HomeMy WebLinkAboutPP - 3725 S 144TH ST - TUKWILA SUPER SAVER FOODS - PERMITS AND PLANS3725 S 144TH ST
ASSOCIATED PERMITS
19-F-062 09-5-090
13-F-284 18-H-205
CITY OF TUKWILA
FIRE MARSHAL'S OFFICE
206-575-4407
FIRE PROTECTION SYSTEMS PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
**PLEASE PRINT**
SITE LOCATION
ebl King Co. Assessor's Tax No.:
1:5—
Site Address: 5 / y T Suite Number: Floor:
Tenant Name: S q q v- 3 /11q v 1t? 1" New Tenant? ❑ - Yes No
Property Owner's Name: FC! 2' VS/ yovqcsQ 1 /�..7 L L
Mailing Address: J 02-1 / 5T 7,e YR 0 d1 -*--P tg cA-- "L „kik_ k- Wq9 „?..„277
City State Zip
CONTACT PERSON -if there are questions about the submittal.
Name:
253 -3(1;2-9726
oc; I ( Day Telephone:
Company Name: /1 t / , .4A r / , c 7 r r <- c�
Mailing Address: i4U' YJ p.73, 5r cy A a w ays-%
SITE LOCATION
CITY OF TUKWILA
FIRE DEPARTMENT
444 Andover Park East
Tukwila, WA 98188
206-575-4407
Date application
accepted:
FIRE PROTECTION SYSTEMS PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
**PLEASE PRINT**
King Co. Assessor's Tax No.: t -1 0000 < < 5
Site Address: 37 2 - T - - ILKent'r Suite Number: Floor:
Tenant Name: �AAQt.S MM-% ( 'PUN -C_
New Tenant? ❑ - Yes ❑ - No
Property Owner's Name: -77M frck
Mailing Address: lf/� `-A-hEl tk,' 1 - C icn iJJZ LA-(rat10UD uA- 9809
/
City State Zip
CONTACT PERSON -if there are questions about the submittal.
Name: AN D9 12 -Li A.NJ
Company Name:
Mailing Address: 1 BLV'
E-mail Address:
ANh1 RyRJ��f trite-OtJ�, c��2 C�
Day Telephone: 2-06 -575---0.3//
A(„ia0A-14*
City State Zip
Fax Number: 7-63-13S-4-91 1'
WA- q' Cil
Total number of new/relocated devices or sprinkler heads:
Valuation of Project (contractor's bid price): $ ,"
Scope of Work (please provide detailed information): ( *i� �- 1. )5 !'/A 1�-(,/ _ 1
1
'Q '
D, 1 Ism S� sl P S-rrr
PERMIT APPLICATION NOTES
Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Fire Marshal to comply with current fee schedules.
Expiration of Plan Review -Every permit issued shall become invalid unless the work on the site authorized by such permit
is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or
abandoned for a period of 180 days after the time the work is commenced. The Fire Marshal is authorized to grant, in
writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing
and justifiable cause demonstrated.
I HEREBY CERTIFY THAT I HA
UNDER PENALTY OF PE .. R
FOR THIS
BU
Signature:
Print Name:
AD AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE
THE LAWS OF THE STATE OR WASHINGTON, AND I AM AUTHORIZED TO APPLY
—7 eSTivrq/
Plan Permit App.doc
1/2/13
Date:
Day Telephone: 2.1:6-575- -03 i 1
TFD FP Form 8
SITE LOCATION
CITY OF TUKWILA
FIRE MARSHAL'S OFFICE
206-575-4407
FIRE PROTECTION SYSTEMS PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
**PLEASE PRINT**
ll King Co. Assessor's Tax No.:
Site Address: 3 - Z S 5 / y'i �h 51" 7Z hie GI Suite Number: Floor:
Tenant Name: / / I'/AA Crps A pilot
3 1, -,fel
New Tenant? ['Yes ❑ - No
Property Owner's Name:
Mailing Address:
City State Zip
CONTACT PERSON -if there are questions about the submittal.
Name: /'/("W/ G i1 04 Lir? t n Day Telephone: vi o6 ' 9cfS LJ
Company Name: / r/ 1.1 00) .9 Z 1 c
Mailing Address: % 6 1/ / ,' C j r701al 1,?2/ ect>, k �G/ n/qk
/ City State Zip
E-mail Address: %%4n 441 giPtini/7_, 6 a llook.CCa� Fax Number:
Contractor's City of Tukwila
NICET III number: Business License number:
Total number of new/relocated devices or sprinkler heads:
Valuation of Project (contractor's bid price): $ rel, 5 00
Scope of Work (please provide detailed information): C1-- i // 6, j 12/te /'1 q Cly Cheri/4(
W I. 30o he" /co f
PERMIT APPLICATION NOTES
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Fire Marshal to comply with current fee schedules.
