HomeMy WebLinkAboutPP - 1120 ANDOVER PARK EAST - UNKNOWN - PERMITS AND PLANS1120 ANDOVER PARK EAST
ASSOCIATED PERMITS
17-5-056 D19-0143
Permit Number: D19-0143
Applied: 4/29/2019
Issued:
Status: UNDER REVIEW
Parent Permit:
Parent Project:
Details:
Approved:
Finaled:
Permit Conditions
City of Tukwila
Description: SANJAY CHAWLA
Site Address: 1120 ANDOVER PARK E
City, State Zip Code: TUKWILA, WA 98188
Applicant: SANJAY CHAWLA
Owner: AANGAN PROPERTIES LLC
Contractor: <NONE>
ENCLOSE WALL AT ONE CORNER OF WAREHOUSE. ROOF AND CONCRETE BONE ALREADY EXIST. NO CONTRACTOR IS GOING TO BUILD
A METAL WALL TO ENCLOSE THAT AREA.
SEQ NO
ADDED DATE
REQUIRED DATE
LIST OF
SATISFY DATE
CONDITIONS
TYPE
STATUS
DEPARTMENT
CONTACT
REMARKS
0
5/2/2019
10100 BUILDING PERMIT
CONDITIONS
PENDING
BUILDING
Allen Johannessen
Notes:
***BUILDING PERMIT CONDITIONS***
1
5/2/2019
10101 WORK SHALL BE INSTALLED
IN ACCORD
PENDING
BUILDING
Allen Johannessen
Notes:
Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance
with the approved construction documents shall be resubmitted for approval.
2
5/2/2019
10103 ALL PERMITS, INSPECTION
RECORD
PENDING
BUILDING
Allen Johannessen
Notes:
All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the
Building Inspector until final inspection approval is granted.
3
5/2/2019
10117 ALL CONSTRUCTION SHALL
BE DONE IN
PENDING
BUILDING
Allen Johannessen
Notes:
All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code.
Printed: Wednesday, 08 May, 2019
1 of 4
f (SYSTEMS
Permit Conditions
City of Tukwila
4
5/2/2019
10125 ALL RACK STORAGE
REQUIRES
PENDING
BUILDING
Allen Johannessen
Notes:
All rack storage requires a separate permit issued through the City of Tukwila Permit Center. Rack storage over 8 -feet in height shall be anchored or
braced to prevent overturning or displacement during seismic events. The design and calculations for the anchorage or bracing shall be prepared by a
registered professional engineer licensed in the State of Washington. Periodic special inspection is required during anchorage of storage racks 8 feet or
greater in height.
5
5/2/2019
10126 THERE SHALL BE NO
OCCUPANCY
PENDING
BUILDING
Allen Johannessen
Notes:
There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception.
6
5/2/2019
10127 REMOVE ALL DEMOLITION
RUBBLE
PENDING
BUILDING
Allen Johannessen
Notes:
Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly
fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building
inspector based on satisfactory completion of this requirement.
7
5/2/2019
10137 ALL PLUMBING AND GAS
PIPING WORK
PENDING
BUILDING
Allen Johannessen
Notes:
All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-
3670).
8
5/2/2019
10138 ALL ELECTRICAL WORK
SHALL BE INSP
PENDING
BUILDING
Allen Johannessen
Notes:
All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center.
9
5/2/2019
10141 VALIDITY OF PERMIT
PENDING
BUILDING
Allen Johannessen
Notes:
VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the
provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions
of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall
not prevent the Building Official from requiring the cor ection of errors in the construction documents and other data.
10
5/2/2019
10201 ALL MECHANICAL WORK
SHALL BE INSP
PENDING
BUILDING
Allen Johannessen
Notes:
All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670).
Printed: Wednesday, 08 May, 2019
2 of 4
. SYSTEMS
Permit Conditions
City of Tukwila
11
5/8/2019
40100 FIRE DEPARTMENT
CONDITIONS
PENDING
FIRE
Notes:
12
5/8/2019
40710 THE ATTACHED SET OF
BUILDING PLANS HAVE BEEN
REVIEWED
PENDING
FIRE
Notes:
13
5/8/2019
40710 THE ATTACHED SET OF
BUILDING PLANS HAVE BEEN
REVIEWED
PENDING
FIRE
Notes:
14
5/8/2019
40205 EGRESS DOORS SHALL BE
READILY OPENABLE
PENDING
FIRE
Al Metzler
Notes:
Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (IFC 1010.1.9)
15
5/8/2019
40208 DEAD BOLTS ARE NOT
ALLOWED ON AUXILIARY
PENDING
FIRE
Al Metzler
Notes:
Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when the door handle is engaged from inside the
tenant space. (IFC Chapter 10)
16
5/8/2019
40210 EXIT HARDWARE AND
MARKING SHALL MEET
PENDING
FIRE
Al Metzler
Notes:
Exit hardware and marking shall meet the requirements of the International Fire Code. (IFC Chapter 10)
17
5/8/2019
40213 DOOR HANDLES, PULLS,
LATCHES, LOCKS AND
PENDING
FIRE
Al Metzler
Notes:
Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall
not require tight grasping, tight pinching or twisting of the wrist to operate. (IFC 1010.1.9.1)
Printed: Wednesday, 08 May, 2019
3 of 4
- ,TSYSTEMS
Permit Conditions
City of Tukwila
18
5/8/2019
40342 FIRE PROTECTION SYSTEMS
SHALL BE MAINTAINED
PENDING
FIREI
Al Metzler
Notes:
Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required systems shall be extended,
altered or augmented as necessary to maintain and continue protection whenever the building is altered, remodeled or added to. Alterations to fire
protection systems shall be done in accordance with applicable standards. (IFC 901.4)
19
5/8/2019
40310 ALL NEW SPRINKLER
SYSTEMS
PENDING
FIRE
Al Metzler
Notes:
All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to
installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written
approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to
the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2436).
