Loading...
HomeMy WebLinkAboutPP - 1120 ANDOVER PARK EAST - UNKNOWN - PERMITS AND PLANS1120 ANDOVER PARK EAST ASSOCIATED PERMITS 17-5-056 D19-0143 Permit Number: D19-0143 Applied: 4/29/2019 Issued: Status: UNDER REVIEW Parent Permit: Parent Project: Details: Approved: Finaled: Permit Conditions City of Tukwila Description: SANJAY CHAWLA Site Address: 1120 ANDOVER PARK E City, State Zip Code: TUKWILA, WA 98188 Applicant: SANJAY CHAWLA Owner: AANGAN PROPERTIES LLC Contractor: <NONE> ENCLOSE WALL AT ONE CORNER OF WAREHOUSE. ROOF AND CONCRETE BONE ALREADY EXIST. NO CONTRACTOR IS GOING TO BUILD A METAL WALL TO ENCLOSE THAT AREA. SEQ NO ADDED DATE REQUIRED DATE LIST OF SATISFY DATE CONDITIONS TYPE STATUS DEPARTMENT CONTACT REMARKS 0 5/2/2019 10100 BUILDING PERMIT CONDITIONS PENDING BUILDING Allen Johannessen Notes: ***BUILDING PERMIT CONDITIONS*** 1 5/2/2019 10101 WORK SHALL BE INSTALLED IN ACCORD PENDING BUILDING Allen Johannessen Notes: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2 5/2/2019 10103 ALL PERMITS, INSPECTION RECORD PENDING BUILDING Allen Johannessen Notes: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3 5/2/2019 10117 ALL CONSTRUCTION SHALL BE DONE IN PENDING BUILDING Allen Johannessen Notes: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. Printed: Wednesday, 08 May, 2019 1 of 4 f (SYSTEMS Permit Conditions City of Tukwila 4 5/2/2019 10125 ALL RACK STORAGE REQUIRES PENDING BUILDING Allen Johannessen Notes: All rack storage requires a separate permit issued through the City of Tukwila Permit Center. Rack storage over 8 -feet in height shall be anchored or braced to prevent overturning or displacement during seismic events. The design and calculations for the anchorage or bracing shall be prepared by a registered professional engineer licensed in the State of Washington. Periodic special inspection is required during anchorage of storage racks 8 feet or greater in height. 5 5/2/2019 10126 THERE SHALL BE NO OCCUPANCY PENDING BUILDING Allen Johannessen Notes: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 6 5/2/2019 10127 REMOVE ALL DEMOLITION RUBBLE PENDING BUILDING Allen Johannessen Notes: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 7 5/2/2019 10137 ALL PLUMBING AND GAS PIPING WORK PENDING BUILDING Allen Johannessen Notes: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431- 3670). 8 5/2/2019 10138 ALL ELECTRICAL WORK SHALL BE INSP PENDING BUILDING Allen Johannessen Notes: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 9 5/2/2019 10141 VALIDITY OF PERMIT PENDING BUILDING Allen Johannessen Notes: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the cor ection of errors in the construction documents and other data. 10 5/2/2019 10201 ALL MECHANICAL WORK SHALL BE INSP PENDING BUILDING Allen Johannessen Notes: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). Printed: Wednesday, 08 May, 2019 2 of 4 . SYSTEMS Permit Conditions City of Tukwila 11 5/8/2019 40100 FIRE DEPARTMENT CONDITIONS PENDING FIRE Notes: 12 5/8/2019 40710 THE ATTACHED SET OF BUILDING PLANS HAVE BEEN REVIEWED PENDING FIRE Notes: 13 5/8/2019 40710 THE ATTACHED SET OF BUILDING PLANS HAVE BEEN REVIEWED PENDING FIRE Notes: 14 5/8/2019 40205 EGRESS DOORS SHALL BE READILY OPENABLE PENDING FIRE Al Metzler Notes: Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (IFC 1010.1.9) 15 5/8/2019 40208 DEAD BOLTS ARE NOT ALLOWED ON AUXILIARY PENDING FIRE Al Metzler Notes: Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when the door handle is engaged from inside the tenant space. (IFC Chapter 10) 16 