HomeMy WebLinkAboutTIS 2023-03-06 Item 2C - Contract Amendment #1 - 2023 Annual Overlay Program Engineering Services with KPG PsomasCity of Tukwila Man Ekberg, Mayor Public Works Deportment - Harr' Pon iekonti, Director/City Engineer INFORMATIONAL MEMORANDUM TO: Transportation & Infrastructure Services Committee FROM: Hari Ponnekanti, Public Works Director/City Engineer BY: Josh Hartley, Public Works Deputy Director Transportation CC: Mayor Allan Ekberg DATE: March 3, 2023 SUBJECT: 2023 Annual Overlay Program - Engineering Services Contract Project No. 92210301 Contract No. 23-012, Amendment No. 1 ISSUE Execute Amendment No. 1 to Contract No. 23-012, with KPG Psomas, Inc. (KPG), to include the 119th St. Pedestrian Crossing design and construction management services into the 2023 Annual Overlay Program contract. BACKGROUND Every year, Public Works (PW) issues a construction project to grind and overlay several blocks of roadways in the City of Tukwila. The annual overlay program is intended to preserve and maintain the street structure in a safe and useable state by resurfacing before failure, which also minimizes costs. Before work can commence, an engineer of record is required to prepare, design, and manage construction of the project. KPG provides a unique blend of knowledge and understanding of the City's overlay program that provides efficiency and benefits which cannot be matched at this time by any other firm. KPG has also performed very well in providing construction management services. DISCUSSION As part of the program described above, PW has a grant that funds the design and construction of a raised crosswalk located on 42nd. Ave. S and S. 119th St. that will provide a safer, more accessible pedestrian crossing. PW included this design into the overlay program to ensure that it is constructed timely. As a standalone project, the 119th pedestrian crosswalk could result on little to zero construction bids. By including it in the overlay program, the scope of work is bundled with other work and becomes more attractive to prospective bidders. KPG has provided an amendment, scope of work, and fee estimate to complete the design of the S. 119th crosswalk and advertise for construction bids. FINANCIAL IMPACT Original Contract (Overlay) Amendment 1 (119th Crosswalk) Total Contract Amount: KPG Contract Fund Source Budget $149,824.00 Overlay CIP $150,000.00 $52,254.00 TIB Grant 175,000.00 $202,078.00 $325,000.00 RECOMMENDATION Approve Amendment No. 1 to Contract No. 23-012 for KPG on the 2023 Annual Overlay Program and consider this item on the Consent Agenda at the March 13, 2023, Council Meeting. ATTACHMENTS: S. 119th Pedestrian Crossing CIP Page KPG 2023 Overlay Consultant Contract - Amendment 1 Proposal 29 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2023 to 2028 PROJECT: S 119th St Bridge/ 42nd Ave S Raised Crosswalk and RRFB Project No. 92210301 Install raised crosswalk, curb bulbs, and a Rectangular Rapid Flashing Beacon on 42nd Ave S at the intersection DESCRIPTION: of the S 119th street pedestrian bridge. JUSTIFICATION: Enhance safety for pedestrians crossing at S 119th Street/42nd Ave S and encourages transportation choices for the neighborhood. STATUS: MAINT. IMPACT: New crosswalk and pedestrian flashing beacon will need to be maintained. COMMENT: Residential improvements and traffic calming features to reduce speeds and improve pedestrian and bicycle safety. Grants submitted to WSDOT and TIB for 2023/2024 funding. FINANCIAL Through Estimated (in $000's) 2021 2022 2023 2024 2025 2026 2027 2028 BEYOND TOTAL EXPENSES Design 30 30 Land (R/W) 0 Const. Mgmt. 35 35 Construction 185 185 TOTAL EXPENSES 0 0 250 0 0 0 0 0 0 250 FUND SOURCES Proposed Grant 175 175 Awarded Grant 0 Mitigation Expected 0 103 Fund Balance 0 0 75 0 0 0 0 0 0 75 TOTAL SOURCES 0 0 250 0 0 0 0 0 0 250 2023 - 2028 Capital Improvement Program 839411 3t City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: CONTRACT FOR SERVICES Amendment # 1 Between the City of Tukwila and KPG Psomas Inc. That portion of Contract No. between the City of Tukwila and KPG Psomas Inc. is