Loading...
HomeMy WebLinkAboutTIS 2023-07-17 COMPLETE AGENDA PACKETVirtual Meeting - Members of the public may listen by dialing 1-253-292-9750 and entering conference ID 478777930# City of Tukwila Transportation and Infrastructure Services Committee • • • Tosh Sharp, Chair Kate Kruller Mohamed Abdi Distribution: K. Kruller C. Hougardy T. Sharp H. Ponnekanti S. Kim (email) G. Lerner (email) City Attorney (email) Clerk File Copy Share pkt pdf on SharePoint to A. Le, C. O'Flaherty, A. Youn Email cover to: F. Ayala, A. Le, C. O'Flaherty, A. Youn, L. Humphrey AGENDA MONDAY, JULY 17, 2023 - 5:30 PM HYBRID MEETING — ONSITE AND VIRTUAL DUWAMISH CONFERENCE Room, 6300 BUILDING, 2ND FLR MS Teams: Click here to join the meeting Next Scheduled Meeting: August 7, 2023 SThe City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206-433-0179 for assistance. Item Recommended Action Page 1. PRESENTATIONS 2. BUSINESS AGENDA a) Public Works Shops Decant Facility Project a) Forward to the 7/24/23 Special Pg. 1 Dept of Ecology Grant Acceptance (S. Edquid) Consent Agenda b) Water Reservoir Site Feasibility Study b) Forward to the 7/24/23 Special Pg. 37 Consultant Selection and Agreement (A. Altallal) Consent Agenda 3. MISCELLANEOUS Next Scheduled Meeting: August 7, 2023 SThe City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206-433-0179 for assistance. City of Tukwila Altar" Ekberg, Mayor Public Works Department - Hoff Poilnekonti, Director/City Engineer INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Hari Ponnekanti, Public Works Director/ City Engineer BY: Sherry Edquid, Project Manager CC: Mayor Ekberg DATE: July 14, 2023 SUBJECT: Public Works Shops Decant Facility Project Department of Ecology Grant Acceptance ISSUE Accept a Department of Ecology (DOE) Water Quality Combined Funding Program grant award for the Enhanced Maintenance and Source Control Plan (EMP) and the design for a decant facility located at the combined Public Works Shops site. BACKGROUND As part of the 2016 plan developed for the Public Works Shops projects, a decant facility was identified as a potential improvement to the future site. A decant facility is an area where stormwater, gathered by vactor trucks from catch basins and other stormwater catchment areas, can be properly disposed of. Stormwater typically contains high concentrations of contaminants. Currently, the City relies solely on a King County (KC) decant facility to dispose of their vactor waste from catch basin cleaning. The KC decant facility is located in Renton, WA which is approximately 18 miles roundtrip during peak traffic. Furthermore, since the pandemic KC has reduced their hours of operation to just three days from previously five days. Also, with the reduced hours it is often busier and there is often a line. Their hours of operation and driving distance severely limit the City on the frequency and number of catch basins they can clean along with additional costs. DISCUSSION In October 2022, Council approved staff to apply for this Water Quality Combined Funding Program grant which funds projects that improve and protect water quality throughout the state. A new requirement to receive DOE funding for maintenance projects, which includes decant facilities, is the development of an EMP. An EMP is a tool that provides information on total stormwater quality infrastructure and performance costs, and helps local governments prioritize resources based on areas that pose the biggest potential risk to water quality. Recently, the City recently received notification that it was awarded a grant for the design of a decant facility and an EMP. FINANCIAL IMPACT This grant would fund the development of an EMP and the design of a decant facility. It is estimated that an EMP will cost approximately $100,580 and that the design for the decant facility will cost $443,000; totaling $543,580. This grant requires a 15% match, which is $81,537 for this project and would come from the PW Shops M&E Building design budget. Project Cost Estimate Grant Request $462,043.00 City Match 81,537.00 Total $543,580.00 Fund Source Project Budget PW Shops Phase II $81,537.00 1 INFORMATIONAL MEMO Page 2 RECOMMENDATION Council is being asked to formally accept the Department of Ecology (DOE) Water Quality Combined Funding Program grant award in the amount of $462,043 to fund an EMP and the design of a decant facility located at the combined Public Works Shops site and consider this item on the Consent Agenda at the July 24, 2023 Special Meeting. Attachments: CIP Page 92 Grant Application Grant Award 2 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2023 to 2028 PROJECT: Soils Reclamation/Decant Facility Project No. 92341201 DESCRIPTION: Construct soils reclamation facility to handle, treat, dispose and/or reuse non -hazardous street sweepings and catch basin cleanings, etc. (formerly named Drainage/Vactor Waste Facility). JUSTIFICATION: To meet State NPDES regulations, the City needs facilities to treat & dispose of waste materials resulting from cleaning/maintenance activities, including street sweepings and Vactor truck wastes. STATUS: MAINT. IMPACT: Expected to decrease maintenance. COMMENT: Will be combined with Public Works Shops. Grants may be available (in $000's) 2021 2022 2023 2024 2025 2026 2027 2028 BEYOND TOTAL EXPENSES Design 49 551 1,300 175 2,075 Land (R/VV) 561 600 1,161 Const. Mgmt. 250 100 350 Construction 500 500 TOTAL EXPENSES 610 0 551 0 0 1,550 0 0 1,375 4,086 FUND SOURCES Proposed Grant 468 1,000 1,468 Bond 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 610 0 83 0 550 0 0 1,375 2,618 TOTAL SOURCES 610 0 551 0 0 1,550 0 0 1,375 4,086 * Note: Site Location is still under consideration. 