Loading...
HomeMy WebLinkAboutST - 10430 EAST MARGINAL WAY SOUTH - WYER CONSTRUCTION COMPANY / KING COUNTY METRO - STORAGE TANKSTANKS) UNDERGROUND STORAGE TANKS (UST) 1 ABOVE GROUND STORAGE TANKS (AST) 10430 EAST MARGINAL WAY SOUTH PARCEL NUMBER(S) 323049028 RELATED PERMIT NUMBER(S) 6-19 7-19 / o e fl &- Date: 2/26/19 Tukwila Fire Department OPERATIONAL PERMIT By virtue of the provisions of the International Fire Code adopted by City of Tukwila Ordinance, Wyser Construction Company, Inc. located at 3301 South Norfolk Street 6-19 7-19 having made application in due form, and as the conditions, surrounding, and arrangements are, in my opinion, such that the intent of the Ordinance can be observed, authority is hereby given and the PERMIT is granted to install, alter, remove, abandon or otherwise dispose of a flammable or combustible liquid tank per 105.7.8 of the International Fire Code. This PERMIT is issued and accepted on condition that all Ordinance provisions now adopted, or that may hereafter be adopted, shall be complied with. THIS PERMIT IS VALID FOR -Ninety Days - This permit does not take the place of any License required by law and is not transferable. Any change in use or occupancy of premises shall require a new permit. Fire Marshal THIS PERMIT MUST BE POSTED ON THE PREMISES MENTIONED ABOVE. T.F.D./F.P. #2 ., Marine Vacuum Service, Inc. P0. Box 24263 Seattle, Washington 98124 Telephone (206) 762-0240 CONTRACTORS LICENSE # MARI VS097JA FAX (206) 763-8084 1-800-540-7491 GENERAL CONTRACTOR AST/UST STORAGE TANK PUMP & RINSE CERTIFICATE Tank Size: i 0 PO //7;7 Last Contents Tank Location:/ 1r1,' 77:60 ri 6/7:+1 Marine Vacuum Service, Inc. certifies that the above mentioned tank(s) have been triple n sed in accordance with the industry standard as outlined in 40 CFR PART 280.70, WAC 173-360.1 380(1), API 1604, API 2015 and that all residual product and rinSate has been disposed of in accordance with Federal, State and Local regulations. Tanks listed above are NOT GAS FREE or NOT SAFE FOR HOT WORK Tank Owner: Contractor: M.V.S. Representative: bjel-rt. Date: ?' 2 /y f /, - Jf'. Notes: _ J a Orin i ! ecC1 , ()\.'r) DBE # D4M1302341 S EPA # WAD980974521 A MINORITY BUSINESS ENTERPRISE ID # D4M1302341 SOUND TESTING, INC. P.O. BOX 16204 SEATTLE, WA 98116 (206) 932-0206 FAX (206) 937-3848 WWW.SOUNDTESTINGINC.COM ilemavtt--- ray est Survey R ed by riol/f0 '- ' j Crrt)ii57 s Vessel, J Di /) (aY) Last Three (3) Loadings MARINE CHEMIST CERTIFICATE .... SERIAL N9 47276 e_i'-, 11-41 /Li 9 VessTOwner orAgent Date Type of Vessel Specific Lo tion of Vessel Tests Performed Y/t$Z Time Survey Completed 17`(75 .E 46 C ,z Ziff e 4":4 . . %�~m e'es:;61,), f 4 7 —/(,4 p f -7 f ', )41.4%.. 