20
5/8/2019
40429 MAINTAIN FIRE ALARM
SYSTEM AUDIBLE/VISUAL
PENDING
FIRE
Al Metzler
Notes:
Maintain fire alarm system audible/visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of
audible/visual notification devices. (City Ordinance #2437)
21
5/8/2019
40408 ALL NEW FIRE ALARM
SYSTEMS OR MODIFICATIONS
PENDING
FIRE
Al Metzler
Notes:
All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall
commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2)
22
5/8/2019
40326 CONTACT THE TUKWILA FIRE
PREVENTION
PENDING
FIRE
Al Metzler
Notes:
Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437)
23
5/8/2019
41306 ANY OVERLOOKED
HAZARDOUS CONDITION
PENDING
FIRE
Al Metzler
Notes:
Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation.
24
5/8/2019
42511
PENDING
FIRE
Al Metzler
Notes:
These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407.
Printed: Wednesday, 08 May, 2019
4 of 4
. 9SYSTEMS
r" 1,
FIRE DEPARTMENT SPRINKLER PLAN REVIEW COMMENTS
Project Name: Reshmis Group Inc.
1120 Andover Park E
Permit No.: 17-S-056
Date: March 31, 2017
Reviewer:
Al Metzler
Fire Protection Project Coordinator
(206) 575-4407 option # 2 (Inspection Requests)
(206) 971-8718 (Plan Review Questions)
• Lateral sway bracing is required at a maximum spacing of 40' for all mains, cross
mains, and branch lines 2.5" and larger. Bracing is provided for the last length of
pipe but within 6' of the end of a feed or cross main. Bracing is required unless
all the pipe is supported by rods less than 6" or by 30 ° wrap-around U -hooks for
any size pipe, 9.3.5.3.
• Minimum clearance around pipes: 2 " for 1"-3.5", 4" for 4" and larger, see 4
exceptions, 9.3.4.
• Longitudinal sway bracing is a maximum of 80' for mains and cross mains and
within 40 ` of the end of the line, 9.3.5.4.
• Provide lateral and longitudinal bracing for changes in pipe direction per section
9.3.5.11.2 for pipe size 2 ih inches and larger.
• Restrain branch lines at the end sprinkler of each line, restrain against vertical
and lateral movement, 9.3.6.3.
• Restraints for branch lines shall be at intervals per table 9.3.6.4 and section
9.3.6.4, and restrain sprig ups greater than 4', 9.3.6.6.
• Comply with ASCE 7-05, section 13.5.6.2.2.
• Provide sprinkler protection beneath all obstructions greater than 4 ft. in width.
• Extend sprinkler protection to all combustible concealed spaces.
i t1
• Comply with NFPA 13 obstruction tables.
• All valves controlling the water supply for automatic sprinkler systems and
waterflow switches on all sprinkler systems shall be electrically supervised.
• All interior control valves shall be readily accessible, labeled and located not
more than 6 ft. above the floor.
• Comply with obstructed/non-obstructed construction rules for sprinkler head
placement.
• Sprinkler heads spaced closer than 6 ft. apart must be baffled.
• Modifications involving 20 or more heads require hydrostatic test and system
isolation if necessary.
• For dry pipe and double interlock preaction systems, in addition to the standard
hydrostatic test, an air pressure leakage test at 40 psi shall be conducted for 24
hours. Any leakage that results in a loss of pressure in excess of 1.5 psi for the
24 hours shall be corrected.
• These conditions apply to all sprinkler piping exposed as necessary to
accomplish the permitted scope of work.
All code references are NFPA 13, 2013 Edition.
DN 1X TO
DRIP DRA
DRUM
N
M
Co
T—
T-
1
r1 o
0
6'-61
(0
ea
2
13'-11/
2'-4
(14
T—
T-
2
T-
2 r�
10'-21/2
i1
FIRE PROTECTION PLAN
1/4"=1-0"
0'
2'
4'
8'
"NEW 6X2 M.T.
