HomeMy WebLinkAboutTIS 2023-04-03 Item 1C - Final Acceptance - East Marginal Way Stormwater Outfalls with Marshbank ConstructionCity of Tukwila
Aran. Ekberg, Mayor
Pabk Works Department - Har/ Ponnekanti, Director/City Engineer
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Hari Ponnekanti, Public Works Director/ City Engineer
BY: Mike Perfetti, Surface Water Sr. Program Manager
CC: Mayor Ekberg
DATE: March 31, 2023
SUBJECT: Surface Water Fund — East Marginal Way Stormwater Outfalls Project
Project No. 91041204, Contract No. 20-118
Project Completion and Acceptance
ISSUE
Accept construction contract as complete and authorize release of retainage.
BACKGROUND
This project constructed drainage improvements along the northern portion of East Marginal Way
South by reestablishing a drainage connection to the Duwamish River and adding water quality
treatment for a portion of East Marginal Way S. Prior to the project, drainage along the northern portion
of East Marginal Way South was conveyed to the Duwamish River through four separate outfalls. The
outfalls are owned by Jorgensen Forge, the Boeing Company, and two by the King County
International Airport. The Jorgensen Forge outfall was abandoned in 2012 under an order from the
Environmental Protection Agency (EPA) and flows had been temporally diverted to a King County
Airport outfall.
DISCUSSION
This project was awarded on October 19, 2020, and construction began on March 8, 2021.
The construction was physically completed on July 27, 2022. The final affidavits of wages paid have
since been received and the notice of completion submitted to State L&I.
FINANCIAL IMPACT
The original contract amount was $1,035,201.00, including tax, and four change orders were executed
for $348,280.03 and a total contract value of $1,383,481.03, which were approved by Council on
August 16, 2021.
Some cost overruns and project delays resulted from underground utility conflicts: first, a previously
unknown fiber optic utility and later an unmarked 4" steel conduit were found to conflict with the
alignment of the new drainage system. Construction was put on hold to accommodate alignment design
revisions. Of the total contract award, $71,494.76 in retainage is being held by the City.
The project received $1,106,250 in design and construction funding from the Department of Ecology
Municipal Stormwater Capacity grant and $100,000 in construction funding from the King County
Opportunity Fund. The remaining project costs were funded through storm water utility revenue,
including savings from the design and construction management portions of the project.
Expenses Fund Source Construction Budget
Construction Contract Amount $1,035,201.00 DOE Grant $1,106,250.00
Change Order Nos. 1-4 348,280.03 KC Grant 100,000.00
Net Unit Price Overruns 46,414.18 Surface Water Fund 223,645.21
Total Contract Amount $1,429,895.21 Total $1,429,895.21
21
Info Memo - East Marginal Way Stormwater Outfalls Project
Page 2
RECOMMENDATION
Council is being asked to formally accept the East Marginal Way Stormwater Outfalls contract with
Marshbank Construction as complete and authorize the release of the $71,494/6 retainage, subject to
standard claim and lien release procedures, and to consider this item on the Consent Agenda at the
April 17, 2023 Regular Council Meeting.
Attachments: Project Photos
2021 CIP, page 84
Notice of Completion, Contract #20-118
Prone; 2O6-433-1200 • Email: Mayor@TukwilaWA.gov + Website: TukwilaWA.gov
22
East Marginal Way South Photos
Bioretention planter, late summer 2022
Stormwater media filter unit installation
23
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2021 to 2026
PROJECT: East Marginal Wy S Stormwater Outfalls Project No. 91041204
DESCRIPTION: Establish legal drainage connections from East Marginal Way South to the Duwamish River.
JUSTIFICATION: Drainage from E Marginal Wy S is discharged through outfalls owned and operated by the Boeing Co.,
Jorgensen Forge, and two King County Airport storm systems without easements.
STATUS: Design completed and approved by the Department of Ecology. Construction is anticipated to begin in
September 2020.
MAINT. IMPACT: Clarifies maintenance responsibility and will ensure reliability of system.
City adopted the L Line in 2015. Construction includes pipe lining, installation of water quality and connecting
COMMENT: the Jorgenson drainage area to Boeing's Z Line. DOE design and construction grant awarded in 2018 for
$1.1m.
FINANCIAL Through Estimated
(in $000's)
2019 2020 2021
2022
2023
2024
2025
2026
BEYOND TOTAL
EXPENSES
Project Location
--`- --
S Be PI
1 W AlIA
5 87 PI VZO
Design
265
45
_
c
N
tee;_11...9°
-
310
Monitoring
31
11
11
53
Const. Mgmt.
