Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PP - 4244 S 146TH ST - UNKNOWN - PERMITS AND PLANS
4244 S 146TH ST ASSOCIATED PERMITS 94-5-127 B94-0200 i WASHINGTON STATE FIRE MARSHAL'S OFFICE /� CONTRACTORS. MATERIAL & TEST REPORT FOR ABOVEGROUND PIPING FIRE SPRINKLER ADVISORY BOARD -i 1 nn + PROCEDURE Upon completion of work, Inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. All defects shall be corrected and system left In service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is under- stood the owner's representative's signature In no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or local ordinances. PROPERTY NAME ii-thq/r) 1t BAYfi IFCSiOCr'�t�C PROPERTY ADDRESS-..t/45V PLANS O Sou'iH $702E7. 7(i.t,t,tLA ACCEPTED BY APPROVING AUTHORITIES (NAME) ADDRESS 4-44 e- etZt INSTALLATION CONFORMS TO ACCEPT PLANS EQUIPMENT USED IS APPROVED IF NO, EXPLAIN DEVIATIONS HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION OF CONTROL VALVE AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT? IF NO, EXPLAIN HAVi: :OPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: 1. SYSTEM COMPONENTS INSTRUCTIONS INSTRu 319N " >. 2. CARE AND MAINTENANCE INSTRUCTIONS. 3. NFPA 13A LOCATION OF SYSTEM SPRINKLERS SUPPLIES BUILDINGS DATE /b-6-95/ IA q OYES U NO YES ❑ NO DYES U NO YES U NO YES ❑ NO YES ❑ NO ]YES El NO MAKE C.:(7:1•11 -1Z.4 L MODEL YEAR OF MANUFACTURE 68R eig ORIFICE SIZE '12 TEMPERATURE QUANTITY RATING 37- 7- /350 PIPE AND FITTINGS TYPE OF PIPE € PV . XL. TYPE OF FITTINGS ALARM VALVE OR FLOW INDICATOR ALARM DEVICE TYPE VAIN iak MAKE MODEL MAXIMUM TIME TO OPERATE THROUGH TEST CONNECTION SEC. MIN usier DRY PIPE OPERATING TEST DRY VALVE MAKE MODEL I SERIAL NO. MAKE 0.0D. MODEL SERIAL NO. * TIME TO TRIP THRU TEST CONNECTION WITHOUT Q.O.D. WITH Q.O.D. MIN. WATER PRESSURE TRIP NT- RF1— Al ESSURE AIR PRESSU_ " TIME WATER -""'REACHED TEST OUTLET SEC. PSI PSI MIN. SEC. ALARM OPERATED PROPERLY NO YES IF NO, , AIN * MEASURED FROM TIME INSPECTORS TEST CONNECTION IS OPENED 85A (OVER) PeS OPERATION...----- • PNEUMATIC ■ ELECTRIC 0 HYDRAULIC —'—'---: PIPING DELUGE SUPERVISED LUES LINO 1 DET EC F INC -I MEDIA SUPERVISED ..