003 CFM Bypass Factor 0.100
Sensible heat ratio 0.818 Resulting RH 42
CFM/Ton 310.4 Design supply temp. 55.0 °F
ft2/Ton 793.7 Zone T -stat Check 1 of 6 OK
BTU/(hrft2) 15.1 Max zone temperature deviation 1.3 °F
Water flow @ 10.0 °F rise N/A
Supply Fan Sizing Data
Actual max CFM at Jul 2100
Standard CFM
Actual max CFM/ft2
3003 CFM
2955 CFM
0.39 CFM/ft2
Fan motor BHP
Fan motor kW
Fan static
3.70 BHP
2.94 kW
4.00 in wg
Outdoor Ventilation Air Data
Design airflow CFM 876 CFM CFM/person 12.46 CFM/person
CFM/ft2 0.11 CFM/ft2
Hourly Analysis Program 5.11 Page 1 of 20
Zone Sizing Summary for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
Air System Information
Air System Name
Equipment Class
Air System Type
VAV
PKG ROOF
VAV
Sizing Calculation Information
Calculation Months Jan to Dec
Sizing Data Calculated
Zone Terminal Sizing Data
Number of zones
Floor Area
Location
6
7672.0 ft2
Seattle IAP, Washington
Zone CFM Sizing Peak zone sensible load
Space CFM Sizing Individual peak space loads
Zone Name
Design
Supply
Airflow
(CFM)
Minimum
Supply
Airflow
(CFM)
Zone
CFM/ft2
Reheat
Coil
Load
(MBH)
Reheat
Coil
Water
gpm
@ 30.0 °F
Zone
Htg Unit
Coil
Load
(MBH)
Zone
Htg Unit
Water
gpm
@ 30.0 °F
Mixing
Box Fan
Airflow
(CFM)
Zone 1
167
66
0.64
3.8
-
0.0
-
167
Zone 2
810
243
0.54
9.6
-
0.0
-
810
Zone 3
796
239
0.33
16.9
-
0.0
-
796
Zone 4
244
73
0.33
5.2
-
0.0
-
244
Zone 5
483
145
0.33
10.3
-
0.0
-
483
Zone 6
444
133
0.33
9.4
-
0.0
-
444
Zone Peak Sensible Loads
Zone Name
Zone
Cooling
Sensible
(MBH)
Time of
Peak Sensible.
Cooling Load
Zone
Heating
Load
(MBH)
Zone
Floor
Area
(ft2)
Zone 1
3.5
Jul 2100
1.7
260.0
Zone 2
17.1
Jul 2100
3.0
1500.0
Zone 3
16.8
Jan 2100
0.0
2393.0
Zone 4
5.1
Jan 2100
0.0
734.0
Zone 5
10.2
Jan 2100
0.0
1451.0
Zone 6
9.4
Jan 2100
0.0
1334.0
Space Loads and Airflows
Zone Name /
Space Name
Mult.
Cooling
Sensible
(MBH)
Time of
Peak
Sensible
Load
Air
Flow
(CFM)
Heating
Load
(MBH)
Floor
Area
(ft2)
Space
CFM/ft2
Zone 1
01-02 Conference
1
3.5
Jul 2100
167
1.7
260.0
0.64
Zone 2
01-01 Office
1
1.1
Jul 2100
53
0.9
125.0
0.42
01-03 Open Office
1
6.0
Jul 2100
284
2.2
330.0
0.86
01-04 Hallway
1
0.2
Jan 2200
11
0.0
110.0
0.10
01-05 Open Office
1
9.7
Jan 2100
462
0.0
935.0
0.49
Zone 3
03-01 Open Office
1
16.8
Jan 2100
796
0.0
2393.0
0.33
Zone 4
04-01 Open Office
1
5.1
Jan 2100
244
0.0
734.0
0.33
Zone 5
05-01 Open Office
1
10.2
Jan 2100
483
0.0
1451.0
0.33
Zone 6
06-01 Open Office
1
9.4
Jan 2100
444
0.0
1334.0
0.33
Hourly Analysis Program 5.11
Page 2 of 20
1.1:9 weJ6oJd sisAleuy AIJnoH
OZ JO E abed
'Totals (incl. Space Multipliers)
1 06-01 Open Office
N
0
3
(o
en
1 05-01 Open Office 1
Zone 5
04-01 Open Office
Zone 4
03-01 Open Office
Zone 3
01-05 Open Office
01-04 Hallway
01-03 Open Office
01-01 Office
Zone 2
01-02 Conference
Zone 1
'Zone Name / Space Name
3
c_
(o
0
1331
UA)
W
N
CCD
-
(WD
V
01
0)
00)
a
N.
