HomeMy WebLinkAboutPermit 1945 - Corporate Properties Investmentssite plan
details
general notes
approved
site plan
vicinity map
detail
catch basin
southcenter south
lpn
finish grades utilities plan
trash enclosure plan
jamb and gate
legal description
site plan
general information
approved
first floor plan
second floor plan
elevations
building core plan
toilet room elevations
partial section thru lobby
typical wall section
building section perimeter stair
roof drainage plan
roof plan schedules
typical architectural details
foundation plan
floor framing plan
roof framing plan
sections
sections
sections
sections general notes
details
typical connections
typical panel reinforcing
first floor box schedule
floor plan
hvac
key mechanical company
general notes
second floor plan hvac
water heate rdetail
second floor atrium and core detail
plumbing fixture schedule
air conditioning unit schedule
exhaust fan schedule