Loading...
HomeMy WebLinkAboutPP - 349 UPLAND DR - ELLIOTT BAY SERVICE TRANSFER - PERMITS AND PLANS349 UPLAND DR ASSOCIATED PERMITS 06-5-005 07-5-191 96-S-226 93-S-241 PRE PROTECTION ATRIOT HYDRAULIC DESIGN INFORMATION SHEET NAME Mit. b iGooA. P>.y�SToti( E LOCATION -SW\ U'PLAw410T/ISN/6 TU1tiWIt34- DATE °I` S- i9( ltd� P7 44., cnin�4o c'P. , ,Ardiv erdr" op 91„��� Wija 71/ biztrusr"163 BUILDING CONTRACTOR L c V c'L(6.C.- CALCULATED BY CA-t.NT CONSTRUCTION: [- COMBUSTIBLE ❑ NON-COMBUSTIBLE OCCUPANCY 'S'tOrlPi SYSTEM NO -S-2- CONTRACT Z CONTRACT NO 12 - S8°11 DRAWING NO Vf-1 CEILING HEIGHT VMZ-S FT. SYSTEM DESIGN `NFPA ❑ NFPA OTHER ❑ SPECIFIC 13: ❑ LT. HAZ. ORD. HAZ. 231 ❑ NFPA 231C: FIGURE (Specify) ':AG.Tof- NA•7TVAL. Vett-TA . GP. • 1 ❑ 2 • 3 ❑ EX. HAZ. CURVE A4 -e C' - PL-; s RULING MADE BY DATE AREA OF SPRINKLER OPERATION DENSITY AREA PER SPRINKLER HOSE ALLOWANCE GPM: INSIDE HOSE ALLOWANCE GPM: OUTSIDE RACK SPRINKLER ALLOWANCE Z [,HOS CS. WET ❑ DRY SYSTEM TYPE .31b bM 11 6 ❑ DELUGE ❑ PRE -ACTION 9t 60 $o MAKE SIZE TEMPERATURE F.AC.K SPRINKLER OR NOZZLE SbO CkEtrTikalE MODEL C-`rti iftr K -FACTOR S.(o RATING 1C05 CALCULATION SUMMARY GPM REQUIRED \1 0 's PSI REQUIRED CI -1:1 AT BASE OF RISER "C" FACTOR USED: OVERHEAD 120 UNDERGROUND Ho WATER SUPPLY DATES STATIC RESIDUAL GPM ELEVATION WATER FLOW TEST PUMP DATA TANK OR RESERVO TIME PSI FLOWING '—f RATED CAPACITY AT PSI ELEVATI CAPACITY \qti ELEVATION PSI 'b 5\03Q WELL c6 P F FLOW GPM LOCATION SOURCE OF \,-)V--c--V E,N`O UQ\.°0-Y '7A1 -QE: INFORMATION 1\SYiWTIj \.r>'$_ COMMODITY STORAGE COMMODITY STORAGE STORAGE k-V(t.NT-TJS:1= CLASS LOCATION Cot+ HEIGHT Z21 -o".. AREA "` AISLE WIDTH % -b METHOD: SOLID PILED ("DJ OW) % RACK t '/o — % PALLETIZED Y U Q cr SINGLE ROW `,CONVENTIONAL PALLET ❑ AUTOMATIC STORAGE ❑ ENCAPSULATED DOUBLE ROW ❑ SLAVE PALLET SOLID SHELVING " 1 -49N - MULTIPLE ROW ❑ OPEN ENCAPSULATED LONGITUDINAL FLUE SPACING IN INCHES CLEARANCE FROM TOP OF STORAGE TO CEILING Co TRANSVERSE 0- Z FT. CO IN. HORIZONTAL BARRIERS PROVIDED /� SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 1 Date: 08/21/2001 C:HASSDATA\BEDSTORE JOB TITLE: IN -RACK SPRINKLER CALCULATION WATER SUPPLY DATA SOURCE STATIC RESID. FLOW AVAIL. TOTAL REQ'D NODE PRESS. PRESS. @ PRESS. @ DEMAND PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) CITY 144.0 20.0 5636.0 121.1 2260.5 106.8 AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE TOTAL HOSE STREAM ALLOWANCE AT SOURCE OTHER HOSE STREAM ALLOWANCES TOTAL DISCHARGE FROM ACTIVE SPRINKLERS NODE ANALYSIS DATA NODE TAG ELEVATION (FT) NODE TYPE 2260.5 GPM 0.0 GPM 500.0 GPM 1760.5 GPM PRESSURE DISCHARGE (PSI) (GPM) 101 19.8 K= 5.60 16.4 22.7 102 19.8 K= 5.60 15.7 22.2 103 19.8 K= 5.60 15.5 22.0 104 19.8 K= 5.60 15.4 22.0 105 19.8 K= 5.60 15.6 22.1 106 19.8 K= 5.60 15.9 22.3 107 19.8 K= 5.60 16.7 22.9 108 13.0 K= 5.60 21.7 26.1 109 13.0 K= 5.60 20.3 25.2 110 13.0 K= 5.60 19.6 24.8 111 13.0 K= 5.60 19.4 24.6 112 13.0 K= 5.60 19.3 24.6 113 13.0 K= 5.60 19.4 24.7 114 13.0 K= 5.60 19.9 25.0 201 26.0 K= 8.00 78.7 71.0 202 26.0 K= 8.00 56.9 60.3 203 26.0 K= 8.00 59.0 61.4 204 26.0 K= 8.00 62.6 63.3 205 26.0 K= 8.00 65.0 64.5 206 26.0 K= 8.00 67.6 65.8 207 26.0 K= 8.00 66.3 65.2 208 26.0 K= 8.00 66.0 65.0 209 26.0 K= 8.00 78.9 71.1 210 26.0 K= 8.00 56.9 60.3 211 26.0 K= 8.00 59.0 61.4 212 26.0 K= 8.00 62.6 63.3 213 26.0 K= 8.00 65.0 64.5 214 26.0 K= 8.00 67.6 65.8 215 26.0 K= 8.00 66.3 65.2 216 26.0 K= 8.00 66.0 65.0 217 26.0 K= 8.00 66.8 65.4 218 26.0 K= 8.00 68.0 66.0 219 26.0 K= 8.00 69.2 66.6 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 Date: 08/21/2001 JOB TITLE: IN -RACK SPRINKLER CALCULATION NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) 220 26.0 221 26.0 222 26.0 62 25.5 61. 25.5 60 25.5 39 26.0 38 26.0 29 24.0 28 24.0 25 25.5 24 25.5 23 25.5 9 24.0 8 24.0 7 24.0 6 24.0 5 24.0 4 24.0 3 24.0 2 24.0 1 24.0 BOR 2.5 FLG 0.5 DD2 -4.0 DD1 -4.0 CITY 0.0 K= 8.00 K= 8.00 K= 8.00 HOSE STREAM SOURCE 69.2 68.0 67.6 18.7 20.0 41.0 80.3 80.1 83.0 82.8 72.3 72.3 74.1 83.3 83.1 82.5 81.7 81.5 81.5 81.6 86.1 86.1 97.7 101.7 104.5 107.9 106.8 66.6 65.9 65.8 500.0 2260.5 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Date: 08/21/2001 JOB TITLE: IN -RACK SPRINKLER CALCULATION PIPE DATA Page 3 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END 111 V. NO/ PT DISC. VH (FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 1 2260.5 10.520 PL 5.00 