Loading...
HomeMy WebLinkAboutPermit PG18-0003 - KING COUNTY / METRO TRANSIT DIVISION - NON-POTABLE WEATHER LINE AND NATURAL GAS LINE TO GAS-FIRED OVENKING COUNTY METRO TRANSIT DIVISION 12100 E MARGINAL WAY S PG1 8-0003 Parcel No: Address: Project Name: 0 City of Tukwila Q Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.Rov PLUMBING/GAS PIPING PERMIT 7340600421 12100 E MARGINAL WAY S Permit Number: PG18-0003 Issue Date: 1/12/2018 Permit Expires On: 7/11/2018 KING COUNTY METRO TRANSIT DIVISION Owner: Name: Address: Contact Person: Name: KING COUNTY -TRANSIT 201 S JACKSON ST #417 , SEATTLE, WA, 98104 PATRICK FARRELL Address: 1363 DAWN RIVER DR , WOODLAND, WA, 98674 Contractor: Name: STELLAR J CORPORATION Address: 1363 DOWN RIVER DR, WOODLAND, WA, 98674 License No: STELUC045J9 Lender: Name: Address: Phone: (360) 518-2128 Phone: (360) 225-7996 Expiration Date: 7/15/2019 DESCRIPTION OF WORK: INSTALL A NON -POTABLE WEATER LINE AND A NATURAL GAS LINE TO AN INDUSTRIAL GAS-FIRED OVEN. TYING INTO AN EXISTING WATER LINE AND NATURAL GAS LINE. Valuation of Work: $12,000.00 Water District: 125 Sewer District: VALLEY VIEW,TUKWILA Fees Collected: $285.44 Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: Date 2017 2017 2017 2015 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Pes-eL Print Name:-1/4-t'c`c—lk Date: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***PLUMBING/GAS PIPING PERMIT CONDITIONS*** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R-3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 gauge. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor/ceiling assemblies and fire -resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. 13: The applicant agrees that he or she will hire a licensed plumber to perform the work outlined in this permit. 14: All new plumbing fixtures installed in new construction and all remodeling involving replacement of plumbing fixtures in all residential, hotel, motel, school, industrial, commercial use or other occupancies that use significant quantities of water shall comply with Washington States Water Efficiency ad Conservation Standards in accordance with RCW 19.27.170 and the 2006 Uniform Plumbing Code Section 402 of Washington State Amendments PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2000 GAS PIPING FINAL 8004 GROUNDWORK O 0 1900 PLUMBING FINAL 9002 ROUGH -IN GAS PIPING 8005 ROUGH -IN PLUMBING 9001 UNDERGROUND CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** King Co Assessor's Tax No.: Site Address 12100 E Marginal Way S Tukwilla WA 98168 Suite Number: Floor:__, New Tenant: 0 Yes R ..No Tenant Name: King County Metro Transit Division PRO .TY 0 NameKing County Metro Transit Division Address: 201 S Jackson St., MS: KSC-TR-0435 City: Seattle State: WA Zip: 98104 Name: Patrick Farrell Address: 1363 Down River Drive City: Woodland State: WA Zip: 98674 Phone: (360) 518-2128 Fax; (360) 225-800' Email: patrickfarrell@stellarj.com PLUMBING CO Company Name: Stellar J Corp Address: 1363 Down River Drive City: Woodland State: WA zip: 98674 Phone: (360) 518-2128 Fax: (360) 225-8007 Contr Reg No.: STELLJC045J9 Exp Date: 07/03/2018 Tukwila Business License No.: BUS -0998148 Valuation of Project (contractor's bid price): $ 12,000 Scope of Work (please provide detailed information): Install a non -potable water line and a natural gas line to an industrial gas-fired oven. Tying into an existing water line and natural gas line. Building Use (per Intl Building Code): Occupancy (per Int'l Building Code): H-4 Utility Purveyor: Water: King County Water District 125 Motor Vehicle Repair II: `ApplicationsWorms-ApplicationsOnLiuc12011 Applications lumbingPcrmitApplicationRcviscd8.9-11.docx Revise -0: August 2011 bh Sewer Puget Sound Energy Page 1 of 2 Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Fixture Type Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain Shower, single head trap Sinks Rain water system— per drain (inside building) Grease interceptor for commercial kitchen (>750 gallon capacity) 1 Each additional medical gas inlets/outlets greater than 5 Atmospheric -type vacuum breakers not included in Iawn sprinkler backflow protections (1-5) Fixture Type Qty 1 Bidet Drinking fountain or water cooler (per head) Lavatory Urinal Water heater and/or vent Repair or alteration of water piping and/or water treatment equipment 1 Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 tum) diameter or smaller Atmospheric -type vacuum