Loading...
HomeMy WebLinkAboutSpecial 2023-06-12 Item 2E - Bid Award / Contract - 2023 Annual Overlay Program & South 119th Street Bridge Raised Crosswalk with Lakeside Industries for $1,296,481.50 (Plus Contingency)ITEM INFORMATION STAFF SPONSOR: JOSH HARTLEY ORIGINAL AGENDA DATE: 06/12/23 AGENDA ITEM TITLE 2023 Annual Overlay Program & S. 119th St. Bridge Raised Crosswalk Construction Bid Award CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date SPONSOR Council Mayor HR DCD Finance Fire TS P&R Police PW Court SPONSOR S SUMMARY In 2022, the City contracted with KPG-Psomas as the design consultant for 2023 Annual Overlay Program and the S 119th St. Bridge Raised Crosswalk Project. A call for bids was advertised in April 2023 with three bids received on May 16, 2023. The confirmed lowest bidder was Lakeside Industries with a bid of $1,296,481.50. Council is being asked to approve the construction award to Lakeside Industries in the amount of $1,296,481.50 for the 2023 Overlay Program and S. 119th St. Raised Crosswalk Projects. REVIEWED BY Trans&Infrastructure CommunitySvs/Safety Finance Comm. Planning/Economic Dev. LTAC Arts Comm. Parks Comm. Planning Comm. DATE: 06/05/23 COMMITTEE CHAIR: TOSH SHARP RECOMMENDATIONS: SPONSOR/ADMIN. Public Works Department COMMITTEE Unanimous Approval; Forward to Special Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $1,296,481.50 $1,296,481.50 $0.00 Fund Source: MULTIPLE SOURCES Comments: MTG. DATE RECORD OF COUNCIL ACTION 06/12/23 MTG. DATE ATTACHMENTS 06/12/23 Informational Memorandum dated 06/02/23 2023 CIP, Page 62,63,73,75 KPG-Psomas Recommendation Letter Lakeside Industries Construction Bid Bid Tabulation Minutes from T&I Committee meeting of 06/05/23 (distributed separately) ----------------------------------Initials --------------------------------- Meeting Date Prepared by Council review 06/12/23 JR Spec 2.E. 209 210 INFORMATIONAL MEMORANDUM TO: Transportation & Infrastructure Services Committee FROM: Hari Ponnekanti, Public Works Director/City Engineer BY: Josh Hartley, Deputy Public Works Director, Transportation CC: Mayor Ekberg DATE: June 2, 2023 SUBJECT: 2023 Annual Overlay Program & S. 119th St. Bridge Raised Crosswalk Project No. 82310401 & 92210301 Construction Bid Award ISSUE Approve construction bid award to Lakeside Industries for the 2023 Annual Overlay Program and the S 119th St. Bridge Raised Crosswalk Project. BACKGROUND/DISCUSSION In 2022, the City contracted with KPG-Psomas as the design consultant for the above referenced projects which reached 100% design in Spring 2023. A call for bids was advertised in April 2023 with three bids received on May 16, 2023. The confirmed lowest bidder was Lakeside Industries with a bid of $1,296,481.50. The E $1,245,715.00. 2023 Annual Overlay Program & S. 119th St. Raised Crosswalk Bid Tabulation Contractor Schedule A Schedule B Total Bid Overlay Program 119th St Lakeside Industries $1,090,622.50 $205,859.00 $1,296,481.50 Tucci & Sons $1,233,257.50 $160,960.00 $1,394,217.50 Icon Materials $1,220,682.60 $205,383.00 $1,426,065.60 FINANCIAL IMPACT Funding will be utilized from four (4) CIP projects as listed below. The total funding available in these four projects is $1,820,000. Bid Amount CIP Project Budget Required Contract: $1,296,481.50 Overlay Program $1,034,632.50 S. 119th Raised C/W $174,999 ADA Improvements $24,200 NTCP $62,650 Total: $1,296,481.50 Construction management of both projects will be performed by KPG-Psomas and will be funded via the same projects listed above. 211 INFORMATIONAL MEMO Page 2 RECOMMENDATION Council is being asked to approve the construction award to Lakeside Industries in the amount of $1,296,481.50 for the 2023 Overlay Program and S. 119th St. Raised Crosswalk Projects and consider on the Consent Agenda at the June 12, 2023 Special Meeting. ATTACHMENTS: 2023 CIP, Page 62,63,73,75 KPG-Psomas Recommendation Letter Lakeside Industries Construction Bid Bid Tabulation 212 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2023 to 2028 PROJECT: S 119th St Bridge/ 42nd Ave S Raised Crosswalk and RRFB Project No.92210301 DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's)2021 2022 2023 2024 2025 2026 2027 2028 BEYOND TOTAL EXPENSES Design 30 30 Land (R/W)0 Const. Mgmt.35 35 Construction 185 185 TOTAL EXPENSES 0 0 250 0 0 0 0 0 0 250 FUND SOURCES Proposed Grant 175 175 Awarded Grant 0 Mitigation Expected 0 103 Fund Balance 0 0 75 0 0 0 0 0 0 75 TOTAL SOURCES 0 0 250 0 0 0 0 0 0 250 Residential improvements and traffic calming features to reduce speeds and improve pedestrian and bicycle safety. Grants submitted to WSDOT and TIB for 2023/2024 funding. Install raised crosswalk, curb bulbs, and a Rectangular Rapid Flashing Beacon on 42nd Ave S at the intersection of the S 119th street pedestrian bridge. Enhance safety for pedestrians crossing at S 119th Street/42nd Ave S and encourages transportation choices for the neighborhood. New crosswalk and pedestrian flashing beacon will need to be maintained. 