2023 - 2028 Capital Improvement Program 803-14 3 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 General Information Project Title Enhanced Maintenance and Source Control Plan and Decant Facility Design Project Short Description Project Long Description 07/10/2023 The goal of the project is to design and construct a decant facility and pump station to improve water quality by reducing sediments and pollutant from entering the city's waterbodies including the Green/Duwamish River. An Enhanced Maintenance and Source Control Plan (EMP) will also be completed to evaluate current practices and water quality improvements that would come from structures, equipment, or maintenance practices associated with the decant facility. The project will design and construct a decant facility and pump station to improve water quality by reducing sediments and pollutant from entering the city's waterbodies including the Green /Duwamish River, which has known impairments. In 2019, as part of a master plan for a new, consolidated Public Works project site (located at 11210 Tukwila International Blvd and 11231 E Marginal Way S, Tukwila, WA 98168), a decant facility was identified as an important improvement to improve operational efficiencies and water quality through increased vactor waste disposal . An EMP will be completed to evaluate current practices and evaluates the water quality improvements that would come from any associated structural improvements, maintenance practices, or improved equipment. Tukwila anticipates that the EMP will identify that a decant facility at an existing public works facility may provide increased water quality benefits, but other maintenance improvements may also be identified through the evaluation and analysis process. The City of Tukwila (the City) anticipates that the decant facility will be approximately 2,800 square feet, with space for decanting vactor trucks including four settling tanks and pump room, and capacity to dispose of 200 tons of sludge, street waste, vactor waste and hydrovac waste annually. The facility will also be hooked up to sanitary sewer. Currently, the City relies solely on a King County decant facility to dispose of their vactor waste from catch basin cleaning. The King County decant facility is located in Renton, Washington which is approximately 18 miles roundtrip from Tukwila. Furthermore, since the pandemic King County has reduced their hours of operation to just three days from previously five days. With the reduced hours, it is often busier and there is often a line. Their hours of operation and driving distance severely limit the City on the frequency and number of catch basins they can clean, and significantly increases costs of disposal. If received, the Combined Water Quality grant would be used to fund the EMP, and subsequent design Page 1 of 2 4 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 General Information of the decant facility. Total Cost $543,580.00 Effective Date 7/1/2023 Project Category Nonpoint Source Activity Onsite Sewage System Stormwater Activity Stormwater Facility Wastewater Facility Will Environmental Monitoring Data No be collected? Ecology Program Water Quality Overall Goal 07/10/2023 Total Eligible Cost $543,580.00 Expiration Date 12/30/2026 The overall goals of the project are to increase disposal capacity from 90 tons to 200 tons of sludge, street waste, vactor waste and hydrovac waste annually; reduce carbon emissions by eliminating vactor truck travel to the nearest King County decant facility, which is 18 miles roundtrip from the City of Tukwila; reduce staff hours and costs, and increase waste elimination efficiencies; and increase stormwater disposal to reduce contamination of local water systems. Page 2 of 2 5 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Project Characterization Project Themes Select a primary and secondary theme that best describes the work to be achieved during this project. Primary Theme: Stormwater Facility Secondary Theme(s): Vactor Waste Facility Project Website If your project has a website, please enter the web address below. After entering a website and saving, another blank row will appear. Up to three websites may be provided. Website Title/Name Web Address 07/10/2023 Page 1 of 1 6 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Recipient