Loading...
HomeMy WebLinkAboutPermit M18-0154 - BOEING #9-08 - HEAT PUMPS REPLACEMENTBOEING #9-08 9725 E MARGINAL WAY S BLDG 9-008 M18-0154 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 5624201032 Permit Number: M18-0154 9725 E MARGINAL WAY S BLDG 9-008 Issue Date: 12/4/2018 Permit Expires On: 6/2/2019 Project Name: BOEING #9-08 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: BOEING COMPANY THE PO BOX 3707 M/C 20-59 PROPERTY TAX DEPT, SEATTLE, WA, 98124 CONNIE HARDIN 4600 S 134 PL , SEATTLE, WA, 98168 HOLADAY PARKS 4600 S 134TH PL, SEATTLE, WA, 98168 Phone: (206) 250-4530 Phone: (206) 520-4530 Expiration Date: DESCRIPTION OF WORK: REPLACING 8 HEAT PUMPS. ASSOCIATED DUCT AND PIPE LINE CHANGES Valuation of Work: $150,000.00 Type of Work: REPLACEMENT Fuel type: Fees Collected: $2,064.91 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Date: `'� —1-4g I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or locs regulating construction or the performance of work. I am authorized to sign and obtain this developm� _ 1 i :re' td the condjtions attached to this permit. / �6/ Signature: �'� Date:! C1//g--- ! Print Name: D�Y�✓1 t k-TGt.c C� This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: ***MECHANICAL PERMIT CONDITIONS*** 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL "i10IfpJ CITY OF TUKV.. LA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. M 1 V — 0 (S 2-f Project No. Date Application Accepted: Date Application Expires: (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION &etr‘i "��V� • V King Co Assessor's Tax No.:$ 2 W 10322., Site Address 72S Z' �, ��r� Tenant Name?Ine1 ti,e PROPERTY OWNER Name: Q i7;:;)7 • t Address• rx u c �o -afl City: ea tt State; ,A ztur N CONTACT PERSON — person communication receiving all project Address: LA k_Dt) s t .3 4 pJCity Name: f _ I"l a i;, Contr Reg No.: 601,3 _off„E 3Date: at/olk KJ Address CityditEt.y State:00L Ziytt G / Phone:W I0 4r30 Fax: le 2 of r�7 0 Email: mom it. h e, o& narks. CD 1 Suite Number: Floor: New Tenant: ❑ Yes �No MECHANICAL CONTRACTOR INFORMATION Company Name: I4 IP--k etrs Address: LA k_Dt) s t .3 4 pJCity State: L'1 ot Zily+ki 6s/ PhoneU4 254?, Fax Farb 24& t760 Contr Reg No.: 601,3 _off„E 3Date: at/olk KJ Tukwila Business License No.: Valuation of project (contractor's bid price): $ \ S (7))7.) ? �.eS pis • (ssocA..c ze;Q Describe the scope of work in detail I eft Use: Residential: New ❑ Commercial: New Fuel Type: Electric ❑ Gas Replacement Replacement Other: H:\Applications\Fmns-Applications On Line 2016 Applications\Mechanical Permit Application Revised I-4-16.doc,c Revised: January 2016 bh Page 1 of 2 l Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Residential, Nighttime Furnace >100k btu Industrial Floor furnace 55 dB(A) Suspended/wall/floor mounted heater 57 dB(A) Appliance vent Commercial Repair or addition to heat/refrig/cooling system 47 dB(A) Air handling unit 65 dB(A) <10,000 cfm 60 dB(A) Unit Type Qty Air handling unit Residential, Nighttime >10,000 cfin Industrial Evaporator cooler 55 dB(A) Ventilation fan connected to single duct 57 dB(A) Ventilation system Commercial Hood and duct 47 dB(A) Incinerator — domestic 65 dB(A) Incinerator — comm/industrial 60 dB(A) i Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment hedd' Aoros Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 *Daytim District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (7am-10pm); • Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDIN !j R c c T O ZED AG 'y T: Signature: . -� • Date: 11 I ZGell Print Name: IA.K tis 'lam cur- A Oft Day Telephone: lb& 2SD ti S 30 Mailing Address: LI loop E tSt444‘ Q,Q 11:\Applications\Fortes-Applications On Line \2016 Applications\Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh _04.7:ctil_ 48,t Lk City State Zip Page 2 of 2 DESCRIPTIONS ACCOUNT QUANTITY PAID $2,064.91 PermitTRAK M18-0154 Address: 9725 E MARGINAL WAY S BLDG 9-008 Apn: 5624201032 $2,064.91 Credit Card Fee $60.14 Credit Card Fee R000.369.908.00.00 0.00 $60.14 MECHANICAL $1,927.66 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $1,508.98 PLAN CHECK FEE R000.322.102.00.00 0.00 $385.53 TECHNOLOGY FEE $77.11 TOTAL FEES.PAID TECHNOLOGY FEE BY. RECEIPT: R15894 R000.322.900.04.00 0.00 $77.11 $2,064.91 Date Paid: Monday, November 26, 2018 Paid By: CONNIE HARDIN Pay Method: CREDIT CARD 07044G Printed: Monday, November 26, 2018 1:28 PM 1 of 1 SYSTEMS CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA Date: 11/26/2018 01:28:21 PM CREDIT CARD SALE VISA CARD NUMBER: TRAN AMOUNT: APPROVAL CD: RECORD 4: CLERK ID: **********1947 $2,064.91 07044G 000 Bill Thank you! Customer Copy K Page 2 of 2 https://classic.convergepay.comNirtualMerchant/transaction.do?dispatchMethod=printTr... 11/26/2018 INSPECTION NO. INSPECTION RECORD Retain a copy with permit olsq PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 Permit Inspection Request Line (206) 438-9350 Project: 9 Zccitilo g-00 Type of Inspection: _ 11�lrz 4.„44._ -rte Address:Date t, I,c� 1776 g I 'Agina.aa, f Called: .S Special Instructions: /00°00 j o me ate Wanted: is r 01-t,01 p.m. Requester: T +h, Phone No:m' 9J b304 Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: 8 m0i- P'�.."s/chif-icede_er..7L ffiee(Ace"(C.A, Date, -19 -17 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 n46 otsq Project: 6 q-Og? Type of Inspection: ptPE, (ltii it-Siritr Addre s: 1745 5- rvlv,4 w,4! Date Called: Special Instructions: Ct..cre,V 0 ® A.K. ate Wanted:Iy, 7J•—(al p.m. Requester: Phone No: ppproved per applicable codes. OMMENTS: ElCorrections required prior to approval. n('.eciek.alet c u Inspector: O 0 ( 1 Date: $-�,5 ,ZO REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Soul, enter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit Ali) OS -4 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: 3oEr,J4 9 --,oe Type of Inspecti n: peg" b✓cT /,.4s 41.1 Address: Date Called: Special Instructions: 'F 1-Qe7 / D ate Wanted:::.. +�/ t 1 Requester: " Phone No: z z4O 3Lt r) Approved per applicable codes. Corrections required prior to approval. COMMENTS: ' iFE /�J� ?—fen,s,), To ins tic G,Ce -a r-tc_ 14 l b /rs1V/ n. L Sc e rS.vti Inspector. 15 Date: z 201 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. NEUDORFER ENGINEERS INC. TEST, ADJUST & BALANCE BALANCE REPORT Boeing Building 9-08.1 Tenant Improvement Tukwila, Washington 2019-0195 Project Completion Date: 06/05/19 Revision Date: Revision Number: WILLIAM C. NEUDORFER CERTIFICATION \ 2465 Exp. 3/31/21 5516 18 Ave S Seattle, WA 98108 Phone (206) 621-1810 Fax (206) 343-9820 R`CEI ED CITY OF TUKV IL -i PERiViIT CENTER 2501 SE Columbia Way, Ste. #230 Vancouver, WA 98661 Phone (503) 235-8924 Fax (503) 235-8925 PROJECT LOCATION Boeing Building 9-08.1, T.I. Tukwila, WA TABLE OF CONTENTS Cover Report Title 3 Certification 4 Warranty 5 Terms of Abbreviations 6-7 Executive Summary 8-10 Heat Pumps w/ Duct Traverses HP1D4 (HP -5) 11-14 HP1 E2 (HP -4) & HP1 E2 (HP -4) 15-19 HP1 E4 (HP -3) 20-23 HP1 E5 (HP -3) 24-27 HP1 F2 (HP -6) 28-31 HP1 F3 (HP -3) 32-35 HP1 F5 (HP -3) 36-39 TAB Drawings 40-45 Instrument Calibration 46 2 Report Title CERTIFIED TEST: BALANCE REPORT Project: Boeing Building 9-08.1 Tenant Improvement Tukwila, Washington NEI Job#: 2019-0195 Engineer: FSI Consulting Engineers Contractor: Holaday