MECHANICAL PERMIT
0923049309 Permit Number: M18-0121
12101 TUKWILA INTL BLVD 300 Issue Date: 10/3/2018
Permit Expires On: 4/1/2019
SEATTLE CHILDRENS
Owner:
Name:
Address:
Contact Person:
Name:
Address:
Contractor:
Name:
Address:
INTERNATIONAL GATEWAY WEST
12201 TUKWILA INTERNATIONAL BL,
SEATTLE, WA, 98168
KAYLENE NELSON
1221 SECOND AVE N , KENT, WA,
98032
HERMANSON COMPANY LLP
(GENERAL)
1221 2ND AVE N , KENT, WA, 98032-
2945
License No: HERMACLOO5BJ
Lender:
Name:
Address:
Phone: (253) 359-7147
Phone: (206) 575-9700
Expiration Date: 8/25/2020
DESCRIPTION OF WORK:
MODIFY AIR DISTRIBUTION FOR 8 ZONES AS NEEDED TO ACCOMMODATE NEW LAYOUT.
Valuation of Work: $18,000.00
Type of Work: REPLACEMENT
Fuel type: ELECT
Fees Collected: $450.48
Electrical Service Provided by: SEATTLE CITY LIGHT
Water District: 20
Sewer District: VALLEY VIEW
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
International Fuel Gas Code:
Permit Center Authorized Signature:
2015
2015
2015
2015
2015
National Electrical Code:
WA Cities Electrical Code:
WAC 296-46B:
WA State Energy Code:
2017
2017
2017
2015
Date: 10 - 3—i ej
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development pe it and agree to the conditions attached to this permit.
Signature:
Print Name:
K i y(J- i )0 -as
Date:L(041
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
2: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
3: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
on satisfactory completion of this requirement.
5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
8: ***MECHANICAL PERMIT CONDITIONS***
9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center (206/431-3670).
10: Manufacturers installation instructions shall be available on the job site at the time of inspection.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
0703 MECH EQUIP EFF
1800 MECHANICAL FINAL
0609 PIPE/DUCT INSULATION
0701 ROUGH -IN MECHANICAL
CITY OF TUKR, ,A
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
MECHANICAL
Applications and plans must be
Applications will not
Mechanical Permit No.
Project No.
a'�1 I fi — c'/a /
Date Application Accepted:
Date Application Expires:
or . zce use onl
PERMIT APPLICATION
complete in order to be accepted for plan review.
be accepted through the mail or by fax.
**please print**
SITE LOCATION
King Co Assessor's Tax No.:
Site Address: 12101 Tukwila International BLVD Suite Number: 300 Floor:
New Tenant: ❑ Yes ❑ „No
0923049309
Tenant Name:
Seattle Childrens
PROPERTY OWNER
Name: WA & N Idaho District Council of Laborers
Address: PO Box 12917
City: Mill Creek State: WA Zip: 98082
CONTACT PERSON — person receiving all project
communication
Name: Kaylene Nelson
Address: 1221 2nd Avenue N
City: Kent State: WA Zip: 98032
Phone: (253) 359-7147 Fax:
Email: Kaylene.nelson@hermanson.com
MECHANICAL CONTRACTOR INFORMATION
Company Name: Hermanson Company
Address: 1221 2nd Avenue N
City: Kent State: WA Zip: 98032
Phone: (253) 359-7147 Fax:
Contr Reg No.: NERMACL005BJ Exp Date: 08/25/2018
Tukwila Business License No.: BUS -0994464
Valuation of project (contractor's bid price): $ 18,000
Describe the scope of work in detail:
Modify air distribution for 8 zones as needed to accommodate new layout
Use:
Residential:
Commercial:
New El
New ❑
Replacement
Replacement
Fuel Type: Electric E Gas ❑
Other:
H: Applications Forms -Applications On Line 2011 Applications Mechanical Permit Application Revised 8-9-1 I.docx
Revised: August 2011
bh
Page of 2
Indicate type of mechanical work being installed and the quantity below:
Unit Type
Qty
Furnace <100k btu
Furnace >100k btu
18
Floor furnace
Suspended/wall/floor
mounted heater
Appliance vent
Repair or addition to
heat/refrig/cooling
system
Air handling unit
<10,000 cfm
Unit Type
Qty
Air handling unit
>10,000 cfm
18
Evaporator cooler
Ventilation fan
connected to single duct
Ventilation system
Hood and duct
Incinerator — domestic
Incinerator —
comm/industrial
Unit Type
Qty
Fire damper
Diffuser
18
Thermostat
Wood/gas stove
Emergency generator
Other mechanical
equipment
Boiler/Compressor
Qty
0-3 hp/100,000 btu
3-15 hp/500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/1,750,000 btu
50+ hp/1,750,000 btu
PERMIT APPLICATION NOTES -
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR t' TH i Z D A . T:
Signature:
Date: 09/11/2018
Print Name: Kaylene Nelson Day Telephone: (253) 359-7147
Mailing Address: 1221 2nd Avenue N
H: Applications Forms -Applications On Line 2011 Applications Mechanical Permit Application Revised 8-9-1 I .docx
Revised: August 201 I
bh
Kent WA 98032
City State Zip
Page 2 of 2
/ 1
DESCRIPTIONS
PermitTRAK
ACCOUNT
QUANTITY
PAID
$450.48
M18-0121 Address: 12101 TUKWILA INTL BLVD 300 Apn: 0923049309
$450.48
Credit Card Fee
$13.12
Credit Card Fee
R000.369.908.00.00
0.00
$13.12
MECHANICAL
$420.54
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
0.00
$33.15
PERMIT FEE
R000.322.100.00.00
0.00
$303.28
PLAN CHECK FEE
R000.322.102.00.00
0.00
$84.11
TECHNOLOGY FEE
$16.82
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R15432
R000.322.900.04.00 0.00
$16.82
$450.48
Date Paid: Wednesday, September 19, 2018
Paid By: HERMANSON COMPANY LLP
Pay Method: CREDIT CARD 448185
Printed: Wednesday, September 19, 2018 1:23 1 of 1
PM
1 /t I SYSTEMS
r 1
CO TUKWILA ETRAKIT
6200 SOUTHCENTER BLVD
TUKWILA, WA 98188
206-433-1870
CITY OF TUKWILA
Date: 09/19/2018 01:22:39 PM
CREDIT CARD SALE
VISA
CARD NUMBER: **********0057 K
TRAN AMOUNT: $450.48
APPROVAL CD: 448185
RECORD #: 000
CLERK ID: Laurie
Thank you!
Customer Copy
Page 2 of 2
https://classic. convergepay. com/V irtualMerchant/transaction. do?dispatchMethod=printTra... 9/19/2018
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
NI' 18-012 /
Project:
570/9-77—L e /mi-DROIS
Type of Inspection:
Rom /H ,(CA 9{I
Address:
/2/0/ 77// 25
Date Called:
_
Special Instructions:
Date Wanted:
//-Z
a.m.;
-45
p.m.
Requester:
Phone No:
Aktpproved per applicable codes. LJ Corrections required prior to approval.
COMMENTS:
8K-Igtz. ,
p —cz�
ice - Ue I , 7451A" 1
vwc4.1-00 cfit
Inspector:
Date:
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Hermanson
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, WA 98032
tel 206-575-9700
fax 206-575-9800
Project: 12101 Tukwila International Blvd,
Tukwila
Date: 09/05/2018
September 18, 2018
2018.09.18 10:49:30-07'00'
Document approved, mechanical
design pages
%t
REVIEWED FOR
CODE COMPLIANCE
APPROVED
SEP 27 2018
City of Tukwila
BUILDING DIVISION
RECEIVED
CITY OF TUKWILA
SEP 1 9 2018
PERMIT CENTER
HVAC SYSTEM COOLING/HEATING CALCS
CARRIER HAP VERSION: 5.11
PERMIT SUBMITTAL PACKAGE
Mrif 019-1
Mechanical Construction,
Engineering and Service
www.hermanson.com
•
Z.