Minimum
Supply Air
(CFM)
C.)
A
O
1451.0
734.0
2393.0
1 935.0
O
O
330.0
125.0
260.0
D
r..
Space Floor
Area
(ft2)
O
00)
O
00)
O
00)
co
00)
O
00)
O
00)
O
00)
O
00)
O
00)
(Ra)
Area Outdoor
Air Rate
(CFM/ft2)
(D
W
O
-
Cas
—
0)
V
--,
0
o
0
-4
0
-,
0
O
O
D
N.
Time
Averaged
Occupancy
(Occupants)
CT
O
O
5.00
5.00
5.00
5.00
Cas
O
O
5.00
5.00
01
O
O
(Rp)
People
Outdoor Air
Rate
(CFM/person)
O
b
O
O
O
O
O
O
1.0
(Ez)
Air
Distribution
Effectiveness
127
138
N
d
....<
1
0(
W
0)
-
N0
....
Space
Outdoor Air
(CFM)
812
127
03
0
2271
U
v
V
W
0...,0))Cr
<
N.
Breathing
Zone
Outdoor Air
(CFM)
O
CO
N
d
0
(D
V
0)
O
(D
V
0)
O
(D
V
0)
O
(D
V
0)
O
A
0)
0.9271
_
CO
1.0521
0.9441
(Evz)1
Space
Ventilation
Efficiency
N
n) ▪ a rn o o com
o o m occas -•3
�
O o3vov2
><g .0 m
• _ CD o o Q
3 --aOa�
-ot .. C '. -.
K7r0 N. c co
O
3 . M°^ CD
> °FD- o
3
3 a
R O
01
CA A-
„5.. -R
0
c
7 N
J.
0
Cf N
O �
p .a O N
co (O CO O= O
d N -s 00
0) N 0
n 0
m m
0
CD
W O
GJ)
O
oz.
Ventilation Sizing Summary for VAV
Air System Design Load Summary for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
Hourly Analysis Program 5.11
Page 4 of 20
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jul 1500
COOLING OA DB / WB 86.0 °F / 67.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
ZONE LOADS
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
868 ft2
479
-
868 ft2
4764
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
7374 W
16024
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
8817 W
28873
-
0
0
-
People
70
14494
14420
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
59870
14420
-
4764
0
Zone Conditioning-
68868
14420
-
2776
0
Plenum Wall Load
20%
120
-
0
0
-
Plenum Roof Load
80%
0
-
0
0
-
Plenum Lighting Load
30%
7548
-
0
0
-
Return Fan Load
3000 CFM
0
-
917 CFM
0
-
Ventilation Load
876 CFM
6510
6695
876 CFM
41776
0
Supply Fan Load
3000 CFM
9996
-
917 CFM
-1334
-
Space Fan Coil Fans-
505
-
-
-505
-
Duct Heat Gain / Loss
3%
1796
-
3%
143
-
» Total System Loads
-
95343
21116
-
42855
0
Central Cooling Coil-
94878
21120
-
0
0
Terminal Reheat Coils
-
0
--
42291
-
» Total Conditioning
-
94878
21120
-
42291
0
Key:
Positive values are clg loads
Negative values are htg loads
Positive values are htg loads
Negative values are clg loads
Hourly Analysis Program 5.11
Page 4 of 20
Zone Design Load Summary for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
Zone 1
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jul 2100
COOLING OA DB / WB 75.4 °F / 63.6 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 75.0 °F
OCCUPIED T -STAT 72.0 °F
ZONE LOADS
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
318 ft2
291
-
318 ft2
1745
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
250 W
561
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
145 W
481
-
0
0
-
People
10
2191
2050
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
3525
2050
-
1745
0
Zone 2
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jul 2100
COOLING OA DB / WB 75.4 °F / 63.6 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 75.0 °F
OCCUPIED T -STAT 72.0 °F
ZONE LOADS
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
550 ft2
504
-
550 ft2
3019
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
1442 W
3237
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
2760 W
9165
-
0
0
-
People
19
4163
3895
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
17069
3895
-
3019
0
Hourly Analysis Program 5.11
Page 5 of 20
Zone Design Load Summary for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
Zone 3
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jan 2100
COOLING OA DB / WB 59.2 °F / 52.5 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 75.0 °F
OCCUPIED T -STAT 72.0 °F
ZONE LOADS
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
2300 W
5164
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
2393 W
7946
-
0
0
-
People
17
3666
3431
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