7L'o' 5kr i 4 X.71 -445- e 2 /-!e /4, .-moi /5,row'' 014 A '. 7 },i/k 144111414- 2— s In the event of changes adversely affecting conditions in the above spaces, or if in any doubt, immediately stop all work and contact the undersigned Marine Chemist. Qualifications: Manipulation of valves or devices tending to alter conditions in pipe lines or tanks noted above, unless specifically approved in this certificate, will require re -inspection and a new Certificate for spaces so affected. All piping, heating coils, pumps and floating roof gaskets attached to or contained within spaces listed above shall be considered "NOT SAFE" unless otherwise specifically designated. STANDARD SAFETY DESIGNATIONS (These detail the..minimum conditions for Safe Entry and Hot Work.) The Marine Chemist may request additional measures if workplace conditions so dictate. ATMOSPHERE SAFE FOR WORKERS means that in a space (a) the oxygen content is between 19.5% and 22% by volkme, and (b) combustible gas is less than 10% of the Lower Explosive Limit, and (c) airborne toxic materials are within permissible concentrations as listed in OSHA's Subpart Z or in ACGIH's current list of Threshold Limit Values. SAFE FOR HOT WORK means that (a) oxygen within the space is less than 22% by volume; and (b) the combustible gas is less than 10% of the Lower Explosive Limit; and (c) cargo residues within the space will not combust during hot work; and (d) pipes that can deliver hazardous materials to the workspace have been separated, blanked, or locked out, and nearby hazardous spaces have been evaluated and noted on the certificate. NOT SAFE FOR HOT WORK: In the compartment or space so designated, hot work is not permitted. "The undersigned acknowledges receipt of this Certificate and understands conditions and limitations under which it was issttedt" e".+1 Jn Signed I ' + �/ 4. it Name li CompKny POSTING This Certificate is based on conditions existing at the time the inspection herein set forth was completed and is issued subject to compliance with all qualifications and instructjpns'�;? Dat pv4'ry\ Signed 50UND TESTING, INC. P.O. BOX 16204 SEATTLE, WA 98116 (206) 932-0206 FAX (206) 937-3848 WWW.SOUNDTESTINGINC.COM MARINE CHEMIST CERTIFICATE SERIAL 47271 Survey Requested by Vessel Owner or Agent Date Vessel Type of Vessel Specific Location of Vessel Last Three (3) Loadings Tests Performed Time Survey Completed In the event of changes adversely affecting conditions in the above spaces, or if in any doubt, immediately stop all work and contact the undersigned Marine Chemist. Qualifications: Manipulation of valves or devices tending to alter conditions