Parks TAB Firm: Neudorfer Engineers Inc 5516 1st Avenue South Seattle, WA 98108 Test Engineer: Andy Eaden / C Architect: -- (keT 'nee 5516 rt Ave S Seattle, WA 98108 Phone (206) 621-1810 Fax (206) 343-9820 3 WILLIAM C. Nii::JDORFER CERTIFI::;ATnoN 24(55 Exp. 3/31/21 roni��y�\c, 2501 SE Columbia Way, Ste. #230 Vancouver, WA 98661 Phone (503) 235-8924 Fax (503) 235-8925 CERTIFICATION The data presented in this report is a record of system measurements and final adjustments that have been obtained in accordance with the current edition of the NEBB Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems. Any variances from design quantities which exceed NEBB tolerances are noted in the Test -Adjust -Balance Report Project Summary. Significant / Noteworthy Remarks are noted on the General Remarks and General Field Notes pages. Other remarks are noted on individual test sheets. Noted deficiencies are not Neudorfer Engineers responsibility to repair. Prior to issuance of this report, Deficiency Reports are forwarded to our contracted agent. Warranty is limited to one year from the date of substantial completion. Within that time, any discrepancies, ambiguities, or omissions found in this report will be retested, adjusted, or balanced as needed. A written notification will be required. Submitted and Certified by: NEBB TAB Firm: Neudorfer Engineers Inc Certification No: 2465 Expiration Date: March 31, 2021 Certification Date: June 5, 2019 (Date completed) Signed and Sealed by: NEBB Supervisor: William C. Neudorfer 4 WILLIAM C. Na.X10RFER CERTIF!GATlJW 2465 Exp. 3 3t/2S h nrnnic �e ti Warranty Project: Boeing Building 9-08.1 Warranty of Services: Neudorfer Engineers, Inc. warrants that the air balancing, evaluated during this performance evaluation are operating at the specified levels as documented within this report. At and only this time, and makes no other warranties, stated or implied, concerning the continued performance, operation or safety in the use of this equipment past this time. Neudorfer Engineers warrants the air and hydronic balancing for 1 year from the date of substantial completion. Neudorfer Engineers reserves the right to correct errors or omissions in the collections of data. Warranty Procedures: For all warranty items, Neudorfer Engineers requires written request. The written request should be specific on the areas of concern, such rooms, or equipment, and the type of issue the occupants are experiencing. Once written notification is received, Neudorfer Engineers will schedule a Technician. It is recommended that an Owner or A/E Representative be on site at that time. Voided Warranty and Additional Charges: If a complaint issue is due to a mechanical equipment failure, control or maintenance related, the return trip maybe subject to a service charge, not covered under warranty. Neudorfer Engineers reserves the right to resolve any TAB issue. If a third party or competing Test & Balance Commissioning firm test or adjust any equipment, all project warranty is voided. (This is typical standard for the Mechanical industry, as Manufacture, Mechanical and Control Contractor voids all warranty when a competing firm tests or manipulates their systems.) Any return trips to the job site are subject to a service charge and a purchase order will be required before returning to the job site. Document Archiving An electronic file of all test documents will be kept on file until the end of the Warranty period. During that time an electronic copy of the test data will be provided a no charge. Any additional hard / bound copies requested will be subject to a fee. 5 Terms and Abbreviations Project: Boeing Building 9-08.1 F , 4 www.. NethiorterENI AC or ACU Air Conditioner or Air Conditioning Unit Act. Actual ACCU Air Cooled Condensing Unit Address Equipment designation number given on the Control Program AH or AHU Air Handler or Air Handling Unit Amps Amperage AP Access Point APP. Application Arr Arrangement AVG Average BHP Brake Horsepower BTU British Thermal Units BTUH British Thermal Units per Hour CAV Constant Air Volume CBV Calbirated Balancing Valve (Circuit Setter) CC Cooling Coil CD Ceiling Diffuser CFLA Correct Full Load Amperage CFM Cubic Feet per Minute CH Chiller CHWS Chilled Water Supply CHWR Chilled Water Retum Coeff. Coefficient CP Circulating Pump CR Ceiling Register CRAC Computer Room Air Conditioner CRU Computer Room Unit CT Cooling Tower CU Condenser Unit CUH Cabinet Unit Heater CWS Condenser Water Supply CWR Condenser Water Retum DAT Discharge Air Temperature DB Dry Bulb DD Direct Drive DDC Direct Digital Controls: EMS Control System for the HVAC Delta Difference, net decrease or increase 6 Des. Design Dia. Diameter Disch. Discharge DNL Data Not Listed EA Exhaust Air EAT Entering Air Temperature Economizer Controls and components that allow an air handler to logically utilize outdoor air for cooling as opposed to the use of mechanical cooling. EDC Electric Duct Coil EDH Electric Duct Heater EF Exhaust Fan EG Exhaust Grille EMCS Energy Management Control System ERU Energy Recovery Unit E.S.P. External Static Pressure Evap. Evaporator EWT Entering Water Temperature FCU Fan Coil Unit FD Fire Damper FH Fume Hood FLA Full Load Amperage: Maximum amperage a motor can draw. Flow Hood Instrument that captures air and converts the reading to CFM. FPB Fan Powered Box FPM Feet per Minute FR Field Report FT Foot, Feet FTU Fan Terminal Unit GPM Gallons per Minute HC Heating Coil HD Pressure Difference across the entering and leaving side of a pump. Heater O.L. Thermal overload protection for motors located at the motor starter (starter heaters) HEPA High Efficiency Particulate Arrestance HOA Hand / Off / Auto Switch HP Horsepower Terms and Abbreviations Project: Boeing Building 9-08.1 HRC HUH HVAC HWS HWR HX HZ I.D. in. in.w.g. Kfactor KW LAT LWG LWR LWT MAU MBH MAX. MBH MIN N/A N/S OA OBD O.D. PD PH PHC Prim. PSI RA RAT RF RH RHC RPM RTU Heat Recovery Coil Hydronic Unit Heater Heating Ventilation and Air Conditioning Heating Water Supply Heating Water Return Heat Exchanger Hertz, cycle per second Inside Diameter inches inches of water gauge Correction factor to the free area need to calculate CFM. Kilowatts Leaving Air Temperature Low Wall Grille Low Wall Register Leaving Water Temperature Make-up Air Hangling Unit 1,000 BTUH Maximum Flow Requirements for DDC Mega BTUs per hour (1MBH=1,000BTUH) Minimum Flow Requirements for DDC Not Available Not Shown or Specified Outside Air Opposed Blade Damper Outside Diameter Pressure Drop. Phase Preheat Coil Primary Pounds per Square Inch Return Air Return Air Temperature Return Fan Relative Humidity Reheat Coil Revolutions per Minute Roof Top Unit 7 RVA Rotating Vane Anemometer -reads air velocity in feet per minute SA Supply Air SAT Supply Air Temperature S.F. Service Factor Schedule Design data obtained from the (sched) mechanical prints' schedule of equipment. SCR SiIcon Controlled Rectifier Speed Controller SF Supply Fan SFD Smoke/Fire Damper SP Static Pressure Spec(s) Specifications sq.ft. square feet Submittals Submitted data on equipment (subs) capabilities. Suct. Suction SWG Sidewall Grille SWR Sidewall Register TAB Test; Adjust; and Balance Tach Tachometer Tech Technician TSP Total Static Pressure: Difference between the entering and leaving static