�" .dYES U NO DOES VALVE OPERATE FROM THE MANUAL TRIP ANC)/OR !EMOTE ' ONTROL ATIOI'1S U YES U NO & •PRERCTION VALVES IS THERE AN ACCESSIBLE FACILITY IN ■ YES EACH CIRCUI i FOR TES TINCTF--I4 , EXPLAIN ■ NO ,�/'--� MAKE MODEL DOES EACH CIRCUIT -OPERATE DOES EACH CIRCUIT SUPERVISION -CUSS ALARM OPERATE VALVE RELEASE MAXIMUM TIME TO OPERATE RELEASE ..YES 11 -VE;) NO MIN SEC TEST ,6YA DESCRIPTION ban) ,Ortgar:tl USIAIIC"' Hydroetatic esli Hull be made et not less than 200 psi (13.0 ben)) for tvvo lv un or 50 pal (3.4 bars) above stent pressure In excess of 150 psi (10.2 for euro hours. a lei dryplps valva clappers shall be left open during teal to prevent damage. All aboveground piping leakage shall be stopped MA Establish 40 psi (2T ben) sir pressure and measure drop which shall not oxce.A 1 -IR psi (0.1 bars) In 24 hours. Test pressure turas d normal wafer sir pressure end measure air pressure drop which shall not exceed 1 112 sl 0.1 bc's) In 24 hours. . 1 r ING 1 FSTS ) ALL PIPING HYDROSTATICALLY TESTED AT P:;( FOR MIS. IF NO, uTT TE REASON DRY PIPING PNEUMATICALLY TESTED ■ YES EQUIPMENT OPERATES PROPERLY ! YES • ■ ONO NO DO YOU CERTIFY AS THE SPRINKLER SYSTEM CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM SILICATE OR DERNATIVES OF SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TEST SYSTEMS OR STOPPING LEAKS? DYES ONO DRAIN TEST READING OF GAGE LOCATED NEAT1 WATER SUPPLY TEST CONNECTION: PSI RESIDUAL PRESSURE WITH VALVE IN TEST CONNECTION OPEN WIDE PSI UNDERGROUND MAINS AND LEAD IN CONNECTIONS SPRINKLER PIPING. RIRED BY COPY OF THE U FORM NO. 8.58 FLUSHED BY INSTALLER OF UNDER- GROUND SPRINKLER PIPING 10 SYSTEM ■ YES RISERS Q NO r NO FLUSHED BEFORE CONNECTION MADE TO OTHER EXPLAIN BLANK TESTING GASKETS NUMBER SED ,MES LOCATIONS NUMBER REMOVED LDED PIPING ■ YES �_ O WELDING IF YES. . . '" DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDIII PTIIOCEDURES COMPLY 11 THE REQUIREMENTS OF AT LEAST AWS 010.9, LEVEL AR -3 DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS D10.£9, LEVEL AR -3 DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPUPNCE WITH A DOCUMENTEDQUALITY CONTROL PROCEDURE TO INSURE THAT AU. DISCS ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND OTHER LDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED ■ ■ ■ YES YES YES ■ ONO ■ NO NO CU I( sUTS ' =G)_ DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT I_ t'� OP- ur ,SS3 Zd"yci� CUTOUTS (DISCS) ARE RETRIEVED? Z lij/ RYES NO FUNCTIONAL FLOWTEST ITU IA DATA NAMEPLATE DOES AHJ REQUIRE A FUNCTIONAL FLOW TEST OF R DENT IAL S RINKLERS'7 ta RE FUNCTIONAL FLOW TEST RESULTS SATISFACTORY? YES 3 YES ■ ■ NO NO NAME PLATE PROVIDED ■ YES • NO IF NO, EXPLIJJN REMARKS DATE LEFT 114 SERVICE WITH ALL CONTROL. VALVES OPEN: SIGNATURES NAM OF SPE CONTRACTOR ACERINKL(IR..E ()Rd-ICCT1Qj-5VSIIMS