in pipe lines or tanks noted above, unless specifically approved in this certificate, will require reinspection and a new Certificate for spaces so affected. All piping, heating coils, pumps and floating roof gaskets attached to or contained within spaces listed above shall be considered "NOT SAFE" unless otherwise specifically designated. STANDARD SAFETY DESIGNATIONS (These detail the minimum conditions for Safe Entry and Hot Work.) The Marine Chemist may request additional measures if workplace conditions so dictate. ATMOSPHERE SAFE FOR WORKERS means that in a space (a) the oxygen content is between 19.5% and 22% by volume, and (b) combustible gas is less than 10% of the Lower Explosive Limit. and (c) airborne toxic materials are within permissible concentrations as listed in OSHA's Subpart Z or in ACGIH's current list of Threshold Limit Values. $AFE FOR HOT WORK means that (a) oxygen within the space is less than 22% by volume; and (b) the combustible gas is less than 10% of the Lower Explosive Limit; and (c) cargo residues within the space will not combust during hot work; and (d) pipes that can deliver hazardous materials to the workspace have been separated, blanked, or locked out, and nearby hazardous spaces have been evaluated and noted on the certificate. NOT SAFE FOR HOT WORT( In the compartment or space so designated, hot work is not permitted. "The undersigned acknowledges receipt of this Certificate and understands conditions and This Certificate is based on conditions existing at the time the inspection herein set forth was completed limitations under which it was issued." and is issued subject to compliance with all qualifications and instructions. Signed Signed Name Company Date Marine Chemist Certificate No. POSTING A B METRO FURNISHED SUBMERSIBLE PUMP FOR INSTALLATION BY CONTRACTOR METRO FURNISHED 12,000 GAL DIKE TANK FOR TEMPORARY INSTALLATION BY CONTRACTOR, SEE DWG G!03 POWER CONDUIT FROM PANEL VIA NEW CONTACTOR, SEE DWG E406 1 ISOLATION VALVE 4 C SOLENOID VALVE (TYP 2 PLACES) SEE DWG E406 INSTALL METRO FURNISHED METER (VEEDEDRIVER RIVER(TOKOHEIM,8DEL 1 MODEL400/15/SP/2), FILTERS, HOSE COUPUNG, HOSE AND NOZZLE (TYP 2 PLACES) 3" DOS METER PEDESTAL W/ NOZZLE CRADLE, FABRICATE FROM It 1/4" AND TS 3x3x1/4 ANCHOR TO PAVEMENT (4 PLACES SEE DWG E406 FOR ELECTRICAL CONTROLS (TYP 2 PLACES) , DIKE TANK PIPING SCHEMATIC (FIRST LOCATION FOR TEMPORARY INSTALLATION) EL 18 14 L /-6" OUTLET a TO SD 1E 13 55 EL. 10 39 3'-0" INSIDE SECTION LOOKING EAST i 6" INLET 0 M ISOLATION VALVE W/ LEVER (TYP 2 PLACES) EMERGENCY IMPACT VALVE EMCO WHEATON MODEL A60-002 OR EQUAL (TYP 2 PLACES) 1 1/2" DOS TO METER (TYP) COVER M-20 LOADING WITH 2 