Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit EL18-0114 - WASHINGTON PLACE / HOTEL INTERURBAN - KITCHEN LIGHTS & PLUGS
WASHINGTON PLACE KITCHEN 223 ANDOVER PARK E ELI8-01 14 Parcel No: Address: Project Name: �-\ City of Tukwila a t of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: %O6'438'935D VVobyite:httm://www.Tukm/i|aVVA.Rov ELECTRICAL PERMIT 0223100090 Permit Number: EL18-0114 223 ANDOVER PARK E WASHINGTON PLACE - KITCHEN Issue Date: 2/26/20I8 Permit Expires On: 8/25/2018 Owner: Name: Address: Contact Person: Name: Address: WASHINGTON TOWERS LP 18Z3OEVALLEY HIGHWAY #l9S' KENT, WA, 98032 CHRISTINE LEE 18230EVALLEY MVVY'SUITE l95, KENT, WA, 98032 Contractor: Name: GREAT WALL ELECTRIC INC Address: POBOX 3838'SEATTLE, WA, 981Z4 License No: GREATWE954CG Lender: Name: Address: Phone: (206) 265-0988 Phone: (206) 898-9168 Expiration Date: 2/7/2019 DESCRIPTION OF WORK: KITCHEN LIGHTS QPLUGS Valuation of single family: $0.00 Valuation of mf/comm: $12'000.00 Type of Work: TENANT IMP Fees Collected: $419.54 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: 2017WA State Energy Code: ,e op() Date: 9 ) 20172017 2015 (() 1 hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulatin construction or the perforn1an2e of work. I am authorized to sign and obtain this development permit and aglee o the conditions attaCt ed to,his-permit. Signature: Print Nan( Date: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***ELECTRICAL PERMIT CONDITIONS*** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-466 WAC and the Washington Cities Electrical Code. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB ( CITY OF TUKW.. Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Electrical Permit No. t1-1 0t 1 Project No. Date Application Accepted: -( Date Application Expires: (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: Tenant Name: c;2.2 3 Ailove,7-7,4/4 a3/ - King Co Assessor's Tax No.: Suite Number: Floor: New Tenant: El Yes D,. No PROPERTY OWNER Name: ZE--e---- Name: Address: Address: Address: City: State: City: State: Zip: CONTACT PERSON — person receiving all project communication Name: ZE--e---- Address: Address: City: State: Zip: Phone: 2402kayeci,Fax: Zip: Email: Fax: ELECTRICAL CONTRACTOR INFORMATION Company Name: Address: City: State: Zip: 9 Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.; Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): Will service be altered? Yes 0 No Type of Use: Type of work: O New 0 Addition 0 Service Change O Low Voltage 0 Generator 0 Fire Alarm Property Served by: O Puget Sound Energy 0 Seattle City Light WAPermit CenteMpplications-HandoutsWermit Applications\ Word‘Electrical Permit Application Revised 1-I-2017.docx Revised: January 2017 bh Adding more than 50 amps? flj Yes 0 No O Remodel O Telecommunication O Tenant Improvement O Temporary Service Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE 0 New single family dwellings $155.91 (including an attached garage) O Garages, pools, spas and outbuildings $83.54 ea O Low voltage systems (alarm, furnace thermostat) $61.05 ea RESIDENTIAL REMODEL AND SERVICE CHANGES O Service change or alteration $83.54 (no added/altered circuits) 0 Service change with added/altered circuits $83.54 number of added circuits $12.00 ea O Circuits added/altered without service change $55.69 (up to 5 circuits) O Circuits added/altered without service change $55.69 (6 or more circuits) $7.65 ea O Meter/mast repair $69.62 O Low voltage systems $61.05 (alarm, furnace thermostat) MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES O Temporary service (residential) $66.30 O Temporary service (generator) $82.52 0 Manufactured/mobile home service $87.98 (excluding garage or outbuilding) O Carnivals $82.21 Number of concessions $11.02 ea Each ride and generator truck $11.02 ea PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRAC OR. Signature: Print Name. Mailing Address: Date: Day Telephone: City WAPermit Center \ Applications -Handouts \ Permit Applications\ WoraElectrical Permit Application Revised I-1-2017.docx Revised: January 2017 bh State Zip Page 2 of 2 r11.4 - 44/ Cash Register Receipt City of Tukwila Receipt Number R13726 DESCRIPTIONS 1 ACCOUNT QUANTITY PermitTRAK ' PAID $870.02 E118-0114 Address: 223 ANDOVER PARK E Apn: 0223100090 $419.54 Credit Card Fee $12.22 Credit Card Fee R000.369,908.00.00 0.00 $12.22 ELECTRICAL $391.65 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $313.32 PLAN CHECK FEE R000.345.832.00.00 0.00 $78.33 TECHNOLOGY FEE $15.67 TECHNOLOGY FEE R000.322,900.04.00 0.00 $15.67 M18-0021 Address: 223 ANDOVER PARK E Apn: 0223100090 $450.48 Credit Card Fee $13.12 Credit Card Fee R000.369.908.00.00 0.00 $13.12 MECHANICAL $420.54 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $303.28 PLAN CHECK FEE R000.322.102.00.00 0.00 $84.11 TECHNOLOGY FEE $16.82 TECHNOLOGY FEE R000.322.900.04.00 TOTAL FEES PAID BY RECEIPT: R13726 0.00 $16.82 ' $870.02 Date Paid: Tuesday, February 06, 2018 Paid By: CHRISTINE LEE Pay Method: CREDIT CARD 92475G Printed: Tuesday, February 06, 2018 3:22 PM 1 of 1 riPPPISYSTEMS INSPECTION RECORD Retain a copy with permit IN ECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431- 6 0 Permit In pection Request Line (206) 438-9350 . , 6.64 Project:cid ik- P E -kc -f r- 1 of Inspection: 4A1/ Addr e Date Called: Special I structions: Date Wanted: Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next nspectkfri. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-36 Permit Inspection Request Line (206) 438-9350 Project: r 1 46\4 Jrvpe of Inspection: 6 PP-A/11)6.5e-Petkii-nc)p/ scrw • r,opiw.yi ) Addre2:2: 4406 - 5--kct-P FL6X• Date Called: 4 E-si-I- - - L.- k 5iISLZ 1/4 gok. /01) Special Instructions: — edAiDuri-5 FfDt-i- Date Wanted: che cal.:rem. Requester: — 5641-- as I b( Cods) v i 75 Tvotr Pt• -/464 Phone No: JApproved per applicable codes. Corrections required prior to approval. COMMENTS: _ • 4LerS GAS /(60,-t5 — riAlL& posertA 6,to..k.spcoe\n4cA-1=1/1( PP-A/11)6.5e-Petkii-nc)p/ scrw • r,opiw.yi ) Ai coPPLc-- - 5--kct-P FL6X• , Off-ci Pe-orer-nec>4 Fa\A-frt.- k6c05 (A) Ini- 4 E-si-I- - - L.- k 5iISLZ 1/4 gok. /01) — edAiDuri-5 FfDt-i- ' — 5641-- as I b( Cods) v i 75 Tvotr Pt• -/464 (A)ki---tk, tAti „ We\ Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee nust be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD etain a copy with permit N PECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION (206) 431-367 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 )_ i Project:lA i - PlAa. Kirc (T p of Inspection: klj> LAWLLIJZ\ Coil itLf-vpir Addre, kkte.: Dae Called: Special Instructions: Date Wanted: ICra3:6111: l V Requester: Phone No: 0 Approved per applicable codes. Corrections required prior to approval. COMMENTS: rQuEP\ 0?Tc-1.<_. Id COJI)&4COlkL)Fdir/75 klj> LAWLLIJZ\ Coil itLf-vpir p(5e-0 FTIPbtstfuilk-s4EJiLkoPez ukt6N A.,,frP--Le 0 1 1).. • PA -Ni 'et- 5c44- 6-1 th.6 f , . Inspector: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: (.nail- Pla<g t " Type of spection: a cg5 A. i el. rc e_ Address: z- 3 /1- Pk' E Date ailed: Special Instructions: P4 rrr_ CvLp.m. Date Wanted: a.m. Requester: Phone No: Approved per applicable codes. n Corrections required prior to approval. t::4_ COMMENTS: tA) ca/ u eAr% Insp 6:41, Dat 1/u ficc REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pyvl Project:A , w A I' ( - ce_ kt i-d-lev‘ Type of Inspection: Li S ict Addres : '2A - - k ,‘ kAd.our p 1.