Hermanson
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, WA 98032
te/ 206-575-9700
fax 206-575-9800
Project: 12101 Tukwila International Blvd,
Tukwila
Date: 09/05/2018
i�
Hermanson
Building Today, Defining Tomorrow
HVAC SYSTEM COOLING/HEATING CALCS
CARRIER HAP VERSION: 5.11
ENVELOPE INPUTS
Mechanical Construction,
Engineering and Service
www.hermanson.com
Wall Constructions
TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
HERMANSON COMPANY LLP
09/05/2018
10:29AM
Existing Wall
Wall Details
Outside Surface Color
Absorptivity
Overall U -Value
Wall Lavers Details (Inside to Outside
Medium
0.675
0.114 BTU/(hrft2•°F)
Layers
Thickness
in
Density
Ib/ft'
Specific Ht.
BTU / (Ib.°F)
R -Value
(hrft2•°F)/BTU
Weight
Ib/ft2
Inside surface resistance
0.000
0.0
0.00
0.68500
0.0
Gypsum board
0.625
50.0
0.26
0.56000
2.6
R-11 batt insulation
3.500
0.5
0.20
6.50000
0.1
8 -in HW concrete
8.000
140.0
0.20
0.66667
93.3
Outside surface resistance
0.000
0.0
0.00
0.33300
0.0
Totals
12.125
-
8.74467
96.1
Hourly Analysis Program v5.11 Page 1 of 1
Window Constructions
'rUK_SAB°EY_IGW-C_LEVEL 3RD FL -1_v5_11
HERMANSON COMPANY LLP
09/05/2018
10:30AM
Existing Glazing
Window Details:
Detailed Input No
Height 1.00 ft
Width 1.00 ft
Overall U -Value 0.560 BTU/(hr•ft2•°F)
Overall Shade Coefficient 0.570
Hourly Analysis Program v5.11 Page 1 of 1
Hermanson
L: Building Today. Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, WA 98032
tel 206-575-9700
fax 206-575-9800
Project: 12101 Tukwila International Blvd,
Tukwila
Date: 09/05/2018
Hermanson
Building Today, Defining Tomorrow
HVAC SYSTEM COOLING/HEATING CALCS
CARRIER HAP VERSION: 5.11
SPACE INPUTS
Mechanical Construction,
Engineering and Service
www.hermanson.com
UK_SABIEY_IGW-C_LEVEL 3RD FL-1_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/05/2018
10:30AM
03-01 Office
1. General Details:
Floor Area 285.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ftZ
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
3. Walls, Windows, Doors:
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office Lights/Elec
0.00 W/ft2
None
145.0 Watts
90.1 Office Lights/Elec
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent ..
Schedule
Exp.
Wall Gross Area (ft')
Window 1 Qty.
Window 2 Qty.
Door 1 Qty.
W
201.5
55
0
0
N
227.5
62
0
0
3.1. Cons ruction Types for Exposure W
Wall Type
1st Window Type
3.2. Construction Types for Exposure N
Wall Type
1st Window Type
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
Existing Wall
Existing Glazing
Existing Wall
Existing Glazing
0.00 CFM
0.50 ACH
0.00 CFM
6. Floors:
Type Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
3.0 People
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
90.1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Hourly Analysis Program v5.11 Page 1 of 13
TUK_SAEtY_IGW-C_LEVEL 3RD FL -1_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/05/2018
10:30AM
03-02 Office
1. General Details:
Floor Area 283.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type Recessed (Unvented) Occupancy 3.0 People
Wattage 0.89 W/ft2 Activity Level Office Work
Ballast Multiplier 1.08 Sensible 245.0 BTU/hr/person
Schedule 90.1 Office Lights/Elec Latent 205.0 BTU/hr/person
Schedule 90.1 Office Occupants
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
3. Walls, Windows, Doors:
2.5. Miscellaneous Loads:
0.00 W/ft2 Sensible 0 BTU/hr
None Schedule None
Latent 0 BTU/hr
Schedule None
145.0 Watts
90.1 Office Lights/Elec
Exp.
Wall Gross Area (ft2)
Window 1 Qty.
Window 2 Qty.
Door 1 Qty.
N
227.5
88
0
0
3.1. Construction Types for Exposure N
Wall Type
1st Window Type
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
Existing Wall
Existing Glazing
0.00 CFM
0.50 ACH
0.00 CFM
6. Floors:
Type Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Hourly Analysis Program v5.11 Page 2 of 13
rUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/05/2018
10:30AM
03-03 Office
1. General Details:
Floor Area 324.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ftz
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
3. Walls, Windows, Doors:
Recessed (Unvented)
0.89 W/ftz
1.08
90.1 Office Lights/Elec
0.00 W/ftz
None
435.0 Watts
90.1 Office Lights/Elec
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent
Schedule
Exp.
Wall Gross Area (ft')
Window 1 Qty.
Window 2 Qty.
Door 1 Qty.
N
253.5
75
0
0
E
201.5
75
0
0
3.1. Construction Types for Exposure N
Wall Type
1st Window Type
3.2. Construction Types for Exposure E
Wall Type
1st Window Type
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
Existing Wall
Existing Glazing
Existing Wall
Existing Glazing
0.00 CFM
0.50 ACH
0.00 CFM
6. Floors:
Type Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
7.0 People
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
90 ..1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Hourly Analysis Program v5.11 Page 3 of 13
TUK_SAB'EY_IGW-C_LEVEL 3RD FL -1_v5_11
HERMANSON COMPANY LLP
Space Input Data
09/05/2018
10:30AM
03-04 Office
1. General Details:
Floor Area
Avg. Ceiling Height
Building Weight
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
143.0 ft2
9.0 ft
70.0 Ib/ft2
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type Recessed (Unvented) Occupancy 3.0 People
Wattage 0.89 W/ft2 Activity Level Office Work
Ballast Multiplier 1.08 Sensible 245.0 BTU/hr/person
.
901 Office Ligc Latenthts/Ele
Schedule 205.0 BTU/hr/person
Schedule 90.1 Office Occupants
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
3. Walls, Windows, Doors:
2.5. Miscellaneous Loads:
0.00 W/ft2 Sensible 0 BTU/hr
None Schedule None
Latent 0 BTU/hr
Schedule None
145.0 Watts
90.1 Office Lights/Elec
Exp.
Wall Gross Area (ft2)
Window 1 Qty.
Window 2 Qty.
Door 1 Qty.
W
221.0
72
0
0
3.1. Construction Types for Exposure W
Wall Type NOTE1: below grade walls same as above grade
1st Window Type Existing Glazing
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling 0.00 CFM
Design Heating 0.05 ACH
Energy Analysis 0.00 CFM
Infiltration occurs at all hours.
6. Floors:
Type Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Hourly Analysis Program v5.11
Page 4 of 13
`TUK_SAB`EY_IGW-C_LEVEL 3RD FL -1_v5_11
HERMANSON COMPANY LLP
Space Input Data
03-05 Office
09/05/2018
10:30AM
1. General Details:
Floor Area 221.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type Recessed (Unvented) Occupancy 3.0 People
Wattage 0.89 W/ft2 Activity Level Office Work
Ballast Multiplier 1.08 Sensible 245.0 BTU/hr/person
Schedule 90.1 Office Lights/Elec Latent 205.0 BTU/hr/person
Schedule 90.1 Office Occupants
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
3. Walls, Windows, Doors:
2.5. Miscellaneous Loads:
0.00 W/ft2 Sensible 0 BTU/hr
None Schedule None
Latent 0 BTU/hr
Schedule None
143.0 Watts
90.1 Office Lights/Elec
Exp.
