HomeMy WebLinkAboutSpecial 2023-06-12 Item 2C - Bid Award / Contract - Andover Park West & 58th Avenue South Sewer Repair with Northwest Cascade for $1,193,891.38 (Plus Contingency)ITEM INFORMATION STAFF SPONSOR: ADIB ALTALLAL ORIGINAL AGENDA DATE: 06/12/23 AGENDA ITEM TITLE APW & 68TH AVE S Sewer Repair Project CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date Mtg Date 06/12/23 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date SPONSOR Council Mayor HR DCD Finance Fire TS P&R Police PW Court SPONSOR’S SUMMARY This project aims to repair two critical sewer locations identified in the Sewer Comprehensive Plan. A call for bids was advertised for the APW & 58th Ave S Sewer Repair Project on May 11, and May 18, 2023. Three bids were opened on May 25, 2023, and the confirmed lowest bidder was Northwest Cascade Inc with a bid of $1,193,891.38. Council is being asked to approve the construction award with Northwest Cascade Inc in the amount of $1,193,891.38 (plus contingency) for the APW & 58th Ave S Sewer Repair Project. REVIEWED BY Trans&Infrastructure CommunitySvs/Safety Finance Comm. Planning/Economic Dev. LTAC Arts Comm. Parks Comm. Planning Comm. DATE: 06/05/23 COMMITTEE CHAIR: TOSH SHARP RECOMMENDATIONS: SPONSOR/ADMIN. Public Works Department COMMITTEE Unanimous Approval; Forward to Special Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $1,193,891.38 $1,850,000.00 $0.00 Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 06/12/23 MTG. DATE ATTACHMENTS 06/12/23 Informational Memorandum dated 06/02/23 2023 CIP, Page 65 Northwest Cascade Inc Construction Contract Bid Tabulation Minutes from T&I Committee meeting of 06/05/23 (distributed separately) COUNCIL AGENDA SYNOPSIS ----------------------------------Initials --------------------------------- ITEM NO. Meeting Date Prepared by Mayor’s review Council review 06/12/23 JR Spec 2.C. 145 146 INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Hari Ponnekanti, Public Works Director /City Engineer BY: Adib Altallal, Utilities Engineer CC: Mayor Allan Ekberg DATE: June 2, 2023 SUBJECT: APW & 58th Ave S Sewer Repair Project Project No. 9140203/80040201 Construction Bid Award ISSUE Approve construction bid award with Northwest Cascade Inc for the APW & 58th Ave S Sewer Repair Project. BACKGROUND In 2021, the City contracted with RH2 Engineers as the design consultant for the APW & 58th Ave S Sewer Repair Project under Contract No. 21-168. This project aims to repair two critical sewer locations identified in the Sewer Comprehensive Plan. DISCUSSION A call for bids was advertised for the APW & 58th Ave S Sewer Repair Project on May 11, and May 18, 2023. Three bids were opened on May 25, 2023, and the confirmed lowest bidder was Northwest Cascade Inc with a bid of $1,193,891.38. The engineer’s estimate was $1,080,632.00. APW & 58th Ave S Sewer Repair Project Bid Tabulation Contractor Bid Total Northwest Cascade, Inc. $1,193,891.38 McCann Construction Ent. Inc. $1,209,877.89 Rodarte Construction, Inc. $1,246,948.56 FINANCIAL IMPACT Construction costs associated with the APW & 58th Ave S Sewer Repair Project will be 100% funded by the Sewer Enterprise Fund. Cost Estimate 2023-2024 Budget Contract $1,193,891.38 Contingency – 15% $179,083.71 Total $1,372,975.09 $1,850,000.00 RECOMMENDATION Council is being asked to approve the construction award with Northwest Cascade Inc in the amount of $1,193,891.38 (plus contingency) for the APW & 58th Ave S Sewer Repair Project and consider this item on the Consent Agenda at the June 12, 2023 Special Meeting. Attachments: 2023 CIP, Page 65 Northwest Cascade Inc Construction Contract & Bid Tabulation 147 148 6565 149 150 CODE 5BCODE 5BCODE 5B151 CODE 5BCODE 5BCODE 5BCODE 5B152 CODE 5BCODE 5B153 CODE 5BCODE 5B154 CODE 5BCODE 5B155 CODE 5BCODE 5BCODE 5B156 CODE 5BCODE 5BCODE 5B157 CODE 5BCODE 5B158 CODE 5BCODE 5B159 CODE 5BCODE 5B160 CODE 5BCODE 5B161 CODE 5BCODE 5BCODE 5B162 CODE 5BCODE 5B163 CODE 5BCODE 5BCODE 5B164 CODE 5BCODE 5B165 CODE 5BCODE 5BCODE 5B166 CODE 5BCODE 5B167 CODE 5BCODE 5B168 