Contacts Project Manager Sherry Edquid Contact Information Sherry Edquid Project Manager 6300 Southcenter Blvd, Suite 100 Tukwila, Washington 98188 (206) 431-2456 (206) 433-0179 sherry.edquid@tukwilawa.gov Authorized Signatory Allan Ekberg Billing Contact 07/10/2023 Contact Information Allan Ekberg Mayor 6200 Southcenter Blvd Tukwila, Washington 98188 (206) 433-1850 allan.ekberg@tukwilawa.gov Brittany Robinson Contact Information Brittany Robinson Public Works Grant Analyst 6300 Southcenter Blvd, Suite 100 Tukwila, Washington 98188 (206) 431-2456 Page 1 of 14 7 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Recipient Contacts (206) 433-0179 brittany.robinson@tukwilawa.gov Other recipient signatures on printed agreement Name Title 07/10/2023 Page 2 of 14 8 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Funding Request- Stormwater Facility Project Total Eligible Cost: $543,580 Grant Request: $462,043 Match Required: $81,537 IMPORTANT NOTICE. Ecology has reduced the standard match requirement for stormwater grants to 15% in response to current economic conditions. The calculated Grant Request and Match Required are based on a standard 85% grant/15% match. However, Ecology may further reduce match requirements for communities meeting the SFAP hardship criteria. Ecology will determine eligibility for special funding when developing funding packages. Are you requesting or will you accept loan funds for part or all of the Yes No eligible project costs or to meet your match requirement? IMPORTANT NOTICE. Ecology may provide special loan funding for stormwater projects in the following cases: (1) projects that meet the criteria for "green project reserve" may receive up to 25% forgivable loan; and (2) preconstruction projects in hardship communities may receive up to 50% forgivable loan. Ecology will determine eligibility for special funding when developing funding packages. Do you want your project to be considered for GPR subsidy under the Yes No CWSRF program? NOTE: Projects are only eligible if they meet EPA's GPR criteria, and applicants accept a CWSRF loan. Do you have any secured funds committed to this project? Yes No If Yes, complete the Secured Funds Table, and include any secured matching funds if known. Source Type Amount Committed State/Federal agency: State/Federal agency: State/Federal agency: Interlocal contributions: Interlocal contributions: Interlocal contributions: 07/10/2023 Page 3 of 14 9 Organization: Tukwila city of - Public Works WATER QUALITY COMBINED FINANCIAL ASSISTANCE Funding Request- Stormwater Facility Project W QC -2024 -Tu kwi I-00085 Local agency: City of Tukwila (match for EMP & design) Local agency: Local agency: In-kind contributions: In-kind contributions: In-kind contributions: Other Other Other Project Step Activity Projects: EMP Development Implementation of EMP Other Activity Facility Projects: Planning (Step 1) Design (Step 2) Construction (Step 3) Design and Construction (Step 4) Cash $81,537.00 Prerequisites and Description No Prerequisites. Includes collection of data, internal coordination efforts, plan development and adoption. Upload Ecology EMP approval letter with application. Includes purchase of equipment and design and construction of decant facilities listed in an approved EMP. Also includes pilot EMP implementation work and data collection for adaptive management. No Prerequisites. Includes all other source control activities, including inspection program development. No Prerequisites. Includes SMAP development, other stormwater project prioritization efforts. No Prerequisites. Includes development of construction documents to 90% Upload Ecology 90% design acceptance letter with application. Includes final plans, bid documents, project construction. Limited to projects with a total eligible cost of $300,000. Small projects that can be completed within an abbreviated timeline. For Planning and Design only (Step 1 or 2) proposals: What is your estimated cost to construct this project? $2,600,000.00 07/10/2023 Page 4 of 14 10 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Scope of Work - Task 1 Grant and Loan Administration: 1 Task Number 1 Task Title Grant and Loan Administration Task Cost $45,000.00 IMPORTANT NOTICE. The cost of this task should not exceed 15% of the Total Eligible Costs you entered on the General Information form. Task Description A. The RECIPIENT shall carry out all work necessary to meet ECOLOGY grant or loan administration requirements. Responsibilities include, but are not limited to: Maintenance of project records; submittal of requests for reimbursement and corresponding backup documentation; progress reports; and the EAGL (Ecology Administration of Grants and Loans) recipient closeout report (including photos, if applicable). In the event that the RECIPIENT elects to use a contractor to complete project elements, the RECIPIENT shall retain responsibility for the oversight and management of this funding agreement. B. The RECIPIENT shall keep documentation