HomeMy WebLinkAboutTIS 2023-03-06 Item 2A - Update - Public Works Test-to-Fit UpdateTUKWILA PUBLIC WORKS
Maintenance and Engineering Building
Test -to -Fit Phase March 6, 2023
1
PROJECT GOALS
Safe • Efficient • Functional • Forward-looking
1. Consolidate all Public Works functions to one location.
2. Provide a safe environment for employees and visitors. Support employee well-being.
3. Convey the Department's values to its customers and employees.
4. Provide a resilient facility that can function following a natural disaster event
5. Be stewards of the environment
6. Reduce ongoing maintenance of facilities and realize value in leasing or selling under
utilized properties.
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi Architects
S 112th St
TPW CAMPUS
• a . • • -• . 1:-• •
SCL Easement
;-‘ (leased) '
(IT •
i'
A .:b
1 qZ
- II i
, a
i ..,
...,
.i'
w ti i
47 i
.*.
If
A. W
,,LotSize
3.95 acres Il
IIN 1•1 I. I. NI I. gm IN
SCL Easement (will be city owned)
2
Duwamish River
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi ArUlitects
3
SAFE ENVIRONMENT
Goal: Provide a safe environment for employees and visitors and improve employee well being
• Improve entrances and intersections for safe traffic flow
• New dedicated truck entrances separate from new visitor entrance
• Adequate turning radius for largest trucks
• Clearly identified pedestrian circulation
• Secure fencing with controlled entrances
• Site Lighting throughout (with particular attention to 24/7 operations)
• Security cameras and site lines for supervision
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi Arthitects
4
RESILIENT FACILITY
Goal: Provide a resilient facility that will last and can function following a natural disaster event
• Site is situated above the 500 year flood plane.
• Invest in structure designed to 'essential facility' standards
• Provide emergency power generation.
• Provide on-site solar power system or plan infrastructure to support future
solar power.
• Evaluate potential for on-site energy storage capacity.
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi Aithitects
5
DEPARTMENT VALUES
Goal: Convey the Department's values to its customers and employees.
• Invest in technologically advanced, industry leading, forward- looking facilities
• Plan capacity to meet future program needs
• Display for Public Works achievements
• Building embodies the Public Works vision
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi Akhitects
Goal: Stewards of the environment
• Energy efficient systems
• Staff training on system operation
• High performance building envelope
• Consider geothermal energy and solar power
• Thoughtful material selection (from structural system to finishes)
• Reduce impervious surfaces
• Treat stormwater before discharging
• Restore habitat along Duwamish River
6
SUSTAINABILITY
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi Architects
DUWAMISH
ESTUARY
SUBWATERSHED
APPROX SITE
LOCATION
Excerpt from Green/Duwamish River Watershed; Salmon Habitat Plan 2021
7
STORY OF THE WATERSHED
SALMON REARING HABITAT
The site has potential to provide shallow water rearing
habitat for juvenile salmonids which is critical to increasing
salmonid survival and restoring this key species to the river.
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi Arthitects
lillliil 1-i• i111Y111617� +]
11111111 r_1Ib11111111 _ l
OHW
EXISTING SITE
200' SHORELINE JURISDICTION
SECTION A: EXISTING SITE SECTION THROUGH RESTORATION PARCEL
SCALE: 1:30
-V
SHORELINE RESTORATION
MAINTENANCE
AND
ENGINEERING
BUILDING
48'
RESTORATION SITE
200' SHORELINE JURISDICTION
STORMWATER FACILITY
SECTION A': VIEW WEST FROM RESTORATION SITE
SCALE 1:30
8
X
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi Architects
S 112 ST
93% Impervious Surface
EXISTING
9
/(
I
- DUWAMISH GARDEN PARK
DUWAMISH RIVER
/1(
IMPERVIOUS SURFACE
S 112 ST
JECT
70% Impervious Surface
TEST -FIT CONCEPT
- /
- DUWAMISH GARDEN PARK
DUWAMISH RIVER
1
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi , Qhitects
Goal: Reduce cost related to ongoing maintenance of facilities and realize
value in leasing or selling under utilized properties.
