HomeMy WebLinkAboutPermit M18-0154 - BOEING #9-08 - HEAT PUMPS REPLACEMENTBOEING #9-08
9725 E MARGINAL WAY S
BLDG 9-008
M18-0154
Parcel No:
Address:
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
MECHANICAL PERMIT
5624201032 Permit Number: M18-0154
9725 E MARGINAL WAY S BLDG 9-008 Issue Date: 12/4/2018
Permit Expires On: 6/2/2019
Project Name: BOEING #9-08
Owner:
Name:
Address:
Contact Person:
Name:
Address:
Contractor:
Name:
Address:
License No:
Lender:
Name:
Address:
BOEING COMPANY THE
PO BOX 3707 M/C 20-59 PROPERTY
TAX DEPT, SEATTLE, WA, 98124
CONNIE HARDIN
4600 S 134 PL , SEATTLE, WA, 98168
HOLADAY PARKS
4600 S 134TH PL, SEATTLE, WA, 98168
Phone: (206) 250-4530
Phone: (206) 520-4530
Expiration Date:
DESCRIPTION OF WORK:
REPLACING 8 HEAT PUMPS. ASSOCIATED DUCT AND PIPE LINE CHANGES
Valuation of Work: $150,000.00
Type of Work: REPLACEMENT
Fuel type:
Fees Collected: $2,064.91
Electrical Service Provided by: SEATTLE CITY LIGHT
Water District: TUKWILA
Sewer District: TUKWILA
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
International Fuel Gas Code:
Permit Center Authorized Signature:
2015
2015
2015
2015
2015
National Electrical Code:
WA Cities Electrical Code:
WAC 296-46B:
WA State Energy Code:
2017
2017
2017
2015
Date: `'� —1-4g
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or locs regulating construction or the performance of work. I am authorized to sign and obtain this
developm� _ 1 i :re' td the condjtions attached to this permit. / �6/
Signature: �'� Date:! C1//g--- !
Print Name: D�Y�✓1 t k-TGt.c C�
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
2: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
3: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
on satisfactory completion of this requirement.
5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
8: ***MECHANICAL PERMIT CONDITIONS***
9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center (206/431-3670).
10: Manufacturers installation instructions shall be available on the job site at the time of inspection.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
0703 MECH EQUIP EFF
1800 MECHANICAL FINAL
0609 PIPE/DUCT INSULATION
0705 REFRIGERATION EQUIP
0701 ROUGH -IN MECHANICAL
"i10IfpJ
CITY OF TUKV.. LA
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
Mechanical Permit No. M 1 V — 0 (S
2-f
Project No.
Date Application Accepted:
Date Application Expires:
(For office use only)
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**please print**
SITE LOCATION &etr‘i
"��V�
• V
King Co Assessor's Tax No.:$ 2 W 10322.,
Site Address 72S Z' �,
��r�
Tenant Name?Ine1 ti,e
PROPERTY OWNER
Name: Q
i7;:;)7
• t
Address• rx u c �o -afl
City: ea tt State; ,A ztur N
CONTACT PERSON — person
communication
receiving all project
Address: LA k_Dt) s t .3 4 pJCity
Name: f _
I"l a
i;,
Contr Reg No.: 601,3 _off„E 3Date: at/olk
KJ
Address
CityditEt.y
State:00L Ziytt G /
Phone:W I0 4r30
Fax: le 2 of r�7
0
Email:
mom it. h e,
o& narks. CD 1
Suite Number: Floor:
New Tenant: ❑ Yes �No
MECHANICAL CONTRACTOR INFORMATION
Company Name: I4 IP--k
etrs
Address: LA k_Dt) s t .3 4 pJCity
State: L'1 ot Zily+ki 6s/
PhoneU4 254?, Fax Farb 24& t760
Contr Reg No.: 601,3 _off„E 3Date: at/olk
KJ
Tukwila Business License No.:
Valuation of project (contractor's bid price): $ \ S (7))7.)
? �.eS pis • (ssocA..c ze;Q
Describe the scope of work in detail I
eft
Use: Residential: New ❑
Commercial: New
Fuel Type: Electric ❑
Gas
Replacement
Replacement
Other:
H:\Applications\Fmns-Applications On Line 2016 Applications\Mechanical Permit Application Revised I-4-16.doc,c
Revised: January 2016
bh
Page 1 of 2
l
Indicate type of mechanical work being installed and the quantity below:
Unit Type
Qty
Furnace <100k btu
Residential, Nighttime
Furnace >100k btu
Industrial
Floor furnace
55 dB(A)
Suspended/wall/floor
mounted heater
57 dB(A)
Appliance vent
Commercial
Repair or addition to
heat/refrig/cooling
system
47 dB(A)
Air handling unit
65 dB(A)
<10,000 cfm
60 dB(A)
Unit Type
Qty
Air handling unit
Residential, Nighttime
>10,000 cfin
Industrial
Evaporator cooler
55 dB(A)
Ventilation fan
connected to single duct
57 dB(A)
Ventilation system
Commercial
Hood and duct
47 dB(A)
Incinerator — domestic
65 dB(A)
Incinerator —
comm/industrial
60 dB(A)
i
Unit Type
Qty
Fire damper
Diffuser
Thermostat
Wood/gas stove
Emergency generator
Other mechanical
equipment
hedd' Aoros
Boiler/Compressor
Qty
0-3 hp/100,000 btu
3-15 hp/500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/1,750,000 btu
50+ hp/1,750,000 btu
Noise:
Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is
created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed.
For more details, see TMC 8.22
*Daytim
District of Sound
Producing Source
District of Receiving Property
Residential, Daytime*
Residential, Nighttime
Commercial
Industrial
Residential
55 dB(A)
45 dB(A)
57 dB(A)
60 dB(A)
Commercial
57 dB(A)
47 dB(A)
60 dB(A)
65 dB(A)
Industrial
60 dB(A)
50 dB(A)
65 dB(A)
70 dB(A)
A few sounds are exempt from the noise code, including:
• Warning devices;
• Construction and property maintenance during the daytime hours (7am-10pm);
• Testing of backup generators during the day.
PERMIT APPLICATION NOTES -
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDIN !j R c c T O ZED AG 'y T:
Signature: . -� • Date: 11 I ZGell
Print Name: IA.K tis 'lam cur- A Oft Day Telephone: lb& 2SD ti S 30
Mailing Address: LI loop E tSt444‘ Q,Q
11:\Applications\Fortes-Applications On Line \2016 Applications\Mechanical Permit Application Revised 1-4-16.docx
Revised: January 2016
bh
_04.7:ctil_ 48,t Lk
City State Zip
Page 2 of 2
DESCRIPTIONS
ACCOUNT
QUANTITY
PAID
$2,064.91
PermitTRAK
M18-0154 Address: 9725 E MARGINAL WAY S BLDG 9-008 Apn: 5624201032
$2,064.91
Credit Card Fee
$60.14
Credit Card Fee
R000.369.908.00.00
0.00
$60.14
MECHANICAL
$1,927.66
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
0.00
$33.15
PERMIT FEE
R000.322.100.00.00
0.00
$1,508.98
PLAN CHECK FEE
R000.322.102.00.00
0.00
$385.53
TECHNOLOGY FEE
$77.11
TOTAL FEES.PAID
TECHNOLOGY FEE
BY. RECEIPT: R15894
R000.322.900.04.00
0.00
$77.11
$2,064.91
Date Paid: Monday, November 26, 2018
Paid By: CONNIE HARDIN
Pay Method: CREDIT CARD 07044G
Printed: Monday, November 26, 2018 1:28 PM 1 of 1
SYSTEMS
CO TUKWILA ETRAKIT
6200 SOUTHCENTER BLVD
TUKWILA, WA 98188
206-433-1870
CITY OF TUKWILA
Date: 11/26/2018 01:28:21 PM
CREDIT CARD SALE
VISA
CARD NUMBER:
TRAN AMOUNT:
APPROVAL CD:
RECORD 4:
CLERK ID:
**********1947
$2,064.91
07044G
000
Bill
Thank you!
Customer Copy
K
Page 2 of 2
https://classic.convergepay.comNirtualMerchant/transaction.do?dispatchMethod=printTr... 11/26/2018
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
olsq
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431
Permit Inspection Request Line (206) 438-9350
Project: 9
Zccitilo g-00
Type of Inspection: _
11�lrz 4.„44._ -rte
Address:Date
t, I,c�
1776 g I 'Agina.aa, f
Called:
.S
Special Instructions:
/00°00 j o me
ate Wanted:
is r 01-t,01
p.m.
Requester:
T +h,
Phone No:m' 9J b304
Approved per applicable codes. 0 Corrections required prior to approval.
COMMENTS:
8 m0i- P'�.."s/chif-icede_er..7L
ffiee(Ace"(C.A,
Date,
-19 -17
REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
n46 otsq
Project:
6 q-Og?
Type of Inspection:
ptPE, (ltii it-Siritr
Addre s:
1745 5- rvlv,4 w,4!
Date Called:
Special Instructions:
Ct..cre,V
0
® A.K.
ate Wanted:Iy,
7J•—(al
p.m.
Requester:
Phone No:
ppproved per applicable codes.
OMMENTS:
ElCorrections required prior to approval.
n('.eciek.alet
c u
Inspector:
O 0 (
1
Date: $-�,5 ,ZO
REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Soul, enter Blvd.. Suite 100. Call to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit Ali) OS -4
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Project:
3oEr,J4 9 --,oe
Type of Inspecti n:
peg" b✓cT /,.4s
41.1
Address:
Date Called:
Special Instructions:
'F
1-Qe7
/
D ate Wanted:::..
+�/ t 1
Requester: "
Phone No:
z
z4O 3Lt r)
Approved per applicable codes. Corrections required prior to approval.
COMMENTS: ' iFE /�J�
?—fen,s,),
To ins tic G,Ce -a r-tc_
14 l b /rs1V/ n. L Sc e rS.vti
Inspector.
15
Date: z 201
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
NEUDORFER ENGINEERS INC.
