Loading...
HomeMy WebLinkAboutPP - 4242 S 146TH ST - UNKNOWN - PERMITS AND PLANS4242 S 146TH ST ASSOCIATED PERMITS 93-S-237 WASHINGTON STATE FIRE MARSHALS OFFICE CONTRACTORS MATERIAL & TEST REPORT FOR ABOVEGROUND PIPING FIRE SPRINKLER ADVISORY BOARD PROCEDURE , Upon completion of work, Inspection And testa shall be made by the contractor's representative and witnessed by an owner's representative. All defects shall lie corrected and systerri left in Service before contractor's personnel finally leave the job. A certificate shall boated out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is under- stood the owner's representative'd Signature In no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's re•'cfu jernente or local ordinances. PROPERTY NAME k/72a PROPERTY ADDRESS DATE 3—*Z‘.1/—?g— PLANS ACCEPTED BY APPROVING AUTHORITIES (NAME) 77,,.E w /G A �-� ADDRESS INSTALLATION CONFORMS TO ACCEPTED PLANS J�. YES EQUIPMENT USED IS APPROVED IpityES IF NO, EXPLAIN DEVIATIONS U NO • NO INSTRUCTIONS HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION d YES OF CONTROL VALVE AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT? IF NO, EXPLAIN U NO HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: *I YES 1. SYSTEM COMPONENTS INSTRUCTIONS ,: YES 2. CARE AND MAINTENANCE INSTRUCTIONS. OYES 3. NFPAI3A ES • • ■NO NO NO NO LOCATION OF SYSTEM SUPPLIES BUILDINGS SPRINKLERS MAKE MODEL YEAR OF MANUFACTURE ORIFICE SIZE QUANTITY TEMPERATURE RATING G4; 4 -X -el -L 432 ¢ ./ •___. /7 / 3,5-112 tz, PIPE AND FITTINGS TYPE OF PIPE aPVC., t g L TYPE OF FITTINGS ALARM VALVE On FLOW INDICATOR ALARM DEVICE MAXIMUM TIME TO OPERATE THROUGH TEST CONNECTION TYPE MAKE MODEL MIN SEC. 144fIv TIA? C fia2 ('S' .4) -- DRY PIPE OPERATING TEST DRY VALVE Q.OD. MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO. * TIME TO TRIP THRU TEST CONNECTION WATER PRESSURE AIR PRESSURE TRIP POINT AIR PRESSURE * TIME WATER REAL UTLET Id�RMI OPERATED PROPERLY MIN. SEC. PSI PSI MIN. SEC. YES NO WITHOUT Q.O.D. WITH O.OD. IF NO, EXP NNECTION IS OPENED 85A MAR 2 8 1994 '1aU, (OVER) DELUGE & OPERATION El PNEUMATIC ❑ ELECTRIC ❑ HYDRAULIC PIPING SUPERVISED OYES U NO 1 DETECTING MEDIA SUPERVISED NO DOES VALVE OPERATE FROM THE MANUAL TRIP AND/OR REMOTE CONTROL ST E UYES U NO r A V t Ian VIS THERE AN ACCESSIBLE VALVES ■ FACIUTY IN EACH CIRCUIT FOR TESTIN YES ■ NO •, 3 'LAIN • MAKE Mme( pS- DO - •CUIT OPERATE SUPERVISION LOSS ALARM DOES EACH CIRCUIT OPERATE VALVE RELEASE MAXIMUM TIME TO OPERATE RELEASE NU YES NO MIN SEC JYES }IYr1RrlaTATtr:• Hydrostetle tail shall be made s1 not tees than 200 pal (13.6 ben) br two hours or 50 pal (3.4 bars) above stalk pressure In rxosa d 150 psl (102 TEST prevent damage. All aboveground piping leakage shall be Hopped. DESCRIPTION bars) fatwo hours. OMbrentw dry-plp . dapped apped shall b• loft open during test b d pwptJAATw Estadlsh 40 pal (2.7 bad) ak pressure and measure drop which shad not exceed 1-1/2 psi (0.1 bad) In 24 hours. Test pressure tanks at normal water level drop *filch shall not exceed 1 1/2 phi (0.1 bed) In 24 hours. and air pressure and measure air re AU. PIPING HYDROSTATI Y TESTED AT PSI FOR HRS. IF NO, STATE REASON DRY PIPING PNEUMATICALLY TESTED 111/ES EQUIPMENT OPERATES PROPERLYYES ■ • NO NO DO YOU CERTIFY AS THE SPRINKLER SYSTEM SILICATE OR DERIVATIVES OF SODIUM SIUCATE, ING SYSTEMS OR STOPPING LEAKS? CONTRACTOR BRINE, OR • YES ■ THAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TEST- NO TESTS 11 DRAIN i TEST READING OF GAGE LOCATED NEARERRESIDUAL SUPPLY TEST CONNECTION: PSI PRESSURE WITH VALVE IN TEST CONNECTION OPEN WIDE Z) - PSI UNDERGROUND MAINS AND LEAD IN CONNECTION SPRINKLER PIPING. VERIFIED BY COPY OF THE U FORM NO. 85B FLUSHED BY INSTALLER OF UNDER- GROUND SPRINKLER PIPING ,1.YES 3S 0 SYSTEM • YES ■ • RISERS NO NO FLUSHED BEFORE CONNECTION MADE TO • OTHER EXPLAIN •. BLANK TESTING NUMBER USED GASKETS LOCATIONS 1 NUMBER REMOVED WELDED PIPING UYES ,INO IF YES.. . DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS 010.9, LEVEL AR -3 DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN WELDING COMPUANCE WITH THE REQUIREMENTS OF AT LEAST AWS 010.9, LEVEL AR -3 DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED • ■ ■ YES YES YES • NO ■ NO ■ NO CUTOUTS DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL (DISCS) CUTOUTS (DISCS) ARE RETRIEVED? • YES ■ NO FUNCTIONAL DOES AHJ REQUIRE A FUNCTIONAL FLOW TEST OF RESIDENTIAL SPRINKLERS? CO U ► YES FLOWTEST WERE FUNCTIONAL FLOW TEST RESULTS SATISFACTORY? Z . , _ 3 YES NO • NO • • ' -1. 