hereby amended as follows: Section 2, Scope of Services, shall be amended with the following: The Consultant agrees to provide the services in accordance with the scope of work included in the attached Exhibit A. Section 4, Payment, shall be amended as follows: An estimated budget for work provided by Consultant is included as Exhibit B, provided that the total amount of payment to the consultant under this agreement shall not exceed $202,078.00 (Orig PSA $149,824.00 + this Amend 1 for $52,254.00) without express written modification of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this day of , 20 CITY OF TUKWILA CONTRACTOR Allan Ekberg, Mayor Printed Name: Nelson Davis, Vice President ATTEST/AUTHENTICATED APPROVED AS TO FORM Christy O'Flaherty, MMC, City Clerk Office of the City Attorney CA Reviewed May 2020 Page 1 of 1 31 EXHIBIT A City of Tukwila 2023 Overlay Program Scope of Work Amendment #1 — S 119th St Pedestrian Crossing February 2023 The Consultant shall prepare final Plans, Specifications and Estimates for the S 110 St Pedestrian Crossing at the S 110 Pedestrian Bridge and 42nd Ave S located in the Allentown Neighborhood. The Plans will not be incorporated into the 2023 Overlay Program construction documents. This contract assumes that the design and construction are being implemented with monies received from the Transportation Improvement Board (TIB), WSDOT Pedestrian and Bicycle grant, and City funds as needed. All project provisions from the Original Scope of work shall apply. The below assumptions, deliverables, and scope shall supplement the original scope and apply to the S 110 St Location: Deliverables • 30% review submittal with Plans and Estimate (electronic copies) • 90% review submittal with Plans, Specifications, and Estimate (electronic copies) • Routing of Plans to utilities for review and comment • Bid Documents and Engineer's Estimate. • WSDOT Coordination and Documentation • SEPA Permit • DAHP Consultation • Shoreline Permit Assumptions for the S 119th St Pedestrian Crossing • This will be a stand alone construction project and contract documents will be developed in a manner to solicit bids. • This contract will utilize WSDOT Pedestrian / Bicycle Program Funds • City will facilitate all coordination with granting agency. • Full topographic survey will be completed by the consultant for the project location. • Rapid Rectangular Flashing Beacons (RRFBs) will be of the solar power system type. • City will provide and communicate updates to affected residents at this location. • The consultant shall budget for attendance of up to two Allentown Meetings at the Tukwila Community Center. • The site location will be separate bidding schedule for construction (Schedule B). City of Tukwila 2023 Overlay Program Supp #1 Page 1 of 3 KPG Psomas Inc February 2023 32 • Only surface utilities requiring adjustment to grade will be shown. • Drainage Modifications may be required • Lane widths and channelization types shall be replaced in kind unless otherwise decided upon in collaboration with the City. • Driveways that are disturbed will be restored with like pavement. • It is assumed there will be approximately eight (8) plan sheets at 1"=20' scale full size (22" X 34"), 1"=40' at reduced scale (11" X 17"). • Drainage & Water Quality Reports will not be required. • SEPA documentation will be filled out by the consultant and submitted and administered by the City . No additional environmental permitting will be required by the consultant. • Shoreline permit will be filled out by the consultant and submitted and administered by the City. • DAHP EZ -01 form will be filled out and submitted by the Consultant on behalf of the City. • Geotechnical exploration and/or investigation will not be required. • Maximum Extent Feasible Documentation is not included in this scope of work • Consultant shall not be responsible for printing and supplying City or Contractor with hard copies of plans and specifications at interim submittals or contract award. SCOPE OF WORK TASK 1— Project Management 1.1 The Consultant shall provide continuous project