HomeMy WebLinkAboutPermit EL18-0057 - YAMATO INDUSTRIES - INSTALL (1) 20A CIRCUIT FOR FORK LIFT CHARGERYAMATO INDUSTRIES
18271 ANDOVER PARK W
ELI 8-0057
Parcel No:
Address:
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
ELECTRICAL OTC PERMIT
3523049104 Permit Number: EL18-0057
18271 ANDOVER PARK W
Project Name: YAMATO INDUSTRIES
Issue Date: 1/16/2018
Permit Expires On: 7/15/2018
Owner:
Name:
Address:
LIT INDUSTRIAL LTD PTNSHP
1717 MCKINNEY AVE #1900 , DALLAS,
WA, 75202
Contact Person:
Name: AARON McMULLEN
Address: PO BOX 1030, MILTON, WA, 98354
Contractor:
Name: ABACUS ELECTRIC CO
Address: PO BOX 1030, MILTON, WA, 98354
License No: ABACUEC928LT
Lender:
Name:
Address:
J//
Phone: (253) 984-1611
Phone: (253) 984-1611
Expiration Date: 6/30/2018
DESCRIPTION OF WORK:
INSTALL (1) 20A CIRCUIT FOR FORK LIFT CHARGER
Valuation of single family: $0.00
Valuation of mf/comm: $1,350.00
Type of Work: ADDITION
Fees Collected: $127.02
Electrical Service Provided by: PUGEST SOUND ENERGY
Water District: HIGHLINE
Sewer District: TUKWILA
L
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
International Fuel Gas Code:
2015
2015
2015
2015
2015
National Electrical Code:
WA Cities Electrical Code:
WAC 296-46B:
WA State Energy Code:
2017
2017
2017
2015
Permit Center Authorized Signature:
Date: 0)(74- ///�
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulglting construction or the performance of work. I am authorized to sign and obtain this
development permit a agree to the conditions attached to this permit.
Signature:
Print Name:
kroh
Date:'' I( Is
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: ***ELECTRICAL PERMIT CONDITIONS***
2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical
Inspector at each work site.
3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical
Inspector.
4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations,
Chapter 296-46B WAC and the Washington Cities Electrical Code.
5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts
of the building, such equipment shall not be concealed until it has been inspected and approved by the
Electrical Inspector.
6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any
violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related
documentation that presumes to grant this authority are therefore not valid.
7: Any change in the scope of work described by the electrical work permit shall require additional work
permits. Where approved plans have been issued, revisions to the plans and additional review may be
required.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
2100 ELECTRICAL FINAL
7003 ROUGH -IN ELECTRICAL
7002 SERVICE
7001 UNDERGROUND/SLAB
CITY OF TUKWILA
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
Electrical Permit No.
57
Project No.
Date Application. Accepted: 10///&(/
t
Date Application Expires:
(For office use only)
ELECTRICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**Please Print**
SITE LOCATION
Site Address: (82_ ( (,•e
Tenant Name: �Q� p� (� T 4
King Co Assessor's Tax No.:
Suite Number: Floor:
New Tenant: ❑ Yes ..No
PROPERTY OWNER
Name:
Address:
City:
State:
Zip:
CONTACT PERSON — person receiving all project
communication
Name: Anti, /7 -?QP /6
Address:
City: State: Zip:
Phone: 2,S1. yc 'Zr( Fax:
IA
Email:0;1 1,0p ekiii I,�-t . //
ELECTRICAL CONTRACTOR INFORMATION
Company Name: Abacus Electric Company
Address: PO Box 1030
City: Milton State: WA Zip: 98354
Phone: (253) 984-161 1 Fax: (253) 984-1613
Contr Reg No.: ABACUEC928L" Exp Date:
Tukwila Business License No.;
Valuation of Project (contractor's bid price): $ (.),3 0
Scope of Work (please provide detailed inform.tio ):
Wlervice be altered? ❑ Yes [ No Adding more than 50 amps? ❑ Yes [, No
T`•lf Use:
--Qwork:
New [ Addition ❑ Service Change ❑ Remodel 0 Tenant Improvement
Low Voltage 0 Generator ❑ Fire Alarm 0 Telecommunication 0 Temporary Service
Pr�rved bv:
‘iget Sound Energy 0 Seattle City Light
pplications-Handouts\Permit Applications lPDFs\Electrical Permit Application Revised I-I-17.docs
aia
Page 1 of 2
RESIDENTIAL
NEW RESIDENTIAL SERVICE
O New single family dwellings $155.91
(including an attached garage)
O Garages, pools, spas and outbuildings $83.54 ea
O Low voltage systems
(alarm, fumace thermostat) $61.05 ea
RESIDENTIAL REMODEL AND SERVICE CHANGES
❑ Service change or alteration $83.54
(no added/altered circuits)
❑ Service change with added/altered circuits $83,54
number of added circuits $12.00 ea
❑ Circuits added/altered without service change $55.69
(up to 5 circuits)
❑ Circuits added/altered without service change $55.69
(6 or more circuits) $7,65 ea
❑ Meter/mast repair $69.62
O Low voltage systems $61.05
(alarm, furnace thermostat)
MULTI -FAMILY AND COMMERCIAL
Fees are based on the valuation of the electrical contract.
