HomeMy WebLinkAboutPermit PG18-0147 - NATERA - INSTALLATION OF APPROXIMATELY 70 IF. OF VACUUM JACKETED LIQUID NITROGEN PIPING AND EQUAL AMOUNTNATERA 3215 S 116 ST SUITE 109 EXPIRED 01/01/2020 PGI 8-0147 Parcel No: Address: City f Tukwila a Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 VVebsite:hup://www.Tubmi|aVVA.Rov PLUMBING/GAS PIPING PERMIT 0923049066 Permit Number: PG18-0147 3215 S 116TH ST 109 Project Name: NATERA Issue Date: 1/2/2019 Permit Expires On: 7/1/2019 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: EPROPERTY TAX INC DEPT 207 POBOX 49OU'S[OlTSDAUE,WA, 85261 AMANDA MOORE 11621 E MARGINAL WAY S , TUKWILA, WA, 98168 P S F MECHANICAL INC 11G21EMARGINAL WAY SSUITE A' TUKWILA, WA, 98168-1965 License No: PSFMEI*090NZ Lender: Name: Address: ''^ Phone: (206) 812-7683 Phone: (206) 764-9663 Expiration Date: 10/5/2019 DESCRIPTION OF WORK: INSTALLATION OF APPROXIMATELY 70 IF. OF VACUUM JACKETED LIQUID NITROGEN PIPING AND EQUAL AMOUNT OF COPPER VENT PIPING WITH A VENT HEATER. SCOPE OF WORK DOES NOT INCLUDE LN2 STORAGE TANKS OR CRYOFREEZERS (INSTALLATION AND MAINTENANCE BY OTHERS). Valuation of Work: $0.00 Water District: TUKWILA Sewer District: VALLEY VIEW Fees Collected: $532J2 Current Codes adopted by the City of Tukwila: International BuiIdng Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fu& Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: 2017WA State Energy Code: 2017 2017 1 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature; Print Name: Date:1/1 Uvl`( I' X4 \r\AA7O4-, This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 2: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 3: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 4: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2000 GAS PIPING FINAL 8004 GROUNDWORK 1900 PLUMBING FINAL 9002 ROUGH -IN GAS PIPING 8005 ROUGH -IN PLUMBING 9001 UNDERGROUND '4 I 1, CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov C Plumbing/Gas Permit No. PA op -17 Project No. Date Application Accepted: 1 — 1 Date Application Expires: 1 411 GI (For office use only) PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: 0923049066 Site Address: 3215 South 116th St Suite Number: Natera Tenant Name: PROPERTY OWNER Name: Amanda Moore Name: E Property Tax Inc Dept City: Seattle State: WA Zip: 98168 Address: PO Box 4900 Email: permits@psfmech.com City: Scottsdale State: AZ Zip: 85261 CONTACT PERSON — person receiving all project communication Name: Amanda Moore Address: 11621 E Marginal Way S City: Seattle State: WA Zip: 98168 Phone: (206) 812-7683 Fax: Email: permits@psfmech.com Floor: New Tenant: D Yes ..No PLUMBING CONTRACTOR INFORMATION Company Name: PSF Mechanical, Inc. Address: 11621 E Marginal Way S City: Seattle State: WA Zip: 98168 Phone: (206) 812-7683 Fax: (206) 762-8381 Contr Reg No.: PSFMEI*090NZ Exp Date: 10/05/2019 Tukwila Business License No.: BUS -0996384 Valuation of Project (contractor's bid price): $ 75,000 Scope of Work (please provide detailed information): Installation of approximately 70 If. of vacuum jacketed liquid nitrogen piping and equal amount of copper vent piping with a vent heater. Scope of work does not include LN2 storage tanks or cryofreezers (Installation and maintenance by others). Building Use (per Int'l Building Code): Commercial Occupancy (per Int'l Building Code): Group B Utility Purveyor: Water: Tukwila Sewer: Tukwila Sewer Service hi: \ Applications \ Forms -Applications On Line \ 2011 Applications,Plumbing Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Fixture Type Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain Shower, single head trap Sinks Rain water system — per drain (inside building) Grease interceptor for commercial kitchen (>750 gallon capacity) 11� Each additional medical gas inlets/outlets greater than 5 f Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1-5) Fixture Type Qty Bidet Drinking fountain or water cooler (per head) Lavatory Urinal Water heater and/or vent Repair or alteration of water piping and/or water treatment equipment 11� Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 