breakers not included is Iawn sprinkler backflow protections over 5 a Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial Wash fountain Water closet Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Gas piping outlets Elxture Type Qty hili Dental unit, cuspidor Floor drain Receptor, indirect waste Building sewer and each nailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1-5 inlets/outlets for a specific gas Each lawn sprinkler system on any one meter including backflow protection devices Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the dale of application shall expire by limitation. The Building Official may grant one extension of time for an additional .period not to ,exceed lRO days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Phunbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: ?AI 4,M4.4.4 Date: I /t( (I $ Print Name: c?c,ksrDay Telephone: 2U1 'S t 5d - Z.(2 fC. Mailing Address: GC -5 0e•,,..111. ver Or.'.Jte V.>EPZ2. t (a.. ' 4 $G.? City State zip 11:\Appliwlions`rornu-Applications On b I viAcd: August 2011 hit Page 2 of 2 Cash Register Receipt City of Tukwila i r �` r ,ry'an PCi1$ 0 s 60 ,, Credit Card Fee $8.31° Credit Card Fee R000.369.908.00.00 0.00 $8.31 GAS $24.31 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $66.30 PLAN CHECK FEE R000.322.103.00.00 0.00 $24.86 PLUMBING$142.16 PERMIT FEE R000.322.100.00.00 0.00 $80.58 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PLAN CHECK FEE R000.322.103.00.00 0.00 $28.43 TECHNOLOGY FEE ,; $ 0.66x TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R13182 R000.322.900.04.00 0.00 $10.66 $285.44 Date Paid: Thursday, January 04, 2018 Paid By: PATRICK FARRELL Pay Method: CREDIT CARD 496861 Printed: Thursday, January 04, 2018 3:34 PM 1 of 1 CRWSYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 P&IS -6003 Project: yakx CrueAy itlefrp 1140461+ Type of Inspectior): F;VVAL Addrerh: rzioo E. M 1J", Ss Date Called:PIPW10 3 -q-ZaK ".1 Special Instructions: ..----0/<- Date Wanted: 3IZOt a.rn., p.m. Requester: Phone No: LJApproved per applicable codes. Corrections required prior to approval. COMMENTS: • (.245, fi toe.4) ooti leAY 15— r, Cofts Fliew,L r 46' Phol-`^- v(A*1 --7A1 "147 p Piuyvtipikt InspectorsZ /179.. Date: 3_ tz_ zoie REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. yout: MECHANICAL FLOOR P 2 CSC Elect Shop Oven \M1.01 MECHANICAL FLOOR PLAN.dwg I eMComponent Supply Con 0 1- �_ ti✓ 6` (/ OEJ 1-1 177/7/////7 FILE COPY Permit Irad 11411(67M0112 LOADING DOCKS Plan review approvCl i �pprev� of construction documents does not authorize the violation of any adopted coda or ordinance. Receipt of approved Field Copy and conditions is acknowledged: By. Cr EXISTING CRANE RAIL AND HOIST NEW SMOKE CAPTURE SYSTEM NEW OVEN 7 REVISIONS No changes shall be rnede to the scone of work without prior 2 nrrovel of Tukwila Building Dnrisir ri NOTE: rev'; ions will r; I!in i 7L� Z777L '7 r—I f JII 677Z/t_�/..:rte 7'-2' PLAN SCALE: 1/4'=1'-0' Ii li PROVIDE FLOOR STRIPING AT 3FT CLEARANCE AROUND NEW EQUIPMENT S G12 (71 EXISTING FIRE PULL STATION, MUST BE ACCESSIBLE III 0 S1r I— ; 111 L Rr='-'77-) i ..`. 1 .,-.tet+ :cal l rc:�l ❑ Plumbing' C C:s Pip:no GENERAL NOTES: 1. CONTRACTOR MUST FIELD VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION WORK. 2. EXISTING UTILITY PIPING IN ROOM NOT SHOWN FOR CLARITY. REFER TO M5.01 FOR UTILITY PIPING CONNECTIONS. 3. NEW EQUIPMENT UTILITY AND EXHAUST CONFIGURATIONS DEPENDENT ON SELECTED MODELS. SUBMIT CONNECTION SCHEMATICS PRIOR TO INSTALLATION. 4. OVEN INSTALLATION FOOTPRINT TO BE CONFIRMED BY FIRST LOCATING OVEN EXHAUST DUCT ROOF PENETRATION FROM INSIDE ROOM TO PROVIDE SPECIFIED CLEARANCE USING STRAIGHT DUCT WITH NO BENDS. 5. NEW EQUIPMENT ACCESSORIES SUCH AS FOLDING OVEN CART TRACKS AND VENT SYSTEM FLEXIBLE ARM NOT SHOWN. REFER TO M7.01 AND M7.02 FOR BASIS OF DESIGN EQUIPMENT. 8. ALL MATERIALS REMOVED DURING CONSTRUCTION SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND DISPOSED OF OFFSITE IN ACCORDANCE WITH LOCAL CODES AND ORDINANCES. REFER TO 011000 SUMMARY. 