Wall Gross Area (ft2)
Window 1 Qty.
Window 2 Qty.
Door 1 Qty.
W
221.0
72
0
0
3.1. Construction Types for Exposure W
Wall Type
1st Window Type
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
Existing Wall
Existing Glazing
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Hourly Analysis Program v5.11 Page 5 of 13
Space Input Data
TUK_SAbEY_IGW-C_LEVEL 3RD FL-1_v5_11 09/05/2018
HERMANSON COMPANY LLP 10:30AM
03-06 Conference
1. General Details:
Floor Area 406.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type Recessed (Unvented) Occupancy 16.0 People
Wattage 0.89 W/ft2 Activity Level Office Work
Ballast Multiplier 1.08 Sensible 245.0 BTU/hr/person
Schedule 90.1 Office Lights/Elec Latent 205.0 BTU/hr/person
Schedule 90.1 Office Occupants
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
3. Walls, Windows, Doors:
2.5. Miscellaneous Loads:
0.00 W/ft2 Sensible 0 BTU/hr
None Schedule None
Latent 0 BTU/hr
Schedule None
1.50 W/ft2
90.1 Office Lights/Elec
Exp.
Wall Gross Area (ft2)
Window 1 Qty.
Window 2 Qty.
Door 1 Qty.
W
364.0
100
0
0
3.1. Construction Types for Exposure W
Wall Type
1st Window Type
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
Existing Wall
Existing Glazing
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Hourly Analysis Program v5.11 Page 6 of 13
TUK_SAI#EY_IGW-C_LEVEL 3RD FL -1_v5_11
HERMANSON COMPANY LLP
Space Input Data
03-07 Server Room
09/05/2018
.10:30AM
1. General Details:
Floor Area 100.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 lb/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type Recessed (Unvented) Occupancy 0.0 Person
Wattage 0.89 W/ft2 Activity Level Office Work
Ballast Multiplier 1.08 Sensible 245.0 BTU/hr/person
Schedule 90.1 Office Lights/Elec Latent 205.0 BTU/hr/person
Schedule None
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
3. Walls, Windows, Doors:
2.5. Miscellaneous Loads:
0.00 W/ft2 Sensible 0 BTU/hr
None Schedule None
Latent 0 BTU/hr
Schedule None
4.00 W/ft2
90.1 Office Lights/Elec
Exp.
Wall Gross Area (ft2)
Window 1 Qty.
Window 2 Qty.
Door 1 Qty.
W
130.0
50
0
0
3.1. Construction Types for Exposure W
Wall Type
1st Window Type
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
Existing Wall
Existing Glazing
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Hourly Analysis Program v5.11 Page 7 of 13
TUK_SAI§EY_IGW-C_LEVEL 3RD FL -1_v5_11
HERMANSON COMPANY LLP
Space Input Data
03-08 Copier Room
09/05/2018
10:30AM
1. General Details:
Floor Area 363.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 lb/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
3. Walls, Windows, Doors:
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office Lights/Elec
0.00 W/ft2
None
1850.0 Watts
90.1 Office Lights/Elec
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent
Schedule
Exp.
W
Wall Gross Area (ft2)
Window 1 Qty.
Window 2 Qty.
Door 1 Qty.
390.0
125
0
0
3.1. Construction Types for Exposure W
Wall Type
1st Window Type
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
Existing Wall
Existing Glazing
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Floor Above Unconditioned Space
Floor Area 363.0 ft2
Total Floor U -Value 0.420 BTU/(hrft2•°F)
Unconditioned Space Max Temp. 82.0 °F
Ambient at Space Max Temp. 82.0 °F
Unconditioned Space Min Temp. 44.0 °F
Ambient at Space Min Temp. 24.0 °F
7. Partitions:
(No partition data).
Hourly Analysis Program v5.11
3.0 People
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
9C.1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Page 8 of 13
TUK_SA6EY_IGW-C_LEVEL 3RD FL-1_v5_11
HERMANSON COMPANY LLP
Space Input Data
03-09 Break Rm-Kitchen
09/05/2018
10:30AM
1. General Details:
Floor Area 369.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
3. Walls, Windows, Doors:
Exp.
W i
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office Lights/Elec
0.00 W/ft2
None
550.0 Watts
90.1 Office Lights/Elec
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent
Schedule
Wall Gross Area (ft2)
169.0
I Window 1 Qty. I
Window 2 Qty. I
50 0
3.1. Construction Types for Exposure W
Wall Type
1st Window Type
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
Existing Wall
Existing Glazing
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Hourly Analysis Program v5.11
Door 1 Qty.
0
10.0 People
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
90.1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Page 9 of 13
TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
HERMANSON COMPANY LLP
Space Input Data
03-10 Reception
09/05/2018
10:30AM
1. General Details:
Floor Area 580.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 lb/ft'
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type Recessed (Unvented) Occupancy 4.0 People
Wattage 0.89 W/ft2 Activity Level Office Work
Ballast Multiplier 1.08 Sensible 245.0 BTU/hr/person
Schedule 90.1 Office Lights/Elec Latent 205.0 BTU/hr/person
Schedule 90 1 Office Occupants
2.2. Task Lighting: 2.5. Miscellaneous Loads:
Wattage 0.00 W/ft2 Sensible 0 BTU/hr
Schedule None Schedule None
Latent 0 BTU/hr
Schedule None
2.3. Electrical Equipment:
Wattage
Schedule
145.0 Watts
90.1 Office Lights/Elec
3. Walls, Windows, Doors:
(No Wall, Window, Door data).
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Hourly Analysis Program v5.11 Page 10 of 13
TUK_SALEY_IGW-C_LEVEL 3RD FL-1_v5_11
HERMANSON COMPANY LLP
Space Input Data
03-11 Office
09/05/20'18
10:30AM
1. General Details:
Floor Area 203.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office Lights/Elec
0.00 W/ft2
None
145.0 Watts
90.1 Office Lights/Elec
3. Walls, Windows, Doors:
(No Wall, Window, Door data).
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Hourly Analysis Program v5.11
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible
Schedule
Latent
Schedule
3.0 People
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
90.1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Page 11 of 13
TUK_SABEY_IGW-C_LEVEL 3RD FL-1_v5_11
HERMANSON COMPANY LLP
Space Input Data
03-12 Storage
09/05/2018
10:30AM
1. General Details:
Floor Area 321.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 Ib/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type Recessed (Unvented) Occupancy 0.0 Person
Wattage 0.89 W/ft2 Activity Level Office Work
Ballast Multiplier 1.08 Sensible 245.0 BTU/hr/person
Schedule 90.1 Office Lights/Elec Latent 205.0 BTU/hr/person
Schedule None
2.2. Task Lighting: 2.5. Miscellaneous Loads:
Wattage 0.00 W/ft2 Sensible 0 BTU/hr
Schedule None Schedule None
2.3. Electrical Equipment:
Wattage
Schedule
0.0 Watts
90.1 Office Lights/Elec
3. Walls, Windows, Doors:
(No Wall, Window, Door data).
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Latent 0 BTU/hr
Schedule None
Hourly Analysis Program v5.11 Page 12 of 13
TUK_SABEY_IGW-C_LEVEL 3RD FL -1 v5 11
HERMANSON COMPANY LLP
Space Input Data
03-13 Open Office -Hall
09/05/2018
10:30AM
1. General Details:
Floor Area 887.0 ft2
Avg. Ceiling Height 9.0 ft
Building Weight 70.0 lb/ft2
1.1. OA Ventilation Requirements:
Space Usage User -Defined
OA Requirement 1 5.0 CFM/person
OA Requirement 2 0.06 CFM/ft2
Space Usage Defaults ASHRAE Std 62.1-2010
2. Internals:
2.1. Overhead Lighting:
Fixture Type
Wattage
Ballast Multiplier
Schedule
2.2. Task Lighting:
Wattage
Schedule
2.3. Electrical Equipment:
Wattage
Schedule
Recessed (Unvented)
0.89 W/ft2
1.08
90.1 Office Lights/Elec
0.00 W/ft2
None
290.0 Watts
90.1 Office Lights/Elec
3. Walls, Windows, Doors:
(No Wall, Window, Door data).