PF 0.7 CITY 0.0 SRCE 106.8 (N/A) 8.3 140 FTG TG PE 1.7 DD1 -4.0 0.0 107.9 0.0 0.008 TL 83.00 PV 0.5 Pipe: 2 FIXED PRESSURE LOSS DEVICE DD1 -4.0 0.0 107.9 0.0 3.4 psi, 2260.4 gpm DD2 -4.0 0.0 104.5 0.0 Pipe: 3 2260.4 10.520 PL 64.00 PF 0.8 DD2 -4.0 0.0 104.5 0.0 8.3 140 FTG E PE -1.9 FLG 0.5 0.0 101.7 0.0 0.008 TL 95.00 PV 0.5 Pipe: 4 2260.4 8.249 PL 6.00 PF 3.2 FLG 0.5 0.0 101.7 0.0 13.6 120 FTG 2T PE -0.9 BOR 2.5 H.S. 97.7 500.0 0.036 TL 90.00 PV 1.2 Pipe: 5 1760.4 8.249 PL 78.00 PF 2.2 BOR 2.5 H.S. 97.7 500.0 10.6 120 FTG E PE -9.3 1 24.0 0.0 86.1 0.0 0.022 TL 98.00 PV 0.8 Pipe: 6 911.3 8.249 PL 3.50 PF 0.0 1 24.0 0.0 86.1 0.0 5.5 120 FTG ---- PE 0.0 2 24.0 0.0 86.1 0.0 0.007 TL 3.50 PV 0.2 Pipe: 7 911.3 6.357 PL 156.00 PF 4.6 2 24.0 0.0 86.1 0.0 9.2 120 FTG T PE 0.0 3 24.0 0.0 81.6 0.0 0.024 TL 194.00 PV 0.6 Pipe: 8 515.1 6.357 PL 12.00 PF 0.1 3 24.0 0.0 81.6 0.0 5.2 120 FTG ---- PE 0.0 4 24.0 0.0 81.5 0.0 0.008 TL 12.00 PV 0.2 Pipe: 9 69.7 6.357 PL 12.00 PF 0.0 4 24.0 0.0 81.5 0.0 0.7 120 FTG ---- PE 0.0 5 24.0 0.0 81.5 0.0 0.000 TL 12.00 PV 0.0 Pipe: 10 -375.8 6.357 PL 17.50 PF 0.3 5 24.0 0.0 81.5 0.0 3.8 120 FTG T PE 0.0 6 24.0 0.0 81.7 0.0 0.005 TL 55.50 PV 0.1 Pipe: 11 -707.0 6.357 PL 54.00 PF 0.8 6 24.0 0.0 81.7 0.0 7.1 120 FTG ---- PE 0.0 7 24.0 0.0 82.5 0.0 0.015 TL 54 00 PV 0.3 Pipe: 11A -707.0 6.357 PL 1„50 PF 0.6 7 24.0 0.0 82.5 0.0 7.1 120 FTG T PE 0.0 8 24.0 0.0 83.1 0.0 0.015 TL 39.50 PV 0.3 Pipe: 11B -778.0 6.357 PL 12.00 PF 0.2 8 24.0 0.0 83.1 0.0 7.9 120 FTG ---- PE 0.0 9 24.0 0.0 83.3 0.0 0.018 TL 12.00 PV 0.4 SPRINKLER. SYSTEM HYDRAULIC C ANALYSIS Dale: 08/21/2001 JOB TITLE: IN -RACK SPRINKLER CALCULATION PIPE DATA (cont.) Page 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 12 -849.1 6.357 PL 100.00 PF 2.9 9 24.0 0.0 83.3 0.0 8.6 120 FTG T PE 0.0 1 24.0 0.0 86.1 0.0 0.021 TL 138.00 PV 0.5 Pipe: 13 396.2 2.469 PL 1.50 PF 6.8 3 24.0 0.0 81.6 0.0 26.5 120 FTG T PE -0.6 23 25.5 0.0 74.1 0'.0 0.505 TL 13.50 PV 4.7 Pipe: 14 445.5 2.469 PL 1.50 PF 8.5 4 24.0 0.0 81.5 0.0 29.9 120 FTG T PE -0.6 24 25.5 0.0 72.3 0.0 0.627 TL 13.50 PV 6.0 Pipe: 15 445.5 2.469 PL 1.50 PF 8.5 5 24.0 0.0 81.5 0.0 29.9 120 FTG T PE -0.6 25 25.5 0.0 72.3 0.0 0.627 TL 13.50 PV 6.0 Pipe: 16 198.3 2.067 PL 4.00 PF 4.7 23 25.5 0.0 74.1 0.0 19.0 120 FTG T PE -0.2 220 26.0 8.0 69.2 66.6 0.333 TL 14.00 PV 2.4 Pipe: 17 131.7 2.067 PL 8.00 PF 1.3 220 26.0 8.0 69.2 66.6 12.6 120 FTG ---- PE 0.0 221 26.0 8.0 68.0 65.9 0.156 TL 8.00 PV 1.1 Pipe: 18 65.8 2.067 PL 8.00 PF 0.3 221 26.0 8.0 68.0 65.9 6.3 120 FTG ---- PE 0.0 222 26.0 8.0 67.6 65.8 0.043 TL 8.00 PV 0.3 Pipe: 19 197.9 2.067 PL 4.00 PF 4.7 23 25.5 0.0 74.1 0.0 18.9 120 FTG T PE -0.2 219 26.0 8.0 69.2 66.6 0.332 TL 14.00 PV 2.4 Pipe: 20 131.4 2.067 PL 8.00 PF 1.2 219 26.0 8.0 69.2 66.6 12.6 120 FTG ---- PE 0.0 218 26.0 8.0 68.0 66.0 0.156 TL 8.00 PV 1.1 Pipe: 21 65.4 1.610 PL 8.00 PF 1.2 218 26.0 8.0 68.0 66.0 10.3 120 FTG ---- PE 0.0 217 26.0 8.0 66.8 65.4 0.145 TL 8.00 PV 0.7 Pipe: 22 195.9 2.067 PL 4.00 PF 4.6 24 25.5 0.0 72.3 0.0 18.7 120 FTG T PE -0.2 214 26.0 8.0 67.6 65.8 0.326 TL 14.00 PV 2.4 Pipe: 23 130.1 2.067 PL 8.00 PF 1.2 214 26.0 8.0 67.6 65.8 12.4 120 FTG ---- PE 0.0 215 26.0 8.0 66.3 65.2 0.153 TL 8.00 PV 1.0 Pipe: 24 65.0 2.067 PL 8.00 PF 0.3 215 26.0 8.0 66.3 65.2 6.2 120 FTG ---- PE 0.0 216 26.0 8.0 66.0 65.0 0.042 TL 8.00 PV 0.3 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Date: 08/21/2001 . JOB TITLE: IN -RACK SPRINKLER CALCULATION PIPE DATA (cont.) Page 5 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 25 249.6 2.067 PL 4.00 PF 7.1 24 25.5 0.0 72.3 0.0 23.9 120 FTG T PE -0.2 213 26.0 8.0 65.0 64.5 0.510 TL 14.00 PV 3.8 Pipe: 26 185.1 2.067 PL 8.00 PF 2.3 213 26.0 8.0 65.0 64.5 17.7 120 FTG ---- PE 0.0 212 26.0 8.0 62.6 63'.3 0.293 TL 8.00 PV 2.1 Pipe: 27 121.8 1.610 PL 8.00 PF 3.7 212 26.0 8.0 62.6 63.3 19.2 120 FTG ---- PE 0.0 211 26.0 8.0 59.0 61.4 0.457 TL 8.00 PV 2.5 Pipe: 28 60.3 1.380 PL 8.00 PF 2.1 211 26.0 8.0 59.0 61.4 12.9 120 FTG ---- PE 0.0 210 26.0 8.0 56.9 60.3 0.264 TL 8.00 PV 1.1 Pipe: 29 195.9 2.067 PL 4.00 PF 4.6 25 25.5 0.0 72.3 0.0 18.7 120 FTG T PE -0.2 206 26.0 8.0 67.6 65.8 0.326 TL 14.00 PV 2.4 Pipe: 30 130.1 2.067 PL 8.00 PF 1.2 206 26.0 8.0 67.6 65.8 12.4 120 FTG ---- PE 0.0 207 26.0 8.0 66.3 65.2 0.153 TL 8.00 PV 1.0 Pipe: 31 65.0 2.067 PL 8.00 PF 0.3 207 26.0 8.0 66.3 65.2 6.2 120 FTG ---- PE 0.0 208 26.0 8.0 66.0 65.0 0.042 