(. E Date Called: Special Instructions: Date Wanted: a.m. p.m. Requester: Phone No: tiApproved per applicable codes. EJ Corrections required prior to approval. COMMENTS: r ceS1-e,9 t (1-C ko C4 Ins ect9 DatV I rcc REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. r 'PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP �\ PERMIT NUMBER: EL18-0114 DATE: 02/06/18 PROJECT NAME: WASHINGTON PLACE - KITCHEN SITE ADDRESS: 223 ANDOVER PARK E X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: Building Division Public Works Fire Prevention Structural n Planning Division n Permit Coordinator ■ PRELIMINARY REVIEW: Not Applicable n (no approval/review required) DATE: 02/08/18 Structural Review Required REVIEWER'S INITIALS: DATE: n APPROVALS OR CORRECTIONS: DUE DATE: 03/08/18 Approved Corrections Required ❑ Approved with Conditions ❑ Denied n (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping 0 PW ❑ Staff Initials: 12/18/2013 GREAT WALL ELECTRIC INC Horne Espanol Contact Safety & Health Claims & Insurance C144 Washington State Department of Labor & industries r \ / Search L&I Page 1 of 3 A -Z Index Ielp boy L&I Workplace Rights Trades & Licensing GREAT WALL ELECTRIC INC Owner or tradesperson Principals LEE, YOUNG, PRESIDENT LEE, YOUNG, AGENT KEHLE, RON, AGENT (End: 03/07/2005) Doing business as GREAT WALL ELECTRIC INC WA UBI No. 602 434 633 PO BOX 3838 SEATTLE, WA 98124 206-898-9168 KING County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Electrical Contractor Active. Meets current requirements. License specialties GENERAL License no. GREATWE954CG Effective — expiration 02/07/2005— 02/07/2019 Designated administrator LEE, YOUNG KONG Active. Meets current requirements. License type License no. Electrical Administrator LEE**YK973CR Bond CBIC Bond account no. SF9723 $4,000.00 Received by L&I Effective date 03/26/2005 03/24/2005 Expiration date Until Canceled Savings No savings accounts during the previous 6 year period. License Violations Infraction no. EALRD00298 Issue date 03/30/2017 Violation city Satisfied RCW/WAC 19.28.271 RCW Violation amount Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602434633&LIC=GREATWE954CG&SAW= 2/23/2018 ELECTRICAL PO.,ER EQUIPMENT SC-EIDULE PLACE KITCHEN SHEET LIST TABLE SUPPLIER SHEET TITLE DESCRIPTION ELECTRICAL COTES ITEM NO, E6.01 W 0 w 0 QU4NTIT' �C VOLTS 0) 0_ O 1 CLASS I EXHAUST 1400D 115 1 JBOXSEE HVAC DRAWINGS 1.1 ® I CLASS 1 EXHAUST DUCTWORK AND FAN 11 15 480 3 JBOX I REFER TO PLAN NOTE I, SEE HVAC DRAWINGS 1.2 ►1 1 MAKE-UP AIR DUCTWORK, HEATER AND FAN 1.6 5 450 3 JBOX REFER TO PLAN NOTE I, SEE HVAC DRAWINGS 1.3 ® I FIRE SUPPRESSION SYSTEM 115 1 JBOX SEE HVAC DRAWINGS, NOTE *15, PROVIDE FIRE ALARM CONNECTION 3 ►1 ( 1 COMBI OVEN 3.21 208 1 500 NEMA 6-I5P INDIRECT WASTE 4 ►;s•11ii.=11©l RANGE WITH OVEN AND GRIDDLE 0.6115 Q DCO 6 1 FRYER SYSTEM WITH FILTRATION 1 6.2 = 115 Q DCO 1 ►M1 1 1 !TILT SKILLET 1 1.4 115 JBOX 9 'UNDER COUNTER REFRIGERATOR 1 6.1 115 DCO NEMA 5-15P 10 R�1 2 FOOD WARMER 15.0 115 DCO NEMA 5-I5P 11 ►•1 1 I UNDER COUNTER REFRIGERATOR 6.1 115 DCO NEMA 5-15P 12 M►r1 1 MICROWAVE OVEN 11.1 115 DCO NEMA 5-20P 13 ►Pt HEAT LAMP 208 JBOX 14 HOT HOLDING CABINET 39.0 208 SCO NEMA 6-50P 15 ►1 RICE COOKER 14.0 115 DCO NEMA 5-I5P 16 10- 1 1 MIXER 1 6.4 208 JBOX 11 SLICER 1.0 115 DCO NEMA 5-15P 18 FOOD PROCESSOR 1.0 115 DCO NEMA 5-15P 19 m 1 DISHWASHER 24.1 480 JBOX INDIRECT WASTE, VERIFY REQUIREMENTS WITH OWNER 20 m 1 UJALK-IN COOLER 3.0 115 JBOX FOR LIGHTS AND DOOR HEATER 20.1 ® 1 WALK-IN COOLER BLOWER COIL 1.8 115 J130X INDIRECT WASTE NOTE S 4 a 13 20.2 CC WALK-IN COOLER COMPRESSOR 1 6.1 208 $$JB0X HEAT REJECTION = XXXXXX BTU 21 ® WALK-IN FREEZER BLOWER COIL 1.2 208 JBOX INDIRECT WASTE, NOTE *5 4 a 13 21.2 ® 1 WALK-IN FREEZER COMPRESSOR 6.3 208 JBOX HEAT REJECTION _ XXXXXX BTU 22 1® 1 WALK-IN KEG COOLER BLOWER COIL 1 2.0 115 JBOX INDIRECT WASTE NOTE "5 4 * 13 22.1 ®= WALK-IN KEG COOLER COMPRESSOR 1� 4.6 208 $$JBOX HEAT REJECTION = XXXXXX BTU 23 ►-wM ME 1 REACH -IN FREEZER 1 9.8 115 Q DCO NEMA 5-20P 24 1►= 1 ICE MACHINE AND STORAGE BIN 12.2208 JBOX INDIRECT WASTE, HEAT REJECTION _ 12.100 BTU 26.1 1 WARMING DRAWER 15 115 JBOX NEMA 5-I5P 2l m 1 TEA URN I XX 115 DCO VERIFY REQUIREMENTS WITH OUJNER 30 ® 2 POINT OF SALE TERMINAL 3.0 115 DCO DEDICATED / ISOLATED - VERIFY REQUIREMENTS WITH OUJNER 30.1 ( Cr4 TICKET PRINTER 3.0 115 DCO DEDICATED / ISOLATED - VERIFY REQUIREMENTS WITH OUJNER 31 1 ® 1 GLASS WASHER 1 208 PC0 INDIRECT WASTE 32.2 I m 2 SODA DISPENSING GUN 3.0 115 DCO DIRECT WASTE 34 I 3 DUMP SINK 8.0 115 DCO INDIRECT WASTE 36BACK BAR COOLER 65 115 DCO NEMA 5-I5P 31 1 BACK BAR COOLER 1 65 115 DCO NEMA 5-15P 31.2 BEER GLYCOL UNIT 12.0 115 DCO NEMA 5-I5P 38 COFFEE BREWER 208 500 VERIFY REQUIREMENTS WITH OWNER 40 MUG FROSTER 6.1 115 D NEMA 5-I5P I 61 1 1 1 COUNTER TOP FREEZER - GLASS DOOR 6.0 115 DCO NEMA 5-I5P 68 1 GRAB AND GO CASE 1 16.0 115 DCO 1 NEMA 5-20P 11 DISPLAY CASE 1 16.0 115 DCO NEMA 5-20P 13 1 ® POINT OF SALE TERMINAL 3.0 115 DCO DEDICATED / ISOLATED - VERIFY REQUIREMENTS WITH OUJNER 14 UNDER COUNTER REFRIGERATOR 6.3 115 DCO NEMA 5-I5P 15 m 1 ESPRESSO MACHINE XX 208 SCO INDIRECT WASTE - VERIFY REQUIREMENTS WITH OWNER 16 ® 1 GRINDER XX 115 D VERIFY REQUIREMENTS WITH OWNER 85 ® 1 COFFEE BREWER XX 208 500 VERIFY REQUIREMENTS WITH OWNER 86 ® GRINDER 1 XX 115 DCO VERIFY REQUIREMENTS WITH OWNER 81 1 UNDER COUNTER REFRIGERATOR 1 6.3 115 DCO NEMA 5-I5P 88 1 I UNDER COUNTER ICE MACHINE 11 5.5115 DCO INDIRECT WASTE 1 100 2 ROLL -IN REFRIGERATOR 9.5 115 DCO NEMA 5-I5P i02 4 MOBILE HEATED CABINET 39.0 208 SCO NEMA 6-50P 105 2 INDUCTION WARMER 15.0 115 D NEMA 5-I5P 101 ��I 10 1 HANGING HEAT LAMP 0.25 MINIIIMEMENI1111JBOX III REACH -IN REFRIGERATOR 6.0 115 1 DCO NEMA 5-I5P 112 1 1 ICE MACHINE 12.2 208 1 JBOX ROO- SEE ARCHITECT'S AND MECHANICAL DRAWINGS ELECTRICAL KITCHEN NOTES 1. THE ELECTRICAL CONTRACTOR SHALL SUPPLY AND INSTALL SEAL-TITE FLEX CONDUIT TO ALL FOOD SERVICE EQUIPMENT IN DAMP AREAS, I.E., SCULLERY, BAR ROOF, ETC. FLEX CONNECTIONS AT ALL FANS ON THE ROOF SHALL BE OF EXTRA LENGTH TO ALLOW FULL FAN REMOVAL FOR THE EASE OF CLEANING. 2. THE ELECTRICAL CONTRACTOR SHALL PROVIDE FUSED DISCONNECTS FOR EQUIPMENT HOOK-UPS AS REQUIRED BY CODE AND LABELING. 3. THE ELECTRICAL CONTRACTOR SHALL PROVIDE DISCONNECTS IN A CONVENIENT ACCESSIBLE LOCATION AT AT THE POWER BOX FOR EACH ICE MACHINE HEAD. 5. THE ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL A VAPOR -PROOF SWITCH AT EACH BLOWER COIL IN THE WALK-IN COOLER (ITEM 20, 21, 22). 8. THE ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL A 48" MINIMUM CORD AND PLUG FOR EACH PIECE OF EQUIPMENT SO NOTED. USE 90 ELBOW OUT OF UNIT. 10. THE ELECTRICAL CONTRACTOR SHALL PROVIDE FOR HOOK-UP OF A THERMOSTAT, SOLENOID, BLOWER COIL AND COMPRESSOR FOR EACH REFRIGERATED UNIT. MAGNETIC STARTERS AND/OR THERMAL PROTECTORS SHALL BE INCLUDED AS NECESSARY. 1 1. THE ELECTRICAL CONTRACTOR SHALL PROVIDE 1" CONDUIT AND JUNCTION BOXES AT EACH CASH REGISTER TERMINAL SO AS TO INTERCONNECT ALL UNITS TO EACH OTHER AND TO THE CENTRAL PROCESSING TERMINAL. CONSULT WITH THE OWNER'S REPRESENTATIVE FOR EXACT LOCATIONS OF ALL TIE-IN UNITS. 12. THE ELECTRICAL CONTRACTOR SHALL PROVIDE A FOUR -WIRE SERVICE TO THE DISH MACHINE. THREE WIRES SHALL BE 8 AWG RATED 750C TO CARRY CURRENT. THE FOURTH WIRE SHALL BE A GROUND. 13. THE PLUMBING CONTRACTOR SHALL PROVIDE AND INSTALL ALL DRAIN LINES FROM WALK-IN BLOWER COILS TO FLOOR SINKS. HEAT TAPE SHALL BE PROVIDED AND WRAPPED AT ALL DRAIN LINES SUBJECT TO THE POSSIBILITY OF FREEZING, SUPPLIED AND INSTALLED BY ELECTRICAL CONTRACTOR. 