TAC. CONTRACTOR LICENSE # TESTS WITNESSED BY FOR PROPERTY OWNER (SIGNED) , TITLE I DATE FDI KLEN�" \- OR (SIGNED) I TITLE I4.7 FO1 PROVING AUTHORITY I TITLE I DATE THAT THE INFORMATION HEREIN IS TRUE AND THA F THIS SPRINKLER SYSTEM WAS INSTALLED IN ACCORD RCW 18-160 AND THE RULES ADOPTED (3Y TFIE WASHINGTON ADMINISTRATIVE CODE AS ADMINISTERED BY RE MARSHAL L1� _ MX75--S--%.. ilARME FICATE OF COMPETENCY HOLDER (PRINT OR TYPE) LIK?NATURE OF CERTIFICATE OF COMPETENCY HOLDER GISTRATION # �� 3 f.- 4 00 43 DATE '1 - 9 ') City of Tukwila Fire Department John W. Rants, Mayor TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM Project Name L.` lr !2c; l 61-edif Address .s /z/(7/ Thomas P. Keefe, Fire Chief Permit No. / I y 020 v XRetain current inspection schedule Needs shift inspection Suite # Approved without correction notice Approved with correction notice issued Sprinklers: S Fire Alarm: Hood & Duct: Halon: Monitor: Pre -Fire: Permits: L Authorized Signature /2-S-5/ Date FINALAPP.FRM T.F.D. Form F.P. 85 Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575-4404 • Fax (206) 575-4439 HYDRAULIC DESIGN INFORMATION SHEET NAME \\JILL\ NM 15AYI-1 Q.Z $1oek_1c� LOCATION -4250- S. )461-14 ST.-Tue.\\itt_A DATE BUILDING 4'2,4111 SYSTEM NO. CONTRACTOR AG>= F)z1 'PrZU'Tl(.T 101.1. CONTRACT NO. "r4- 734 CALCULATED BY SD. 0-A • CONSTRUCTION: E1COMBUSTIBLE OCCUPANCY APPROVING AUTHORITIES ❑NON-COMBUSTIBLE DRAWING NO. _ 1 ot= I CEILING HEIGHT _ __ FT. :SIGN ❑NFPA. ❑ 13: ❑ LT. HAZ. ORD. HAZ. GP. ❑1 ❑ 2 ❑3 ❑ EX. HAZ. NFPA 231 ❑ NFPA 231C: FIGURE _ ; CURVE __- OTHER (Specify) 13- 0 ,•- SPECIFIC RULING MADE BY DATE SPECIFIC _ SYSTEM D AREA OF SPRINKLER OPERATION 1 NDJ Z 1105 SYSTEM TYPE DENSITY NA KWET • DRY ❑DELUGE ❑PRE -ACTION AREA PER SPRINKLER I94, 43 SPRINKLER OR NOZZLE HOSE ALLOWANCE GPM: INSIDE �"' MAKE C-G•t lel•• MODEL Selz- cvrG. HOSE ALLOWANCE GPM: OUTSIDE SIZE V21 K -FACTOR 4-3 RACK SPRINKLER ALLOWANCE 0 _ TEMPERATURE RATING ISS° No/ 15 PL-.6'tE CALCULATION SUMMARY GPM REQUIRED 140/ Z4P-4•O PSI REQUIRED 6o.1/4As_5 @ cA-rf cv.-3.-1. (Specify location) "C" FACTOR USED: OVERHEAD rSo/ 12o UNDERGROUND MFG_ SPGG. (PuG') WATER SUPPLY 1 WATER FLOW TEST PUMP DATA TANK OR RESERVOIR DATE & TIME 1993 RATED CAPACITY CAP O MP STATIC PSI 70 AT PSI EL' iy ON RESIDUAL PSI_ i ELEVATION iv • GPM FLOWING 1000 £ \ 1� '\ `s ELEVATION hit • 4 10 , _ t 1 �0 573444043 GPM LOCATION SOURCE OF INFORMATION \.J1S112Z Q1ST. 12S COMMODITY CLASS LOCATION4.