TEST, ADJUST & BALANCE
BALANCE REPORT
Boeing Building 9-08.1
Tenant Improvement
Tukwila, Washington
2019-0195
Project Completion Date: 06/05/19
Revision Date:
Revision Number:
WILLIAM C. NEUDORFER
CERTIFICATION
\
2465
Exp. 3/31/21
5516 18 Ave S
Seattle, WA 98108
Phone (206) 621-1810
Fax (206) 343-9820
R`CEI ED
CITY OF TUKV IL -i
PERiViIT CENTER
2501 SE Columbia Way, Ste. #230
Vancouver, WA 98661
Phone (503) 235-8924
Fax (503) 235-8925
PROJECT
LOCATION
Boeing Building 9-08.1, T.I.
Tukwila, WA
TABLE OF CONTENTS
Cover
Report Title 3
Certification 4
Warranty 5
Terms of Abbreviations 6-7
Executive Summary 8-10
Heat Pumps w/ Duct Traverses
HP1D4 (HP -5) 11-14
HP1 E2 (HP -4) & HP1 E2 (HP -4) 15-19
HP1 E4 (HP -3) 20-23
HP1 E5 (HP -3) 24-27
HP1 F2 (HP -6) 28-31
HP1 F3 (HP -3) 32-35
HP1 F5 (HP -3) 36-39
TAB Drawings 40-45
Instrument Calibration 46
2
Report Title
CERTIFIED TEST: BALANCE REPORT
Project: Boeing Building 9-08.1
Tenant Improvement
Tukwila, Washington
NEI Job#: 2019-0195
Engineer: FSI Consulting Engineers
Contractor: Holaday Parks
TAB Firm: Neudorfer Engineers Inc
5516 1st Avenue South
Seattle, WA 98108
Test Engineer: Andy Eaden
/ C
Architect: --
(keT 'nee
5516 rt Ave S
Seattle, WA 98108
Phone (206) 621-1810
Fax (206) 343-9820
3
WILLIAM C. Nii::JDORFER
CERTIFI::;ATnoN
24(55
Exp. 3/31/21
roni��y�\c,
2501 SE Columbia Way, Ste. #230
Vancouver, WA 98661
Phone (503) 235-8924
Fax (503) 235-8925
CERTIFICATION
The data presented in this report is a record of system measurements and final
adjustments that have been obtained in accordance with the current edition of the
NEBB Procedural Standards for Testing, Adjusting, and Balancing of
Environmental Systems. Any variances from design quantities which exceed
NEBB tolerances are noted in the Test -Adjust -Balance Report Project Summary.
Significant / Noteworthy Remarks are noted on the General Remarks and General
Field Notes pages. Other remarks are noted on individual test sheets.
Noted deficiencies are not Neudorfer Engineers responsibility to repair. Prior to
issuance of this report, Deficiency Reports are forwarded to our contracted agent.
Warranty is limited to one year from the date of substantial completion. Within
that time, any discrepancies, ambiguities, or omissions found in this report will be
retested, adjusted, or balanced as needed. A written notification will be required.
Submitted and Certified by:
NEBB TAB Firm: Neudorfer Engineers Inc
Certification No: 2465
Expiration Date: March 31, 2021
Certification Date: June 5, 2019
(Date completed)
Signed and Sealed by:
NEBB Supervisor: William C. Neudorfer
4
WILLIAM C. Na.X10RFER
CERTIF!GATlJW
2465
Exp. 3 3t/2S
h nrnnic �e ti
Warranty
Project: Boeing Building 9-08.1
Warranty of Services:
Neudorfer Engineers, Inc. warrants that the air balancing, evaluated during this performance
evaluation are operating at the specified levels as documented within this report. At and only this time,
and makes no other warranties, stated or implied, concerning the continued performance, operation or
safety in the use of this equipment past this time. Neudorfer Engineers warrants the air and hydronic
balancing for 1 year from the date of substantial completion. Neudorfer Engineers reserves the right
to correct errors or omissions in the collections of data.
Warranty Procedures:
For all warranty items, Neudorfer Engineers requires written request. The written request should be
specific on the areas of concern, such rooms, or equipment, and the type of issue the occupants are
experiencing. Once written notification is received, Neudorfer Engineers will schedule a Technician. It
is recommended that an Owner or A/E Representative be on site at that time.
Voided Warranty and Additional Charges:
If a complaint issue is due to a mechanical equipment failure, control or maintenance related, the
return trip maybe subject to a service charge, not covered under warranty. Neudorfer Engineers
reserves the right to resolve any TAB issue. If a third party or competing Test & Balance
Commissioning firm test or adjust any equipment, all project warranty is voided. (This is typical
standard for the Mechanical industry, as Manufacture, Mechanical and Control Contractor voids all
warranty when a competing firm tests or manipulates their systems.) Any return trips to the job site
are subject to a service charge and a purchase order will be required before returning to the job site.
Document Archiving
An electronic file of all test documents will be kept on file until the end of the Warranty period. During
that time an electronic copy of the test data will be provided a no charge. Any additional hard / bound
copies requested will be subject to a fee.
5
Terms and Abbreviations
Project: Boeing Building 9-08.1
F ,
4
www.. NethiorterENI
AC or ACU Air Conditioner or Air Conditioning Unit
Act. Actual
ACCU Air Cooled Condensing Unit
Address Equipment designation number given
on the Control Program
AH or AHU Air Handler or Air Handling Unit
Amps Amperage
AP Access Point
APP. Application
Arr Arrangement
AVG Average
BHP Brake Horsepower
BTU British Thermal Units
BTUH British Thermal Units per Hour
CAV Constant Air Volume
CBV Calbirated Balancing Valve
(Circuit Setter)
CC Cooling Coil
CD Ceiling Diffuser
CFLA Correct Full Load Amperage
CFM Cubic Feet per Minute
CH Chiller
CHWS Chilled Water Supply
CHWR Chilled Water Retum
Coeff. Coefficient
CP Circulating Pump
CR Ceiling Register
CRAC Computer Room Air Conditioner
CRU Computer Room Unit
CT Cooling Tower
CU Condenser Unit
CUH Cabinet Unit Heater
CWS Condenser Water Supply
CWR Condenser Water Retum
DAT Discharge Air Temperature
DB Dry Bulb
DD Direct Drive
DDC Direct Digital Controls: EMS Control
System for the HVAC
Delta Difference, net decrease or increase
6
Des. Design
Dia. Diameter
Disch. Discharge
DNL Data Not Listed
EA Exhaust Air
EAT Entering Air Temperature
Economizer Controls and components that allow an
air handler to logically utilize outdoor air
for cooling as opposed to the use of
mechanical cooling.
EDC Electric Duct Coil
EDH Electric Duct Heater
EF Exhaust Fan
EG Exhaust Grille
EMCS Energy Management Control System
ERU Energy Recovery Unit
E.S.P. External Static Pressure
Evap. Evaporator
EWT Entering Water Temperature
FCU Fan Coil Unit
FD Fire Damper
FH Fume Hood
FLA Full Load Amperage: Maximum
amperage a motor can draw.
Flow Hood Instrument that captures air and
converts the reading to CFM.
FPB Fan Powered Box
FPM Feet per Minute
FR Field Report
FT Foot, Feet
FTU Fan Terminal Unit
GPM Gallons per Minute
HC Heating Coil
HD Pressure Difference across the entering
and leaving side of a pump.
Heater O.L. Thermal overload protection for motors
located at the motor starter (starter heaters)
HEPA High Efficiency Particulate Arrestance
HOA Hand / Off / Auto Switch
HP Horsepower
Terms and Abbreviations
Project: Boeing Building 9-08.1
HRC
HUH
HVAC
HWS
HWR
HX
HZ
I.D.
in.
in.w.g.
Kfactor
KW
LAT
LWG
LWR
LWT
MAU
MBH
MAX.
MBH
MIN
N/A
N/S
OA
OBD
O.D.
PD
PH
PHC
Prim.
PSI
RA
RAT
RF
RH
RHC
RPM
RTU
Heat Recovery Coil
Hydronic Unit Heater
Heating Ventilation and Air Conditioning
Heating Water Supply
Heating Water Return
Heat Exchanger
Hertz, cycle per second
Inside Diameter
inches
inches of water gauge
Correction factor to the free area need to
calculate CFM.
Kilowatts
Leaving Air Temperature
Low Wall Grille
Low Wall Register
Leaving Water Temperature
Make-up Air Hangling Unit
1,000 BTUH
Maximum Flow Requirements for DDC
Mega BTUs per hour (1MBH=1,000BTUH)
Minimum Flow Requirements for DDC
Not Available
Not Shown or Specified
Outside Air
Opposed Blade Damper
Outside Diameter
Pressure Drop.
Phase
Preheat Coil
Primary
Pounds per Square Inch
Return Air
Return Air Temperature
Return Fan
Relative Humidity
Reheat Coil
Revolutions per Minute
Roof Top Unit
7
RVA Rotating Vane Anemometer -reads
air velocity in feet per minute
SA Supply Air
SAT Supply Air Temperature
S.F. Service Factor
Schedule Design data obtained from the
(sched) mechanical prints' schedule of
equipment.
SCR SiIcon Controlled Rectifier
Speed Controller
SF Supply Fan
SFD Smoke/Fire Damper
SP Static Pressure
Spec(s) Specifications
sq.ft. square feet
Submittals Submitted data on equipment
(subs) capabilities.
Suct. Suction
SWG Sidewall Grille
SWR Sidewall Register
TAB Test; Adjust; and Balance
Tach Tachometer
Tech Technician
TSP Total Static Pressure: Difference
between the entering and leaving
static pressure of a fan.
TP Traverse or Test Point
UH Unit Heater
VAV Variable Air Volume; box that
contains a motorized damper that
modulates airflow.
VD Volume Damper
VFD Variable Frequency Drive
Velgrid Instrument that reads used to read
velocity in feet per minute.
VP Velocity Pressure
VVT Variable Volume Terminal
WC Water Column
W.G. Water Gauge
WB Wet Bulb
PROJECT Boeing Building 9-08.1 Tenant Improvements
LOCATION Tukwila, Washington
EXECUTIVE SUMMARY
This project has been balanced per plans and specifications using the National Environmental
Balancing Bureau (NEBB) standards and procedures.
Neudorfer Engineers performed the air balancing on the following: (8) New Hydronic Condenser Heat
Pumps.
These fans have been checked for unit data, operating amperage, voltage, rotation, and operating
static pressure. All outlets have been proportioned to ±10% of design airflow unless otherwise noted.