MISCELLANEOUS FEES
❑ Temporary service (residential) $66.30
❑ Temporary service (generator) $82.52
❑ Manufactured/mobile home service $87.98
(excluding garage or outbuilding)
❑ Carnivals $82.21
Number of concessions $ 11.02 ea
Each ride and generator truck $11.02 ea
***EFFECTIVE JANUARY 1, 2014 EACH
PERMIT WILL BE ASSESSED A 5%
TECHNOLOGY FEE***
PERMIT APPLICATION NOTES -
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing
and justifiable cause demonstrated.
I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR ELECTRICAL CONTRACTOR:
Signature:
Print Name:
Pa.vot4 ifkc-il-P/t4.
Mailing Address: EPS ( are)
Date: 1 r
Day Telephone: 25 3 ' 9'9((—(b0
W:1Permit CenteriApplications-Handouts\Permri ApplicationslPDFs\Elenrical Permit Ap
Revised: January 2017
bh
at
Revised I.I-17.docx
City
S
tate Zip
Page 2 of 2
Cash RegisterReceipt
City of Tukwila
DESCRIPTIONS 1
PermitTRAK
ACCOUNT
1 QUANTITY I
PAID
$127.02
EL18-0057 Address: 18271 ANDOVER PARK W
Apn: 3523049104
$127.02
ELECTRICAL
$120.97
PERMIT FEE MULTI-FAM/COMM
R000.322.101.00.00
0.00
$120.97
TECHNOLOGY FEE
$6.05
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: 1113399
R000.322.900.04.00
0.00
$6.05
$127.02
Date Paid: Tuesday, January 16, 2018
Paid By: ABACO CONTRACTORS LTD
Pay Method: CHECK 18073
Printed: Tuesday, January 16, 2018 12:16 PM 1 of 1
sfirmysTEms
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3
Permit Inspection Request Line (206) 438-9350
Project:ivb
lAtikr°//
Type of Inspection:
/+
/
Address:
kitiv)
/721/
Date Called:
Special Instructions:
r'r/�
(F; L -i 2 / ll
1} t i ff I
i, n /A
Date Wanted:
a.m
m.
Requester: -j
0 t -f -'!ii
Phone No: 55 (
70
'
;54
Approved per applicable codes. E Corrections required prior to approval.
COMMENTS:
11-
r1:641./"
tc1/41/4417\
REINSPECTION E REQUIRED. Prior to next inspection, fee ust be
paid at 6300 Sout center Blvd.. Suite 100. Call to schedule reinspection.
Inspector:
Date: 01
2.3
ABACUS ELECTRIC CO
k)
Washington State Department of
Labor & Industries
Home Espanol Contact
Safety & Health Claims & Insurance
Page 1 of 4
Search L&I
A -Z Index help
Workplace Rights Trades & Licensing
ABACUS ELECTRIC CO
Owner or tradesperson
Principals
SMITH, SHANE, PARTNER/MEMBER
MOSS, HAYWOOD
TROY, PARTNER/MEMBER
(End: 05/25/2017)
Doing business as
ABACUS ELECTRIC CO
WA UBI No.
602 838 703
Parent company
ABACO CONTRACTORS LLC
PO Box 1030
MILTON, WA 98354
253-984-1611
PIERCE County
Business type
Limited Liability Company
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Electrical Contractor
License specialties
GENERAL
License no.
ABACUEC928LT
Effective — expiration
06/30/2008— 06/30/2018
Designated administrator
.......... ..........
Yourglich, Matthew R
License type
Electrical Administrator
Bond
Lexon Ins Co
Bond account no.
9807640
Received by L&I
06/01/2011
Savings
No savings accounts during the previous 6 year period.
License Violations
Infraction no.
ETUCP00438
Issue date
Active.
Meets current requirements.
Active.
Meets current requirements.
License no.
YOURGMR863BH
$4,000.00
Effective date
06/27/2011
Expiration date
Until Canceled
Satisfied
RCW/WAC
Help us improve
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602838703&LIC=ABACUEC928LT&SAW= 1/16/2018