Expiration of Plan Review -Every permit issued shall become invalid unless the work on the site authorized by such permit
is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or
abandoned for a period of 180 days after the time the work is commenced. The Fire Marshal is authorized to grant, in
writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing
and justifiable cause demonstrated.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE
UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OR WASHINGTON, AND I AM AUTHORIZED TO APPLY
FOR THIS PERMIT.
BUILDING OWNER OR AUTHORIZED AGENT:
Signature:
Print Name:
Date:
Day Telephone:
Plan Permit App.doc 8/22/14 TFD FP Form 8
FIRE DEPARTMENT HOOD SUPPRESSION PLAN REVIEW COMMENTS
Project Name: Han's Fresh Pita Bread
3725 S 144th St.
18-H-205
October 23, 2018
Permit No.:
Date:
Reviewer:
Al Metzler
Fire Protection Project Coordinator
(206) 575-4407 option # 2 (Inspection Requests)
(206) 971-8718 (Plan Review Questions)
• Nozzle heights above appliances to be per manufacturers installation guidelines.
• Fryers shall be installed with at least a 16 inch space between the fryer and
surface flames from adjacent cooking equipment or a minimum 8 inch high steel
or tempered glass baffle plate shall be installed between the appliances.
• Upon activation of the suppression system, the make-up air supply will shut off
and the exhaust will keep running.
• Type 1 hood systems shall be designed and installed to automatically activate
the exhaust system whenever cooking operations occur. The activation of the
exhaust system shall occur through an interlock with the cooking appliances, by
means of heat sensors or by means of other approved methods.
• Activation of the suppression system shall shunt all electrical power under the
hood as well as the gas supply.
• Install a "K" rated portable fire extinguisher within 30 ft. of the cooking equipment.
• The hood suppression system shall be monitored by a U.L. Central Monitoring
Station.
• If code compliant fire alarm notification is not already in place in the kitchen, a
minimum 110 candela horn/strobe shall be installed above the kitchen hood
suppression system manual pull station at a height of 80 inches above the floor.
• A separate fire alarm permit from the Tukwila Fire Department is required for all
fire alarm work.
-7/ s -.A/(
• The suppression system manual pull station shall be located no closer than 10 ft.
and no farther than 20 ft. from the cooking equipment and be placed at a height
of 42 to 48 inches above the floor.
• The inside lower edge of the hood shall overhang or extend a horizontal distance
of not less than 6 inches beyond the edge of the top horizontal surface of the
appliance on all open sides. The vertical distance between the front lower lip of
the hood and such surface shall not exceed 4 feet.
• If cooking appliances are wheeled, the appliance wheels shall be set in tracks
permanently mounted to the floor to ensure appliance is returned to original
location if moved for cleaning or maintenance.
Sa'-
F -e kr- v
ACCEPTED
0 Without Comments
As Noted in Red
O Per The Attached Letter
These plans have been reviewed by The Tukwila Fire
evention Bureau for conformance with current City
ndaris. Acceptance is subject to errors and
•nisslons which do not authorize violations of adopted
;.indards anti ordinances, The responsibility for the
: equacy of desig! rf;',sts totally with Me designer.
,: dii ions, deledo! ; evisions to these drawings after
this date wit! void tri . <. ceptance and will require a
tesubmitta+ r,k +d , .-,-�wngs for subsequent approval.
Final acceptance i`. Su oject to meta test and inspection by
The Tukwila Fire Prevention Bureau.
Date: 4-9- l 1 By:
',E ►-h.�s ha►.� � w„� •,.,,� 1 o c4.,,614►h
atiA 11, „...AAA go" above -Glop.-.
14 eco
140,t1 ,57(, -.11°,,e
`� ?'r to �� ° FIG a
TUKWILA FIRE DEPARTMENT
Please call 206-5754407 and
give this Fire Permit No.
Iq-F-o(/)-
and exact address for shut-
down
hutdown or restoration approval.
/J
'NOTICE
A complete ped, Tukwila
Fire Department Pre-test
Certificate must he presented
to the ':rnsre torr prior to
commencem..;t of Acceptance
Testing :any Fire Alarm
and Detection Systi•^:;ns.