pressure of a fan. TP Traverse or Test Point UH Unit Heater VAV Variable Air Volume; box that contains a motorized damper that modulates airflow. VD Volume Damper VFD Variable Frequency Drive Velgrid Instrument that reads used to read velocity in feet per minute. VP Velocity Pressure VVT Variable Volume Terminal WC Water Column W.G. Water Gauge WB Wet Bulb PROJECT Boeing Building 9-08.1 Tenant Improvements LOCATION Tukwila, Washington EXECUTIVE SUMMARY This project has been balanced per plans and specifications using the National Environmental Balancing Bureau (NEBB) standards and procedures. Neudorfer Engineers performed the air balancing on the following: (8) New Hydronic Condenser Heat Pumps. These fans have been checked for unit data, operating amperage, voltage, rotation, and operating static pressure. All outlets have been proportioned to ±10% of design airflow unless otherwise noted. New Heat Pump (HP1D4) (HP -5) This new heat pump serves the Boeing Bldg. 9-08.1, Work Station Room 11D5. Design is 750 CFM and actual is 865 CFM (115% of design total). This is a direct drive EMC motor, with no speed controller. The outside air actual CFM was obtained from a total air duct traverse. Refer to Duct Traverse Sheet T-01, for further details. This heat pump was tested in heating and cooling mode, refer to the Coil Test Data Sheets for further details. New Heat Pump (HP1 E2) (HP -4) This new heat pump serves the Boeing Bldg. 9-08.1, Conference Room 12E2. Design is 2,000 CFM and actual is 2,075 CFM (104% of design total). This heat pump did not have any outside air ducted to the unit, since there are (2) heat pumps that serve this room. This heat pump was tested in heating and cooling mode, refer to the Coil Test Data Sheets for further details. New Heat Pump (HP1 E3) (HP -4) This new heat pump serves the Boeing Bldg. 9-08.1, Conference Room 12E2. Design is 2,000 CFM and actual is 2,120 CFM (106% of design total). The outside air actual CFM was obtained from a total air duct traverse. Refer to Duct Traverse Sheet T-02, for further details. This heat pump was tested in heating and cooling mode, refer to the Coil Test Data Sheets for further details. NATIONAL ENVIRONMENTAL BALANCING BUREAU 8 PROJECT Boeing Building 9-08.1 Tenant Improvements LOCATION Tukwila, Washington EXECUTIVE SUMMARY (CONTD.) New Heat Pump (HP1E4) (HP -3) This new heat pump serves the Boeing Bldg. 9-08.1, Work Room 11E4. Design is 1,200 CFM and actual is 1,220 CFM (102% of design total). The outside air actual CFM was obtained from a total air duct traverse. Refer to Duct Traverse Sheet T-03, for further details. This heat pump was tested in heating and cooling mode, refer to the Coil Test Data Sheets for further details. New Heat Pump (HP1 E5) (HP -3) This new heat pump serves the Boeing Bldg. 9-08.1, Work Room 11E5. Design is 1,200 CFM and actual is 1,220 CFM (102% of design total). The outside air actual CFM was obtained from a total air duct traverse. Refer to Duct Traverse Sheet T-04, for further details. This heat pump was tested in heating and cooling mode, refer to the Coil Test Data Sheets for further details. New Heat Pump (HP1 F2) (HP -6) This new heat pump serves the Boeing Bldg. 9-08.1, Work Room 11E2. Design is 1,400 CFM and actual is 1,460 CFM (104% of design total). The outside air actual CFM was obtained from a total air duct traverse. Refer to Duct Traverse Sheet T-05, for further details. This heat pump was tested in heating and cooling mode, refer to the Coil Test Data Sheets for further details. New Heat Pump (HP1 F3) (HP -3) This new heat pump serves the Boeing Bldg. 9-08.1, Work Room 11E3. Design is 1,200 CFM and actual is 1,180 CFM (98% of design total). The outside air actual CFM was obtained from a total air duct traverse. Refer to Duct Traverse Sheet T-06, for further details. This heat pump was tested in heating and cooling mode, refer to the Coil Test Data Sheets for further details. NATIONAL ENVIRONMENTAL BALANCING BUREAU 9 Neudorfer-Erfdtrieer Consulting Engineers Seatte Portland PROJECT Boeing Building 9-08.1 Tenant Improvements LOCATION Tukwila, Washington EXECUTIVE SUMMARY (CONTD.) New Heat Pump (HP1F5) (HP -3) This new heat pump serves the Boeing Bldg. 9-08.1, Work Room 12E5. Design is 1,200 CFM and actual is 1,215 CFM (101 % of design total). The outside air actual CFM was obtained from a total air duct traverse. Refer to Duct Traverse Sheet T-07, for further details. This heat pump was tested in heating and cooling mode, refer to the Coil Test Data Sheets for further details. Balancing diagrams are attached to this report with outlets numbered for locations. NATIONAL ENVIRONMENTAL BALANCING BUREAU 10 Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: HP1D4 (HP -5) AREA: Work Station 11D5 Unit Data Unit Manufacturer Unit Model Number Unit Serial Number Unit Discharge Fan Rotation HP1D4 (HP-51/Filter Filter Type Filter Quantity - Size 1 Filter Dimensions - Size 1 DAIKIN W.CCW.5.024.B.F.Y.L.S.04.YY .A.C.Y.YY.Y.YYY.YYY.YYY E029522300100 Top Horizontal Counterclockwise Pleated 1 20x24x2 Test Data Total Design Flow Total Actual Flow RA Design Flow RA Actual Flow OA Design Flow OA Actual Flow HP1D4 (HP-51/Fart Motor Volts T1-T2 Motor Amps T1 750 CFM 865 (1) CFM 625 CFM 865 (2) CFM 125 CFM 610 (2)(3)(4) CFM 280 Volts 1 Amps Log: Tested By: Andy Eaden Date: 6/4/2019 Motor Data HP1D4 (HP-51/Fan Drive Type Motor Manufacturer Motor HP Motor Rated Volts Motor Phase Motor Hertz Motor FL Amps Direct Drive Genteq 1/3 HP 277 Volts 1 60 Hz 2.6 Amps Test Pressures Actual Total SP Fan Discharge SP Fan Suction SP Design External SP Actual External SP Filter DP Actual Coil DP Actual 0.31 in. wc 0.08 in. wc -0.23 in. wc 0.5 in. we 0.09 in. wc 0.08 in. wc 0.14 in. wc HP1D4 (HP -5) HP1D4 (HP -5) HP1D4 (HP -5) HP1D4 (HP -5) 6/4/2019 6/4/2019 6/4/2019 6/4/2019 Andy Eaden Andy Eaden Andy Eaden Andy Eaden (4) Per the mechanical prints, there was no volume damper installed, to throttle down the airflow to achieve the design outside air CFM. (1) The supply fan motor is an EMC motor, plus is direct drive. There is no speed controller installed tc slow down the fan to achieve the design CFM total. (3) The actual outside air flow was obtained by a tot: air round duct traverse. Refer to duct traverse shee T-01, for further details. (2) The return air filter duct and the outside duct are installed per plan, but the return air filter and the outside aur duct are both open to the plenum above the ceiling grid. Neudorfer Engineers, Inc. 11 Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 HP1D4 (HP -5) Supply Outlet Summary DATE: 6/5/2019 CONTACT: Andy Eaden System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Outlet -01 * Work Station 11D5 Flowhood CD -7 8" round 1 - 125 130 145 116 (1) Outlet -02 Work Station 11D5 Flowhood CD -7 8" round 1 - 125 140 145 116 - Outlet -03 Work Station 11D5 Flowhood CD -7 8" round 1 - 125 150 140 112 Outlet -04 Work Station 11D5 Flowhood CD -7 8" round 1 - 125 150 145 116 Outlet -05 Work Station 11D5 Flowhood CD -7 8" round 1 - 125 130 145 116 Outlet -06 Work Station 11D5 Flowhood CD -7 8" round 1 - 125 160 145 116 Totals: - - - - - 750 860 865 115 - Log: HP1D4 (HP-5)/Outlet-01 6/4/2019 Andy Eaden (1 The volume damper is full open. HP1D4 (HP -5) Return Inlet Summary