14. ALL DRAIN LINES FROM EQUIPMENT REQUIRING CONDENSATION REMOVAL SHALL BE DONE IN COPPER. 15. IT SHALL BE THE RESPONSIBILITY OF "OTHERS" TO INTERCONNECT THE HOOD FIRE PROTECTION SYSTEMS TO THE BUILDING FIRE DETECTION UNITS AS REQUIRED. 18. THE OWNER'S VENDOR OF CHOICE SHALL SUPPLY AND INSTALL A CO2 STORAGE CANISTER IN THE LIQUOR STORAGE ROOM. AN EXTERIOR FILL VALVE AND ALL CO2 UNITS SHALL BE SUPPLIED AND INSTALLED BY THE VENDOR. 19. THE ELECTRICAL CONTRACTOR SHALL SUPPLY AND INSTALL TO EACH PIECE OF ROOF -TOP EQUIPMENT (FANS, MOTORS, COMPRESSORS, CONDENSERS, ETC.) A SEPARATE WEATHER -PROTECTED DISCONNECT SWITCH. 20. PLUMBING CONTRACTOR SHALL SUPPLY AND INSTALL ANTI -SIPHON VALVE ASSEMBLIES FOR SODA DISPENSING SYSTEM. 22. IT SHALL BE THE RESPONSIBILITY OF THE PLUMBING AND ELECTRICAL CONTRACTORS TO MAKE ALL REQUIRED WATER, GAS, DRAIN AND ELECTRICAL FINAL CONNECTIONS FOR ALL MAKE-UP AIR SYSTEM UNITS. 23. 11- SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO INSTALL ALL OWNER SUPPLIED COMPUTER/COMMUNICATIONS CABLES AS PER OWNERS DIRECTION. 24. IT SHALL BE THE RESPONSIBILITY OF PLUMBING CONTRACTOR TO COMPLY WITH ALL LOCAL CODES CONCERNING GAS VALVE REGULATOR VENTING. 25. ELECTRICAL CONTRACTOR SHALL PROVIDE A INDIVIDUAL DISCONNECT BOX FOR EACH PIECE OF ROOF TOP ELECTRICALLY POWERED EQUIPMENT. 26. THE GENERAL CONTRACTOR SHALL PHOTOGRAPH ALL WALLS CONTAINING BACKING PRIOR TO SHEETROCK/FRP INSTALLATION. 27. THE PLUMBING CONTRACTOR SHALL PROVIDE CLEANOUTS AT 1ST ELBOW ON EACH WALK-IN BLOWER COIL DRAIN. 29. THE PLUMBING CONTRACTOR SHALL SUPPLY AND INSTALL WATER LINE BACK CHECK VALVES AS REQUIRED PER CODE. 30. THE ELECTRICAL CONTRACTOR SHALL PROVIDE INTERCONNECT SWITCHING BETWEEN THE KITCHEN EXHAUST HOOD EXHAUST FANS AND THE KITCHEN MAKE-UP AIR SYSTEMS AS REQUIRED PER LOCAL CODE AND AUTHORITIES. .31. COMMUNICATIONS CABLES ARE SUPPLIED BY OWNER AND INSTALLED BY ELECTRICAL CONTACTOR. 32. ELECTRICAL AND MECHANICAL CONTRACTOR TO VERIFY REQUIREMENTS OF OWNER PROVIDED EQUIPMENT. 35. PRESSURE REGULATORS FOR GAS COOKING EQUIPMENT SUPPLIED BY CMA AND INSTALLED PER CODE AND MANUFACTURER'S SPECIFICATIONS BY PLUMBING CONTRACTOR. PLAN NOTES 0 PROVIDE DISCONNECT, CONDUIT, WIRING , AND CONNECTIONS FOR 2ND LEVEL ROOF TOP HVAC UNITS AS REQUIRED. REFER TO MECHANICAL EQUIPMENT SCHEDULE AND DRAWINGS FOR REQUIREMENTS AND LOCATION. REVISIONS No changes shall r rn-,d n the scoop Of work without prior approvnl of Tukwila Building Division NOTE: Revisions will require a nE:,v plan suhrn't► I and may include additional plan review fes FILE COPY Permit No. 6("I(6 - Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted codo or ordinance. Receipt of approved Field Copy and conditions is aci;not dged: City of Tukwila BUILDING DIVISION SEPARATE PET2iMIT R Qu ��:T) ��FOR: (fid" lechanical Q�Electrical Plumbing Glias Piping City of Tu1kwila Lir 2-1G D ELIS RECEIVED CITY OF TUKWILA FEB 0 6 2018 PERMIT CENTER D I1� WASHINGTON PLACE KITCHEN SHEET LIST TABLE SHEET NUMBER SHEET TITLE E0.01 ELECTRICAL POWER EQUIPMENT SCHEDULE E2.01 ELECTRICAL PARTIAL POWER FLOOR PLANS E6.01 ELECTRICAL POWER ONE -LINE DIAGRAM E7.01 ELECTRICAL PANEL SCHEDULES 1- z w 0 w w 0 a 0 U U W J w o 3'- I0 CDo\ N W ,- NU 04 \ n0 4,44.../ \ 1 \ /...... 111111111.111111111111111 TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com PROJECT TITLE WASHINGTON TOWER PROJECT ADDRESS 223 ANDOVER PARK E TUKWILA, WASHINGTON REVIEWED FOR COMPLIANCE WITH NFPA 70 - NEC FEB 2 2 2018 ,IF 14* City of Tukwila BUILDING DIVISION REVISION DATE DWG ISSUE ISSUED 08/10/17 DATE SHEET TITLE ELECTRICAL POWER EQUIPMENT SCHEDULE DRAWN CHECKED TWE JOB # CLIENT JOB # SHEET SCALE BCY CHL 170204 NONE SHEET NUMBER E0.01 SHEET OF TB.9 -II ill II TB.1 12" HK1 H_FR SEC -HKR SEC i �I. 4 i KITCHEN 124 26 _=====.17.:17- 121- --- 24 11 +NM�30.� +48" 2 1 +120" ELECTRICAL„,_ CONTRACTOR' TO PROVID AND INSTAL " 32 34 DROP CORN% +12" +120" +12" 15 'J +120" +120" 120" 35,37,39;k' ' +84"(16> Til ((_ T C, +48" PARTIAL ELECTRICAL POWER 1ST FLOOR PLAN (KITCHEN AREA) SCALE: 1/4" = 1'-0" HC 20 REFER TO PLAN NOTE 3, TYPICAL UNLESS OTHER WISE NOTED. 7 COFFEE ROOM +48" 115/1 154 , T� 18(GF r _ 3 \ TA.6 TA ) T6 - T6.1 T7.9 PARTIAL ELECTRICAL POWER 1ST FLOOR PLAN (COFFEE AREA) SCALE: 1/4" = 1'-0" TD.2 TD.2 EF -1 26,26 GREASE'DU down to L2 CD Av1C-N2.2- 1 ASA(` -A19 9_1-1 30140 MANE -UP AIR down to L2 18" STAND FOR HEAT PUMPS ON WEST WALL TO CLEAR ROOFING INSULATION (TYP 9), Intake Hood MA r5 7\dWP PVH 3.9 '-0" PVH 3.8 13'-11 It 14x12 - S5 400 PARTIAL ROOF HVAC PLAN AREA E SCALE: 1/4" = 1'-0" T2; ,I ROOM #239 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL DROP CORD 1 +48" 115/1 154 1 17Th PARTIAL ELECTRICAL POWER FLOOR PLAN (2ND FLOOR) SCALE: 1/4" = 1'-0" REFER TO PLAN NOTE 1, TYPICAL GENERAL NOTES 1. ELECTRICAL CONTRACTOR TO COORDINATE ALL EQUIPMENT REQUIREMENTS WITH KITCHEN, HVAC, PLUMBING, AND FIRE ALARM CONTRACTORS. REFER TO MECHANICAL, KITCHEN, END ELECTRICAL. 2. THE CONTRACTOR SHALL PROVIDE AND INSTALL STAINLESS STEEL OUTLET AND RECEPTACLE COVERS IN SERVICE AREAS. 3. THE ELECTRICAL CONTRACTOR SHALL CONNECT ALL REMOTE COMPRESSORS AND PROVIDE DISCONNECTS, MAGNETIC STARTERS, AND THERMAL OVERLOAD PROTECTION AS REQUIRED. 4. THE ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL HEAT TAPE ON DRAIN LINES IN DANGER OF FREEZING. 5. THE ELECTRICAL CONNECTIONS, SPECIFICATIONS AND DIMENSIONS SHOWN ON THESE PLANS ARE FOR FOOD SERVICE EQUIPMENT ONLY. SEE THE ARCHITECT'S PLAN SET FOR ALL OTHER ELECTRICAL REQUIREMENTS FOR THIS PROJECT. 6. ALL ELECTRICAL ROUGH -IN WORK AND ALL FINAL CONNECTIONS FOR ALL ITEMS SHOWN AND SPECIFIED ON THESE PLANS BY CMA SHALL BE PERFORMED BY THE ELECTRICAL CONTRACTOR. 7. UNLESS OTHERWISE SPECIFIED IN THESE PLANS OR OTHER WRITTEN CONTRACTS, IT SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO PROVIDE ALL ELECTRICAL -TYPE MATERIALS INCLUDING WIRING, SWITCHES, DISCONNECTS, FLEX, CONDUIT, CONTRACTORS, TRANSFORMERS, THERMAL OVERLOAD PROTECTORS, MAGNETIC STARTERS, ELECTRICAL PANELS, CORDS, PLUGS, COVERS, ETC. 8. ALL DIMENSIONS SHOWN ARE FROM GRID LINES, FINISHED WALLS OR FINISHED FLOORS TO CENTER LINE OF ELECTRICAL OUTLET BOXES. HEIGHTS ARE NOT TO BE TAKEN FROM CURBS OR PLATFORMS. 9. 10. THE SYMBOLS SHOWN ON THIS PLAN ARE FOR INDICATION OF ROUGH -IN LOCATION AND TYPE OF CONNECTION ONLY. THE ELECTRICAL CONTRACTOR SHALL PROVIDE CIRCUITS AND CONDUIT RUNS AS PER GOOD PRACTICE AND CODE. 10. IT SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO PROVIDE INTERCONNECT SWITCHING BETWEEN THE KITCHEN EXHAUST HOOD EXHAUST FANS AND THE KITCHEN MAKE UP AIR SYSTEMS AS REQUIRED PER LOCAL CODE AND AUTHORITIES. 11. IT SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO PROVIDE ELECTRICAL CONTRACTORS ON ALL ELECTRICAL OUTLET, JUNCTION BOXES, ETC. LOCATED UNDER ANY CLASS 1 EXHAUST HOOD SO AS TO DISCONNECT UPON ACTIVATION OF THE FIRE SUPPRESSION SYSTEM. 12. THE ELECTRICAL CONTRACTOR SHALL PROVIDE FUSED DISCONNECTS FOR EQUIPMENT HOOK-UPS AS REQUIRED BY CODE AND LABELING. 13. ALL GFCI RECEPTACLES SHALL BE LOCATED IN AN ASSESSABLE LOCATION FOR STATIONARY EQUIPMENT. PLAN NOTES O HOMERUN ALL BRANCH CIRCUITS TO PANEL HR2A IN 2ND FLOOR ELECTRICAL ROOM 225. REFER TO ELECTRICAL EQUIPMENT AND PANEL SCHEDULES. • HOMERUN ALL BRANCH CIRCUITS TO PANEL HC1. REFER TO ELECTRICAL EQUIPMENT AND PANEL SCHEDULES. aHOMERUN ALL BRANCH CIRCUITS TO PANEL HKR SECTION I AND 11. REFER TO ELECTRICAL EQUIPMENT AND PANEL SCHEDULES. 