7. ANY UTILITY AND CONDUIT WORK THAT REQUIRES SHUTDOWN MUST BE DONE ON WEEKENDS IN COORDINATION WITH PROJECT REPRESENTATIVE. FLAG NOTE: 1> FURNACE EXHAUST DUCT SHALL BE MINIMUM 3 INCHES CLEARANCE FROM BEAM. FIELD VERIFY LOCATION OF EXHAUST DUCT FIRST, THEN LOCATE FURNACE, PER PHOTO DETAIL 1/M5.01 STRUCTURAL NOTE: OEQUIPMENT ANCHORAGE BY CONTRACTOR AND COMPLY WITH EQUIPMENT MANUFACTURERS SPECIFICATIONS. UTILIZE STRUCTURAL EPDXY ANCHOR SUCH AS WL1] HIT -RE 500 SD AND HAS -R304 SS -RODS. SUBMIT SIGNED STAMPED DESIGN CALCULATIONS BY WA P.E MINIMUM TWO WEEKS PRIOR TO INSTALL TO KC REPRESENTATIVE. SPECIAL INSPECTION REQUIRED. ANCHORS SHALL BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. VIEWED FOR D OMPLIANCE APP OVED JAN 10 201B IBJ City of Tukwi BUILDING PGS a=000s RECEIVED CITY OF TUKWILA JAN 04 2018 PERMIT CENTER KEYPLAN v QI f ''alt ,>,. �' DESIGNED: M. KAPLAN PROJECT MANAGER: D. LOWMAN SCALEDATE AS NOTED � King County `..'r'.`7 Department of Transportation METRO TRANSIT DIVISION COMPONENT SUPPLY CENTER ELECTRIC SHOP OVEN MECHANICAL FLOOR PLAN APRIL 2017 �,�j {~,i (jl Turcw' i d DRAWN: CHECKED: •ECKED: J. J.SMYTH APPROVED: ZEL SITE LOCATION N0 BUILDING DIVISION � • IBISNO-LIZ NO: wow ROM - ONE INCH AT RAl SHE 1- I DRAINING NO: No. REVISION BY APPD DATE RECOMME D. CRIPR ^ CONTRACT NO: C011l4C17 I IF NOT ONE INCH SCALE ACCORDINGLY SHEET NO: OF17 a w .dwg 1 Layout: FLOOR 0 0 coV w O O LL W tr CC0 U CC (0 u_ 0 0 LL 0 0. 0 0 + 0 N N ( 7' 55.01 �—�— N8 01 J 1 114' GAS V 1' WATER 25' (R 85.02 FURNACE EXHAUST 8'x6 RECTANGULAR DUCT FAN STARTER PANEL PER MANUFACTURER 1 EXHAUST FAN CRANE TRANSITIONAL DUCT FITTINGS NOT SHOWN -,I SMOKE CAPTURE ARM FINISHED FLOOR 2 NEW OVEN SECTION SCALE: 3/8'=1'-0' GENERAL NOTES: 1. CONTRACTOR MUST FIELD VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION WORK. 2. EXISTING UTILITY PIPING IN ROOM NOT SHOWN FOR CLARITY. REFER TO M5.01 FOR UTILITY PIPING CONNECTIONS. 3. NEW EQUIPMENT UTILITY AND EXHAUST CONFIGURATIONS DEPENDENT ON SELECTED MODELS. SUBMIT CONNECTION SCHEMATICS PRIOR TO INSTALLATION. 4. OVEN INSTALLATION FOOTPRINT TO BE CONFIRMED BY FIRST LOCATING OVEN EXHAUST DUCT ROOF PENETRATION FROM INSIDE ROOM TO PROVIDE SPECIFIED CLEARANCE USING STRAIGHT DUCT WITH NO BENDS. 5. NEW EQUIPMENT ACCESSORIES SUCH AS FOLDING OVEN CART TRACKS AND VENT SYSTEM FLEXIBLE ARM NOT SHOWN. REFER TO M7.01 AND M7.02 FOR BASIS OF DESIGN EQUIPMENT. 6. ALL MATERIALS REMOVED DURING CONSTRUCTION SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND DISPOSED OF OFFSITE IN ACCORDANCE WITH LOCAL CODES AND ORDINANCES. 7. DUCTWORK BRACING AND SUPPORTS SHALL BE A SEISMIC RESTRAINT SYSTEM; SHOP DRAWINGS SHALL BE STAMPED AND SIGNED BY A WA P.E. AS SPECIFIED IN SECTION 233100, SUBMIT TO KC REPRESENTATIVE MIN 4 WEEKS PRIOR TO INSTALL. SHOULD EXISTING SUPPORTS NOT BE ADEQUATE, NEW SUPPORTS AT CMU WALLS SHALL UTILIZE THROUGH BOLTING. 'ALL ROOFING SYSTEM SEALING, FLASHING AND REPAIRS TO BE PERFORMED BY KING COUNTY ROOFING CONTRACTOR. COORDINATE WORK WITH PROJECT REPRESENTATIVE. 9. OVEN EXHAUST STACK IS PART OF EQUIPMENT PACKAGE; PER SPECIFICATIONS THE STACK IS CERAMIC LINED (INSULATED), RATED FOR 2300 F INTERNAL TEMPERATURE WHERE THE EXTERIOR TEMPERATURE REMAINS LESS THAN 100 F; AND DOES NOT REQUIRE EXPANSION JOINT. 10. ANY UTILITY AND CONDUIT WORK THAT REQUIRES SHUTDOWN MUST BE DONE ON WEEKENDS IN COORDINATION 1MTH PROJECT REPRESENTATIVE. REVIEW --u FOR CODE COMPLIANCE ►' APPROVED 1 JAN 1 0 201:9 City of Tukwila BUILDING DIV;"i, RECEIVED CITY OF TUKWILA JAN 04 2018 PERMIT CENTER No. REVISION BY DATE DESIGNED: M. KAPLAN PROJECT MANAGER: D. LOWMAN SCALE: AS NOTED APPROVED: LIZ KRENZEL IBIS NO: CONTRACT NO: C01194C17 SITE LOCA ONE INCH AT FULL S12E I '• 1 W NOT ONE INCH. SCALE ACCORDINGLY King County Department of Transportation METRO TRANSIT DIVISION COMPONENT SUPPLY CENTER ELECTRIC SHOP OVEN FLOOR LEVEL SECTION CUT DATE APRIL 2017 DRAWING NO: M3.01 SHEET NO: OF 8 17 126' GIRDER SKYLIGHT W14x24 (BELOW) 25'-0" --I LM Ul oi 41 41 ) 18± I Mixi 0 1 SKYLIGHT] j 25,' HV -21 ) 7' ± 5,-3" (REF) 1'-5" EXIST NG FANS 11Fq F-29 3 T-7" 4'-1" NEW SMOKE CAPTURE SYSTEM FAN 1V-4" 0 1T-8" ± NEW OVEN EXHAUST 2E4.0" 25' (REF) F-32 I I I CU -2 L_ • cv GENERAL NOTES: 1. CONTRACTOR MUST FIELD VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION WORK 2. LOCATE OVEN EXHAUST DUCT ROOF PENETRATION FROM INSIDE ROOM TO PROVIDE SPECIFIED. CLEARANCE USING STRAIGHT DUCT WITH NO BENDS. 3. ALL ROOFING SYSTEM SEALING, CUTTING, REMOVAL, FLASHING AND REPAIRS TO BE PERFORMED BY KING COUNTY ROOFING CONTRACTOR. COORDINATE WORK WITH PROJECT REPRESENTATIVE. 