New Heat Pump (HP1D4) (HP -5)
This new heat pump serves the Boeing Bldg. 9-08.1, Work Station Room 11D5. Design is 750 CFM
and actual is 865 CFM (115% of design total). This is a direct drive EMC motor, with no speed
controller. The outside air actual CFM was obtained from a total air duct traverse. Refer to Duct
Traverse Sheet T-01, for further details. This heat pump was tested in heating and cooling mode, refer
to the Coil Test Data Sheets for further details.
New Heat Pump (HP1 E2) (HP -4)
This new heat pump serves the Boeing Bldg. 9-08.1, Conference Room 12E2. Design is 2,000 CFM
and actual is 2,075 CFM (104% of design total). This heat pump did not have any outside air ducted to
the unit, since there are (2) heat pumps that serve this room. This heat pump was tested in heating
and cooling mode, refer to the Coil Test Data Sheets for further details.
New Heat Pump (HP1 E3) (HP -4)
This new heat pump serves the Boeing Bldg. 9-08.1, Conference Room 12E2. Design is 2,000 CFM
and actual is 2,120 CFM (106% of design total). The outside air actual CFM was obtained from a total
air duct traverse. Refer to Duct Traverse Sheet T-02, for further details. This heat pump was tested in
heating and cooling mode, refer to the Coil Test Data Sheets for further details.
NATIONAL ENVIRONMENTAL BALANCING BUREAU
8
PROJECT Boeing Building 9-08.1 Tenant Improvements
LOCATION Tukwila, Washington
EXECUTIVE SUMMARY (CONTD.)
New Heat Pump (HP1E4) (HP -3)
This new heat pump serves the Boeing Bldg. 9-08.1, Work Room 11E4. Design is 1,200 CFM and
actual is 1,220 CFM (102% of design total). The outside air actual CFM was obtained from a total air
duct traverse. Refer to Duct Traverse Sheet T-03, for further details. This heat pump was tested in
heating and cooling mode, refer to the Coil Test Data Sheets for further details.
New Heat Pump (HP1 E5) (HP -3)
This new heat pump serves the Boeing Bldg. 9-08.1, Work Room 11E5. Design is 1,200 CFM and
actual is 1,220 CFM (102% of design total). The outside air actual CFM was obtained from a total air
duct traverse. Refer to Duct Traverse Sheet T-04, for further details. This heat pump was tested in
heating and cooling mode, refer to the Coil Test Data Sheets for further details.
New Heat Pump (HP1 F2) (HP -6)
This new heat pump serves the Boeing Bldg. 9-08.1, Work Room 11E2. Design is 1,400 CFM and
actual is 1,460 CFM (104% of design total). The outside air actual CFM was obtained from a total air
duct traverse. Refer to Duct Traverse Sheet T-05, for further details. This heat pump was tested in
heating and cooling mode, refer to the Coil Test Data Sheets for further details.
New Heat Pump (HP1 F3) (HP -3)
This new heat pump serves the Boeing Bldg. 9-08.1, Work Room 11E3. Design is 1,200 CFM and
actual is 1,180 CFM (98% of design total). The outside air actual CFM was obtained from a total air
duct traverse. Refer to Duct Traverse Sheet T-06, for further details. This heat pump was tested in
heating and cooling mode, refer to the Coil Test Data Sheets for further details.
NATIONAL ENVIRONMENTAL BALANCING BUREAU
9
Neudorfer-Erfdtrieer
Consulting Engineers Seatte Portland
PROJECT Boeing Building 9-08.1 Tenant Improvements
LOCATION Tukwila, Washington
EXECUTIVE SUMMARY (CONTD.)
New Heat Pump (HP1F5) (HP -3)
This new heat pump serves the Boeing Bldg. 9-08.1, Work Room 12E5. Design is 1,200 CFM and
actual is 1,215 CFM (101 % of design total). The outside air actual CFM was obtained from a total air
duct traverse. Refer to Duct Traverse Sheet T-07, for further details. This heat pump was tested in
heating and cooling mode, refer to the Coil Test Data Sheets for further details.
Balancing diagrams are attached to this report with outlets numbered for locations.
NATIONAL ENVIRONMENTAL BALANCING BUREAU
10
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: HP1D4 (HP -5)
AREA: Work Station 11D5
Unit Data
Unit Manufacturer
Unit Model Number
Unit Serial Number
Unit Discharge
Fan Rotation
HP1D4 (HP-51/Filter
Filter Type
Filter Quantity - Size 1
Filter Dimensions - Size 1
DAIKIN
W.CCW.5.024.B.F.Y.L.S.04.YY
.A.C.Y.YY.Y.YYY.YYY.YYY
E029522300100
Top Horizontal
Counterclockwise
Pleated
1
20x24x2
Test Data
Total Design Flow
Total Actual Flow
RA Design Flow
RA Actual Flow
OA Design Flow
OA Actual Flow
HP1D4 (HP-51/Fart
Motor Volts T1-T2
Motor Amps T1
750 CFM
865 (1) CFM
625 CFM
865 (2) CFM
125 CFM
610 (2)(3)(4) CFM
280 Volts
1 Amps
Log:
Tested By: Andy Eaden
Date: 6/4/2019
Motor Data
HP1D4 (HP-51/Fan
Drive Type
Motor Manufacturer
Motor HP
Motor Rated Volts
Motor Phase
Motor Hertz
Motor FL Amps
Direct Drive
Genteq
1/3 HP
277 Volts
1
60 Hz
2.6 Amps
Test Pressures
Actual Total SP
Fan Discharge SP
Fan Suction SP
Design External SP
Actual External SP
Filter DP Actual
Coil DP Actual
0.31 in. wc
0.08 in. wc
-0.23 in. wc
0.5 in. we
0.09 in. wc
0.08 in. wc
0.14 in. wc
HP1D4 (HP -5)
HP1D4 (HP -5)
HP1D4 (HP -5)
HP1D4 (HP -5)
6/4/2019
6/4/2019
6/4/2019
6/4/2019
Andy Eaden
Andy Eaden
Andy Eaden
Andy Eaden
(4) Per the mechanical prints, there was no volume
damper installed, to throttle down the airflow to
achieve the design outside air CFM.
(1) The supply fan motor is an EMC motor, plus is
direct drive. There is no speed controller installed tc
slow down the fan to achieve the design CFM total.
(3) The actual outside air flow was obtained by a tot:
air round duct traverse. Refer to duct traverse shee
T-01, for further details.
(2) The return air filter duct and the outside duct are
installed per plan, but the return air filter and the
outside aur duct are both open to the plenum above
the ceiling grid.
Neudorfer Engineers, Inc.
11
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
HP1D4 (HP -5) Supply Outlet Summary
DATE: 6/5/2019
CONTACT: Andy Eaden
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size
LxW / D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Outlet -01 *
Work Station
11D5
Flowhood
CD -7
8" round
1
-
125
130
145
116
(1)
Outlet -02
Work Station
11D5
Flowhood
CD -7
8" round
1
-
125
140
145
116
-
Outlet -03
Work Station
11D5
Flowhood
CD -7
8" round
1
-
125
150
140
112
Outlet -04
Work Station
11D5
Flowhood
CD -7
8" round
1
-
125
150
145
116
Outlet -05
Work Station
11D5
Flowhood
CD -7
8" round
1
-
125
130
145
116
Outlet -06
Work Station
11D5
Flowhood
CD -7
8" round
1
-
125
160
145
116
Totals:
-
-
-
-
-
750
860
865
115
-
Log:
HP1D4 (HP-5)/Outlet-01
6/4/2019
Andy Eaden
(1 The volume damper is full open.
HP1D4 (HP -5) Return Inlet Summary
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size LxW /
D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Inlet -01*
Work Station
11D5
Velgrid
Duct
23 x 18
2.875
-
625
865
865
138
(1)
Totals:
-
-
-
-
-
625
865
865
138
-
Log:
HP1D4 (HP-5)/Inlet-01
6/4/2019
Andy Eaden
(1) The retum air filter inlet is open to the plenum.
Neudorfer Engineers, Inc.
12
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-01/Total outside air duct traverse
for HP1D4 (HP -5)
AREA: Work Station 11D5
Unit Data
Type of Traverse
Diameter
Insulation Width
Air Flow Area
Number Of Rows
Readings Per Row
Total Readings
Round
8 in.
0 in.
0.35 sq. ft.
2
10
20
Log:
Tested By: Andy Eaden
Date: 6/4/2019
Final Data
Sum of Readings
Average Reading
Design Total Flow
Actual Total Flow
Static Pressure
34958
1748 FPM
125 CFM
612 CFM
0.01 in.
T-01/Total outside air duct traverse for 6/4/2019
HP1D4 (HP -5)
T-01/Total outside air duct traverse for 6/4/2019
HP1D4 (HP -5)
T-01/Total outside air duct traverse for 6/4/2019
HP1D4 (HP -5)
Andy Eaden
Andy Eaden
Andy Eaden
The outside duct is installed per plan, but the return
air filter and the outside air duct are both open to the
plenum above the ceiling grid.
There is no volume damper installed, per the
mechanical print. To throttle down the air flow to
achieve the design CFM.
A Shortridge Multimeter with a Pitot Tube was used
to obtain velocity readings.
Neudorfer Engineers, Inc.
13
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-01/Total outside air duct traverse
for HP1D4 (HP -5)
AREA: Work Station 11D5
Hole 1
Tested By: Andy Eaden
Date: 6/4/2019
Traverse Data Points
0
8
Neudorfer Engineers, Inc.