EACH 12" X 12" AND 1 EACH 24" X 24" ACCESS MANWAYS —� A 3" DOS FROM SUBMERSIBLE PUMP (SEE M403 b DET U/M404 FOR CONT ) D 1 E F G H DIKE VENT, EXTEND 2' ABOVE PARAPET �+---2" PRIMARY TANK VENT, EXTEND 2' ABOVE PARAPET POWER CONDUIT FROM PANEL VIA NEW CONTACTOR, ROUTE 12'-6"± ABOVE GRADE PROVIDE TEMPORARY PIPE SUPPORT (TYP ) FUEL AND WASH BLDG LINE OF PARAPET METRO FURNISHED SUBMERSIBLE PUMP FOR INSTALLATION BY CONTRACTOR METRO FURNISHED 12,000 GAL DIKE TANK FOR TEMPORARY INSTALLATION BY CONTRACTOR, SEE DWG G103 u IE 14 05 h'� 5'-0" INSIDE SECTION LOOKING NORTH EXISTING OIL WATER SEPARATOR (FOR REFERENCE ONLY) D E TALI L SCALE T 1/2"=I'-0" No REVISION T 4 BY B DATE BAFFLE (TYP) PAVEMENT EXTENSION SECTIONS DIKE TANK PIPING SCHEMATIC (SECOND LOCATION FOR TEMPORARY INSTALLATION) ADJUSTABLE DRAW OFF THREADED 2" EL, 2" X 1-1/2" P -TRAP ADAPTOR (SCREWED X SUP JOINT) WITH NUT, 1-1/2" X 6" 17 GA BRASS TUBE 2" FRP PIPE TO WASTE OIL TANK PITCH DOWN 1/4"/FT PRECAST CONCRETE VAULT EXTENSION SECTIONS DETAIL SCALE - NONE 1 EMBED TOP EDGE OF FILTER FABRIC 24" IN LEAN CONC MIX (TYP. ALL AROUND EXCAVATION) lI PAVEMENT, SEE CIVIL DWG'S 1 EXIST SOIL (TYP) LIMIT OF EXCAVATION (TYP) TYPE A FILL MATL 1 INDICATES WALL PENETRATION (TYP OF 2) CONNECT TO EXIST 2" DOS 0 THIS POINT SEE DET B/ M403 FUEL AND WASH BUILDING 2'-0" MIN OR AS RECOMMANDED BY TANK MANUFACTURER (TYP ) 12'-0" (TYP) INDICATES PIPING INTO CONC SLAB (TYP ) ROUTE TO EMER GENERATOR AND STANDBY BOILER FROM DIKE TANK (SEE DET T/M404) EXIST METERING DISPENSERS INDOOR FUEL ISLANDS (RIGHT SIDE FUELING, 4 TYP) EXIST METERING DISPENSER OUTDOOR 0 NON -REV FUEL APRON CONNECT TO EXIST 2" DOS 0 THIS POINT 3" DOS FROM VALVE BOX SEE M401 FOR CONTINUATION - DIESEL FUEL DISPENSING SCHEMATIC 1 TYPE "A" FILL 4'-0" —1,-0" TYPE D FILL MATERIAL (PEA GRAVEL MINUS CONFORMING TO SPECIFIED GRADATION (TYP)) 6" LEAN CONCRETE MIX (CONTROLLED DENSITY FILL) SEE NOTE 1 • /2•/,/\ 'ENVELOPE PEA GRAVEL BACKFILL 1 AROUND ENTIRE TANK EXCAVATION WITH FILTER FABRIC AS SHOWN, 'SEE NOTE 1 EMBED FILTER FABRIC 24" IN CONCRETE OR HOLD BOTTOM OF FABRIC AS RECOMMENDED BY FABRIC MANUFACTURER TANK HOLD DOWN BALLAST, SEE DET A/M501 1).1','jt. kl�1r 4! Ci <:` '•' 1 CAW , ;ft,ii .1121 ^'' PPROVED OW;nye :4, 4 i 757L-. SECTION 1'-0 ; BEDDING SCALE I /8'= I '•-0" t HOLD DOWN HARDWARE (SEEDET A/M501, tYP ) NOTES: _,_1'_O» 95% COMPACTION BELOW SLAB 1 LEAN CONCRETE AND FILTER FABRIC ARE REQUIRED IN AREAS OF VEHICLE CIRCULATION 2 SEE DWG M101 FOR MECHANICAL SYMBOLS RAVEN Cf ��/fff SCALE. NOTED 7 C E F CONTRACT NO T/M 11-93 T U z LAI z 0 Wy o0 `` 0 z� Li.. V Lai N Lai NQ J �Nj J 1i = Q? 1100 c 5 129891 Municipality of Me tropolitan Seattle SOUTH BASE / UNIT