- 21 -11. COMMODITY STORAGE STORAGE HEIGHT AREA AISLE WIDTH STORAGE METHOD: SOLID PILED % PALLETIZED % RACK %, ____ _ _ ❑ SINGLE ROW ❑CONVENTIONAL PALLET ❑AUTOMATIC STORAGE ❑ENCAPSULATED ❑ DOUBLE ROW LJSLAVE PALLET ❑SOLID SHELVING ❑NON- ❑ MULTIPLE ROW ❑OPEN ENCAPSULATED Y Q c FLUE SPACING IN INCHES LONGITUDINALTRANSVERSE CLEARANCE FROM TOP OF STORAGE TO CEILING FT. IN _ HORIZONTAL BARRIERS PROVIDED ■ I I I �I 111, 1 }1i • /• J I;: .i } ii 4 II 1'a a-- I t i 44 -1 I t - I 11 1'' rt 11-1 e.i ills 4{1 ! t 4 i ,; aII '11 1 III4 ' 4 1 . .-4--/-L 1- I ti -""---4-4---*--“ -1'4 1 11 11111 " ' " - � ,111 1- �, �1 -4-, I t- f11=111,_ ;iillffilIMI0111 fir! . . i . t ♦f �.,�� �uY +F—;_.- rpri � _! MullPig/ill 1111 ; �■� �.aiI■■ SUN /A`M1/1 ■I ._ ■■t1 � � _ I � iiii111111 41111111d �,i�'sir�:llill MI ice■Il .. t ii i I !Ili!!! NMI MIN1111 MEI M 0 r of A■ 31vDs A1d11'inW 'I'S'd CONTRACT NO. NAME 1�`(1-.1, E.6-51 • HYDRAULIC CALCULATIONS LOCATION ► ►-\stc::› FL \>J SHEET NO OF DATE 6,-2E3)-94 NOZZLE TYPE 8 LOCATION FLOW IN G.P.M. PIPE SIZE FITTING 8 DEVICES PIPE EQUIV. LENGTH FRICTION LOSS P.S.I./FT REQUIRED P.S.I. HYD. REF.PT 0 ELEV. NOTES o cavo ZE W LGTH. Go • T 13.2 aT-Q 3 FTOTTG. 77 17 • .t3) Q ILv 3/40 PFPE 10-i q ►r -a 3 LGTH. 6 PT 23.9 ►E - -7 FTG. io Q I Ca s4. PF 2. o TOT. t S .131. PE o IT -e. 3LGTH. 9 • T Z5.9 4 FTG. 3 0 ICA 3/4" PF 1.6 TOT. i2 -131 PE 3.9 ' 9' 14-61. Q rr-s2) 5 LGTH. 34- PT 31.4 t -r- a IIFTG. 2.0 Q 160 i l. PF 2.4 2'E 14 TOT. 54 .044 PE q u•4g' rFTG. ►E s LGTH. 9 _owe PT 33.e 0 •3 Q I Lfl PF 1.2 TOT. 14 PE 3.9 9'14.61. 0 LGTH. _ PT 35.9 FTG. Q I (p PF `TOT. PE 2.5cv-FuC.v 0 Psis 10Ni 45 LGTH. LSD — PT 41.4 F opc�.gstec. is 2-2PN/tocol DOWN. ►-nre. 3E 24FTG• LA Q it,11%4. PF 7. - TOT. 319 , PE 1.7 Q LGTH. PT 5o_ I S e c t-r`t cot.),.. . Q ,TG . PF OT. P E Q ,LGTH. PT FTG. Q PF • TOT. PE Q LGTH. PT Q FTG• PF TOT PE a LGTH. PT FTG• Q • F TOT. PE o LGTH. PTF 0 FTG• TOT. PE Q LGTH. PT -FTG. 0 PF TOT. PE o LGTH FTG. PT PF TOT. PE o V LGIH• FTG. PT Q PF TOT. PE o J__GTH. FTG. PT Q PF TOT. PE o LG H. ' PT FTG. Q PF TOT. PE o ' LGTH. PT FTG. Q PF TOT. PE, _ PT I CONTRACT NO. HYDRAULIC CALCULATIONS NAME LOCATION 2 N E '2' Fto'J SHEET NO OF DATE NOZZLE TYPE 8 LOCATION FLOW IN G.P.M. PIPE SIZE FITTING 8 DEVICES PIPE EQUIV. LENGTH FRICTION LOSS P.S.I./FT ' REQUIRED P.S.I. NYE). REF.PT 0 ELEV. NOTES GEaTVbI_ Q cP4c- 2E 14LQo FTTH. T `i.l I SP1ac.ir.Ka IS 3T-25 G. i-7 Gg>? ca.)c. Q 13 I,/ �� 4 PF (,.t�, TOT. 1-7 '6"6c1' '6"6c114. n11n.X- o LGTH. PT 15.9 3 FTG. Q PF TOT. PE q LE 14 LGTH. 43 PT 9. 