• Durable finishes (easy to clean, water resistant and slip resistant)
• Infrastructure for future expansion
• Flexible, adaptable spaces
• Durable paving surfaces to reduce future maintenance
• Life cycle cost analysis for systems selection
10
LONG TERM VALUE
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi Arthitects
Iterations
Kick Off
September
2022
11
1
I
I
1
1
Stakeholder
Input
Process
Refine
Schemes
1
1
1
I
1
I
Stakeholder
Input
Process
Further
Refine
(6) Options
1
1
1
R
Present
Concepts to
Council
Develop
evaluation criteria
Score each Concept
Plan based on criteria
Determine
preferred scheme
TEST -TO -FIT PROCESS
Present
Findings
Wrap Up
March
2023
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi Arrhitects
a0'OaOaoaaq
Y �v�111ii11lilrn:alililili!
FLEE ,PKING
FLEET AND BALI IES
BUILDING
111111 Illlllllei41111111111111
'1
111E&oa11111111"��®
11111111111111111%
SCHEME A
1114004
11'11111111111111111
-1mI F,P.KING
1€tII*
SCHEME D
12
Y M
yswaswaaa,
MinilMtny5➢liliillliilii
�IIIIIIIIEI111111111�111II�,
nn111111i1111111111111
SCHEME B
L--
I11111111111111111111111111_, 11"111
111111111E 1111111111
11111111179111"''
111111111!” IIIIM'
111111111iiaill
SCHEME E
A
CONCEPT SCHEMES
"'0'0o0'd004 ,\
°'. N!IR1111�'sS•l:Rr111�R111Y1l�-_
es9.e.�.s
!0k..
111111111111111a'ea111111111111111
SCHEME C
�O�O��yO�e'sess
` CiRl11iilm�ldiilR11i ira m -o 1
`'`
SIAF PARKING PARK
111111117i1 11111111w1aa111111I
I3.CiilmmiG
1111Cm¢911i1111111R11_
SCHEME F
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi /lrhitects
13
ID#
Criteria Description
"Big Picture" Criteria (pass/fail)
1.1 Provides for Department of Ecology waiver requirements
1.2 Provides for code required stormwater facilities
1.3 Located above 500 year flood plane
1.4 Provides for future capacity
Public Works Staff Input
2.0 Public Works Staff Preferences & Recommendations
Program Elements and Flow
2.1 Public Works site program elements provided
2.2 Public Works covered parking provided
2.3 Public Works uncovered parking provided
2.4 Decant facility located adjacent to Spoils
2.5 Accommodates Drive Through Tool Storage
2.6 Accommodates Drive Through Dumpster Platform
2.7 Police Evidence Provided
2.8 Police Impound Provided
Campus, Access, Security, and Identity
Building location allows for M&E visitor parking to be separated from
3.1 staff parking
3.2 F&F visitor parking separated from staff parking
3.3 Improves entrance from Tukwila Intl Blvd
3.4 Provides for new security fence
3.5 Provides for new site lighting and security cameras
3.6 Efficient walking route between F&F and M&E buildings
3.7 Efficient walking distance from M&E to site program
3.8 Building location high -vis to the public
3.9 Building location takes advantage of amenity view to river
3.10 Utilizes existing driveway locations at E Marginal Way S
Environment and Sustainability
4.1 Building orientation optimized for passive solar access
4.2 Opportunity for solar panels over covered parking or roof
4.3 Opportunity for EV charging infrastructure
4.4 Reduces impervious surfaces
4.5 Habitat and trail connection to adjacent restoration areas
EVALUATION CRITERIA
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi Architects
14
ID#
Criteria Description
Importance
"Big Picture" Criteria (pass/fail)
1.1 Provides for Department of Ecology waiver requirements
1.2 Provides for code required stormwater facilities
1.3 Located above 500 year flood plane
1.4 Provides for future capacity
Essential
Essential
Essential
Essential
Public Works Staff Input
2.0 Public Works Staff Preferences & Recommendations
1.00
Program Elements and Flow
2.1 Public Works site program elements provided
2.2 Public Works covered parking provided
