HomeMy WebLinkAboutRes 2072 - 2024-2029 Transportation Improvement ProgramWashington Resolution No. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2024- 2029), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2024-2029); and WHEREAS, on June 12, 2023, a public hearing was held regarding the City's Six - Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A Six -Year Transportation Improvement Program for the calendar years 2024 to 2029, attached hereto as Exhibit A, is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington CC:\Legislative Development\TIP 2024-2029 5-2-23 Cyndy Knighton Review by Andy Youn Page 1 of 2 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Special Meeting thereof this 2A6- day of (Apk, , 2023. ATTEST/AUTHENTICATED: 1.—DocuSigned by: aCriShl FL4ALVIL(1 88678483C8594E7 . Christy O'Flaherty, MMC C n hia Delostrinos Johnson City Clerk Council President APPROVED AS TO FORM BY: f—DoctiSigned by: co\LL 5F ACM r AA 165F d Office of the City Attorney Filed with the City Clerk: ‘P-1-°-7-3 Passed by the City Council: 6-L6 Resolution Number: Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2024 to 2029 CCALegislative Development\TIP 2024-2029 5-2-23 Cyndy Knighton Review by Andy Youn Page 2 of 2 Washington State War Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type S. 05 STBG(UL) / 1037(004) TUK-62 42nd Ave S Bridge Replacement 42nd Ave S over the Duwamish River Interurban Ave S to Northern end of bridge Replace the existing 42nd Ave S steel truss bridge. The replacement will require preliminary engineer design, right-of-way, and construction phases. The new structure will meet current road and bridge design standards. The replacement structure configuration will be two through -lanes, possibly a turn pocket, and include sidewalks. 06/12/23 06/26/23 1,100,000 2,600,000 11 RW 0.100 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2024 STBG(UL) 1,500,000 0 0 1,100,000 2,600,000 S RW 2024 BR 86,500 0 0 13,500 100,000 S CN 2024 BR 11,913,500 MAW 17,000,000 0 28,913,500 Totals 13,500,000 17,000,000 1,113,500 31,613,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 800,000 0 0 0 0 RW 100,000 0 0 0 0 CN 0 15,636,500 13,500,000 0 0 Totals 900,000 15,636,500 13,500,000 0 0 Report Date: May 04, 2023 Page 1 Washington Stato VAIII Department of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside -n c z n 0 mt ..7 o N x. a Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 RW WA -1111:: 46th Avenue Safe Routes to School 46th Avenue S S 150th Street to S 144th Street Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised crosswalk across S 144th Street with RRFB. 06/12/23 06/26/23 90,000 270,000 05 RW 0.370 0 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 RW 0 SRTS 180,000 90,000 270,000 P RW 2024 0 0 SRTS 220,000 20,000 240,000 P CN 2025 0 SRTS 1,660,000 410,000 2,070,000 Totals 0 2,060,000 520,000 2,580,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 270,000 0 0 0 0 RW 240,000 0 0 0 0 CN 0 2,070,000 0 0 0 Totals 510,000 2,070,000 0 0 0 Report Date: May 04, 2023 Page 2 W shn t DopHrtmo+ntingtost of T mttportotkm Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside Functional Class) Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type' RW Required''. 00 WA05409 Allentown Truck Reroute Project to Study alternatives for truck access to reroute outside of residential neighborhood. 06/12/23 06/26/23 600,000 600,000 18 0 600,000 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PL 2024 0 0 600,000 600,000 Totals 0 600,000 0 600,000 600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PL 600,000 0 0 0 0 Totals 600,000 0 0 0 0 Report Date: May 04, 2023 Page 3 Ai Washington State Department at Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside -n c 0 0 o 0: a, 2 Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes] Total Length Environmental Type RW Required 00 4th WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/12/23 06/26/23 435,000 435,000 06 0 50,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2024 4th 0 5th & 6th 0 435,000 435,000 Totals 0 50,000 0 435,000 435,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 50,000 50,000 50,000 50,000 100,000 Totals 50,000 50,000 50,000 50,000 100,000 Report Date: May 04, 2023 Page 4 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted:. Amendment Resolution No. Improvement Type r) o, Total Length Environmental Type RW Required 16 WA -07746 Andover Park E/Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/12/23 06/26/23 134,000 134,000 03 C G O P S TW 2025 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2025 0 0 134,000 134,000 S RW 2025 0 0 0 0 10,000 10,000 P CN 2026 0 0 0 1,570,000 1,570,000 Totals 0 0 1,714,000 1,714,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 134,000 0 0 0 RW 0 10,000 0 0 0 CN 0 0 1,570,000 0 0 Totals 0 144,000 1,570,000 0 0 Report Date: May 04, 2023 Page 5 �� W*sh ttjton Stat 7/1 Dona meat of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside n, , u 0 m Priority Number A, PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m c Adopted Amendment Resolution No. Improvement Type Ei 2 r1 oa m Total Length Environmental Type', RW Required 04 RW WA -15107 Andover Park East/Industry Dr Intersection Andover Park E Industry Drive to Design and construct traffic signal with Andover Park East left turn lanes and crosswalks. 