1 0 NAME PLATE PROVIDED DATA NAMEPLATE ©YES ,^_ANO IF NO, EXPLAIN DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: REMARKS NAME OF SPRINKLER CONTBACTOR ail Fj/24- Pav1 e.77 o7V -$ ys?-ri r '`rrfre__ CONTRACTOR UCENSE # TESTS WITNESSED BY //11 �- �Q� SIGNATURES FOR P'!0' ' OW/I- I TIJ / Z - 1 -32..'/ f/� N�V7=/ �¢ FO - 1» NKLER oo• TRACJO (SIGNED) I TITLE 1-272-V Of COWS 7. ( / ROVING AUTHORITY TITLE DAT T THE INFORMATION HEREIN IS TRUE AND THAT THIS SPRINKLER SYSTEM WAS INSTALLED IN ACCORD - CW 4N0 THE RULES ADOPTED BY THE WASHINGTON ADMINISTRATIVE CODE AS ADMINISTERED BY L REGI TION # 3 - 424- o°43 NAM ERTIFICATE OF COMPETENCY HOLDER (PRINT OR TYPE) SIGNATURE OF CERTIFICATE OF COMPETENCY HOLDER DATE 3 -2.4 ADDITIO BSA BACK �3 -24 -15 ts\--\;‘)\-\/ HYDRAULIC DESIGN INFORMATION SHEET DATE 9 6/93 NAME "4.4,6 /2,5/L� N�C_ LOCATION CS %7'!0 ,S7t.. 737,At 9B/66 BUILDING /2./.S)LEA.. e CONTRACTOR ,67z. ""/�4 i *y e /5o'() 7,5 -/ /dtjC- CALCULATED BY A 2Y)A)62, (7z21) CONSTRUCTION: Ot,OMBUSTIBLE ❑NON-COMBUSTIBLE SYSTEM NO. i CONTRACT NO. 93— 7/O DRAWING NO. /o F, CEILING HEIGHT _ �- � FT. OCCUPANCY APPROVING AUTHORITIES el7)./C7-1-5/6)//4 'ifG` :;'3 Q j),9717.- SYSTEM DESIGN NFPA. 13: ❑NFPA 231 ObTHER (Specify) EJ SPECIFIC RULING Q LT.. HAZ. ❑ NFPA 231C: n/ A/4 /3 -.6 ORD. HAZ. GP. 01 02 03 0 EX. HAZ. FIGURE ; CURVE MADE BY DATE AREA OF SPRINKLER OPERATION /1411/ DENSITY AREA PER SPRINKLER / Ne HOSE ALLOWANCE GPM: INSIDE HOSE ALLOWANCE GPM: OUTSIDE RACK SPRINKLER ALLOWANCE SYSTEM TYPE dWET ❑ DRY ['DELUGE ❑PRE-ACTION � SPRINKLER OR NOZZLE MAKECEIV7 4c. MODEL 4B'e6nxf4l SIZE Z K -FACTOR 44 3 TEMPERATURE RATING /SJ`"b/46C/i36";a4v ale CALCULATION SUMMARY GPM REQUIRED 24.9/16 PSI REQUIRED A7/36.6 tikdEre..4,eot)1,-9b _s-o/P/ (Specily Location) "C" FACTOR USED: OVERHEAD C=/5"d UNDERGROUND f 014. .)J WATER SUPPLY WATER FLOW TEST DATE & TIME 93 STATIC PSI 7 e2 RESIDUAL PSI 2 0 GPM FLOWING /600 ELEVATION LOCATION SOURCE OF INFORMATION RAT AT P ELE PUMP DATA r i COMMENTS. N. _._.) IN RED 0 PER i A 1 :TAC,-: ED LETTER I— EL TANK OR RESERVOIR CITY ATION WELL PR OF FLOW GPM The drawinjs hereto have reviewed dna ac.; .ced by the Tukwila Firs Jt. iditivllb, del .i );i3 'r twin or revisions t w 0 H r F- 0 0 2 U U COMMODITY STORAGE HEIGHT STORAGE METHOD: SOLID PI U cc 0 SINGLE RO ❑ DOUBLE 140W 0 MULTIPLE ROW date will vol..] I:an. re : - . GLA Final accc ars de ec r re✓i;D,;,i