Loading...
HomeMy WebLinkAboutTIS 2023-02-06 Item 2D - Grant Application - King County Cooperative Watershed Management Grant for Nelsen Side ChannelCity of Tukwila ALiarr Ekberg, Mayor Prlbk Works 0 'partrnent - Harr Porrnekantr, Director/City Engineer INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Hari Ponnekanti, Public Works Director/ City Engineer BY: Brittany Robinson, Public Works Grant Analyst Josh Hopkins, Project Manager CC: Mayor Ekberg DATE: February 3, 2023 SUBJECT: Surface Water Fund — Nelsen Side Channel Project No. 91641203 Grant Application ISSUE Authorize the submittal of a grant application to the King County 2023 Cooperative Watershed Management (CWM) grant program. BACKGROUND The Nelsen side channel is a remnant section of the Green River as it existed prior to the construction of the 1-405 in the 1960s. The remnant channel is separated from the mainstem of the river by a constructed levee but offers potential as off - channel rearing habitat for threatened Puget Sound Chinook salmon and other aquatic species. This project will set the levee back to create a ±1.2 -acre side channel, restore an acre of riparian forest, provide additional flood storage, and provide public access to the river. Currently, there is a concept design in place for this project and property transfer arrangements are underway between the City, WDNR and WSDOT. DISCUSSION King County is currently seeking applications for the 2023 CWM grant program. The CWM program goal is to deliver projects that intended to recover ESA -listed salmon species and restore watershed ecosystems. The priorities, driven primarily by WRIA salmon conservation plans, include habitat restoration and protection, water quality improvements, regionally - coordinated monitoring, watershed planning, stewardship, outreach, and education. Grant submissions are due on March 3, 2023. FISCAL IMPACT The City is seeking $700,000 from the CWM grant program to fund additional acquisition and design costs for the Nelsen Side Channel Project. The grant application indicates that the City must leverage costs outside of the grant request. In this case, the leveraged costs have already been funded by other grants. Amount Fund Source Leverage Budget CWM Grant $700,000 2021 CWM $250,000 Leverage 600,000 RCO 100,000 Total $1,300,000 OSRC 250.000 Total $600,000 RECOMMENDATION Committee is being asked to approve the submittal of the Cooperative Watershed Management grant application for the Nelsen Side Channel project. Attachments: 2023 CIP Page 83 Project Milestones 47 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2023 to 2028 PROJECT: Nelsen Salmon Habitat Side Channel Project No. 91641203 DESCRIPTION: Create an off -channel salmon rearing habitat side channel by connecting a segment of historic river channel with the Green River. JUSTIFICATION: WRIA 9 has identified this project a proposed action in the Salmon Habitat Plan. The project area is primarily within State lands, but the intent is to transfer to City. The project may take place STATUS: under an aquatic lease (DNR), depending on timing. Grant application for design funding submitted to Floodplains in 2020 with a low probability of success. MAINT. IMPACT: Expected to increase maintenance COMMENT: Property acquisition to the north could create the opportunity for a side channel and additional flood storage, or potentially combine this with Gilliam Creek Fish Barrier project depending on funding source feedback. FINANCIAL Through Estimated (in $000's) 2021 2022 2023 2024 2025 2026 2027 2028 BEYOND TOTAL EXPENSES Project Location ; rim i`:sost IV" 1p :�� Design 50 300 300 ,AlI111 650 Land (R/W) 5 300 X11 ►*. 305 Monitoring ��y//j�, 0 Const. Mgmt. b , NN m �, 385 ��St 385 Construction cn 47 S,TIVOM 1,440 6a 7 vonim, 1,440 TOTAL EXPENSES 0 55 600 300 1,825 0 0 0 0 2,780 FUND SOURCES Awarded Grant 50 150 150 350 Proposed Grant 300 100 1,232 1,632 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 5 150 50 593 0 0 0 0 798 TOTAL SOURCES 0 55 600 300 1,825 0 0 0 0 2,780 2023 - 2028 Capital Improvement Program 48 Project Location ; rim i`:sost IV" 1p :�� D ,AlI111 411i o s X11 ►*. ��y//j�, 2 6 L'j'44.t b , NN m �, ��St co cn 47 S,TIVOM 6a 7 vonim, a 1 v "i\so, 1 *01/ S 156 \.1_0 ' . ` \�1� rhes�f ::±� f ■ Iais .160., � 1l( ��T�� u 2023 - 2028 Capital Improvement Program 48 Nelsen Side Channel Project Milestones Target Date Hire Design Consultant 3/15/2023 Apply for Permits 5/30/2024 Purchase Nelsen Family Trust Parcel 5/30/2024 Cultural Resources Complete 12/31/2023 Data Gathering Started 4/30/2023 Data Gathering Complete 6/30/2023 Preliminary Design Complete 12/31/2023 Final Project Design Complete 6/30/2024 Hire Construction Consultant 03/31/2025 Project Construction to Start 06/01/2025 Project Complete 06/01/2026 49