06/12/23 06/26/23 75,000 75,000 03 P 0.100 657,000 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2025 RW 0 10,000 0 75,000 75,000 S RW 2025 657,000 0 0 0 10,000 10,000 P CN 2026 0 0 657,000 657,000 Totals 0 0 742,000 742,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 75,000 0 0 0 RW 0 10,000 0 0 0 CN 0 0 657,000 0 0 Totals 0 85,000 657,000 0 0 Report Date: May 04, 2023 Page 6 MIL IV;Washington Stator Department at Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside -ri c 3 ° 0 at rii g r, B. Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E Begin 8 End Termini F. Project Description G. Structure ID 2 a ID m. 2, Adopted Amendment Resolution No, Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance 06/12/23 06/26/23 1,345,000 1,345,000 06 0 205,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2024 0 0 1,345,000 1,345,000 Totals 0 205,000 0 1,345,000 1,345,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8, 6th ALL 205,000 215,000 220,000 230,000 475,000 Totals 205,000 215,000 220,000 230,000 475,000 Report Date: May 04, 2023 Page 7 411111a Washington State V. Department of Transportatton Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/12/23 06/26/23 8,850,000 8,850,000 06 CGOPS TW 1,500,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2024 0 0 8,850,000 8,850,000 Totals 0 1,500,000 0 8,850,000 8,850,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8. 6th ALL 1,400,000 1,400,000 1,400,000 1,500,000 3,150,000 Totals 1,400,000 1,400,000 1,400,000 1,500,000 3,150,000 Report Date: May 04, 2023 Page 8 Wathksgton State Vapr Department at Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C, Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type ALL 00 WA -15104 Annual Traffic Signal Program Varies to Design and construct traffic signal upgrades and repairs of signals that exceed routine maintenance work;loop replacement, head replacement, and controllers. Replace direct bury cable for existing lighting system, 06/12/23 06/26/23 1,040,000 1,040,000 44 P 130,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2024 0 0 1,040,000 1,040,000 Totals 0 130,000 0 1,040,000 1,040,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 130,000 130,000 130,000 150,000 300,000 Totals 130,000 130,000 130,000 150,000 300,000 Report Date: May 04, 2023 Page 9 Wath DepairrtligtnnS torransportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside -n a n 0—. a7 g rf; E Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment g? 0 a p z p Improvement Type Utility Codes Total Length Environmental Type RW Required 04 RW WA -15109 E Marginal Way S (BAR - S 112 St) E Marginal Way S Boeing Access Road to S 112th St Design and construct curb, gutter, drainage, lighting, turn lanes, and traffic control. 06/12/23 06/26/23 288,000 288,000 03 CGOPS TW 0.270 0 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 RW 0 0 0 288,000 288,000 P RW 2029 0 0 TIB 280,000 420,000 700,000 P CN 2029 0 TIB 970,000 1,460,000 2,430,000 Totals 0 1,250,000 2,168,000 3,418,000 Expenditure Schedule Phase let 2nd 3rd 4th 5th & 6th PE 0 50,000 0 0 170,000 RW 0 0 0 0 700,000 CN 0 0 0 0 2,430,000 Totals 0 50,000 0 0 3,300,000 Report Date: May 04, 2023 Page 10 Ana ItZapairtmtent on Sol Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside -n c n 0 = E. o 0, 2 . B. Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E, Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 TUK-63 Keeping South King County Moving with TDM South King County Various to Various This project will help people access sustainable transportation options that reduce drive -alone travel and traffic congestion In South King County. TDM programming and services will be provided to residents, workers, visitors, employers, property managers, and students in Tukwila and the partnering jurisdictions of Burien, Des Moines, Kent, Renton, and SeaTac. The program will target those willing and able to try sustainable modes of transportation at activity centers (community hubs, commercial areas, business parks, multifamily housing complexes, and educational institutions). Examples of activity centers include the Tukwila International Boulevard District, Southcenter, and Sea -Tac Airport, The TDM Program will work in partnership with transit agencies, nonprofits, employers, and community organizations to reach priority populations through trusted channels. The project aims to reduce 542,997 vehicle trips and 8,093,549 vehicle miles traveled. 