5/8/2019 40210 EXIT HARDWARE AND MARKING SHALL MEET PENDING FIRE Al Metzler Notes: Exit hardware and marking shall meet the requirements of the International Fire Code. (IFC Chapter 10) 17 5/8/2019 40213 DOOR HANDLES, PULLS, LATCHES, LOCKS AND PENDING FIRE Al Metzler Notes: Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. (IFC 1010.1.9.1) Printed: Wednesday, 08 May, 2019 3 of 4 - ,TSYSTEMS Permit Conditions City of Tukwila 18 5/8/2019 40342 FIRE PROTECTION SYSTEMS SHALL BE MAINTAINED PENDING FIREI Al Metzler Notes: Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required systems shall be extended, altered or augmented as necessary to maintain and continue protection whenever the building is altered, remodeled or added to. Alterations to fire protection systems shall be done in accordance with applicable standards. (IFC 901.4) 19 5/8/2019 40310 ALL NEW SPRINKLER SYSTEMS PENDING FIRE Al Metzler Notes: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2436). 20 5/8/2019 40429 MAINTAIN FIRE ALARM SYSTEM AUDIBLE/VISUAL PENDING FIRE Al Metzler Notes: Maintain fire alarm system audible/visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of audible/visual notification devices. (City Ordinance #2437) 21 5/8/2019 40408 ALL NEW FIRE ALARM SYSTEMS OR MODIFICATIONS PENDING FIRE Al Metzler Notes: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 22 5/8/2019 40326 CONTACT THE TUKWILA FIRE PREVENTION PENDING FIRE Al Metzler Notes: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 23 5/8/2019 41306 ANY OVERLOOKED HAZARDOUS CONDITION PENDING FIRE Al Metzler Notes: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 24 5/8/2019 42511 PENDING FIRE Al Metzler Notes: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. Printed: Wednesday, 08 May, 2019 4 of 4 . 9SYSTEMS r" 1, FIRE DEPARTMENT SPRINKLER PLAN REVIEW COMMENTS Project Name: Reshmis Group Inc. 1120 Andover Park E Permit No.: 17-S-056 Date: March 31, 2017 Reviewer: Al Metzler Fire Protection Project Coordinator (206) 575-4407 option # 2 (Inspection Requests) (206) 971-8718 (Plan Review Questions) • Lateral sway bracing is required at a maximum spacing of 40' for all mains, cross mains, and branch lines 2.5" and larger. Bracing is provided for the last length of pipe but within 6' of the end of a feed or cross main. Bracing is required unless all the pipe is supported by rods less than 6" or by 30 ° wrap-around U -hooks for any size pipe, 9.3.5.3. • Minimum clearance around pipes: 2 " for 1"-3.5", 4" for 4" and larger, see 4 exceptions, 9.3.4. • Longitudinal sway bracing is a maximum of 80' for mains and cross mains and within 40 ` of the end of the line, 9.3.5.4. • Provide lateral and longitudinal bracing for changes in pipe direction per section 9.3.5.11.2 for pipe size 2 ih inches and larger. • Restrain branch lines at the end sprinkler of each line, restrain against vertical and lateral movement, 9.3.6.3. • Restraints for branch lines shall be at intervals per table 9.3.6.4 and section 9.3.6.4, and restrain sprig ups greater than 4', 9.3.6.6. • Comply with ASCE 7-05, section 13.5.6.2.2. • Provide sprinkler protection beneath all obstructions greater than 4 ft. in width. • Extend sprinkler protection to all combustible concealed spaces. i t1 • Comply with NFPA 13 obstruction tables. • All valves controlling the water supply for automatic sprinkler systems and waterflow switches on all sprinkler systems shall be electrically supervised. • All interior control valves shall be readily accessible, labeled and located not more than 6 ft. above the floor. • Comply