System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Inlet -01* Work Station 11D5 Velgrid Duct 23 x 18 2.875 - 625 865 865 138 (1) Totals: - - - - - 625 865 865 138 - Log: HP1D4 (HP-5)/Inlet-01 6/4/2019 Andy Eaden (1) The retum air filter inlet is open to the plenum. Neudorfer Engineers, Inc. 12 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-01/Total outside air duct traverse for HP1D4 (HP -5) AREA: Work Station 11D5 Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 8 in. 0 in. 0.35 sq. ft. 2 10 20 Log: Tested By: Andy Eaden Date: 6/4/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 34958 1748 FPM 125 CFM 612 CFM 0.01 in. T-01/Total outside air duct traverse for 6/4/2019 HP1D4 (HP -5) T-01/Total outside air duct traverse for 6/4/2019 HP1D4 (HP -5) T-01/Total outside air duct traverse for 6/4/2019 HP1D4 (HP -5) Andy Eaden Andy Eaden Andy Eaden The outside duct is installed per plan, but the return air filter and the outside air duct are both open to the plenum above the ceiling grid. There is no volume damper installed, per the mechanical print. To throttle down the air flow to achieve the design CFM. A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Neudorfer Engineers, Inc. 13 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-01/Total outside air duct traverse for HP1D4 (HP -5) AREA: Work Station 11D5 Hole 1 Tested By: Andy Eaden Date: 6/4/2019 Traverse Data Points 0 8 Neudorfer Engineers, Inc. 14 Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: HP1E2 (HP -4) AREA: Conference Room 12E2 Unit Data Unit Manufacturer DAtKIN Unit Model Number W.CCW.5.060.8.F.Y.L.S.04.YY .A.C.Y.YY.Y.YYY.YYY.YYY Unit Serial Number E029522300300 Unit Discharge Top Horizontal Fan Rotation Counterclockwise HP1E2 (HP-41/Fitter Filter Type Filter Quantity - Size 1 Filter Dimensions - Size 1 Pleated 2 20x24x2 Test Data Total Design Flow Total Actual Flow RA Design Flow RA Actual Flow OA Design Flow OA Actual Flow HP1E2 (HP-4)/Fan Motor Volts T1-T2 Motor Amps T1 2000 CFM 2075 CFM 2000 CFM 2075 CFM (1) CFM (1) CFM 209 Volts 3.6 Amps Log: Tested By: Andy Eaden Date: 6/4/2019 Motor Data HP1E2 (HP-4)/Fan Drive Type Direct Drive Motor Manufacturer Genteq Motor HP 1 HP Motor Rated Volts 120/208/240 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Amps 12.8/9.4/9.1 Amps Test Pressures Actual Total SP Fan Discharge SP Fan Suction SP Design External SP Actual External SP Filter DP Actual Coil DP Actual 0.36 in. wc 0.03 in. wc -0.33 in. wc 0.5 in. wc 0.04 in. wc 0.13 in. wc 0.19 in. wc HP1E2 (HP -4) 6/4/2019 Andy Eaden (1) There was outside air ducted to this heat pump, since there are (2) in this conference room. HP1E2 (HP -4) Supply Outlet Summary System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Outlet -01 Conference Room 12E2 Flowhood CD -6 14" round 1 - 1000 1125 1045 105 (1) Outlet -02* Conference Room 12E2 Flowhood CD -6 14" round 1 - 1000 945 1030 103 (1) Totals: - - - - - 2000 2070 2075 104 - Log: HP1 E2 (HP-4)/Outlet-02 6/4/2019 Andy Eaden (1 The volume damper is full open. HP1E2 (HP -4) Return Inlet Summary System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Inlet -01 * Conference Room 12E2 Velgrid Duct 38 x 23 6.06 - 2000 2075 2075 104 (1) Totals: - - - -- 2000 2075 2075 104 - Log: HP1E2 (HP-4)/Inlet-01 6/4/2019 Andy Eaden (1) The return air filter inlet is open to the plenum. Neudorfer Engineers, Inc. 15 Heat Pump PROJECT: Boeing Bldg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: HP1E3 (HP -4) AREA: Conference Room 12E2 Unit Data Unit Manufacturer Unit Model Number Unit Serial Number Unit Discharge Fan Rotation HP1E3 (HP-4)/Filter Filter Type Filter Quantity - Size 1 Filter Dimensions - Size 1 DAIKIN W.CCW.5.060.B.F.Y.L.S.04.YY .A. C.Y.YY.Y.YYY.YYY.YYY E029522300800 Top Horizontal Counterclockwise Pleated 2 20x24x2 Test Data Total Design Flow Total Actual Flow RA Design Flow RA Actual Flow OA Design Flow OA Actual Flow )HP1E3 (HP-4)/Fan Motor Volts T1-T2 Motor Amps T1 2000 CFM 2120 CFM 1685 CFM 2120 (1) CFM 315 CFM 370 (1)(2)(3) CFM 208 Volts 4.19 Amps Log: Tested By: Andy Eaden Date: 6/4/2019 Motor Data JIP1E3 (HP-4)/Fart Drive Type Motor Manufacturer Motor HP Motor Rated Volts Motor Phase Motor Hertz Motor FL Amps Direct Drive Genteq 1 HP 120/208/240 Volts 1 60 Hz 12.8/9.4/9.1 Amps Test Pressures Actual Total SP Fan Discharge SP Fan Suction SP Design External SP Actual External SP Filter DP Actual Coil DP Actual 0.53 in. wc 0.14 in. wc -0.39 in. wc 0.5 in. wc 0.2 in. wc 0.11 in. we 0.33 in. wc HP1E3 (HP -4) HP1E3 (HP -4) HP1E3 (HP -4) 6/4/2019 Andy Eaden 6/4/2019 Andy Eaden 6/4/2019 Andy Eaden (3) Per the mechanical prints , there was no volume damper installed, to throttle down the airflow to achieve the design outside air CFM. (2) The actual outside air flow was obtained by a tot. air round duct traverse. Refer to duct traverse shee T-02, for further details. (1) The retum air filter duct and the outside duct are installed per plan, but the return air filter and the outside air duct are both open to the plenum above the ceiling grid. HP1E3 (HP -4) Supply Outlet Summary System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Outlet -01 Conference Room 12E2 Flowhood CD -6 14" round 1 - 1000 1185 1070 107 Outlet -02* Conference Room 12E2 Flowhood CD -6 14" round 1- 1000 955 1050 105 (1) Totals: - - - - - 2000 2140 2120 106 - Log: HP1E3 (HP-4)/Outlet-02 6/4/2019 Andy Eaden (1 The volume damper is full open. Neudorfer Engineers, inc. 16 Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 HP1 E3 (HP -4) Return Inlet Summary DATE: 6/5/2019 CONTACT: Andy Eaden System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final Remarks Inlet -01 * Conference Room 12E2 Velgrid Duct 38 x 23 6.06 - 1685 2120 2120 126 (1) Totals: - - - - - 1685 2120 2120 126 - Log: HP1E3 (HP-4)/Inlet-01 6/4/2019 Andy Eaden (1) The retum air filter inlet is open to the plenum. Neudorfer Engineers, Inc. 17 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-02/Total outside air duct traverse for HP1E3 (HP -4) AREA: Conference Room 12E2 Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 10 in. 0 in. 0.55 sq. ft. 2 10 20 Log: Tested By: Andy Eaden Date: 6/4/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 13396 670 FPM 315 CFM 369 CFM 0.04 in. T-02rrotal outside air duct traverse for 6/5/2019 HP1E3 (HP -4) T-02/Total outside air duct traverse for 6/4/2019 HP1E3 (HP -4) T-02/Total outside air duct traverse for 6/4/2019 HP1E3 (HP -4) Andy Eaden Andy Eaden Andy Eaden The outside duct is installed per plan, but the retum air filter and the outside air duct are both open to the plenum above the ceiling grid. There is no volume damper installed, per the mechanical print. To throttle down the air flow to achieve the design CFM. A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Neudorfer Engineers, Inc. 18 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-02/Total outside air duct traverse for HP1E3 (HP -4) AREA: Conference Room 12E2 Miele 1 Tested By: Andy Eaden Date: 6/4/2019 Traverse Data Points rr w a 19 0 Neudorfer Engineers, Inc. 19 Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: HP1E4 (HP -3) AREA: Work Room 11 E4 Unit Data Unit Manufacturer Unit Model Number Unit Serial Number Unit Discharge Fan Rotation HP1E4 (HP-3)/Filter Filter Type Filter Quantity - Size 1 Filter Dimensions - Size 1 DAIKIN