4T PROVIDE STARTER DISCONNECT 3/4"C, 4#12, #12G TO HK1-1 • PROVIDE STARTER DISCONNECT 3/4"C, 4#12, #12G TO HK1-7 ELECTRICAL LEGEND O 115 VOLT DUPLEX OUTLET SDI 115 VOLT DCO. DEDICATED/ISOLATED 2O8V SPECIALTY OUTLET 47' X-' STARTER DISCONNECT JUNCTION BOX COMMUNICATIONS GABLE - VERIFY SPEC'S AND REQUIREMENTS WITH OWNER s ON/OFT MOTOR RATED SWITCH CES EXISTING GFCI GM RECEPTACLES SHALL BE PASS + SEYMOUR NO. 2095-W CN) NEW CRS REVISED ELECTRICAL PANEL r ELECTRICAL TRANSFORMER T T KITCHEN ,ELECTRICAL EQUIPMENT RECEIVED CITY OF TUKWILA FEB 0 6 2010 PERMIT CENTER 1 J J w 0 J 0 U U Ld w r 10 o N 0CqC Wiii. IINISIMIIIII TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com PROJECT TITLE WASHINGTON TOWER PROJECT ADDRESS 223 ANDOVER PARK E TUKWILA, WASHINGTON rtEVIEWED FOR CONIPLIAMCE WITH NFPA 70 - NEC FEB 2 2 2010 FEB 2 2 2018 City of Tukwila BUILDING DIVISION City of BUILDING DIVISION REVISION DATE DWG ISSUE ISSUED 08/10/17 DATE SHEET TITLE ELECTRICAL PARTIAL POWER FLOOR PLANS DRAWN CHECKED TWE JOB # CLIENT JOB # SHEET SCALE BCY CHL 170204 1/4" = 1'-0" SHEET NUMBER E2.01 SHEET OF CIRCUIT LEGEND (ALL CONDUCTORS ARE COPPER, UNLESS NOTED OTHERWISE) 34), 3W+G (4 WIRES TOTAL) 34, 3W+N+G (5 WIRES TOTAL) 10, 2W+N+G (4 WIRES TOTAL) CKT ED RACEWAY/WIRE CKT AMPS CKT ID CD RACEWAY/WIRE RACEWAY/WIRE CKT CKT ID RACEWAY/WIRE CKT AMPS (d ( xxs) KVA TYPE 2011 314"C, 3#12, #12G 20 20Y 3/4"C, 4#12, #12G 20 20S 3/4"C, 3#12, #12G 20 30A 3/4"C, 3#10, #10G 30 30Y 314"C, 4#10, #10G 30 30S 3/4"C, 3#10, #10G 30 400 3/4"C, 3#8, #10G 40 40Y 3/4"C, 4#8, #10G 40 40S 3/4"C, 3#8, #10G 40 50A 3/4"C, 3#8, #10G 50 50Y 3/4"C, 4#8, #10G 50 50S 3/4"C, 3#8, #10G 50 60A 1"C, 3#6, #10G 60 60Y 1"C, 4#6, #10G 60 60S 1"C, 3#6, #10G 60 70/1 1-1/4"C, 3#4, #8G 70 70Y 1-1/4"C, 4#4, #8G 70 70S 1-114"C, 3#4, #8G 70 80A 1-1/4"C, 3#4, #8G 80 80Y 1-1/4"C, 4#4, #8G 80 80S 1-1/4"C, 3#4, #8G 80 9011 1-1/4"C, 3#3, #8G 90 90Y 1-1/4"C, 4#3, #8G 90 90S 1-1/4"C, 3#3, #8G 90 1000 1-1/4"C, 3#2, #8G 100 100Y 1-1/4"C, 4#2, #8G 100 100S 1-1/4"C, 3#2, #8G 100 1250 2"C, 3#2/0 AL, #6G 125 125Y 2"C, 4#2/0 AL, #6G 125 125S 2"C, 3#2/0 AL, #6G 125 1500 2"C, 3#3/0 AL, #6G 150 150Y 2"C, 4#3/0 AL, #6G 150 150S 2"C, 3#3/0 AL, #6G 150 175A 2"C, 3#410 AL, #6G 175 175Y 2-1/2"C, 4#4/0 AL, #6G 175- C - - 200A 2-1/2"C, 3-250KCM AL, #6G 200 200Y 2-1/2"C, 4-250KCM AL, #60 200 - - - 225A 2-10C, 3-300KCM AL, #4G 225 225Y 3"C, 4-300KCM AL, #4G 225 - - - 250A 3"C, 3-350KCM AL, #4G 250 250Y 3"C, 4-350KCM AL, #4G 250- 20/1 - - 3000 3"C, 3-500KCM AL, #4G 300 300Y 3-1/2"C, 4-500KCM AL, #4G 300- 20/1 - - 400A 3-1/2"C, 3-500KCM, #3G 400 400Y 4"C, 4-500KCM, #3G 400- 25 - - 6000 2 -SETS [3"C, 3-500KCM AL, #210 AL G] 600 600Y 2 -SETS [3-1/2"C, 4-500KCM AL, #2/0 ALG] 600- - - - 800A 2 -SETS [3-1/2"C, 3-500KCM, #2/0 AL G] 800 800Y 2 -SETS [3-1/2"C, 4-500KCM, #310 AL GI - 34), 4W, NO GND (4 WIRES TOTAL) 2500A 7 -SETS [4"C, 3-500KCM, #600 KCM CU G] 2500 800YB 4 -SETS [2-112"C, 4-250KCM AL, #3/0 AL GI 29 200P 2-1/2"C, 4-250KCM AL 200 - - - 900Y 3 -SETS [3-1/2"C, 4-500KCM, #310 AL G] - 400P 4"C, 4-500KCM 400 - - - 1200Y 4 -SETS [3-1/2"C, 4-500KCM AL, #400 AL G] 0.840 600P 2 -SETS 3"C, 3-500KCM AL 600 - - - 1600Y 6 -SETS [3-1/2"C, 4-500KCM AL, #600 AL G] 11.29 800P 4 -SETS 2-1/2"C, 4-250KCM AL 800 - - - 2500Y 7-SETS[4"C, 4-500KCM AL, #600 KCM AL G] LOAD TYPE 900P 3 -SETS 3-1/2"C, 4-500KCM 900 - - - 3000Y 8-SETS[4"C, 4-500KCM CU, #600 KCM AL G] K 3000P 8 -SETS 4"C, 4-500KCM CU 3000 (E)1200A BUS DUCT BD -1 3 PHASE, 4 WIRE + GROUND LEVEL 3 / 39,669 / n /0 0 /100A / ^ 400A o o 400Y )-(E)HP2 (E)T-2H 75KVA 480/208V - O HR2A (R) HR2B (E) HR2C (E) LEVEL 2 (E)MSB-2 ) 3000A FEED FROM WITH 1600A BREAKER (E)HDB 1600A 1200 0 225 -0 100 0 400 .-. -0 0 200Y) -J 225Y 100 ,849 40.151 (E)T-HY1 45KVA ( 400Y 200 (-DO (200Y ) 200Y 200 0 E)HM 1 42,835 (E)ATS- 2 200A OPTIONAL STANDBY (R)HK1 0 (E)HY1 (E)T-HKR 45 KVA 100A }- 480/208V - 150Y (E)T-HR1 75KVA N)HK SEC N)HKR SEC I I (E)750KW GENERATOR (480Y/277V) LEVEL (1) ELECTRICAL PARTIAL ONE -LINE DIAGRAM SCALE: NONE 0 PANEL (N)HC1 LOCATION: SERVING: FED FROM: ELEC RM 1ST FLR - COFFEE SHOP 208/120 VOLT 100 AMP MAIN LUGS ONLY SCCR: 10,000 A 3 PHASE .AFC: 1,875 A 4 WIRE MOUNTING: SURFACE HOTEL COFFEE SHOP HR1 CKT LOAD DESCRIPTION TYPE KVA A/P PHASE A/P KVA TYPE LOAD DESCRIPTION CKT 1 DISPLACE CASE - ITEM 71 K 1.920 20/1 A A 20/1 0.305 L LTG - RM 116A 2 3 POS TERMINAL - ITEM 73 K 0.360 20/1 6.000 - B 2011 0.760 K UNDERCOUNTER REF - ITEM 87 4 5 UNDER COUNTER REF-ITEM74 K 0.760 20/1 C C 20/1 0.760 K UNDERCOUNTERREF - ITEM 87 6 7 ESPRESSO - ITEM 75 - K - 6.000 - 40/2 - A 20/1 0.660 K UNDERCOUNTER ICE -ITEM 88 8 9 20/1 0 B 20/1 0.660 K UNDERCOUNTERICE-ITEM88 10 11 COFFEE BREWER - ITEM 85 - K - 6.000 - 40/2 - 0.180 20/1 C 20/1 0.720 K FREEZER - ITEM 67 12 13 A 13 BAR COOLER - ITEM 36 20/1 0.720 K FREEZER - ITEM 67 14 15 COFFEE GRINDER - ITEM 76 K 1.500 20/1 HEAT LAMPS - ITEM 13 - 0 15 20/1 1.920 K GRAB & GO -ITEM 68 16 17 COFFEE GRINDER-ITEM86 K 1.500 20/1 BAR SADO- ITEM 17 C 20/1 0.180 R RCPT COUNTER 18 19 COFFEE GRINDER - ITEM 86 K 1.500 20/1 A BAR GLASS WASHER - ITEM 31 - 20/1 0.180 R RCPT WALL 20 21 SPARE S K 20/1 20 B 20/1 - S SPARE 22 23 SPARE S - 20/1 K - 2.500 - C 20/1 - S SPARE 24 25 SPACE S 25 - A 20/1 - - S SPACE 26 27 SPACE S 1.170 - B - - S SPACE 28 29 SPACE S -- 1.680 20/1 C - - S SPACE 30 30 31 FOOD PROCESSOR - ITEM 18 K 0.840 20/1 A 50/2 - 14.000 - K - PHASE LOAD PHASE A= 11.29 KVA PHASE B= 8.20 KVA PHASE C= 6.92 KVA 20/1 6 LOAD TYPE L R M H WH HM D A K LM TOTAL LOADS CONN. LOAD 0.31 0.36 36 37 A 20/1 25.74 S 26.41 KVA 73.29 AMP CALC. LOAD 0.38 0.36 20/1 - S SPARE 40 16.73 SPARE 17.47 KVA 48.50 AMP - NOTES: * = GFCI CIRCUIT BREAKER. C 20/1 PANEL (N)HKR LOCATION: SERVING: FED FROM: KITCHEN 208/120 VOLT 150 AMP BUS RATING SCCR: 10,000 A 3 PHASE 150 AMP MAIN BREAKER AFC: 3,307 A 4 WIRE MOUNTING: SURFACE HOTEL KITCHEN LOADS HK1 (VIA45 KVAXFMR T-HKR) CKT LOAD DESCRIPTION TYPE KVA A/P PRASE A/P KVA TYPE LOAD DESCRIPTION CKT 1 BPR -TEA URN - ITEM 27 K 1.700 20/1 A *20/1 0.700 K FRYER - ITEM 6 2 3 BAR -COFFEE - ITEM 38 - K - 6.000 - 40/2 6 *20/1 0.400 K RANGE CONTROL - ITEM 4 4 5 - C *20/2 - 0.660 - K - OVEN - ITEM 3 - 6 7 BAR -WARNER DRAWER - ITEM 26.1 K 1.000 20/1 A 8 9 RCPT BAR -OUTLETS K 0.180 20/1 B *20/1 0.160 K TILT SKILLET- ITEM 7 10 11 RCPT BAR -POS K 0.180 20/1 C 20/1 0.540 K PRINTER - ITEM 30.1 12 13 BAR COOLER - ITEM 36 K 0.700 20/1 A 20/2 - 2.200 - K - HEAT LAMPS - ITEM 13 - 14 15 BAR COOLER - ITME 37 K 0.700 20/1 B 16 17 BAR SADO- ITEM 17 K 0.900 20/1 C 20/1 0.800 K UNDERCOUNTER REF- ITEM 11 18 19 BAR GLASS WASHER - ITEM 31 - K - 1.450 - 20/2 - A 20/1 1.800 K FOOD WARMER - ITEM 15 20 21 B 20/1 1.800 K FOOD WARMER - ITEM 15 22 23 ICE MACHINE-ITEM24 - K - 2.500 - 20/2 - C 20/1 0.800 K UNDERCOUNTERREF-ITEM9 24 25 A 20/1 2.000 K MICROWAVE OVEN - ITEM 12 26 27 FREEZER - ITEM 23 K 1.170 20/1 B 20/1 0.500 K HOOD CONTROL/FIRE SUPPRESSION 28 29 RICE COOKER - ITEM 15 K 1.680 20/1 C 20/1 - S SPARE 30 31 FOOD PROCESSOR - ITEM 18 K 0.840 20/1 A 50/2 - 14.000 - K - HOT HOLD CAB - ITEM 14 - 32 33 SUCER - ITEM 17 K 0.840 20/1 6 34 35 MIXER - ITEM 16 - - K - - 1.000 - - 20/3 - - C 20/1 - S SPARE 36 37 A 20/1 - S SPARE 38 39 B 20/1 - S SPARE 40 41 SPARE S - 20/1 C 20/1 - S SPARE 42 PHASE LOAD PHASE A= 22.90 KVA PHASE B= 19.48 KVA PHASE C= 11.79 KVA LOAD TYPE L R M H WH HM D A K LM TOTAL LOADS PANEL (N)HKR 47.20 47.20 KVA 131.01 AMP SEC II 6.97 6.97 KVA 19.35 AMP CONN. LOAD 54.17 54.17 KVA 150.36 