TL 8.00 PV 0.3 Pipe: 32 249.6 2.067 PL 4.00 PF 7.1 25 25.5 0.0 72.3 0.0 23.9 120 FTG T PE -0.2 205 26.0 8.0 65.0 64.5 0.510 TL 14.00 PV 3.8 Pipe: 33 185.1 2.067 PL 8.00 PF 2.3 205 26.0 8.0 65.0 64.5 17.7 120 FTG ---- PE 0.0 204 26.0 8.0 62.6 63.3 0.293 TL 8.00 PV 2.1 Pipe: 34 121.8 1.610 PL 8.00 PF 3.7 204 26.0 8.0 62.6 63.3 19.2 120 FTG ---- PE 0.0 203 26.0 8.0 59.0 61.4 0.457 TL 8.00 PV 2.5 Pipe: 35 60.3 1.380 PL 8.00 PF 2.1 203 26.0 8.0 59.0 61.4 12.9 120 FTG ---- PE 0.0 202 26.0 8.0 56.9 60.3 0.264 TL 8.00 PV 1.1 Pipe: 35A 71.0 2.469 PL 1.50 PF 0.3 8 24.0 0.0 83.1 0.0 4.8 120 FTG T PE 0.0 28 24.0 0.0 82.8 0.0 0.021 TL 13.50 PV 0.2 Pipe: 35B 71.0 2.067 PL 27.00 PF 1.8 28 24.0 0.0 82.8 0.0 6.8 120 FTG T PE -0.9 38 26.0 0.0 80.1 0.0 0.050 TL 37.00 PV 0.3 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Date: 08/21/2001 JOB TITLE: IN -RACK SPRINKLER CALCULATION PIPE DATA (cont.) Page 6 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 35C 71.0 1.610 PL 8.00 PF 1.3 38 26.0 0.0 80.1 0.0 11.2 120 FTG ---- PE 0.0 201 26.0 8.0 78.7 71.0 0.168 TL 8.00 PV 0.8 Pipe: 35D 71.1 2.469 PL 1.50 PF 0.3 9 24.0 0.0 83.3 0.0 4.8 120 FTG T PE 0.0 29 24.0 0.0 83.0 0.0 0.021 TL 13.50 PV 0.2 Pipe: 35E 71.1 2.067 PL 27.00 PF 1.8 29 24.0 0.0 83.0 0.0 6.8 120 FTG T PE -0.9 39 26.0 0.0 80.3 0.0 0.050 TL 37.00 PV 0.3 Pipe: 35F 71.1 1.610 PL 8.00 PF 1.3 39 26.0 0.0 80.3 0.0 11.2 120 FTG ---- PE 0.0 209 26.0 8.0 78.9 71.1 0.169 TL 8.00 PV 0.8 Pipe: 36 331.2 2.727 PL 50.50 PF 40.1 6 24.0 0.0 81.7 0.0 18.2 120 FTG 8E2TB PE -0.6 60 25.5 0.0 41.0 0.0 0.223 TL 179.50 PV 2.2 Pipe: 37 331.2 2.227 PL 7.00 PF 21.0 60 25.5 0.0 41.0 0.0 27.3 120 FTG 2ET PE 0.0 61 25.5 0.0 20.0 0.0 0.599 TL 35.00 PV 5.0 Pipe: 38 175.0 2.227 PL 6.80 PF 1.3 61 25.5 0.0 20.0 0.0 14.4 120 FTG ---- PE 0.0 62 25.5 0.0 18.7 0.0 0.184 TL 6.80 PV 1.4 Pipe: 39 75.6 1.752 PL 30.75 PF 6.1 61 25.5 0.0 20.0 0.0 10.1 120 FTG ET PE 2.5 101 19.8 5.6 16.4 22.7 0.125 TL 48.75 PV 0.7 Pipe: 40 52.9 1.752 PL 10.25 PF 0.7 101 19.8 5.6 16.4 22.7 7.0 120 FTG ---- PE 0.0 102 19.8 5.6 15.7 22.2 0.065 TL 10.25 PV 0.3 Pipe: 41 30.8 1.752 PL 10.25 PF 0.2 102 19.8 5.6 15.7 22.2 4.1 120 FTG ---- PE 0.0 103 19.8 5.6 15.5 22.0 0.024 TL 10.25 PV 0.1 Pipe: 42 8.7 1.752 PL 10.25 PF 0.0 103 19.8 5.6 15.5 22.0 1.2 120 FTG ---- PE 0.0 104 19.8 5.6 15.4 22.0 0.002 TL 10.25 PV 0.0 Pipe: 43 -13.3 1.752 PL 20.17 PF 0.2 104 19.8 5.6 15.4 22.0 1.8 120 FTG 2E PE 0.0 105 19.8 5.6 15.6 22.1 0.005 TL 32.17 PV 0.0 Pipe: 44 -35.4 1.752 PL 10.25 PF 0.3 105 19.8 5.6 15.6 22.1 4.7 120 FTG ---- PE 0.0 106 19.8 5.6 15.9 22.3 0.031 TL M25 PV 0.1 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Date: 08/21/2001 . JOB TITLE: IN -RACK SPRINKLER CALCULATION PIPE DATA (cont.) Page 7 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 45 -57.7 1.752 PL 10.25 PF 0.8 106 19.8 5.6 15.9 22.3 7.7 120 FTG ---- PE 0.0 107 19.8 5.6 16.7 22.9 0.076 TL 10.25 PV 0.4 Pipe: 46 -80.6 1.752 PL 41.00 PF 5.8 107 19.8 5.6 16.7 22.9 10.7 120 FTG ---- PE -2.5 61 25.5 0.0 20.0 0.0 0.141 TL 41.00 PV 0.8 Pipe: 47 106.5 1.752 PL 10.25 PF 2.4 62 25.5 0.0 18.7 0.0 14.2 120 FTG ---- PE 5.4 108 13.0 5.6 21.7 26.1 0.236 TL 10.25 PV 1.4 Pipe: 48 80.4 1.752 PL 10.25 PF 1.4 108 13.0 5.6 21.7 26.1 10.7 120 FTG ---- PE 0.0 109 13.0 5.6 20.3 25.2 0.140 TL 10.25 PV 0.8 Pipe: 49 55.1 1.752 PL 10.25 PF 0.7 109 13.0 5.6 20.3 25.2 7.3 120 FTG ---- PE 0.0 110 13.0 5,6 19.6 24.8 0.070 TL 10.25 PV 0.4 Pipe: 50 30.4 1.752 PL 10.25 PF 0.2 110 13.0 5.6 19.6 24.8 4.0 120 FTG ---- PE 0.0 111 13.0 5.6 19.4 24.6 0.023 TL 10.25 PV 0.1 Pipe: 51 5.7 1.752 PL 20.17 PF 0.0 111 13.0 5.6 19.4 24.6 0.8 120 FTG 2E PE 0.0 112 13.0 5.6 19.3 24.6 0.001 TL 32.17 PV 0.0 Pipe: 52 -18.9 1.752 PL 10.25 PF 0.1 112 13.0 5.6 19.3 24.6 2.5 120 FTG ---- PE 0.0 113 13.0 5.6 19.4 24.7 0.010 TL 10.25 PV 0.0 Pipe: 53 -43.6 1.752 PL 10.25 PF 0.5 113 13.0 5.6 19.4 24.7 5.8 120 FTG ---- PE 0.0 114 13.0 5.6 19.9 25.0 0.045 TL 10.25 PV 0.2 Pipe: 54 -68.5 1.752 PL 41.00 PF 4.3 114 13.0 5.6 19.9 25.0 9.1 120 FTG ---- PE -5.4 62 25.5 0.0 18.7 0.0 0.104 TL 41.00 PV 0.6 NOTES: (1) Calculations were performed by the HASS 5.8.0 computer program under license no. 4 C1324J granted by HRS Systems, Inc. 2193 Ranchwood Dr., N.E. Atlanta, GA 30345 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Date: 08/21/2001 JOB TITLE: IN -RACK SPRINKLER CALCULATION (2) The system has been balanced to provide an average imbalance at each node