1 2 IT --2 I 'FTG. Iv MT. Co I .oa9 Q 13 3 74� PF 5.4 IT- t3 3 PE A. . Plo-0 Q TI.GTH. PT 14.5 3 k= 3.41 TG. )4I Q l'64, PF JOT. PE Q 13 _ IT -8 3 LGTH. s PT 15.9 3 ZfO . tIS Q ZCD .6 six 3/ ,, PP5_2 .2 IlE T 5 3 �TH• .4.,..; ` E F21. 1 4 G. • -1'P 2C,.4 4'1Q TOT. i2 PE 3.9 9' m.6• q 1 n 17.-5 s LGTH. 34 .I 14 PT Z9. - I 5 IT -2 ► FTOTTG• 20 Quo.62 PFPE iO[0.2.14. s4- , Q ai.43 1 �� to s GTH• 9 PT 35-3 0 Qom•!. TG. s OT. 14- Pr 3.2 '23 PE 3.9 o l'iFTG. ,.GTH. PT 42.4 E c Lc J Q 2Co .L ._.- PF TOT. ' PE 3. S Q P•iG 1 � I c,v LGTH. 250 • T 45.9 F . MFo. SPLcc- 5.L PS) /too Dorn MTQ•. 3� FTG• �9 0 up. co -- PF 1-7. `'j TOT 3t 9_ PE 1. i o LGTH. PT .s.s S _ FTG. Q • F TOT. ` PE o LGTH. FTG. PF Q TOT. PE q LGTH. PT Q FTG. PF TOT. PE o LOTH En. PT Q PF TOT. PE o (LGTH. PT FTG. 0 PF TOT. PE o LGTH. PT r FTG. Q o PF TOT. LGTH., PE •T FTG. 0 PF TOT. PE o LGTH. PT 0 FTG. PF TOT. •E_ PT HYDRAULIC DESIGN INFORMATION SHEET NAME \VIl.L.1t1v1 13L6Y1-I V.Z$tOEti1GIE LOCATION c51JLS© S. t46i1-1 ST. 'TL]L\"/tl.ls. BUILDING DATE 6.-26 -9+ LOCATION 99- CONTRACTOR AGS Pee RLOT1;C.T ON.. CALCULATED BY ID. t..- . CONSTRUCTION: S1COMBUSTIBLE ❑NON-COMBUSTIBLE OCCUPANCY SYSTEM NO. CONTRACT NO. `14- 734 DRAWING NO. _ 1_ot= 1 CEILING HEIGHT _ ' __ FT. APPROVING AUTHORITIES SYSTEM DESIGN ❑NFPA. III 13: ❑ LT. HAZ. ORD. HAZ. GP. ❑1 ❑ 2 ❑3 ❑ EX. HAZ. NFPA 231 ❑NFPA 231C: FIGURE_ . _._____..._; CURVE OTHER (Specify) 13- 0 ❑ SPECIFIC RULING MADE BY DATE_ AREA OF SPRINKLER OPERATION 1 1.1D / 2. •IL:)5 SYSTEM TYPE DENSITY i•...)A Et WET ■ DRY ❑DELUGE ❑PRE -ACTION AREA PER SPRINKLER 19Cd' SPRINKLER OR NOZZLE HOSE ALLOWANCE GPM: INSIDE -630"' MAKE GEN-rriZ-NA-- MODEL cqf4Z O X - HOSE ALLOWANCE GPM: OUTSIDE -EP- SIZE 1/2' K -FACTOR 41'-3 RACK SPRINKLER ALLOWANCE 0 TEMPERATURE RATING ISS° ND/ 15S" PI6.1E. CALCULATION SUMMARY GPM REQUIRED It./ Z(D - Le PSI REQUIRED 50-1/4‘S.5 @ c.rr( co.- -1- (Specily Location) "C" FACTOR USED: OVERHEAD rSoJ 120 UNDERGROUND'-'‘ccm- sF' c. Cpsc) WATER SUPPLY WATER FLOW TEST DATE & TIME 1993 PUMP DATA RATED CAPACITY TANK OR RESERVOIR CAPACIT STATIC PSI iQ AT PSI ELEV ,��► ' .. RESIDUAL PSI_ ZJ ELEVATION GPM FLOWING 1O00 - ELEVATION p \` 1i1\ . •trraa GPM ,, LOCATION MINI SOURCE OF INFORMATION \J' -S1 QI' T. - 12S I' ; COMMODITY STORAGE I COMMODITY CLASS LOCATTDN 4P"7-'.1'14 STORAGE HEIGHT AREA AISLE WIDTH STORAGE METHOD: SOLID PILED % PALLETIZED % RACK __ °,„ ___.