Failure of test wiili result
in a Re -inspection Fee and
termination of the testing
PAID
MAR 13 2019
TUKWILA FIRE
CCift2a)i
"31VD13112130 aNY 30N30I1
2 D Z
mO
O
M Z
O D
NI m
o -1 o
co
-< C
`'s
ri
0 nN
I 2 n
m
� N
< m
r
"S13)IDV219
•
• • • • 1 • • • • •
K \ Z "i n -0 '0 'O "O 7. -0 00 3 O 'G
> , C 2 2 70 70 70 70 77 m 73
70
z0Nzgm�;o000 0-0NZ00
Z m v X X X X -Z.{ X D X m X X
C cmr' -a 3 m 12 O C) C w
rr- r73 m n �_ Z n to ry D Gl n
prp O c Z n W -� C Z* D
Dm x -<< rr- S m O m r mC -� Z
O C m r W=? p NJ N 7Z oo C 70 m D
Z � Z m
Z -� m M N 0 O r- Ni K v p7 vi C- 0
v 0 -"I Z -m-I y% F, O y Z
cz -10Km . ct� z z
to 0 0 0 2 .Z.{ O= 0 G1 0
co -� c J 71 m Z r
m rr" --I m m Z N rT- N 70 00 03
0
z 53 0 CI N 2 0X 70 c0 x
1A131SAS NOISS32IddflS 32113 11 X31O2Id
L6F.8-06L-90Z
6ti8IZS890Z
D N
D
03
-
al
ooA P3
=cmn
--I =
C D
* W
0
v
•
n
VO YEL
Meets the requirements of Standard 01300
Wet Chemical Solution
Extinguishing System Unit
PREENGINEERED TYPE
LISTED 16S6
13000
The Date of Maeufactige is oil NCO'
Heiser Logistics Inc. • Canandaigua, New York 144209'
•
MAINTENANCE this.
ead and understand the owner's manual for fire suppression system. The extinguisher
er
s stem unit shall be inspected monthly or at more frequent intervals when circumstances
Y
require. The unit shall be pressurized as intended. Recharge if pressure is below operable
range. The piping and nozzles should be examined to ascertain that they are unobstructed.
Install, inspect, maintain and test in accordance with the ProTex ! I Technical Manual P/N
10053 and NPFA 17A standard for wet chemical extinguishing systems.
RECHARGE
Cylinder must be relieved of remaining pressure before removing valve assembly. The
recharge procedure must be done by a qualified ProTex distributor in accordance with the
approved procedures established by Heiser Logistics. Refill only with 3 Gal. (11.4 L) of
ProTex wet agent P/N RL3000 and pressurize to 225 PSI (15.5 BAR) at 70° F21 °C .
(25.3
KG) (Cylinder, Agent and Valve)
Approximate gross weight 55.7 lbs.( )
.
WARNING
The anti -recoil plug shall be installed on the cylinder
y nder except when the cylinder assembly
is connected to the system
piping or when the cylinder is being filled.
CAUTION
-Contents under pressure 22
Operable range of system 225 PSI (15.5 BAR) operating pressure @ 70°F (20°C).
• Cylinder facto t is 32°F -124°F (0°C to 49°C).
If cylinder factory est pressure 450 PSI (31 BAR). Cylinder
tested in shows signs of corrosion ) Y nder meets dot requirements.
accordance with Nn or mechanical damage it must be hydrostatically
IS We 17A, or it must be replaced.
NM FPA
expellent t solution agent HM _
gas HMIs age IS 2-0-0/Potassium Carbonate/alkaline irritant. Nitrogen
/very cold discharge. Contents under high pressure.
MSp3 AVAILABLE AT:
www.he1serusa.com
CONGRATULATIONS:
You have purchased a fire suppression system designed and produced by the premier supplier of fire safety products
over the past 30 years. However, to guarantee the maximum effectiveness of your new Protex Series II fire suppression
system, you, as the owner/manager, must become familiar with your new equipment. For this purpose, we are pleased to
provide you with this owner's manual which will contain the following information:
• APPLICATION
• IN CASE OF FIRE
• MAINTENANCE
• MANAGEMENT RESPONSIBILITY
Please note that this owner's manual is not a detailed installation, operation, and maintenance manual.
The detailed installation, operation, and maintenance manual, PROTEX SERIES I/ RESTAURANT KITCHEN FIRE
SUPPRESSION SYSTEM TECHNICAL MANUAL (Part Number 10053 ), is available upon request from any authorized
Protex distributor, or directly from Heiser Logistics. However, because it is difficult to completely understand every aspect
of an intricate pre-engineered system simply by reading the Technical Manual, Heiser Logistics will not be responsible for
system installation, modification, or recharge performed by any non -certified person(s).
APPLICATION
The Protex Series II is a pre-engineered restaurant fire suppression system, tested and listed by Underwriters
Laboratories, Inc. under EX3470. It meets the stringent requirements of U.L. Standard 300. Your authorized Protex
Series II installer will install your system within the UL Listed design parameters. The following hazard areas of your
equipment should be considered for system protection:
.COKING APPLIANCES
Ai, types of cooking appliances
should be protected, including
deep fat fryers, griddles, ranges,
and broilers. Radiant, lava rock,
and upright broilers should also
be protected.
DUCT
Circular, square, or rectangular
sheet metal structure to
exhaust cooking vapors to
outside air.
HOOD
Collection area to
funnel grease laden
vapors to the duct.
The plenum area
of the hood (behind
the filters) must be
protected.
FUEL SHUT-OFF DEVICES
Equipment should be provided
to ensure fire control by
automatically shutting off
energy sources to cooking
equipment (gas or electric).
IN CASE OF FIRE
Fires can start in a cooking appliance, the hood, or the duct. In case of fire, it is important that you understand the
operation of your fire suppression system.