mm) diameter or smaller f Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial Wash fountain Water closet Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Repair or alteration of drainage or vent piping 11� Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter f Gas piping outlets Fixture Type Qty Dental unit, cuspidor Floor drain Receptor, indirect waste Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1-5 11� inlets/outlets fore specific gas f Each lawn sprinkler system on any one meter including backflow protection devices Liquid Nitrogen Piping PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT, BUILDING OW/: OR AUTHO ZED AGENT: Signatur : J/ Print Name: 11AKA1A.&( t AMe42-__ Mailing Address: 11621 E Marginal Way S, Suite A H:\Apptications\Forms-Applications On Line\20t 1 Apptications`Plumbing Permit Application Revised 8-9-t t.docz Revised: August 2011 bh Date: 12/14/2018 Day Telephone: (206) 812-7683 Seattle WA 98168 City State Zip Page 2 of 2 r 1, DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $532.72 PG18-0147 Address: 3215 S 116TH ST 109 Apn: 0923049066 $532.72 Credit Card Fee $15.52 Credit Card Fee R000.369.908.00.00 0.00 $15.52 PLUMBING $497.31 PERMIT FEE R000.322.100.00.00 0.00 $364.70 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PLAN CHECK FEE R000.322.103.00.00 0.00 $99.46 TECHNOLOGY FEE $19.89 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R16067 R000.322.900.04.00 0.00 $19.89 $532.72 Date Paid: Friday, December 14, 2018 Paid By: AMANDA MOORE Pay Method: CREDIT CARD 669707 Printed: Friday, December 14, 2018 1:23 PM 1 of 1 (7, SYSTEMS Page 2 of 2 CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA Date: 12/14/2018 01:23:27 PM CREDIT CARD SALE MASTERCARD CARD NUMBER: **********5490 K TRAN AMOUNT: $532.72 APPROVAL CD: 669707 RECORD #: 000 CLERK ID: Bill Thank you! Customer Copy https://classic. convergepay.com/V irtualMerchant/transaction.do?dispatchMethod=printTr... 12/14/2018 12/3/2019 City of Tukwila Department of Community Development AMANDA MOORE 11621 E MARGINAL WAY S TUKWILA, WA 98168 RE: Permit No. PG 18-0147 NATERA 3215 S 116TH ST 109 Dear Permit Holder: ("7 Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 1/1/2020. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 1/1/2020, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, 1:4 7-.1 Bill Rambo Permit Technician File No: PG18-0147 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 r� City of Tukwila Allan Ekberg, Mayor Department of Community Development - Jack Pace, Director June 20, 2019 Amanda Moore 11621 E marginal Way S Tukwila, WA 98168 RE: Request for Extension #1 Permit Number PG18-0147 Dear Ms. Moore, This letter is in response to your written request for an extension to Permit PGI8-0147. The Building Official, Jerry Hight, has reviewed your letter and considered your request to extend the above referenced permit. It has been determined that the City of Tukwila Building Division will be granting an extension to the permit through January 1, 2020. If you should have any questions, please contact our office at (206) 431-3670. Sincerely, Kandace Nichols Permit Technician File: Permit No. PG18-0147 Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov p 9 Building Relationships. Creating Environment June 14th, 2019 City of Tukwila Department of Community Development 6300 Southcenter Blvd, Suite #100 Tukwila, WA 98188 ATTN: Kandace Nichols 0/ 47 RE: Permit No. PG18-04-74-- NATERA 3215 S 116 ST To whom it may concem, We would like to request a 180 day extension on the above mentioned permit. At this time work is expected to begin in the next 3 months. Please contact me if there are any questions or concerns, Amanda Moore Permits and Licensing PSF Mechanical, Inc. (206) 812-7683 1 permits@psfinech.com 1 license@pslmech.com PSFIVec Request for Extensior # J Current Expiration Date: 7 -ict Extension Request: )(Approved for days Denied (provide explanation) Signature/ nitials Corporate Office (206) 764-9663 Tacoma Office 53) 830-5978 C r 424 16/ „ Margns: '168 5/31/2019 City of Tukwila Department of Community Development AMANDA MOORE 11621 E MARGINAL WAY S TUKWILA, WA 98168 RE: Permit No. PG 18-0147 NATERA 3215 S 116TH ST 109 Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 7/1/2019. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 7/1/2019, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Kandace Nichols Permit Technician File No: PG18-0147 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 / PERMIT COORD Cop'O PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: PG18-0147 DATE: 12/14/18 PROJECT NAME: NATERA SITE ADDRESS: 3215 S 116 ST X Original Plan Submittal Response to Correction Letter #_ Revision # after Permit Issued Revision # before Permit Issued DEPARTMENTS: (j Building Division blit Wo"rk� Fire Prevention Structural n Planning Division Permit Coordinator in PRELIMINARY REVIEW: Not Applicable n (no approval/review required) DATE: 12/18/18 Structural Review Required REVIEWER'S INITIALS: DATE: n APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Corrections Required Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 1/15/19 n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW D Staff Initials: 12/18/2013 P S F MECHANICAL INC Home Espanol Contact Safety & Health Claims & Insurance ill)Washington State Department of Labor & Industries Page 1 of 3 ;Search L&I AZ Index Help My L&I Workplace Rights Trades & Licensing P S F MECHANICAL INC Owner or tradesperson Principals REYNOLDS, JAMES P, PRESIDENT READ, ANDREW A, PRESIDENT BEARDSLEY, WARREN SCOTT, SECRETARY CRITCHLOW, JAMES D (End: 09/27/2011) Doing business as P S F MECHANICAL INC WA UBI No. 601 318 369 11621 E Marginal Way S Suite A SEATTLE, WA 98168 206-764-9663 KING County Business type Corporation Governing persons WARREN BEARDSLEY JOHN P KING; CHRISTOPHER J LAWSON; DOUGLAS 0 LONG; ANDREW AARON READ; License Verify the contractors active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. PSFMEI*090NZ Effective — expiration 08/09/1991— 10/05/2019 Bond Travelers Cas & Surety Co Bond account no. 105975899q $12,000.00 Received by L&I Effective date 03/13/2014 03/13/2014 Expiration date Until Canceled Bond history Insurance Liberty Mutual Fire Insurance Policy no. TB2Z91452741018 $1,000,000.00 Help us improve httos://secure.lni.wa.gov/verify/Detail.aspx?UBI=601318369&LIC=PSFMEI*090NZ&SAW= 1/2/2019 P S F MECHANICAL INC Received by L&I 09/28/2018 Effective date 10/01/2018 Expiration date 10/01/2019 \ Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. This company has multiple workers' comp accounts. Active accounts L&I Account ID 848,535-00 Doing business as PSF MECHANICAL INC Estimated workers reported Quarter 3 of Year 2018 "Greater than 100 Workers" L&I account contact T3 / KAYLENE MONIER (360)902-6627 - Email: BRKB235@lni.wa.gov Track this contractor el Account is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for, Inspection results date 09/10/2014 Inspection no. 317399160 Location 9322 14 Avenue S Seattle, WA 98108 Inspection results date 04/01/2013 Inspection no. 316732031 Location 600 University Seattle, WA 98101 Violations No violations Page 2 of 3 « Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UB1=601318369&LIC=PSFMEI*090NZ&SAW= 1/2/2019 PIPING GE\ ERAL NOTES LE \_DS 1. BEFORE COMMENCEMENT OF WORK THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION, ELEVATIONS AND CHARACTERISTICS OF ALL UTILITIES AND PIPING AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT OR ANY DISCREPANCIES. 2. EXACT LOCATIONS AND MOUNTING HEIGHT OF PIPING SHALL BE OBTAINED FROM DRAWINGS FOR ANY OTHER DATA, CONTACT OWNERS.. 3. ALL PIPING SHALL BE INSTALLED SO AS TO AVOID INTERFERENCE WITH ELECTRICAL AND MECHANICAL EQUIPMENT AND STRUCTURAL FRAMINGS. 4. ALL WORKS SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND UNIFORM PLUMBING CODES. IN CASE OF CONFLICTS OF CODES AND DRAWINGS AND SPECIFICATIONS, THE MOST STRINGENT SHALL PREVAIL. 5. EXTERIOR VENTS SHALL BE INSTALLED 10'-0" FROM/OR TERMINATED 3'-0" ABOVE ANY FRESH AIR INTAKES. 