HomeMy WebLinkAboutSpecial 2023-06-26 Item 3A - Resolution - 2024-2029 Transportation Improvement ProgramITEM INFORMATION
STAFF SPONSOR: JENNIFER RONDA ORIGINAL AGENDA DATE: 06/12/23
AGENDA ITEM TITLE Resolution for Six-Year Transportation Improvement Program (2024 - 2029)
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date 06/12/23 Mtg Date Mtg Date 06/26/23 Mtg Date Mtg Date Mtg Date 06/12/23 Mtg Date
SPONSOR Council Mayor HR DCD Finance Fire TS P&R Police PW Court
SPONSOR’S
SUMMARY
The Transportation Improvement Program (TIP) is updated annually as required by the
Revised Code of Washington (RCW). The TIP generally lists only those transportation-
related projects planned within the next six years that are deemed regionally significant or
that have grant funding awarded or expected. The TIP is scheduled for adoption on June
26, 2023. Council is being asked to approve the Resolution for the 2024 - 2029 Six-Year
Transportation Improvement Program.
REVIEWED BY Trans&Infrastructure CommunitySvs/Safety Finance Comm. Planning/Economic Dev.
LTAC Arts Comm. Parks Comm. Planning Comm.
DATE: 06/05/23 COMMITTEE CHAIR: TOSH SHARP
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works Department
COMMITTEE Unanimous Approval; Forward to the Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source:
Comments:
MTG. DATE RECORD OF COUNCIL ACTION
06/12/23
06/26/23
MTG. DATE ATTACHMENTS
06/12/23 Informational Memorandum dated 06/02/23
Draft Resolution
Draft 2024-2029 TIP Summary
2024–2029 “Draft” Transportation Improvement Program
Current Adopted 2023–2028 TIP
06/26/23
COUNCIL AGENDA SYNOPSIS
----------------------------------Initials --------------------------------- ITEM NO.
Meeting Date Prepared by Mayor’s review Council review
06/12/23 JR
06/26/23 JR
Forward to next Special Meeting
Final Resolution
Spec 3.A.
111
112
City of Tukwila
Washington
Resolution No.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2024-
2029), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the
City Council of the City of Tukwila has previously adopted a Transportation Improvement
Program and thereafter periodically modified said Transportation Improvement Program
by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six-Year Transportation Improvement Program for the
ensuing six calendar years (2024-2029); and
WHEREAS, on June 12, 2023, a public hearing was held regarding the City's Six-
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six-Year Transportation Improvement Program
for the calendar years 2024 to 2029, attached hereto as Exhibit A, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington
CC:\Legislative DevelopmentVTIP 2024-2029 5-2-23
Cyndy Knighton Review by Andy Youn Page 1 of 2
113
CC:\Legislative Development\TIP 2024-2029 5-2-23
Cyndy Knighton Review by Andy Youn Page 2 of 2
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Special Meeting thereof this _______ day of _________________, 2023.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC Cynthia Delostrinos Johnson
City Clerk Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Office of the City Attorney
Exhibit A: City of Tukwila Six-Year Transportation Improvement Program for 2024 to 2029
114
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required05 / 1037(004)TUK-62 06/12/23 06/26/23 11 0.100 DCE No
42nd Ave S Bridge Replacement
42nd Ave S over the Duwamish River
Interurban Ave S to Northern end of bridge
Replace the existing 42nd Ave S steel truss bridge. The replacement will require
preliminary engineer design, right-of-way, and construction phases. The new
structure will meet current road and bridge design standards. The replacement
structure configuration will be two through-lanes, possibly a turn pocket, and include
sidewalks.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2024 STBG(UL)1,500,000 0 1,100,000 2,600,000
S RW 2024 BR 86,500 0 13,500 100,000
S CN 2024 BR 11,913,500 MAW 17,000,000 0 28,913,500
Totals 13,500,000 17,000,000 1,113,500 31,613,500
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 800,000 0 0 0 0
RW 100,000 0 0 0 0
CN 0 15,636,500 13,500,000 0 0