06/12/23 06/26/23 0 672,000 44 ALL 0.000 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2024 0 WSDOT 672,000 0 672,000 S ALL 2024 0 OTHER 168,000 0 168,000 Totals 0 840,000 0 840,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 210,000 105,000 0 0 0 Totals 210,000 105,000 0 0 0 Report Date: May 04, 2023 Page 11 7 Wash' on Stat. Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID i c, zi 3 . 2, Adopted Amendment 0,7 2. 5. S Z 9 Improvement Type Utility Codes Total Length Environmental Type RW Required 17 RW WA -1111( Macadam Rd S Complete Streets Project Macadam Road S 150th Street to S 144th Street Design and construction of a complete street on Macadam Road. Road widening and rechannelization to add 5 -foot bike lanes and 5 -foot sidewalks on both sides of the roadway. Includes illumination, curb, and storm drainage. 06/12/23 06/26/23 50,000 400,000 04 RW 0.350 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 RW 0 Ped/Bike Program 350,000 50,000 400,000 P RW 2024 0 0 Ped/Bike Program 90,000 10,000 100,000 P CN 2025 0 Ped/Bike Program 2,800,000 300,000 3,100,000 Totals 0 3,240,000 360,000 3,600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 400,000 0 0 0 0 RW 100,000 0 0 0 0 CN 0 3,100,000 0 0 0 Totals 500,000 3,100,000 0 0 0 Report Date: May 04, 2023 Page 12 41111‘ Z117. leffishington State Deportment of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside c 9. 0 , F = a E Priority Number A. PIN/Project No, B. STIP ID C. Project Title D. Road Name or Numberii* E. Begin & End Termini F. Project Description G. Structure ID x a i . Adopted Amendment ?D' a ci 9 Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -13494 S 119th St Pedestrian Bridge Painting S 119th Street West bank Duwamish River to East bank Duwamish River Ongoing maintenance of the S 119th Street Pedestrian Bridge in the Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance needed. 06/12/23 06/26/23 200,000 200,000 06 0 0,040 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2024 0 0 200,000 200,000 Totals 0 0 0 200,000 200,000 Expenditure Schedule Phase let 2nd 3rd 4th 5th & 6th CN 0 200,000 0 0 0 Totals 0 200,000 0 0 0 Report Date: May 04, 2023 Page 13 AIM Washington State VA, Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside Funding Priority Number Phase Phase Start Year (YYYY) Hearing Adopted Amendment Resolution No. 9 -0 0 Utility Codes Total Length Environmental Type RW Required -n c = A. PIN/Project No. C. Project Title B. STIP ID a 2 D. Road Name or Number P RW in E. Begin & End Termini F. Project Description G. Structure ID 2,070,000 03 50,000 50,000 WA -15108 06/12/23 06/26/23 0 03 CGOPS 0,100 2,070,000 Yes 0 0 2,420,000 2,420,000 TW S 133 St/SR599 Southbound Intersection S 133rd Street SR 599 SB Ramp to Design and construct intersection improvements, which could include a new traffic signal or a roundabout, lighting, pedestrian facilities, and drainage. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 RW 0 0 0 300,000 300,000 P RW 2028 0 0 2,070,000 0 50,000 50,000 P CN 2029 0 0 2,070,000 2,070,000 Totals 0 0 2,420,000 2,420,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 300,000 RW 0 0 0 0 50,000 CN 0 0 0 0 2,070,000 Totals 0 0 0 0 2,420,000 Report Date: May 04, 2023 Page 14 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m �. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 STBG(UL) WA03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S 06/12/23 06/26/23 79,000 579,000 28 CN 0.250 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 STBG(UL) 500,000 0 0 79,000 579,000 P CN 2025 SRTS 2,302,000 0 0 388,000 2,690,000 Totals 2,802,000 0 467,000 3,269,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 579,000 0 0 CN 0 0 0 2,690,000 0 Totals 0 0 579,000 2,690,000 0 Report Date: May 04, 2023 Page 15 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside c, z. C)—. a7 2 E 0 0 q z § ?,. A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E . Begin & End Termini F. Project Description G. Structure ID x m 2. 2, Adopted Amendment Resolution No, Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -1111; S 152nd Street Safe Routes to School S 152nd Street Tukwila International Blvd to 42nd Avenue S Design and construct curb, gutter and sidewalks on both sides including widening pavement width by 3 feet to construct on -street parking lane on north side of street. 06/12/23 06/26/23 815,000 4,015,000 05 0 0.300 3,200,000 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2024 0 TIB 3,200,000 815,000 4,015,000 Totals 0 3,200,000 815,000 4,015,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 4,015,000 0 0 0 0 Totals 4,015,000 0 0 0 0 Report Date: May 04, 2023 Page 16 Washington State W. Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside Functional Class 15 o . ...7 z c 3: A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID z a a =, 2 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 CMAQ TUK-64 South King County TDM South King County N/A to N/A This project will provide TDM programming and services at selected activity centers in Tukwila and partnering South King County jurisdictions. Activity centers include community hubs, commercial areas, business parks, multifamily housing complexes, and educational institutions. For example, places such as Tukwila International Boulevard District, Southcenter, and Sea -Tac Airport, By providing transportation resources and incentives, the project will encourage people to choose sustainable transportation options that reduce drive -alone travel and traffic congestion in South King County. TDM services will be provided to residents, commuters, and visitors, targeting those willing and able to try sustainable modes of transportation. The program will work in partnership with partner agencies, nonprofits, employers, and community organizations. 06/12/23 06/26/23 15,000 520,232 24 450,000 0.000 55,232 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PL 2024 CMAQ 450,000 OTHER 55,232 15,000 520,232 Totals 450,000 280,116 55,232 15,000 520,232 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PL 280,116 0 0 0 0 Totals 260,116 0 0 0 0 Report Date: May 04, 2023 Page 17 Washington State TI/ Department of Then Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside , o H w Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Numberin E. Begin & End Termini F. Project Description G. Structure ID = ro Adopted o ? Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 CN WA -13495 Southcenter Blvd/65th Avenue S Signal Southcenter Boulevard 65th Avenue S to Design and construct a new traffic signal at the Southcenter Boulevard/65th Avenue S intersection to improve level of service and safety. 06/12/23 06/26/23 200,000 200,000 21 CN 2025 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2024 CN 0 0 0 200,000 200,000 P CN 2025 0 0 TIB 500,000 500,000 1,000,000 Totals 0 500,000 700,000 1,200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 100,000 0 0 0 0 CN 1,000,000 0 0 0 0 Totals 1,100,000 0 0 0 0 Report Date: May 04, 2023 Page 18 Adis EhspartmentSate otl Transportation Agency; Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2024 to 2029 N Outside -n c = ri 0 .4: p7 ° r, E Priority Number A. PIN/Project No, B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -13491 Transportation Demand Management Implementation to Provision of TOM services to Commute Trip Reduction -affected employment sites. Facilitate employer reporting and records associated with biennial CTR survey. Engage CTR employment sites with opportunities for improvement and remain connected via technical meetings with other CTR jurisdictional representatives. 06/12/23 06/26/23 0 88,526 44 ALL 0.000 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2024 0 WSDOT 88,526 0 88,526 P ALL 2025 0 WSDOT 46,650 0 46,650 Totals 0 135,176 0 135,176 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 46,650 46,650 0 0 0 Totals 46,650 46,650 0 0 0 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 16,752,000 28,280,408 23,504,500 68,536,908 Report Date: May 04, 2023 Page 19 Christy O'Flaherty From: Christy O'Flaherty Sent: Tuesday, June 27, 2023 10:05 AM To: Andi Markley Cc: Cyndy Knighton Subject: Tukwila Transportation Improvement Program 2024-2029 Importance: High June 27, 2023 TO: PUGET SOUND REGIONAL COUNCIL RE: CITY OF TUKWILA 2024-2029 TRANSPORTATION IMPROVEMENT PROGRAM Following is a link to City of Tukwila Resolution #2072 passed June 26, 2023, adopting the Transportation Improvement Program for 2024-2029. Res 2072 - 2024-2029 Trsportatad„�r Irnprover ehr grar�� Please contact me with any questions. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC, Records Governance Manager/City Clerk xc: Cyndy Knighton, Transportation Engineer Christy O'Flaherty From: Christy O'Flaherty Sent: Tuesday, June 27, 2023 10:02 AM To: 'G regA@TI B.wa.gov' Cc: Cyndy Knighton Subject: Tukwila Transportation Improvement Program 2024-2029 Importance: High June 27, 2023 TO: TRANSPORTATION IMPROVEMENT BOARD RE: CITY OF TUKWILA 2024-2029 TRANSPORTATION IMPROVEMENT PROGRAM Following is a link to City of Tukwila Resolution #2072 passed June 26, 2023, adopting the Transportation Improvement Program for 2024-2029. Res 2072 - 2024-2129 "t'r ins ortation Improvement Pr ue am Please contact me with any questions. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC, Records Governance Manager/City Clerk xc: Cyndy Knighton, Transportation Engineer Christy O'Flaherty From: Christy O'Flaherty Sent: Tuesday, June 27, 2023 10:08 AM To: 'millarr@wsdot.wa.gov' Cc: Cyndy Knighton Subject: Tukwila Transportation Improvement Program 2024-2029 Importance: High June 27, 2023 TO: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION RE: CITY OF TUKWILA 2024-2029 TRANSPORTATION IMPROVEMENT PROGRAM Following is a Zink to City of Tukwila Resolution #2072 passed June 26, 2023, adopting the Transportation Improvement Program for 2024-2029. Res 2072 - 2024-2029 Traa sport tiion Imp'ovent Progr Please contact me with any questions. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC, Records Governance Manager/City Clerk xc: Cyndy Knighton, Transportation Engineer