2023 - 2028 Capital Improvement Program 22 213 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2023 to 2028 PROJECT: Traffic Calming/Residential Safety Improvements Project No. 80010301 DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's)2021 2022 2023 2024 2025 2026 2027 2028 BEYOND TOTAL EXPENSES Design 7 100 155 155 155 155 155 155 155 1,192 Land (R/W)0 Const. Mgmt.0 Construction 93 300 495 420 495 495 495 495 495 3,783 TOTAL EXPENSES 100 400 650 575 650 650 650 650 650 4,975 FUND SOURCES ARPA 100 400 400 400 500 Awarded Grant 0 Proposed Grant 250 175 250 250 250 250 250 1,675 Mitigation Expected 0 City Operating Funds 0 0 400 400 400 400 400 2,000 TOTAL SOURCES 100 400 650 575 650 650 650 650 650 5,475 Residential improvements and traffic calming features to reduce speeds and improve pedestrian and bicycle safety such as the speed cushions, RRFB crossings, LED enhanced signs, Radar driver feedback signs, etc. Varies, depends on treatment(s) used. Programmatic approach to addressing neighborhood traffic concerns through a variety of methods. Residential street improvements with sidewalks, safety improvements, and bike facilities. Neighborhood revitalization by improving residential streets. Future candidates are listed in the citywide comprehensive update and safety-based prioritization of residential street improvements, sidewalks, and bike lanes. 2023 - 2028 Capital Improvement Program 3 33214 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2023 to 2028 PROJECT: Annual Overlay and Repair Program Project No.80010401 DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's)2021 2022 2023 2024 2025 2026 2027 2028 BEYOND TOTAL EXPENSES Design 316 150 150 150 150 150 150 150 150 1,516 Land (R/W)0 Const. Mgmt.43 200 200 200 200 200 200 200 200 1,643 Construction 970 1,050 1,050 1,050 1,050 1,050 1,150 1,150 1,300 9,820 TOTAL EXPENSES 1,329 1,400 1,400 1,400 1,400 1,400 1,500 1,500 1,650 12,979 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Solid Waste Utility Tax 1,329 1,400 1,400 1,400 1,400 1,400 1,500 1,500 1,650 12,979 TOTAL SOURCES 1,329 1,400 1,400 1,400 1,400 1,400 1,500 1,500 1,650 12,979 Ongoing project. Only one year actuals shown in first column. Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay. Reduces annual maintenance. Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets. Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects. 2023 - 2028 Capital Improvement Program 1212 215 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2023 to 2028 PROJECT: Americans with Disabilities Act (ADA) Improvements Project No.91510405 DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's)2021 2022 2023 2024 2025 2026 2027 2028 BEYOND TOTAL EXPENSES Design 35 5 5 5 5 5 5 5 70 Land (R/W)0 Const. Mgmt.5 5 5 5 5 5 5 35 Construction 90 40 40 40 40 40 40 330 TOTAL EXPENSES 0 35 100 50 50 50 50 50 50 435 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Traffic Impact Fees 0 Parking Tax 0 35 100 50 50 50 50 50 50 435 TOTAL SOURCES 0 35 100 50 50 50 50 50 50 435 Project will be ongoing until City facilities and infrastructure meet ADA requirements. This will also include ADA compliance by utilities and private development. Construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. The enforcement of ADA laws and standards was delayed pending legal challenges and studies. Recent court rulings now mandate ADA compliance. The City must provide upgrades with most construction projects. Provide annual funding to construct improvements as necessary. Began the ADA Transition Plan in 2016 with adoption in 2017. The goal is to resolve ADA compliance issues within a reasonable time period. Negligible. 2023 - 2028 Capital Improvement Program 1414216 May 23, 2023 City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Attn: Mayor & City Counsel Re: 2023 Tukwila Overlay Program Project – Recommendation of Award Dear Mayor & City Counsel, As requested, KPG Psomas has completed the verification for Lakeside Industries Inc. for the 2023 Tukwila Overlay Program Project for their bid amount of $1,296,481.50. As part of our review, we contacted all of their listed references. Three of the Fifteen provided references were able to be contacted. All of the feedback we received was positive and included comments such as: “No issues”, “Project completed on time and under budget”, “Responsive and Excellent quality of work” and I am happy to say that all of the refences mentioned that they would be happy to work with them again on future projects. We have checked the status of Lakeside Industries Inc on the Washington State Labor and Industries web page to confirm they are currently licensed, bonded, and insured, no strikes or debarment records arose federally or statewide. KPG Psomas acknowledges