management and administration for the duration of the Project. (Estimate 6 months). • Hold project coordination meetings with the City to update progress and review submittals. Assume (6) meetings. • The Consultant shall provide monthly status reports and billings. • The Consultant shall provide independent QA/QC reviews by senior in-house staff of all deliverables prior to submittal to the City. TASK 2 — Survey and Base mapping 2.1 Provide ground based topographic surveys to generate basemaps at a 1"= 20' scale and digital terrain model (DTM) in AutoCAD format of the project limits described above. Field survey shall pick up curbs, edges of gutter pan, drainage/sanitary sewer structures to include pipe diameters, grate and invert elevations, the next connecting drainage/sanitary sewer structure situated beyond the above- described mapping areas, water appurtenances to include valves, meters and hydrants, fences, utility surface features, field markings of existing utilities identified previous to the survey by a sub -contracted locate company, buildings/structure faces, building awnings, traffic and business signs, striping and trees. One -foot contours will be generated from the DTM. Vertical datum is assumed to be NAVD 88. TASK 3 — Design 3.1 The Consultant shall prepare 30% Plans and Estimate for the S 119th St Pedestrian crossing. City of Tukwila KPG Psomas Inc 2023 Overlay Program Supp #1 Page 2 of 3 February 2023 33 3.2 The Consultant shall prepare 90%, and Final Plans . The anticipated plan sheets include: • Cover (1 sheet) • Survey Control (1 sheet) • Site Preparation Plan (1 sheet) • Proposed Improvement Plan (1 sheet) • Raised Crosswalk Detail Plan (1 sheet) • RRFB Details (1 sheet) • Traffic Control Plans (2 sheets) TOTAL: (8 sheets) 3.3 The Consultant shall calculate quantities and prepare Engineers Estimate of Probable Construction Cost for in preparation for the bid documents and bid proposal. 3.4 The Consultant shall prepare the Contract Specification per 2023 WSDOT Standard Specifications for the 90% Review Submittal and the Bid Documents. 3.5 The consultant shall attend up to one community meetings at the TCC to provide project update on the S 119th St Pedestrian Crossing TASK 4 — WSDOT and Permitting Coordination 4.1 The Consultant shall coordinate design approval and construction documents with the funding agencies for grant funding compliance. 4.2 The Consultant shall assist the City in preparation of the following permits: • SEPA • Shoreline Management • DAHP EZ -01 Form Deliverables • 30% Plans • 30% Cost Estimate • 90% & Final Plans • 90% & Final Cost Estimate • 90% & Final Contract documents including site specific Special Provisions • WSDOT Coordination • Permitting City of Tukwila 2023 Overlay Program Supp #1 Page 3 of 3 KPG Psomas Inc February 2023 34 KPG PSOMAS EXHIBIT B PRIME CONSULTANT COST COMPUTATIONS Client: City of Tukwila Project 2023 Overlay Program Amendment #1 DATE: 2/3/2023 Task No. Task Description Labor Hour Estimate Total Hours and Labor Fee Estimate by Task Principal Senior Engineer Project Engineer II Project Engineer I Design Engineer Survey Manager Survey Crew I (W/Equip) Project Surveyor Office Admin 285 215 175 149 133 251 205 164 103 Hours Fee Task 1 Project Management 1.1 Project Management 4 20 8 32 $ 5,464.00 Task Total 4 0 20 0 0 0 0 0 8 32 $ 5,464.00 Task 2 Survey and Basemapping 2.1 Field Sruvey and Prepare Basemap 2 4 4 10 $ 1,978.00 Task Total 0 0 0 0 0 2 4 4 0 10 $ 1,978.00 Task 3 Final Design 3.1 Prepare 30% Plans 16 4 16 16 52 $ 8,652.00 3.2 Prepare 90% Plans 8 8 20 16 52 $ 8,228.00 3.3 Preapre 30%, 90%, Final Cost Estimates 12 12 20 12 56 $ 9,256.00 3.4 Prepare 90% & Final Contract Documents 2 12 24 38 $ 7,350.00 3.5 Community Meeting Preparation and Attendance 2 4 6 $ 1,270.00 Task Total 4 48 52 56 44 0 0 0 0 204 $ 34,756.00 Task 4 WSDOT & Permitting Coordination 4.1 WSDOT and TIB Coordination 4 16 8 28 $ 5,132.00 4.2 Permitting 4 8 16 28 $ 4,924.00 Task Total 8 0 24 24 0 0 0 0 0 56 $ 10,056.00 Total Labor Hours and Fee 16 48 96 80 44 2 4 4 8 302 $ 52,254.00 Total Estimated Budget $ 52,254.00 35