4. PAINT EXHAUST DUCT TO MATCH EXISTING STACKS ON ROOF. REVIEVVE ODE COM APPRO i 1 JAN 10 FOR LANCE ED 2018 ROOF PLAN SCALE: 1/4".1'-0" City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JAN 04 2018 PERMIT CENTER • KEYPLAN No. REVISION BY APPD DATE DESIGNF_D: KAPLAN DRAVM: V.VALDEZ CHECKED: J. SMYTH PROJECT MANAGER D. LOWMAN APPROVED: LIZ KRENZEL IBIS P40: VOW 11001.1011% CONTRACT NO: C011114C17 SCALE: AS NOTED SITE LOCATION NO: ONE INCH AT FULL SIZE IF NOT ONE INCH. SCALE ACCORDINGLY King County Department of Transportation METRO TRANSIT DIVISION COMPONENT SUPPLY CENTER ELECTRIC SHOP OVEN MECHANICAL ROOF PLAN DATE: APRIL 2017 DRAWING NO: M4.01 SHEET NO: OF 7 17 iI 2.jpg; photo detail 3.jpg; CEILING CSC PHOTO DETAIL SCALE: NONE M3.01 CEILING CSC PHOTO DETAIL SCALE: NONE M3.01 CEILING CSC PHOTO DETAIL SCALE: NONE M3.01 FLAG NOTES FIELD VERIFY FURNACE LOCATION SUCH THAT THERE IS 2" MINIMUM CLEARANCE BETWEEN EXHAUST DUCT AND EXISTING GAS PIPE AND ELECTRICAL CONDUIT. EQUIPMENT GAS SUPPLY PIPE TIE-IN LOCATION. IF INSUFFICIENT CLEARANCE, REROUTE PIPE OR CONDUIT IN COORDINATION WITH PROJECT REPRESENTATIVE. MODIFY EXISTING LOW PRESSURE AIR PIPING PER PHOTO DETAILS 2 AND 3, TO PROVIDE ? MINIMUM CLEARANCE FROM FURNACE EXHAUST DUCT. >NEEDED DETACH LOW PRESSURE AIR PIPE AT ELBOWS, SHOWN HERE AND PHOTO DETAS. 3. SHIFT THE STRAIGHT PIPE RUN AS TOWARDS THE WEST WALL TO MATCH EXISTING CONNECTION SHOWN N PHOTO DETAIL 3. SOUTH PIPE RUN WILL REQUIRE AN ESTIMATED 8"•10" EXTENSION, DIMENSION TO BE FIELD VERIFIED. DETACH LOW PRESSURE AIR PIPE AT ELBOWS, AS SHOWN HERE AND IN PHOTO DETAI. 2. REMOVE INDICATED SECTION AND REATTACH STRAIGHT PIPE RUN. APPROVED REVIEWED FOR CODE COMPLIANCE APPROVED JAN 10 2018 City of Tukwila BUILDING DIVISO' RECEIVED CITY OF TUKWILA JAN 04 2018 PERMIT CENTER KEYPLAN REVISION BY APPD DATE DESIGNED: M. KAPLAN DRAWN: V. VALDEZ CHECKED: J. SMYTH RECOMMENDE/�DJ• D. CRIPPEN.( • PROJECT MANAGER D. LOWMAN APPROVED: LIZ KRENZEL IBIS NO: ZION( NEWEST: • CONTRACT NO: C01194C17 SCALE: AS NOTED SITE LOCATION NO: ONE INCH AT FULL SIZE I" IF NOT ONE INCH, SCALE ACCORDINGLY King Comity Department of Transportation METRO TRANSIT DIVISION COMPONENT SUPPLY CENTER ELECTRIC SHOP OVEN PHOTO DETAILS DATE APRIL 2017 DRAWING NO: M5.01 SHEET NO: OF 8 17 O 3 O s J 0 U_ Zd 0 w m J 0) 3 ai J_ W 0J Q U 2 U W 2 SO m 0 0. 0 rn 0 w U 0) U 0 0. In 0 0. 0 0 0 'W 0> 0 0 CO 0 m meq?W to m�0 n4 m 0(.4 C csi 0 ao mwe6 OI -LL W Q NEW 1" x 1" x 1" TEE DRIP LEG 2 1/2" c EXISTING 1" NG PIPE 11 D4 EQUIPMENT GAS CONNECTION DETAIL SCALE: NTS 1" 1" EXISTING 1" WATER SUPPLY TO EQUIPMENT TRANSITION FITTING DEPENDENT ON PURCHASED EQUIPMENT 1" 3" METER 5 PSIG 0-300 SCFM 10 FT 30 AC 101 12.5 MBH 20 FT 50 FT AC 103 12.5 MBH BURNOFF OVEN 390 MBH 50 FT NEW GAS PIPING AND CONNECTED EQUIPMENT DIAGRAM >� SCALE: NTS - AC 102 17.5 MBH 11 1 x 1/2" REDUCER EQUIPMENT WATER SUPPLY CONNECTION SCHEMATIC �21 SCALE: NTS TO EQUIPMENT EQUIPMENT SCHEDULE ITEM BURNOFF OVEN ROOF EXHAUST BASIS OF DESIGN MANUFACTURER JACKSON GREENHECK MODEL • 4404 CUBE 101-4 MECHANICAL CFM 180 1000 S.P. N/A 0.25 RPM N/A 1725 BTUH 390 N/A GAS SUPPLY 1-10 PSI WA WATER SUPPLY 40-60 PSI N/A ELECTRICAL HP N/A 1/4 VOLTAGE 120 120 PHASE 1 1 FLA 15 6 WEIGHT LBS 4500 100 OTHER: ROOF FAN BASIS OF DESIGN REQUIRES 14.5" X 14.5" ROOF OPENING LEGEND: 11 REVIEWED FOR CODE COMPLIANCE APPROVED JAN 1 0 2018 City of Tukwila BUILDING DMSION UNION BALL VALVE GAS COCK FLEX CONNECTOR REDUCER RECEIVED CITY OF TUKWILA JAN 04 2018 PERMIT CENTER KEYPLAN r 'r y�; DESIGNED: M. KAPLAN PROJECT MANAGER: D. COWMAN SCALE: AS NOTEDAPRIL tgil King County Department of Transportation METRO TRANSIT DIVISION COMPONENT SUPPLY CENTER ELECTRIC SHOP OVEN MECHANICAL DIAGRAMS AND SCHEDULE DATE: 2017 DRAWN: V. VALDEZ APPROVED: LIZ KRENZEL SITE LOCATION NO: I lb '�siqut r„s CHECKED: J. SMYTH IBIS NO: SOUK 1001110.1001110.- ONE INCH AT FULL SPIE I DRAWING NO: M6.01 No. REVISION BY APPD DATE RECOMMEN. ,0: ' D. GRIPPE , CONTRACT NO: CO' 117 I IF NOT ONE INCH, SCALE ACCORDINGLY SHEET NO: OF 9 17 CSC ELECTRIC SHOP OVEN PROJECT CONTRACT C01194C17 TECHNICAL SPECIFICATIONS PROFESSIONAL SEALS Mika Kaplan, PE Division 01 Division 02 Division 23 Jeremy Vining, PE Division 26 r Ls" REVIEWED FOR CODE COMPLIANCE APPROVED JAN 10 218 City of Tukwila BUILDING DIVISiON Approved: David Crippen, PE nager, Design & Construction Engineering Section RECEIVED CITY OF TUKWILA PG03.0003 JAN 04 2018 PERMIT CENTER g/vZ7 SECTION 231123 NATURAL GAS PIPING SYSTEMS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.02 SUMMARY A. Description: Work includes natural gas piping and associated appurtenances, materials, equipment, labor, supervision, tools and items necessary for the construction, installation, connection, testing and operation of mechanical work. This section applies to all Division 23 sections. 