Loading...
HomeMy WebLinkAboutPP - 660 STRANDER BLVD - UNKNOWN - PERMITS AND PLANS660 STRANDER BLVD ASSOCIATED PERMITS 19-S-145 SITE LOCATION CITY OF TUKWILA FIRE MARSHAL'S OFFICE 206-575-4407 FIRE PROTECTION SYSTEMS PERMIT APPLICATI[ON Applications and plans must be complete in order to be accepted for plan review. **PLEASE PRINT** Site Address: `.�© ,47 (X Z /d L✓d Tenant Name: 57%16 (./e-46. Property Owner's Name: Mailing Address: CONTACT PERSON -if there are questions about the submittal. Name: Company Name: 4t ' Ltvirs•-• Mailing Address: 7Ass OCG sr King Co. Assessor's Tax No.,: Suite Number: Floor: New Tenant? 1=1- Yes ❑ - No City State Zip Day Telephone: 05'J S=72- '70319").- K,A f 2- K City E-mail Addresse717%i'�.11� NICET III number: /i'%/ irr. o tf v19 44 -- Total —Total number of new/relocated devices or sprinkler heads: Fax Number: Contractor's City of Tukwila Business License number: c(0— State Zip Valuation of Project (contractor's bid price): $ e./ceGr Scope of Work (please provide detailed information): /WO/ 5-,244/z796. ti/3 PERMIT APPLICATION NOTES Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Fire Marshal to comply with current fee schedules. Expiration of Plan Review -Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The Fire Marshal is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OR WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: PAiD 2319 Signature: TUKWILA f R E Date: 7/(017 Print Name: Day Telephone: 0.5.7P Plan Permit App.doc 8/22/14 TFD FP Form 8 4 FIRE DEPARTMENT SPRINKLER PLAN REVIEW COMMENTS Project Name: Studio Velle 660 Strander BI Permit No.: 19-S-145 Date: July 24, 2019 Reviewer: Al Metzler Fire Protection Project Coordinator (206) 575-4407 option # 2 (Inspection Requests) (206) 971-8718 (Plan Review Questions) • Lateral sway bracing is required at a maximum spacing of 40' for all mains, cross mains, and branch lines 2.5" and larger. Bracing is provided for the last length of pipe but within 6' of the end of a feed or cross main. Bracing is required unless all the pipe is supported by rods less than 6" or by 30 ° wrap-around U -hooks for any size pipe, 9.3.5.3. • Minimum clearance around pipes: 2 " for 1"-3.5", 4" for 4" and larger, see 4 exceptions, 9.3.4. • Longitudinal sway bracing is a maximum of 80' for mains and cross mains and within 40 ' of the end of the line, 9.3.5.4. • Provide lateral and longitudinal bracing for changes in pipe direction per section 9.3.5.11.2 for pipe size 2'h inches and larger. • Restrain branch lines at the end sprinkler of each line, restrain against vertical and lateral movement, 9.3.6.3. • Restraints for branch lines shall be at intervals per table 9.3.6.4 and section 9.3.6.4, and restrain sprig ups greater than 4', 9.3.6.6. • Comply with ASCE 7-02, section 9.6.2.6.2 (e). • Ceilings used for flex drop attachments shall comply with ASTM C 635 and ASTM C 636 per section 9.2.1.3.3.2. A • Where flexible sprinkler hose fittings exceed 6ft. in length and are supported by a suspended ceiling, a hanger(s) attached to the structure shall be required to ensure that the maximum unsupported length does not exceed 6 ft.(9.2.1.3.3.3). • Flexible sprinkler hose bends shall not exceed the maximum radius permitted by the listing. • Provide sprinkler protection beneath all obstructions greater than 4 ft. in width. • Extend sprinkler protection to all combustible concealed spaces. • Comply with NFPA 13 obstruction tables. • All valves controlling the water supply for automatic sprinkler systems and waterflow switches on all sprinkler systems shall be electrically supervised. • All interior control valves shall be readily accessible, labeled and located not more than 6 ft. above the floor. • Comply with obstructed/non-obstructed construction rules for sprinkler head placement. • Sprinkler heads spaced closer than 6 ft. apart must be baffled. • Modifications involving 20 or more sprinkler heads require hydrostatic test and system isolation if necessary. • For dry pipe and double interlock preaction systems in addition to the standard hydrostatic test, an air pressure leakage test at 40 psi shall be conducted for 24 hours. Any leakage that results in a Toss of pressure in excess of 1.5 psi for the 24 hours shall be corrected. These conditions apply to all sprinkler piping exposed as necessary to accomplish the permitted scope of work. • Weld stamps shall be inspected on the ground, before the pipe is hung. • These conditions apply to all sprinkler piping exposed as necessary to accomplish the permitted scope of work. All code references are NFPA 13, 2019 Edition.