REPAIR UNDERGROUND TANK REPLACEMENT AREA 4 DETAILS AND PIPING SCHEMATICS G 7 DATE. MARCH 1993 ALE Na X14 DRAWING NO- M404 P M404 SHEET NO.44 63 H A HAZARDOUS STORAGE SHED EXISTING PANEL "P9" SEE DET B/E406 FIRST LOCATION FOR TEMPORARY DIESEL FUEL TANK INSTALLATION SUBMERSIBLE PUMP FURNISHED BY METRO 12OVAC FROM UNE STARTER B 3/4"RGS POWER WIRING CONDUIT METRO FURNISHED SUBMERSIBLE PUMP FOR INSTALLATION BY CONTRACTOR A D METRO FURNISHED 12,000 GAL. DIKE TANK FOR TEMPORARY INSTALLATION BY CONTRACTOR, SEE DWG G103 POWER CONDUIT FROM PANEL VIA NEW CONTACTOR SEE CONTROL DIAGRAMS THIS DWG SOLENOID VALVE (TYP 2 PLACES) METRO FURNISHED METER (TYP 2 PLACES) ,- TEMPORARY PUMP 7— STARTER & TIMER RELAY PANEL INSTL SEE DET C/E406 PLAN -- TEMPORARY DIKE TANK! INSTALLATION r t 0 DISPENSER CRADLE SW #1 f s CONTRACTOR TO PROVIDE PROTECTIVE RAMP FOR CONDUIT CROSSING, ANCHOR ANCHOR TO EXISTING PAVING SOL #1 DISPENSER CRADLE SW #2 1 DIKE TANK PIPING SCHEMATIC (FIRST LOCATION FOR TEMPORARY INSTALLATION) CONCEPTUAL DIAGRAM SOL #2 b DIESEL OIL SUPPLY PIPING TIMER RELAY PANEL DETAIL SCALD _ NONE FUEL NOZZLE 230VAC L2 Li N 20A,3P BREAKER 3/4"RGS POWER & CONTROL WIRING CONDUIT TO TIMER RELAY PANEL, SEE a DET C/E406 1 1/2" DOS TO METER (TYP) • • ex GROUND WIRE, SAME SIZE AS CURRENT CARRYING CONDUCTORS f -do-- PANEL "P9" 3PST TOGGLE SWITCH r-- LINE STARTER • i 1TR�' ZTR' 0,4 .7 DISPENSER CRADLE SW #1 oho DISPENSER CRADLE SW #2 SOL #1 SOL #2 DIESEL OIL PUMP CONTROL DIAGRAM (1ST LOCATION - TEMPORARY DIESEL FUEL TANK) OPERATION E F 1 4 A G 3/4"RGS CONDUIT TO DIESEL OIL PUMP LINE STARTER 1 0 00 0 EXISTING PANEL "P9" SEE NOTE 1 1 WHEN NOZZLE IS REMOVED FROM CRADLE SWITCH IS CLOSED ENERGIZING TIMING RELAY WHICH CLOSES CONTACT ENERGIZING PUMP MOTOR, AND OPENS SOL 2 WHEN NOZZLE IS REPLACED ON CRADLE, CRADLE SWITCH OPENS DE -ENERGIZING TIMING RELAY WHICH STARTS PRESET TIME DELAY AT COMPLETION OF TIME DELAY CONTACT OPENS DE-ENERG1Zt,j4G PUMP MOTOR HAZARDOUS STORAGE SHED — OUTSIDE PANELS DIESEL OIL PUMP -LINE -STARTER.., 3/4"RGS POWER & CONTROL WIRING CONDUIT TO PANEL "P9" 0 HAZARDOUS STORAGE SHED • A J 0 H A NOTES: 1 CONTRACTOR SHALL DE -ENERGIZE PANEL "P9" BEFORE REMOVING COVER TQ INSTALL PUMP POWER WIRING AFTER NEW WIRING IS COMPLETED REINSTALL COVER WITH NEW GASKET AND TORQUE COVER BOLTS PER MANUFACTURERS SPECIFICATION TIMER RELAY PANEL TEMPORARY PLYWOOD BACKBOARD AND POSTS 3/4"GRS POWER & #CONTROL WIRING CONDUIT TO DIESEL OIL TANK _ i STARTER AND TIMER RELAY PANEL -- TEMPORARY INSTALLATION DETAIL - SCALE NONE V z W z 0 No. REVISION BY APP D DATE fiAi21" 14 91, DRAWN CHECKED A., RECOMMENDED t „meTwo SCALE. NONE APPROVED CONTRACT NO T/M 11-93 Municipality of Metropolitan Seattle SOUTHBASE/UNIT REPAIR UNDERGROUND TANK REPLACEMENT AREA 4-FUEL/WASH BLDG. ELEC. DIAGRAM & MISC. T DETAILS 129910 DATE MARCH 1993 FILE NO X14 DRAWING N0 E406 SHEET NO OF 63 -- 63 B C 7 F IfL G t _ f — ra .a. .mm3 3a.