Totals 900,000 15,636,500 13,500,000 0 0
Report Date: May 04, 2023 Page 1
Six Year Transportation Improvement Program
From 2024 to 2029
115
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required19 WA-11113 06/12/23 06/26/23 05 0.370 Yes
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
including curb bulb-out at the SE corner of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2024 0 SRTS 180,000 90,000 270,000
P RW 2024 0 SRTS 220,000 20,000 240,000
P CN 2025 0 SRTS 1,660,000 410,000 2,070,000
Totals 0 2,060,000 520,000 2,580,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 270,000 0 0 0 0
RW 240,000 0 0 0 0
CN 0 2,070,000 0 0 0
Totals 510,000 2,070,000 0 0 0
Report Date: May 04, 2023 Page 2
Six Year Transportation Improvement Program
From 2024 to 2029116
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required00 WA05409 06/12/23 06/26/23 18 EIS No
Allentown Truck Reroute Project
to
Study alternatives for truck access to reroute outside of residential neighborhood.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PL 2024 0 0 600,000 600,000
Totals 0 0 600,000 600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PL 600,000 0 0 0 0
Totals 600,000 0 0 0 0
Report Date: May 04, 2023 Page 3
Six Year Transportation Improvement Program
From 2024 to 2029
117
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required00 WA-05405 06/12/23 06/26/23 06 No
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S ALL 2024 0 0 435,000 435,000
Totals 0 0 435,000 435,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 50,000 50,000 50,000 50,000 100,000
Totals 50,000 50,000 50,000 50,000 100,000
Report Date: May 04, 2023 Page 4
Six Year Transportation Improvement Program
From 2024 to 2029118
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required16 WA-07746 06/12/23 06/26/23 03 C G O P S
T W
No
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2025 0 0 134,000 134,000
S RW 2025 0 0 10,000 10,000
P CN 2026 0 0 1,570,000 1,570,000
Totals 0 0 1,714,000 1,714,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 134,000 0 0 0
RW 0 10,000 0 0 0
CN 0 0 1,570,000 0 0
Totals 0 144,000 1,570,000 0 0
Report Date: May 04, 2023 Page 5
Six Year Transportation Improvement Program
From 2024 to 2029
119
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required04 WA-15107 06/12/23 06/26/23 03 P 0.100 Yes
Andover Park East/Industry Dr Intersection
Andover Park E
Industry Drive to
Design and construct traffic signal with Andover Park East left turn lanes and
crosswalks.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2025 0 0 75,000 75,000
S RW 2025 0 0 10,000 10,000
P CN 2026 0 0 657,000 657,000
Totals 0 0 742,000 742,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 75,000 0 0 0
RW 0 10,000 0 0 0
CN 0 0 657,000 0 0
Totals 0 85,000 657,000 0 0
Report Date: May 04, 2023 Page 6
Six Year Transportation Improvement Program
From 2024 to 2029120
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required14 WA-03731 06/12/23 06/26/23 06 No
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S ALL 2024 0 0 1,345,000 1,345,000
Totals 0 0 1,345,000 1,345,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 205,000 215,000 220,000 230,000 475,000
Totals 205,000 215,000 220,000 230,000 475,000
Report Date: May 04, 2023 Page 7
Six Year Transportation Improvement Program
From 2024 to 2029
121
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required16 WA-03733 06/12/23 06/26/23 06 C G O P S
T W
No
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S ALL 2024 0 0 8,850,000 8,850,000
Totals 0 0 8,850,000 8,850,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 1,400,000 1,400,000 1,400,000 1,500,000 3,150,000
Totals 1,400,000 1,400,000 1,400,000 1,500,000 3,150,000
Report Date: May 04, 2023 Page 8
Six Year Transportation Improvement Program
From 2024 to 2029122
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required00 WA-15104 06/12/23 06/26/23 44 P No
Annual Traffic Signal Program
Varies
to
Design and construct traffic signal upgrades and repairs of signals that exceed
routine maintenance work;loop replacement, head replacement, and controllers.