u a9i.7�ys. x ; TP • lo talent 57364-0043 Vairi % •4;;. u yv4e• EIV' L PALLpi,7. UTOMA' IC STORA - APSULATED �I SLAVE PAI JKWILA LIS OLTD S E ❑NON- - c 407 ❑9J • ENCAPSULATED FLUE SPACING IN INCHES LONGITUDINAL_ TRANSVERSE CLEARANCE FROM TOP OF STORAGE TO CEILING FT. IN. HORIZONTAL BARRIERS PROVIDED 000 000 - N Q 000 000 CO .O N - T 0 0 0 0 S CO - N 00 00 N P - N 00 00 N � o 00 00 '0 00 00 FLOW - GPM i IIIc n 11 1111 1111 ilii 1111j1IT1 1111 1111 in11 1111 1111 1111 7 n kft T 1iif IITT 1111 1111 i I 73 1111 O 41 1 SUMMAF '©� NI 5 O v a w 1 ~ C ,, ~ 0, 9 2 4. jt c c ~-.1Q N a M c T F ..._c c lj .�.. I c c 1111 1111 0 1111 -— 1117 o WI Till o 1111 Ln v- IITT TTII o 111 111I11 p `9 1111 1111 Lr)v)`0 111 1111 ii l'1 I)I1 1111 1111 t1) N 1111 illi O W11111 11ii — 0 000 000 - N Q 000 000 CO .O N - T 0 0 0 0 S CO - N 00 00 N P - N 00 00 N � o 00 00 '0 00 00 FLOW - GPM CONTRACT NO. 93- 7/0HYDRAULIC CALCULATIONS SHEET NOL / NAME ,eE.s/,d E.)C(/s10. w/f) DATE 8/93 LOCATION /2•S t5; 7Z,e„ ✓,/4 R% 98/d8 NOZZLE TYPE 8 LOCATION FLOW IN G.P.M. PIPE SIZE FITTING 8 DEVICES PIPE EQUIV. LENGTH -D FRICTION LOSS PSI/FT / Z 3 REQUIRED P.S.I. T /3.6 HYD. REF PT 0/�A''• %� ELEV. e -/s'0 g.,443 NOTES �`/i�AL4� 0 3�/U 17"4 zL k FTG. >4 /AS Q /(o PF 3, 8/ TOT. Z9. o PE - i. 5 0 34/ LGTH. z-4)PT -/3/Z /4,, // Al 8.333 r; FTG. 3 /A� 0 >4,/ PF . G 10 TQT. 6-o PE 0 / LGTH. 5113--n . 6�3 , PT /4..77 6 S, 333 7rx iE FTG. /9 TOT. 3'f/ tL.GTH. /i�5 Q /(p PF z . 3 S PE Q / /2-6 PT /9. i z G B.333 /E lc FTG. B 14. Q 16 PF • 8 9 TOT. 2,4-49 • 0 V35 PE 0 X --G.. / LGTH. 7-+' PT Zo.al D 8.333 er/Zo 416e-6 X-2 p',41,4 T 2,Sec. 1,4/,6,).5 9.5-e, /-ps//oG,, 27 E FTG. SPF 14 0/6 0 J. 03 TOT. J5, 333 LGTH. . 667 PE 3.05/ P T 2 V, 4'A e / —D FG. PF .5- //4 13/6, TOT. PE o � 7- LGTH. z. PT 29.68 _ , /-6 /i,,., 44.,.,.4 Af.:s13..�! M.a,✓F..[ z. 2 pfri Tilru /G+o'a /4 /4/ FTS• /.3 ), .S 0/6 PF 5. 74 TOT. zI,3 , PE_ 1.7 V 0 LGTH. PT 34..6/ S -3;d /r9.n 0 /!o FTG. PF TOT. PE o LGTH. PT FTG. Q PF TOT. PE 0 LGTH. PT FTG• 0 PF TOT PE 0 LGTH. PT Q FTG• PF TOT. PE o LGTH. `PT FTG. 0 PF TOT. RE 0 LGTH. PT ' FTG. 0 PF TOT. PE 0 LGTH PT FTG. 0 PF TOT. PE 0 LGTH. PT FTG• 0 PF TOT. PE 0 LGTH. PT FTG. 0 _ PF TOT. PE o LGTH. PT 0 FTG. PF Tot. PE o LGTH. PT Q FTG . PF TOT. .PE PT _ CONTRACT NO. 93"7 HYDRAULIC CALCULATIONS NAME 1C/L46, 4VS/46z*A.k6 /77zIo S,oe. - lows LOCATION 4/2$/6 .S. /* s7.