14
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: HP1E2 (HP -4)
AREA: Conference Room 12E2
Unit Data
Unit Manufacturer DAtKIN
Unit Model Number W.CCW.5.060.8.F.Y.L.S.04.YY
.A.C.Y.YY.Y.YYY.YYY.YYY
Unit Serial Number E029522300300
Unit Discharge Top Horizontal
Fan Rotation Counterclockwise
HP1E2 (HP-41/Fitter
Filter Type
Filter Quantity - Size 1
Filter Dimensions - Size 1
Pleated
2
20x24x2
Test Data
Total Design Flow
Total Actual Flow
RA Design Flow
RA Actual Flow
OA Design Flow
OA Actual Flow
HP1E2 (HP-4)/Fan
Motor Volts T1-T2
Motor Amps T1
2000 CFM
2075 CFM
2000 CFM
2075 CFM
(1) CFM
(1) CFM
209 Volts
3.6 Amps
Log:
Tested By: Andy Eaden
Date: 6/4/2019
Motor Data
HP1E2 (HP-4)/Fan
Drive Type Direct Drive
Motor Manufacturer Genteq
Motor HP 1 HP
Motor Rated Volts 120/208/240 Volts
Motor Phase 1
Motor Hertz 60 Hz
Motor FL Amps 12.8/9.4/9.1 Amps
Test Pressures
Actual Total SP
Fan Discharge SP
Fan Suction SP
Design External SP
Actual External SP
Filter DP Actual
Coil DP Actual
0.36 in. wc
0.03 in. wc
-0.33 in. wc
0.5 in. wc
0.04 in. wc
0.13 in. wc
0.19 in. wc
HP1E2 (HP -4)
6/4/2019 Andy Eaden (1) There was outside air ducted to this heat pump,
since there are (2) in this conference room.
HP1E2 (HP -4) Supply Outlet Summary
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size
LxW / D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Outlet -01
Conference
Room 12E2
Flowhood
CD -6
14" round
1
-
1000
1125
1045
105
(1)
Outlet -02*
Conference
Room 12E2
Flowhood
CD -6
14" round
1
-
1000
945
1030
103
(1)
Totals:
-
-
-
-
-
2000
2070
2075
104
-
Log:
HP1 E2 (HP-4)/Outlet-02
6/4/2019
Andy Eaden
(1 The volume damper is full open.
HP1E2 (HP -4) Return Inlet Summary
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size LxW /
D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Inlet -01 *
Conference
Room 12E2
Velgrid
Duct
38 x 23
6.06
-
2000
2075
2075
104
(1)
Totals:
-
-
-
--
2000
2075
2075
104
-
Log:
HP1E2 (HP-4)/Inlet-01
6/4/2019
Andy Eaden
(1) The return air filter inlet is open to the plenum.
Neudorfer Engineers, Inc.
15
Heat Pump
PROJECT: Boeing Bldg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: HP1E3 (HP -4)
AREA: Conference Room 12E2
Unit Data
Unit Manufacturer
Unit Model Number
Unit Serial Number
Unit Discharge
Fan Rotation
HP1E3 (HP-4)/Filter
Filter Type
Filter Quantity - Size 1
Filter Dimensions - Size 1
DAIKIN
W.CCW.5.060.B.F.Y.L.S.04.YY
.A. C.Y.YY.Y.YYY.YYY.YYY
E029522300800
Top Horizontal
Counterclockwise
Pleated
2
20x24x2
Test Data
Total Design Flow
Total Actual Flow
RA Design Flow
RA Actual Flow
OA Design Flow
OA Actual Flow
)HP1E3 (HP-4)/Fan
Motor Volts T1-T2
Motor Amps T1
2000 CFM
2120 CFM
1685 CFM
2120 (1) CFM
315 CFM
370 (1)(2)(3) CFM
208 Volts
4.19 Amps
Log:
Tested By: Andy Eaden
Date: 6/4/2019
Motor Data
JIP1E3 (HP-4)/Fart
Drive Type
Motor Manufacturer
Motor HP
Motor Rated Volts
Motor Phase
Motor Hertz
Motor FL Amps
Direct Drive
Genteq
1 HP
120/208/240 Volts
1
60 Hz
12.8/9.4/9.1 Amps
Test Pressures
Actual Total SP
Fan Discharge SP
Fan Suction SP
Design External SP
Actual External SP
Filter DP Actual
Coil DP Actual
0.53 in. wc
0.14 in. wc
-0.39 in. wc
0.5 in. wc
0.2 in. wc
0.11 in. we
0.33 in. wc
HP1E3 (HP -4)
HP1E3 (HP -4)
HP1E3 (HP -4)
6/4/2019 Andy Eaden
6/4/2019 Andy Eaden
6/4/2019 Andy Eaden
(3) Per the mechanical prints , there was no volume
damper installed, to throttle down the airflow to
achieve the design outside air CFM.
(2) The actual outside air flow was obtained by a tot.
air round duct traverse. Refer to duct traverse shee
T-02, for further details.
(1) The retum air filter duct and the outside duct are
installed per plan, but the return air filter and the
outside air duct are both open to the plenum above
the ceiling grid.
HP1E3 (HP -4) Supply Outlet Summary
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size
LxW / D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Outlet -01
Conference
Room 12E2
Flowhood
CD -6
14" round
1
-
1000
1185
1070
107
Outlet -02*
Conference
Room 12E2
Flowhood
CD -6
14" round
1-
1000
955
1050
105
(1)
Totals:
-
-
-
-
-
2000
2140
2120
106
-
Log:
HP1E3 (HP-4)/Outlet-02
6/4/2019
Andy Eaden
(1 The volume damper is full open.
Neudorfer Engineers, inc.
16
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
HP1 E3 (HP -4) Return Inlet Summary
DATE: 6/5/2019
CONTACT: Andy Eaden
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size LxW /
D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
Remarks
Inlet -01 *
Conference
Room 12E2
Velgrid
Duct
38 x 23
6.06
-
1685
2120
2120
126
(1)
Totals:
-
-
-
-
-
1685
2120
2120
126
-
Log:
HP1E3 (HP-4)/Inlet-01
6/4/2019
Andy Eaden
(1) The retum air filter inlet is open to the plenum.
Neudorfer Engineers, Inc.
17
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-02/Total outside air duct traverse
for HP1E3 (HP -4)
AREA: Conference Room 12E2
Unit Data
Type of Traverse
Diameter
Insulation Width
Air Flow Area
Number Of Rows
Readings Per Row
Total Readings
Round
10 in.
0 in.
0.55 sq. ft.
2
10
20
Log:
Tested By: Andy Eaden
Date: 6/4/2019
Final Data
Sum of Readings
Average Reading
Design Total Flow
Actual Total Flow
Static Pressure
13396
670 FPM
315 CFM
369 CFM
0.04 in.
T-02rrotal outside air duct traverse for 6/5/2019
HP1E3 (HP -4)
T-02/Total outside air duct traverse for 6/4/2019
HP1E3 (HP -4)
T-02/Total outside air duct traverse for 6/4/2019
HP1E3 (HP -4)
Andy Eaden
Andy Eaden
Andy Eaden
The outside duct is installed per plan, but the retum
air filter and the outside air duct are both open to the
plenum above the ceiling grid.
There is no volume damper installed, per the
mechanical print. To throttle down the air flow to
achieve the design CFM.
A Shortridge Multimeter with a Pitot Tube was used
to obtain velocity readings.
Neudorfer Engineers, Inc.
18
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-02/Total outside air duct traverse
for HP1E3 (HP -4)
AREA: Conference Room 12E2
Miele 1
Tested By: Andy Eaden
Date: 6/4/2019
Traverse Data Points
rr
w
a
19
0
Neudorfer Engineers, Inc.
19
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: HP1E4 (HP -3)
AREA: Work Room 11 E4
Unit Data
Unit Manufacturer
Unit Model Number
Unit Serial Number
Unit Discharge
Fan Rotation
HP1E4 (HP-3)/Filter
Filter Type
Filter Quantity - Size 1
Filter Dimensions - Size 1
DAIKIN
W.CCW.5.036.B.F.Y.L.S.04.Y'
. A. C. Y. YY. Y. YYY. YYY. YYY
E029522300500
Top Horizontal
Counterclockwise
Pleated
1
20x24x2
Test Data
Total Design Flow
Total Actual Flow
RA Design Flow
RA Actual Flow
OA Design Flow
OA Actual Flow
HPI E4 (HP-3VFan
Motor Volts T1-T2
Motor Amps T1
1200 CFM
1220 CFM
1130 CFM
1220 (1) CFM
70 CFM
105 (1)(2)(3) CFM
209 Volts
2.56 Amps
Log:
Tested By: Andy Eaden
Date: 6/4/2019
Motor Data
HP1E4 (HP-31/Fan
Drive Type
Motor Manufacturer
Motor HP
Motor Rated Volts
Motor Phase
Motor Hertz
Motor FL Amps
Direct Drive
Genteq
1/2 HP
120/208/240 Volts
1
60 Hz
7.7/5.0/4.3 Amps
Test Pressures
Actual Total SP
Fan Discharge SP
Fan Suction SP
Design External SP
Actual External SP
Filter DP Actual
Coil DP Actual
0.34 in. wc
0.04 in. wc
-0.30 in. wc
0.5 in. wc
0.08 in. wc
0.13 in. we
0.13 in. wc
HP1E4 (HP -3)
HP1E4 (HP -3)
HP1E4 (HP -3)
6/4/2019 Andy Eaden
6/4/2019 Andy Eaden
6/4/2019 Andy Eaden
(3) Per the mechanical prints , there was no volume
damper installed, to throttle down the airflow to
achieve the design outside air CFM.
(2) The actual outside air flow was obtained by a tot
air round duct traverse. Refer to duct traverse shee
T-03, for further details.
(1) The retum air filter duct'and the outside duct are
installed per plan, but the return air filter and the
outside air duct are both open to the plenum above
the ceiling grid.
HP1E4 (HP -3) Supply Outlet Summary
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size
LxW / D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Outlet -01
Work Room
11E4
Flowhood
CD -6
12" round
1
-
600
665
615
103
Outlet -02'
Work Room
11E4
Flowhood
CD -6
12" round
1
-
600
555
605
101
(1)
Totals:
-
-
-
-
-
1200
1220
1220
102
-
Log:
HP1E4 (HP-3)/Outlet-02
6/4/2019
Andy Eaden
(1 The volume damper is full open.
Neudorfer Engineers, Inc.
20
Consulting Engineers Seatle Porliand
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
HP1E4 (HP -3) Return Inlet Summary
DATE: 6/5/2019
CONTACT: Andy Eaden
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size LxW /
D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Inlet -01 *
Work Room
11 E4
Velgrid
Duct
23 x 18
2.87
-
1130
1220
1220
108
(1)
Totals:
-
-
-
-
-
1130
1220
1220
108
-
Log:
HP1E4 (HP-3)/Inlet-01
6/4/2019
Andy Eaden
(1) The return air filter inlet is open to the plenum.