16777
3431
-
0
0
Zone 4
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jan 2100
COOLING OA DB / WB 59.2 °F / 52.5 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 75.0 °F
OCCUPIED T -STAT 72.0 °F
ZONE LOADS
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
706 W
1584
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
734 W
2437
-
0
0
-
People
5
1125
1052
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
5146
1052
-
0
0
Hourly Analysis Program 5.11
Page 6 of 20
Zone Design Load Summary for VAV
Project Name: TUK_SABEYSEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
Zone 5
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jan 2100
COOLING OA DB / WB 59.2 °F / 52.5 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 75.0 °F
OCCUPIED T -STAT 72.0 °F
ZONE LOADS
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Details
Sensible
(BTU/hr)
Latent
(BTUIhr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
1395 W
3131
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
1451 W
4818
-
0
0
-
People
10
2223
2080
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
10173
2080
-
0
0
Zone 6
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jan 2100
COOLING OA DB / WB 59.2 °F / 52.5 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 75.0 °F
OCCUPIED T -STAT 72.0 °F
ZONE LOADS
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
1282 W
2879
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
1334 W
4430
-
0
0
-
People
9
2044
1912
0
0
0
Infiltration-
0
0
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
9352
1912
-
0
0
Hourly Analysis Program 5.11
Page 7 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
TABLE 1.1.A. Component Loads For Space "01-02 Conference" In Zone "Zone 1"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jul 2100
COOLING OA DB / WB 75.4 °F / 63.6 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
318 ft2
291
-
318 ft2
1745
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
250 W
561
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
145 W
481
-
0
0
-
People
10
2191
2050
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
3525
2050
-
1745
0
TABLE 1.1.B. Envelope Loads For Space "01-02 Conference" In Zone "Zone 1"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hrft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
N EXPOSURE
WALL
318
0.114
-
291
-
1745
Hourly Analysis Program 5.11 Page 8 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
TABLE 2.1.A. Component Loads For Space "01-01 Office" In Zone "Zone 2"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jul 2100
COOLING OA DB / WB 75.4 °F / 63.6 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
0 ft'
0
-
0 ft'
-
-
Wall Transmission
156 ft'
143
-
156 ft2
856
-
Roof Transmission
0 ft2
0
-
0 ft'
0
-
Window Transmission
0 ft'
0
-
0 ft'
0
-
Skylight Transmission
0 ft2
0
-
0 ft'
0
-
Door Loads
0 ft'
0
-
0 ft'
0
-
Floor Transmission
0 ft'
0
-
0 ft'
0
-
Partitions
0 ft'
0
-
0 ft'
0
-
Ceiling
0 ft2
0
-
0 ft'
0
-
Overhead Lighting
120 W
270
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
145 W
481
-
0
0
-
People
1
219
205
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
1113
205
-
856
0
TABLE 2.1.B. Envelope Loads For Space "01-01 Office' In Zone "Zone 2"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr•ft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
N EXPOSURE
WALL
156
0.114
-
143
-
856
Hourly Analysis Program 5.11 Page 9 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
TABLE 2.2.A. Component Loads For Space "01-03 Open Office" In Zone "Zone 2"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jul 2100
COOLING OA DB / WB 75.4 °F / 63.6 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
394 ft2
361
-
394 ft2
2163
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
317 W
712
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
1015 W
3370
-
0
0
-
People
7
1534
1435