FIRST:
SECOND:
THIRD:
Evacuate all personnel and customers from the fire area.
CaII the Fire Department.
Operate Manual Pull (if needed) on way out of the building.
LAST: Personnel trained in the proper operation of hand portable extinguishers can stand by to watch for
reignition if means of easy exit are available. Anyone who is not trained should exit the premises
immediately.
When the fire has been extinguished, call your local authorized Protex Series II distributor to recharge the system, after
determining the cause of fire.
Under no circumstances should cooking operations resume before qualified personnel reinstate the integrity of your fire
suppression system.
MAINTENANCE
The Protex Series II is a sophisticated fire suppression system involving intricate mechanical components. To ensure the
proper operation of the system, regular inspection and maintenance must be performed by an authorized, trained Protex
Series II distributor on a semi-annual basis, or after every periodic hood and duct cleaning (whichever occurs more
frequently).
This system is made up of parts listed by Underwriters Laboratories Inc. with limitations contained in the detailed
installation manual. The authorized distributor must be consulted after the system is discharged or whenever changes
are planned for the system and/or area of protection.
In addition to the regularly scheduled maintenance, as an owner, you are required each month, per NFPA-17A 5-2.1, to
inspect and verify the following:
1. The extinguishing system is in its proper location.
2. The maintenance tag or certificate is in place.
3. The manual actuators are unobstructed.
4. The pressure gauge(s), if provided, is in operable
range.
5. No obvious physical damage or condition exists that
might prevent operation.
If you find any deficiencies, you must have them corrected immediately. You must keep records for any extinguishing
system found to require corrective actions. The date of inspection and the initials of the person making the monthly
in...:: -;tion must be recorded. You must retain these records for the period between the semiannual maintenance.
6. The tamper indicators and seals are intact.
7. The hood, duct, and protected cooking appliances
have not been replaced, modified, or relocated.
8. The nozzle blowoff caps are intact and undamaged.
NAGEMENT RESPONSIBILITY
:s good business sense for you to take an interest in the following areas of your business operation to ensure the
ssible fire protection for your restaurant:
Arrange for proper inspection and maintenance of the fire control system as well as hand portable extinguishers.
is:iminate all potentially combustible materials or arrange for their proper storage.
.Arrange for upgrading of the fire suppression system if cooking equipment is added or revised, and provide
protection for changes made to the ventilation system.
Arrange for a continuing education program in the restaurant fire suppression system operation as new
employees are added to the staff.
P.:r;:ember, fire hazards within restaurant cooking and ventilation equipment are real. Many restaurants that have fires
ne->ar re -open for business, and many suffer severe financial Toss due to lack of business continuity. Your Protex Series
II restaurant fire suppression system is a mechanical device and, as such, requires periodic service by your distributor's
qualified and trained personnel.
This owner's manual is not intended to serve as instructions for installation or service of the Protex Series II system,
but rather to inform purchasers of this equipment as to their responsibilities in the proper usage and maintenance of
this system. A copy of the detailed manual outlining Underwriters Laboratories Listing of the Protex Series II system is
available upon request from an authorized Protex Series 11 distributor or directly from Heiser Logistics. However, because
it is difficult to completely understand every aspect of an intricate pre-engineered system simply by reading the Technical
Manual, Heiser Logistics will not be responsible for system installation, modification, or recharge performed by any non -
certified person(s).
This system is made up of units tested within limitations contained in the detailed installation manual. An
Authorized System Designer must be consulted whenever changes are planned for the system or area of
protection. An Authorized Installer or System Designer must be consulted after the system has discharged.
•
di
•
•
•
•
•
•
Chapter 3 - System Design
PIPE VOLUMES CONVERSION CHART
'.'i' = 20.5 mi per ft. 34" = 37.5 ml per ft. W' = 59.8 ml per ft. W = 105 ml per ft.
Total Pipe From First Nozzle to Last Nozzle
First Nozzle Maximum Pipe Length Maximum Pipe Length
C.yitoiler Flow TotalPipe to Last
Sue Poing Volume Nozzle
.'‘" ''4" K" 51. '4" 'h` h"
L i600 5 1500 600 73.10 ft 40.00 ft 25.0o ft -- 29.2o ft 16.00 ft 10.0o ft
13000 to t910 1125 93.17 ft 50.93 ft 31.94 ft 18.19 ft 54.88 ft 30.00 ft 18.81 ft 10.71 ft
L460o 14 3400 3000 165.85 ft 90.67 ft 56.86 ft 32.38 ft 146.34 ft 80.00 ft 50.17 ft 28.57 ft
L4600 15 2600 2000 126.83 ft 69.33 ft 43.48 ft 24.76 ft 97.56 ft 53.33 ft 33.44 ft 19.05 ft
L6000 19 4215 1688/side 205.6, ft 112.40 ft 70.48 ft 40.14 ft 82.34 ft 45.01 ft 28.23 ft 16.08 ft
Lb000 20 3465 1312.5/ 169.02 ft 92.4o ft 57.94 ft 33.00 ft 64.oz ft 35.00 ft 21.95 ft 12.50 ft
side
Pipe length! Pipe Size/ml Pipe length/ Pipe Size/ml
rt K' '/e" %. !4` ft 11" '/s" ,/" w.