___ — Cl SINGLE ROW ❑CONVENTIONAL PALLET ❑AUTOMATIC STORAGE ❑ENCAPSULATED ❑ DOUBLE ROW L]SLAVE PALLET ❑SOLID SHELVING ❑NON- ❑ MULTIPLE ROW ❑OPEN ENCAPSULATED a cc FLUE SPACING IN INCHES LONGITUDINAL..____TRANSVERSE CLEARANCE FROM TOP OF STORAGE TO CEILING FT. IN HORIZONTAL BARRIERS PROVIDED tiJ0 I' I 11! SII ! 1� 0. n 4+1 --f 41 1s' 4 1 • 4 -4, I� I+ I,t fi'1 li;; . If1 t i1 4— -a- 6 1 0 f QZ Cti A 3"1V3s A 1du lnw -I•s•d CONTRACT NO. NAME 16.YI-k lessl. HYDRAULIC CALCULATIONS LOCATION 1---\S".".>FLc / SHEET NO OF DATE :-2,-9+ NOZZLE TYPE 8 LOCATION FLOW IN G.P.M. PIPE SIZE FITTING 8 DEVICES PIPE EQUIV. LENGTH FRICTION LOSS P.S.I./FT REQUIRED P.S.I. HYD. REF.PT 0 ELEV. NOTES o cwc ZE W 1 Ia Go • T 13. - 37-R 3 17 FTGTOT. i7 • •t 1 Q ILo 3/4. PF i0.1 P Q 1r --s 3 LGTH. 5 • T 23.9 3 -t TG. IC,. Q 1 /.4n PF 2. o OT. 15 11 ' PE Q 3/.¢" 1T-6 3 GTH. - ' T z5.9 4 TG. 3 Q tCp PF t.to ' QT. i2 .131 PE 3.9 9'14.61, (4 1 ii it -e) S GTH. 3 - PT 31. • IT- a 1 TG . Q 160 P 2.4 2E 14 I •T• 5420 .044 PEF o x1A.40 r. 1s s GTH. 9 PT 33.E o TG. s Q I PF 1.2 OT. 14 _owe PE 3.9 9' µ•c1. o 11 GTH. PT 36 .9E v _ Q IL PF OT. PE 2.5r.y_F Q Pvc- I!'Z 1 cav 4 TH. 2.60 PT 41.4 F o1:ci. Sf c. I5 2-2.PS1/►QcaI DOWN. ►�►Te_ Q Ili PF 7. - OT. 319 PE t . i O GTH. PT 1 S e ct-r`c •,..)...1. PT Q - OT. PE Q GTH. PT FTG. PF Q 0 _ TOT LGTH. PE PT FTG. Q PF TOT PE Q LGTH. PT FTG. Q •F TOT. PE o LTH. Q FTG. PF TOT. PE Q LGTH. PT Q FTG. PF TOT. PE 0 TH PT Q PF TOT. PE o UK FTG. 0 PF TOT. PE o TH. PT FTG. Q PF TOT. PE o �L TH. PT FTG. Q PF TOT. PE o LGTH. PT Q FTG. PF TOT. • E_ PT CONTRACT N0. SHEET NO OF NAME DATE HYDRAULIC CALCULATIONS LOCATION 2 1-AtaNs. Ftc->` J NOZZLE TYPE & LOCATION FLOW IN G.P.M. PIPE SIZE FITTING a •EVICES PIPE EQUIV. LENGTH FRICTION LOSS P.S.I./FT REQUIRED P.S.I. HYD. REF.PT 0 ELEV. NOTES GE,.illzdt_. Q cN U 2E �4 I GTH. &,o - T 9. I I�Pa ci i 3T-2 3 FTG. 1'7 >Z cmc . 0 13 3 „ �4 F C..e, .10 TOT. 17 .059 1:::E 14 Mn(_ 0 LGTH. PT Is -9 3 TG. Pr Q ® GT GTH. 43 PE PT 9.I p TIMII 2 3/4" PF s.4 Q 13 .0239 PE GTH. PT l4. = 3.41 • I TG. QT. GTH. s PF V_- PE PT159 TG. to OT. IS .b PF 5.2 PE IT 5 3 GTH. - P T 21.1 4 MIMI PF 4.1 � •411111031 • 3�S PE 3q g' 14.6.0 PT z9.I 5 scu I14OT. s sd GTH. 9 PT 3S_3 o IT PFPE 3.9 P./c. iii' GTH. PT 42.4 E P iSC.V. LC»Ji I c,v FTG. .- TOT. PE 3. LGTH. 'LBO PT 45.9 F MR./. 'w- S.C. PSI/tool DOM. MT• 3� FTG• �•cj • TOT 319 PE 1.7 Q LGTH. PT Gs.s S - FTG. •F TOT. PE o LGTH. FTG. PJ •TOTE PF • LGTH.PT FTG. PF NEE PE • TH T e Q PF • PE o • PT Q PF TOT. PE FTG. Q 0 PF TOT.PE LTH. FTG 0 PF TOT. PE o LGTH. PT 0 FTG. PF TOT. .E_ PT • - 4 • - \: t• • _ -- - a 1 SY/A TYPE HEAD uPR1GHT ON LINE Cr UPRIGHT ON 1- STUB UP G.eRaca E Bar141;:too1-4 -- 1,10 (1 ON5USTAFt.