1.03 CODES AND STANDARDS A. Regulatory Requirements: Comply with applicable city, county and state codes and ordinances. B. Codes and Standards: 1. ANSI LC 1, Standard for Fuel Gas Piping Systems Using Corrugated Stainless Steel Tubing 2. ANSI 221.24, Connectors for Gas Appliances 3. ANSI Z21.69, Connectors for Movable Gas Appliances 4. ANSI Z21.80, Standard for Line Pressure Regulators 5. International Fuel Gas Code 6. NFPA 54, National Fuel Gas Code 7. FM Global Data Sheet 7-52, Natural Gas and Gas Systems 1.04 SUBMITTALS A. Comply with requirements in Division 01 and Section 230500. B. Product Data: Submit manufacturer's technical product data and maintenance data for the following: 1. Indoor gas piping 2. Valves and gas cocks C. Testing Reports: Pressure testing records. PART 2 PRODUCTS 2.01 GENERAL A. Furnish products of sizes, ratings, and characteristics indicated which comply with manufacturer's standard materials, design, and construction in accordance with 231123 -1 C01194C17 published product information. Furnish quantity of piping and appurtenances required for complete installation. Furnish materials and products complying with ASME B31.2 where applicable with pressure rating on natural gas piping system selected for maximum design pressures. 2.02 INDOOR NATURAL GAS PIPING A. Pipe and Fittings: 1. Pipe to be ASTM A106 Gr B seamless 2. All pipe fittings shall be of domestic manufacture in conformance with the following codes: a. Cast iron fittings: Not Acceptable b. Malleable iron fittings: ANSI B16-3 c. Weld end fittings: ANSI B16-9, ASTM A-234 d. Socket weld fittings: ANSI B16.11 e. Copper fittings: ASTM B-32, ANSI B16.22 f. Welded flanges: ASTM -A105; ANSI B16.5 g. Cast copper: B16.18 h. Cast Iron: Not Acceptable i. Malleable Iron: ASTM A197 j. Malleable Iron Unions: ASME B16.39 3. Grooved Joint Couplings and Fittings: Not acceptable. 4. Teflon Tape on Screwed Connections: Not acceptable. 5. Unions: Use only type approved by UPC and AHJ. 6. Reducing bushings are not acceptable. Pipe diameter change may be accomplished with bell -type fittings. 7. Flexible Tubing: Type 300 series corrugated stainless steel tubing (CSST) and flame retardant jacket with compatible mechanical brass fittings acceptable. Comply with ANSI LC 1, Gastight Division/Titeflex Corp. OmegaFlex® CounterStrike, or Dumont. 8. Flexible Connector: Type 304 braided stainless steel. Screwed, welded, or flanged ends. CSA approved. UL listed for flammable and combustible gases and liquids. Rated for 175 psig at 70 F. Comply with ANSI Z21.24 and ANSI Z21.69. Flex -Hose UltraFuel Flex or approved. 9. Maximum spacing between pipe supports are given in the following table, for steel pipe to prevent excessive stress: This does not apply where there are concentrated loads between supports. Pipe Size Max. Span/Ft. Pipe Size Max. Span/Ft. 1/2" 5 4" 14 3/4" 6 5" 16 1" 7 6" 17 1-1/2" 9 8" 19 2" 10 10" 22 2-1/2" 11 12" over 23 231123 - 2 C01194C17 2.03 VALVES A. Gas Cocks 2-1/2 Inch and Smaller: 175 psig non -shock WOG, bronze straightway, flat or square head, threaded ends. Include handle. Nordstrom No. 142, NIBCO, or approved. B. Gas Cocks 3 Inch and Larger: Not used 2.04 PRESSURE REGULATOR A. Not used, unless as specified by Manufacturer and provided as integral component of purchased prefabricated equipment package. 2.05 PIPING SPECIALTIES A. Not Used PART 3 EXECUTION 3.01 INSPECTION A. General: Verify installation conditions as satisfactory to receive work of this section. Do not install until unsatisfactory conditions are corrected. Beginning work constitutes acceptance of conditions as satisfactory. 3.02 PREPARATION A. Field Measurements: Field verify locations of new and existing work prior to commencing work of this section. B. Protection: Protect surrounding areas and surfaces to preclude damage from work of this section. 3.03 INSTALLATION, APPLICATION, ERECTION, AND PERFORMANCE A. General: Install, apply, erect, and perform the work in accordance with Article "Quality Assurance" provisions, specifications, and manufacturer's installation instructions and directions. Where these may be in conflict, the more stringent requirements govern. B. Do not cover up or enclose work until inspected and approved. If in non-compliance, uncover work, remove, and provide new to satisfaction of the King County Project Representative at no additional cost to King County. 