Replace direct bury cable for existing lighting system.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S ALL 2024 0 0 1,040,000 1,040,000
Totals 0 0 1,040,000 1,040,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 130,000 130,000 130,000 150,000 300,000
Totals 130,000 130,000 130,000 150,000 300,000
Report Date: May 04, 2023 Page 9
Six Year Transportation Improvement Program
From 2024 to 2029
123
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required04 WA-15109 06/12/23 06/26/23 03 C G O P S
T W
0.270 Yes
E Marginal Way S (BAR - S 112 St)
E Marginal Way S
Boeing Access Road to S 112th St
Design and construct curb, gutter, drainage, lighting, turn lanes, and traffic control.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2025 0 0 288,000 288,000
P RW 2029 0 TIB 280,000 420,000 700,000
P CN 2029 0 TIB 970,000 1,460,000 2,430,000
Totals 0 1,250,000 2,168,000 3,418,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 50,000 0 0 170,000
RW 0 0 0 0 700,000
CN 0 0 0 0 2,430,000
Totals 0 50,000 0 0 3,300,000
Report Date: May 04, 2023 Page 10
Six Year Transportation Improvement Program
From 2024 to 2029124
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required00 TUK-63 06/12/23 06/26/23 44 0.000 No
Keeping South King County Moving with TDM
South King County
Various to Various
This project will help people access sustainable transportation options that reduce
drive-alone travel and traffic congestion in South King County. TDM programming
and services will be provided to residents, workers, visitors, employers, property
managers, and students in Tukwila and the partnering jurisdictions of Burien, Des
Moines, Kent, Renton, and SeaTac. The program will target those willing and able to
try sustainable modes of transportation at activity centers (community hubs,
commercial areas, business parks, multifamily housing complexes, and educational
institutions). Examples of activity centers include the Tukwila International Boulevard
District, Southcenter, and Sea-Tac Airport. The TDM Program will work in partnership
with transit agencies, nonprofits, employers, and community organizations to reach
priority populations through trusted channels. The project aims to reduce 542,997
vehicle trips and 8,093,549 vehicle miles traveled.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S ALL 2024 0 WSDOT 672,000 0 672,000
S ALL 2024 0 OTHER 168,000 0 168,000
Totals 0 840,000 0 840,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 210,000 105,000 0 0 0
Totals 210,000 105,000 0 0 0
Report Date: May 04, 2023 Page 11
Six Year Transportation Improvement Program
From 2024 to 2029
125
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required17 WA-11110 06/12/23 06/26/23 04 0.350 CE No
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2024 0 Ped/Bike Program 350,000 50,000 400,000
P RW 2024 0 Ped/Bike Program 90,000 10,000 100,000
P CN 2025 0 Ped/Bike Program 2,800,000 300,000 3,100,000
Totals 0 3,240,000 360,000 3,600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 400,000 0 0 0 0
RW 100,000 0 0 0 0
CN 0 3,100,000 0 0 0
Totals 500,000 3,100,000 0 0 0
Report Date: May 04, 2023 Page 12
Six Year Transportation Improvement Program
From 2024 to 2029126
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required00 WA-13494 06/12/23 06/26/23 06 0.040 No
S 119th St Pedestrian Bridge Painting
S 119th Street
West bank Duwamish River to East bank Duwamish River
Ongoing maintenance of the S 119th Street Pedestrian Bridge in the
Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance
needed.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2024 0 0 200,000 200,000
Totals 0 0 200,000 200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 200,000 0 0 0
Totals 0 200,000 0 0 0
Report Date: May 04, 2023 Page 13
Six Year Transportation Improvement Program
From 2024 to 2029
127
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required03 WA-15108 06/12/23 06/26/23 03 C G O P S
T W
0.100 Yes
S 133 St/SR599 Southbound Intersection
S 133rd Street
SR 599 SB Ramp to
Design and construct intersection improvements, which could include a new traffic
signal or a roundabout,
lighting, pedestrian facilities, and drainage.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 0 0 300,000 300,000
P RW 2028 0 0 50,000 50,000
P CN 2029 0 0 2,070,000 2,070,000
Totals 0 0 2,420,000 2,420,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 300,000
RW 0 0 0 0 50,000
CN 0 0 0 0 2,070,000
Totals 0 0 0 0 2,420,000
Report Date: May 04, 2023 Page 14