that Lakeside Industries Inc is a qualified bidder, and this is a responsive bid for the 2023 Tukwila Overlay Program project. We recommend the City of Tukwila award the project to Lakeside Industries Inc. We have enclosed the contractor verification Package & Reference checks for your review. Respectfully, Jamison Baker Resident Engineer KPG Psomas, Inc. Cc: Enclosures: Lakeside Industries Inc Verification Package 217 218 219 220 221 222 223 224 LAKESIDE INDUSTRIES, INC. Unique Entity ID VTR5L2GMBN23 CAGE / NCAGE 05ZW8 Purpose of Registration All Awards Registration Status Active Registration Expiration Date Sep 29, 2023 Physical Address 6505 226TH PL SE STE 200 Issaquah, Washington 98027-8905 United States Mailing Address Pob 7016 Issaquah, Washington 98027-7016 United States Business Information Doing Business as (blank) Division Name (blank) Division Number (blank) Congressional District Washington 08 State / Country of Incorporation Washington / United States URL (blank) Registration Dates Activation Date Sep 30, 2022 Submission Date Sep 29, 2022 Initial Registration Date Mar 20, 2002 Entity Dates Entity Start Date Apr 1, 1972 Fiscal Year End Close Date Nov 30 Immediate Owner CAGE (blank) Legal Business Name (blank) Highest Level Owner CAGE (blank) Legal Business Name (blank) Executive Compensation Registrants in the System for Award Management (SAM) respond to the Executive Compensation questions in accordance with Section 6202 of P.L. 110-252, amending the Federal Funding Accountability and Transparency Act (P.L. 109-282). This information is not displayed in SAM. It is sent to USAspending.gov for display in association with an eligible award. Maintaining an active registration in SAM demonstrates the registrant responded to the questions. Proceedings Questions Registrants in the System for Award Management (SAM.gov) respond to proceedings questions in accordance with FAR 52.209-7, FAR 52.209-9, or 2. C.F.R. 200 Appendix XII. Their responses are displayed in the responsibility/qualification section of SAM.gov. Maintaining an active registration in SAM.gov demonstrates the registrant responded to the proceedings questions. Exclusion Summary Active Exclusions Records? No SAM Search Authorization I authorize my entity's non-sensitive information to be displayed in SAM public search results: Yes Entity Types Business Types Entity Structure Corporate Entity (Not Tax Exempt) Entity Type Business or Organization Organization Factors (blank) Profit Structure For Profit Organization 225 Socio-Economic Types Check the registrant's Reps & Certs, if present, under FAR 52.212-3 or FAR 52.219-1 to determine if the entity is an SBA-certified HUBZone small business concern. Additional small business information may be found in the SBA's Dynamic Small Business Search if the entity completed the SBA supplemental pages during registration. Financial Information Accepts Credit Card Payments Yes Debt Subject To Offset No EFT Indicator 0000 CAGE Code 05ZW8 Points of Contact Electronic Business Diana Reeves Pob 7016 Issaquah, Washington 98027 United States Doug Stillgebauer Pob 7016 Issaquah, Washington 98027 United States Government Business MICHAEL Lee Pob 7016 Issaquah, Washington 98027 United States MICHAEL Lee Pob 7016 Issaquah, Washington 98027 United States Past Performance Doug Stillgebauer Pob 7016 Issaquah, Washington 98027 United States Doug Stillgebauer Pob 7016 Issaquah, Washington 98027 United States Service Classifications NAICS Codes Primary Yes NAICS Codes 237310 NAICS Title Highway, Street, And Bridge Construction 212321 Construction Sand And Gravel Mining 324121 Asphalt Paving Mixture And Block Manufacturing Disaster Response Yes, this entity appears in the disaster response registry. Bonding Levels Dollars (blank)(blank) States Oregon Washington Counties (blank) Metropolitan Statistical Areas (blank) 226 227 References for Lakeside Industries Inc City Project Name Contact Name Contact Number Comments WSDOT I-90 E Sunset Way I/C Acme Concrete Paving (509) 242-1234 Called & Spoke with Admin. Advised that they have a long, good standing relationship with Lakeside & the overall experience Is positive. No issues. Lakeside Is responsive & Good quality work. Seattle C.O.K 2017 Street Overlay Project City of Seattle (253) 537-2990 Brian DeCapp responded via email & advised that the city of Seattle uses Lakeside all the time for many projects & thus far have no complaints. They are responsive and easy to work with. Great quality of work. Federal Way 2017 Asphalt Overlay Project City of Federal Way (253) 835-7000 Spoke with Jeff with Public works. Said that Lakeside has been with City of Federal way for a few seasons & they have been very easy to work with. Quality of work Is great. Under budget & Under working days for project. Communicate effectively with the city. 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253