6. THE CONTRACTOR SHALL COORDINATE ALL ACCESS PANELS WITH BUILDING REFLECTED CEILING PLAN AND ELECTRICAL LIGHTING PLAN. 7. THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS WITH UTILITY PIPING AND INSURE THE NEW PIPING WILL NOT HINDER OTHER APPUCATION FOR SERVICES. ROUTING OF PIPING MUST BE PREPLANNED AND MUST BE FULLY AGREED UPON BEFORE INSTALLATION. FIELD VERIFY BEFORE BID. 8. THE CONTRACTOR SHALL FULLY STUDY THE PLANS AND WITH THOROUGH EVALUATION OF SITE, WILL INSURE THE JOB WILL BE INSTALLED WITHIN BID QUOTED. CONTRACTOR WILL BE RESPONSIBLE FOR FULL AGREEMENT AND SATISFACTION OF OWNER. INSTALLATION WILL BE COMPLETE WITH ALL SEISMIC AMENITIES AND SUPPORTS, EVEN IF NOT DETAILED ON PLANS. 9. CONNECTIONS BETWEEN INCOMPATIBLE MATERIALS ABOVE GROUND AND INSIDE BUILDINGS SHALL BE BE MADE WITH FULL AND COMPLETE ISOLATION WITH NEOPRENE SHEETS. 10. CONTRACTOR SHALL COORDINATE ALL PATHWAYS, THE TYPE OF STRUCTURE, AND MATCH THE UBRARY OF DETAILS PRODUCED. ADDITIONAL SUPPORTS CAN BE ADDED UNDER THE ORIGINAL CONTRACT. NO AD SERVICES PERMITTED. 11. NOT USED. 12. ALL MATERIALS AND EQUIPMENT USED SHALL BE NEW AND UNUSED. THE CONTRACTOR SHALL ONLY USE QUAUFIED LABOR FOR THE PROPER INSTALLATION OF SUCH MATERIAL/EQUIPMENT PER APPLICABLE STANDARDS. 13. 14. 15. 16. NOT USED. NOT USED. NOT USED. NOT USED. 17. THE PLUMBER SHALL VERIFY ALL PENETRATIONS THROUGH THE BUILDING STRUCTURES WITH OWNERS. THE PLUMBER TO SEAL ALL FIRE RATED PIPING PENTERATIONS WITH FOAM SEALANTS OF EQUAL FIRE RATING. 18. ALL VALVES ARE TO BE LOCATED IN PROPER AND ACCESSIBLE SPACES. 19. NOT USED. 20. CONTRACTOR IS TO SECURE THE PIPING TO THE PROPER LOCATIONS IN THE BUILDING STRUCTURES (VERIFY WITH THE STRUCTURE AND CORRESPONDING DETAIL) 21. PROVIDE 4" PER 100 FEET MINIMUM SLOPE UP TO CRYOVENT. 22. CONTRACTOR SHALL MAKE REASONABLE ALLOWANCE FOR VALVES, FITTINGS, PIPING, AND SUPPORTS NOT SHOWN ON PLANS. 23. DRAWINGS ARE OF SCHEMATIC FORM AND CHANGES MAY BE NECESSARY FOR CONVENIENCE, OBSTRUCTIONS, OR EFFICIENCY. THE CONTRACTOR SHALL BE REQUESTED TO PROVIDE VAUD REASONS FOR ANY CHANGES. PLUMBING LEGEND SYMBOL DESCRIPTION 41 PRESSURE RELIEF PER ELDEC STNDRD CHECK VALVE PER ELDEC STANDARD D I CAPPED PIPE FOR FUTURE USE [ FLEXIBLE PIPE SOIL VENT - SOFT WATER SW -AIR-OR-A- COMPRESSED AIR A HB HOSE BIBB A KHB KEYED HOSE BIBB A RH8 RECESSED HOSE BIBB BALL VALVE -1><- SOV SHUT OFF/GATE VALVE if- GAS COCK (VALVE) KI CHECK VALVE WALL CLEAN OUT I WCO FCO FLOOR CLEAN OUT CLEAN -OUT TO GROUND COTG 100 r. LENGTH/ONE-FT DROP PLUGGED OR CAPPED PIPE L GAS LINE G e OR POC POINT OF CONNECTION ROOF DRAIN do OVERFLOW Di; ® FLOOR DRAIN '�' FLOOR SINK AIKX ROOF DRAIN W/ OVERFLOW THRU WALL CONDENSATE DRAIN PIPE CD MATERIALS LEGEND SERVICE NITROGEN INSIDE OUTSIDE _ O REMARKS/ NOTES SECTION 4302 2S- VACUUM INSULATED PIPE PART 1 -GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and all provisions as mandated by Owner, Owners' represehtatwe, Standards, and rreniadurers stringent gudellnes. B AN nodes, standard, manufactures installation are applicable. 1.02 SUMMARY A. Perform all work required to provide and install vacuum Insulated pipe and accessories for dshib lion of liquid nitrogen from outside tank to indoor facilities, with supplementary terns necessary for proper attribution to final point of use including valves, Stings and vacuum ports, all amenities required for complete and functional system, even if not detailed. 1.03 REFERENCE STANDARDS A. The latest puttered edition of a reference stall be applicable to this Project unless identied by a specific edition date B. All reference amendments adopted prior to the effective date of this Contract WWI be applicable to this Project. C All materials, installation and workmanship shell comply with the applicable requirements and standards addressed within tie following references. 1. ANSI 1331.3 -Chemical Plant and Petroleum Refiring Piping 2 ASTM A312-Welded Pipe. 1.94 QUALITY ASSURANCE A. Valves: Manufacturers lame and pressure rating marked on valve body. B. Welding Materials and Procediroe: Conform to ASME Code and applicable state labor regulations. C. Manufacturer Quakfications: Company specializing in manufacturing the products specified in this section with minimum three years documented experience. D. Installer Qualifications: Company specializing In performing the walk of this section with mrimum three years documented experience. 