2.3 Public Works uncovered parking provided
2.4 Decant facility located adjacent to Spoils
2.5 Accommodates Drive Through Tool Storage
2.6 Accommodates Drive Through Dumpster Platform
2.7 Police Evidence Provided
2.8 Police Impound Provided
1.00
1.00
1.00
1.00
0.75
0.75
0.50
0.50
Campus, Access, Security, and Identity
Building location allows for M&E visitor parking to be separated from
3.1 staff parking
3.2 F&F visitor parking separated from staff parking
3.3 Improves entrance from Tukwila Intl Blvd
3.4 Provides for new security fence
3.5 Provides for new site lighting and security cameras
3.6 Efficient walking route between F&F and M&E buildings
3.7 Efficient walking distance from M&E to site program
3.8 Building location high -vis to the public
3.9 Building location takes advantage of amenity view to river
3.10 Utilizes existing driveway locations at E Marginal Way S
1.00
1.00
1.00
1.00
1.00
0.75
0.75
0.50
0.50
0.50
Environment and Sustainability
4.1 Building orientation optimized for passive solar access
4.2 Opportunity for solar panels over covered parking or roof
4.3 Opportunity for EV charging infrastructure
4.4 Reduces impervious surfaces
4.5 Habitat and trail connection to adjacent restoration areas
1.00
1.00
1.00
0.75
0.50
EVALUATION CRITERIA
Criteria Weighted by Importance
"Most Important"
"Very Important"
"Somewhat Important"
x1.00
x0.75
x0.50
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi hitects
Example
Criteria 1
Criteria 2
Scheme A
2
3
Scheme B
3
2
Initial Scores
Criteria 1 (x 1.0)
Criteria 2 (x 0.5)
5
2x 1.0 = 2
3 x 0.5 = 1.5
5 Tie
3x 1.0 = 3
2x0.5 = 1
Weighted Score
15
3.5
4
Initial Score
Weighted Score
EVALUATION CRITERIA SCORING METHOD
Criteria Weighted by Importance
"Most Important"
"Very Important"
"Somewhat Important"
x1.00
x0.75
x0.50
Possible scores applied to criteria
3 = Excellent
2 = Good
1 = Fair
0 = Poor / Not Provided
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi Akhitects
Criteria
ID #
Criteria Description
Criteria
Importance
"Big Picture" Criteria (pass/fail)
1.1 Provides for Department of Ecology waiver requirements
1.2 Provides for code required stormwater facilities
1.3 Located above 500 year flood plane
1.4 Provides for future capacity
Essential
Essential
Essential
Essential
Public Works Staff Input
2.0 Public Works Staff Preferences & Recommendations
1.00
Program Elements and Flow
2.1 Public Works site program elements provided
2.2 Public Works covered parking provided
2.3 Public Works uncovered parking provided
2.4 Decant facility located adjacent to Spoils
2.5 Accommodates Drive Through Tool Storage
2.6 Accommodates Drive Through Dumpster Platform
2.7 Police Evidence Provided
2.8 Police Impound Provided
1.00
1.00
1.00
1.00
0.75
0.75
0.50
0.50
Campus, Access, Security, and Identity
Building location allows for M&E visitor parking to be separated from
3.1 staff parking
3.2 F&F visitor parking separated from staff parking
3.3 Improves entrance from Tukwila Intl Blvd
3.4 Provides for new security fence
3.5 Provides for new site lighting and security cameras
3.6 Efficient walking route between F&F and M&E buildings
3.7 Efficient walking distance from M&E to site program
3.8 Building location high -vis to the public
3.9 Building location takes advantage of amenity view to river
3.10 Utilizes existing driveway locations at E Marginal Way S
1.00
1.00
1.00
1.00
1.00
0.75
0.75
0.50
0.50
0.50
Environment and Sustainability
4.1 Building orientation optimized for passive solar access
4.2 Opportunity for solar panels over covered parking or roof
4.3 Opportunity for EV charging infrastructure
4.4 Reduces impervious surfaces
4.5 Habitat and trail connection to adjacent restoration areas