� 3 - - - H r -w A B C D E F G H 5 ONLY TANKS WHICH HAVE BEEN IDENTIFIED FOR REMOVAL ARE SHOWN ON THIS DRAWING OTHER EXISTING UNDERGROUND TANKS ARE NOT SHOWN FOR CLARITY. B M ELEVATION ESTABLISHED FROM SOUTH BASE BUILDING AND PAVING CONTRACT, METRO NO T3B74-13, DRAWING G2. R R SPIKE ON NORTH SIDE OF POWER POLE N OF S ENTRANCE TO SOUTH BASE DATUM IS U S C AND G S 1929, ADJUSTED 1947 AND PUBUSHED BY N S G (USC AND G S) IN 1972 5 REMOVE: (1) 6.000 GAL. DIESEL OIL TANK INSTALL NEW METRO FURNISHED - 6.000 GAL DIESEL OIL TANK 1 3.000 GAL ENGINE OIL TANK 1 3,000 GAL. DUAL PRODUCT AUTOMATIC TRANSMISSION FLUID TANK SEE DETAIL A/G107 AND A/M301 STAFF PARKING REMOVE AND INSTALL NEW METRO FURNISHED (1) 2,000 GAL WASTE OIL TANK SEE DET. B/G105 AND B/M202 HAZARDOUS STORAGE SHE REMOVE (1)6,000 GAL DIESEL FUEL TANK 1) 2,000 GAL WASTE OIL TANK INSTALL NEW METRO FURNISHED. (1) 6,000 GAL. DIESEL FUEL TANK SEE DET B/G107 AND B/M301 FIRST LOCATION FOR TEMPORARY DIESEL FUEL TANK FURNISHED BY METRO FOR INSTALLATION BY THE CONTRACTOR SEE DET S/M404 STORAGE SHED RETENTION POND MAINTENANCE BLDG AREA 2 GAL. TRANSMISSION FLUID TANKS GAL LUBE OIL TANK GAL WASTE OIL TANK METRO FURNISHED: GAL. TRANSMISSION FLUID TANK GAL ENGINE OIL TANK GAL ANTI—FRFT7F CONCENTRATE TANK A/G106 AND A f M202 COACH PARKING REMOVE. 1 550 GAL DIESEL FUEL TANK 1 1,000 GAL DIESEL FUEL TANK 3 12,000 GAL DIESEL FUEL TANKS 1 10.000 GAL. DIESEL FUEL TANK 1 2.000 GAL. WASTE OIL TANK 1 6,000 GAL ANTI—FREEZE CONCENTRATE TANK 1 8.000 GAL LUBE OIL TANK 1 12,000 GAL UNLEADED GASOUNE TANK INSTALL NEW METRO FURNISHED - (3) 12,000 GAL DIESEL FUEL TANKS 2,000 GAL WASTE OIL TANK 1 6.000 GAL ANTI—FREEZE CONCENTRATE TANK 1 6 000 GAL ENGINE OIL TANK 1 12,000 GAL UNLEADED GASOUNE TANK SEE DET A/G108 AND DWG M401 REMOVE. 1 6,000 GAL. DIESEL FUEL TANK 1) 550 GAL DIESEL FUEL TANK INSTALL NEW METRO FURNISHED (1) 6.000 GAL. DIESEL FUEL TANK SEE DET A/G105 AND A/M201 STAFF PARKING SECOND LOCATION FOR TEMPORARY DIESEL FUEL TANK FURNISHED BY METRO FOR INSTALLATION BY THE CONTRACTOR SEE DET T/M404 3 4 1 CONTRACTOR TO PROVIDE TANK PROTECTION, JERSEY BARRIER, ECOLOGY BLOCKS OR OTHER APPROVED METHOD 2 OPERATIONS BLDG FUEL AND WASH BLDG 1 AREA 4 CONTRACTOR'S GATE (SEE DWG C101) EXIST POWER POLE EAST MAGINAL WAY Municipality of Metropolitan Seattle SOUTH BASE / UNIT REPAIR UNDERGROUND TANK REPLACEMENT 129850 DAZE MARCH 1993 RENO X14 DRAWING NO. REVISION CONTRACT NO TAA 11-93 SITE PLAN A B C 0 E V F V G V H 3