AMP CALC. LOAD 35.21 35.21 KVA 97.73 AMP PANEL SEC 2 LOCATION: SERVING: FED FROM: KITCHEN 208/120 VOLT 150 AMP MAIN LUGS ONLY 10,000 A 3 PHASE 3,307 A 4 WIRE MOUNTING: SURFACE 3PHASE LOADS SECTION 1 CKT LOAD DESCRIPTION TYPE KVA A/P PHASE A/P KVA TYPE LOAD DESCRIPTION CKT 43 WALK-IN KEG - ITEM 22 BLOWER K 0.240 20/1 A 20/1 0.360 K WALK-IN - ITEM 20 44 45 WALK-IN KEG - ITEM 22.1 - K - 0.950 -- 20/2 B 20/1 0.220 K WALK-IN - ITEM 20.1 BLOWER 46 47 C 20/2 - 1.260 - K - WALK-IN - ITEM 20.2 COMPRESSOR - 48 49 BEER GLYCOL - ITEM 37.2 K 1.440 20/1 A 50 51 SPARE S - 20/1 B 20/2 - 0.250 - K - WALK-IN FREEZER - ITEM 21 - 52 53 SPARE S - 20/1 C 54 55 SPARE S - 20/1 A 20/3 - - 2.250 - - K - - WALK-IN COMPRESSOR - ITEM 21.2 - - 56 57 SPARE S - 20/1 B 58 59 SPARE S - 20/1 C 60 61 SPACE S - - A - - S SPACE 62 63 SPACE S - - B - - S SPACE 64 65 SPACE S - - C - - S SPACE 66 67 SPACE S - - A - - S SPACE 68 69 SPACE S - - B - - S SPACE 70 71 SPACE S - - C - - S SPACE 72 73 SPACE S - - A - - S SPACE 74 75 SPACE S - - B - - S SPACE 76 77 SPACE S - - C - - S SPACE 78 79 SPACE S - - A - - S SPACE 80 81 SPACE S - - B - - S SPACE 82 83 SPACE S - - C - - S SPACE 84 PHASE LOAD PHASE A= 3.42 KVA PHASE B= 1.57 KVA PHASE C= 1.98 KVA LOAD TYPE L R M H WH HM D A K LM TOTAL LOADS CONN. LOAD 6.97 6.97 KVA 19.35 AMP CALC. LOAD 4.53 4.53 KVA 12.58 AMP REQUIRED FEED-THRU LUGS OPTIONS: NOTES: * - PROVIDE SHUNT TRIP BREAKER AND CONTROL BY TYPE I HOOD FIRE SUPPRESSION SYSTEM. NEW ELECTRICAL PANEL SCHEDULES PLAN NOTES 0 PROVIDE PANEL HCI, CONDUIT, WIRING, AND CONNECTIONS AS REQUIRED. PROVIDE NEW 60A/3P BREAKER IN EXISTING PANEL HR1. 0 PROVIDE PANEL HKR, CONDUIT, WIRING, AND CONNECTIONS AS REQUIRED. 0 ADDED LOAD TO EXISTING PANEL. REFER TO PANEL SCHEDULES. RECEIVED CITY OF TUKWILA FEB 0 6 2018 PERMIT CENTER ELI5 1 ,: II ELECTRICAL POWER ONE -LINE fuTh lItt. TRES WEST ENGINEERS TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com PROJECT TITLE WASHINGTON TOWER PROJECT ADDRESS 223 ANDOVER PARK E TUKWILA, WASHINGTON I°�EVIEWEU .FOR OMPLIANCE WITH NFPA 70 - NEC FEB 2 2 2018 City of Tukwila BUILDING DIVISION REVISION DATE DWG ISSUE 08/10/17 ISSUED DATE SHEET TITLE ELECTRICAL POWER ONE -LINE DIAGRAM DRAWN BCY CHECKED CHL TWE JOB # 170204 CLIENT JOB # SHEET SCALE NONE SHEET NUMBER E6.01 SHEET OF PANEL (E)HDB LOCATION: SERVING: FED FROM: ELEC RM IST FLR 480/277 VOLT 1600 AMP MAIN LUGS ONLY SCCR: 65,000 A 3 PHASE AFC: 44,555 A 4 WIRE MOUNTING: SURFACE HOTEL LOADS MSB CKT LOAD DESCRIPTION ' TYPE KVA NP PHASE A/P KVA TYPE LOAD DESCRIPTION CKT 1 PANEL HM1 - - P - - 109.552 - - 400/3 - - A 1200/3 - 915.588 - - P - - HOTEL BUS DUCT (BD -1) - - 2 3 LTG - FITNESS, RESTR MS, LAUNDRY B- 2.394 4 5 B C 6 7 PANEL HL1 NA 200AATS-2) - - P - - 82.659 - - 200/3 - - A- 2.763 20/1 400/3 - - - S SPACE 8 9 SIGN LIGHTING (NOTE 1) B- 7 10 - 5 SPACE 10 11 13 PANEL HP8 - C- 174,444 - - - S SPACE 12 13 PANEL HY1 (VIA45KVAXEMR T-HY1) - - P - - 26.996 - - 100/3 - - A 20/1 0 200/3 - - 64.550 - - P - - PANEL HK1 - - 14 15 18 B SPACE - - 16 17 /3 - - A C 18 19 SPACE S - - A A B 225/3 - 144.459 - - P - - HP3 - - 20 21 SPACE S - -B 20/1 PHASE LOAD PHASE A= B 22 23 SPACE S - - 17 PHASE LOAD PHASE A= C- 24 PHASE LOAD PHASE A= 407.41 KVA PHASE B= 398.63 KVA PHASE C= 393.31 KVA LOAD TYPE L R LOAD TYPE L R M H WH HM D A K LM TOTAL LOADS PANEL (E)HDB SPARE S - 20/1 0.720 B RCPT- RM 260 KVA AMP PANEL HP2 KVA AMP PANEL HM1 SPARE S 107.36 2.19 0.720 5.00 11.47 143.53 KVA 172.63 AMP 28.25 109.55 KVA 131.77 AMP BUS DUCT BD -1 21.12 36.04 692.08 5.00 9.00 132.35 20.00 60.30 KVA 72.62 AMP 11.47 916.69 KVA 1,101.28 AMP PANEL HL1 17.05 19.98 12.51 2.00 1.15 S 31.96 170.36 KVA 204.91 AMP 9.15 82.88 KVA 99.42 AMP PANEL HK1 - 0.54 27.62 2.00 5.00 WALK-IN FREEZER (5 HP) (HOTEL KITCHEN) -- 3.40 177.04 KVA 59.01 PANEL HP8 64.65 KVA 77.64 AMP PANEL HY1 - 0,90 27.30 2.00 33 WALK IN COOLER 0.50 25.60 209.82 AMP PANEL HP10 27.00 KVA 32.47 AMP PANEL HP3 35 4.50 144.46 2.00 20/1 - 3.40 189.93 KVA 228.44 AMP 59.00 144.46 KVA 173.76 MAP CONN. LOAD 38.18 57.46 956.41 7.19 15.15 132.35 52.46 25.60 59.01 59.00 1,343.80 KVA 1,616.35 AMP CALC. LOAD 47.72 33.73 956.41 7.19 15.15 51.70 52.46 25.60 38.36 14.75 1,243.07 KVA 1,495.18 AMP 39 NOTES: R 0.360 20/1 41 PANEL (E)BD-1 LOCATION: SERVING: FED FROM: VERTICAL BUS DUCT (HOTEL) 480/277 VOLT 1200 AMP MAIN LUGS ONLY SCCR: 65,000 A 3 PHASE AFC: 40,151 A 4 WIRE MOUNTING: SURFACE HOTEL LOADS HDB CKT LOAD DESCRIPTION TYPE KVA NP PHASE A/P KVA TYPE LOAD DESCRIPTION CKT 1 PANEL HP2 - P - 143.526 - 400/3 -B - A 100/3 - - 60.295 - - P - - PANEL HR2A(VIA75 KVAXFMR T -2H) - - 2 3 LTG - FITNESS, RESTR MS, LAUNDRY L 2.394 4 5 B C 6 7 PANEL HP4 - P - - 170.360 - - 400/3 - - A 2.763 20/1 400/3 - - 177.038 - - P - - PANEL HP6 - - 8 9 SIGN LIGHTING (NOTE 1) B 7 10 11 0.366 20/1 C 12 13 PANEL HP8 - P - - 174,444 - - 400/3 - - A 9 LTG- HOTEL EXTERIOR (NOTE 1) 400/3 - - 189.925 - - P - - PANEL HP10 - - 14 15 20/1 0 L 16 17 11 LTG - HOTEL EXT. CANOPY (NOTE 1) C 18 19 SPACE - - 5 - - - /3 - - A L LTG - 16TH FLOOR EXTER. (NOTE 1) /3 - - - - - S - - SPACE - - 20 21 A B S 22 23 S SPARE C 24 LTG - POOL AREA (NOTE 1) L 0.768 20/1 PHASE LOAD PHASE A= B KVA PHASE B= 20/1 - S SPARE 16 17 PHASE LOAD PHASE A= 314.82 KVA PHASEB= 307.12 KVA PHASE C= 293.65 KVA 20/1 - S LOAD TYPE L R M 11 WH HM D A K LM TOTAL LOADS PANEL (E)BD-1 SPARE 20 21 SPARE S - 20/1 0.720 B RCPT- RM 260 KVA AMP PANEL HP2 21.12 22 122.40 SPARE S - 20/1 0.720 5.00 11.47 143.53 KVA 172.63 AMP PANEL HR2A SPARE 25.32 5.00 5.00 D - - 12.98 12.00 A 5.00 5.00 60.30 KVA 72.62 AMP PANEL HP4 SPARE 2.52 139.40 RCPT- RM 126, 125 B 26.44 2.00 - S 3.40 170.36 KVA 204.91 AMP PANEL HP6 RCPT - FLOORBOX HOTEL DINING 3.52 139.40 - 4.50 27.62 2.00 31 WALK-IN FREEZER (5 HP) (HOTEL KITCHEN) -- 3.40 177.04 KVA 212.94 AMP PANEL HP8 TYPE I RANGE HOOD 2.34 142.80 - S 27.30 2.00 33 WALK IN COOLER 3.40 174.44 KVA 209.82 AMP PANEL HP10 S 2.34 143.07 35 4.50 38.01 2.00 20/1 - 3.40 189.93 KVA 228.44 AMP CONN. LOAD 21.12 36.04 692.08 5.00 9.00 132.35 20.00 100/3 - - 43.460 - - 11.47 915.59 KVA 1,101.28 AMP CALC. LOAD 26.40 23.02 692.08 5.00 9.00 51.70 20.00 C 42 2.87 830.07 KVA 998.42 AMP R NOTES: PANEL SCHEDULE IS SHOWN FOR VERTICAL BUS DUCT. OVERCURRENT DEVICES SHWON ARE FUSE SIZES REQUIRED AT FUSIBLE 38 39 DISCONNECTS CONNECTED TO BUS DUCT. REFER TO ONE -LINE DIAGRAM. R PANEL (E)HL1 LOCATION: SERVING: FEDFROM: ELEC RM 1ST FLR 480/277 VOLT 200 AMP MAIN LUGS ONLY SCCR: 50,000 A 3 PHASE AFC: 41,084 A 4 WIRE MOUNTING: SURFACE HOTEL LIGHTING LOADS (NEC 702) HOB (VIA 200AATS-2) CKT LOAD DESCRIPTION TYPE KVA A/P PHASE NP KVA TYPE LOAD DESCRIPTION CKT 1 LTG - HOTEL LOBBY/CORRIDORS L 1,740 20/1 A 20/1 2.424 L LTG- EAST SITE (NOTE 1) 2 3 LTG - FITNESS, RESTR MS, LAUNDRY L 2.394 20/1 5 B 20/1 - S SPARE 4 5 LTG - DINING AREA L 2.763 20/1 7 SPACE C 20/1 3.000 L SIGN LIGHTING (NOTE 1) 6 7 LTG - HOTEL ELEV L 0.366 20/1 A SPACE 5 20/1 - S SPARE 8 9 LTG- HOTEL EXTERIOR (NOTE 1) L 0.750 20/1 11 B S 20/1 0.624 L LTG- 16TH FLOOR EXTER. (NOTE 1) 10 11 LTG - HOTEL EXT. CANOPY (NOTE 1) L 0.540 20/1 13 SPACE C 20/1 0.884 L LTG - 16TH FLOOR EXTER. (NOTE 1) 12 13 LTG- KITCHEN L 0.801 20/1 A SPACE S 20/1 - S SPARE 14 15 LTG - POOL AREA (NOTE 1) L 0.768 20/1 PHASE LOAD PHASE A= B KVA PHASE B= 20/1 - S SPARE 16 17 SPARE S - 20/1 M H C 20/1 - S SPARE 18 19 SPARE S - 20/1 A KVA PHASE B. 422.57 20/1 - S SPARE 20 21 SPARE S - 20/1 0.720 B RCPT- RM 260 20/1 - S SPARE 22 23 SPARE S - 20/1 0.720 5.00 C 20/1 - S SPARE 24 25 WALK-IN COOLER (5 HP) (HOTEL KITCHEN) - D - - 6.500 - - 20/3 - - A 5.00 R 20/1 - S SPARE 26 27 RCPT- RM 126, 125 B 0.720 20/1 - S SPARE 28 29 R RCPT - FLOORBOX HOTEL DINING C 20/1 - S SPARE 30 31 WALK-IN FREEZER (5 HP) (HOTEL KITCHEN) -- D - 6.500 - - 20/3 - - A TYPE I RANGE HOOD 30 20/1 - S SPARE 32 33 WALK IN COOLER B 20/1 20/1 - S SPARE 34 35 R 0.540 C 20/1 - S SPARE 36 37 HOOD (HOTEL KITCHEN) (7,5 HP) (NOTE 1) - M - - 9.145 - - 20/3 - - A - 20/1 100/3 - - 43.460 - - P - - PANEL HR1 ('1A75KVAXFMR T-HR1) - - 38 39 RCPT. RM 134 B 37 40 41 0.360 20/1 C 42 R 20/1 0.360 R RCPT. RM 134 38 39 RCPT- DATA 116C R 0.360 20/1 41 B PHASE LOAD PHASE A= 26.69 KVA PHASEB= 25.92 KVA PHASE C= 30.05 KVA RCPT- DATA, 116C R 0,360 LOAD TYPE L R M H WH HM D A K LM TOTAL LOADS PANEL(E)HL1 17.05 A 9.15 5 20/1 - 13.00 SPARE 44 9,15 39.20 KVA 47.15 AMP PANEL HR1 20/1 19.98 3.37 5 1.15 - 18.96 SPARE 46 2.11 43.46 KVA 52.27 AMP CONN. LOAD 17.05 19.98 12.51 C 1.15 - 31.96 SPARE 48 9,15 82.66 KVA 99.42 AMP CALC. LOAD 21.32 14.99 12.51 5 1.15 - 31.96 SPARE 50 2.29 84.22 KVA 101.30 AMP - NOTES: 1.) ROUTE VIA LIGHTING CONTROL PANEL 'LCP-H'. 