of 0.001 gpm and a maximum imbalance at any node of 0.059 gpm. (3) Page 8 Velocity pressures are printed for information only, and are not used in balancing the system. Maximum water velocity is 29.9 ft/sec at pipe 14. (4) PIPE FITTINGS TABLE Pipe Table Name: STANDARD.PIP PAGE: A Diameter (in) 1.380 1.610 2.067 2.469 PAGE: B Diameter (in) MATERIAL: S40 HWC: 120 Equivalent Fitting Lengths E T L C B Ell Tee LngEll ChkVly BfyVly 3.00 4.00 5.00 6.00 6.00 8.00 10.00 12.00 2.00 7.00 2.00 9.00 3.00 11.00 4.00 14.00 2.50 3.20 4.50 7.00 MATERIAL: THNWL HWC: 120 Equivalent Fitting Lengths E T L C B Ell Tee LngEll ChkVly BfyVly 6.357 18.00 38.00 11.00 40.00 13.00 8.249 20.00 42.00 14.50 50.00 13.00 PAGE: D Diameter (in) 10.520 PAGE: F Diameter (in) MATERIAL: DIR.ON HWC: 140 Equivalent Fitting Lengths E T L C B Ell Tee LngEll ChkVly BfyVly in Feet G A GatVly AlmChk 1.00 10.00 1.00 10.00 1.00 10.00 1.00 10.00 in Feet G A GatVly AlmChk D DPV1v 10.00 10.00 10.00 10.00 D DPV1v 4.00 34.00 59.00 4.00 32.00 30.00 in Feet G GatVly 31.00 71.00 23.00 78.00 27.00 7.00 MATERIAL: SUPER HWC: 120 Equivalent Fitting Lengths E T L C B Ell Tee LT -ELL CHK -VA BFY-VA 1.752 6.00 12.00 3.00 14.00 4.00 2.227 7.00 14.00 4.30 16.00 6.50 2.727 10.00 19.00 6.50 23.00 11.00 in Feet G GATE -V 1.00 1.00 2.00 A D AL -VA DRY -VA 0.00 0.00 13.00 0.00 0.00 16.00 • SPRINKLER SYSTEM HYDRAULIC ANALYSIS Date: 08/21/2001 .'JOB TITLE: IN -RACK SPRINKLER CALCULATION WATER SUPPLY CURVE 180+ 165+ 150+ 135+ \ \ P120+ 0\ R ; \ E ; \ S ; \ 5105+ X \ U ' R ' E 90+ \ 60+ 45+ 30+ LEGEND \ X = Required Water Supply 106.80 psi @ 2260.5 gpm 15+ 0 = Available Water Supply 121.12 psi @ 2260.5 gpm ?1 Page 9 * <-20.0 psi @ 5636 gpm Flow Test Point 0++-+---+----+ + + + + + + 16002400 3200 4000 4800 5600 6400 7200 8000 FLOW (GPM) 4. ti F't C1� NEit•D - Fz r: V.tr'14. M TG1l.ET r--_ -- _ 4.. e Or (i;4Nrr) -rP ow - r .11 Tt r 1l 4) 4, WO,4'F- ° �o I N. M?',-, r1E.. .r 14IpE I,± VER ) j . VEc'ifY , 1e.:ar i layrJ ' W'U. bY47 nerd fig •: ` A �.. �✓� tris . a4. av1Z1-0 CO NW — .5-v F 2.04 C iNSU�, (1� it ►CAT 'Op u �, W tll — h) L% wi FJ<T a4 . MT. qtr G' TY� , •M SRRINKL iL� "i� Ec't edtko r Ty<li. NLARG.ED F. Exir �' (" (► WITHOUT COMMENTS. ' *' AS NOTED. IN RED (❑ • PER THE ATTACHED LETTER The Drawings affixed her haveeei ed and accepted.. by &ity:o Tu it Fire Dept. Ac1ditioa, deIe • tisians to these ir•jwi rl;s aftep'thr -v-3'rd-'l*s—acceptance-an- �- p .v, w) ITJ1.3 req resubrnittaI of re :. YLt"a McTu4._- -F-+ aeeept :G -is fi E��sT Pe t.p ins;iay a representa NEW T �t - cN� FL�+iJ :ent ?:vh hrw �trCt pr.'t�T d exact address for shut= flown or restoration apr.+roval. 349 UPLAND DR 93-S-241 SEP l J 3 ,I g 14 i `v./A2aHet) SE, 'PR6-ree-re OVERfiiAO sr.*: 4. SY.re'14. exari,v 4 4 `' .KAW 4"_AFF ArtlIVN Pre-- %� Cx 167"%/414 WA No 1/5E _ex /s ?1 A ges-ntOpw, -X4/17"1,414 FdtG HE/G,Nr 1,LM/5iNln 14AL( .,5 bFFIGg._ IZO I�AFr - �/� Be '0. AFt=_ vALVE - 9444 SPRINKLER PLAN i/8'=1=0" iq 1 sre A.r"rA-VG0 6"73 c.ees.er.3 sec cu/ 110-rES: sA✓rer 1, '•; DENOTES E.XISTIN6s SPR(N,CGeV 2,---73,e,v,r Cx/sr/A/ _-P/Pin/4 a, MR DCA/oTES NEG1 ld b NT6.7a SCOPE OF WORK ACCEPTED ITHOUT COMMENTS. N)TEr) IN RED . • _.< 'c . ^.; T ^. I'D LETTER The drawings affixed hereto have been reviewe:i ani accedted by the City of TukNil Fire De,,t. A i-ditibns, deletions or revisions to t;I '.r..wings after this date will void thi - .: v.,Jtance and will require a resubmittal of revised drawings. ,e 1 final acceptance is subject to field - 4 y,representative of this 7tlepartment DATE; 7 BY: ./f^�t _ CITY CITY OF TUKWILA 575-4407 1 A-rL o - F%R E TO -r1E wTO EA/s-rMr OVER HEAD MA Int / PROW _DE sPe/,/ LE,2 - P.20TEGT/co/ —Fra Nes,./ OFF/ce /9 QEA. sysrem. DE5/4/1,Es0 ---Peg FPsI /3 eel) Naea sc,v4-Dvze; TUKWILA FIRE DEPARTMENT Please call: 575-4407 and give this Job No. 9G-S-a.a-� and exact address for shute down or restoration approval. �jccrme/o� w�c - ANDoV6R PARK WES r._ AEA Oc woe4 13ty-ts: 15 Fu(Zv _sPR NixLtritCD - I 1417' SITE PLAN NTS 41440, SPRINKLERS USED SYM SPRINKLER oRIFICE SIZE. TYPE & FINISH QUAN • /tBt�E els"�� TEMP 14.5 - REVISIONS MK DATE BY A A CONTRACT NAME THE BEDROOM COMPANY 349 UPLAND DRIVE TUKWILA, WA 349 UPLAND DR 95-S-226 PATRIOT • ARE -PROTECTION 2004-A 48th Ave Ct. E. Tacoma, -WA 98424 (Phone) 926-2290 (!