W.CCW.5.036.B.F.Y.L.S.04.Y' . A. C. Y. YY. Y. YYY. YYY. YYY E029522300500 Top Horizontal Counterclockwise Pleated 1 20x24x2 Test Data Total Design Flow Total Actual Flow RA Design Flow RA Actual Flow OA Design Flow OA Actual Flow HPI E4 (HP-3VFan Motor Volts T1-T2 Motor Amps T1 1200 CFM 1220 CFM 1130 CFM 1220 (1) CFM 70 CFM 105 (1)(2)(3) CFM 209 Volts 2.56 Amps Log: Tested By: Andy Eaden Date: 6/4/2019 Motor Data HP1E4 (HP-31/Fan Drive Type Motor Manufacturer Motor HP Motor Rated Volts Motor Phase Motor Hertz Motor FL Amps Direct Drive Genteq 1/2 HP 120/208/240 Volts 1 60 Hz 7.7/5.0/4.3 Amps Test Pressures Actual Total SP Fan Discharge SP Fan Suction SP Design External SP Actual External SP Filter DP Actual Coil DP Actual 0.34 in. wc 0.04 in. wc -0.30 in. wc 0.5 in. wc 0.08 in. wc 0.13 in. we 0.13 in. wc HP1E4 (HP -3) HP1E4 (HP -3) HP1E4 (HP -3) 6/4/2019 Andy Eaden 6/4/2019 Andy Eaden 6/4/2019 Andy Eaden (3) Per the mechanical prints , there was no volume damper installed, to throttle down the airflow to achieve the design outside air CFM. (2) The actual outside air flow was obtained by a tot air round duct traverse. Refer to duct traverse shee T-03, for further details. (1) The retum air filter duct'and the outside duct are installed per plan, but the return air filter and the outside air duct are both open to the plenum above the ceiling grid. HP1E4 (HP -3) Supply Outlet Summary System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Outlet -01 Work Room 11E4 Flowhood CD -6 12" round 1 - 600 665 615 103 Outlet -02' Work Room 11E4 Flowhood CD -6 12" round 1 - 600 555 605 101 (1) Totals: - - - - - 1200 1220 1220 102 - Log: HP1E4 (HP-3)/Outlet-02 6/4/2019 Andy Eaden (1 The volume damper is full open. Neudorfer Engineers, Inc. 20 Consulting Engineers Seatle Porliand Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 HP1E4 (HP -3) Return Inlet Summary DATE: 6/5/2019 CONTACT: Andy Eaden System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Inlet -01 * Work Room 11 E4 Velgrid Duct 23 x 18 2.87 - 1130 1220 1220 108 (1) Totals: - - - - - 1130 1220 1220 108 - Log: HP1E4 (HP-3)/Inlet-01 6/4/2019 Andy Eaden (1) The return air filter inlet is open to the plenum. Neudorfer Engineers, Inc. 21 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-03/Total outside air duct traverse for HP1E4 (HP -3) AREA: Work Room 11 E4 Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 6 in. 0 in. 0.20 sq. ft. 2 10 20 Log: Tested By: Andy Eaden Date: 6/4/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 10398 520 FPM 70 CFM 104 CFM 0.02 in. T-03/Total outside air duct traverse for 6/5/2019 HP1E4 (HP -3) T-03/Total outside air duct traverse for 6/4/2019 HP1E4 (HP -3) T-03/Total outside air duct traverse for 6/4/2019 HP1E4 (HP -3) Andy Eaden Andy Eaden Andy Eaden The outside duct is installed per plan, but the return air filter and the outside air duct are both open to the plenum above the ceiling grid. There is no volume damper installed, per the mechanical print. To throttle down the air flow to achieve the design CFM. A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Neudorfer Engineers, Inc. 22 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-03/Total outside air duct traverse for HP1E4 (HP -3) AREA: Work Room 11 E4 kiole Tested By: Andy Eaden Date: 6/4/2019 Traverse Data Points N O 5 Neudorfer Engineers, Inc. 23 Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: HP1E5 (HP -3) AREA: Work Room 11E5 Unit Data Unit Manufacturer DAIKIN Unit Model Number W.CCW.5.036.B.F.Y.L.S.04.YY . A. C. Y. YY. Y. YYY. YYY. YYY Unit Serial Number E029522300700 Unit Discharge Top Horizontal Fan Rotation Counterclockwise HP1E5 (HP-31/Filter Filter Type Filter Quantity - Size 1 Filter Dimensions - Size 1 Pleated 1 20x24x2 Test Data Total Design Flow Total Actual Flow RA Design Flow RA Actual Flow OA Design Flow OA Actual Flow HP1E5 (HP-3)/Fart Motor Volts T1-T2 Motor Amps 11 1200 CFM 1220 CFM 1140 CFM 1220 (1) CFM 60 CFM 150 (1)(2)(3) CFM 207 Volts 2.69 Amps Log: Tested By: Andy Eaden Date: 6/4/2019 Motor Data HP1E5 (HP-31/Fan Drive Type Direct Drive Motor Manufacturer Genteq Motor HP 1/2 HP Motor Rated Volts 120/208/240 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Amps 7.7/5.0/4.3 Amps Test Pressures Actual Total SP Fan Discharge SP Fan Suction SP Design Extemal SP Actual Extemal SP Filter DP Actual Coil DP Actual 0.43 in. wc 0.05 in. wc -0.38 in. wc 0.5 in. wc 0.06 in. wc 0.15 in. wc 0.22 in. wc HP1E5 (HP -3) HP1E5 (HP -3) HP1E5 (HP -3) 6/4/2019 Andy Eaden (3) Per the mechanical prints , there was no volume damper installed, to throttle down the airflow to achieve the design outside air CFM. 6/4/2019 Andy Eaden (2) The actual outside air flow was obtained by a tot. air round duct traverse. Refer to duct traverse shee T-04, for further details. 6/4/2019 Andy Eaden (1) The retum air filter duct and the outside duct are installed per plan, but the return air filter and the outside air duct are both open to the plenum above the ceiling grid. HP1E5 (HP -3) Supply Outlet Summary System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Outlet -01 Work Room 11E5 Flowhood CD -6 12" round 1 - 600 665 610 102 Outlet -02* Work Room 11E5 Flowhood CD -6 12" round 1 - 600 540 610 102 (1) Totals: - - - - - 1200 1205 1220 102 - Log: HP1E5 (HP-3)/Outlet-02 6/4/2019 Andy Eaden (1 The volume damper is full open. Neudorfer Engineers, Inc. 24 Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 HP1 E5 (HP -3) Return Inlet Summary DATE: 6/5/2019 CONTACT: Andy Eaden System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Inlet -01 * Work Room 11E5 Velgrid Duct 25 x 20 1 - 1140 1220 1220 107 (1) Totals: - - - -- 1140 122e 1220 107 - Log: HP1 E5 (HP-3)/Inlet-01 6/4/2019 Andy Eaden (1) The retum air filter in et is open to the plenum. Neudorfer Engineers, Inc. 25 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-04/Total outside air duct traverse for HP1E5 (HP -3) AREA: Work Room 11E5 Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 6 in. 0 in. 0.20 sq. ft. 2 10 20 Log: Tested By: Andy Eaden Date: 6/4/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 15047 752 FPM 60 CFM 150 CFM 0.02 in. T-04/Total outside air duct traverse for 6/5/2019 HP1E5 (HP -3) T-04/Total outside air duct traverse for 6/4/2019 HP1E5 (HP -3) T-04/Total outside air duct traverse for 6/4/2019 HP1E5 (HP -3) Andy Eaden Andy Eaden Andy Eaden The outside duct is installed per plan, but the retum air filter and the outside air duct are both open to the plenum above the ceiling grid. There is no volume damper installed, per the mechanical print. To throttle down the air flow to achieve the design CFM. A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Neudorfer Engineers, Inc. 26 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-04ITotai outside air duct traverse for HP1 E5 (HP -3) AREA: Work Room 11E5 Hole 1 Tested By: Andy Eaden Date: 6/4/2019 Traverse Data Points 0 766 713 78e 1760 813 852 855 805 843 827 6 A m Neudorfer Engineers, Inc. 27 Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: HP1F2 (HP -6) AREA: Work Room 11E2 Unit Data Unit Manufacturer DAIKIN Unit Model Number W.CCW.5.042.B.F.Y.L.S.04.YY . A. C. Y. YY. Y. YYY. YYY. YYY Unit Serial Number E029522300400 Unit Discharge Top Horizontal Fan Rotation Counterclockwise HPI F2 (HP-6)/Filter Filter