53 B 5 20/1 PANEL (E)HR1 LOCATION: SERVING: FED FROM: ELEC RM 1ST FLR 208/120 VOLT 225 AMP BUS RATING SCCR: 10,000 A 3 PHASE 225 AMP MAIN BREAKER AFC: 5,922 A 4 WIRE MOUNTING: SURFACE HOTEL RECEPTACLE LOADS HL1 (VIA 75KVA XFMR T -H R1) CKT LOAD DESCRIPTION TYPE KVA A/P PHASE A/P KVA TYPE LOAD DESCRIPTION CKT 1 EF -V9 M 0.528 15/1 A 20/1 1.080 D GAS-FIRED BOILER (13-1) 2 3 RCPT - RM 134 R 0.900 20/1 5 B 20/1 1.080 D GAS-FIRED BOILER (B-2) 4 5 RCPT - RM 134 R 0.900 20/1 7 SPACE C 25/1 2.112 M EF -V11, EF -V12, EF -V13, EF -V14 6 7 RCPT- RM 134 R 0.720 20/1 A SPACE 5 20/1 0.720 R RCPT -DINING 8 9 RCPT-RM117, 118 R 0.900 20/1 11 B S 20/1 - S SPARE 10 11 RCPT-RMI17, 118 R 0.900 20/1 13 SPACE C 20/1 - S SPARE 12 13 RCPT- RM 117, 118 R 0.720 20/1 A SPACE S 20/1 0.720 R RCPT - DINING / EXTERIOR 14 15 RCPT- FRONT DESK R 0.360 20/1 PHASE LOAD PHASE A= 13 KVA PHASE B= 20/1 0.900 R RCPT - DINING /EXTERIOR 16 17 RCPT- FRONT DESK R 0.360 20/1 M H C 15/1 1.152 WH DWI1-5 (WTR HTR) (LEVEL 1) 18 19 RCPT - FRONT DESK R 0.360 20/1 A KVA PHASE B. 422.57 15/1 0.528 M RCP -8 (RECIRC PUMP) (LEVEL 1) 20 21 RCPT - LOBBY, 133, 122 R 0.720 20/1 0.720 B RCPT- RM 260 20/1 0.720 R RCPT - FLOORBOX HOTEL LOBBY 22 23 RCPT- LOBBY, 120, 121, 133 R 0.720 20/1 0.720 5.00 C 20/1 0.720 R RCPT - FLOORBOX HOTEL LOBBY 24 25 RCPT- LOBBY, 121, 128 R 0.900 20/1 A 5.00 R 20/1 0.720 R RCPT - FLOORBOX HOTEL DINING 26 27 RCPT- RM 126, 125 R 0.720 20/1 29 B R 20/1 0.720 R RCPT - FLOORBOX HOTEL DINING 28 29 RCPT- RM 127, 127, EXTERIOR R 0.540 20/1 31 RCPT -RM 134 C 20/1 1.800 D TYPE I RANGE HOOD 30 31 RCPT- RM 126, 127, ST -103 R 0.540 20/1 A WALK IN COOLER D 20/1 0.360 R RCPT. RM 134 32 33 RCPT - ELEV #1, 2, 3 PIT R 0.540 20/1 35 B D 20/1 0.360 R RCPT. RM 134 34 35 SPARE 5 - 20/1 37 RCPT -239 C 20/1 0.360 R RCPT. RM 134 36 37 RCPT- DATA 116C R 0.360 20/1 A RCPT- RM300M R 20/1 0.360 R RCPT. RM 134 38 39 RCPT- DATA 116C R 0.360 20/1 41 B R 20/1 0.360 R RCPT. RM 134 40 41 RCPT- DATA, 116C R 0,360 20/1 43 SPARE C 20/1 0.200 M LOUVERS (L30,31) 42 43 RCPT- DATA, 116C R 0.360 20/1 A SPARE 5 20/1 - S SPARE 44 45 RCPT- DATA, 1160 R 0.360 20/1 47 B 5 20/1 - S SPARE 46 47 RCPT- DATA 116C R 0.360 20/1 49 SPARE C 20/1 - S SPARE 48 49 SPARE S - 20/1 A SPARE 5 20/1 - 5 SPARE 50 51 SPARE S - 20/1 53 B 5 20/1 - S SPARE 52 53 SPARE 8 - 20/1 55 SPARE C 20/1 - S SPARE 54 55 SPARE S - 20/1 A SPARE S 60/3 - - 15.000 - - P - - PANEL HCI (COFFEE SHOP) - - 56 57 SPARE S - 20/1 59 B S 58 59 SPARE S - 20/1 C 60 L R M 11 WH HM D A l< PHASE LOAD PHASE A= 18.39 KVA PHASE B= 21.85 PHASE LOAD PHASE A= 13.98 KVA PHASE B= 14.00 KVA PHASE C.= 15.48 KVA L R M LOAD TYPE L R M H VVH HM 0 A K LM TOTAL LOADS PANEL (E)HR1 36.01 AMP 19.98 3.37 20.64 1.15 5.00 3.96 131.35 AMP PANEL HR2B 2.11 28.46 KVA 79.00 AMP PANEL HC1 0.31 12.98 15.32 5.00 5,00 15.00 36.01 AMP CONN. LOAD 15.00 KVA 41.64 AMP CONN. LOAD 0.31 19.98 3.37 FEED-THRU LUGS 1.15 5.00 18.96 167.36 AMP CALC. LOAD 2.11 43.46 KVA 120.63 AMP CALC. LOAD 0.38 14.99 3.37 1.15 1.25 18.96 131.56 AMP REQUIRED 0.53 39.00 KVA 108.25 AMP NOTES: ALL BOND LETTERING ARE REVISED DEMAND LOAD IN EXISTING PANEL. NOTES: • = GFCI CIRCUIT BREAKER. PANEL (E)HK1 LOCATION: SERVING: FED FROM: KITCHEN 480/277 VOLT 250 AMP MAIN LUGS ONLY SCCR: 25,000 A 3 PHASE AFC: 17,674 A 4 WIRE MOUNTING: SURFACE HOTEL KITCHEN LOADS HDB CKT LOAD DESCRIPTION TYPE KVA A/P PHASE AJP KVA TYPE LOAD DESCRIPTION CKT 1 SPARE 5 - 20/1 A 100/3 - - 64.550 - - P - - PANEL HKR NA 45 KVAXFMR T-HKR) - - 2 3 SPARE S - 20/1 5 B 4 5 SPARE S - 20/1 RCPT- RM 134 R C 6 7 SPACE 5 - - A RC PT - 226, 226B 6 - - 5 SPACE 20/1 9 SPACE 5 - - R B S - - 5 SPACE 10 11 SPACE S - - R RCPT- 200H, 227,228 C - - 5 SPACE 12 13 SPACE S - - A RCPT- 200H, 227, 228 12 - - S SPACE 14 15 SPACE S - - R B 14 - - S SPACE 16 PHASE LOAD PHASE A= 19.89 KVA PHASE B= 22.51 KVA PHASE C= 22.16 KVA 16 17 RCPT - POOL CHEM FEED PUMP LOAD TYPE L R M H WH HM D A K LM TOTAL LOADS PANEL (E)HK1 M - 5.000 - 30/2 - A KVA PHASE B. 422.57 20/1 1.200 R RCPT -FRIDGE KVA AMP PANEL HKR B 0.54 20/1 0.720 5,00 RCPT- RM 260 22 23 59.01 H - 64.55 KVA 77.64 AMP CONN. LOAD S 0.54 20/1 0.720 5.00 RCPT- RM 196, 200,234, 314 24 25 59.01 KVA 64.55 KVA 77.64 AMP CALC. LOAD R 0.54 26 27 5.00 R 0.360 20/1 38.36 B 43.90 KVA 52.80 AMP 0.900 NOTES: RCPT- RM 229, 230 28 29 RCPT- RM 134 PANEL (E)HR2A LOCATION: SERVING: FED FROM: ELEC RM 2ND FLR 208/120 VOLT 225 AMP BUS RATING SCCR: 10,000 A 3 PHASE 225 AMP MAIN BREAKER AFC: 5,863 A 4 WIRE MOUNTING: SURFACE HOTEL LOADS BUS DUCT BD -1 (VIA 75 KVA XFMR T -2H) CKT LOAD DESCRIPTION TYPE KVA A/P PHASE PJP KVA TYPE LOAD DESCRIPTION CKT 1 SPARE S - 20/1 A 20/1 0.720 R RCPT- RM 226, 226B, 225 2 3 RCPT- ICE MAKER 3RD FLR D 1.000 *20/1 5 B 20/1 0.720 R RCPT- RM226, 226B, 225 4 5 RCPT- RM 134 R 0.360 20/1 - - C 20/1 0.900 R RC PT - 226, 226B 6 7 RCPT- RM 134 R 0.360 20/1 A 11 13 20/1 0.900 R RCPT- 200H, 227,228 S 9 RCPT- RM 134 R 0.360 20/1 26.996 - - B A 20/1 0.900 R RCPT- 200H, 227,228 10 11 SPARE S - 20/1 SPACE - 16 C 20/1 0.900 R RCPT- 200H, 227, 228 12 13 RCPT - POOL CHEM CONTROLLER R 1.500 20/1 A 0 225/3 - - 20/1 1.500 R RCPT - RM 239 HOT CART 14 15 RCPT- POOL CHEM FEED PUMP R 1.500 20/1 B B 22 20/1 1.500 R RCPT- RM 239 HOT CART 16 17 RCPT - POOL CHEM FEED PUMP R 1.500 20/1 KVA PHASE C= 302.83 C 20/1 1.500 R RCPT - RM 239 HOT CART 18 19 POOL PUMP - M - 5.000 - 30/2 - A KVA PHASE B. 422.57 20/1 1.200 R RCPT -FRIDGE 20 21 LOAD TYPE B R 20/1 0.720 R RCPT- RM 260 22 23 POOL HEATER - H - 5.000 - 30/2 - SPARE S C 20/1 0.720 R RCPT- RM 196, 200,234, 314 24 25 A KVA AMP 20/1 0.900 R RCPT- RM 229, 230 26 27 RCPT- RM 134 R 0.360 20/1 28.25 B 131.77 AMP 20/1 0.900 R RCPT- RM 229, 230 28 29 RCPT- RM 134 R 0.360 20/1 11.47 963.31 KVA C 20/1 0.900 R RCPT- RM 229, 230 30 31 RCPT -RM 134 R 0.360 20/1 A 94.06 KVA 113.14 AMP 20/1 0.900 R RCPT- RM 231, 232 32 33 WALK IN COOLER D 1.800 20/1 9.15 B 107.86 AMP 20/1 0.900 R RCPT- RM 231, 232 34 35 ICE MACHINE D 1.200 20/1 CONN. LOAD 27.00 KVA C 20/1 0.540 R RCPT- COR, HOTEL 3RD FLR 36 37 RCPT -239 R 0.720 20/1 A 144.46 KVA 173.76 AMP 20/1 - S SPARE 38 39 RCPT- RM300M R 0.360 20/1 59.00 B 1,705.66 AMP 20/1 48.10 31.30 SPARE 40 41 RCPT- RM 300M R 0,360 20/1 14.75 1,289.61 KVA C 20/1 -S R SPARE 42 43 SPARE S H 20/1 A D A 20/1 - S SPARE 44 45 SPARE 5 - 20/1 13.00 B 44 20/1 - S SPARE 46 47 SPARE 5 - 20/1 3.96 SPARE C 20/1 - 5 SPARE 48 49 SPARE S - 20/1 A