City of Tukwila John W. Rants, Mayor
Fire Department Thomas P. Keefe, Fire Chief
TUKWILA FIRE DEPARTMENT
FINAL APPROVAL FORM
Project Name L� 044 C r Fl j/1/ e5
Permit No. .D 9 g-- x 6 1 7
Address /,--003 S ' Suite #
Retain current inspection schedule ,
A. Needs shift inspection
Approved without correction notice
Approved with correction notice issued
Sprinklers: 5 -/3
Fire Alarm:
Hood & Duct:
Halon:
Monitor:
Pre -Fire: r
Permits:
/2
Authorized Signature Da e
FINALAPP.FRM T.F.D. Form P.P. 85
Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575-4404 • Fax (206) 575-4439
4
D S1GN CALCULATIONS (NFPA 13D)
RESIDENTIAL FIRE SPRINKLER SYSTEM
Project Name: Thy Fr 4z3.
'� j
Protect Location: 12003 Ave, 5,
Available Water Supply -
Max. Sprinkler Spacing
g.p.m. at lr`I
1 (Q ft. X ft
Sheet no. of
Date: 0 -
By:
Floor Level:
Elev. of Spkrs.
p s i • Location:
Sprinkler I.D. ±*€i/ t'N 1 S '2_90
9'
One-sprinklerdesign
Min. flow g.p.m.: Min. pressure lq r5 p s.i.
Two -sprinkler design
Min. flow I Z g.p.m.: Min. pressure $ • Z p.s.i.
Type of piping:
CPvc
PB
Steel (Sch. 401
Copper K. L. M (circle one)
CALCULATIONS
2 -sprinkler flow: System demand = 27
g.p.m.
CALCULATIONS
1 sprinkler flow: System demand =
l (o g.p.m.
PIPING (1-spkr flow)
TOTALUNIT _ TOTAL
DIA LES NGTH X FR LO — FR. LOSS
�{ZO LINE -Lill— . )�O' 1 oP2"I4
CPA, . I" (45'' , oq{ L q$
FITTINGS &'•VALVES (1-spkr. flow)
DIA & X UNIT TOTAL X UNIT
� TOTAL
TYPE ��' l _ _
EL LEN. FR.
1 FR. LOSS
_ _Z_
-IMA 1
C b I" I. IG Chc�&--
METER FRICTION LOSS (size = 1" )
SPRINKLER PRESSURE REQUIRED
ELEVATION HEAD LOSS (Z,0 ft. X 0.433)
TOTAL SYSTEM PRESSURE DEMAND
TOTAL tUPPLY PRESSURE AVAILABLE
5,S
PIPING (2-spkr. flow =
o uNI I'/' Ind ,23 5q
L
Gv'L ►„ 45° . ex►Z
kilel tt dri3i
FITTINGS & VALVES (2-spkr. flow =2q g.p.m.)
g
�_ 3 , S
1 '°qZ
4211 det
METER FRICTION LOSS (size = ( )
SPRINKLER PRESSURE REQUIRED
ELEVATION HEAD LOSS (2pft. X 0.433)
TOTAL SYSTEM PRESSURE DEMAND
TOTAL SUPPLY PRESSURE AVAILABLE
5,9
11 E
,400,0,44000410004000,100114110***XV
'0,04,005,,t5t* .
Without Comments
As Noted In Red
Per The Attached Letter
'lese plans have been reviewed by The
.'lvention Bureau for conformance with c
standards. Acceptance is Subject to error
-nissions which do not authorize violation
ndards and ordinances. The responsib
'.'quacy of design rests totally with the d
P.:.litions, deletions or revisions h) these d
date will void this acceptance and will
let ubmittal of revised drawings for subse
P-iral acceptance is subject to field test an
-Ftle Tukwila Fire Prevention Bureau.
ukwila Fire
rrent city
and
of adopted
lib/ for the
signer.
rawings after
require a
uent approval.
inspection by
tawILA FiRE DEPARTMEA
Please call: 575-4407
and give this job
No.
and exact address for shuta
down or restoration approval.
5t:',57,151,455.04: prAkira,4,551.,..555
2'4
• . •
e:rrair ELAIArloNi
iNIY L. LINE.
Aht..7EFOs4os.76.,. K 11?"146N1
t3114 ET
to
VEA -f F/p)
Peg
M 17112-6..GTIONS
r::› 2114 PI, iv_
CANE)LiE
JAC,
ftag.
9 kAD..5
rgikiteag.
"littrfC5F-7"F-7i-50-1?"-: A$5
impACT BARRIER
L mENTs 4 swiTcHE.5
lei' het IN , AE30vE sLAB
.50t ,4
22Y-50
Ave.
Ace.ef-,5
'544 fignalligUinfr ok •
MIR (.4.9,15,7ZA, w
5/8 " ix, (owe) e COMMON
L$ i CONT. TO. UNPEILSIDE
OP' ROOF sHEATHIr46
I SEE PET.iSMV‘
, ft a : 11
MA -1N Fi-oorL.
i.iolf)
lagEqEW
N NOV 04 199
trA A
I Fri)