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling
Design Heating
Energy Analysis
Infiltration occurs at all hours.
0.00 CFM
0.00 ACH
0.00 CFM
6. Floors:
Type Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Hourly Analysis Program v5.11
2.4. People:
Occupancy
Activity Level
Sensible
Latent
Schedule
2.5. Miscellaneous Loads:
Sensible ..
Schedule
Latent
Schedule
4.0 People
Office Work
245.0 BTU/hr/person
205.0 BTU/hr/person
90.1 Office Occupants
0 BTU/hr
None
0 BTU/hr
None
Page 13 of 13
Hermanson
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, WA 98032
tel 206-575-9700
fax 206-575-9800
Project: 12101 Tukwila International Blvd,
Tukwila
Date: 09/05/2018
Hermanson
Building Today, Defining Tomorrow
HVAC SYSTEM COOLING/HEATING CALCS
CARRIER HAP VERSION: 5.11
SYSTEM INPUTS
Mechanical Construction,
Engineering and Service
www.hermanson.com
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
VAV Input Data
09/05/2018
10:31 AM
. General Details:
Air System Name VAV
Equipment Type Packaged Rooftop Units
Air System Type VAV
Number of zones 1
2. Ventilation System Components:
Ventilation Air Data:
Airflow Control Constant Ventilation Airflow
Ventilation Sizing Method ASHRAE Std 62.1-2010
Unocc. Damper Position Closed
Damper Leak Rate 5
Outdoor Air CO2 Level 400 ppm
Economizer Data:
Control Integrated enthalpy control
Upper Cutoff 75.0 °F
Lower Cutoff 35.0 °F
Central Cooling Data:
Supply Air Temperature 55.0 °F
Coil Bypass Factor 0.100
Cooling Source Air -Cooled DX
Schedule JFMAMJJASOND
Capacity Control Cycled or Staged Capacity - Fan On
Supply Fan Data:
Fan Type
Configuration
Fan Performance
Overall Efficiency
Forward Curved with Variable Frequency Drive
Draw-thru
4.00 in wg
48 %
% Airflow
100
90
80
70
60
50
% kW
100
77
60
44
35
25
% Airflow
40
30
20
10
0
%kW
19
13
9
7
6
Duct System Data:
Supply Duct Data:
Duct Heat Gain
Duct Leakage
Return Duct or Plenum Data:
Return Air Via
Wall Heat Gain to Plenum
Roof Heat Gain to Plenum
Lighting Heat Gain to Plenum
3. Zone Components:
Space Assignments:
3 %
2
Return Air Plenum
20 %
80 %
30 %
Zone 1: Zone 1
03-01 Office
x1
03-02 Office
x1
03-03 Office
x1
03-04 Office
x1
03-05 Office
x1
03-06 Conference
x1
03-07 Server Room
x1
03-08 Copier Room
x1
03-09 Break Rm-Kitchen
x1
03-10 Reception
x1
03-11 Office
x1
03-12 Storage
x1
03-13 Open Office -Hall
x1
Hourly Analysis Program 5.11 Page 1 of 2
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
VAV Input Data
09/05/20'18
10:31 AM
Thermostats and Zone Data:
Zone
Cooling T-Stat
Occ.
(°F)
Cooling T-Stat
Unocc.
(°F)
Heating T-Stat
Occ.
(°F)
Heating T-Stat
Unocc.
(°F)
T-Stat
Throttling
Range
(°F)
Diversity
Factor
(%)
Direct
Exhaust
Airflow
(CFM)
Direct
Exhaust Fari
(kW)
1
75.0
80.0
72.0
55.0
1.00
100
0.0
0.0
Thermostat Schedule
Unoccupied Cooling is
Supply Terminals Data:
90.1 Office HVAC
Available
Zone
Terminal Type
Air
Distribution
Air
Distribution
Effectiveness
Specification
Air
Distribution
Effectiveness
Minimum Airflow
Fan Performance
Fan
Efficiency
Design
Supply
Temp.
1
Series FPMBX
with reheat
Ceiling supply /
ceiling return
ASHRAE 62.1
<auto>
30 %
0.30 in wg
70 %
86.9 °F
Reheat Coil Source
Reheat Coil Schedule
Zone Heating Units:
Zone Unit Heat Source
Zone Heating Unit Schedule
4. Sizing Data (Computer -Generated):
System Sizing Data:
Sizing Data:
Cooling Supply Temperature
Supply Fan Airflow
Ventilation Airflow
Hydronic Sizing Specifications:
Chilled Water Delta -T
Hot Water Delta -T
Safety Factors:
Cooling Sensible
Cooling Latent
Heating
Zone Sizing Data:
Zone Airflow Sizing Method
Space Airflow Sizing Method
Electric Resistance
JFMAMJJASOND
Electric Resistance
JFMAMJJASOND
55.0 °F
3888.5 CFM
926.4 CFM
10.0 °F
30.0 °F
0 %
0 %
0 %
Peak zone sensible load
Individual peak space loads
Zone
Supply Airflow
(CFM)
Zone Htg Unit
(MBH)
Reheat Coil
(MBH)
FPMBX Fan
(CFM)
1
3810.8
-
81.0
3810.8
5. Equipment Data
Central Cooling Unit - Air -Cooled DX
Estimated Maximum Load
Design OAT
Equipment Sizing
Gross Cooling Capacity
Compressor & OD Fan Power
Conventional Cutoff OAT
Low Temperature Operation
134.7 MBH
95.0 °F
User -Defined
1.0 MBH
1.000 kW
55.0 °F
Not used
Hourly Analysis Program 5.11 Page 2 of 2
Hermanson
Ii Building Today. Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, WA 98032
tei 206-575-9700
fax 206-575-9800
Project: 12101 Tukwila International Blvd,
Tukwila
Date: 09/05/2018
Hermanson
Building Today, Defining Tomorrow
HVAC SYSTEM COOLING/HEATING CALCS
CARRIER HAP VERSION: 5.11
SYSTEM OUTPUTS
Mechanical Construction,
(Engineering and Service
www.hermanson.com
Air System Sizing Summary for VAV
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11 09/05/2018
Prepared by: HERMANSON COMPANY LLP 10:34AM
Air System Information
Air System Name VAV Number of zones 1
Equipment Class PKG ROOF Floor Area 4485.0 ft'
Air System Type VAV Location Seattle IAP, Washington
Sizing Calculation Information
Calculation Months Jan to Dec Zone CFM Sizing Peak zone sensible load
Sizing Data Calculated Space CFM Sizing Individual peak space loads
Central Cooling Coil Sizing Data
Total coil load 11.2 Tons Load occurs at Jun 1600
Total coil load 134.7 MBH OA DB / WB 84.5 / 66.9 °F
Sensible coil load 113.1 MBH Entering DB / WB 78.6 / 62.5 °F
Coil CFM at Jun 1600 3889 CFM Leaving DB / WB 51.3 / 49.9 °F
Max block CFM at Jun 1700 3889 CFM Coil ADP 48.2 °F
Sum of peak zone CFM 3889 CFM Bypass Factor 0.100
Sensible heat ratio 0.839 Resulting RH 42
CFM/Ton 346.4 Design supply temp. 55.0 °F
ft2/Ton 399.5 Zone T -stat Check 0 of 1 OK
BTU/(hr•ft2) 30.0 Max zone temperature deviation 0.0 °F
Water flow @ 10.0 °F rise N/A
Supply Fan Sizing Data
Actual max CFM at Jun 1700
Standard CFM
Actual max CFM/ft2
3889 CFM
3826 CFM
0.87 CFM/ft2
Fan motor BHP
Fan motor kW
Fan static
4.79 BHP
3.80 kW
4.00 in wg
Outdoor Ventilation Air Data
Design airflow CFM 926 CFM CFM/person 15.70 CFM/person
CFM/ft2 0.21 CFM/ft2
p
Hourly Analysis Program 5.11 Page 1 of 20
Zone Sizing Summary for VAV
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11 09/05/2018
Prepared by: HERMANSON COMPANY LLP 10:34AM
Air System Information
Air System Name VAV Number of zones 1
Equipment Class PKG ROOF Floor Area 4485.0 ft2
Air System Type VAV Location Seattle IAP, Washington
Sizing Calculation Information
Calculation Months Jan to Dec
Sizing Data Calculated
Zone Terminal Sizing Data
Zone CFM Sizing Peak zone sensible load
Space CFM Sizing Individual peak space loads
Zone Name
Design
Supply
Airflow
(CFM)
Minimum
Supply
Airflow
(CFM)
Zone
CFM/ft2
Reheat
Coil
Load
(MBH)
Reheat
Coil
Water
gpm
@ 30.0 °F
Zone
Htg Unit
Coil
Load
(MBH)
Zone
Htg Unit
Water
gpm
@ 30.0 °F
Mixing
Box Fan
Airflow
Zone
3811
1143
0.85
81.0
-
0.0
-
(CFM)
3811
1
6.6
Jun 1700
Zone Peak Sensible Loads
Zone Name
Zone
Cooling
Sensible
(MBH)
Time of
Peak Sensible
Cooling Load
Zone
Heating
Load
(MBH)
Zone
Floor
Area
(ft2)
Zone 1
80.3
Jun 1700
39.6
4485.0
Space Loads and Airflows
Hourly Analysis Program 5.11
Page 2 of 20
Zone Name /
Space Name
Mult.