1 20.5 37.5 59.8 105 11 225.5 412.5 657.8 1155
2 41 75 119.6 210 12 246 450 717.6 1260
3 61.5 112.5 179.4 315 13 266.5 487.5 777.4 1365
4 82 150 239.2 420 14 287 525 837.2 1470
5 102.5 187.5 299 525 15 307.5 562.5 897 1575
6 123 225 358.8 63o 16 328 600 956.8 1680
7 143.5 262.5 418.6 735 17 348.5 637.5 1016.6 1785
8 264 300 478.4 840 18 369 675 1076.4 1890
9 184.5 337.5 538.2 945 19 389.5 712.5 1136.2 1995
10 205 375 598 1050 20 410 750 1196 2100
UL EX4S2I S9
2015 -DEC -I, Rev D
Part x PMAN2
Design Index Chart and Nozzle Coverage Summary Sheet
Appliance
Fryers w/out Drip Board
Fryers w/out Drip Board
Fryers w/Drip Board
(Condition 1)
Fryers w/Drip Board
(Condition 2)
Fryer§ w/Drip Board
(Condiuon I)
Fryers w/Drip Board
(Condition 2)
Tilt Skillet/Braising Pan
Tilt Skillet/Braising Pan
Small Range
Large Range
Small Range w/Backshelf
Protection
Small Range wlBackshelf
Protection
Small Wok
Small Wok
Large Wok
Large Wok
Small Griddle
Small Griddle
Small Griddle
Large Griddle
Large Griddle
Radiant Char -Broiler
Radiant Char -Broiler
Large Radiant Char -Broiler
Large Radiant Char -Broiler
Lava Rock Char -Broiler
Lava Rock Char -Broder
Solid Fuel Char -Broiler
(max. furl depth 6")
Solid Fuel Char -Broiler
Salamander Broiler
Upright/Salamander Broiler
Henny Penny Fryer Mono Rail
Henny Penny Fryer Dual Lift
Nieco Broiler Model MPB
with Catalyst only
Nieco Broiler Model JF94E
Electric Broiler with Catalyst
Bakers Pride Broiler
with Smoker Box
Chain Broiler (Internal Chamber)
Plenum Single Bank / V Bank
Duct
Rectangular/Circular Duct
Rectangular/Circular Duct
Nozzle
Mount Figure Type
H 3-3 NL2H
1. 3 4 N1.21.
H 3-5 NL2H
How
Points
2
2
2
H 3-5 NL2H 2
L 3.5 NL2L 2
L 3-5 N12L 2
H 3-7 NL2H 2
L 3-8 NL2L 2
H 3-9 NLIH 1
N/A 3-10 NL21. 2
L 3-11 NLIL 1
H 3-11b NL21. 2
H 3-12 NLIH 1
L 3-13 NLIL 1
H 3-14 NL2H 2
L 3-15 N1.2L 2
H 3-16 NLIH 1
L 3.17a NLIL 1
L 3-17b NL2L 2
H 3-18 NL2H 2
L 3-19 NI.21. 2
11 3-20 NLIH 1
L 3-21 NLIL 1
H 3-22 NL2H 2
L 3-23 NL2L 2
H 3-24 NL2L 2
1 3-25 NL2L 2
H 3-26 NLIH 1
L 3-27 NLIL 1
N/A 3-30a NLIH 1
N/A 3.306 N1.1 L 1
N/A 3.31 NI.211
t 1'i
N/A 3.31
N/A 3-33
N/A 3-34
N/A 3.35 NL2H !•.:
N/A 3-31 NLIL
H NLIH 1
NL2D 2
NLIL 1
UL EX452I 17
Max Width (in)
191
19'1
Deep Vat
Overall Cooking Area
Deep Vat
Overall Cooking Area
Deep Vat
Overall Cooking Area
Deep Vat
Overall Cooking Area
27%
2714
12
28
12
12
24 Diameter Max,
24 Diameter Max.
30 Diameter Max.
30 Diameter Max.
36
36
36
48
48
26
26
36
36
26
26
24
24
31
36
Max
Depth
(in)
6
6
8
8
Chapter 3 -System Design
Min Mas
Max Max Nozzle Nozzle
Length Area Height Height
(in) (inti (in) (in)
19 24 48
19 13 24
27% 324 24 48
18 S00 24 48
191 371 24 48
25% 495 24 48
18 324 13 24
27% 500 13 24
191/2 371 13 24
25% 495 13 24
500 24 48
500 13 24
28 336 40 50
28 784 34 48
28 336 13 24
28 336 24 35
24 48
13 24
24 48
13 24
1080 24 48
1080 10 24
1080 13 24
1440 24 48
1440 10 24
624 24 48
624 13 24
864 36 48
864 13 36
624 24 35
624 15 24
480 24 35
480 15 24
151 16 18
28 Front Edge
above the grate
See Special Instructions
Sec Special Instructions
Sec Special Instructions
See Special Instructions
See Special Instructions
38
48 120
34
17
Perim
no limit 100
50
33 35
Front Edge I.