Six Year Transportation Improvement Program
From 2024 to 2029128
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required17 WA03782 06/12/23 06/26/23 28 0.250 CE No
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over I-5 between 51st Ave S and 53rd Ave S
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2026 STBG(UL)500,000 0 79,000 579,000
P CN 2025 SRTS 2,302,000 0 388,000 2,690,000
Totals 2,802,000 0 467,000 3,269,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 579,000 0 0
CN 0 0 0 2,690,000 0
Totals 0 0 579,000 2,690,000 0
Report Date: May 04, 2023 Page 15
Six Year Transportation Improvement Program
From 2024 to 2029
129
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required19 WA-11112 06/12/23 06/26/23 05 0.300 No
S 152nd Street Safe Routes to School
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Design and construct curb, gutter and sidewalks on both sides including widening
pavement width by 3 feet to construct on-street parking lane on north side of street.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2024 0 TIB 3,200,000 815,000 4,015,000
Totals 0 3,200,000 815,000 4,015,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 4,015,000 0 0 0 0
Totals 4,015,000 0 0 0 0
Report Date: May 04, 2023 Page 16
Six Year Transportation Improvement Program
From 2024 to 2029130
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required00 TUK-64 06/12/23 06/26/23 24 0.000 No
South King County TDM
South King County
N/A to N/A
This project will provide TDM programming and services at selected activity centers
in Tukwila and partnering South King County jurisdictions. Activity centers include
community hubs, commercial areas, business parks, multifamily housing complexes,
and educational institutions. For example, places such as Tukwila International
Boulevard District, Southcenter, and Sea-Tac Airport. By providing transportation
resources and incentives, the project will encourage people to choose sustainable
transportation options that reduce drive-alone travel and traffic congestion in South
King County. TDM services will be provided to residents, commuters, and visitors,
targeting those willing and able to try sustainable modes of transportation. The
program will work in partnership with partner agencies, nonprofits, employers, and
community organizations.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PL 2024 CMAQ 450,000 OTHER 55,232 15,000 520,232
Totals 450,000 55,232 15,000 520,232
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PL 260,116 0 0 0 0
Totals 260,116 0 0 0 0
Report Date: May 04, 2023 Page 17
Six Year Transportation Improvement Program
From 2024 to 2029
131
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required04 WA-13495 06/12/23 06/26/23 21 No
Southcenter Blvd/65th Avenue S SIgnal
Southcenter Boulevard
65th Avenue S to
Design and construct a new traffic signal at the Southcenter Boulevard/65th Avenue
S intersection to improve level of service and safety.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2024 0 0 200,000 200,000
P CN 2025 0 TIB 500,000 500,000 1,000,000
Totals 0 500,000 700,000 1,200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 100,000 0 0 0 0
CN 1,000,000 0 0 0 0
Totals 1,100,000 0 0 0 0
Report Date: May 04, 2023 Page 18
Six Year Transportation Improvement Program
From 2024 to 2029132
Agency:Tukwila
County:King
MPO/RTPO:PSRC Y Inside N Outside
FunctionalClassPriority NumberA. PIN/Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID HearingAdoptedAmendmentResolution No.Improvement TypeUtility CodesTotal LengthEnvironmental TypeRW Required00 WA-13491 06/12/23 06/26/23 44 0.000 No
Transportation Demand Management Implementation
to
Provision of TDM services to Commute Trip Reduction-affected employment sites.
Facilitate employer reporting and records associated with biennial CTR survey.
Engage CTR employment sites with opportunities for improvement and remain
connected via technical meetings with other CTR jurisdictional representatives.
Funding
Status Phase Phase Start Year (YYYY)Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S ALL 2024 0 WSDOT 88,526 0 88,526
P ALL 2025 0 WSDOT 46,650 0 46,650
Totals 0 135,176 0 135,176
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 46,650 46,650 0 0 0
Totals 46,650 46,650 0 0 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Tukwila 16,752,000 28,280,408 23,504,500 68,536,908
Report Date: May 04, 2023 Page 19
Six Year Transportation Improvement Program
From 2024 to 2029
133