Cooling
Sensible
(MBH)
Time of
Peak
Sensible
Load
Air
Flow
(CFM)
Heating
Load
(MBH)
Floor
Area
(ft2)
Space
CFM/ft2
Zone 1
03-01 Office
1
6.6
Jun 1700
310
5.9
285.0
1.09
03-02 Office
1
3.6
Jun 1800
172
4.2
283.0
0.61
03-03 Office
1
8.3
Jun 1400
390
6.9
324.0
1.20
03-04 Office
1
6.0
Jun 1700
282
2.7
143.0
1.97
03-05 Office
1
6.2
Jun 1700
290
2.8
221.0
1.31
03-06 Conference
1
12.7
Jun 1700
598
4.1
406.0
1.47
03-07 Server Room
1
4.7
Jun 1700
221
1.8
100.0
2.21
03-08 Copier Room
1
16.3
Jun 1700
769
9.1
363.0
2.12
03-09 Break Rm-Kitchen
1
7.9
Jun 1700
373
2.0
369.0
1.01
03-10 Reception
1
2.6
Jan 2100
123
0.0
580.0
0.21
03-11 Office
1
1.6
Jan 2100
74
0.0
203.0
0.37
03-12 Storage
1
0.7
Jan 2200
33
0.0
321.0
0.10
03-13 Open Office -Hall
1
3.8
Jan 2100
177
0.0
887.0
0.20
Hourly Analysis Program 5.11
Page 2 of 20
Ventilation Sizing Summary for VAV
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
1. Summary
Ventilation Sizing Method
Design Condition
Occupant Diversity (D)
Uncorrected Outdoor Air Intake (Vou)
System Ventilation Efficiency (Ev)
Outdoor Air Intake (Vot)
2. Space Ventilation Analysis
ASHRAE Std 62.1-2010
Minimum flow (cooling)
1.000
564 CFM
0.609
926 CFM
Hourly Analysis Program 5.11 Page 3 of 20
Minimum
Supply Air
(CFM)
Space Floor
Area
(ft2)
Area Outdoor
Air Rate
(CFM/ft2)
Time
Averaged
Occupancy
(Occupants)
' Peo7e
Outdoor Air
Rate
(CFM/person)
Air
Distribution
Effectiveness
Space
Outdoor Air
(CFM)
Breathing
Zone
Outdoor Air
(CFM)
Space
Ventilation
Efficiency
Zone Name / Space Name
Mult.
(Vpz)
(Az)
(Ra)
(Pz)
(Rp)
(Ez)
(Voz)
(Vbz)
(Evz)
Zone 1
03-01 Office
1
93
285.0
0.06
3.0
5.00
1.0
32
32
1.059
03-02 Office
1
52
283.0
0.06
3.0
5.00
1.0
32
32
0.932
03-03 Office
1
117
324.0
0.06
7.0
5.00
1.0
54
54
1.003
03-04 Office
1
85
143.0
0.06
3.0
5.00
1.0
24
24
1.089
03-05 Office
1
87
221.0
0.06
3.0
5.00
1.0
28
28
1.068
03-06 Conference
1
179
406.0
0.06
16.0
5.00
1.0
104
104
0.949
03-07 Server Room
1
66
100.0
0.06
0.0
5.00
1.0
6
6
1.176
03-08 Copier Room
1
231
363.0
0.06
3.0
5.00
1.0
37
37
1.144
03-09 Break Rm-Kitchen
1
112
369.0
0.06
10.0
5.00
1.0
72
72
0.920
03-10 Reception
1
55
580.0
0.06
4.0
5.00
1.0
55
55
0.674
03-11 Office
1
27
203.0
0.06
3.0
5.00
1.0
27
27
0.717
03-12 Storage
1
19
321.0
0.06
0.0
5.00
1.0
19
19
0.609
03-13 Open Office -Hall
1
73
887.0
0.06
4.0
5.00
1.0
73
73
0.691
Totals (incl. Space Multipliers)
1196
564
0.609
Hourly Analysis Program 5.11 Page 3 of 20
Air System Design Load Summary for VAV
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
Hourly Analysis Program 5.11
Page 4 of 20
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jun 1600
COOLING OA DB / WB 84.5 °F / 66.9 °F
HEATING DATA AT DES HTG
HEATING OA DB f WB 24.0 °F / 19.2 °F
ZONE LOADS
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Window & Skylight Solar Loads
824 ft2
34750
-
824 ft2
-
-
Wall Transmission
1783 ft2
1639
-
1783 ft2
9712
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
824 ft2
3029
-
824 ft2
22149
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
363 ft2
839
-
363 ft2
4269
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
4311 W
9429
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
5002 W
16425
-
0
0
-
People
59
12308
12095
0
0
0
Infiltration
-
0
0
3467
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
78418
12095
-
39597
0
Zone Conditioning
-
85153
12095
-
37324
0
Plenum Wall Load
20%
681
-
0
0
-
Plenum Roof Load
80%
0
-
0
0
-
Plenum Lighting Load
30%
4413
-
0
0
-
Return Fan Load
3889 CFM
0
-
1167 CFM
0
-
Ventilation Load
926 CFM
7502
9533
926 CFM
44982
0
Supply Fan Load
3889 CFM
12972
-
1167 CFM
-1686
-
Space Fan Coil Fans
-
654
-
-
-654
-
Duct Heat Gain / Loss
3%
2353
-
3%
1188
-
» Total System Loads
-
113727
21628
-
81153
0
Central Cooling Coil
-
113073
21630
-
0
0
Terminal Reheat Coils
-
0
-
-
80332
-
» Total Conditioning
-
113073
21630
-
80332
0
Key:
Positive values are clg loads
Negative values are htg loads
Positive values are htg
Negative values are clg
loads
loads
Hourly Analysis Program 5.11
Page 4 of 20
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
Zone Design Load Summary for VAV
09/05/2018
10:34AM
Zone 1
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jun 1700
COOLING OA DB / WB 83.2 °F / 66.4 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 75.0 °F
OCCUPIED T -STAT 72.0 °F
ZONE LOADS
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Details
Sensible
(BTU/hr)
Latent
(BTU/hr)
Window & Skylight Solar Loads
824 ft2
36435
-
824 ft2
-
-
Wall Transmission
1783 ft2
1928
-
1783 ft2
9712
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
824 ft2
2714
-
824 ft2
22149
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
363 ft2
854
-
363 ft2
4269
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
4311 W
9486
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
5002 W
16467
-
0
0
-
People
59
12449
12095
0
0
0
Infiltration
-
0
0
-
3467
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
80332
12095
-
39597
0
Hourly Analysis Program 5.11 Page 5 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_IGW-C LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
TABLE 1.1.A. Component Loads For Space "03-01 Office" In Zone "Zone 1"
TABLE 1.1.B. Envelope Loads For Space "03-01 Office' In Zone "Zone 1"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jun 1700
COOLING OA DB / WB 83.2 °F / 66.4 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB i WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
COOLING
HEATING
Sensible
Latent
U -Value
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
117 ft2
4199
-
117 ft2
Wall Transmission
312 ft2
289
-
312 ft'
1713
187
Roof Transmission
0 ft2
0
-
0 ft2
0
181
Window Transmission
117 ft2
385
-
117 ft2
3145
Skylight Transmission
0 ft2
0
-
0 ft2
0
102
Door Loads
0 ft2
0
-
0 ft2
0
204
Floor Transmission
0 ft2
0
-
0 ft2
0
Partitions
0 ft2
0
-
0 ft2
0
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
274 W
603
-
0
0
Task Lighting
0 W
0
-
0
0
Electric Equipment
145 W
477
-
0
0
People
3
633
615
0
0
0
Infiltration
-
0
0
1090
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
6586
615
-
5948
0
Hourly Analysis Program 5.11
Page 6 of 20
TABLE 1.1.B. Envelope Loads For Space "03-01 Office' In Zone "Zone 1"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hrft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
W EXPOSURE
WALL
147
0.114
-
187
-
804
WINDOW 1
55
0.560
0.570
181
3184
1478