- 3'
above the chain
0 - 6- from end of
plenum
Diameter
31%
16
2015 -DEC -1, Rev D
Part r PMAN2
ro
ro
robrib
ralb
rom
p
poi
pea
win
00011
001
0001
000
its
To: Authorized ProTex I1 Restaurant Fire System Distributors
From: Kevin Mussack, Vice President, Technical Instruction
Subject: MCH2 (Mechanical Control Head) Tamper Seals
Terence.' Pyro-Chem Bulletin No. 2017267 dated October 19, 2017
n response to feedback from our distributors, we are pleased to announce that our MCH2
(Mechanical Control Head) now offers the option to add a visual tamper seal.
A tamper seal replacement hole has been added to the MCH2 along with two tamer seal
control head connector package included with each MCH2. P s to the
lem Bulletin referenced above is to be considered a temporary supplement to the
:hnical Manual dated December 1, 2015.
- information and inquiries, please contact your Sales Manager or Kevin Mussack, Vice
chnical Instruction at (800) 828-9638 or email us at sales@heiserusa.com.
35 NORTH STREET • SUITE 50
CANANDAIGUA, NEW YORK 14424
FAX: 585.919.6930 / 800.782.2937
Toll-free Order and Customer Service: 1.800.828.9638
rii
Chapter 2 - Components
DETECTION EQUIPMENT
LINK HOUSING DETECTOR KIT (P/N 210SH)
P/N 210SU Link Housing Kit includes a 10" High Stand-off Steel
Detector Bracket (P/N 349H), 2 th" EMT Conduit Connectors (P/N
800), 2 cable crimps (P/N 320S), and 2 S -hooks (P/N 341S). Fusible
Links must be ordered separately. See Figure 2-14.
LINK HOUSING DETECTOR
BRACKET (P/N 349H)
mart
EMT CONDUIT
CONNECTOR
(PIN 800)
w II
CRIMPS (PIN 320S)`-
R S -HOOKS )
(P/N 3415)
Figure 2-14: Link Housing Kit
LINK HOUSING DETECTOR KIT (P/N 225SH)
P/N 225SH Link Housing Kit includes a 10" High Stand-off Steel
Detector Bracket (P/N 349H), 2 'h" EMT Conduit Connectors (P/N
800). a Fusible Link Hanger (P/N FLH25). Fusible Links must be
ordered separately. See Figure 2-14a.
LINK HOUSING DETECTOR BRACKET (PIN 34911)
i
Fusible Link
Hanger (P/N FLH2S)
EMT CONDUIT
CONNECTOR
(P/N 800)
Figure 2-14a: Link Housing Kit
6
FUSIBLE LINK HANGER (P/N FLH25)
The FLH25 Fusible Link Hanger is an accessory designed to
simplify the installation of Fusible Links in the Detection line. It
is included in the 225SH Link Housing Kit or it can be purchased
separately. The FLH25 Fusible Link Hanger makes it possible to
install Fusible Links without cutting and crimping loops in the
Detection line for each link. See Figure 2-15.
Figure 2-15: Fusible Link Hanger
FUSIBLE LINKS
The Fusible Link is designed to separate at a specific temperature
releasing tension from the Detection line, causing system
actuation. See Figure 2-16 and Table 2-5.
Figure 2-16: ML Style Fusible Link
After determining the maximum ambient temperature at the
Fusible Link location, select the correct Fusible Link according tc
the temperature condition chart below:
P/N Temperature Rating To Be Used Where Temperature Does Not Eire(
_ _
3231 t65° F (74°C)
3232 212° F (too°C)
280° F (138°C) 210° 1 (99° C)
3233
95° F (35° C)
142° F (61° C)
3234 360° F (182°C) 29o° F (143 C)
3235 450° F (232°C) 38o° F (193 C)
-
3236 500° F (26o°C) 430° F (211 C)
Table 2-5
QUIK FASTENER SCREW (P/N 1404S)
The Quik -Fastener Screw provides an approved, easy way:
components inside hood and ducts. Quik -Fastener Screws
in packs of 24 and include a Double -Ended Pilot Drill
(P/N PDB18) See Figure 2-17.
Figure 2-17: Quik -Fastener Screw
2015 -DEC -1, IL
tyro
Fire Suppression
& Building Products
INSTRUCTIONS FOR INSTALLING MICROSWITCH ASSEMBLIES
TO "CH" AND "EN" CONTROL HEADS
02/05/2009 •
NOTE: Before installing switch assemblies, position control
head in the pinned. cocked position. This will allow
additional room for mounting switches.