` ?Z k 49 u14 9248 SHEET NO..&OF 2� OATE 9/ZR/93 NOZZLE TYPE 8 LOCATION FLOW IN G.P.M. PIPE SIZE DEVICES FITTING 8 PIPE EQUIV. LENGTH FRICTION LOSS P.S.I./FT REQUIRED P.S.I. HYD. REF.P1 0 ELEV. Gr/So k'r443 NOTES tE,T�.e•L 1,8e Q I GTN./, S pT 9. / 2 , 8. a _.. 4 3/ rile /‘/ FTG. // PF 1. /Z 154 "0 0/ 3 TOT. /2.S .a893 PE -./3 Q LGTH. *PT /45.b7 19 13,333 _ vg -a7 TG. Pr 'y/= Q OT. PE ,%/D 77 Q GTH. 'PT TG. . PF 0 10T• PE q 3 1/ G H./3 PT 9./ % 8.0 l fit z(k TO. /6 PF Z, 5? /As Q/3 10T_. z9 ,P893 PE -,1s zo=1 C1)3'9, 3 `� ' GTH. 2-O PT A 8.333 it TG. 3 .11.5g PF /.7Z �r"/ 017 Z. AS 02(0,9 OT. s -o _3 S/3 PE 0 Q24.1/ �7� GTH. 4'o -D PT /3.210 8 19.333 /E FIG. /y PF 6•/3 z#95 j -y . //3b PE Q / GTH. iZ-b PT /9.3? c 8J33 /E kTG. 8 PF 2.33 2.4.SQ.ZG.`� OT. //36 PE Q X -L. � GTH. 7.33 PT 21.72 D _ 0.333 frit TG. 8 PF z.49 Lw/Z) A�Enx.c/ , Z45 0 26.? OT. i 33 33 . / 1% PE 3, oYY ro ,rsc Q GTH. PT z7. 5 E / -o vha-nsis gyro FTG. PF 6.d /"Rv-trkAi,Lass Q TOT. PE 6P -s-/ Q 1 i Z LGTH.Z3'D PT 33.1'S /-U /L D j ,4v1. FTG. /3 Pr i 3 4,.r1e�4 .ti sw4Fi,:r:.►4 ZAS 0 249 TOT z m3 PE /. 7 474,s, ; a,:zei=o Q /Z /S/9,.9u $ - 3-0 FTGH. PT ;,9S 0 zd.9 . TOT. PE o LGTH. PT FTG. PF Q TOT. PE Q LGTH• PT FTG. Q TOT. ,PF PE o LATH PT . PF o TO . FE o PTF • 0 TOT. PE o GTH. tPT FTG. PF Q TOT. LGTIi. PE PT o FTG. PF 0 OT. PE o LGTH. PT FTG. PF 0 _ TOT. PE PT :.TVI E r 1- a. 5PRK P!PJNcI FSA GriERAk NOTES 1. ALL MATERIALS A INSTALLATION TO BE PER NFPA 13-D. 2. ALL PIPING AND FITTINGS TO BE CPVC, EXCEPT WHERE HATED OTHERWISE. 3, RISER PIPE TO BE ALLIED "XL". 4. ALL BANGERS TO BE TOLCO FIG. 13 OR 23 WITH 114" HEX HEAD LAG SCREWS. - 5. ALL DROPS TO SPRINKLERS ARE 314" CPYC. 6. OWNER TO PROVIDE ADEQUATE HEAT TO PREVENT WATER. IN PIPES FROM FREEZING IN AREAS PROTECTED WITH A WET PIPE SPRINKLER SYSTEM. 7. INSTALLATION AND TESTING TO BE PER THE AUTHORITY HAVING JURISDICTION. MANGE$ SPhCING _FOR CPVC 3/4" PIPE - MAXIMUM OF 5'-6" 1" PIPE - MAXIMUM OF 6'-0" 1 114" PIPE - MAXIMUM OF 61-6" I SPRINKLER SPACING MAXIMUM SPACING FROM WALL FOR_CENTRALFGBR CONCEALED RES/. SPRINKLER IS 7'-O". MAXIMUM SPACING BETWEEN SPRINKLERS IS_ 14`-O". MINIMUM SEPARATION BETWEEN SPRINKLERS IS 8`-0". 4- • f .2 �.•f ! _ 'irk + ' {+V%.W _AV } ib .