N EXPOSURE
WALL
166
0.114
-
102
-
908
WINDOW 1
62
0.560
0.570
204
1015
1667
Hourly Analysis Program 5.11
Page 6 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEYIGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
•.-...- ,. ...•. ..i/,nNUnent Loaas ror space "03-02 Office" In Zone "Zone 1"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jun 1800
COOLING OA DB / WB 81.2 °F / 65.8 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
88 ft2
1612
-
88 ft2
-
Wall Transmission
140 ft2
88
-
140 ft2
766
-
Roof Transmission
0 ft2
0
-
0 ft2
0
1612
Window Transmission
88 ft2
230
-
88 ft2
2365
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
Door Loads
0 ft2
0
-
0 ft2
0
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft'
0
-
0 ft2
0
-
Overhead Lighting
272 W
602
-
0
0
-
Task Lighting
0 W
0
-
0
0
Electric Equipment
145 W
479
-
0
0
People
3
640
615
0
0
0
Infiltration
-
0
0
1083
0
Miscellaneous-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
3649
615
-
4214
0
-----.-.- -•c.•u• ",.ewNe waus ror space U3-02 Office' In Zone "Zone 1"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr•ft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
N EXPOSURE
WALL
140
0.114
-
88766
-
WINDOW 1
88
0.560
0.570
230
1612
2365
Hourly Analysis Program 5.11
Page 7 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
TABLE 1.3.A. Component Loads For Space "03-03 Office" In Zone "Zone 1"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jun 1400
COOLING OA DB / WB 84.5 °F / 66.9 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB 1 WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
150 ft2
3983
-
150 ft2
-
-
Wall Transmission
305 ft2
263
-
305 ft2
1674
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
150 ft2
515
-
150 ft2
4032
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
311 W
672
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
435 W
1420
-
0
0
-
People
7
1423
1435
0
0
0
Infiltration
-
0
0
-
1239
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
8277
1435
-
6946
0
TABLE 1.3.B. Envelope Loads For Space "03-03 Office' In Zone "Zone 1"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hrft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
N EXPOSURE
WALL
179
0.114
-
75
-
980
WINDOW 1
75
0.560
0.570
257
1165
2016
E EXPOSURE
WALL
127
0.114
-
188
-
694
WINDOW 1
75
0.560
0.570
257
2819
2016
Hourly Analysis Program 5.11
Page 8 of 20
Space Design Load Summary for VAV
' Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL-1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
TABLE 1.4.A. Component Loads For Space "03-04 Office
" In Zone "Z
DESIGN COOLING
COOLING DATA AT Jun 1700
COOLING OA DB / WB 83.2 °F / 66.4 °F
OCCUPIED T -STAT 75.0 °F
HEATING DA1
HEATING OA
OCCUPIED T -
SPACE LOADS
Sensible
Latent
Window & Skylight Solar Loads
Wall Transmission
Details
72 ft2
(BTU/hr)
4168
(BTU/hr)
Roof Transmission
149 ft2
168
Window Transmission
Skylight Transmission
Door Loads
0 ft2
0
72 ft2
237
0 ft2
0
Floor Transmission
Partitions
Ceiling
0 ft2
0
0 ft2
0
0 ft2
0
Overhead Lighting
Task Lighting
0 ft2
0
Details
72 ft
149 ft
0ft
72 ft
0 ft
0 ft
0 ft
0 ft
0 ft
137 W
302
0
Electric Equipment
People
OW
0
145 W
477
Infiltration
3
633
615
0
0
0
Miscellaneous
Safety Factor
0
0
0
0
» Total Zone Loads
0% / 0%
0
0
0%
5986
615
)ne 1"
DESIGN HEATING
A AT DES HTG
)B/WB 24.0°F/19.2°F
STAT 72.0 °F
Sensible
Latent
i (BTU/hr)
(BTU/hr)
2
-
z
746
-
0
-
1935
-
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
-
-
0
0
55
0
0
0
0
0
2736
0
TABLE 1.4.B. Envelope Loads For Space "03-04 Office' In Zone "Zone 1"
COOLING
COOLING
Area
U -Value
Shade
TRANS
SOLAR
HEATING
W EXPOSURE
WALL
(ft2)
(BTU/(hrft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
TRANS
(BTU/hr)
WINDOW 1
149
0.104
72
0.560
0.570
168
237
Hourly Analysis Program 5.11
4168
746
1935
Page 9 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
TABLE 1.5.A. Component Loads For Space "03-05 Office" In Zone "Zone 1"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jun 1700
COOLING OA DB / WB 83.2 °F / 66.4 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB f WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
72 ft2
4168
-
72 ft2
-
-
Wall Transmission
149 ft2
184
-
149 ft'
818
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
72 ft2
237
-
72 ft2
1935
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
212 W
467
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
143 W
471
-
0
0
-
People
3
633
615
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
6161
615
-
2753
0
TABLE 1.5.B. Envelope Loads For Space "03-05 Office' In Zone "Zone 1"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr-ft2-°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
W EXPOSURE
WALL
149
0.114
-
184
-
818
WINDOW 1
72
0.560
0.570
237
4168
1935
Hourly Analysis Program 5.11 Page 10 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEYIGW-C LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
•�-- .•..•-,• vv.evpinICII► Lodas ror apace U;5-Ub Conference" In Zone "Zone 1"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jun 1700
COOLING OA DB / WB 83.2 °F / 66.4 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
100 ft2
5789
-
100 ft2
-
(BTU/hr)
Wall Transmission
264 ft'
336
-
264 ft2
1449
Roof Transmission
0 ft2
0
-
0 ft'
0
5789
Window Transmission
100 ft2
329
-
100 ft2
2688
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
Floor Transmission
0 ft2
0
-
0 ft2
0
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
390 W
859
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
609 W
2005
-
0
0
People
16
3376
3280
0
0
0
Infiltration
-
0
0-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
12694
3280
-
4137
0
--- ....•.-. �..1rwI a+Nc iudus ror apace --Us-Ub conference" In Zone "Zone 1"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr•ft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
W EXPOSURE
(BTU/hr)
WALL
264
0.114
-
336
1449
WINDOW 1
100
0.560
0.570
329
5789
2688
Hourly Analysis Program 5.11
Page 11 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
TABLE 1.7.A. Component Loads For Space "03-07 Server Room" In Zone "Zone 1"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jun 1700
COOLING OA DB / WB 83.2 °F / 66.4 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
50 ft2
2895
-
50 ft2
-
-
Wall Transmission
80 ft2
95
-
80 ft2
439
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
50 ft2
165
-
50 ft2
1344