One and TWo Micro -Switch Assemblies — CH
When switch installation is complete, remove locking pin and
make certain the arms of each switch operate properly when
contacted by the contact post.
WHEN INSTALLATION IS COMPLETE. MAKE
CERTAIN SWITCH ARMS OPERATE PROPERLY
WHEN CONTACTING CONTACT POST
7PDT SWITCH ASSEMBLY
004723
One and Two Micro -Switch Assembly — EN
WHEN
INSTALLATION p$
COMPLETE. i
MAKE CERTAIN
SWITCH ARMS
OPERATE
PROPERLY
WHEN
CONTACTING
CONTACT POST
Three and Four Micro -Switch Assembly - CH
NOTE: WHEN INSTALLING 3 AND 4
MICRO -SWITCHES, YOU MUST BEGIN BY PLACING
TWO (2) MICRO SWITCHES ON POSTS, THEN
SPACERS AND ADDITIONAL SWITCHES
RETAINING
SCREW (2)
WHEN INSTALLATION IS COMPLETE, MAKE
CERTAIN SWITCH ARMS OPERATE PROPERLY
WHEN CONTACTING CONTACT POST
NOTE: WHEN INSTALLING GAS VALVE
CABLE. MAKE CERTAIN THAT
THE CABLE WILL RUN IN-
BETWEEN THE UPPER AND
LOWER MICRO -SWITCHES
CONTACT POST -*-
EXTENSION
• ----•►EXTENSION
SPDT SWITCH ASSEMBLY
SWITCH SPACERS
WHEN INSTALLATION IS COMPLETE.
MAKE CERTAIN SWITCH ARMS
OPERATE PROPERLY WHEN
CONTACTING CONTACT POST
SPDT SWITCH ASSEMBLY (2)
Three and Four Micro -Switch Assembly — EN
NOTE; WHEN INSTALLING
3 AND 4 MICRO -SWITCHES,
YOU MUST BEGIN BY PLACING
TWO (2) MICRO -SWITCHES ON
POSTS. THEN SPACERS AND
ADDITIONAL SWITCHES
NOTE: WHEN INSTALLING GAS VALVE
CABLE, MAKE CERTAIN THAT THE
CABLE WILL RUN IN-BETWEEN
THE UPPER AND LOWER MCRO-
SWITCHES
RETAINING
SCREW (2)
WHEN INSTALLATION IS
COMPLETE. MAKE
CERTAIN SWITCH ARMS
OPERATE PROPERLY
WHEN CONTACTING
CONTACT POST
SPDT
SWITCH
ASSEMBLY
SWITCH SPACERS
CONTACT POST
EXTENSION
4! v •�
c-1-;-*",- Lam` ��
Ip.
, .1�/r41
i1V� 1114101111iook
,---
WHEN / WHEN INSTALLATION IS COMPLETE,
s MAKE CERTAIN SWITCH ARMS
OPERATE PROPERLY WHEN
CONTACTING CONTACT POST
SPDT SWITCH
ASSEMBLY (2)
004725
004726
Switch Wiring Diagram
SIa(I H- NCI BIAGBAM
BLACK
RED
BROWN
21 A 125, 250 OR 227 VAC
1 HP 125 VAC
2 HP 250 VAC
N.O.
N.C.
A1
i
1
\_J
CT)
CI.
W
0
w
CC
1 1
1
COVER SCREW (4)
0
Q
0
g
'.J
o Without Comments
0 As Noted in Red
ye- Per The Attacheo Letter
These plans have beer, reviewed by The Tukwila Fire
Prevention Bureau tnf :onformance with current City
standards. Accep . is subject to errors and
omissions which cu r,ot authorize violations of adopted
standards anti urc, ircA The responsibility for the
adequacy of desig, i is Totally with the designer.
Additions, c »Letior . 'visions to these drawings after
this date will void tis'.:..3:,ceptance and will require a
resubmittal o' ii-awings for subsequent approval.
Final acceptzi c£ i_ ::uoJect to field test and inspection by
The Tukwila F,r, Bureau.
Date: / 0) I g S 1 I
-UM:_A FIRE DEPARTMENT
lease call 206-575-4407 and
Ire this Fire ►•Amit
excct cddras for shut-
.;. wn or ronaltion eipproval,
1 w 1
1
_II
EOL
75cd
FREEZER
SAAR'S MARKETPLACE
3725 SOUTH 144TH STREET
TUKWILA, WA 98168
TO FACP
EXISTING HOOD SYSTEM MANUAL PULL
EW HORN/STROBE
HOOD
L 1
COUNTER
PARTIAL KITCHEN AREA
SCALE: 1/8"=1'
rir
COUNTER
MARKET SHOPPING AREA
VICINTY MAP
SCALE: NOT TO SCALE
KEY LEGEND AND COMPONENT LIST
SYMBOL
DESCRIPTION
OTY
PART #
MANUFACTOR
MOUNTING SPEC
C
FIRE ALARM CONTROL PANEL
1
MS -5024
FIRE -UTE
WALL TOP @ 66'
DE
HORN/STROBE
1
HSW
WHEELOCK
WALL @80'-96'
F
MANUAL PULL STATION
1
HOOD SYSTEM
HOOD SYSTEM
WALL @ 48'
FIRE ALARM WIRE LEGEND
DESIG.