1.05 DATA A. Product Data: Provide data on pipe materials, pipe fittings, valves and accessories. Provide manufacturers catalog information. B. Record Documents: Record actual locations of valves. Mc C. Operation and Maintenance Data: 1.06 DELIVERY, STORAGE AND HANDLING A. Accept valves on site in shipping containers with labeling in place Inspect for damage. B. Provide temporary end caps and closures on piping and fittings Maintain in place untl mstaSatlon. C Protect piping systems from entry of foreign materials by temporary covers, compk4ing sections of the work and isolating pens of completed system. PART 2-PRODUCTS 2.01 GENERAL A. All materials shall meet or exceed all applicable referenced standards, federal, state and local requirements, and conform to codes and ordinances of aut hondes having jurisdiction. 2.02 VACUUM INSULATED PIPE A. Manufactures: 1. Chart Industries, Inc.; Techntab Products, Inc.; Quality Cryogenics, Approved Equal per owners' request B. The vacuum insulated piping system shall be composed of prefabricated sections of the static vacuum design with a chemical getering system The sections must have bayonet end connections for assembly in the fled without welding. The manufacturer shall have design bayonet locations and provide a piping dewing for customer approval. C. The Inter carrier shall be INVAR 36 with 36% nickel alloy for minimal contraction between atmospheric and cryogenic temperatures or 304 stainless with bellows. Pipe ends shall be bayonet joints for joining spools and as use points.. Male bayonet shall be INVAR 3& D. The vacuum jacket shell be 304 stainless steel in accordance with the ASME Code for Unfired Pressure Vessel, Section VIII for an internal vacuum and external atmospheric pressure with the assembly at ambient temperature. Expansion joins shall not be necessary • After liquid begins to flow from the farthest use point, you can lest any additional legs of the system that may be required. • For systems with a gas vent, make sure the gas vent is operating correctly. 4. The bulk tank valve may now be Idly opened. The use point velvets) may now be closed or left open as desired. E Note: The cool down process involves rapid pressure changes and metal contractions. You may see or hear evidence of these changes such as pipe vibrations and/or popping souses. As these changes subside, showy throttle open the tank outlet valve to push liquid further Into the system Additional Guideline% (a) All welding shall be performed by quieted welders using approved welding procedures per ASME B31.3 (b) Welds will he exam ned in accordance with requirements of ASME B31.3- Norval Fluid Service Per section 341.4. 1 In -Process Examination in accordance with section 344.7 may be substituted for all or part of the radiographic examination (c) All VP should be cormercialty cleaned for cryogenic service. Piping service shall be Oxygen cleaned (d) All welds and the entire spool shall be leak tested with a helium mass spectrometer calibrated to a serstvlly of tx1OE standard cc/sec. (e) Heat shall be applied during the evacuation of the spool sections to accelerate out gassing. The minimum temperature shell be 2e0°F. Means shall be employed on the vacuum pumping system to prevent oil from beck streemng etc the spcol vacuum space. Spools shell be sealed off at less then 10 microns (f) The installer shall perform a field pneumatic leak test on the completed piping system at 110% of the design pressure per ASME B31.3 E. The vacuum annulus inner carrier shall be supported within the jacket by a support system designed to absorb thermal loads on the Inner pipe when partially or completely lined with product minimize heat leakage, withstand loadings 1, 2, are 3, listed below during shipping and loading 4 during and after 'retaliation. 1. Three it bad applied vertical downward 2. Three '9' load applied vertical upward 3. Two "g' load applied horizontally, longitudinally, or laterally combined with one'g' load vertically downward. 