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
5977
1435
-
2163
0
TABLE 2.2.B. Envelope Loads For Space "01-03 Open Office" In Zone "Zone 2"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hrft2.°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
N EXPOSURE
WALL
394
0.114
-
361
-
2163
Hourly Analysis Program 5.11 Page 10 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
TABLE 2.3.A. Component Loads For Space "01-04 Hallway" In Zone "Zone 2"
" In Zone "Zone 2"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jan 2200
COOLING OA DB / WB 57.4 °F / 51.8 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
COOLING
HEATING
Sensible
Latent
U -Value
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
106 W
238
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
0 W
0
-
0
0
-
People
0
0
0
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
238
0
-
0
0
TABLE 2.3.B. Envelope Loads For Space "01-04 Hallwa
" In Zone "Zone 2"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr•ft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
Hourly Analysis Program 5.11 Page 11 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
TABLE 2.4.A. Component Loads For Space "01-05 Open Office" In Zone "Zone 2"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jan 2100
COOLING OA DB / WB 59.2 °F / 52.5 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
899 W
2018
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
1600 W
5313
-
0
0
-
People
11
2410
2255
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
9741
2255
-
0
0
TABLE 2.4.B. Envelope Loads For Space "01-05 Open Office" In Zone "Zone 2"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr.ft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
Hourly Analysis Program 5.11 Page 12 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
TABLE 3.1.A. Component Loads For Space "03-01 Open Office" In Zone "Zone 3"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jan 2100
COOLING OA DB / WB 59.2 °F / 52.5 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
2300 W
5164
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
2393 W
7946
-
0
0
-
People
17
3666
3431
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
16777
3431
-
0
0
TABLE 3.1.B. Envelope Loads For Space "03-01 Open Office" In Zone "Zone 3"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr•ft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
Hourly Analysis Program 5.11 Page 13 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
TABLE 4.1.A. Component Loads For Space "04-01 Open Office" In Zone "Zone 4"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jan 2100
COOLING OA DB / WB 59.2 °F / 52.5 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
706 W
1584
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
734 W
2437
-
0
0
-
People
5
1125
1052
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
5146
1052
-
0
0
TABLE 4.1.B. Envelope Loads For Space "04-01 Open Office" In Zone "Zone 4"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr•ft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
Hourly Analysis Program 5.11 Page 14 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
TABLE 5.1.A. Component Loads For Space "05-01 Open Office" In Zone "Zone 5"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jan 2100
COOLING OA DB / WB 59.2 °F / 52.5 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
1395 W
3131
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
1451 W
4818
-
0
0
-
People
10
2223
2080
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
10173
2080
-
0
0
TABLE 5.1.B. Envelope Loads For Space "05-01 Open Office" In Zone "Zone 5"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr•ft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
Hourly Analysis Program 5.11 Page 15 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