Subtotal Weighted Score
Weighted Ranking
1.00
1.00
1.00
0.75
0.50
Concept A
Initial Weighted
Score Total
Concept B
Initial Weighted
Score Total
3
3
3
3
3
3
3
2
2
3
3
3
3
2.25
2.25
1
1
2
3
3
3
0
2
2
0
2
3
3
3
0
1.5
1.5
0
1
3
3
3
3
3
2
3
2
3
3
3
3
3
3
3
1.5
2.25
1
1.5
1.5
3
3
3
3
3
3
3
3
2.25
1.5
57
1st
3
1
3
3
3
3
2
3
3
3
1
3
3
3
0.75
2.25
1
1.5
1.5
2
3
3
2.25
1.5
46.75
3rd
Concept C
Initial Weighted
Scor Total
0
0
3
3
3
0
0
0
0
2
3
3
3
0
0
0
0
1
1
0
3
3
3
1
3
1
0
0
1
0
3
3
3
0.75
2.25
0.5
0
0
2
3
3
2
3
2
3
3
1.5
1.5
34.5
4th
Concept D
Initial Weighted
Score Total
0
0
3
3
3
0
0
0
0
1
3
3
3
0
0
0
0
0.5
3
0
3
3
3
0
2
1
0
0
3
0
3
3
3
0
1.5
0.5
0
0
0
3
3
2
3
0
3
3
1.5
1.5
32.5
5th
Concept E
Initial Weighted
Score Total
Concept F
Initial Weighted
Score Total
1
2
3
3
3
2
2.25
2.25
0
1
0
0
1
3
3
0
0
0
0
0
1
3
3
0
0
0
0
0
3
3
3
3
3
3
0
3
3
3
3
3
3
3
3
2.25
0
1.5
1.5
1.5
1
3
3
3
3
1
3
3
2.25
1.5
50
2nd
2
0
3
3
3
1
0
0
3
2
0
3
3
3
0.75
0.75
0
0
1.5
3
3
3
3
0.75
1.5
32.25
6th
16 Miller Hayashi /1ithitects
17
POLICE
IMPOUND
0 I I . JI
A
O
O •
O
\ CONCEPT A
111111m1115 11111111111111
i
BRINE TANKS
0000
COVERED
(12) 9X20
00000
FLEET PARKING
SPOILS
0
ElAN
STAF
RKINIi
NCOVER:.1
.6) 9x19
MAINTENANCE AND
ENGINEERING BUILDING
3 -STORY
35,000 SF
104IRIDx10
VISITOR
PAR
---\
--
--
-- 1
/
/i /
/i
-- /
/
N.
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi Plrrhitects
TOOLS/EQUIP/PARTS (REMOVED FROM M&E)
I
I I I ILOADINGI I I I
I
I II II II II
I
EXTERIOR COVERED STORAGE
;0 /EREC
3C) 3X20
STAF
RKINIi
NCOVER:.1
.6) 9x19
MAINTENANCE AND
ENGINEERING BUILDING
3 -STORY
35,000 SF
104IRIDx10
VISITOR
PAR
---\
--
--
-- 1
/
/i /
/i
-- /
/
N.
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi Plrrhitects
JAN
2023
PRE - DESIGN
18
SCHEMATIC
DESIGN
•
GCCM
Procurement
REPORT TO COUNCIL
FOR APPROVAL
(Target: March 2023)
JAN
2024
DESIGN
DEVELOPMENT
Nov 2023
City ownership
of UPS parcel
REPORT TO COUNCIL
FOR APPROVAL
(Target: October 2023)
JAN
2025
CONSTRUCTION
DOCUMENTS
ENVIRONMENTAL REVIEW AND PERMITTING
REPORT TO COUNCIL
FOR APPROVAL
(Target: June 2024)
COUNCIL APPROVAL PROCESS
JAN
2026
CONSTRUCTION
May 2025
April 2025
UPS Lease Expires
REPORT TO COUNCIL
FOR APPROVAL
(Target: March 2025)
JAN
2027
MOVE
IN
December
2026
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi /fir hitects
West Site Preparation, Demolition, Grading, Paving, Utilities (3.95 acres)
West Site Structures (covered parking, police evidence, truck wash)
East Site Preparation, Demolition, Grading, Paving, Utilities (6.90 acres)
East Site Structures (covered parking, spoils, salt/sand/gravel)
Maintenance & Engineering Building
Tool Storage Building
Shoreline Restoration
Decant Facility
CONCEPTUAL"ALL IN" MASTER PLAN COST
$ 3,949,000
$ 2,700,000
$15,271,000
$ 4,924,000
$16,445,000
$ 1,248,000
$ 1,528,000
$ 770,000
Sub -Total Construction Cost $46,835,000
Escalation to Jan 2026(at 7% for the first year and compunded at 4.5% per year thereafter)$ 7,678 ,000
Construction Cost including escalation
Project Related Costs
$54,513,000
$29,352,000
Master Plan Conceptual Project Cost $83,865,000
19
Tukwila Public Works
M&E Building
March 6, 2023
Miller Hayashi ! Qhitects
Tukwila Public Works
Operations Campus,
Phase 2
MARCH 6, 2023
TRANSPORTATION AND INFRASTRUCTURE SERVICES
Next Steps
March 13, Committee of the Whole: Briefing to Full Committee
TBD, TIS: Contract for Design
TBD, COW: Contract for Design
TBD, Regular Council: Authorize Design Contract
TBD, City Council: Schematic Design Check In, Updated Costs
November 1, 2023, City Takes ownership of east parcel.
TBD, City Council: Design Development, Updated Costs
March 2025, City Council: Design Development, Construction
Documents, Final Cost Estimates, Go to Bid.