--ax..) ' 92 -- ' ;r SEP 17 1996 DESIGNER Ke/' P w DATE ISHEET 1 ///4/44 OF z JOB NO. /Z. -O0 6/,zr /tro a G LL 0 ►�) ►`� M U w = O )� Z m Vi G ® CJ N OC L_ O CO V) Z CC O I J J Z Z 0 U 1 d n w p z Q.. w CD 0 CD w / _Q d LJ CC 0 OD w 0 `l- U_ w O I w Z 5 c 0 C!1 Q 11141 /1V. LVV VVV 1 VVR SNEET Z of Z 1 . UJ/ UJ r• Z ... w O O Z W za wYN LJ O01Licet O Z O c ®UQ�i►-' �Qwv,z (==7w z z _,- 0 ,-= w < In Z w m CD p u.) r rn Q w _ w Q Q W z 0 00 _Z u_ f - J G F^ F-- ()I G=(i'ZW (n -j w w Z Z JC)GW CO Li - w W J CD CO a. a Lai N Z Z LI O 177 w 0 G < U w Z zZ.UCZLJ rvUZc= -= 0:E_J0CD � 1-- 1 < 0co in w> XMZa](n LI_ • 1 Z cc II wO u) OOW) Om- (nz�� z-' Qz IrQGw ...., 1 r-- Z C' ., AJI213/1 ,Aild3A, ..17–it „8--,Z NIN3d0 •214 >i3f1211 1UNI u o• y9–,0L —0,„0 –,6 1--a M 2' x 4' SUSPENDED I ACOUSTICAL CLG. L SYSTEM BRACE PER r DTL. 9/ T-1 I 2X4 "STUD WALL W/ SOUND INSUL. & 1 LAYER 5/8" GYP. BD. EA. SIDE za wYN LJ O01Licet O Z O c ®UQ�i►-' �Qwv,z (==7w z z _,- 0 ,-= w < In Z w m CD p u.) r rn Q w _ w Q Q W z 0 00 _Z u_ f - J G F^ F-- ()I G=(i'ZW (n -j w w Z Z JC)GW CO Li - w W J CD CO a. a Lai N Z Z LI O 177 w 0 G < U w Z zZ.UCZLJ rvUZc= -= 0:E_J0CD � 1-- 1 < 0co in w> XMZa](n LI_ • 1 Z cc II wO u) OOW) Om- (nz�� z-' Qz IrQGw ...., 1 r-- Z C' ., AJI213/1 ,Aild3A, ..17–it „8--,Z NIN3d0 •214 >i3f1211 1UNI r — T NI 0)1 Ht I., iO4- FFICE ECEPTION — 1 >4 WOMEN 1 4 ENTRY PARTIAL FLOOR PLAN ORK AREA I.+ SCALE; 1/8'=1'-O' 4 — —,_, - — SCOPE OF WORK 1. ADD HEADS FOR NEW WALLS AND CEILING GENERAL NOTES 1. --- = EXISTING FIRE SPRINKLER LINES. 2. ALL CEILING HEIGHTS TO BE 9'-0" U.N.O. 3. ALL HANGERS TO BE 160E U.N.O. 4. ALL DROPS TO BE 1(0-10)ADN. 0 ACCEPTED Without Comments As Noted In Red Per The Attached Letter These plans have been reviewed by The Tukwila Fire Prevention Bureau for -Conk-on-lance with current city standards. AccepLmce is subject to errors and omissions which dol Yat authorize violations of adopted standards and ordinances. The responsibility for the adequacy of design rests totally with the designer. Additions, deletions or revisions tb these drawings after this date will void this,acceptance and will require a resubmittal of revised drawings for subsequent approval. Final acceptance is subject to field test and inspection by The Tukwila Fire Prevention Bureau. Date: /- - 0 By: cr IS. St 1;11^,,/^.P,^,^ VICINITY MAP SCALE; NTS Ii I TUKWILA FIRE DEPARTMEN1 Please call: 575.4407 -nd give this job o., 0 -3)- O O C. xact address for shut. wn or restoration approval. FILA PAID JAN - 9 2006 TukwiUa Fire .23 ee/ HANGER LEGEND A "U" HOOK B COACH SCREW ROD D BM. CLAMP W/ "STRAP E EYELET F FLUSH SHELL G CEILING FLANGE H SIDE BEAM BRACKET K SHORT CLIP M ALL THREAD ROD N TOGGLE NUT P POWDER DRIVEN STUD R EXPANSION BOLT S PIPE SPIKE T U V w x Y Z STATE CERTIFICATION SPRINKLER LEGEND I . •r " r 61\, °? r N SPRINKLER ORIFICE SIZES AND TYPE = c9 a z o W a w N ~ co— 1 2 5 3 7 1 O® 1/2° 16 8 16 2 SPRAY O 1" 3 4 17 ❑ • 3/4„ V,. 1 1 32 SPRAY O ® 1" /616 2 ;2" 11 8 16 2 SIDEWALL < 1" Z DRY TYPE 0 d 1" O.1" TEMP RATING SPRINKLERS UP AND DOWN U z = J0 m 2 — WAY EARTHQUAKE BRACE �1}� 4 — WAY EARTHQUAKE BRACE 0 165° o 'r�' o Q 212° 1/2" I 1" /" STRUCTURELINEOF PIPE IN TO CENTER Q 266° 1„ ® 1/2« � 350° 1" � 1' FITTING LEGEND Q 500° 1/2" ® 1/2" P PIPE—O—LET APPROVAL REQUIRED F PLAIN END FIT FITTING SN GROOVED SHAPED NIPPLE TUKWILA TSN THREADED SHAPED NIPPLE SPRINKLER HEADS USED SYM MANUF MODEL TYPE THREAD SIZE ORIFICE SIZE HEAD FINISH ESCUTCH FINISH TEMP QTY • RELIABLE G RECESSED 1/2 1/2 CHROME CHROME 165 13 TOTAL 13 QUALITY CONTROL BY MARK FROMONG DATE 1-6-05 APPROVED FOR FABRICATION BY DATE GENERAL NOTES 1. ALL MATERIAL AND EQUIPMENT TO BE NEW AND UL LISTED OR FM APPROVED. 2. PIPING DIMENSIONS ARE CENTER TO CENTER EXCEPT RISERS AND DIMENSIONS SHOWN THUSLY (1-6) WHICH ARE END TO END. 3. EARTHQUAKE BRACING SHALL BE PROVIDED IN ACCORDANCE WITH NFPA PAMPHLET NO. 13, APPLICABLE EDITION 4. PIPE HANGERS AND METHOD OF HANGING TO BE IN ACCORDANCE WITH NFPA PAMPHLET NO. 13, APPLICABLE EDITION. 5. PIPING SHALL BE IN ACCORDANCE WITH NFPA PAMPHLET NO. 13, APPLICABLE EDITION 6. JOINING OF PIPE AND FITTINGS, THREADED do WELDED, SHALL BE IN ACCORDANCE WITH NFPA PAMPHLET NO. 13, APPLICABLE EDITION. 7. OWNER TO PROVIDE ADEQUATE HEAT IN AREAS PROTECTED BY A WET PIPE SPRINKLER SYSTEM TO PREVENT WATER IN PIPES FROM FREEZING. 