Type Pleated Filter Quantity - Size 1 1 Filter Dimensions - Size 1 20x24x2 Test Data Total Design Flow Total Actual Flow RA Design Flow RA Actual Flow OA Design Flow OA Actual Flow HP1F2 fHP-6)/Fan Motor Volts T1-T2 Motor Amps T1 1400 CFM 1460 CFM 1340 CFM 1460 (1) CFM 60 CFM 130 (1)(2)(3) CFM 208 Volts 2.19 Amps Log: Tested By: Andy Eaden Date: 6/5/2019 Motor Data HP1F2 (HP-6)/Fan Drive Type Direct Drive Motor Manufacturer Genteq Motor HP 3/4 HP Motor Rated Volts 120/208/240 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Amps 9.6/7.3/6.8 Amps Test Pressures Actual Total SP Fan Discharge SP Fan Suction SP Design External SP Actual External SP Filter DP Actual Coil DP Actual 0.45 in. wc 0.04 in. wc -0.41 in. wc 0.5 in. wc 0.06 in. wc 0.15 in. wc 0.24 in. wc HP1F2 (HP -6) HP1F2 (HP -6) HP1F2 (HP -6) 6/5/2019 Andy Eaden (3) Per the mechanical pnnts , there was no volume damper installed, to throttle down the airflow to achieve the design outside air CFM. 6/5/2019 Andy Eaden (2) The actual outside air flow was obtained by a tot, air round duct traverse. Refer to duct traverse shee T-05, for further details. 6/5/2019 Andy Eaden (1) The return air filter duct and the outside duct are installed per plan, but the return air filter and the outside air duct are both open to the plenum above the ceiling grid. HP1F2 (HP -6) Supply Outlet Summary System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Outlet -01 Work Room 11E2 Flowhood CD -6 12" round 1 - 700 740 740 106 Outlet -02` Work Room 11E2 Flowhood CD -6 12" round 1 - 700 720 720 103 (1) Totals: - - - - - 1400 1460 1460 104 - Log: HP1F2 (HP-6)/Outlet-02 6/5/2019 Andy Eaden (1) The volume damper is full open. Neudorfer Engineers, Inc. 28 Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 HP1F2 (HP -6) Return Inlet Summary DATE: 6/5/2019 CONTACT: Andy Eaden System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Inlet -01* Work Room 11E2 Velgrid Duct 23 x 18 2.875 - 1340 1460 1460 109 (1) Totals: - - - - - 1340 1460 1460 109 - Log: HP1F2 (HP-6)/Inlet-01 6/5/2019 Andy Eaden (1) The retum air filter inlet is open to the plenum. Neudorfer Engineers, Inc. 29 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-05/Total outside air duct traverse for HP1F2 (HP -6) AREA: Work Room 11 E2 Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 6 in. 0 in. 0.20 sq. ft. 2 10 20 Log: Tested By: Andy Eaden Date: 6/5/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 12752 638 FPM 60 CFM 128 CFM 0.03 in. T-05/Total outside air duct traverse for 6/5/2019 HP1F2 (HP -6) T-05/Total outside air duct traverse for 6/5/2019 HP1F2 (HP -6) T-05/Total outside air duct traverse for 6/5/2019 HP1F2 (HP -6) Andy Eaden Andy Eaden Andy Eaden The outside duct is installed per plan, but the retum air filter and the outside air duct are both open to the plenum above the ceiling grid. There is no volume damper installed, per the mechanical print. To throttle down the air flow to achieve the design CFM. A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Neudorfer Engineers, Inc. 30 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-05/Total outside air duct traverse for HP1F2 (HP -6) AREA: Work Room 11E2 Hole 1 Traverse Data Points ev a Tested By: Andy Eaden Date: 6/5/2019 337 1 an I 894 6 Neudorfer Engineers, Inc. 31 Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: HP1F3 (HP -3) AREA: Work Room 11E3 Unit Data Unit Manufacturer Unit Model Number Unit Serial Number Unit Discharge Fan Rotation HP1F3 (HP-3)/Fitter Filter Type Filter Quantity - Size 1 Filter Dimensions - Size 1 DAIKIN W . C C W. 5.036. B. F. Y. L. S.04.YY .A.C.Y.YY.Y.YYY.YYY.YYY E029522300200 Top Horizontal Counterclockwise Pleated 1 20x24x2 Test Data Total Design Flow Total Actual Flow RA Design Flow RA Actual Flow OA Design Flow OA Actual Flow HP1F3 (HP-3)/Fart Motor Volts T1-T2 Motor Amps T1 1200 CFM 1180 CFM 1150 CFM 1180 (1) CFM 50 CFM 140 (1)(2)(3) CFM 209 Volts 2.6 Amps Log: Tested By: Andy Eaden Date: 6/5/2019 Motor Data HP1F3 IHP-3)/Fan Drive Type Motor Manufacturer Motor HP Motor Rated Volts Motor Phase Motor Hertz Motor FL Amps Direct Drive Genteq 1/2 HP 120/208/240 Volts 1 60 Hz 7.7/5.0/4.3 Amps Test Pressures Actual Total SP Fan Discharge SP Fan Suction SP Design External SP Actual External SP Filter DP Actual Coil DP Actual 0.46 in. wc 0.06 in. wc -0.40 in. wc 0.5 in. wc 0.11 in. we 0.12 in. wc 0.23 in. wc HP1F3 (HP -3) HP1F3 (HP -3) HP1F3 (HP -3) 6/5/2019 Andy Eaden 6/5/2019 Andy Eaden 6/5/2019 Andy Eaden (3) Per the mechanical prints , there was no volume damper installed, to throttle down the airflow to achieve the design outside air CFM. (2) The actual outside air flow was obtained by a tot. air round duct traverse. Refer to duct traverse shee T-06, for further details. (1) The return air filter duct and the outside duct are installed per plan, but the return air filter and the outside air duct are both open to the plenum above the ceiling grid. HP1F3 (HP -3) Supply Outlet Summary System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final Remarks Outlet -01 Work Room 11E3 Flowhood CD -6 12" round 1 - 600 635 590 98 • Outlet -02* Work Room 11E3 Flowhood CD -6 12" round 1 - 600 560 590 98 (1) Totals: - - - - - 1200 1195 1180 98 - Log: HP1F3 (HP-3)/Outlet-02 6/5/2019 Andy Eaden (1) The volume damper is full open. Neudorfer Engineers, Inc. 32 Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 HP1F3 (HP -3) Return Inlet Summary DATE: 6/5/2019 CONTACT: Andy Eaden System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Inlet -01 * Work Room 11E3 Velgrid Duct 20 x 24 3.33 - 1150 1180 1180 103 (1) Totals: - - - - - 1150 1180 1180 103 - Log: HP1F3 (HP-3)/Inlet-01 6/5/2019 Andy Eaden (1) The return air filter inlet is open to the plenum. Neudorfer Engineers, Inc. 33 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-06/Total outside air duct traverse for HP1F3 (HP -3) AREA: Work Room 11E3 Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 6 in. 0 in. 0.20 sq. ft. 2 10 20 Log: Tested By: Andy Eaden Date: 6/5/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 14043 702 FPM 50 CFM 140 CFM 0.02 in. T-06/Total outside air duct traverse for 6/5/2019 HP1F3 (HP -3) T-06/Total outside air duct traverse for 6/5/2019 HP1F3 (HP -3) T-06/Total outside air duct traverse for 6/5/2019 HP1F3 (HP -3) Andy Eaden Andy Eaden Andy Eaden The outside duct is installed per plan, but the return air filter and the outside air duct are both open to the plenum above the ceiling grid. There is no volume damper installed, per the mechanical print. To throttle down the air flow to achieve the design CFM. A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Neudorfer Engineers, Inc. 34 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-06/Total outside air duct traverse for HP1F3 (HP -3) AREA: Work Room 11E3 Traverse Data Points Tested By: Andy Eaden Date: 6/5/2019 6 A tO Neudonfer Engineers, Inc. 35 Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: HP1F5 (HP -3) AREA: Work Room 12E5 Unit Data Unit Manufacturer DAIKIN Unit Model Number W.CCW.5.036.B.F.Y.L.S.04.YY . A. C. Y. YY. Y. YYY. YYY. YYY Unit Serial Number E029522300600 Unit Discharge Top Horizontal Fan Rotation Counterclockwise HP1F5 (HP-3)/Filter Filter Type Filter Quantity - Size 1 Filter Dimensions - Size 1 Pleated 1 20x24x2 Test Data Total Design Flow Total Actual Flow RA Design Flow RA Actual Flow OA Design Flow OA Actual Flow HP1F5 (HP-3)/Fan Motor Volts T1-T2 Motor Amps T1 1200 CFM 1215 CFM 1160 CFM 1215 (1) CFM 40 CFM 105 (1)(2)(3) CFM 208 Volts 2.6 Amps Log: Tested By: Andy Eaden Date: 6/5/2019 Motor Data }IPIF5 (HP-31/Fan Drive Type Direct Drive Motor Manufacturer Genteq Motor HP 1/2 HP Motor Rated Volts 120/208/240 Volts Motor Phase 1 Motor Hertz 60 Hz Motor FL Amps 7.7/5.0/4.3 Amps Test Pressures Actual Total SP Fan Discharge SP Fan Suction SP Design External SP Actual External SP Filter DP Actual Coil DP Actual 0.43 in. wc 0.04 in. wc -0.39 in. wc 0.5 in. wc 0.06 in. wc 0.15 in. wc 0.22 in. wc HP1F5 (HP -3) HP1F5 (HP -3) HP1F5 (HP -3) 6/5/2019 Andy Eaden (3) Per the mechanical prints , there was no volume damper installed, to throttle down the airflow to achieve the design outside air CFM. 6/5/2019 Andy Eaden (2) The actual outside air flow was obtained by a tot, air round duct traverse. Refer to duct traverse shee T-07, for further details. 