Neudorfer Engineers, Inc.
21
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-03/Total outside air duct traverse
for HP1E4 (HP -3)
AREA: Work Room 11 E4
Unit Data
Type of Traverse
Diameter
Insulation Width
Air Flow Area
Number Of Rows
Readings Per Row
Total Readings
Round
6 in.
0 in.
0.20 sq. ft.
2
10
20
Log:
Tested By: Andy Eaden
Date: 6/4/2019
Final Data
Sum of Readings
Average Reading
Design Total Flow
Actual Total Flow
Static Pressure
10398
520 FPM
70 CFM
104 CFM
0.02 in.
T-03/Total outside air duct traverse for 6/5/2019
HP1E4 (HP -3)
T-03/Total outside air duct traverse for 6/4/2019
HP1E4 (HP -3)
T-03/Total outside air duct traverse for 6/4/2019
HP1E4 (HP -3)
Andy Eaden
Andy Eaden
Andy Eaden
The outside duct is installed per plan, but the return
air filter and the outside air duct are both open to the
plenum above the ceiling grid.
There is no volume damper installed, per the
mechanical print. To throttle down the air flow to
achieve the design CFM.
A Shortridge Multimeter with a Pitot Tube was used
to obtain velocity readings.
Neudorfer Engineers, Inc.
22
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-03/Total outside air duct traverse
for HP1E4 (HP -3)
AREA: Work Room 11 E4
kiole
Tested By: Andy Eaden
Date: 6/4/2019
Traverse Data Points
N
O
5
Neudorfer Engineers, Inc.
23
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: HP1E5 (HP -3)
AREA: Work Room 11E5
Unit Data
Unit Manufacturer DAIKIN
Unit Model Number W.CCW.5.036.B.F.Y.L.S.04.YY
. A. C. Y. YY. Y. YYY. YYY. YYY
Unit Serial Number E029522300700
Unit Discharge Top Horizontal
Fan Rotation Counterclockwise
HP1E5 (HP-31/Filter
Filter Type
Filter Quantity - Size 1
Filter Dimensions - Size 1
Pleated
1
20x24x2
Test Data
Total Design Flow
Total Actual Flow
RA Design Flow
RA Actual Flow
OA Design Flow
OA Actual Flow
HP1E5 (HP-3)/Fart
Motor Volts T1-T2
Motor Amps 11
1200 CFM
1220 CFM
1140 CFM
1220 (1) CFM
60 CFM
150 (1)(2)(3) CFM
207 Volts
2.69 Amps
Log:
Tested By: Andy Eaden
Date: 6/4/2019
Motor Data
HP1E5 (HP-31/Fan
Drive Type Direct Drive
Motor Manufacturer Genteq
Motor HP 1/2 HP
Motor Rated Volts 120/208/240 Volts
Motor Phase 1
Motor Hertz 60 Hz
Motor FL Amps 7.7/5.0/4.3 Amps
Test Pressures
Actual Total SP
Fan Discharge SP
Fan Suction SP
Design Extemal SP
Actual Extemal SP
Filter DP Actual
Coil DP Actual
0.43 in. wc
0.05 in. wc
-0.38 in. wc
0.5 in. wc
0.06 in. wc
0.15 in. wc
0.22 in. wc
HP1E5 (HP -3)
HP1E5 (HP -3)
HP1E5 (HP -3)
6/4/2019 Andy Eaden (3) Per the mechanical prints , there was no volume
damper installed, to throttle down the airflow to
achieve the design outside air CFM.
6/4/2019 Andy Eaden (2) The actual outside air flow was obtained by a tot.
air round duct traverse. Refer to duct traverse shee
T-04, for further details.
6/4/2019 Andy Eaden (1) The retum air filter duct and the outside duct are
installed per plan, but the return air filter and the
outside air duct are both open to the plenum above
the ceiling grid.
HP1E5 (HP -3) Supply Outlet Summary
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size
LxW / D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Outlet -01
Work Room
11E5
Flowhood
CD -6
12" round
1
-
600
665
610
102
Outlet -02*
Work Room
11E5
Flowhood
CD -6
12" round
1
-
600
540
610
102
(1)
Totals:
-
-
-
-
-
1200
1205
1220
102
-
Log:
HP1E5 (HP-3)/Outlet-02
6/4/2019
Andy Eaden
(1 The volume damper is full open.
Neudorfer Engineers, Inc.
24
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
HP1 E5 (HP -3) Return Inlet Summary
DATE: 6/5/2019
CONTACT: Andy Eaden
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size LxW /
D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Inlet -01 *
Work Room
11E5
Velgrid
Duct
25 x 20
1
-
1140
1220
1220
107
(1)
Totals:
-
-
-
--
1140
122e
1220
107
-
Log:
HP1 E5 (HP-3)/Inlet-01
6/4/2019
Andy Eaden
(1) The retum air filter in et is open to the plenum.
Neudorfer Engineers, Inc.
25
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-04/Total outside air duct traverse
for HP1E5 (HP -3)
AREA: Work Room 11E5
Unit Data
Type of Traverse
Diameter
Insulation Width
Air Flow Area
Number Of Rows
Readings Per Row
Total Readings
Round
6 in.
0 in.
0.20 sq. ft.
2
10
20
Log:
Tested By: Andy Eaden
Date: 6/4/2019
Final Data
Sum of Readings
Average Reading
Design Total Flow
Actual Total Flow
Static Pressure
15047
752 FPM
60 CFM
150 CFM
0.02 in.
T-04/Total outside air duct traverse for 6/5/2019
HP1E5 (HP -3)
T-04/Total outside air duct traverse for 6/4/2019
HP1E5 (HP -3)
T-04/Total outside air duct traverse for 6/4/2019
HP1E5 (HP -3)
Andy Eaden
Andy Eaden
Andy Eaden
The outside duct is installed per plan, but the retum
air filter and the outside air duct are both open to the
plenum above the ceiling grid.
There is no volume damper installed, per the
mechanical print. To throttle down the air flow to
achieve the design CFM.
A Shortridge Multimeter with a Pitot Tube was used
to obtain velocity readings.
Neudorfer Engineers, Inc.
26
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-04ITotai outside air duct traverse
for HP1 E5 (HP -3)
AREA: Work Room 11E5
Hole 1
Tested By: Andy Eaden
Date: 6/4/2019
Traverse Data Points
0
766
713
78e
1760
813
852
855
805
843
827
6
A
m
Neudorfer Engineers, Inc.
27
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: HP1F2 (HP -6)
AREA: Work Room 11E2
Unit Data
Unit Manufacturer DAIKIN
Unit Model Number W.CCW.5.042.B.F.Y.L.S.04.YY
. A. C. Y. YY. Y. YYY. YYY. YYY
Unit Serial Number E029522300400
Unit Discharge Top Horizontal
Fan Rotation Counterclockwise
HPI F2 (HP-6)/Filter
Filter Type Pleated
Filter Quantity - Size 1 1
Filter Dimensions - Size 1 20x24x2
Test Data
Total Design Flow
Total Actual Flow
RA Design Flow
RA Actual Flow
OA Design Flow
OA Actual Flow
HP1F2 fHP-6)/Fan
Motor Volts T1-T2
Motor Amps T1
1400 CFM
1460 CFM
1340 CFM
1460 (1) CFM
60 CFM
130 (1)(2)(3) CFM
208 Volts
2.19 Amps
Log:
Tested By: Andy Eaden
Date: 6/5/2019
Motor Data
HP1F2 (HP-6)/Fan
Drive Type Direct Drive
Motor Manufacturer Genteq
Motor HP 3/4 HP
Motor Rated Volts 120/208/240 Volts
Motor Phase 1
Motor Hertz 60 Hz
Motor FL Amps 9.6/7.3/6.8 Amps
Test Pressures
Actual Total SP
Fan Discharge SP
Fan Suction SP
Design External SP
Actual External SP
Filter DP Actual
Coil DP Actual
0.45 in. wc
0.04 in. wc
-0.41 in. wc
0.5 in. wc
0.06 in. wc
0.15 in. wc
0.24 in. wc
HP1F2 (HP -6)
HP1F2 (HP -6)
HP1F2 (HP -6)
6/5/2019 Andy Eaden (3) Per the mechanical pnnts , there was no volume
damper installed, to throttle down the airflow to
achieve the design outside air CFM.
6/5/2019 Andy Eaden (2) The actual outside air flow was obtained by a tot,
air round duct traverse. Refer to duct traverse shee
T-05, for further details.
6/5/2019 Andy Eaden (1) The return air filter duct and the outside duct are
installed per plan, but the return air filter and the
outside air duct are both open to the plenum above
the ceiling grid.
HP1F2 (HP -6) Supply Outlet Summary
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size
LxW / D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Outlet -01
Work Room
11E2
Flowhood
CD -6
12" round
1
-
700
740
740
106
Outlet -02`
Work Room
11E2
Flowhood
CD -6
12" round
1
-
700
720
720
103
(1)
Totals:
-
-
-
-
-
1400
1460
1460
104
-
Log:
HP1F2 (HP-6)/Outlet-02
6/5/2019
Andy Eaden
(1) The volume damper is full open.
Neudorfer Engineers, Inc.
28
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
HP1F2 (HP -6) Return Inlet Summary
DATE: 6/5/2019
CONTACT: Andy Eaden
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size LxW /
D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Inlet -01*
Work Room
11E2
Velgrid
Duct
23 x 18
2.875
-
1340
1460
1460
109
(1)
Totals:
-
-
-
-
-
1340
1460
1460
109
-
Log:
HP1F2 (HP-6)/Inlet-01
6/5/2019
Andy Eaden
(1) The retum air filter inlet is open to the plenum.
Neudorfer Engineers, Inc.
29
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-05/Total outside air duct traverse
for HP1F2 (HP -6)
AREA: Work Room 11 E2
Unit Data
Type of Traverse
Diameter
Insulation Width
Air Flow Area
Number Of Rows
Readings Per Row
Total Readings
Round
6 in.
0 in.
0.20 sq. ft.
2
10
20
Log:
Tested By: Andy Eaden
Date: 6/5/2019
Final Data
Sum of Readings
Average Reading
Design Total Flow
Actual Total Flow
Static Pressure
12752
638 FPM
60 CFM
128 CFM
0.03 in.