DESCRIPTION
A
16/2 FPLP INITIATING CIRCUIT WIRING
B
14/2 FPLP INDICATING CIRCUIT WIRING
C
16/4 FPLP ANNUNCIATOR CIRCUIT WIRING
D
14/2 FPLP DUCT DETECTOR OR DOOR HOLDER POWER WIRING
E
AWG-16-THHW FOR DIRECT BURY/WET LOCATION
AREA OF WORK
FRONT DOOR
FACP
PAID
NOV 20 ZA13
UKWILA FIRE
27 -3 /a,
T1M EASTMAN NICET#110622 LEVEL IV
0
P6
hh
APPROVED WI:
TE
11-19-13 ki3
122891
FA -01
Li -
171 " Without Comments
❑ As Noted In Red
❑ Per The Attached Letter
These plans have been reviewed by The Tukwila Fire
Prevention Bureau for conformance with tante is subject to errors Citystandards. Acceptance
omissions which do
ordinancot es. The respons responviolations sibility adoptedhe
standards and ord with the designer.
adequacy of design rests totally
Additions, deletions or revisions
itance and thesei i requiredrawings
this date will void thisp rove
resubmit -tat of revised drawings for subsequent app
Final acceptance is subject to field test and inspection r,.
The Tukwila Fire Prevention Bureau.
Date: -26 —/ 7 By.
TUKWILA AMU FIRE DEPARTMENT'
206-575-4407 ani
n _>tins Fire Permit No.
gIVOXECk address for shut-
PProvda
NOTICE
A completed, signed, Tukwila
Fire Department Pre-test
Certificate must be presented
to the Inspector prior to
commencement of Acceptance
Testing of any Fire Alarm
and Detection Systems.
Failure of test will result
in a Re -inspection Fee and
termination cf the test-
x
x
-4
a
'NUNS 2IV310 ONLJ JO ISVA XVMNIIN HIM 3NVH1380A1Od ONV
A2183H0 S£Z# XVMNIW RUM HSINIA 'S13)10Vt18 03dVHS-1
Wf1NIWf11V. RUM S3N11dS al HOVJIV: 'V3MV..3OIA1.13S H3A0
k11V011213A CI1Nflon a3aao8 UOOMG VH HOIH .b X GIM „l
x
Design per NFPA 13 — Ordinary Hazard Occupancy — 130 sq ft per sprinkler
All materials to be new, U.L. listed, and F.M. approved
All heads to be a minimum of 6' apart and to be unobstructed by any means
2 — Add Tyco Model DS -1 5.6 K -Factor 200° Dry Pendent Sprinkler Heads 1/2 x 1/2
2 — Total
RETAINER STRAP WHERE REQUIRED
IN SEISMIC AREAS
TOP BEAM/ C -CLAMP
WITH SET SCREW
3/8' ALL THREAD ROD
PIPE SWIVEL RING
STEEL JOIST/TRUSS
HANGER DETAIL
NTS
UNISTRUT CLAMP
SPRINKLER PIPING
UNISTRUT
TYPICAL HANGER DETAIL
NO SCALE
Ne Tee.-Lo_�pnic l Br rir h Came
•
t=ire
!,.-..; i current City
and
•:!o j- of. adopted
lror the
adeq:.iacy o r,: ;;� E ;:he designer.
Additions, d^ie;:io , .• to these drawings after
this date wi!! void r 1,V and will require a
resubmittal of revised dravvings for subsequent approval.
Final acceptance Is subject to field test and Inspection by
The Tukwila .Fire. Prevention Bureau.
Date: CP — 3 -09 By:
Tk iVitILA FIRE DEPARTAgatt
Please call: 575.4407.,
and give thi+ti job
No. CSR- S -CA D.
and exact address for shuts
down or restoration aorrovtt.
NOTICE
Weld stamps must be
inspected before pipe is
hung. Do not paint piping
prior to hydrostatic test
approval
COW\
FIRE PROTECTION
INCORPORATED.
P.O. BOX 12113
MILL CREEK, WASHINGTON 98082-0113
PH. (425) 481-7669
Subway
Tukwila Trading Center
3 725,144th 5A- PAUD
Tukwila, WA MAY 2 8 2009
tikwiia Fire
?y
DATE:_ 27-”! I DRAWN. j %4 (: SCALE: Vi
_/5 / z -Z-