3.04 INDOOR PIPING AND COMPONENT INSTALLATION A. Comply with NFPA 54 for installation and purging of natural gas piping. B. Install pipe supports in accordance with MSS SP -69 and this section, whichever is more stringent. C. Remove cutting burrs before assembling piping. 231123-3 C01194C17 D. Use sealants which are chemically resistant to natural gas on metal gas piping threads. Use sealants sparingly, and apply to only male threads of metal joints. E. Install drip legs in gas piping at equipment connections and where required by code. F. Install dielectric unions where dissimilar metals are joined. G. Install piping with 1 inch slope in 60 feet (0.14 per cent) in direction of flow. 3.05 EQUIPMENT CONNECTIONS A. Connect gas piping to gas-fired equipment item with drip leg, shutoff gas cock, and flexible connector. Do not conceal components. Install gas valves to allow for easy access. Comply with equipment manufacturer's installation instructions. 3.06 FLUSHING OF NATURAL GAS PIPING A. After completion of natural gas piping installation and prior to pressure testing, flush interior surfaces by injecting dry nitrogen or carbon dioxide into open ends of piping just prior to making final connections to equipment and utility services. Extend and terminate discharge piping directly outdoors. 3.07 PRESSURE TESTING A. Test natural gas piping in accordance with ASME B31.2, local utility requirements and this section. Coordinate testing with Puget Sound Energy (PSE). Comply with Puget Sound Energy requirements for gas pipe pressure testing. 3.08 SYSTEMS TRAINING A. No training is required for this section. 3.09 COMMISSIONING A. Equipment and systems referenced in this section shall be commissioned per Section 230800. Contractor has specific responsibilities for scheduling, coordination, test development, testing and documentation. Coordinate commissioning activities with the Project Representative. END OF SECTION 231123-4 C01194C17 SECTION 232113 HYDRONIC PIPING PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.02 SUMMARY A. Section includes pipe and fitting materials and joining methods for the following: 1. Copper tube and fittings. 2. Joining materials. 3. Transition fittings. 4. Dielectric fittings. 1.03 CODES AND STANDARDS A. Perform work in accordance with requirements in the state in which the work is performed. 1.04 SUBMITTALS A. Product Data: For each type of the following: 1. Pipe. 2. Fittings. 3. Joining materials. 1.05 STANDARDS OF QUALITY A. Steel Support Welding: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel." B. Pipe Welding: Qualify procedures and operators according to ASME Boiler and Pressure Vessel Code: Section IX. 1. Comply with ASME 831.9, "Building Services Piping," for materials, products, and installation. 2. Certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current. PART 2 PRODUCTS 2.01 PERFORMANCE REQUIREMENTS 232113 - 1 C01194C17 A. Hydronic piping components and installation shall be capable of withstanding the following minimum working pressure and temperature unless otherwise indicated: 1. Process Water Piping: 80 psig at 73 deg F. B. COPPER TUBE AND FITTINGS 1. Drawn -Temper Copper Tubing: ASTM B 88, Type L or ASTM B 88, Type 2. DWV Copper Tubing: ASTM B 306, Type DWV. 3. Grooved, Mechanical -Joint, Wrought -Copper Fittings: ASME B16.22. 4. Grooved -End Copper Fittings: ASTM B 75, copper tube or ASTM B 584, bronze casting. 5. Grooved -End -Tube Couplings: Rigid pattern unless otherwise indicated; gasketed fitting. C. STEEL PIPE AND FITTINGS Not Used. D. JOINING MATERIALS 1. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to ASTM B 813. 2. Brazing Filler Metals: AWS A5.8/A5.8M, BCuP Series, copper -phosphorus alloys for joining copper with copper; or BAg-1, silver alloy for joining copper with bronze or steel. E. DIELECTRIC FITTINGS 1. General Requirements: Assembly of copper alloy and ferrous materials with separating nonconductive insulating material. Include end connections compatible with pipes to be joined. PART 3 EXECUTION 3.01 PIPING APPLICATIONS A. Process water piping, aboveground, NPS 2 and smaller, shall be the following: 1. Type L or Type M, drawn -temper copper tubing, wrought -copper fittings, and soldered joints. B. Process water piping, aboveground, NPS 2-1/2 and larger: Not Used 3.02 PIPING INSTALLATIONS A. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Install piping as indicated unless deviations to layout are approved on Coordination Drawings. B. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise. 232113 -2 C01194C17 C. Install piping to allow application of insulation and to permit valve servicing. D. Install piping free of sags and bends, at indicated slopes. E. Install fittings for changes in direction and branch connections. F. Select system components with pressure rating equal to or greater than system operating pressure. G. Install groups of pipes parallel to each other, spaced to permit applying insulation and servicing of valves. H. Install piping at a uniform grade of 0.2 percent upward in direction of flow. I. Reduce pipe sizes using eccentric reducer fitting installed with level side up. J. Install unions in piping, NPS 2 and smaller, adjacent to valves, at final connections of equipment, and elsewhere as indicated. K. Install shutoff valve immediately upstream of each dielectric fitting. 3.03 DIELECTRIC FITTING INSTALLATION A. Install dielectric fittings in piping at connections of dissimilar metal piping and tubing. B. Dielectric Fittings for NPS 2 and Smaller: Use dielectric unions. C. Dielectric Fittings for NPS 2-1/2 and Larger: Not Used. 3.04 HANGERS AND SUPPORTS A. Comply with requirements specified in the contract Drawings, and with the requirements specified herein for maximum spacing of supports, B. Install the following pipe attachments: 1. Adjustable steel clevis hangers for individual horizontal piping less than 20 feet long. 2. Adjustable roller hangers and spring hangers for individual horizontal piping 20 feet or longer. 3. Pipe Roller: MSS SP -58, Type 44 for multiple horizontal piping 20 feet or longer, supported on a trapeze. 4. Spring hangers to support vertical runs. 5. Provide copper -clad hangers and supports for hangers and supports in direct contact with copper pipe. C. Install hangers for drawn -temper copper piping with the following maximum spacing and minimum rod sizes: 1. NPS 3/4: Maximum span, 5 feet; minimum rod size, 1/4 inch. 2. NPS 1: Maximum span, 6 feet; minimum rod size, 1/4 inch. 3. NPS 1-1/4: Maximum span, 7 feet; minimum rod size, 3/8 inch. 232113 - 3 C01194C17 4. NPS 1-1/2: Maximum span, 8 feet; minimum rod size, 3/8 inch. 5. NPS 2 or larger: Not Used, D. Support vertical runs at roof, at each floor, and at 10 -foot intervals between floors. 3.05 PIPE JOINT CONSTRUCTION A. Ream ends of pipes and tubes and remove burrs. B. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly. C. Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to tube end. Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," using lead-free solder alloy complying with ASTM B 32. D. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube" Chapter, using copper -phosphorus brazing filler metal complying with AWS A5.8/A5.8M. E. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows: 1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified. 2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds. F. Welded Joints: Construct joints according to AWS D10.12WD10.12, using qualified processes and welding operators according to "Quality Assurance" Article. G. Grooved Joints: Assemble joints with coupling and gasket, lubricant, and bolts. Cut or roll grooves in ends of pipe based on pipe and coupling manufacturer's written instructions for pipe wall thickness. Use grooved -end fittings and rigid, grooved -end -pipe couplings. H. Pressure -Sealed Joints: Use manufacturer -recommended tool and procedure. Leave insertion marks on pipe after assembly. 3.06 TERMINAL EQUIPMENT CONNECTIONS A. Sizes for supply and return piping connections shall be the same as or larger than equipment connections. B. Install control valves in accessible locations close to connected equipment. C. Install bypass piping with globe valve around control valve. If parallel control valves are installed, only one bypass is required. 232113 - 4 C01194C17 3.07 FIELD QUALITY CONTROL A. Prepare hydronic piping according to ASME 831.9 and as follows: 1. Leave joints, including welds, uninsulated and exposed for examination during test. 2. Provide temporary restraints for expansion joints that cannot sustain reactions due to test pressure. If temporary restraints are impractical, isolate expansion joints from testing. 3. Flush hydronic piping systems with clean water; then remove and clean or replace strainer screens. 4. Isolate equipment from piping. If a valve is used to isolate equipment, its closure shall be capable of sealing against test pressure without damage to valve. Install blinds in flanged joints to isolate equipment. 