4. Mel Uniform Building Code for Zone 3 seismic requirements when inner line is filed with TritNorethylene. F. The laminar radiation shielding inner Ilne shall De "super insulated' with a Mrirrxirn of twenty alternate Myers of aluminum foil and cryogenic paper Each section of the chemical getting system shall have molecular sieve and a hydrogen converter installed in the vacuum annuls for the purpose of removing the majority of vacuum contaminants, The quantity of sorption pumping materials required for each section shall be determined by the manufacturer. H. Each section shall be equipped with a combination evactatior/relief valve port complete with a Hosting DV -SR Vacuum Transducer for montoring the vacuum level without breaking into the vacuum annulus. I. Heat shall be applied during pumping to accelerate outgassing Minimum temperature shall be 200 degrees Fahrenheit. Sections to be sealed at less than 10 microns J. All manufacturing shall be accomplished through the use of certified welders. Testing of welds lnclldes leek - testing with helium nets spectrometer calibrated to a sensitivity of 1 x 10.9 standard colseoord. A two-day vacuum retention test to verify leak testing and seal off. K. Three fool and six loot flexible vacuum jacketed sections to offset horizontally around walls. L. All ngld end flexile piping shall be rated for 150 peg maximum. M. All points of tee drops shell be provided with internal traps. 203 VALVES A. Valves shall be provided for point of use isolation. Each valve shall be WI vacuum insulated extended stem valve. Valve shall accormhodate operating temperatures between -320 degrees to +165 degrees a a maximum operating pressure a 600 PSI CWP. 204 CRYOVENTS A. Heated cryovertts shall be provided at the end of each main and at other locations as recommended by the manufacturer. 205 FILL STATION A Manufacturer Shall provide one le station assembly with manually actuated dead -man switch solenoid valve controlled dispensingsystem whereitr rewired in protect drawings 2.06 FITTINGS A. Each point of use outlet stall be provided with male connector to receive freezer hose. Intermediate piping and fittings ghat be stainless (304). Each drop may serve from one to four freezers PART 3 - EXECUTION 3.01 PREPARATION A. Visually inspect all components for damage prior to installation. If deep dents are noted, do rot install pipe. Contact manufacturer for aeeieMnce. B. Clean bayonet couplings and 0-ring using clean lint tree cloth and solvent approved by the manufacturer. C. Read vacwm on each section ofpipe, usingHastingsVacuum Gauge. Rep ort any vacuum pipe reeding higher than 35 microns. 3.02 INSTALLATION A. Installation shall meet or exceed all applicable federal, state and local requirements, referenced standards and conform to codes and ordirences of authorities having jurisdiction B. Installation shall be in accordance with manufacturer's published recommendations. G Provide non -conducting dielectric connections wherever joining dissimilar metals. D Rost piping in orderly manner and maintain gradient. E. Install piping to conserve boding space. F. Group piping whenever practical at cannon elevations G. Install piping to allow for expansion and contraction without stressing pipe, lints, or connected equipment H. Provide clearance for access to vanes and fittings. I Refer to manufacturer's Installation instructions for complete installation J Slope shall be 1" per 50' span for gas bubbles to naturally nse up to cryovent K Flexible pipe minimum bend radius per inner flex size: 1' inner pipe with 16" bend radius, 1 W inner pipe with 20' bend radius, 2' inner pipe with 20' bend radius. L All torque values for tightening nuts shall be per manufacturers' values M. All Bayonet piping sizes and installations must be per manufacturer's guideli nes N All pipes in axial direction must be Bose to allow slight pipe m overrents. Every 5" support must be a roller. O. Trap End: Skgle &op use points require trap end. P All safety bulletins from all manufacturersto be followed are the installers must have Installed this system with ten years of experience with manufacturer's training programs. 