SPARE 25.74 20/1 - S SPARE 50 51 SPARE 5 - 20/1 16.96 B 25.74 20/1 - S SPARE 52 53 SPARE 5 - 20/1 56 SPARE C 20/1 - 5 SPARE 54 55 SPARE S - 20/1 A SPARE 54 20/1 - S SPARE 56 57 SPARE S - 20/1 P - - B 56 50/2 - 5.000 - D - AV EQUIP RACK - 58 59 SPARE S - 20/1 SPARE S C 60 C 60 L R M 11 WH HM D A l< PHASE LOAD PHASE A= 18.39 KVA PHASE B= 21.85 KVA PHASE C= 20.07 KVA 17.20 KVA PHASE C= 17.40 LOAD TYPE L R M H WI -1 HM D A K LM TOTAL LOADS PANEL (E)HR2A K 25.32 5.00 5.00 36.01 AMP 19.98 12.00 20.64 1.15 5.00 47.32 KVA 131.35 AMP PANEL HR2B 2.11 28.46 KVA 79.00 AMP PANEL HC1 0.31 12.98 15.32 5.00 5,00 12.98 KVA 36.01 AMP CONN. LOAD 25.32 5.00 5.00 0.31 12.98 12.00 FEED-THRU LUGS 1.15 5.00 60.30 KVA 167.36 AMP CALC. LOAD 2.11 17.66 5.00 5.00 0.38 6.49 12.00 1.15 1.25 47.40 KVA 131.56 AMP REQUIRED 0.53 FEED-THRU LUGS 139.62 AMP OPTIONS: ALL BOND LETTERING ARE REVISED DEMAND LOAD IN EXISTING PANEL. NOTES: • = GFCI CIRCUIT BREAKER. EXISTING ELECTRICAL PANEL SCHEDULES FOR (REFERENCE ONLY) PANEL (R)HDB LOCATION: SERVING: FED FROM: ELEC RM 1ST FLR 480/277 VOLT 1600 AMP MAIN LUGS ONLY SCCR: 65,000 A 3 PHASE AFC: 44,555A 4 WIRE MOUNTING: SURFACE HOTEL LOADS MSB CKT LOAD DESCRIPTION TYPE KVA A/P PHASE A/P KVA TYPE LOAD DESCRIPTION CKT 1 PANEL HMI - - P - - 109.552 - - 400/3 - - A 1200/3 - 953.314 - P - - HOTEL BUS DUCT (BD -1) - - 2 3 LTG - FITNESS, RESTRMS, LAUNDRY- B 2.394 4 5 B 0 6 7 PANEL HL1 (V1A200AATS-2) - - P - - 94.064 - - 200/3 - - A 2.763 20/1 - - S SPACE 8 9 SIGN LIGHTING (NOTE 1) B 7 - - 5 SPACE 10 11 13 PANEL HP8 - - C - - S SPACE 12 13 PANEL HY1 (VIA45KVAXEMR T-HY1) - - P - - 26.996 - - 100/3 - - A 20/1 B 200/3 - - 89.674 - - P - - PANEL H K1 - - 14 15 18 B SPACE - 16 17 /3 - - A C 18 19 SPACE S - - A A 0 225/3 - - 144.459 - .. P - - HP3 - - 20 21 SPACE S - - 20/1 B 6 22 23 SPACE S SPARE - 17 PHASELOAD PHASE A= C 24 319.06 KVA PHASE C= 302.83 KVA 20/1 - S LOAD TYPE L 0 M H WH PHASE LOAD PHASE A= 446.16 KVA PHASE B. 422.57 KVA PHASE C= 405.88 KVA SPARE 20 21 LOAD TYPE L R M H WH HM D A K LM TOTAL LOADS PANEL (R)HDB SPARE S 0.720 20/1 0,720 R 11.47 143.63 KVA 172.63 AMP PANEL HR2A KVA AMP PANEL HM1 5.00 D - 107.36 2,19 A 45.41 5.00 98.02 KVA 117.90 AMP 28.25 109.65 KVA 131.77 AMP BUS DUCT BD -1 21.12 31.36 692.08 5.00 9.00 132.35 17.00 170.36 KVA 45.41 11.47 963.31 KVA 1,146.66 AMP PANEL HL1 17.36 20.34 12.51 2.003,40 1.15 WALK-IN FREEZER (5 HP) (HOTEL KITCHEN) 16.96 177.04 KVA 25.74 9.15 94.06 KVA 113.14 AMP PANEL HKI - S 15.46 2.00 33 SPARE 3.40 174.44 KVA 74.21 9.15 89.67 KVA 107.86 AMP PANEL HY1 35 0.90 38.01 2.00 20/1 - 0.50 25.60 228.44 AMP CONN. LOAD 27.00 KVA 32.47 AMP PANEL HP3 5.00 9.00 144.46 17.00 100/3 - - 45.41 11,47 953.31 KVA 1,146.66 AMP 59.00 144.46 KVA 173.76 AMP CONN. LOAD 38.48 52.60 971.88 7.19 10.15 132.35 34.46 25.60 145.36 59.00 1,418.06 KVA 1,705.66 AMP CALC. LOAD 48.10 31.30 971.88 7.19 10.15 ,_ 51.70 34.46 25.60 94.48 14.75 1,289.61 KVA 1,651.16 AMP KVA NOTES: R 0.360 LOAD TYPE L PANEL (R)BD-1 LOCATION: SERVING: FED FROM: VERTICAL BUS DUCT (HOTEL) 480/277 VOLT 1200 AMP MAIN LUGS ONLY SCCR: 65,000 A 3 PHASE AFC: 40,151 A 4 WIRE MOUNTING: SURFACE HOTEL LOADS HDB CKT LOAD DESCRIPTION TYPE KVA A/P PHASE A/P KVA TYPE LOAD DESCRIPTION CKT 1 PANEL HP2 - - P - 143.526 - 400/3 - - A 100/3 - - 98.021 - - P - - PANEL HR2A (\AA 75 KVAXFMR T -2H) - - 2 3 LTG - FITNESS, RESTRMS, LAUNDRY- El 2.394 4 --- 5 B C 6 7 PANEL HP4 - P - - 170.360 - - 400/3 - - A 2.763 20/1 400/3 - - 177.038 - - P - - PANEL HP6 - - 8 9 SIGN LIGHTING (NOTE 1) B 7 10 11 0.366 20/1 C 12 13 PANEL HP8 - - P - - 174.444 - - 400/3 - - A 9 LTG- HOTEL EXTERIOR (NOTE 1) 400/3 - - 189.925 - - P - - PANEL HP10 - - 14 15 20/1 B L 16 17 11 LTG - HOTEL EXT. CANOPY (NOTE 1) C 18 19 SPACE - S - - - - - /3 - - A L LTG - 16TH FLOOR EXTER. (NOTE 1) /3 - - - - - 5 - - SPACE - - 20 21 A 0 M 22 23 5 SPARE C 24 LTG - POOL AREA (NOTE 1) L 0.768 20/1 6 20/1 - S SPARE 16 17 PHASELOAD PHASE A= 331.43 KVA PHASE B= 319.06 KVA PHASE C= 302.83 KVA 20/1 - S LOAD TYPE L 0 M H WH HM D A K LM TOTAL LOADS PANEL (R)BD-1 SPARE 20 21 SPARE S 0.720 20/1 0.720 B RCPT- RM 260 KVA AMP PANEL HP2 21.12 22 122.40 SPARE S 0.720 20/1 0,720 R 11.47 143.63 KVA 172.63 AMP PANEL HR2A SPARE 20.64 5.00 5.00 D - 12.98 9.00 A 45.41 5.00 98.02 KVA 117.90 AMP PANEL HP4 SPARE 2.52 139.40 RCPT- RM 126, 125 B 26.44 2.00 - S 3.40 170.36 KVA 204.91 AMP PANEL 1-1P6 RCPT- FLOORBOX HOTEL DINING 3.52 139.40 - 4.50 27.62 2.003,40 31 WALK-IN FREEZER (5 HP) (HOTEL KITCHEN) D - - 177.04 KVA 212.94 AMP PANEL HP8 TYPE 1 RANGE HOOD 2.34 142.80 - S 27.30 2.00 33 SPARE 3.40 174.44 KVA 209.82 AMP PANEL HPIO S 2.34 143.07 35 4.50 38.01 2.00 20/1 - 3.40 189.93 KVA 228.44 AMP CONN. LOAD 21.12 31.36 , 692.08 5.00 9.00 132.35 17.00 100/3 - - 45.41 11,47 953.31 KVA 1,146.66 AMP CALC. LOAD 26.40 20.68 692.08 5.00 9.00 51.70 17,00 C 45.41 2.87 870.14 KVA 1,046.61 AMP R NOTES: PANEL SCHEDULE IS SHOWN FOR VERTICAL BUS DUCT. OVERCURRENT DEVICES SHWON ARE FUSE SIZES REQUIRED AT FUSIBLE 38 39 DISCONNECTS CONNECTED TO BUS DUCT. REFER TO ONE -LINE DIAGRAM. R PANEL (R)HL1 LOCATION: SERVING: FED FROM: ELEC RM 1ST FLR 480/277 VOLT 200 AMP MAIN LUGS ONLY SCCR: 60,000 A 3 PHASE AFC: 41,084 A 4 WIRE MOUNTING: SURFACE HOTEL LIGHTING LOADS (NEC 702) HOB (V1A 200A ATS -2) CKT LOAD DESCRIPTION TYPE KVA A/P PHASE A/P KVA TYPE LOAD DESCRIPTION CKT 1 LTG - HOTEL LOBBY/CORRIDORS L 1.740 20/1 A 20/1 2.424 L LTG - EAST SITE (NOTE 1) 2 3 LTG - FITNESS, RESTRMS, LAUNDRY- L 2.394 20/1 5 B 20/1 - S SPARE 4 5 LTG - DINING AREA L 2.763 20/1 * 30/3 - - 20.040 - - C 20/1 3.000 L SIGN LIGHTING (NOTE 1) 6 7 LTG - HOTEL ELEV L 0.366 20/1 A 12 13 20/1 - S SPARE 8 9 LTG- HOTEL EXTERIOR (NOTE 1) L 0.750 20/1 SPARE B 15 20/1 0.624 L LTG- 16TH FLOOR EXTER. (NOTE 1) 10 11 LTG - HOTEL EXT. CANOPY (NOTE 1) L 0.540 20/1 SPARE 16 C 20/1 0.884 L LTG - 16TH FLOOR EXTER. (NOTE 1) 12 13 LTG- KITCHEN L 0.801 20/1 A R M 20/1 - 5 SPARE 14 15 LTG - POOL AREA (NOTE 1) L 0.768 20/1 6 20/1 - S SPARE 16 17 SPARE S 0.360 20/1 C 20/1 - S SPARE 18 19 SPARE S 0.360 20/1 A 15.46 20/1 - S SPARE 20 21 SPARE S 0.720 20/1 0.720 B RCPT- RM 260 20/1 - S SPARE 22 23 SPARE S 0.720 20/1 0,720 R C 20/1 - S SPARE 24 25 WALK-IN COOLER (5 HP) (HOTEL KITCHEN) - D - 6.500 - 20/3 - - A RCPT- RM 134 R 20/1 - 5 SPARE 26 27 RCPT- RM 126, 125 B 0.720 20/1 - S SPARE 28 29 R RCPT- FLOORBOX HOTEL DINING C 20/1 - S SPARE 30 31 WALK-IN FREEZER (5 HP) (HOTEL KITCHEN) D - - 6.500 -- -- 20/3 A TYPE 1 RANGE HOOD 30 20/1 - S SPARE 32 33 SPARE B 20/1 20/1 - S SPARE 34 35 R 0.540 C 20/1 - S SPARE 36 37 HOOD (HOTEL KITCHEN) (7.5 HP) (NOTE 1) - M - 9.145 _- -- 20/3 A - 20/1 100/3 - - 54.865 - - P - - PANEL HR1 (VIA75KVAXFMR T-HR1) - - 38 39 RCPT. RM 134 B 37 40 41 0.360 20/1 C 42 R 20/1 0.360 R RCPT. RM 134 38 39 RCPT - DATA, 116C R 0.360 20/1 20/1 B PHASE LOAD PHASE A= 32.97 KVA PHASE B= 29.12 KVA PHASE C= 31.97 KVA RCPT - DATA 116C R 0.360 LOAD TYPE L R M H WH HM D A K LM TOTAL LOADS PANEL(R)HL1 17.05 A 9.15 K - 20/1 - 13.00 SPARE 44 9.15 39.20 KVA 47,15 AMP PANEL HR1 0.31 20.34 3.37 ICE MACHINE - ITEM 112 - 239 - 1.15 - 3.96 SPARE 25.74 2.11 54.87 KVA 65.99 AMP CONN. LOAD 17.36 20.34 12.51 C 1.15 - 16.96 SPARE 25.74 9.15 94.06 KVA 113.14 AMP CALC. LOAD 21.70 15.17 12.51 1.800 1.15 - 16.96 SPARE 25.74 2.29 95.52 KVA 114.89 AMP - NOTES: 1.) ROUTE VIA LIGHTING CONTROL PANEL 'LCP-H'. 