T-05/Total outside air duct traverse for 6/5/2019
HP1F2 (HP -6)
T-05/Total outside air duct traverse for 6/5/2019
HP1F2 (HP -6)
T-05/Total outside air duct traverse for 6/5/2019
HP1F2 (HP -6)
Andy Eaden
Andy Eaden
Andy Eaden
The outside duct is installed per plan, but the retum
air filter and the outside air duct are both open to the
plenum above the ceiling grid.
There is no volume damper installed, per the
mechanical print. To throttle down the air flow to
achieve the design CFM.
A Shortridge Multimeter with a Pitot Tube was used
to obtain velocity readings.
Neudorfer Engineers, Inc.
30
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-05/Total outside air duct traverse
for HP1F2 (HP -6)
AREA: Work Room 11E2
Hole 1
Traverse Data Points
ev
a
Tested By: Andy Eaden
Date: 6/5/2019
337 1
an I
894
6
Neudorfer Engineers, Inc.
31
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: HP1F3 (HP -3)
AREA: Work Room 11E3
Unit Data
Unit Manufacturer
Unit Model Number
Unit Serial Number
Unit Discharge
Fan Rotation
HP1F3 (HP-3)/Fitter
Filter Type
Filter Quantity - Size 1
Filter Dimensions - Size 1
DAIKIN
W . C C W. 5.036. B. F. Y. L. S.04.YY
.A.C.Y.YY.Y.YYY.YYY.YYY
E029522300200
Top Horizontal
Counterclockwise
Pleated
1
20x24x2
Test Data
Total Design Flow
Total Actual Flow
RA Design Flow
RA Actual Flow
OA Design Flow
OA Actual Flow
HP1F3 (HP-3)/Fart
Motor Volts T1-T2
Motor Amps T1
1200 CFM
1180 CFM
1150 CFM
1180 (1) CFM
50 CFM
140 (1)(2)(3) CFM
209 Volts
2.6 Amps
Log:
Tested By: Andy Eaden
Date: 6/5/2019
Motor Data
HP1F3 IHP-3)/Fan
Drive Type
Motor Manufacturer
Motor HP
Motor Rated Volts
Motor Phase
Motor Hertz
Motor FL Amps
Direct Drive
Genteq
1/2 HP
120/208/240 Volts
1
60 Hz
7.7/5.0/4.3 Amps
Test Pressures
Actual Total SP
Fan Discharge SP
Fan Suction SP
Design External SP
Actual External SP
Filter DP Actual
Coil DP Actual
0.46 in. wc
0.06 in. wc
-0.40 in. wc
0.5 in. wc
0.11 in. we
0.12 in. wc
0.23 in. wc
HP1F3 (HP -3)
HP1F3 (HP -3)
HP1F3 (HP -3)
6/5/2019 Andy Eaden
6/5/2019 Andy Eaden
6/5/2019 Andy Eaden
(3) Per the mechanical prints , there was no volume
damper installed, to throttle down the airflow to
achieve the design outside air CFM.
(2) The actual outside air flow was obtained by a tot.
air round duct traverse. Refer to duct traverse shee
T-06, for further details.
(1) The return air filter duct and the outside duct are
installed per plan, but the return air filter and the
outside air duct are both open to the plenum above
the ceiling grid.
HP1F3 (HP -3) Supply Outlet Summary
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size
LxW / D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
Remarks
Outlet -01
Work Room
11E3
Flowhood
CD -6
12" round
1
-
600
635
590
98
• Outlet -02*
Work Room
11E3
Flowhood
CD -6
12" round
1
-
600
560
590
98
(1)
Totals:
-
-
-
-
-
1200
1195
1180
98
-
Log:
HP1F3 (HP-3)/Outlet-02
6/5/2019
Andy Eaden
(1) The volume damper is full open.
Neudorfer Engineers, Inc.
32
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
HP1F3 (HP -3) Return Inlet Summary
DATE: 6/5/2019
CONTACT: Andy Eaden
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size LxW /
D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Inlet -01 *
Work Room
11E3
Velgrid
Duct
20 x 24
3.33
-
1150
1180
1180
103
(1)
Totals:
-
-
-
-
-
1150
1180
1180
103
-
Log:
HP1F3 (HP-3)/Inlet-01
6/5/2019
Andy Eaden
(1) The return air filter inlet is open to the plenum.
Neudorfer Engineers, Inc.
33
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-06/Total outside air duct traverse
for HP1F3 (HP -3)
AREA: Work Room 11E3
Unit Data
Type of Traverse
Diameter
Insulation Width
Air Flow Area
Number Of Rows
Readings Per Row
Total Readings
Round
6 in.
0 in.
0.20 sq. ft.
2
10
20
Log:
Tested By: Andy Eaden
Date: 6/5/2019
Final Data
Sum of Readings
Average Reading
Design Total Flow
Actual Total Flow
Static Pressure
14043
702 FPM
50 CFM
140 CFM
0.02 in.
T-06/Total outside air duct traverse for 6/5/2019
HP1F3 (HP -3)
T-06/Total outside air duct traverse for 6/5/2019
HP1F3 (HP -3)
T-06/Total outside air duct traverse for 6/5/2019
HP1F3 (HP -3)
Andy Eaden
Andy Eaden
Andy Eaden
The outside duct is installed per plan, but the return
air filter and the outside air duct are both open to the
plenum above the ceiling grid.
There is no volume damper installed, per the
mechanical print. To throttle down the air flow to
achieve the design CFM.
A Shortridge Multimeter with a Pitot Tube was used
to obtain velocity readings.
Neudorfer Engineers, Inc.
34
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-06/Total outside air duct traverse
for HP1F3 (HP -3)
AREA: Work Room 11E3
Traverse Data Points
Tested By: Andy Eaden
Date: 6/5/2019
6
A
tO
Neudonfer Engineers, Inc.
35
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: HP1F5 (HP -3)
AREA: Work Room 12E5
Unit Data
Unit Manufacturer DAIKIN
Unit Model Number W.CCW.5.036.B.F.Y.L.S.04.YY
. A. C. Y. YY. Y. YYY. YYY. YYY
Unit Serial Number E029522300600
Unit Discharge Top Horizontal
Fan Rotation Counterclockwise
HP1F5 (HP-3)/Filter
Filter Type
Filter Quantity - Size 1
Filter Dimensions - Size 1
Pleated
1
20x24x2
Test Data
Total Design Flow
Total Actual Flow
RA Design Flow
RA Actual Flow
OA Design Flow
OA Actual Flow
HP1F5 (HP-3)/Fan
Motor Volts T1-T2
Motor Amps T1
1200 CFM
1215 CFM
1160 CFM
1215 (1) CFM
40 CFM
105 (1)(2)(3) CFM
208 Volts
2.6 Amps
Log:
Tested By: Andy Eaden
Date: 6/5/2019
Motor Data
}IPIF5 (HP-31/Fan
Drive Type Direct Drive
Motor Manufacturer Genteq
Motor HP 1/2 HP
Motor Rated Volts 120/208/240 Volts
Motor Phase 1
Motor Hertz 60 Hz
Motor FL Amps 7.7/5.0/4.3 Amps
Test Pressures
Actual Total SP
Fan Discharge SP
Fan Suction SP
Design External SP
Actual External SP
Filter DP Actual
Coil DP Actual
0.43 in. wc
0.04 in. wc
-0.39 in. wc
0.5 in. wc
0.06 in. wc
0.15 in. wc
0.22 in. wc
HP1F5 (HP -3)
HP1F5 (HP -3)
HP1F5 (HP -3)
6/5/2019 Andy Eaden (3) Per the mechanical prints , there was no volume
damper installed, to throttle down the airflow to
achieve the design outside air CFM.
6/5/2019 Andy Eaden (2) The actual outside air flow was obtained by a tot,
air round duct traverse. Refer to duct traverse shee
T-07, for further details.
6/5/2019 Andy Eaden (1) The retum air filter duct and the outside duct are
installed per plan, but the return air filter and the
outside air duct are both open to the plenum above
the ceiling grid.
HP1F5 (HP -3) Supply Outlet Summary
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size
LxW / D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Outlet -01
Work Room
12E5
Flowhood
CD -6
12" round
1
-
600
630
610
102
Outlet -02*
Work Room
12E5
Flowhood
CD -6
12" round
1
-
600
580
605
101
(1)
Totals:
-
-
-
-
-
1200
1210
1215
101
-
Log:
HP1F5 (HP-3)/Outlet-02
6/5/2019
Andy Eaden
(1 The volume damper is full open.
Neudorfer Engineers, Inc.
36
Heat Pump
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
HP1 F5 (HP -3) Return Inlet Summary
DATE: 6/5/2019
CONTACT: Andy Eaden
System/Unit
Area Served
Type of
Reading
Outlet
Type
Size UN!!
D
AK
Design
Velocity
Design
Value
Prelim
Reading
Final
Reading
Final
%
Remarks
Inlet -01*
Work Room
12E5
Velgrid
Duct
20 x 25
3.47
-
1160
1215
1215
105
(1)
Totals:
-
-
-
-
-
1160
1215
1215
105
-
Log:
HP1F5 (NP-3)/Inlet-01
6/5/2019
Andy Eaden
(1) The retum air filter inlet is open to the plenum.
Neudorfer Engineers, Inc.
37
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-07/Total outside air duct traverse
for HP1F5 (HP -3)
Unit Data
Type of Traverse
Diameter
Insulation Width
Air Flow Area
Number Of Rows
Readings Per Row
Total Readings
Round
6 in.
0 in.
0.20 sq.ft.
2
10
20
Log:
Tested By: Andy Eaden
Date: 6/5/2019
Final Data
Sum of Readings
Average Reading
Design Total Flow
Actual Total Flow
Static Pressure
10374
519 FPM
40 CFM
104 CFM
0.01 in.
T-07/Total outside air duct traverse for 6/5/2019
HP1F5 (HP -3)
T-07/Total outside air duct traverse for 6/5/2019
HP1F5 (HP -3)
T-07/Total outside air duct traverse for 6/5/2019
HP1F5 (HP -3)
Andy Eaden
Andy Eaden
Andy Eaden
The outside duct is installed per plan, but the return
air filter and the outside air duct are both open to the
plenum above the ceiling grid.