TABLE 6.1.A. Component Loads For Space "06-01 Open Office" In Zone "Zone 6"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jan 2100
COOLING OA DB / WB 59.2 °F / 52.5 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
1282 W
2879
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
1334 W
4430
-
0
0
-
People
9
2044
1912
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
9352
1912
-
0
0
TABLE 6.1.B. Envelope Loads For Space "06-01 Open Office" In Zone "Zone 6"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr•ft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
Hourly Analysis Program 5.11 Page 16 of 20
System Psychrometrics for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
July DESIGN COOLING DAY, 1500
TABLE 1: SYSTEM DATA
Component
Location
Dry -Bulb
Temp
(°F)
Specific
Humidity
(Ib/Ib)
Airflow
(CFM)
CO2 Level
(ppm)
Sensible
Heat
(BTU/hr)
Latent
Heat
(BTU/hr)
Ventilation Air
Inlet
86.0
0.01002
876
400
6510
6695
Vent - Return Mixing
Outlet
81.0
0.00886
3000
1064
-
-
Central Cooling Coil
Outlet
51.3
0.00735
3000
1064
94878
21120
Supply Fan
Outlet
54.4
0.00735
3000
1064
9996
-
Cold Supply Duct
Outlet
55.0
0.00735
2940
1064
-
-
Zone Air
-
77.1
0.00840
2940
1344
68868
14420
Return Plenum
Outlet
79.5
0.00840
2940
1344
7668
-
Duct Leakage Air
Outlet
54.4
0.00735
60
1064
-
-
Retum Duct
Outlet
79.0
0.00838
3000
1338
-
-
Air Density x Heat Capacity x Conversion Factor: A sea level = 1.080; At site altitude = 1.063 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4670.1 BTU/(hr-CFM)
Site Altitude = 449.0 ft
TABLE 2: ZONE DATA
Zone Name
Zone
Sensible
Load
(BTU/hr)
T -stat
Mode
Zone
Cond
(BTU/hr)
Zone
Temp
(°F)
Zone
Airflow
(CFM)
CO2
Level
(ppm)
Terminal
Heating
Coil
(BTU/hr)
Zone
Heating
Unit
(BTU/hr)
Zone 1
3254
Cooling
3623
76.0
167
1786
0
0
Zone 2
16389
Cooling
18588
76.6
810
1338
0
0
Zone 3
16282
Cooling
18885
77.3
796
1309
0
0
Zone 4
4994
Cooling
5793
77.3
244
1309
0
0
Zone 5
9873
Cooling
11451
77.3
483
1309
0
0
Zone 6
9077
Cooling
10528
77.3
444
1309
0
0
Hourly Analysis Program 5.11 Page 17 of 20
System Psychrometrics for VAV
Project Name: TUK_SABEY_SEA CHILDRENS 1ST FL_v5_11
Prepared by: HERMANSON COMPANY LLP
09/06/2018
03:45PM
WINTER DESIGN HEATING
TABLE 1: SYSTEM DATA
Component
Location
Dry -Bulb
Temp
(°F)
Specific
Humidity
(Ib/Ib)
Airflow
(CFM)
CO2 Level
(ppm)
Sensible
Heat
(BTUIhr)
Latent
Heat
(BTU/hr)
Ventilation Air
Inlet
24.0
0.00103
876
400
-41776
0
Vent - Return Mixing
Outlet
26.0
0.00103
917
400
-
-
Central Cooling Coil
Outlet
26.0
0.00103
917
400
0
0
Supply Fan
Outlet
27.4
0.00103
917
400
1334
-
Cold Supply Duct
Outlet
27.2
0.00103
898
400
-
-
Zone Air
-
69.7
0.00103
898
401
-2776
0
Retum Plenum
Outlet
69.7
0.00103
898
401
0
-
Duct Leakage Air
Outlet
27.4
0.00103
18
400
-
-
Retum Duct
Outlet
68.9
0.00103
917
401
-
-
Air Density x Heat Capacity x Conversion Factor. A sea level = 1.080; At site altitude = 1.063 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4670.1 BTU/(hr-CFM)
Site Altitude = 449.0 ft
TABLE 2: ZONE DATA
Zone Name
Zone
Sensible
Load
(BTU/hr)
T -stat
Mode
Zone
Cond
(BTU/hr)
Zone
Temp
(°F)
Zone
Airflow
(CFM)
CO2
Level
(ppm)
Terminal
Heating
Coil
(BTU/hr)
Zone
Heating
Unit
(BTU/hr)
Zone 1
-1745
Heating
-1486
66.5
167
401
3804
0
Zone 2
-3019
Heating
-1321
66.8
810
401
9411
0
Zone 3
0
Heatin
12
71.3
796
401
11769
0
Zone 4
0
Heating
4
71.3
244
401
3610
0
Zone 5
0
Heating
8
71.3
483
401
7136
0
Zone 6
0
Heating
7
71.3
444
401
6561
0
Hourly Analysis Program 5.11 Page 18 of 20
9 weJ6oad spAleuy AIJnoH
0
0
0 0
b 0
0 0
o N
0 0 0
0 0 0
0 0 0
0
0
0
0
0
0
0 0 0
0 0 0
(3) 03 0 N - 0) 03 0
( cum ) ipiwnH oijioeds
r
� o
C
:(7f CD o
• co CD
mcu
• cn
n �
O
Z C°
� o
13-a
,O
m
v
nZ
v
• a�
CD
m -1
EI
D0,
ZD
w
z-<
010,
�D
Dn
Z=
�O
-u m
z
m
r-
<
I01
System Psychrometrics for VAV
6.g we.I6ad sis (Ieuy AIJn0H
OZ JO OZ a6ed
0
0 0
0 0
0 0
O N
P O o
0 0 0
0 0 0
0 0 0 0 0
0 0 0 0 0
0
0
d7 0o O N - O Oo o
ql/ql ) Alp w n H °woods
D
or
53-
C N
O
N O
Co—
CO CD
2 0 co
� D
Cn
m
G) v
z cn
5.