8. ALL WIRING OF ELECTRICAL DEVICES (IF REQUIRED) TO BE PROVIDED BY OTHERS 9. PAINTING OF PIPE 8c EQUIPMENT (IF REQUIRED) TO BE PROVIDED BY OTHERS 10. FURRING OF PIPE & EQUIPMENT (IF REQUIRED) TO BE PROVIDED BY OTHERS DESIGN CRITERIA 1. ORDINARY HAZARD PIPE SCHEDULE PER NFPA 13. PIPE NOTES 1. ALL PIPE TO BE SCH 40. REVISIONS NO DATE BY DESCRIPTION CONTRACT WITH: R MILLER CONSTRUCTION 146 THIRD AVE S. EDMONDS, WA 98020 PROJECT NAME: ELLIOT BAY TRANSFER TI 349/351 UPLAND DRIVE TUKWIL/ JERRY 349-351 UPLAND DR 206-459 06-S-005 PATRIFP099CF @patriotfire.comOM 1'ilar W\/W,PATRIOTFIRE,CDM FIRE PROTECTION 2707 70TH AVENUE EAST TEL (253) 926-2290 TACOMA, WA 98424 FAX (253) 922-6150 DESIGNER JOHN DACCA SHEET I --P1 DATE 1-6-05 1 OF 1 JOB NO. 12-9179 ---+:�-- -- --�--- r T - -i_�- —�'�- WOMEN OFFICE - - -��,-.{1 *-----+_�—----�_�--2 PECEPT ON WOR AREA OFFI .SIA. P"1161111MIFI11111111 MINEMEMall=111 • - -----�--a ENTRY PARTIAL FLOOR PLA SCALE: 1/8'=1'-0' Tr SCOPE OF WORK 1. ADD HEADS FOR NEW WALLS AND CEILINGS. GENERAL NOTES 1. --- = EXISTING FIRE SPRINKLER LINES. 2. ALL CEILING HEIGHTS TO BE 9'-0" U.N.O. 3. ALL HANGERS TO BE 160E U.N.O. 4. ALL DROPS TO BE 1(0-10)ADN. VICINITY MAP SCALE: NTS PAD JAN - 9 2006 Tukwila Fire 2.2,/(4-7 5v HANGER LEGEND A "U" HOOK B COACH SCREW ROD D BM. CLAMP W/ "STRAP E EYELET F FLUSH SHELL G CEILING FLANGE H SIDE BEAM BRACKET K SHORT CLIP M ALL THREAD ROD N TOGGLE NUT P POWDER DRIVEN STUD R EXPANSION BOLT S PIPE SPIKE T U V w x Y Z STATE CERTIFICATION SPRINKLER LEGEND ' . (�^.rr,.. `..r . fY),,.. I i l , fel �` `✓� U/ z rn SPRINKLER ORIFICE SIZES AND TYPE i 2 z W W a W N - o -o 1 2 5 3 7 1 Q ®1 /2" 16 8 16 2 SPRAY O ® 1" 3 4 17 ❑ • 3/4" 32 SPRAY O 1" 2 7 a a 1/2,. 8 2 SIDEWALL a 1 1" 1" 1 DRY TYPE 001" 2 O• O 1" �� TEMP RATING I SPRINKLERS UP AND DOWN za m Z 3 2- WAY EARTHQUAKE BRACE 0 165° o m Q 0 4 - WAY EARTHQUAKE BRACE O 212° 1/2" al i" (� STRUCTUREEOF PIPE TO IN CENTER /� LIN O 286° 1" ® 1/2" O 350° O so0' 1• 1/21® 4 n. 1/2" FITTING LEGEND P PIPE -0 -LET APPROVAL REQUIRED F PLAIN END FIT FITTING SN GROOVED SHAPED NIPPLE TUKWILA TSN THREADED SHAPED NIPPLE SPRINKLER HEADS USED SYM MANUF MODEL TYPE THREAD SIZE ORIFICE SIZE HEAD FINISH ESCUTCH FINISH TEMP QTY • REUABLE G RECESSED I/2 I/2 CHROME CHROME 165 13 TOTAL 13 QUALITY CONTROL BY MARK FROMONG DATE 1-6-05 APPROVED FOR FABRICATION BY DATE GENERAL NOTES 1. ALL MATERIAL AND EQUIPMENT TO BE NEW AND UL LISTED OR FM APPROVED. 2. PIPING DIMENSIONS ARE CENTER TO CENTER EXCEPT RISERS AND DIMENSIONS SHOWN THUSLY (1-6) WHICH ARE END TO END. 3. EARTHQUAKE BRACING SHALL BE PROVIDED IN ACCORDANCE WITH NFPA PAMPHLET NO. 13, APPLICABLE EDITION 4. PIPE HANGERS AND METHOD OF HANGING TO BE IN ACCORDANCE WITH NFPA PAMPHLET NO. 13, APPLICABLE EDITION. 5. PIPING SHALL BE IN ACCORDANCE WITH NFPA PAMPHLET NO. 13, APPLICABLE EDITION 6. JOINING OF PIPE AND FITTINGS, THREADED & WELDED, SHALL BE IN ACCORDANCE WITH NFPA PAMPHLET NO. 13, APPLICABLE EDITION. 7. OWNER TO PROVIDE ADEQUATE HEAT IN AREAS PROTECTED BY A WET PIPE SPRINKLER SYSTEM TO PREVENT WATER IN PIPES FROM FREEZING. 8. ALL WIRING OF ELECTRICAL DEVICES (IF REQUIRED) TO BE PROVIDED BY OTHERS 9. PAINTING OF PIPE & EQUIPMENT (IF REQUIRED) TO BE PROVIDED BY OTHERS 10. FURRING OF PIPE & EQUIPMENT (IF REQUIRED) TO BE PROVIDED BY OTHERS DESIGN CRITERIA 1. ORDINARY HAZARD PIPE SCHEDULE PER NFPA 13. PIPE NOTES 1. ALL PIPE TO BE SCH 40. REVISIONS NO DATE BY DESCRIPTION CONTRACT WITH: R MILLER CONSTRUCTION 146 THIRD AVE S. EDMONDS, WA 98020 PROJECT NAME: ELLIOT BAY TRANSFER TI 349/351 UPLAND DRIVE TUKWILA, WA JERY 206- 459-0650 5—' PATRIFPO99CF ,,44f T ���' WWW,PATRIUTFIRE,CHM r IOT 1� ®patriotfire.com ;k. FIRE PROTECTION 2. 2707 70TH AVENUE EAST TEL (253) 926-2290 TACOMA, WA 98424 FAX (253) 922-6150 DESIGNER JOHN DACCA SHEET F— P 1 DATE 1-6-05 1 OF 1 JOB NO. 12-9179 Y 1444 ./I1(141194 41;14 rha 45101,41 4 j, 441 '4 11144 ,el 14 a 1 1+ n1 h "t".` 40 } 4 4g 1 11 1 4 or 5 t 4 1 W, 1 n 44 ' 44 )nr ` 4 w. rw '4444 ( { r 41 4 1 ''4 X44 4 J 1444 1 4 T.. i A 4 411 "W 47 t 4 4 44 41 4 44 44 4 "1 44 l+ w 4 /, 4 Pr' rt �t'i yl Tyra rrY .t+4,44 4�4W !4 "n wW rl 4' A a y44Y WI '14 a s { n 1v, 4 w 4 414 ; a a j 444 t, W 4, 44 i I �}Cv *`ie T 1' ybp+wfn w. t 4fl ° r+ fiy n }ri+ C� GMM r l ti^nr *' 4*"+'a�d%o! ^ ""w Vo r+ r a Y a . + 4a ; '' + <4N 4 ar 44 r 4 M }d v't 1 `'4 +' / t; e 4 it 4 6i 'S' a T rh °h r U' a 4 4 l` r•� Y �I „A �. w 1 4 lvrr :.1 S 4 41,0 +d 1 I +~# < , , m i,' Y oar 44 4 e 44 �4 Ip 4 "� „ 1 t` 4 1 44 e J} y b ` 1i" 44 4 v w 4 .' A r N 44 r 4•4 q n° + 4 „4 44 4 ig Y dS fy 1 v 1. " "l 1 44 .4 '14 v n J 4 4M " r l + . 