There is no volume damper installed, per the
mechanical print. To throttle down the air flow to
achieve the design CFM.
A Shortridge Multimeter with a Pitot Tube was used
to obtain velocity readings.
Neudorfer Engineers, Inc.
38
Neudorferngiri fs n
Consulting Engineers Seatle Portland
www,Hei boder€4
Duct Traverse
PROJECT: Boeing BIdg.9-08.1 T.I.
LOCATION: TUKWILA, WA
PROJECT #: 2019-0195
DATE: 6/5/2019
CONTACT: Andy Eaden
SYSTEM/UNIT: T-07/Total outside air duct traverse
for HP1F5 (HP -3)
Hole 1
Tested By: Andy Eaden
Date: 6/5/2019
Traverse Data Points
M
d
G
trt
Neudorfer Engineers, Inc.
39
8¢01 9011/W !xlf M1
W =
W zCC oo
r
w
O QQZ
O
Lu
Z
1-- OOU)
Q W Q 5
Lij>�
1;7;-
zw
00 0
9 ti F-
0) CO CD
SCOPE OF WORK
GENERAL NOTES
8
g
A
g
z
O
cccp
N
co Z o
O
O W
ec ca
O 0
O
CODE SUMMARY
y4
ei
Q
.45
COVER SHEET
Eg
a
g
,,6 oGLL �� §N ale ew,s' x ,, g<
2g§ff `�� ��,,F2 a �x,S Fi g 2�b6 Vo
Poi R22-2RE,5"' MOT 8 MIHN
AREA MAP
_
I—
o
z
N¢ O
CC za
CD
CC
Z g
0
NO.
O Olik
.
, c , V*:* liCD
9� ill 1.--
-
Z
O 4
Z
O
Uw
O
_.,m
a_
Q..
E//
L
8L/
00.
yy,�
Z.
QA
b�
3
tl
5 a
$
4
lia
U
z
o
CD
ow.��
88 •
8-5
,Y
n
,Lythge‘` �..�
. .o „ iiiii,i,,Ilr4
v
8
6
SSUE LEGEND
•
a
g
II'
.
INDEX OF DRAWINGS
a
ai m
olo
o�oo
me m
oggo
mem
opo
m
000
TAT
jo
olo
m-
m
o$o---
--
----
MECHANICAL
-
EQUIPMENT SCHEDULES
HVAC SECURITY DETAILS
.11IIIIII
N
Fs oIgI
o
ARCHITECTURAL
GENERAL DESIGN NOTES
- _
CD PODIA CONSTRUCTION DETAILS
EXITING PLAN
FLOW PLAN - REMOVAL
FLOOR PLAN
i
S+o
S ii,',„pi
REFLECTED CEILING PLAN - REMOVAL
REFLECTED CEILING PLAN ilI
SCHECULES
INTERIOR ELEVATIONS_
INTERIOR ELEVATIONS
INTER I OR ELEVATIONS
MISC. SECTIONS AND DETAILS _
MISC. SECTIONS AND DETAILS
--
oo
ES
ELECTRICAL
PAGING
FLOOR LIGHTING PLAN
208Y/120V POWER PLAN
480Y/277V POMP PLAN FIRST FLOOR
FIRST FLOOR FIRE ALARM SYSTEM
TIRE DETECTION 8 ALARM SYSTEM EQUIPMENT 8 WIRING LAYOUT
FIRE DETECTION 8 ALARM SYSTEM EQUIPMENT & WIRING LAYWT
TELEPHONE FIRST FLOOR
L.W SYSTEMS - FIRST FLOOR
3c
ad
SIGNAL REFERENCE GRID FIRST FLOOR
FIRST FLOOR LIGHTING PLAN
FLOOR LIGHTING PLAN
[FIRST FLOOR FIRE ALARM SYSTEM
FIRE DETECTION 8 ALARM SYSTEM EQUIPMENT A WIRING LAYOUT
FIRE DETECTION 8 ALARM SYSTEM EQUIPMENT 8 WIRING LAYDUT
TELEPHONE FIRST FLOOR
LAN SYSTEMS - FIRST FLOOR
LIGHTING CONTROL WIRING DIAGRAMS
LOW VOLTAGE LIGHTING CONTROL SCHEDULE - FIRST FLOOR
LIGHTING SCHEDULE AND DETAILS
INSTALLATION DETAILS
SHIELDING & TEMPEST RWM REQUIREMENTS
SHIELDING 8 TEMPEST RWM REQUIREMENTS
SHIELDING & TEMPEST RON REQUIREMENTS
LIGHTING CONTROL WIRING
X
34g�gSS
W1
g
ww
•.•1..I.1..••IWI)
�
,,-WW'-
offip
-2,ow
=
wwwWwR
gE
•l••1.•••..•I•.....•••••••.••.•••...•
I
r9-08-IE265R _
9-08-IE36GR
9-08-IE410R
Q 9-08-IE110
0 9-08-IE260
• 9-08-1E264_
I•I 9-08-E527
• 9-08-E528
INDEX OF DRAWINGS
mlmmlmmmmmmmm
SIE1
clo oiooloofoeoeoecH.;Ol000
000cmig.°0000�coo188g122
mlmmmmmmmmm
CJVmm
;mm
MECHANICAL
11110l11=
EQUIPMENT SCHEDULES
HVAC SECURITY DETAILS
.
.11IIIIII
N
Fs oIgI
o
ARCHITECTURAL
GENERAL DESIGN NOTES
- _
CD PODIA CONSTRUCTION DETAILS
EXITING PLAN
FLOW PLAN - REMOVAL
FLOOR PLAN
i
S+o
S ii,',„pi
REFLECTED CEILING PLAN - REMOVAL
REFLECTED CEILING PLAN ilI
SCHECULES
INTERIOR ELEVATIONS_
INTERIOR ELEVATIONS
INTER I OR ELEVATIONS
MISC. SECTIONS AND DETAILS _
MISC. SECTIONS AND DETAILS
--
oo
9-08-A372 • -�
9-08-A373
9-08-A374
9-08-A505 _�
E
•.•1..I.1..••IWI)
•••1•.1...••
1 I
INDEX OF DRAWINGS
222E2222,
il
CJVmm
;mm
MECHANICAL
HVAC PLAN
_HVAC PLAN _ _ .. _. _
FIRST FLOOR PIPING PLAN
FIRST FLOOR PIPING PLAN
EQUIPMENT SCHEDULES
HVAC SECURITY DETAILS
HVAC DETAILS
FIRE PROTECTION IST FLOOR PLAN
FIRE PROTECTION 15T FLOOR PLAN
N
Fs oIgI
g=2
INCLUDED
IN SET
1 DRAWING NO.
i
S+o
S ii,',„pi
9-08-IM2605
9-08-IM280
tr
s
g
r
1
SHEET INDEX
os
58
7 M
A
01
a
Ild In L 02/9 /B .urea IIS
2 a
28 1
V��
k
Ail
e
11 1
N @II;e.g
1
1 ng 93$
i 4 5 1 i h liti 1 ;Ii.
1
1
A
Z
0
0 Co1
I— w
Z
o
O w
U W
ce
0 0 LL
O o
0
2)
co
cn
ohs
o
1 ssg b
1
O
b'P
II
&5
q @ 1����Yb��
4b 1 'a;;;;i4/Q/ 1 eW8 &iiiliv 1 if Ear..A
S
8
1
GENERAL DESIGN NOTES
is
G
0
4
8
NMI. MRS µow
a %
l;
8
;
A$
2k
;
i
:
c
s
s
a
a
sr.
1
1
A
Z
0
0 Co1
I— w
Z
o
O w
U W
ce
0 0 LL
O o
0
2)
co
cn
ohs
o
1 ssg b
1
O
b'P
II
&5
q @ 1����Yb��
4b 1 'a;;;;i4/Q/ 1 eW8 &iiiliv 1 if Ear..A
S
8
1
GENERAL DESIGN NOTES
is
G
0
4
8
0: OI/21 t OI/I
14
a 2
s
3
ffi
_ N
i3
PA ETA
•�
a
U
Lg
r
al o
d
tl
m
HEAT PUMP (HP) SCHEDULE C
C 0
E 3
X
ibxixxxx=ixi.'
x8a,
MEtxxxxxal=xxxxx liTtxxxxxxxxxiixxxxxxx
r
8 _
.,
LECTRK
RTUS CORE 8F
TITUS CORE 23
TITUS CORE 97
TITUS CORE 23
.o,
5
_rerm.rlm3
.,
R
$i$
R
5
8
o
n m
r
8 0
r
3 r
ah o
a
$ 0
0
$
- i
o s
o
F.,
v
8 v
IMG PERFORMANCE
HEAT ABSORBED
MBH
12.2
r
B r
o
0
EEEEEME
e
3
s 53
.o
.:.,
8, 8—.
R.
33013.=13"9,8
o
4�
g
_
_
OGLING PE
SENSIBLE
MBH
11.3
2 8
m _
m
.. m
m m
8
m
m
m 2
s
N
-P=
8 -
8
_
5 _
r
�
X
5
5555
3,3
2
22
r
n
n
• .,
.,
F3 5
Vi
N,00,000,100,000,0000,0,000,90
WATER FU
MAK. PRESS. DROP
CONDENSER 1T. WG
04
W
a g
'I
r SCUARE CEILING DIFFUSER
SQUARE CEILING DIFFUSER
SQUARE CEILING DIFFUSER
SQUARE CEILING DIFFUSER
SQUARE CEILING DIFFUSER
SQUARE CEILING DIFFUSER
S�(IIARE CEILING
- 0
6 0
0
PECIAL DET
FACE VEL
FPM
EON
#
r
EXHAUST GRILL
EXHAUST GRILL
89
8
6500661E 1660057 GRILLE
ECGCRATE EXHUAST GRILLE 1
i
8888'>�
>e
W PERFORMA
EMW. STATIC I. W .