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
96 W
211
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
400 W
1317
-
0
0
-
People
0
0
0
0
0
0
Infiltration
-
0
0
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
4682
0
-
1783
0
TABLE 1.7.B. Envelope Loads For Space "03-07 Server Room" In Zone "Zone 1"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr•ft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
W EXPOSURE
WALL
80
0.114
-
95
-
439
WINDOW 1
50
0.560
0.570
165
2895
1344
Hourly Analysis Program 5.11 Page 12 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
TABLE 1.8.A. Component Loads For Space "03-08 Copier Room" In Zone "Zone 1"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jun 1700
COOLING OA DB / WB 83.2 °F / 66.4 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
125 ft2
7236
-
125 ft2
-
-
Wall Transmission
265 ft2
329
-
265 ft2
1455
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
125 ft2
412
-
125 ft2
3360
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
363 ft2
854
-
363 ft2
4269
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
349 W
768
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
1850 W
6090
-
0
0
-
People
3
633
615
0
0
0
Infiltration
-
0
0-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
16322
615
-
9083
0
TABLE 1.8.B. Envelope Loads For Space "03-08 Copier Room" In Zone "Zone 1"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hrft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
W EXPOSURE
WALL
265
0.114
-
329
-
1455
WINDOW 1
125
0.560
0.570
412
7236
3360
Hourly Analysis Program 5.11 Page 13 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
TABLE 1.9.A. Component Loads For Space "03-09 Break Rm-Kitchen" In Zone '"Zone 1"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jun 1700
COOLING OA DB / WB 83.2 °F / 66.4 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB I WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTUIhr)
(BTU/hr)
Window & Skylight Solar Loads
50 ft2
2895
-
50 ft2
-
-
Wall Transmission
119 ft2
150
-
119 ft2
653
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
50 ft2
165
-
50 ft2
1344
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
355 W
780
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
550 W
1811
-
0
0
-
People
10
2110
2050
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
7910
2050
-
1997
0
TABLE 1.9.B. Envelope Loads For Space "03-09 Break Rm-Kitchen" In Zone "Zone 1"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr•ft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
W EXPOSURE
WALL
119
0.114
-
150
-
653
WINDOW 1
50
0.560
0.570
165
2895
1344
Hourly Analysis Program 5.11 Page 14 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_IGW-C LEVEL 3RD FL -12v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
TABLE 1.10.A. Component Loads For Space "03-10 Reception" In Zone "Zone 1"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jan 2100
COOLING OA DB / WB 59.2 °F / 52.5 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
557 W
1252
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
145 W
481
-
0
0
-
People
4
876
820
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
2609
820
-
0
0
TABLE 1.10.B. Envelope Loads For Space "03-10 Reception" In Zone "Zone 1"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr•ft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
Hourly Analysis Program 5.11 Page 15 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
TABLE 1.11.A. Component Loads For Space "03-11 Office" In Zone "Zone 1"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jan 2100
COOLING OA DB / WB 59.2 °F / 52.5 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft'
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
195 W
438
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
145 W
481
-
0
0
-
People
3
657
615
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
1577
615
-
0
0
TABLE 1.11.B. Envelope Loads For Space "03-11 Office" In Zone "Zone V
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hrft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
Hourly Analysis Program 5.11 Page 16 of 20
Space Design Load Summary for VAV
1 Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
TABLE 1.12.A. Component Loads For Space "03-12 Storage"
In Zone "Zone 1"
DESIGN COOLING
DESIGN HEATING
COOLING
COOLING DATA AT Jan 2200
COOLING OA DB / WB 57.4 °F / 51.8 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
Area
Sensible
Latent
TRANS
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft2
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
Door Loads
0 ft2
0
-
0 ft2
0
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
Ceiling
0 ft'
0
-
0 ft2
0
-
Overhead Lighting
309 W
696
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
0 W
0
-
0
0
-
People
0
0
0
0
0
0
Infiltration
-
0
0
-
0
0
Miscellaneous
-
00
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
696
0
-
0
0
TABLE 1.12.B. Envelope Loads For Space "03-12 Stora e" In Zone "Zone 1"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hr•ft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
Hourly Analysis Program 5.11
Page 17 of 20
Space Design Load Summary for VAV
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
TABLE 1.13.A. Component Loads For Space "03-13 Open Office -Hall' In Zone "Zone 1"
DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Jan 2100
COOLING OA DB / WB 59.2 °F / 52.5 °F
OCCUPIED T -STAT 75.0 °F
HEATING DATA AT DES HTG
HEATING OA DB / WB 24.0 °F / 19.2 °F
OCCUPIED T -STAT 72.0 °F
HEATING
Sensible
Latent
Shade
Sensible
Latent
SPACE LOADS
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
Window & Skylight Solar Loads
0 ft2
0
-
0 ft'
-
-
Wall Transmission
0 ft2
0
-
0 ft2
0
-
Roof Transmission
0 ft2
0
-
0 ft2
0
-
Window Transmission
0 ft2
0
-
0 ft2
0
-
Skylight Transmission
0 ft2
0
-
0 ft2
0
-
Door Loads
0 ft2
0
-
0 ft2
0
-
Floor Transmission
0 ft2
0
-
0 ft2
0
-
Partitions
0 ft2
0
-
0 ft2
0
-
Ceiling
0 ft2
0
-
0 ft2
0
-
Overhead Lighting
853 W
1914
-
0
0
-
Task Lighting
0 W
0
-
0
0
-
Electric Equipment
290 W
963
-
0
0
-
People
4
876
820
0
0
0
Infiltration
-
0
0
0
0
Miscellaneous
-
0
0
-
0
0
Safety Factor
0% / 0%
0
0
0%
0
0
» Total Zone Loads
-
3753
820
-
0
0
TABLE 1.13.B. Envelope Loads For Space "03-13 O en Office -Hall" In Zone "Zone 1"
COOLING
COOLING
HEATING
Area
U -Value
Shade
TRANS
SOLAR
TRANS
(ft2)
(BTU/(hrft2•°F))
Coeff.