4 N"t t4)ar 44144 4 ,,1%,,,,,,,ft 4�iR 1 a4 pw 44 4 4• t r err { F rr V 1 A r w p 4 h {i 444' ° a+ `` rn } 41+ 4 4 U + y 9 doh ) .". r a v d r4r td R + r 7,� $ r �l y " F 4h1 b` ) 'x 444 ` SI V #1 41 44 4444 41 4 r l A r 1444 4 7 44 44 " 9 r 1 X+} 1 '' • 9 r 1 44 +r )4 1 k44a r 44444 144 4 t « 4 a p r 4U . Yr rr� I )N �e 1f tlm 4 444 1 F "1.'4.`x4 5~« I� };NJ y 41 ,u! a4 P y 41 1 r` 1, 4 ltl v `� 44 4 J Nr 44 of t rL 444 1 '4 S UJ 4 4 t� t 4 r l 0 o1 l4 t ) w (I.4 4. r S J 1 + 44 44 ge 11 + 0. 1 h I i; ' 44 444 9444 44.1 tAa..4 '4 « 4 '')1 r) J) 444 44 4} 4 4 4 1U 44 41 r 7 + it I Y 4, 44 4 R� k I, ,F Fr I i f r r 444 r ' f 41 4 A I 144 4" 4 1 r 4 44 414 44. r 444 111 d r` 4 .4 7' 8a r 41 4 r J 4 at 4 1 V 9 4 4 ,' Y 4. 44 +4 a4 4• 44 1 44 44 Y 4 Ir 4 01 d t 21h RACK MAIN 1 1 # .4 144 ° A 64 4 v 4 '1, r" y r 4 rS N 44 r 1 ti 44 J 4 J KM4r 'mSMx't�l'GwR^+v v7,1f+.04.0^ ,y, r "4 if r ) u y u !d 11 r m 44.4}4 ,r 14 i 44 b4 'i P k 44 ) 1 4 Y1 44 4. 4 k r " 4 r 4 44 )4 a 44 1 44 414 1,14 `4 7 1 ;14„ "44 $ . 41 1 1 Ih 4 {444. 44444 4 a y 40 W Y b 4 4' 441 d f 4 /* 411J, 44 r 44 ! f 9 r 4 1 4 1 4444 5 '4 x 11 4 1) rily r Y 4 yr 4 1e i + 21/2 RACK MAIN 44 II '4 Y{ 4 AI e 1 4 14 41 2142 RACK MAIN 4,"."4'"41'4 44'04;1144 r.a}.q ,r11p010 1;44 yl1 '441444 4^44 7,744441A+.44♦ 44 44 d M't'K.erxrfrrr 444Y.4Ir44444'�44 M4444 -.!*9p / 41w :,44. h 4' 4 1' 4 (r 4atLiv 4 444 14 ,r T 4 �'7 ,4 4Y 1 M' �' b tr- v,i, �5 r ' 1 r "r .r r 4 r� 1,+ .� I{4444( �4Ct -' ". *" T44l/ 4 � 4 w"t ?, st,, ky44't, 4, y la. !4 V fpr + 1 Yr r 4• ra 1 x+4 , 4444 X514 y,N "1f °q '74./ Ve 1 r, I' 1 1 1 444 " 44 [1 fl 0.. vt�. 4 4 � w.° 1,; 41 , t rr't 414, `� a '~*' 14 4 1441 i 444 �1 44 , b wt 4 I }, 4 e �P 4, Y,1 � A +" 44 4 4 4 4' 4 }, 4 444 4nw `I I �f j 4 1 .,, IAtr.; x44 9 v 1 44 4.4,4 4 444 .' { 1 41 4 +. y a4 4 I 4 91 d h 4 A 44 V 444 t a 4 4 444 4N A h 1 , t Ir e, II 1 II 4 444 4 }4, 4 r 1444 4 44 14 11 1. 4 , I Yry 4 4 G W 444 4 r e 44 r, J 4 A all Y t 44 { I h 14418 y°r 49A 1' k J 11 4. { r al r 2 1 d 1 4 {k , A Aa 44 4�r 4 r yl) 41 4 44 , r w , Y! " 4 r P r 1 4 '1 4 pt 4 rf 4 1444444 l r I41 1 r V i 44 I tr 4 44 9 r 4 1 r K I 1011 , sr. I t 4/41 ▪ 1444 4 raw �Ia . tW 7 414i">r'�v4r'r""fk'" `,'r'Pwk v'r"Kdyru'S Vr6 .',S' 4' , rvd 1.4 r 44 ! «+ x 4 1 4r 44 l 44 dpnir T , 7 44h 4 444 t 4 4 44 4i44Yr4 >4 V �" 4 d ✓ ` 1449* y r 11 44 Gt4 rY .M Y f P C t 1 1 9 y 4 +4 A 131 P h44 4( r! 4, I) 4 r M 1 1 44 1 rb .y 44 g 4 444 1C , y' i .40 4, U" „ TI 1 4 J 1 R r r n 4, 4 f 4 24)3 t 44 OVERHEAD REMOTE AREA 398' GPM/2040 SQ FT SYSTEM DEMAND 909 2 GPM 0 45 PSI AT BASE OF RISER 11/* 11/'2 0.1.5500 444444.11491444444.4. 4 a �'-'-Be MAIN 1 fA 4 4 1 r l 4 fY,4 4, A SINGLE, ROW r,SECTIO 441 }a Il FP - 4 a 14 i FI t A 4 1 }i f r , 4, Y I1 4 w 11 1 44 4 Or 44 4444 4 4 044 1 44 54o a i 4411444.1 hy4r 14444 41 V44444 fh1 ILd hrb S6 ( r« w4 <w+ Y' r<'1144 1 r ' hit V{s 4f r w iJ A 4h I1n.;.4 1+44 1J4 41x it 444 wr,4 4 644 x.444# 441 law, #P1=.._.1 , 1 4 Y 44P4:1 4 C4'a 7 4 any t 4 '4 P-- 4 S y It 1 I S it 4 4 1 M F SINGLE- ROW {4 1 1 4 44 44 44 41 4 4 44 9 4 1 4 41 440 y 4 444 4 44 G 94 f ia y 4 7 oVERHEAD FIRE SPRINKLER PLAN 44 44 ! 4 r 444 TTr " r , 4. 4 A 444 h r 44 I, 4 144 l 74 A g° Y ',SECTION },454 1r4v 444 441 "ll 444. 7+ 4. Y r d i1 I I 4 J 44444, 11'1444'!71 44 4 (444 + r 4 t 9! « w rS44 r 4 �4° k n ter 4 rU 11 X 1}44x 444 J{4 ', allr�M`�I�rp�yAOkrV ,v law 4 rJ44 ` �'�+ re 1, 44 A44 N 411 4 44 al 4 rlryi.i %41 < rt "4 r'Mrr , 444, n y 4 4 4 i 44 4 1 1 '4 do: rk ?4571 ileo ,wc}-�w: ' 1r404 4J4i4, 41, 444444 446 11 1,0000r,wW.4'4414 , 4wM.w44441+w"+wn' 4 Y N 4.4 )444^ '(10.444,_ SCALE. 1/8' 4r� 11,b` es, 4 4444 444 1° 144 r DOUBLE'' ROW SECTION FP- .70 14 01 D 'DOUBLE ROW SECTION v. 41, 444 X44 ) ) 9 rot41 } r4 41411 nl et 14. or 446 .1 ir 44 40 • 14 REMOVE ELBOW AT TOP OF RACK RISER AND INSTALL TEE 21/2 RACK MAIN 05.6.151.11. 4.4514.1441151 15•44.44.454 FURNITURE STORAGE TO 22'0 SOLID rtHEINES HYDRAULICALLY CALCULATED TO 'PROVIDE A DENSITY OF COMBINED RACK 'AND 0.H. FLOW14ATi NODE BOR 1760 GPM' 0 915 PSI 0 11 it 41 It ti 0,461r 1904' 4$11 t 21/2 *41 14 1. 1 144; STRUT CLAMP -STEEL PIPE -PS1501a1 (1 5/8 Fr LONG, SECURE BOLTS, NUTS AND sHANGER 2 9-41/2 444 71 x 2 7/16) W/ (2) 3/8 x 1 WASHERS 22-11/2 11 1 ,* RACK REMOTE AREA , 7, HEADS," 2 LEVELS 22 GPM EA01-1, ,SYSTEM DEMAND , AL BASE OF RISER 10 1 0111 1.4 It 4 Iv '411 r 14 t 04 FLOW TEST 914 914 fit 0m 72 1 Trrogge ,1•1•01•11. 