CODE 5BCODE 5B169 CODE 5BCODE 5B170 CODE 5BCODE 5B171 CODE 5BCODE 5B172 CODE 5BCODE 5B173 CODE 5BCODE 5B174 CODE 5BCODE 5B175 CODE 5BCODE 5B176 CODE 5BCODE 5BCODE 5B177 CODE 5BCODE 5BCODE 5B178 CODE 5BCODE 5BCODE 5B179 CODE 5BCODE 5B180 City of Tukwila Low bidder Error Item No.Item Description Quantity Unit Unit Price Total Amount Quantity Unit Unit Price Total Amount Quantity Unit Unit Price Total Amount Quantity Unit Unit Price Total Amount 1 Mobilization/Demolition (10% Max.)1 LS 89,300$ 89,300$ 1 LS 108,375$ 108,375$ 1 LS 100,000$ 100,000$ 1 LS 50,000$ 50,000$ 2 Traffic Control, Temporary Traffic Control & Flagger Labor 1 LS 75,000$ 75,000$ 1 LS 120,000$ 120,000$ 1 LS 110,000$ 110,000$ 1 LS 180,000$ 180,000$ 3 Temporary Erosion Control 1 LS 10,000$ 10,000$ 1 LS 40,000$ 40,000$ 1 LS 12,500$ 12,500$ 1 LS 7,500$ 7,500$ 4 Trench Safety and Shoring (Minimum bid of $1000.00)1 LS 25,000$ 25,000$ 1 LS 50,000$ 50,000$ 1 LS 18,500$ 18,500$ 1 LS 1,000$ 1,000$ 5 Dewatering using Sumping Only - 58th Avenue S Project Site 1 LS 5,000$ 5,000$ 1 LS 10,250$ 10,250$ 1 LS 5,000$ 5,000$ 1 LS 20,000$ 20,000$ 6 Dewatering using Sumping Only - Andover Park West Project Site 1 LS 15,000$ 15,000$ 1 LS 10,250$ 10,250$ 1 LS 5,000$ 5,000$ 1 LS 25,000$ 25,000$ 6A Dewatering Vacuum Wellpoint System, if Needed to Support Sumping - Andover Park West Project Site 1 LS 100,000$ 100,000$ 1 LS 3,000$ 3,000$ 1 LS 25,000$ 25,000$ 1 LS 50,000$ 50,000$ 6B Supplemental Dewatering Vacuum Wellpoint System, if Needed to Support Sumping - Andover Park West Project Site 1 LS 50,000$ 50,000$ 1 LS 3,000$ 3,000$ 1 LS 10,000$ 10,000$ 1 LS 50,000$ 50,000$ 7 Pothole Existing Utilites and Groundwater 12 EA 1,200$ 14,400$ 12 EA 860$ 10,320$ 12 EA 1,500$ 18,000$ 12 EA 850$ 10,200$ 8 Provide, Install, and Manage Temporary Wastewater Bypasses 1 LS 20,000$ 20,000$ 1 LS 52,000$ 52,000$ 1 LS 95,000$ 95,000$ 1 LS 105,000$ 105,000$ 9 8-inch PVC Gravity Sewer Pipe 45 LF 250$ 11,250$ 45 LF 250$ 11,250$ 45 LF 450$ 20,250$ 45 LF 850$ 38,250$ 10 24-inch PVC Gravity Sewer Pipe 430 LF 500$ 215,000$ 430 LF 600$ 258,000$ 430 LF 968$ 416,240$ 430 LF 462$ 198,660$ 11 48" Dia. Eccentric MH w/ 24" Frame & Cover & Predl Base Liner, (8' Depth)2 EA 12,000$ 24,000$ 2 EA 10,275$ 20,550$ 2 EA 19,500$ 39,000$ 2 EA 15,000$ 30,000$ 12 48" Dia. Manhole (Extra Depth)3 VF 250$ 750$ 3 VF 2,500$ 7,500$ 3 VF 600$ 1,800$ 3 VF 300$ 900$ 13 Re-establish MH Penetrations 3 EA 3,000$ 9,000$ 3 EA 5,075$ 15,225$ 3 EA 4,500$ 13,500$ 3 EA 7,500$ 22,500$ 14 Reconnect Existing Laterals 4 EA 4,000$ 16,000$ 4 EA 1,300$ 5,200$ 4 EA 2,500$ 10,000$ 4 EA 2,000$ 8,000$ 15 CSBC Backfill & CSTC Bedding 2,470 TONS 45$ 111,150$ 2,470 TONS 53$ 130,910$ 2,470 TONS 5$ 12,350$ 2,470 TONS 60$ 148,200$ 16 Foundation Material 210 CY 45$ 9,450$ 210 CY 125$ 26,250$ 210 CY 135$ 28,350$ 210 CY 75$ 15,750$ 17 HMA for Full Depth Trench Patching 400 TONS 225$ 90,000$ 400 TONS 222$ 88,800$ 400 TONS 170$ 68,000$ 400 TONS 225$ 90,000$ 18 HMA for 2" Grind & Overlay 50 TONS 375$ 18,750$ 50 TONS 575$ 28,750$ 50 TONS 475$ 23,750$ 50 TONS 280.0$ 14,000$ 19 6-inch Thick CSTC Subgrade Layer 210 TONS 45$ 9,450$ 210 TONS 74$ 15,540$ 210 TONS 65$ 13,650$ 210 TONS 60$ 12,600$ 20 Post-Construction Sewer Main Cleaning and Video Inspection 1 LS 3,000$ 3,000$ 1 LS 6,200$ 6,200$ 1 LS 6,500$ 6,500$ 1 LS 3,000$ 3,000$ 21 Restoration 1 LS 20,000$ 20,000$ 1 LS 23,000$ 23,000$ 1 LS 6,500$ 6,500$ 1 LS 12,000$ 12,000$ 22 Force Account - Minor Changes 1 FA 40,000$ 40,000$ 1 FA 40,000$ 40,000$ 1 FA 40,000$ 40,000$ 1 FA 40,000$ 40,000$ Subtotal 981,500.00$ Subtotal A 1,084,370.00$ Subtotal A 1,098,890.00$ Subtotal A 1,132,560.00$ 99,131.50$ 109,521.37$ 110,987.89$ 114,388.56$ Total 1,080,631.50$ Total 1,193,891.37$ Total 1,209,877.89$ Total 1,246,948.56$ Washington State Sales Tax 10.1% 2023 Andover Park W and 58th Avenue S Sewer Repair Northwest Cascade, Inc. Washington State Sales Tax 10.1% McCann Construction Enterprises, Inc. Washington State Sales Tax 10.1% Engineer's Estimate Rodarte Construction, Inc. Washington State Sales Tax 10.1%181