3.03 APPLICATION A Install hangers and supports at intervals of 6 to B feet and all large in direction poins Use split damp hanger type supports with appropriate isolation. Piping shall not be able to sway. Refer to specification 20 05 29 Supports and Sleeves. B Point of use drops shall be attached to architectural pipe column or attached to wall with strut charnel. Coordinete spacing requirements of electrical raceway. 3.04 TESTING - DRY NITROGEN A. Alter installation of all conponerits, the installer shall pressurize the entire system with dry nitrogen gas to maximize operating pressure. Presetre stall not exceed 1.25 times vacuum insulated pressure rating. There should be no pressure decrease in a four host period. If the pressure drops in a four hour period, bubble test entire system, darting at supply tank until the leaks located and repaired. Repeat until the pressure told test is successful. 3.04 TESTING - LIQUID NITROGEN A. Alter dry nitrogen lest the manufacturer shall introduce liquid nitrogen into the piping system from a supply tank. The closest point of use valve shall be opened first, unit liquid nitrogen begins to issue. Repeat sequence for all points of use through to far point. B. The system shall be visually inspected for condernsatkxh on vacuum insulated pipe. The manufacturer shall make adjustr ants as needed to ehmirate abnormal frost formation or condensation C It is recommended that connection of the system to a liquid cryogen bulk tank or supply be performed by customer's liquid cryogen supplier. Starting Up a Cryogenic System When inklating flow into a VJP system it is necessary to gradually cool down the pipe from ambient temperature to cryogenic temperature. D. Procedure: Note: If Field Joints are installed, the Owner or the Owner's Representative may specify Inspection requirements. Be sure to verify Inspections are complete prior to proceeding. 1. Visually ireped the VJP system to ensure all connections are joined and the installation meets the requirererts listed previously. This includes but is not limited to: • ❑ All bayonet clamps are installed and tightened. • 0 Piping clamps and hangers are correctly installed and tightened • 0 Safely relief valves have been installed and are in the proper locations. Verify liquid can not be trapped anywhere in the system. 2. Next charge the system with cryogen to look for leaks: • ❑ Make sure the use point valves and valves in portions you do not want to test are closed. You will need to remove any valve lookout devices before opening. • D Slowly crack open the cryogen supply valve on the bulk storage tank and allow the pressure to equalize between the system and the tank. Note On systems with a gas vent the pressure will not equalize until the line is full • L' Inspect the system once the bulk tank valve has been cracked open 3.Orbe the system has been pressurized, cool down the system and check for system operation. • On systems with a gas vent, gas will expel from the vent unfit system is cooled. • Go to the farthest end point open the use point valve, and let the system fill up with cryogen to cool the system down. • Continue to watch for leaks, which can indicate an assembly problem, and frost on insulated connectors that could indicate an MpropeM assembled o-ring. .d' dUF'anZv'' I:'t Jrcmar.ce l cn5 s Date REVISIONS =cope Dian r SEPARATE PERMIT REQUIRED FOR: Ly Mechanical mr Electrical Plumbing MU Gas Piping City of Tukwila BUILDING DIVISION EXPiREl JAM 01 2020 VJ PIPE FRONT WALL MOUNT -ANGLE BRACKET ANGLE BRACKET WALL STRUT CUSHION CLAMP UNISTRUT ANGLE BRACKET TOP SIDE SCALE: 1' = WALL VJ PIPE WALL MOUNT - SURFACE StRfr C U5IION CLAMP FRONT SCALE'. 