1 sf- FP- 1:!ACK FIRE SPRIkLER PLAN str 41; 4 441 c 44 66 GRIN 141 9 94 4 st ASHERS 2x2x3/16 ANGLE IRON SECURE W1114 (2) 3/8x11/2 BOLTS. NUTS AND WASHERS SHOP DRILL 7/16 HOLE (2) PIPE RILL V2 HOLE so HANGER Z STATIC 144 RESIDOL 20 FLOW 5636 SOURbE TUKWILA WATER LOCATION UPLAND DRIVE, WEST END 40 it- AREA OF' WORK )i 1/ 4., 71 '4: .: 'I ::: it 4,,,'"4"4,'„, .,;-: ' 4 '", .4,-44 v 4." l',4,. :4r, '''1444:11‘,..4(4: ' ' %' 't,,rat.'144c 41'; ..1,44ts 4 t 1 I I '1. 4 4;4' ; If 4'4 V‘ :4/ 444441,:.:4,., ,.. _41 4 664 41144'44 44774474 04414,4447066, *17 4446' r1;t747 tog 01111474 Irg 14T - 144 o g0gele7r 74446 vs....74076+14 77744, .471 41* 44 t I4 44 st 4 114 44 444 1 4 0 40 ACCEPTED Without Comments As Noted In Red Per The Attached Letter These plans have been reviewed by The Tukwila Fire Prevention Bureau for conformance with current city -1,andards Acceptance is subject to errors and nisstons which do not authorize violattons of adopted indards and ordinances The responsibility for the t-‘quacy of desIgn rests totally with the designer tittons deletions or revisions to these drawings after uote will void this acceptance and will require a .,t,ibmittal of revised drawings for subsequent approval mat acceptance is subject to field test and inspection by the Tukwila Fire Preventio Bureau Date 'fZ.\_S\,("3\ By VILS 1 5COPEOF WORK TUKWILA FIRE DEPARTMENT please call 575 4407 and give this lob EXTEND EXISTING RACK SYSTEM TO UNPROTECTED RACKS PER TUKWILA INSPECTION REPORT, frtl. 41414 1`, titr No and exact addreSs for shuta down or restoration approval ST rat; T S 170th 61 ''''' ')' r07orpora;41?: ::Ita;:4'D N s. 4 11 t 64 TVI 4 ikIland Dr ir 6, 104 Triland Dr 44 Ma Park 0 i4, I 44. 470 A4 41 t gr I :5.13 hi 047 444 C 2001 Ma BC1uest.op f 444 66 \k/ C 1 ki 44 le 11' 4474471,47;4 t 9 444 464411l 4411441a41,, koirc TY 04 I GI ie AUG 2 3, 2CT1 v 110 4466. • 1 44 r co 4:4 *a 40,1 '14, ,4 .44 414 sr tt 3'4).4004r .07-7"1 444r440744 r7.17. 4 0 447, 44 Irrg 1 41 44 4 44. '442 Ir g <-414:--`41‘-r-5•4‘'141—i1-4 "45:94 T 4 44 44 HANGER LEGEND 8 COACH SCREW ROD Dr, 13M CLAMP W/ "STRAP EYELET, THROUGHBOLT F FLUSH SHELL G CEILING FLANGE H SIDE BEAM BRACKET K SHORT CUP M ALL THREAD ROD N TOGGLE t NUT P POWDER DRIVEN STUD R EXPANSION BOLT- S PIPE SPIKE Y SEE DETAIL Z SEE' DETAIL FITTING LEGEND PLAIN END rix FITTING SN GROOVED SHAPED NIPPLE TSH THREADED SHAPED NIPPLE + 4 - WAY EARTHQUAKE SPACE STRUCTURE TO CENT ER LINE Of PIPE IN INCHES a. STATE CERTIFICATION 5PRINKLER LEGEND sppitshartt optrice SIZES ANS) TYPE 4 31 ' TEMP RATING SPRAY SIDEWALL DRY TTPE sCe 2124 2864 500' gf 1/2" APPROVAL REQUIRED are OF TUKWILA SPRINKLER HEADS USED" mAwvt THREAD SIZE ORRICE , SIZE HUD EStUTCH FINISH mask sym RELKIIE SSP 12/, 165' ,48 TYPE .1555. it 4.4 444 Tara. 46 OUAUTT CONTROL ST DATE APPROVED' TOR FABRICATION ST DATE GENERAL NOTES 1 AU, MATERIAL AND EOUIPmENT TO SE NEW APO IX LISTED OR fiaJ APPROvED 2 PIPING DINENSIONS ARE CENTER TO CENTER EXCEPT RISERS ANC/ DINENSION$ SHOwe4 THUSLY (1-6) wsic$4 APE END TO IMO 3 EARTHQUAKE BRACING SHALL OE PROVIDED ACCORDANCE WITH 4 pIPE HANGERS ANO befto$00. No4GING TO RE 114 ACCORDANCE WITH NFPA PAMPHLET NO 13 APPUCASLE EDITION 5 PIPING SHALL BE IN ACCORDANCE 141104 NFPA PAMPHLET NO 13 APPLICABLE EDITION 6 JOINING OF PIPE AND ITIIINGS THREADED & WELDED SHALL BE IN ACCORDANCE WITH 14FPA PAMPHLET NO 13 APPLICABLE EDITION 7 OWNER 10 poov,DE AbrQUATE HEAT AREAS PROTECTED BY A WET PIPE SPRINKLER SYSTEM TO PREVENT wATER IN PIPES FROM FREEZING 8, MI WIRIRO OF ELECTRICAL DEVICES OF REQUIRED) TO BE PROvIDED tre OTHERS PAINTING Or PIPE A EQuiPmENT ;MOORED) TO OE PROWIED 10 tURRING OF PIPE & EOUIPNENT (IF REQUIRED) TO BE PROVIDED BY OTHERS DESIGN CRITERIA DESIGN PER FACTORY MUTUAL DATA SHEET 8-33 FACTORY MUTUAL SUPERSEDES NEPA 13 REQUIREMENTS CLASS IV COMMODITIES STORED ON SOLID RACK SHELVING TO 22', RACK HYDRAUUCALLY CALCULATED AND BALANCED WITH 011 RACK REQUIRES 7 HEADS EACH ON 2 LEVELS, Flown 22 GPM OH SYSTEM REQUIRED TO FLOW 398 GPM/2000 SQ FT PIPE NOTES 1 AU. THREADED PIPING TO BE SCH-40 REVISIONS NO DATE BT CONTRACT WITH BEDROOM SUPERSTORE 349 UPLAND DRIVE ANDY, PH. 619-466-1236 PROJECT NAME , RACK SPRINKLER CORRECTIONS 44 t RORY BEDROOM SUPERSTORE 349 UPLAND DR TUKWILA. WA 98188 , 349 UPLAND DR 11 T FIRE PROTECTION 1, :t2707 70th AVENUE EAST DESIONER DATE t TEL FAX SHEET mom 2531 '926-2290 Z53 922-6150 4,4 Nil s 14