HomeMy WebLinkAboutPP - 18235 OLYMPIC AVE S - KAWNEER - PERMITS AND PLANS18235 OLYMPIC AVE S
ASSOCIATED PERMITS
99-F-154
02-S-256
NEW BATHROOMS
O
EXISTING RISER
•
EXISTING 2" UNE
"—EXISTING DEMISING
ACCEPTED
171 Without Comments
❑ As Noted In Red
❑ Per The Attached Letter
These plans have been reviewed by The Tukwila Fire
Prevention Bureau for coni .rmz nce with current city
standards. Acceptance is subject to errors and
omissions which do not authorize violations of adopted
I standards and ordinances. .i"r'. responsibility for the
adequacy of design ret:, totE:iy with the cls -=finer.
Additions, deletions or revi ;ens Mese drawings after
this date will void this accL,P,..aqcs and will require a
resubmittal of revised drawings for.subsaquent approval.
Era! acceptance is subject to field test and inspection by
The Tukwila Fire Prevention Bureau.
Date: 5-1)) -5 `+ By: 4i_ 57/
PARTIAL FIRE SPRINKLER PLAN
SCALE: 1/8"=1'-0" Wr,
LISTER/FITTER NOTES
1. ALL. SCREWED PIPE TO BE XL
2. ALL HANGERS TO BE TYPE -Y U.N.O.
3. ALL DROPS TO BE 1(0-6) TO ADN. U.N.O.
SCOPE OF WORK
ADD TWO FIRE SPRINKLER HEADS TO NEW Bl H cg 8. I
MAY 18 1999
18235 OLYMPIC AVE S
99-S-154
1111 OOOOOOOOOOOOOOOOOOOOOOOOO
A
TUKWILA FIRE DEPARTMENT.
Please call: 575-4407
and give this iob
No.
and ':,1'.;
a VY approval.
rA A
II0'44411111 ')
HANGER LEGEND
Z
3/8" ELCO ZE710
SPRINKLER HEADS USED
SYM
MAKE, ORIFICE SIZE, TYPE & FINISH
TEMP
OTY
•
RELYOLE MCO G REC W/ ADN 1/2 1/2 CHR CIR
155
2
REVISIONS
MK
DATE
BY
CONTRACTVNTH:
COMMERCIAL TENANT SERVICES
CONTRACT NAME:
WEST COAST PAPER
18235 OLYMPIC AVE S
TUKWILA, WA ;
JIM SUTTER 253-229-1667
IM
ArBIOT'
PATRIFP099CF `
7A0jOlt WA 98424
TL (253) 926-22
FAX (253) 922-615
FIRE PROTECTION
DESIGNER
DATE
JOB NUMBER
CLINT CARR
4-6-99
12-4484 '
1
174847
/ ._ALF - - fY ✓ _ _
C, r e
5-0 ----
r
r- E C.: FA t
to -0 t
-i-
/ 0 I'
l0-0 -
GZ-0 - t -Cc
EGF
/
I
It
to
ExT
of
:s
t
11
t
-0
1
t'4
a-0
rrEre! -T
-{4ic. e='f L
ICS -C? 1-v 3
Xo U(11?)
m
I F
1-%kt
- I- = --
L
t ti -0
£AFF
0
0
4
_ c -r ...1At t-4 ''� _-,
-i_ WI ri-V rt!- 't i z/a t E_-
A-'' A : - -4- -
-j
—*-
r i k1041
J ' f"AAS A J `e R
`{it c,!�- _ '4 -5 4"- J\ L&
ACCEPTED
Without Comments -
As Noted In Red
Per The Attached Letter
These plans have been reviewed by The Tukwila Fire
Prevention Bureau for conformance with current city
standards. Acceptance is subject to errors and
omissions which do not authorize violations of adopted
standards and ordinances. The responsibility for the
adequacy of design rests totally with the designers _
Additions, deletions or revisions to these drawings after
this date will void this acceptance and will require a
resubmittal of revised drawings for subsequent approval.
Final acceptance is subject to field test and inspection by
The Tukwila Fire Prevention Bureau.
Date:( 2.
5 VO
By:
fUKWILA FIRE D PA IV .N1
Please call: 575.4407
and give this job
No.
and exact address for shut=
down or restoration approval.
lam`
F-1A_/a =`%
rir 5 �IZC?
AF- r P' I RE
ii N
ra '' - _.i -1 t -'t � est. Inc.
e � o4`5�ate
Certifica
IJ
Du: 242
j002
1
ta'OIYh Dace.
- ! ulti
- v
-1 J'
VICINITY MAP
CONTRACT NAME:
tr, AT. - t
FILE
0. -
CONTRACT WITH:
-
Z -l4 -6\/..i
tNH
—
hl -1.- 1-4 ft1 (� _ icc,
HANGER L_EQENID
SPRINKLER HEADS
REVISIONS
QENERAL_ NOTES
A
"lf HOOK
L
"L" ROD
SYMBOL
TYPE
MFG
MODEL
SIZE
TEMP_
FINISH
CANOPY
QUANTITY
MK
DATE
BY
DESCRIPTION
B
COACH SCREW ROD
M
MACHINE THREADED ROD
0
FrF
R--�.R.
S''a
� t+ 20 Hie
REG. C Ff r2
Zt
A
C
°C" CLAMP -
N
TOGGLE NUT
A
D
TOP BEAM CLAMP
P
POWDER DRIVEN STUD
A
E
EYE ROD
R
WEDGE ANCHOR
A
F
FLUSH SHELL
T
APPROVALS REQUIRED
G
CEILING FLANGE
O
Ltt1s_
'. I�Wkt_A Et1
SIDE BEAM BRACKET
J
"J" BOLT
X
K
SHORT CUP
Y
TOTAL THIS SHEET
1. ALL MATERIAL AND EQUIPMENT TO BE NEW AND UNDERWRITERS APPROVED. -
2. PIPING DIMENSIONS ARE CENTER TO CENTER EXCEPT RISER & DIMENSIONS -
SHOWN THUSLY (1-6) WHICH ARE END TO END.
3. EARTHQUAKE BRACING SHALL BE PROVIDED IN ACCORDANCE WITH NFPA
PAMPHLET NO. 13.
4. PIPE HANGERS AND METHOD OF HANGING TO BE IN ACCORDANCE WITH
NFPA PAMPHLET NO. 13.
5. PIPING SHALL BE IN ACCORDANCE WITH NFPA PAMPHLET NO. 13.
6. JOINING OF PIPE AND FITTINGS, THREADED AND WELDED SHALL BE IN
ACCORDANCE WITH NFPA PAMPHLET NO. 13_ -- -
7. OWNER TO PROVIDE ADEQUATE HEAT TO PREVENT WATER IN PIPES FROM
FREEZING IN AREAS PROTECTED BY A WET PIPE SPRINKLER SYSTEM. -
B. STRUCTURAL ADEQUACY OF THE BUILDING TO SUPPORT THE SPRINKLER
PIPING IS THE RESPONSIBILITY OF THE OWNER AND/OR HIS STRUCTURAL
REPRESENTATIVE.
Fire Systems west
219 Frontage Road North, Suite 13 -
n..,;f It % 052017
18235 OLYMPIC AVE S
02-S-257
WA CL #FIRESWI 140B1
WA ECL #FIRESWI 055LW
Q.C. FAB BY:
/ /
Q.C. INSTALL BY:
DESIGNER
DATE
JOB NO.
SHEET
A ;�_
-it
1 C 1