6/5/2019 Andy Eaden (1) The retum air filter duct and the outside duct are installed per plan, but the return air filter and the outside air duct are both open to the plenum above the ceiling grid. HP1F5 (HP -3) Supply Outlet Summary System/Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Outlet -01 Work Room 12E5 Flowhood CD -6 12" round 1 - 600 630 610 102 Outlet -02* Work Room 12E5 Flowhood CD -6 12" round 1 - 600 580 605 101 (1) Totals: - - - - - 1200 1210 1215 101 - Log: HP1F5 (HP-3)/Outlet-02 6/5/2019 Andy Eaden (1 The volume damper is full open. Neudorfer Engineers, Inc. 36 Heat Pump PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 HP1 F5 (HP -3) Return Inlet Summary DATE: 6/5/2019 CONTACT: Andy Eaden System/Unit Area Served Type of Reading Outlet Type Size UN!! D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Inlet -01* Work Room 12E5 Velgrid Duct 20 x 25 3.47 - 1160 1215 1215 105 (1) Totals: - - - - - 1160 1215 1215 105 - Log: HP1F5 (NP-3)/Inlet-01 6/5/2019 Andy Eaden (1) The retum air filter inlet is open to the plenum. Neudorfer Engineers, Inc. 37 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-07/Total outside air duct traverse for HP1F5 (HP -3) Unit Data Type of Traverse Diameter Insulation Width Air Flow Area Number Of Rows Readings Per Row Total Readings Round 6 in. 0 in. 0.20 sq.ft. 2 10 20 Log: Tested By: Andy Eaden Date: 6/5/2019 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 10374 519 FPM 40 CFM 104 CFM 0.01 in. T-07/Total outside air duct traverse for 6/5/2019 HP1F5 (HP -3) T-07/Total outside air duct traverse for 6/5/2019 HP1F5 (HP -3) T-07/Total outside air duct traverse for 6/5/2019 HP1F5 (HP -3) Andy Eaden Andy Eaden Andy Eaden The outside duct is installed per plan, but the return air filter and the outside air duct are both open to the plenum above the ceiling grid. There is no volume damper installed, per the mechanical print. To throttle down the air flow to achieve the design CFM. A Shortridge Multimeter with a Pitot Tube was used to obtain velocity readings. Neudorfer Engineers, Inc. 38 Neudorferngiri fs n Consulting Engineers Seatle Portland www,Hei boder€4 Duct Traverse PROJECT: Boeing BIdg.9-08.1 T.I. LOCATION: TUKWILA, WA PROJECT #: 2019-0195 DATE: 6/5/2019 CONTACT: Andy Eaden SYSTEM/UNIT: T-07/Total outside air duct traverse for HP1F5 (HP -3) Hole 1 Tested By: Andy Eaden Date: 6/5/2019 Traverse Data Points M d G trt Neudorfer Engineers, Inc. 39 8¢01 9011/W !xlf M1 W = W zCC oo r w O QQZ O Lu Z 1-- OOU) Q W Q 5 Lij>� 1;7;- zw 00 0 9 ti F- 0) CO CD SCOPE OF WORK GENERAL NOTES 8 g A g z O cccp N co Z o O O W ec ca O 0 O CODE SUMMARY y4 ei Q .45 COVER SHEET Eg a g ,,6 oGLL �� §N ale ew,s' x ,, g< 2g§ff `�� ��,,F2 a �x,S Fi g 2�b6 Vo Poi R22-2RE,5"' MOT 8 MIHN AREA MAP _ I— o z N¢ O CC za CD CC Z g 0 NO. O Olik . , c , V*:* liCD 9� ill 1.-- - Z O 4 Z O Uw O _.,m a_ Q.. E// L 8L/ 00. yy,� Z. QA b� 3 tl 5 a $ 4 lia U z o CD ow.�� 88 • 8-5 ,Y n ,Lythge‘` �..� . .o „ iiiii,i,,Ilr4 v 8 6 SSUE LEGEND • a g II' . INDEX OF DRAWINGS a ai m olo o�oo me m oggo mem opo m 000 TAT jo olo m- m o$o--- -- ---- MECHANICAL - EQUIPMENT SCHEDULES HVAC SECURITY DETAILS .11IIIIII N Fs oIgI o ARCHITECTURAL GENERAL DESIGN NOTES - _ CD PODIA CONSTRUCTION DETAILS EXITING PLAN FLOW PLAN - REMOVAL FLOOR PLAN i S+o S ii,',„pi REFLECTED CEILING PLAN - REMOVAL REFLECTED CEILING PLAN ilI SCHECULES INTERIOR ELEVATIONS_ INTERIOR ELEVATIONS INTER I OR ELEVATIONS MISC. SECTIONS AND DETAILS _ MISC. SECTIONS AND DETAILS -- oo ES ELECTRICAL PAGING FLOOR LIGHTING PLAN 208Y/120V POWER PLAN 480Y/277V POMP PLAN FIRST FLOOR FIRST FLOOR FIRE ALARM SYSTEM TIRE DETECTION 8 ALARM SYSTEM EQUIPMENT 8 WIRING LAYOUT FIRE DETECTION 8 ALARM SYSTEM EQUIPMENT & WIRING LAYWT TELEPHONE FIRST FLOOR L.W SYSTEMS - FIRST FLOOR 3c ad SIGNAL REFERENCE GRID FIRST FLOOR FIRST FLOOR LIGHTING PLAN FLOOR LIGHTING PLAN [FIRST FLOOR FIRE ALARM SYSTEM FIRE DETECTION 8 ALARM SYSTEM EQUIPMENT A WIRING LAYOUT FIRE DETECTION 8 ALARM SYSTEM EQUIPMENT 8 WIRING LAYDUT TELEPHONE FIRST FLOOR LAN SYSTEMS - FIRST FLOOR LIGHTING CONTROL WIRING DIAGRAMS LOW VOLTAGE LIGHTING CONTROL SCHEDULE - FIRST FLOOR LIGHTING SCHEDULE AND DETAILS INSTALLATION DETAILS SHIELDING & TEMPEST RWM REQUIREMENTS SHIELDING 8 TEMPEST RWM REQUIREMENTS SHIELDING & TEMPEST RON REQUIREMENTS LIGHTING CONTROL WIRING X 34g�gSS W1 g ww •.•1..I.1..••IWI) � ,,-WW'- offip -2,ow = wwwWwR gE •l••1.•••..•I•.....•••••••.••.•••...• I r9-08-IE265R _ 9-08-IE36GR 9-08-IE410R Q 9-08-IE110 0 9-08-IE260 • 9-08-1E264_ I•I 9-08-E527 • 9-08-E528 INDEX OF DRAWINGS mlmmlmmmmmmmm SIE1 clo oiooloofoeoeoecH.;Ol000 000cmig.°0000�coo188g122 mlmmmmmmmmm CJVmm ;mm MECHANICAL 11110l11= EQUIPMENT SCHEDULES HVAC SECURITY DETAILS . .11IIIIII N Fs oIgI o ARCHITECTURAL GENERAL DESIGN NOTES - _ CD PODIA CONSTRUCTION DETAILS EXITING PLAN FLOW PLAN - REMOVAL FLOOR PLAN i S+o S ii,',„pi REFLECTED CEILING PLAN - REMOVAL REFLECTED CEILING PLAN ilI SCHECULES INTERIOR ELEVATIONS_ INTERIOR ELEVATIONS INTER I OR ELEVATIONS MISC. SECTIONS AND DETAILS _ MISC. SECTIONS AND DETAILS -- oo 9-08-A372 • -� 9-08-A373 9-08-A374 9-08-A505 _� E •.•1..I.1..••IWI) •••1•.1...•• 1 I INDEX OF DRAWINGS 222E2222, il CJVmm ;mm MECHANICAL HVAC PLAN _HVAC PLAN _ _ .. _. _ FIRST FLOOR PIPING PLAN FIRST FLOOR PIPING PLAN EQUIPMENT SCHEDULES HVAC SECURITY DETAILS HVAC DETAILS FIRE PROTECTION IST FLOOR PLAN FIRE PROTECTION 15T FLOOR PLAN N Fs oIgI g=2 INCLUDED IN SET 1 DRAWING NO. i S+o S ii,',„pi 9-08-IM2605 9-08-IM280 tr s g r 1 SHEET INDEX os 58 7 M A 01 a Ild In L 02/9 /B .urea IIS 2 a 28 1 V�� k Ail e 11 1 N @II;e.g 1 1 ng 93$ i 4 5 1 i h liti 1 ;Ii. 1 1 A Z 0 0 Co1 I— w Z o O w U W ce 0 0 LL O o 0 2) co cn ohs o 1 ssg b 1 O b'P II &5 q @ 1����Yb�� 4b 1 'a;;;;i4/Q/ 1 eW8 &iiiliv 1 if Ear..A S 8 1 GENERAL DESIGN NOTES is G 0 4 8 NMI. MRS µow a % l; 8 ; A$ 2k ; i : c s s a a sr. 1 1 A Z 0 0 Co1 I— w Z o O w U W ce 0 0 LL O o 0 2) co cn ohs o 1 ssg b 1 O b'P II &5 q @ 1����Yb�� 4b 1 'a;;;;i4/Q/ 1 eW8 &iiiliv 1 if Ear..A S 8 1 GENERAL DESIGN NOTES is G 0 4 8 0: OI/21 t OI/I 14 a 2 s 3 ffi _ N i3 PA ETA •� a U Lg r al o d tl m HEAT PUMP (HP) SCHEDULE C C 0 E 3 X ibxixxxx=ixi.' x8a, MEtxxxxxal=xxxxx liTtxxxxxxxxxiixxxxxxx r 8 _ ., LECTRK RTUS CORE 8F TITUS CORE 23 TITUS CORE 97 TITUS CORE 23 .o, 5 _rerm.rlm3 ., R $i$ R 5 8 o n m r 8 0 r 3 r ah o a $ 0 0 $ - i o s o F., v 8 v IMG PERFORMANCE HEAT ABSORBED MBH 12.2 r B r o 0 EEEEEME e 3 s 53 .o .:., 8, 8—. R. 33013.