5. Install safety valve, set at a pressure no more than one-third higher than test pressure, to protect against damage by expanding liquid or other source of overpressure during test. B. Perform the following tests on hydronic piping: 1. Use ambient temperature water as a testing medium unless there is risk of damage due to freezing. Another liquid that is safe for workers and compatible with piping may be used. 2. While filling system, use vents installed at high points of system to release air. Use drains installed at low points for complete draining of test liquid. 3. Subject piping system to hydrostatic test pressure that is not less than 1.5 times the system's working pressure. Test pressure shall not exceed maximum pressure for any vessel, pump, valve, or other component in system under test. Verify that stress due to pressure at bottom of vertical runs does not exceed 90 percent of specified minimum yield strength or 1.7 times the "SE" value in Appendix A in ASME 831.9, "Building Services Piping." 4. After hydrostatic test pressure has been applied for at least 10 minutes, examine piping, joints, and connections for leakage. Eliminate leaks by tightening, repairing, or replacing components and repeat hydrostatic test until there are no leaks. 5. Prepare written report of testing. END OF SECTION 232113 - 5 C01194C17 gRMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: PG18-0003 DATE: 01/04/18 PROJECT NAME: KING COUNTYU METRO TRANSIT DIVISION SITE ADDRESS: 12100 E MARGINAL WAY S X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: VuildefMvisib c.611111 1•10( \ Ck\ii Public Works Fire Prevention Structural Planning Division Permit Coordinator II PRELIMINARY REVIEW: Not Applicable E (no approval/review required) DA I E,: 01/09/18 Structural Review Required REVIEWER'S INITIALS: DATE: E APPROVALS OR CORRECTIONS: DUE DATE: 02/06/18 Approved C Approved with Conditions Corrections Required LJ Denied (corrections entered in Reviews) (ie: Zoning Issues) [i] Notation: REVIEWER'S INITIALS: DATE: Permit Center Use 0110 CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: 12/18/2013 STELLAR J CORPORATION Home Espanol Contact Safety & Health Claims & Insurance 0 Washington State Department of Labor & Industries Q Search L&I Page 1 of 3 ISSN A-2 Index Help My L&I Workplace Rights Trades & Licensing STELLAR J CORPORATION Owner or tradesperson Principals KINGHORN, ROBERT E Doing business as STELLAR J CORPORATION WA UBI No. 601 702 222 1363 DOWN RIVER DR WOODLAND, WA 98674 360-225-7996 COWLITZ County Business type Corporation Governing persons ROBERT E KINGHORN JEFFREY WALKER; JEFF G CARLSEN; CHERYL SUBASIC; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. STELLJC046J9 Effective — expiration 04/29/1996— 07/16/2019 Bond LIBERTY MUTUAL INS CO Bond account no. 23013678 $12,000.00 Received by L&I Effective date 04/12/2010 04/29/2010 Expiration date Until Canceled Insurance Charter Oak Fire Ins Co $1,000,000.00 Policy no. DT -CO -1 G239362-COF-1 Received by L&I Effective date 06/2812017 07/03/2017 Expiration date 07/03/2018 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601702222&LIC=STELLJC045J9&SAW= 1/11/2018 STELLAR J CORPORATION L&I Tax debts No L8.I tax debts are recorded for this con license during the previous 6 year period, but someis may be recorded by other agencies. ofaN License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 908,480-00 Account is current. Doing business as STELLAR J CORPORATION Estimated workers reported Quarter 3 of Year 2017 "31 to 50 Workers" L&I account contact TO / KRISTINE HATHAWAY (360)902-4811 - Email: HATK2350Ini.wa.gov Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been Issued against this contractor. Contractors not allowed to bid No debarments have been Issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 09/26/2016 Inspection no. 317940969 Location 215 NW 36th St Seattle, WA 98107 Inspection results date 09106/2016 Inspection no. 317941805 Location 28300 Rodendo Beach Drive Des Moines, WA 98198 Inspection results date 04/06/2016 Inspection no. 317939907 Location 18337 120th Ave Bothell, WA 98011 Inspection results date 02/06/2012 Inspection no. 315684233 Location 522 South Sam Street Monroe, WA 98272 No violations No violations No violations No violations Page 2 of 3 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601702222&LIC=STELLJC045J9&SAW= 1/11/2018