Loading...
HomeMy WebLinkAboutPP - 18235 OLYMPIC AVE S - KAWNEER - PERMITS AND PLANS18235 OLYMPIC AVE S ASSOCIATED PERMITS 99-F-154 02-S-256 NEW BATHROOMS O EXISTING RISER • EXISTING 2" UNE "—EXISTING DEMISING ACCEPTED 171 Without Comments ❑ As Noted In Red ❑ Per The Attached Letter These plans have been reviewed by The Tukwila Fire Prevention Bureau for coni .rmz nce with current city standards. Acceptance is subject to errors and omissions which do not authorize violations of adopted I standards and ordinances. .i"r'. responsibility for the adequacy of design ret:, totE:iy with the cls -=finer. Additions, deletions or revi ;ens Mese drawings after this date will void this accL,P,..aqcs and will require a resubmittal of revised drawings for.subsaquent approval. Era! acceptance is subject to field test and inspection by The Tukwila Fire Prevention Bureau. Date: 5-1)) -5 `+ By: 4i_ 57/ PARTIAL FIRE SPRINKLER PLAN SCALE: 1/8"=1'-0" Wr, LISTER/FITTER NOTES 1. ALL. SCREWED PIPE TO BE XL 2. ALL HANGERS TO BE TYPE -Y U.N.O. 3. ALL DROPS TO BE 1(0-6) TO ADN. U.N.O. SCOPE OF WORK ADD TWO FIRE SPRINKLER HEADS TO NEW Bl H cg 8. I MAY 18 1999 18235 OLYMPIC AVE S 99-S-154 1111 OOOOOOOOOOOOOOOOOOOOOOOOO A TUKWILA FIRE DEPARTMENT. Please call: 575-4407 and give this iob No. and ':,1'.; a VY approval. rA A II0'44411111 ') HANGER LEGEND Z 3/8" ELCO ZE710 SPRINKLER HEADS USED SYM MAKE, ORIFICE SIZE, TYPE & FINISH TEMP OTY • RELYOLE MCO G REC W/ ADN 1/2 1/2 CHR CIR 155 2 REVISIONS MK DATE BY CONTRACTVNTH: COMMERCIAL TENANT SERVICES CONTRACT NAME: WEST COAST PAPER 18235 OLYMPIC AVE S TUKWILA, WA ; JIM SUTTER 253-229-1667 IM ArBIOT' PATRIFP099CF ` 7A0jOlt WA 98424 TL (253) 926-22 FAX (253) 922-615 FIRE PROTECTION DESIGNER DATE JOB NUMBER CLINT CARR 4-6-99 12-4484 ' 1 174847 / ._ALF - - fY ✓ _ _ C, r e 5-0 ---- r r- E C.: FA t to -0 t -i- / 0 I' l0-0 - GZ-0 - t -Cc EGF / I It to ExT of :s t 11 t -0 1 t'4 a-0 rrEre! -T -{4ic. e='f L ICS -C? 1-v 3 Xo U(11?) m I F 1-%kt - I- = -- L t ti -0 £AFF 0 0 4 _ c -r ...1At t-4 ''� _-, -i_ WI ri-V rt!- 't i z/a t E_- A-'' A : - -4- - -j —*- r i k1041 J ' f"AAS A J `e R `{it c,!�- _ '4 -5 4"- J\ L& ACCEPTED Without Comments - As Noted In Red Per The Attached Letter These plans have been reviewed by The Tukwila Fire Prevention Bureau for conformance with current city standards. Acceptance is subject to errors and omissions which do not authorize violations of adopted standards and ordinances. The responsibility for the adequacy of design rests totally with the designers _ Additions, deletions or revisions to these drawings after this date will void this acceptance and will require a resubmittal of revised drawings for subsequent approval. Final acceptance is subject to field test and inspection by The Tukwila Fire Prevention Bureau. Date:( 2. 5 VO By: fUKWILA FIRE D PA IV .N1 Please call: 575.4407 and give this job No. and exact address for shut= down or restoration approval. lam` F-1A_/a =`% rir 5 �IZC? AF- r P' I RE ii N ra '' - _.i -1 t -'t � est. Inc. e � o4`5�ate Certifica IJ Du: 242 j002 1 ta'OIYh Dace. - ! ulti - v -1 J' VICINITY MAP CONTRACT NAME: tr, AT. - t FILE 0. - CONTRACT WITH: - Z -l4 -6\/..i tNH — hl -1.- 1-4 ft1 (� _ icc, HANGER L_EQENID SPRINKLER HEADS REVISIONS QENERAL_ NOTES A "lf HOOK L "L" ROD SYMBOL TYPE MFG MODEL SIZE TEMP_ FINISH CANOPY QUANTITY MK DATE BY DESCRIPTION B COACH SCREW ROD M MACHINE THREADED ROD 0 FrF R--�.R. S''a � t+ 20 Hie REG. C Ff r2 Zt A C °C" CLAMP - N TOGGLE NUT A D TOP BEAM CLAMP P POWDER DRIVEN STUD A E EYE ROD R WEDGE ANCHOR A F FLUSH SHELL T APPROVALS REQUIRED G CEILING FLANGE O Ltt1s_ '. I�Wkt_A Et1 SIDE BEAM BRACKET J "J" BOLT X K SHORT CUP Y TOTAL THIS SHEET 1. ALL MATERIAL AND EQUIPMENT TO BE NEW AND UNDERWRITERS APPROVED. - 2. PIPING DIMENSIONS ARE CENTER TO CENTER EXCEPT RISER & DIMENSIONS - SHOWN THUSLY (1-6) WHICH ARE END TO END. 3. EARTHQUAKE BRACING SHALL BE PROVIDED IN ACCORDANCE WITH NFPA PAMPHLET NO. 13. 4. PIPE HANGERS AND METHOD OF HANGING TO BE IN ACCORDANCE WITH NFPA PAMPHLET NO. 13. 5. PIPING SHALL BE IN ACCORDANCE WITH NFPA PAMPHLET NO. 13. 6. JOINING OF PIPE AND FITTINGS, THREADED AND WELDED SHALL BE IN ACCORDANCE WITH NFPA PAMPHLET NO. 13_ -- - 7. OWNER TO PROVIDE ADEQUATE HEAT TO PREVENT WATER IN PIPES FROM FREEZING IN AREAS PROTECTED BY A WET PIPE SPRINKLER SYSTEM. - B. STRUCTURAL ADEQUACY OF THE BUILDING TO SUPPORT THE SPRINKLER PIPING IS THE RESPONSIBILITY OF THE OWNER AND/OR HIS STRUCTURAL REPRESENTATIVE. Fire Systems west 219 Frontage Road North, Suite 13 - n..,;f It % 052017 18235 OLYMPIC AVE S 02-S-257 WA CL #FIRESWI 140B1 WA ECL #FIRESWI 055LW Q.C. FAB BY: / / Q.C. INSTALL BY: DESIGNER DATE JOB NO. SHEET A ;�_ -it 1 C 1