0.6
8
8
2w
3w
ww
W.
xx
;
T_
C 0
HEAT PUMP ID NUMBERS
HPI I HP2 HP3 1 HP4 I HP5
KRUEGER 6404123
KRUEGER 6404123
ibxixxxx=ixi.'
x8a,
MEtxxxxxal=xxxxx liTtxxxxxxxxxiixxxxxxx
rxxxxxxxxxxxxxxxxxxxxx
x xxzxxxxxx xa$xsxrxxxx xxx xxxxxxxxxxxxxx
xxixxxxxxxxxx44xxxtxxxxxx2xx¢ixxxxxxxxzxxx.
xxxmi��xxxxxxxxx�.�xxxxx w,lai n,NH
xxxxx,1x4xxxxxxxxx .xxx' 'xxx fxx
Hxzi$raiiiicnxxx:xxxilitxxtialiilii
�ammmmm��sso��a«¢m��s4c��a<mm��44�4���m
xxx=xxxxxxxxxxxxxxxxxxxxxxxx=4i=ki ___i__i
8
�3 0
Z CN N�II, in
AIR DIFFUSER / REGISTER / GRILL SCHEDULE
x
KRUEGER 6404123
KRUEGER 6404123
KRUEGER 6404123
KRUEGER 6404123
KRUEGER 6404123
r TITUSTMS
��
1=
g /
KRUEGER EGC-1557
KRUEGER 6590123
KRUEGER 6590123
KRUEGER 6590E23
TITUS SERIES 270
TITUS SERIES 270
_r c _
RTUS CORE 8F
TITUS CORE 23
TITUS CORE 97
TITUS CORE 23
.o,
5
_rerm.rlm3
.,
9 9
3 3
mr
oa-
E8
m 8
.,
n m
r
8 0
r
3 r
_ r�
.FL1
_n
_)
53 o
R r
3.4
0!153
1.
8 §
8
_ 8
R e_
§ 8
= 8
o
0
EEEEEME
36
36
-,
<" <0.;
.:.,
8, 8—.
R.
33013.=13"9,8
o
4�
g
_
_
2 8
m _
_
VI'
.i,:` c'-''
r7,
7,. "
2 2
,7,
:Is .7
7 5
5 _
r
�
X
5
5555
3,3
3 5
5 5
5 5
5 3x
5 5
5 3
3 5
F3 5
Vi
N,00,000,100,000,0000,0,000,90
'I
r SCUARE CEILING DIFFUSER
SQUARE CEILING DIFFUSER
SQUARE CEILING DIFFUSER
SQUARE CEILING DIFFUSER
SQUARE CEILING DIFFUSER
SQUARE CEILING DIFFUSER
S�(IIARE CEILING
DIFFUSER
ECG CRATE CEILING RETURN GRILL
ECG CRATE CEILING SUPPLY GRILL
PERFORATED CEILING SUPPLY GRILL
PERFORATED CEILING SUPPLY GRILL
PERFORATED CEILING SUPPLY GRILL
SUPPLY GRILL
SUPPLY GRILL
SUPPLY GRILL
SUPPLY GRILL
EXHAUST GRILL
EXHAUST GRILL
EXHAUST GRILL
EXHAUST GRILL
89
8
6500661E 1660057 GRILLE
ECGCRATE EXHUAST GRILLE 1
i
8888'>�
>e
8 888
8
8
2w
3w
ww
W.
SOUND ATTENUATOR (SA) SCHEDULE
x
t
t
IAC TYPE S
IAC TWE S
1 IAC TWE S
IAC TWE S
8,10 ,
_ _•
_ _
_r c _
1.3.33
3333
CI3
.,
9 9
3 3
mr
oa-
E8
., 9
., 9
3 r
MINIMUM REWIRED 60001
pAF 6 01
nNc � I
♦1000 7 12 16
§ 8
§ s
s s
-5
EEEEEME
8
EQUIPMENT SCHEDULES
BOSS LAB PACKAGE 6 - 9-06.0 71
co
4
Os.
s.
Z
5
o
c.
5
3
3
5
8
5
g
3
5
R
6
2
8
5
8
411 Neudorfer Engineers. Inc.
C on*uUtng tr+garworg Sao IiN Portland
Instrument Calibrations
Instrument Type
Air Data Meter with Flowhood
Instrument Manufacturer
Shortridge
Instrument Model Number
ADM 860
Instrument Serial #
M92595
Calibration Due Date
2/6/2020
Instrument Type
Tachometer
Instrument Manufacturer
Shimpo
Instrument Model Number
DT-205LR
Instrument Serial #
D1520236R
Calibration Due Date
11/08/2019
Instrument Type
Amp Probe
Instrument Manufacturer
Fluke
Instrument Model Number
324
Instrument Serial #
28680012WS
Calibration Due Date
11/08/2019
Instrument Type
Temperature Probe
Instrument Manufacturer
Shortridge
Instrument Model Number
ADM 860
Instrument Serial #
M92595
Calibration Due Date
2/6/2020
Instrument Type
Air Foil
Instrument Manufacturer
Shortridge
Instrument Model Number
ADM 860
Instrument Serial #
M92595
Calibration Due Date
2/6/2020
Instrument Type
Hydrometer
Instrument Manufacturer
Shortridge
Instrument Model Number
HDM-250
Instrument Serial #
W11007
Calibration Due Date
10/25/2019
46
/ t
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: M18-0154 DATE: 11/26/18
PROJECT NAME: BOEING #9-08
SITE ADDRESS: 9725 E MARGINAL WAY S
X Original Plan Submittal
Response to Correction Letter #
Revision # before Permit Issued
Revision # after Permit Issued
DEPARTMENTS:
ArT- kL l�-Z7•1
Building Division
Public Works
n
Ayfr
Fire Prevention Planning Division n
Structural
nPermit Coordinator
PRELIMINARY REVIEW:
Not Applicable n
(no approval/review required)
DATE: 11/27/18
Structural Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved
Corrections Required n Denied
(ie: Zoning Issues)
Approved with Conditions
(corrections entered in Reviews)
DUE DATE: 12/25/18
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire 0 Ping ❑ PW 0 Staff Initials:
12/18/2013
HOLADAY PARKS INC
Washington State Department of
Labor & Industries
Hoene Espanol Contact
Safety & Health Claims & Insurance
Page 1 of 3
Search L&I
A -Z Index 1 tele My 1.2t1
Workplace Rights Trades & Licensing
HOLADAY PARKS INC
Owner or tradesperson
Principals
BECK, DAVID CARL, PRESIDENT
CONNELL, DANIEL A, PRESIDENT
GIRI, BIJIT, PRESIDENT
PIZZEY, GRACE K, VICE PRESIDENT
FREEL, JERRY LEE, VICE PRESIDENT
PARKS, GERALD T JR, PRESIDENT
(End: 08/12/2015)
NAILON, JUNE ANNETTE, VICE PRESIDENT
(End: 08/12/2015)
O'CONNOR, BONNY K, SECRETARY
(End: 08/12/2015)
BECK, DAVID CLARENCE, TREASURER
(End: 08/12/2015)
VAN DER VEEN, ERIC M, VICE PRESIDENT
(End: 08/14/2013)
PIZZEY, GRACE KATHERINE, VICE
PRESIDENT
(End: 08/14/2013)
VAN DER VEEN, JULIE
ELIZABETH, MEMBER
(End: 08/14/2013)
CONNELL, DANIEL AARON, MEMBER
(End: 08/14/2013)
GIRI, BUIT, MEMBER
(End: 08/14/2013)
KIEL, RINALD HOWARD, MEMBER
(End: 08/14/2013)
WHITMYRE, CHRISTIAN, MEMBER
(End: 08/14/2013)
NELSON, MICHAEL, SECRETARY
(End: 11/04/2010)
PARKS, DAVID L, TREASURER
(End: 11/04/2010)
TALBOT, PAUL, TREASURER
(End: 11/04/2010)
Doing business as
HOLADAY PARKS INC
4600 S 134TH PL
SEATTLE, WA 98168
206-248-9700
KING County
WA UBI No. Business type
578 004 089 Corporation
Help us improve
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 12/4/2018
HOLADAY PARKS INC
Governing persons
DAVID
BECK
DAN CONNELL;
JERRY FREEL;
BIJIT GIRI;
GRACE PIZZEY;
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor Active.
Meets current requirements.
License specialties
GENERAL
License no.
HOLADPI379NO
Effective — expiration
01/21/1983— 09/03/2019
Bond
LIBERTY MUTUAL INS CO
Bond account no.
23000452
$12,000.00
Received by L&I Effective date
08/23/2002 09/01/2002
Expiration date
Until Canceled
Insurance
Phoenix Insurance Company, The
Policy no.
DTCO1 F465357PHX18
$1,000,000.00
Received by L&I Effective date
10/30/2018 11/01/2018
Expration date
11/01/2019
Insurance history
Savings
No savings accounts during the previous 6 year period.
Lawsuits against the bond or savings
No lawsuits against the bond or savings accounts during the previous 6 year period.
L&I Tax debts
No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts
may be recorded by other agencies.
License Violations
No license violations during the previous 6 year period.
Workers' comp
Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums.
L&I Account ID
177,231-00
Doing business as
HOLADAY PARKS INC
Estimated workers reported
Quarter 3 of Year 2018 "Greater than 100 Workers"
L&I account contact
T4 / CASSANDRA SMITH (360)902-5632 - Email: SMCA235@lni.wa.gov
Account is current.
Public Works Strikes and Debarments
Verify the contractor is eligible to perform work on public works projects.
Contractor Strikes
No strikes have been issued against this contractor.
Page 2 of 3
Help us improve
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 12/4/2018
HOLADAY PARKS INC
Contractors not allowed to bid ,. �
No debarments have been issued against this contractor.
Workplace safety and health
Check for any past safety and health violations found on jobsites this business was responsible for.
Inspection results date
09/22/2016 No violations
Inspection no.
317940948
Location
1007 Stewart St
Seattle, WA 98101
Inspection results date
08/09/2016
Inspection no.
317940177
Location
1011 Western Ave, Suite 1000
Seattle, WA 98104
Inspection results date
05/05/2016
Inspection no.
317940156
Location
4600 S 134th PI
Tukwila, WA 98168
Inspection results date
06/11/2014
Inspection no.
317319382
Location
1011 Dexter Ave
Seattle, WA 98102
Inspection results date
05/08/2014
Inspection no.
317278497
Location
2nd and 110th Ave
Bellevue, WA 98004
No violations
No violations
No violations
No violations
Page 3 of 3