with obstructed/non-obstructed construction rules for sprinkler head placement. • Sprinkler heads spaced closer than 6 ft. apart must be baffled. • Modifications involving 20 or more heads require hydrostatic test and system isolation if necessary. • For dry pipe and double interlock preaction systems, in addition to the standard hydrostatic test, an air pressure leakage test at 40 psi shall be conducted for 24 hours. Any leakage that results in a loss of pressure in excess of 1.5 psi for the 24 hours shall be corrected. • These conditions apply to all sprinkler piping exposed as necessary to accomplish the permitted scope of work. All code references are NFPA 13, 2013 Edition. DN 1X TO DRIP DRA DRUM N M Co T— T- 1 r1 o 0 6'-61 (0 ea 2 13'-11/ 2'-4 (14 T— T- 2 T- 2 r� 10'-21/2 i1 FIRE PROTECTION PLAN 1/4"=1-0" 0' 2' 4' 8' "NEW 6X2 M.T. Sprinkler Legend Symbol Manufacturer SIN Quantity K -Factor Type Size Response Finish Temperature ,,, TYCO TY3235 15 5.6 Pendent 1r4 Quick Chrome 200°F . Total = 15 �NE 41-10 \DN 1X TO AUX DRAIN w FIRE PROTECTION PLAN 1/4"=1'-0" 0' 2' 4' 8' 'NEW 6X2 M.T. 3X2 M.T. SPRINKLER PIPE UNISTRUT�,_ PIPE CLAMP 0 CONSTRUCTION NOTES: 1. ALL WORK PER NFPA 13 2016. 2. ADD DRY PENDENT SPRINKLERS TO NEW COOLER AND FREEZER IN EXISTING WAREHOUSE. TOP OF BOOTH SELF' TAPPING SCREW HANGER DETAIL NTS DN 1X TO DRUM DRIP DRA N -\ to 0 0 2 2 6'-61/2 13'-134 2 - 10'-234 = mai 1st co ZS Mil Fy 22CM®®aX11222 C6CMIMIMCM2212a2®CMV MB ®®22® CM 22 CM 22 CI 22 CM 22 222222®a2222tMCM- 0 4 r s 9'-9'r4 2 T-534 1' 1'� —b —b 1'78 s 0 DN 1X TO AUX DRAIN NEW 6X2 M.T. EXISTING FULLY SPRINKLERED WAREHOUSE. NO WORK THIS AREA EA b p� XX XX XX XX XX 22 1112 22 CM CC 22.40 DN 6X TO AUX DRY 1 SYSTEM 1 1 1 1 11 e 1 11 1 1 e 3X2 M.T. 1 ®12111111121212 EXISTING FULLY SPRINKLERED WAREHOUSE. NO WORK THIS AREA e 0 1 ® 1 0 0 11 0 6 0 e 11 11 0 11 11 1 1 1 ® 1 1 1 0 1 1 1 1 1 1 1 1 EXISTING FULLY SPRINKLERED WAREHOUSE. NO WORK THIS AREA 1 ssR»®is cm ®cm®®a®cmcm2222cmcmssatmis®cm®®22® MIIIEiII D II 12 EXISTIN•3 FULLY SPRINKLERED WAREHOUSE. NO WORK THIS AREA EXISTING FULLY SPRINKLERED WAREHOUSE. NO WORK THIS AREA EX.8 13 IC CI SI CI 12 II 22 CI IC CE CI II II CI CI IM ®1®®®i m 11 11 1 11 X11 0 0 0 0 MAIN ROUTING PLAN NTS Car El Without Comments 0 As Noted in Red ,EC- Per The Attached Letter These plans have been et viewed by The Tukwila Fire Prevention Bureau r'a .3iformance with current City standards. Accepf:E to errors and omissions which r✓(. violations of adopted i:.,,ndards and ord - : ::: The responsibility for the equacy of desol : -;orally with the designer. ditions, deletio! _,isions to these drawings after itis date will void rY::.:c: ptarlce and will require a resubmittal o'' r_,'i15(i ._:7'w ngs for subsequent approval. Final acceptance if 5I1r1)eti rc 11eIa test and inspection by The Tukwila Hr ?re\'ent or Bureau. Dater ^3 I -i -2 51I TUKWILA FIRE DEPARTMENT Pie sn c-: 285-575-407 and give. thi, Fire Permit No. �7--Oc(4) c . Qt Ss for glut - Limn f, i c; apprwal. s— ss soar MM e --vs---_ ®o® ss se CERTIWASHINGTON ICATE OF COMPETENCY FIRE PROTECTION SPRINKLER SYSTEMS Michael Todd Hallengren 7223-01QZ1p,,, Level 3A, Emerald Fire, L.L.C. EMERAFL98. R Signature oMI®e®®o.smea e p ®mw®erar®Ma� EX.8 Ill ®El1111 Ci2111221CIC KC3I2®13®CIC321 0 EXISTING FULLY SPRINKLERED WAREHOUSE. NO WORK THIS AREA PAID MAR 2) 2017 TUKWILA FIRF 2r 2 3/0 - EXISTING 8" SYSTEM RISER. NO WORK 0 0 0 0 11 REVISIONS: )oebtx/XX • W N W ILI W• Lt ft J W O > O gg i- (1.4 J � 1- JOB NAME: SHEET NAME tL DRAWN BY: AD/MH DATE: 3/16/17 JOB #: 217013 SHEET NO: FP1