(BTU/hr)
(BTU/hr)
(BTU/hr)
Hourly Analysis Program 5.11 Page 18 of 20
System Psychrometrics for VAV
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
June DESIGN COOLING DAY, 1600
TABLE 1: SYSTEM DATA
Component
Location
Dry -Bulb
Temp
(°F)
Specific
Humidity
(Ib/Ib)
Airflow
(CFM)
CO2 Level
(ppm)
Sensible
Heat
(BTU/hr)
Latent
Heat
(BTU/hr)
Ventilation Air
Inlet
84.5
0.01025
926
400
7502
9533
Vent - Retum Mixing
Outlet
78.6
0.00858
3889
955
-
-
Central Cooling Coil
Outlet
51.3
0.00738
3889
955
113073
21630
Supply Fan
Outlet
54.4
0.00738
3889
955
12972
-
Cold Supply Duct
Outlet
55.0
0.00738
3811
955
-
-
Zone Air
-
76.0
0.00806
3811
1132
85153
12095
Return Plenum
Outlet
77.3
0.00806
3811
1132
5094
-
Duct Leakage Air
Outlet
54.4
0.00738
78
955
-
-
Retum Duct
Outlet
76.8
0.00805
3889
1129
-
-
Air Density x Heat Capacity x Conversion Factor: At sea level = 1.080; At site altitude = 1.063 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4670.1 BTU/(hr-CFM)
Site Altitude = 449.0 ft
TABLE 2: ZONE DATA
Zone Name
Zone
Sensible
Load
(BTU/hr)
T -stat
Mode
Zone
Cond
(BTU/hr)
Zone
Temp
(°F)
Zone
Airflow
(CFM)
CO2
Level
(ppm)
Terminal
Heating
Coil
(BTU/hr)
Zone
Heating
Unit
(BTU/hr)
Zone 1
78418
Cooling
85153
76.0
3811
1132
0
0
Hourly Analysis Program 5.11 Page 19 of 20
System Psychrometrics for VAV
Project Name: TUK_SABEY_IGW-C_LEVEL 3RD FL -1_v5_11
Prepared by: HERMANSON COMPANY LLP
09/05/2018
10:34AM
WINTER DESIGN HEATING
TABLE 1: SYSTEM DATA
T
Component
Location
Dry -Bulb
Temp
(°F)
Specific
Humidity
(Ib/Ib)
Airflow
(CFM)
CO2 Level
(ppm)
Sensible
Heat
(BTU/hr)
Latent
Heat
(BTU/hr)
Ventilation Air
Inlet
24.0
0.00103
926
400
-44982
0
Vent - Return Mixing
Outlet
33.4
0.00103
1167
401
-
-
Central Cooling Coil
Outlet
33.4
0.00103
1167
401
0
0
Supply Fan
Outlet
34.8
0.00103
1167
401
1686
-
Cold Supply Duct
Outlet
33.8
0.00103
1143
401
-
-
Zone Air
-
70.4
0.00103
1143
403
-37324
0
Return Plenum
Outlet
70.4
0.00103
1143
403
0
-
Duct Leakage Air
Outlet
34.8
0.00103
23
401
-
-
Return Duct
Outlet
69.7
0.00103
1167
403
-
-
Air Density x Heat Capacity x Conversion Factor: At sea level = 1.080; At site altitude = 1.063 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4670.1 BTU/(hr-CFM)
Site Altitude = 449.0 ft
TABLE 2: ZONE DATA
Zone Name
Zone
Sensible
Load
(BTU/hr)
T -stat
Mode
Zone
Cond
(BTU/hr)
Zone
Temp
(°F)
Zone
Airflow
(CFM)
CO2
Level
(ppm)
Terminal
Heating
Coil
(BTU/hr)
Zone
Heating
Unit
(BTU/hr)
Zone 1
-39597
Heating
-37324
70.4
3811
403
80332
0
Hourly Analysis Program 5.11 Page 20 of 20
.PERMIT COORD COPY 0
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: M18-0121 DATE: 09/24/18
PROJECT NAME: SEATTLE CHILDRENS
SITE ADDRESS: 12101 TUKWILA INT'L BLVD
X Original Plan Submittal
Response to Correction Letter #
Revision # before Permit Issued
Revision # after Permit Issued
DEPARTMENTS:
Building Division
Public Works
Fire Prevention
Structural
19u6\1(6
Planning Division
❑ Permit Coordinator
PRELIMINARY REVIEW:
DATE: 09/25M3_
Not Applicable ri Structural Review Required
(no approval/review required)
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved
DUE DATE: 10/238
❑ Approved with Conditions ❑
Corrections Required ❑ Denied ❑
(corrections entered in Reviews) (ie: Zoning Issues)
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg 0 Fire 0 Ping ❑ PW 0 Staff Initials:
12/18/2013
HERMANSON COMPANY LLP
Washington State Department of
Labor & Industries
Horne Espanol Contact
Safety & Health Claims & Insurance
Search L&I
Page 1 of 3
J
A -Z Index Help My L &.t
Workplace Rights Trades & Licensing
HERMANSON COMPANY LLP
Owner or tradesperson
Principals
NICOLAISEN, KNUT H, PARTNER/MEMBER
BROCK, DANIEL L, PARTNER/MEMBER
FOX, DEAN M, PARTNER/MEMBER
HENGEL, STEPHEN A, PARTNER/MEMBER
DYCKMAN, KENNETH
A, PARTNER/MEMBER
ROBINETT, PAUL J, PARTNER/MEMBER
HERMANSON, RICHARD
L, PARTNER/MEMBER
ALMON, KEVIN, PARTNER/MEMBER
(End: 08/05/2010)
MACDONALD, JAMES, PARTNER/MEMBER
(End: 08/05/2010)
Doing business as
HERMANSON COMPANY LLP
WA UBI No.
602 004 844
1221 2ND AVE N
KENT, WA 98032-2945
206-575-9700
KING County
Business type
Limited Liability Partnership
Governing persons
CORP
HERMANSON
LLC HERMANSON GROUP;
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor Active.
......_.............._......................._....
Meets current requirements.
License specialties
GENERAL
License no.
HERMACLOO5BJ
Effective — expiration
01/11/2000— 08/25/2020
Bond
WESTERN SURETY CO
Bond account no.
929381801
$12,000.00
Received by L&I Effective date
12/01/2005 01/01/2006
Expiration date
Until Canceled
Help us improve
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602004844&LIC=HERMACL005BJ&SAW= 10/3/2018
HERMANSON COMPANY LLP Page 2 of 3
Insurance
Transportation lits Co
Policy no.
6043050846
$1,000,000.00
Received by L&I Effective date
08/16/2018 08/21/2018
Expiration date
08/21/2019
Insurance history
Savings
No savings accounts during the previous 6 year period.
Lawsuits against t:ie bond or savings
No lawsuits against the bond or savings accounts during the previous 6 year period.
L&I Tax debts
No L&l tax debts E.re recorded for this contractor license during the previous 6 year period, but some debts
may be recorded by other agencies.
License Violations
No license vioiaticas during the previous 6 year period.
Workers' comp
Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums.
L&I Account ID
409,648-01
Doing business as
HERMANSON COMPANY LLP
Estimated workers reported
Quarter 2 of Year 2018 "Greater than 100 Workers"
L&I account contact
T4 / TERRI MADIS JN (360)902-4654 - Email: KIRT235@Ini.wa.gov
Account is current.
Public Works Strikes and Debarments
Verify the contractor is eligible to perform work on public works projects.
Contractor Strikes
No strikes have been issued against this contractor.
Contractors not ai:owed to bid
No debarments have been issued against this contractor.
Workplace safety and health
Check for any past afety and health violations found on jobsites this business was responsible for.
Inspection results date
05/22/2018 Violations
Inspection no.
317948819
Location
1221 2nd Ave N
Kent, WA 98032
Inspection results date
03/05/2018
Inspection no.
317948149
Location
635 Park Ave N
Renton, WA 980::7
Inspection results date
02/23/2016
Inspection no.
317939295
No violations
No violations
Help us improve
https://secure.lni. wa.gov/verify/Detail.aspx?UBI=602004844&LIC=HERMACL005BJ&SAW= 10/3/2018