0 1.800 20/1 REVISED ELECTRICAL PANEL SCHEDULES PANEL (R)HR1 LOCATION: ELEC RM 1ST FLR 208/120 VOLT 225 AMP BUS RATING SCCR: 10,000 A 3 PHASE 225 AMP MAIN BREAKER AFC: 6,922 A 4 WIRE MOUNTING: SURFACE SERVING: HOTEL RECEPTACLE LOADS FED FROM: H LI (VIA75KVAXFMR T-HR1) CKT LOAD DESCRIPTION TYPE KVA A/P PHASE A/P KVA TYPE LOAD DESCRIPTION CKT 1 EF -V9 M 0.528 15/1 A 20/1 1.080 D GAS-FIRED BOILER (B-1) 2 3 RCPT- RM 134 R 0.900 20/1 5 0 20/1 1.080 D GAS-FIRED BOILER (B-2) 4 5 RCPT - RM 134 R 0.900 20/1 * 30/3 - - 20.040 - - C 25/1 2.112 M EF -V11, EF -V12, EF -V13, EF -V14 B 7 RCPT - RM 134 R 0.720 20/1 A 12 13 20/1 0.720 R RCPT - DINING 8 9 RCPT -0M117, 118 R 0.900 20/1 SPARE B 15 20/1 - 5 SPARE 10 11 RCPT- RM 117, 118 R 0.900 20/1 SPARE 16 C 20/1 - S SPARE 12 13 RCPT- RM 117, 118 R 0.720 20/1 A R M 20/1 0.720 R RCPT - DINING / EXTERIOR 14 15 RCPT - FRONT DESK R 0.360 20/1 13 20/1 0.900 R RCPT- DINING / EXTERIOR 16 17 RCPT - FRONT DESK R 0.360 20/1 C 15/1 1.152 WH DVVI-1-5 (VVTR HTR) (LEVEL 1) 18 19 RCPT- FRONT DESK R 0.360 20/1 A 15.46 15/1 0.528 M RCP -B (RECIRC PUMP) (LEVEL 1) 20 21 RCPT - LOBBY, 133, 122 R 0.720 20/1 0.720 13 RCPT- RM 260 20/1 0.720 R RCPT - FLOORBOX HOTEL LOBBY 22 23 RCPT- LOBBY, 120, 121, 133 R 0.720 20/1 0,720 R C 20/1 0.720 R RCPT- FLOORBOX HOTEL LOBBY 24 25 RCPT- LOBBY, 121, 128 R 0.900 20/1 A RCPT- RM 134 R 20/1 0.720 R RCPT - FLOORBOX HOTEL DINING 26 27 RCPT- RM 126, 125 R 0.720 20/1 29 B R 20/1 0,720 R RCPT- FLOORBOX HOTEL DINING 28 29 RCPT- RM 127, 127, EXTERIOR R 0.540 20/1 31 RCPT- 0M134 C 20/1 1.800 D TYPE 1 RANGE HOOD 30 31 RCPT- RM 126, 127,ST-103 R 0.540 20/1 A SPARE S 20/1 0,360 R RCPT. RM 134 32 33 RCPT - ELEV#1, 2, 3 PIT R 0.540 20/1 35 B S 20/1 0.360 R RCPT. RM 134 34 35 SPARE S - 20/1 37 RCPT -239 C 20/1 0.360 R RCPT. RM 134 36 37 RCPT- DATA, 116C R 0.360 20/1 A RCPT- RM 300M R 20/1 0.360 R RCPT. RM 134 38 39 RCPT - DATA, 116C R 0.360 20/1 20/1 B 20/1 0.360 R RCPT. RM 134 40 41 RCPT - DATA 116C R 0.360 20/1 20/1 A C 20/1 0.200 M LOUVERS (L30,31) 42 43 RCPT - DATA, 116C R 0.360 20/1 A 8.112 - K - 20/1 - S SPARE 44 45 RCPT - DATA 116C R 0.360 20/1 48 B ICE MACHINE - ITEM 112 - 239 - 20/1 - S SPARE 46 47 RCPT - DATA, 116C R 0.360 20/1 50 51 C 20/1 - S SPARE 48 49 SPARE S - 20/1 A 20/1 1.800 20/1 - 5 SPARE 50 51 SPARE S - 20/1 0 1.800 20/1 -8 56 SPARE 52 53 SPARE S - 20/1 50/2 - C 20/1 - S SPARE 54 55 SPARE S - 20/1 A _._ 60 *60/3 - - 26.405 - - P - - PANEL HC1 (COFFEE SHOP) - - 56 57 SPARE S - 20/1 B PHASE LOAD PHASE A= 58 59 SPARE S - 20/1 C 60 L R M 11 WH HM D A l< LM TOTAL LOADS PANEL (R)HR2A PHASE LOAD PHASE A= 20.26 KVA PHASE B= 17.20 KVA PHASE C= 17.40 KVA 45.41 5.00 85.06 KVA LOAD TYPE L R M H VvH HM ID A K LM TOTAL LOADS PANEL(R)HR1 36.01 AMP 19.98 3.37 20.64 1.15 5,00 3.96 12.98 9.00 2.11 28.46 KVA 79.00 AMP PANEL HC1 0.31 0.36 15.32 5.00 5,00 6.49 25.74 26.41 KVA 73,29 AMP CONN. LOAD 0.31 20,34 3.37 FEED-THRU LUGS 1.15 3.96 25.74 2.11 54.87 KVA 152.29 AMP CALC. LOAD 0.38 15.17 3.37 1.15 3.96 25.74 0.53 60.30 KVA 139.62 AMP NOTES: * - PROVIDE NEW 60A/3P BREAKER IN SPARE SPACE ALL BOND LETTERING ARE REVISED DEMAND LOAD IN EXISTING PANEL. PANEL (R)HK1 LOCATION: SERVING: FED FROM: KITCHEN 480/277 VOLT 250 AMP MAIN LUGS ONLY SCCR: 26,000 A 3 PHASE AFC: 17,674 A 4 WIRE MOUNTING: SURFACE HOTEL KITCHEN LOADS HDB CKT LOAD DESCRIPTION TYPE KVA NP PI4ASE A/P KVA TYPE LOAD DESCRIPTION CKT 1 KITCHEN EF -1 - ' - M - - 9.145 - - *20/3 - -0 A 100/3 - - 54.170 - - p - - PANEL H KR (V1A45 KVAXFMR T-HKR) - - 2 3 RCPT - ICE MAKER 3RD FLR B 1.000 4 5 B 20/1 6 7 KITCHEN MUA-1 - M - - 6.319 - - * 20/3 - - A 0.360 20/1 * 30/3 - - 20.040 - - K - - DISHWASHER - ITEM 19 - 124 - - 8 9 RCPT- 226, 226B B 7 10 11 0.360 20/1 C 12 13 SPARE S - 20/1 A 9 RCPT- RM 134 20/1 - 5 SPARE 14 15 SPARE S - 20/1 10 B SPARE 20/1 - S SPARE 16 PHASE LOAD PHASE A= 34.73 KVA PHASEB= 31.31 KVA PHASE C= 23.63 KVA RCPT - POOL CHEM CONTROLLER R 1.500 LOAD TYPE L R M H W-1 HM D A K LM TOTAL LOADS PANEL (R)HK1 20/1 15.46 20/1 - S SPARE 20.04 9.15 35.60 KVA 42.70 AMP PANEL HKR 20/1 C 20/1 - S SPARE 54.17 19 64.17 KVA 65.16 AMP CONN. LOAD 30/2 - A 15.46 20/1 1.200 R RCPT -FRIDGE 74.21 9.15 89.67 KVA 107.86 AMP CALC. LOAD 20/1 0.720 15.46 RCPT- RM 260 22 23 POOL HEATER - H - 48.24 2.29 65.99 KVA 79.37 AMP 0 NOTES: * - PROVIDE NEW BREAKER IN SPARE SPACE. 0,720 R ALL BOND LETTERING ARE REVISED DEMAND LOAD IN EXISTING PANEL. 24 PANEL (R)HR2A LOCATION: SERVING: FED FROM: ELEC RM 2ND FLR 208/120 VOLT 225 AMP BUS RATING SCCR: 10,000 A 3 PHASE 225 AMP MAIN BREAKER AFC: 6,863 A 4 WIRE MOUNTING: SURFACE HOTEL LOADS BUS DUCT BD -1 NIA75 KVAXFMR T -2H) CKT LOAD DESCRIPTION TYPE KVA NP PHASE A/P KVA TYPE LOAD DESCRIPTION CKT 1 SPARE S 20/1 A 20/1 0.720 R RCPT- RM 226, 226B, 225 2 3 RCPT - ICE MAKER 3RD FLR D 1.000 *20/1 B 20/1 0.720 R RCPT- RM226, 22613, 225 4 5 RCPT- RM 134 R 0.360 20/1 C 20/1 0.900 R RCPT- 226, 226B 7 RCPT - RM 134 R 0.360 20/1 A 20/1 0.900 R RCPT- 200H, 227, 228 8 9 RCPT- RM 134 R 0.360 20/1 B 20/1 0.900 R RCPT -2001-I, 227, 228 10 11 SPARE S - 20/1 C 20/1 0.900 R RCPT- 200H, 227,228 12 13 RCPT - POOL CHEM CONTROLLER R 1.500 20/1 A 20/1 - S SPARE 14 15 RCPT - POOL CHEM FEED PUMP R 1.500 20/1 B 20/1 - S SPARE 16 17 RCPT - POOL CHEM FEED PUMP R 1.500 20/1 C 20/1 - S SPARE 18 19 POOL, PUMP - M - 5.000 - 30/2 - A 20/1 1.200 R RCPT -FRIDGE 20 21 B 20/1 0.720 R RCPT- RM 260 22 23 POOL HEATER - H - 5.000 - 30/2 - 0 20/1 0,720 R RCPT- RM 196, 200, 234,314 24 25 A 20/1 0.900 R RCPT- RM 229, 230 26 27 RCPT- RM 134 R 0.360 20/1 B 20/1 0.900 R RCPT- RM 229, 230 28 29 RCPT- RM 134 R 0.360 20/1 C 20/1 0.900 R RCPT- RM 229, 230 30 31 RCPT- 0M134 R 0.360 20/1 A 20/1 0.900 R RCPT- RM 231, 232 32 33 SPARE S - 20/1 B 20/1 0.900 R RCPT-RM231, 232 34 35 SPARE S - 20/1 C 20/1 0.540 R RCPT - COR, HOTEL 3RD FLR 36 37 RCPT -239 R 0.540 20/1 A **50/2 - 8.112 - K - HOT CART - ITEM 102 -239 - 38 39 RCPT- RM 300M R 0.360 20/1 B 40 41 RCPT- RM300M R 0.360 20/1 C **50/2 - 8.112 - K - HOT CART - ITEM 102 - 239 - 42 43 WALK IN COOLER - ITEM 100 -239 K 1.800 20/1 A 44 45 WALK IN COOLER - ITEM 100 -239 K 1.800 20/1 B **50/2 - 8.112 - K - HOT CART • ITEM 102 - 239 - 46 47 REACH -IN REF - ITEM 111 -239 K 0.720 20/1 C 48 49 ICE MACHINE - ITEM 112 - 239 - K - 2.538 - **20/2 - A **50/2 - 8.112 - K - HOT CART - ITEM 102 - 239 - 50 51 B 52 53 5 -HANGING HEAT LAMPS -ITEM 107-239 K 1.260 20/1 C 20/1 1.800 K INDUCTION WARNER - ITEM 106 - 239 54 55 5 -HANGING HEAT LAMPS -ITEM 107-239 K 1.250 20/1 A 20/1 1.800 K INDUCTION WARNER - ITEM 105 - 239 56 57 SPARE S - 20/1 B 50/2 - 8.000 - D - AV EQUIP RACK - 58 59 SPARE S - 20/1 C _._ 60 PHASE LOAD PHASE A= 34.99 KVA PHASE B= 33.78 KVA PHASE C= 29.25 KVA LOAD TYPE L R M 11 WH HM D A l< LM TOTAL LOADS PANEL (R)HR2A 20.64 5.00 5.00 9.00 45.41 5.00 85.06 KVA 236.06 AMP PANEL HR2B 12.98 12.98 KVA 36.01 AMP CONN. LOAD 20.64 5.00 5,00 12.98 9.00 45.41 5.00 98.02 KVA 272.08 AMP CALC. LOAD 15.32 5.00 5,00 6.49 9.00 29.51 1.25 71.57 KVA 198.66 AMP REQUIRED FEED-THRU LUGS OPTIONS: NOTES: * = GFCI CIRCUIT BREAKER. ** = PROVIDE NEW BREAKER IN SPARE SPACE. ALL BOND LETTERING ARE REVISED DEMAND LOAD IN EXISTING PANEL. RECEIVED CITY OF TUKWILA FEB 0 6 2018 PERMIT CENTER EL1 11 443 JW...... --a. itt TRES WEST ENGINEERS J. TRES WEST ENGINEERS, INC. 2702 SOUTH 42ND STREET, SUITE 301 TACOMA, WA 98409-7315 Phone: 253.472.3300 www.treswest.com PROJECT TITLE WASHINGTON TOWER PROJECT ADDRESS 223 ANDOVER PARK E TUKWILA, WASHINGTON {Ni 2. 2010 dila STU14g BUILDING DIVI°10 REVISION DATE DWG ISSUE ISSUED 08/10/17 DATE SHEET TITLE ELECTRICAL PANEL SCHEDULES DRAWN CHECKED TWE JOB # CLIENT JOB # SHEET SCALE BCY CHL 170204 NONE SHEET NUMBER E7.01 SHEET OF