m cQ
D O
z
0
System Psychrometrics for VAV
=PERMIT COORD COPY 0
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: M18-0117
PROJECT NAME: SEATTLE CHILDRENS
SITE ADDRESS: 3355 Sinn' PL
X Original Plan Submittal
Response to Correction Letter #
DATE: 09/19/18
Revision # before Permit Issued
Revision # after Permit Issued
DEPARTMENTS:
\\g
Building Division
Public Works
frIvI
Fire Prevention
Structural
6\110
Planning Division
Permit Coordinator
PRELIMINARY REVIEW:
DATE: 0_9[210 8
Not Applicable ri Structural Review Required
(no approval/review required)
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved
DUE DATE: 10/18/18
❑ Approved with Conditions ❑
Corrections Required ❑ Denied ❑
(corrections entered in Reviews) (ie: Zoning Issues)
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire 0 Ping 0 PW ❑ Staff Initials:
12/18/2013
HERMANSON COMPANY LLP
Washington State Department of
Labor & Industries
Flon]e Espanol Contact
Safety & Health Claims & Insurance
Search L&I
1:
Page 1 of 3
A-Zindex 1 tele My T.&t
Workplace Rights Trades & Licensing
HERMANSON COMPANY LLP
Owner or tradesperson
Principals
NICOLAISEN, KNUT H, PARTNER/MEMBER
BROCK, DANIEL L, PARTNER/MEMBER
FOX, DEAN M, PARTNER/MEMBER
HENGEL, STEPHEN A, PARTNER/MEMBER
DYCKMAN, KENNETH
A, PARTNER/MEMBER
ROBINETT, PAUL J, PARTNER/MEMBER
HERMANSON, RICHARD
L, PARTNER/MEMBER
ALMON, KEVIN, PARTNER/MEMBER
(End: 08/05/2010)
MACDONALD, JAMES, PARTNER/MEMBER
(End: 08/05/2010)
Doing business as
HERMANSON COMPANY LLP
WA UBI No.
602 004 844
1221 2ND AVE N
KENT, WA 98032-2945
206-575-9700
KING County
Business type
Limited Liability Partnership
Governing persons
CORP
HERMANSON
LLC HERMANSON GROUP;
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor
License specialties
GENERAL
License no.
HERMACLOO5BJ
Effective — expiration
01/11/2000— 08/25/2020
Bond
WESTERN SURETY CO
Bond account no.
929381801
Active.
Meets current requirements.
$12,000.00
Received by L&I Effective date
12/01/2005 01/01/2006
Expiration date
Until Canceled
Help us improve
httns_//secure.lni.wa.aov/verify/Detail.aspx?UBI=602004844&LIC=HERMACL005BJ&SAW= 10/3/2018
HERMANSON COMPANY LLP
Insurance
Transportation Ins Co
Policy no.
6043050846
$1,000,000.00
Received by L&I Effective date
08/16/2018 08/21/2018
Expiration date
08/21/2019
Insurance history
Savings
No savings accounts during the previous 6 year period.
Lawsuits against the bond or savings
No lawsuits against the bond or savings accounts during the previous 6 year period.
L&I Tax debts
No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts
may be recorded by other agencies.
License Violation
No license violations during the previous 6 year period.
Workers' comp
Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums.
L&I Account ID
409,648-01
Doing business as
HERMANSON COMPANY LLP
Estimated workers reported
Quarter 2 of Year 2018 "Greater than 100 Workers"
L&I account contact
T4 / TERRI MADISON (360)902-4654 - Email: KIRT235@lni.wa.gov
Account is current.
Public Works Strikes and Debarments
Verify the contractor is eligible to perform work on public works projects.
Contractor Strikes
No strikes have been issued against this contractor.
Contractors not allowed to bid
No debarments have been issued against this contractor.
Workplace safety and health
Check for any past safety and health violations found on jobsites this business was responsible for.
Inspection results date
05/22/2018
Inspection no.
317948819
Location
1221 2nd Ave N
Kent, WA 98032
Inspection results date
03/05/2018
Inspection no.
317948149
Location
635 Park Ave N
Renton, WA 98057
Inspection results date
02/23/2016
Inspection no.
317939295
Violations
No violations
No violations
Page 2 of 3
Help us improve
https://secure.lni. ;va.gov/verify/Detail.aspx?UBI=602004844&LIC=HERMACL005BJ&SAW= 10/3/2018