50
265
315
Construction
300
1,000
1,300
TOTAL EXPENSES
296
406
1,276
0
0
0
0
0
0
1,978
FUND SOURCES
Awarded Grant RCO
164
100
842
1,106
KCFCD
50
50
Proposed Grant
0
Mitigation Expected
0
Utility Revenue
132
256
434
0
0
0
0
0
0
822
TOTAL SOURCES
296
406
1,276
0
0
0
0
0
0
1,978
2021 - 2026 Capital Improvement Program
84
24
Project Location
--`- --
S Be PI
1 W AlIA
5 87 PI VZO
_
c
N
tee;_11...9°
-
r
GIS
Nor
2021 - 2026 Capital Improvement Program
84
24
NOTICE OF COMPLETION OF
PUBLIC WORKS CONTRACT
Department Use Only
Assigned to:
Date Assigned:
Date 03/09/2023
Form Version Original
Revision Reason
Awarding Agency Information
Prime Contractor Information
Name TUKWILA, CITY OF
UBI 916001519
Name MARSHBANK
CONSTRUCTION INC
UBI 601649423
Address 6300 S CENTER BLVD #101 TUKWILA,WA-98188
Address PO BOX 97 LAKE STEVENS,WA-98258
Email Address mike.perfetti@tukwilawa.gov
Email Address rachelle@marshbankconst.com
Contact Name Mike Perfetti
Phone 206-550-4930
Contact Name
MARSHBANK
CONSTRUCTION INC
Phone 425-377-9708
Project Information
Project Name East Marginal Way Outfall Stormwater Retrofit
Project
Contract # 20-118
Affidavit ID 1181422
Jobsite Address
Date Awarded
11/16/2020
Date Work Commenced
03/08/2021
Date Work Completed
07/14/2022
Date Work Accepted
07/22/2022
Federally Funded Transportation Project If yes, attach Contract Bond Statement. ❑
Bond Waived?
Retainage Waived?
Subcontractors Used? If yes, complete
Addendum A. a
Detailed Description of Work Completed Construction of approximately 1600 linear feet of drainage improvements within the
right-of-way of East Marginal Way, including but not limited to stormwater pump station installation, gravity and force main storm
sewer, stormwater treatment vaults, cured in place pipe lining, bioretention planters, permeable pavement and paving, roadway,
curb and gutter restoration, and other work necessary to complete the Work as specified and shown in the Contract Documents.
DOR Tax Information
"Right -click on the total field and select Update Field to auto -calculate.
Contract Amount
$1,035,201.00
Liquidated Damages
$ 0.00
Additions (+)
$348,280.03
Amount Disbursed
$1,358,400.45
Reductions (-)
-$46,414.18
Amount Retained
$ 0.00
Sub -Total*
$1,429,895.21
Other
$71,494.76
Sales Tax Amount
$ 0.00
Sales Tax Rate If multiple rates, attach a list.
10.10%
TOTAL*
$1,429,895.21
TOTAL*
$1,429,895.21
These two totals must be equal.
Apprentice Utilization Information
Was Apprentice Utilization Required? If yes, complete this entire section.
Engineer's Estimate $1,300,445.00
Utilization % 15.29%
Was a Good Faith Effort approved?
Comments
The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM THE RETAINED FUNDS until receipt of all release certificates and affidavits.
Submitting Form: Submit the completed form by email to all three agencies below.
elDepartment of Revenue
Public Works Section
(360)704-5650
Washington State Department of
`%Labor & Industries
Employment Seai5ty Department
Registration, Inquiry, Standards &
Coordination Unit
(lnn1Rgn-�dQQ
Contract Release
(855) 545-8163, option # 4
ContractRelease@LN I. WA. GOV
Addendum A: Please List all Subcontractors and Sub -tiers Below
This addendum can be submitted in other formats.
Provide known affidavits at this time. No L&I release will be granted until all affidavits are listed.
Subcontractor's Name:
UBI Number: (Required)
Affidavit ID*
APPLY -A -LINE LLC
600553941
1107197
EVERGREEN CONCRETE CUTTING
INC
601605667
1072424
GARY MERLINO CONST CO INC
600584952
1077806
GREEN CITY INC
601196371
1164597
INSITUFORM TECHNOLOGIES LLC
601880220
1062187
MAK'S DUMP TRUCK LLC
602671980
1065712
NORTHLINE SURVEYING, INC
604206249
1159632
OLSON BROTHERS PRO -VAC LLC
602170975
1051546
PUGET PAVING & CONST INC
600403309
1097298
SALINAS SAWING & SEALING INC
601717158
1100545
SERVICE ELECTRIC CO INC
179023787
1139247
SILVERSTREAK INC
600432781
1097123
STRONG TRUCKING, INC.
601777166
1028061
VENTILATION POWER CLEANING
INC
578089188
1063879
WILSON CONCRETE CONST INC
602168956
1120200
26