1' = I' -a SIDE WALL FLOOR MOUNT - SURFACE VJ PIPE UNISTRUT CONCRETE ANCHORS B POST BASE SIDE SCALE: 1' = 1'-m END CEILING CEILING MOUNT- Be5 FLEXIBLE ALL -THREAD -- t SS HOSE CLAMP 6' OC SIDE END CELNG CEILING MOUNT - R50 RIGID CEILING --- ALL -THREAD VJ PIPE SIDE END CEILING REVVElieLD 3iZ CODE COMPLIANCE APPROVED DEC 13 2018 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA DEC 1 4 2018 PERMiT CENTER CLIENT U.S. CRYOGENICS, INC 12609 NE 95th Street Unit B-101 Vancouver, Washington 98682 >- g J 0 a° U. O J O 0 < 0 -I W I. co zQ THESE PLANS WERE DEVELOPED RESTRICTNELY FOR USE ON THE STRUCTURES AND BY PERSONS/ COMPANY AS SPECIFIED IN THE TRLE BLOCK. ANY OTHER USE (INCLUDING, BUT NOT UMfaED TO, DISSEMINATION AND COPYING) OF THESE PLANS AND ANY PORTION THEREOF, AS WELL AS ANY USE OF THE PLANS BY ANY PARTY OR PARTIES OTHER THAN THE ONES SPECIFIED IN THE TITLE BLOCK. ARE STRICTLY PROHIBITED UNLESS UNDER A WRITTEN PERMISSION BY SGE. KHOSROW 11SAUMrt NOURMOHAMMADI 2515 BAMBOO Newport Beach, CA 92660 Tel.(949) 852-8700 ' Fox (949) 852-1918 --t-2tre ts Ise LS, vi; S3677 0. b'CrectNAL. tie [EXPIRES JOB No. 181438 PLUMIBNG SHEET-R REV DATE REVISIONS DESCRIPTION BY P'd DATE: DECEMBER 5, 2018 DESIGNED BY RA APPROVED BY KN GENERAL NOTES, DETAILS SCALE. 1-= SCALE- f1'4* P1.0 ter r c. 0 o 0 ��Ian 1 0 0 0 0 (7) _T EXPI'.' D JAN O 1 ZOZB ovn DEC 1 '.': 232 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA DEC I42018 PERMIT CENTER PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF US CRYOGENICS. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT "HE WRITTEN PERMISSION OF US CRYOGENICS IS PROHIBITED. S 0 LL I CLIENT U.S. CRYOGENICS, INC 12609 NE 95th Street Unit B-101 Vancouver, Washington 98682 2a > N 0 Z W 0 o- J 0 uj Z 3215 S. 116TH STREET TUKWILA, WA 98168 THESE PLANS WERE DEVELOPED RESTRICTIVELY FOR USE ON THE STRUCTURES AND BY PERSONS/ COMPANY AS SPECIFIED IN THE TITLE BLOCK. ANY OTHER USE TO. DISSEMINATION AND INCLUDICOPYYIING OF NOT TREESE PLANS AND ANY PORTION THEREOF, AS WELL AS ANY USE OF THE PLANS BY ANY PARTY OR PARTIES OTHER THAN THE ONES SPECIFIED IN THE TITLE BLOCK, ARE STRICTLY PROHIBITED UNLESS UNDER A WRITTEN PERMISSION BY SCE. REV KHOSROW "SAUM" NOURMOHAMMADI 2515 BAMBOO Newport Beach, CA 92660 Tel(949) 852-8700 ' Fax (949) 852-1918 DATE JOB No. 181438 PLUMIBNG SHEET-R REVISIONS DESCRIPTION DATE: DECEMBER 5, 2018 DESIGNED BY RA APPROVED BY KN PLUMBING PLAN P2.0 (A) CLIENT U.S. CRYOGENICS, INC HEATER H WAL 63'-3" DROP CEILING (USING r CRYOVENT VENT LINE 1/2" IPS VJ PIPE 6 1/2" 111-6 1/2" ` _ (PIPE SLOPE NOT REQUIRED) r 8 1/4 js 6' 7-6• SLOPE PIPE UP 1" IPS VJ SUPPLY PIPE 7, BOX - 6" PER 100 FEET ki \ \ = \ 9�� 4; IPS VJ PIPE o /2" VJ NAL�As� �/2" kr co zn 9 L LIQUID NITROGEN (LN2) CRYOGENIC STORAGE STORAGE TANKS BY OTHERS FREEZER BY OTHERS 1 3 ELEVATION VIEW SCALE: 1/4" = 1'-0" 1 DROP CEILING 6'-0 1/4" r CRYOVENT ID 1 .. r.. ( , " LIQUID NITROGEN (LN2) CRYOGENIC STORAGE STORAGE TANKS BY OTHERS FREEZER BY OTHERS ELEVATION VIEW SCALE: 1/4" = 1'-0" 6'-6 1/2'' 11'-2" r r PNEUMATIC SAFETv 6'-0" D (2) PLCS r VALVE RELIEF VALVE N I r kr \ \ CO 5 7' 5'-7" 1-1/4' ID FLEX i1/44 M 1 1'�`— _ JF I 11-2" \ o - `s 1 •• 1 l� I 1 J I Y- I \, ELEVATION VIEW LIQUID NITROGEN (LN2) STORAGE TANKS BY OTHERS SCALE: 1/4" = 1'-0" L 1 L0 VENT HEATER 0 —� WALL BOXES T ELEVATION VIEW EXPIRED JAIL 0 a. 2020 PGl8eoH7 CODE CC:,';'L A E APPROVED DEC 1?2018 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA DEC 142018 PEi-trMTl f CENTER 12609 NE 95th Street Unit B-101 Vancouver, Washington 98682 LOCATION 3215 S. 116TH STREET TUKWILA, WA 98168 THESE PLANS WERE DEVELOPED RESTRICTIVELY FOR USE ON THE STRUCTURES AND BY PERSONS/ COMPANY AS SPECIFIED IN THE TITLE BLOCK. ANY OTHER USE (INCLUDING. BUT NOT UNITED TO, DISSEMINATION AND COPYING) OF THESE PLANS AND ANY PORTION THEREOF, AS WELL AS ANY USE OF THE PLANS BY ANY PARTY OR PARTIES OTHER THAN THE ONES SPECIFIED IN THE TITLE BLOCK. ARE STRICTLY PROHIBITED UNLESS UNDER A WRITTEN PERMISSION BY SOE. KHOSROW "SAUM" NOURMOHAMMADI 2515 BAMBOO Newport Beach, CA 92660 Tel.(949) 852-8700 $ Fax (949) 852-1918 JOB No. 18143E PLUMIBNG SHEET-R REVISIONS REV DATE DESCRIPTION DATE: DECEMBER 5, 2018 DESIGNED BY RA APPROVED BY KN ELEVATIONS PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF US CRYOGENICS. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF US CRYOGENICS IS PROHIBITED. P3.0