Sprinkler Legend
Symbol
Manufacturer
SIN
Quantity
K -Factor
Type
Size
Response
Finish
Temperature
,,,
TYCO
TY3235
15
5.6
Pendent
1r4
Quick
Chrome
200°F
.
Total = 15
�NE
41-10
\DN 1X TO AUX
DRAIN
w
FIRE PROTECTION PLAN
1/4"=1'-0"
0'
2'
4'
8'
'NEW 6X2 M.T.
3X2 M.T.
SPRINKLER
PIPE
UNISTRUT�,_
PIPE CLAMP
0
CONSTRUCTION NOTES:
1. ALL WORK PER NFPA 13 2016.
2. ADD DRY PENDENT SPRINKLERS TO NEW COOLER
AND FREEZER IN EXISTING WAREHOUSE.
TOP OF BOOTH
SELF' TAPPING
SCREW
HANGER DETAIL
NTS
DN 1X TO DRUM
DRIP DRA N -\
to
0
0
2
2
6'-61/2 13'-134 2 - 10'-234
= mai 1st co ZS Mil
Fy
22CM®®aX11222 C6CMIMIMCM2212a2®CMV MB ®®22® CM 22 CM 22 CI 22 CM 22 222222®a2222tMCM-
0
4
r
s
9'-9'r4
2
T-534 1' 1'�
—b —b 1'78
s
0
DN 1X TO AUX
DRAIN
NEW 6X2 M.T.
EXISTING FULLY SPRINKLERED WAREHOUSE.
NO WORK THIS AREA
EA b p�
XX XX XX XX XX 22 1112 22 CM CC 22.40
DN 6X TO AUX DRY
1 SYSTEM
1
1
1
1
11
e
1
11
1
1
e
3X2 M.T. 1
®12111111121212
EXISTING FULLY SPRINKLERED WAREHOUSE.
NO WORK THIS AREA
e
0
1
® 1
0
0
11
0
6
0
e
11
11
0
11
11
1
1
1
® 1
1
1
0
1
1
1
1
1
1
1
1
EXISTING FULLY SPRINKLERED WAREHOUSE.
NO WORK THIS AREA
1
ssR»®is
cm ®cm®®a®cmcm2222cmcmssatmis®cm®®22® MIIIEiII D II 12
EXISTIN•3 FULLY SPRINKLERED WAREHOUSE.
NO WORK THIS AREA
EXISTING FULLY SPRINKLERED WAREHOUSE.
NO WORK THIS AREA
EX.8
13 IC CI SI CI 12 II 22 CI IC CE CI II II CI CI IM ®1®®®i
m
11
11
1
11
X11
0
0
0
0
MAIN ROUTING PLAN
NTS
Car
El Without Comments
0 As Noted in Red
,EC- Per The Attached Letter
These plans have been et viewed by The Tukwila Fire
Prevention Bureau r'a .3iformance with current City
standards. Accepf:E to errors and
omissions which r✓(. violations of adopted
i:.,,ndards and ord - : ::: The responsibility for the
equacy of desol : -;orally with the designer.
ditions, deletio! _,isions to these drawings after
itis date will void rY::.:c: ptarlce and will require a
resubmittal o'' r_,'i15(i ._:7'w ngs for subsequent approval.
Final acceptance if 5I1r1)eti rc 11eIa test and inspection by
The Tukwila Hr ?re\'ent or Bureau.
Dater ^3 I -i -2
51I
TUKWILA FIRE DEPARTMENT
Pie sn c-: 285-575-407 and
give. thi, Fire Permit No.
�7--Oc(4)
c . Qt Ss for glut -
Limn f, i c; apprwal.
s— ss soar MM e --vs---_ ®o® ss se
CERTIWASHINGTON
ICATE OF COMPETENCY
FIRE PROTECTION SPRINKLER SYSTEMS
Michael Todd Hallengren
7223-01QZ1p,,, Level 3A,
Emerald Fire, L.L.C.
EMERAFL98. R
Signature
oMI®e®®o.smea
e p
®mw®erar®Ma�
EX.8
Ill ®El1111 Ci2111221CIC KC3I2®13®CIC321
0
EXISTING FULLY SPRINKLERED WAREHOUSE.
NO WORK THIS AREA
PAID
MAR 2) 2017
TUKWILA FIRF
2r 2 3/0 -
EXISTING 8" SYSTEM
RISER. NO WORK
0
0
0
0
11
REVISIONS:
)oebtx/XX
•
W
N
W ILI
W• Lt
ft
J
W
O >
O gg
i-
(1.4
J �
1-
JOB NAME:
SHEET NAME
tL
DRAWN BY:
AD/MH
DATE:
3/16/17
JOB #:
217013
SHEET NO:
FP1