=13"9,8 o 4� g _ _ OGLING PE SENSIBLE MBH 11.3 2 8 m _ m .. m m m 8 m m m 2 s N -P= 8 - 8 _ 5 _ r � X 5 5555 3,3 2 22 r n n • ., ., F3 5 Vi N,00,000,100,000,0000,0,000,90 WATER FU MAK. PRESS. DROP CONDENSER 1T. WG 04 W a g 'I r SCUARE CEILING DIFFUSER SQUARE CEILING DIFFUSER SQUARE CEILING DIFFUSER SQUARE CEILING DIFFUSER SQUARE CEILING DIFFUSER SQUARE CEILING DIFFUSER S�(IIARE CEILING - 0 6 0 0 PECIAL DET FACE VEL FPM EON # r EXHAUST GRILL EXHAUST GRILL 89 8 6500661E 1660057 GRILLE ECGCRATE EXHUAST GRILLE 1 i 8888'>� >e W PERFORMA EMW. STATIC I. W . 0.6 8 8 2w 3w ww W. xx ; T_ C 0 HEAT PUMP ID NUMBERS HPI I HP2 HP3 1 HP4 I HP5 KRUEGER 6404123 KRUEGER 6404123 ibxixxxx=ixi.' x8a, MEtxxxxxal=xxxxx liTtxxxxxxxxxiixxxxxxx rxxxxxxxxxxxxxxxxxxxxx x xxzxxxxxx xa$xsxrxxxx xxx xxxxxxxxxxxxxx xxixxxxxxxxxx44xxxtxxxxxx2xx¢ixxxxxxxxzxxx. xxxmi��xxxxxxxxx�.�xxxxx w,lai n,NH xxxxx,1x4xxxxxxxxx .xxx' 'xxx fxx Hxzi$raiiiicnxxx:xxxilitxxtialiilii �ammmmm��sso��a«¢m��s4c��a<mm��44�4���m xxx=xxxxxxxxxxxxxxxxxxxxxxxx=4i=ki ___i__i 8 �3 0 Z CN N�II, in AIR DIFFUSER / REGISTER / GRILL SCHEDULE x KRUEGER 6404123 KRUEGER 6404123 KRUEGER 6404123 KRUEGER 6404123 KRUEGER 6404123 r TITUSTMS �� 1= g / KRUEGER EGC-1557 KRUEGER 6590123 KRUEGER 6590123 KRUEGER 6590E23 TITUS SERIES 270 TITUS SERIES 270 _r c _ RTUS CORE 8F TITUS CORE 23 TITUS CORE 97 TITUS CORE 23 .o, 5 _rerm.rlm3 ., 9 9 3 3 mr oa- E8 m 8 ., n m r 8 0 r 3 r _ r� .FL1 _n _) 53 o R r 3.4 0!153 1. 8 § 8 _ 8 R e_ § 8 = 8 o 0 EEEEEME 36 36 -, <" <0.; .:., 8, 8—. R. 33013.=13"9,8 o 4� g _ _ 2 8 m _ _ VI' .i,:` c'-'' r7, 7,. " 2 2 ,7, :Is .7 7 5 5 _ r � X 5 5555 3,3 3 5 5 5 5 5 5 3x 5 5 5 3 3 5 F3 5 Vi N,00,000,100,000,0000,0,000,90 'I r SCUARE CEILING DIFFUSER SQUARE CEILING DIFFUSER SQUARE CEILING DIFFUSER SQUARE CEILING DIFFUSER SQUARE CEILING DIFFUSER SQUARE CEILING DIFFUSER S�(IIARE CEILING DIFFUSER ECG CRATE CEILING RETURN GRILL ECG CRATE CEILING SUPPLY GRILL PERFORATED CEILING SUPPLY GRILL PERFORATED CEILING SUPPLY GRILL PERFORATED CEILING SUPPLY GRILL SUPPLY GRILL SUPPLY GRILL SUPPLY GRILL SUPPLY GRILL EXHAUST GRILL EXHAUST GRILL EXHAUST GRILL EXHAUST GRILL 89 8 6500661E 1660057 GRILLE ECGCRATE EXHUAST GRILLE 1 i 8888'>� >e 8 888 8 8 2w 3w ww W. SOUND ATTENUATOR (SA) SCHEDULE x t t IAC TYPE S IAC TWE S 1 IAC TWE S IAC TWE S 8,10 , _ _• _ _ _r c _ 1.3.33 3333 CI3 ., 9 9 3 3 mr oa- E8 ., 9 ., 9 3 r MINIMUM REWIRED 60001 pAF 6 01 nNc � I ♦1000 7 12 16 § 8 § s s s -5 EEEEEME 8 EQUIPMENT SCHEDULES BOSS LAB PACKAGE 6 - 9-06.0 71 co 4 Os. s. Z 5 o c. 5 3 3 5 8 5 g 3 5 R 6 2 8 5 8 411 Neudorfer Engineers. Inc. C on*uUtng tr+garworg Sao IiN Portland Instrument Calibrations Instrument Type Air Data Meter with Flowhood Instrument Manufacturer Shortridge Instrument Model Number ADM 860 Instrument Serial # M92595 Calibration Due Date 2/6/2020 Instrument Type Tachometer Instrument Manufacturer Shimpo Instrument Model Number DT-205LR Instrument Serial # D1520236R Calibration Due Date 11/08/2019 Instrument Type Amp Probe Instrument Manufacturer Fluke Instrument Model Number 324 Instrument Serial # 28680012WS Calibration Due Date 11/08/2019 Instrument Type Temperature Probe Instrument Manufacturer Shortridge Instrument Model Number ADM 860 Instrument Serial # M92595 Calibration Due Date 2/6/2020 Instrument Type Air Foil Instrument Manufacturer Shortridge Instrument Model Number ADM 860 Instrument Serial # M92595 Calibration Due Date 2/6/2020 Instrument Type Hydrometer Instrument Manufacturer Shortridge Instrument Model Number HDM-250 Instrument Serial # W11007 Calibration Due Date 10/25/2019 46 / t PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M18-0154 DATE: 11/26/18 PROJECT NAME: BOEING #9-08 SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: ArT- kL l�-Z7•1 Building Division Public Works n Ayfr Fire Prevention Planning Division n Structural nPermit Coordinator PRELIMINARY REVIEW: Not Applicable n (no approval/review required) DATE: 11/27/18 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required n Denied (ie: Zoning Issues) Approved with Conditions (corrections entered in Reviews) DUE DATE: 12/25/18 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire 0 Ping ❑ PW 0 Staff Initials: 12/18/2013 HOLADAY PARKS INC Washington State Department of Labor & Industries Hoene Espanol Contact Safety & Health Claims & Insurance Page 1 of 3 Search L&I A -Z Index 1 tele My 1.2t1 Workplace Rights Trades & Licensing HOLADAY PARKS INC Owner or tradesperson Principals BECK, DAVID CARL, PRESIDENT CONNELL, DANIEL A, PRESIDENT GIRI, BIJIT, PRESIDENT PIZZEY, GRACE K, VICE PRESIDENT FREEL, JERRY LEE, VICE PRESIDENT PARKS, GERALD T JR, PRESIDENT (End: 08/12/2015) NAILON, JUNE ANNETTE, VICE PRESIDENT (End: 08/12/2015) O'CONNOR, BONNY K, SECRETARY (End: 08/12/2015) BECK, DAVID CLARENCE, TREASURER (End: 08/12/2015) VAN DER VEEN, ERIC M, VICE PRESIDENT (End: 08/14/2013) PIZZEY, GRACE KATHERINE, VICE PRESIDENT (End: 08/14/2013) VAN DER VEEN, JULIE ELIZABETH, MEMBER (End: 08/14/2013) CONNELL, DANIEL AARON, MEMBER (End: 08/14/2013) GIRI, BUIT, MEMBER (End: 08/14/2013) KIEL, RINALD HOWARD, MEMBER (End: 08/14/2013) WHITMYRE, CHRISTIAN, MEMBER (End: 08/14/2013) NELSON, MICHAEL, SECRETARY (End: 11/04/2010) PARKS, DAVID L, TREASURER (End: 11/04/2010) TALBOT, PAUL, TREASURER (End: 11/04/2010) Doing business as HOLADAY PARKS INC 4600 S 134TH PL SEATTLE, WA 98168 206-248-9700 KING County WA UBI No. Business type 578 004 089 Corporation Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 12/4/2018 HOLADAY PARKS INC Governing persons DAVID BECK DAN CONNELL; JERRY FREEL; BIJIT GIRI; GRACE PIZZEY; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. HOLADPI379NO Effective — expiration 01/21/1983— 09/03/2019 Bond LIBERTY MUTUAL INS CO Bond account no. 23000452 $12,000.00 Received by L&I Effective date 08/23/2002 09/01/2002 Expiration date Until Canceled Insurance Phoenix Insurance Company, The Policy no. DTCO1 F465357PHX18 $1,000,000.00 Received by L&I Effective date 10/30/2018 11/01/2018 Expration date 11/01/2019 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 177,231-00 Doing business as HOLADAY PARKS INC Estimated workers reported Quarter 3 of Year 2018 "Greater than 100 Workers" L&I account contact T4 / CASSANDRA SMITH (360)902-5632 - Email: SMCA235@lni.wa.gov Account is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Page 2 of 3 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 12/4/2018 HOLADAY PARKS INC Contractors not allowed to bid ,. � No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 09/22/2016 No violations Inspection no. 317940948 Location 1007 Stewart St Seattle, WA 98101 Inspection results date 08/09/2016 Inspection no. 317940177 Location 1011 Western Ave, Suite 1000 Seattle, WA 98104 Inspection results date 05/05/2016 Inspection no. 317940156 Location 4600 S 134th PI Tukwila, WA 98168 Inspection results date 06/11/2014 Inspection no. 317319382 Location 1011 Dexter Ave Seattle, WA 98102 Inspection results date 05/08/2014 Inspection no. 317278497 Location 2nd and 110th Ave Bellevue, WA 98004 No violations No violations No violations No violations Page 3 of 3 Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 12/4/2018