„ } i IE! rf, Flat Z a{ 101.,rL 1 ce4&2 s : BiDG SECTION THRU ENJRY GREAT R'A _ t SUPPLY T4 SPRKS _ � • ��, ., l4PT x RA- ST1C ADP WATER GSE 4 ICSOA VALVE. r C OBE. V E,: ---.1„a I WATER FICW S1l1ttIC}{ I" iLKIt15 950 EkCKFLUW 1Z Movnf woritr V"O ° t�o„ 75 01 elfer;05- vF 10145 r t! 5- oyn FIRE 5PRK . 5upiRs SCAi-�s NTS 1 i` i?- a 1 ti 1 � EXIST. FIRE. I-IYDRANT i i3 T UKWIIA FIRE DEPARTME:N`r (ease call e 575.4407 ve this Job - 93-s-'23? A 4 1 ldress for shu .-.gyration appro„" `ACCEPTED © WITHOUT COMMENTS AS NOTED IN RED PER THE ATTACHED LETTER The drawings affixed hereto have been reviewed and accepted by the City of Tukwila Fire Dept Additions deletions or revisions to these drawin ;s of+_r this date will void this a::e )t n.. Li 1 /illrequire a resubmittal of revise,] Jr.1Ning Final acceptance is subsea t t3 fief inspection by a rearesernative of this department _ DATE 7-30-x/3 - BY -4f $ CITY OF TUKWILA # SEA 575 4407 I�• ,� - ACE -_ l +.E• L 4O."34. s 1993 FIRE PROTECTION SYSTEMS. INC. 26217 MAPLE VALLEY/BLACK DIAMOND RD., S E. - MAPLE VALLEY WA 98038 206-432-4401 `"E'2 S1 � �� � CONTR UC ACf�PS44TP1 4 SPRINKLERS LEGEND SYM 0 TYPE HEAD UPR'CH T ON LINE MODEL MAKE SIZE TEMP _ FINISH ESCUTCHEON QTY EARTHQUAKE BRACE --+�-- FLEXIBLE COUPLING FLQW ..,RISER FLOW ._DROP Ca? UPR`GHT ON 1 STUB UP 0 PENDEN T ON LINE • PENDENT ON r DROP (±) UPPIGHT & PENDENT ON 1" DROP • DRY PENDENT SIDEwALL RIGID COUPLING —r— REDUCING COUPLING 1 155' BRAs5 PSI) -I+ cc.icEL. t35° —a FLEXIBLE COUPLING & CAP t PIPE TO BOTTOM OF DECK ----1 SCREWED CAP — 4 PLUG HANGER LEGEND gt - U -HOOK W/2 NO 16x2" DRIVE SCREWS FOR 1"-2" PIPE - OR LAG SCREW PER NFPA #13 FOR 2 -yr AND LARGER PIPE #5 - EYE SOCKET w73/8- x 2-172' LAG SCREW A T ROD & PIPE RING #10 - EYE ROD wJ LAG SCREW PER NFPA #13 & PIPE RING #12 - TOP BEAM CLAMP A T ROD & PIPE RING SYSTEM DESIGN CRITERIA )4EPA. "13 D iu1(W1tA FIRE. P: WJ XT'IA4 De. r PROJECT k DD RES DE ' C r- li.�-- S.14d"'STT - 5rUKWILA WA, same, 4- ---r-- HANGER LOCATION 0 HYDRAULIC REFERENCE POINT TOTAL SPRINKLERS THIS SHEET 17 r t. PIPE TO FINISHED FLOOR } sit CONTRACT WITH R -K BUILDERS 14741 F ."'°AV. S. TUKWILA 9816E. DRWG TITtE SITE RAN RISS DWG FIR .5PRK PIM iNCITES DATE 9-23-3 DRAWN BY RE24 $RYICR Ala -7172525 REVISED X14 6. APPROVALS BY 'ruxv./I LA F(RE PRE -vat lots! DEPT' .41 CONTR 1 93-710 Or I SAID