-t✓ FixrLt S- K p A 5 W P,1 C. -'T HELL_ O PENDENT ON UNE • PENDEN ON 1 DROP • DRY PENDENT • 1 If= 1 _ WAR GAUGC�E4 14"aA•G.Y&i . 03. -" C, -OBE. UALYE "wawt swriut To 4.t P. e V Vcr. twos er CrrrtELS) A 1 4 F , 2 V E ri -1 4- i 1, f L �• SUPPLY 1D SPRKS. I N PT w PLASTIC - ADR • • -L� OFFICE } • 1 X t • sb-toiz, rWILXI 5 950 SACKFLOW a `1 ASD TSrig I a - IZ 1 3. FiRE5PRK.SUPPL'' R1S3CAM.=NTS, 1 SPRINKLERS MAKE SIZE TEMP FINISH DROP 5 TPA rie I t Q TY EAR THQUAKE BRACE RIGID COuPLING REDuCING COUPLING PC ti S :r._ E. - a • f! I — `T Et -OM '°1-2 _ Q_ rt P STN 1 f a T 0 ,- * tot".Tu tat 1t+ 4 1 1 j -•-v-. `'• 1 II f . I Y 0 LIT t t.,1 TY 1 -r- , t 19 i +tom_ --- - 1 r —* j t i f t I -Q' K. t.c. Z 4 .v ,Q s L~ . IJ ..-4 �-y- / AD- , i LEGEND 1 1 i F • ; Y I4 IrCr • r ttiASTFg- ea 2bUM i s r Zs HANGER LEGEND secrION east 1. ALL MATERIALS & INSTALLATION TO,BE PER NETA 13—D •tt 4. _ ALL HANGERS TO BE TOLCO FIG. 22 -OR 3 WITH- 1/4" 5. _ ALL DROPS _TO SPRINKLER.S ARE 3/4" CPVC. 6._ __OWNER TO PROVIDE -ADEQUATE HEAT TO PREVENT WATER IN - PIPES FROM FREEZING IN AREAS PROTECTED WITH A WET PIPE SPRINKLER SYSTEM._ _ Ave • • • - - 7. -INSTALLATION AND TESTING_TO,BE PER THE AuTlioRITY • SPRINKLER SPACING . _ - SPRINKLER IS —0"; MAXIMUM' SPACING BETWEEN. SPRINKLERS 14 '-0 . = MINIMUM SEPARATION BETWEEN' SPRINKLERS IS - ACCEPTED DUWITHOUT COMMENTS. gika AS NOTED IN RED O PER THE ATTACHED LETTER The drawings affixed hereto have been reviewed and accepted by the City of Tukwila Fire Dept. Additions, deletions or revisions to these drawings after this date will void this icla.)tance and will require a resubmittal of revised drawings. Final acceptance is subject to field - CITY OF TUKWILA 575-4407 FILE ACE TUKWILA FIRE DEPARTMENT Please call: 575-4407 and give this job No. qZ— ,5'/z7 and ex ct address for shut, down or restoration approval. 26217 MAPLE VALLEY/BLACK 04AMOND RD. SE. MAPLE VALLEY. WA 98038 - E_EGUE .2 JUN 3 0 1;194 - 208-432-4401 /1 - U -HOOK Wn NO 1522- DRIVE SCREWS FOR 1.-1" PIPE SYSTEM DESIGN CRITERIA FLEXIBLE COUPLING & CAP SCR EWED CAP PLUG HANGER LOCATION HYDRAULIC REFERENCE POINT • - OR LAC SCREW PER NFPA J13 FOR 2-1/2" AND LARGER PIPE - (Yr SOCKET W 3 8 x 2-1 r LAC SCREW. A.T. ROO & PIPE RING /10 - EYE ROD W LAG SCREW R NFPA /13 & PIPE RING 112 - TOP tIF-AM CLAMP, A T. ROo PIPE RING t PIPE TO rINISHED FLOOR 1/4 CONTRACT WITH • pRAwN BY et