that demonstrates the project is in compliance with applicable procurement, contracting, and interlocal agreement requirements; permitting requirements, including application for, receipt of, and compliance with all required permits, licenses, easements, or property rights necessary for the project; and submittal of required performance items. This documentation shall be available upon request. C. The RECIPIENT shall maintain effective communication with ECOLOGY and maintain up-to-date staff contact information in the EAGL system. The RECIPIENT shall carry out this project in accordance with any completion dates outlined in this agreement. Task Goal Statement Properly managed and fully documented project that meets ECOLOGY's grant or loan administrative requirements. Task Expected Outcomes * Timely and complete submittal of requests for reimbursement, quarterly progress reports, Recipient Closeout Report, and two-page outcome summary report. * Properly maintained project documentation. Recipient Task Coordinator Sherry Edquid 07/10/2023 Page 5 of 14 11 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Scope of Work - Task 1 Grant and Loan Administration: 1 Deliverable Description Due Date Received? (ECY Use Only) 1.1 1.2 07/10/2023 Progress Reports that 3/31/2026 include descriptions of work accomplished, project challenges or changes in the project schedule. Submitted at least quarterly. Recipient Closeout 3/31/2026 Report (EAGL Form) EIM Study ID Latitu Longi de tude (expr (expr esse esse d in din deci deci mals) mals) 47.46 -122.2 28980 54661 52325 30346 1 5 Location Address 6300 Southcenter Boulevard, Tukwila WA 98166 47.46 -122.254661 6300 Southcenter 28980 303465 Boulevard, Tukwila 52325 WA 98166 1 Page 6 of 14 12 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Scope of Work - FOR APPLICATION Task Number Task Cost Task #1 $45,000.00 Task #2 $93,580.00 Task #3 $405,000.00 Task #4 $0 Task #5 $0 Task #6 $0 Task #7 $0 Task #8 $0 Task #9 $0 Task Total $543,580.00 Task #: 2 Task Title Grant and Loan Administration Enhanced Maintenance and Source Control Plan (EMP) Decant Facility Design Task Title: Enhanced Maintenance and Source Control Plan (EMP) Task Cost: $93,580.00 Expected Start Date: 7/1/2023 Expected Finish Date: 7/31/2024 Describe the work that will be billed to this task. (char 3,500) The EMP will evaluate current practices and evaluates the water quality improvements that would come from any associated structural improvements, maintenance practices, or improved equipment. Tukwila anticipates that the EMP will identify that a decant facility at an existing public works facility may provide increased water quality benefits, but other maintenance improvements may also be identified through the evaluation and analysis process. Deliverables To Add a Row Enter a deliverable 07/10/2023 To Delete a Row In the row you want to delete, remove the information in all of the textboxes Page 7 of 14 13 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Scope of Work - FOR APPLICATION When done, click the SAVE button After SAVE a new row will appear Repeat these steps for each deliverable When done, click the SAVE button After SAVE the row will be deleted Deliverables Table (Deliverables are documents that can be uploaded into EAGL to show that work was completed; deliverables should align with the detailed budget provided on the Task Costs and Budget Form and the project schedule uploaded on the Project Planning and Schedule Form.) Deliverables Description Deliverable Date Deliverable Budget Contract Management and 7/26/2024 $9,298.00 Administration Develop Baseline Information 11/1/2023 $8,729.00 Develop Water Quality Benefit 1/5/2024 $19,755.00 Methodology Alternative Evaluation 3/22/2024 $15,274.00 Develop Draft EMP 6/1/2024 $29,704.00 Develop Final EMP 7/19/2024 $10,820.00 Total Deliverable Budget: $93,580.00 Total Task Costs: Task #: 3 Task Title: Decant Facility Design Task Cost: $405,000.00 Expected Start Date: 8/1/2024 Expected Finish Date: 12/31/2025 Describe the work that will be billed to this task. (char 3,500) The task will complete full design and bid ready documents for the decant facility. The City anticipates that the decant facility will be approximately 2,800 square feet, with space for decanting vactor trucks including four settling tanks and pump room, and capacity to dispose of 200 tons of 07/10/2023 Page 8 of 14 14 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Scope of Work - FOR APPLICATION sludge, street waste, vactor waste and hydrovac waste annually. The facility will also be hooked up to sanitary sewer. Deliverables To Add a Row Enter a deliverable When done, click the SAVE button After SAVE a new row will appear Repeat these steps for each deliverable To Delete a Row In the row you want to delete, remove the information in all of the textboxes When done, click the SAVE button After SAVE the row will be deleted Deliverables Table (Deliverables are documents that can be uploaded into EAGL to show that work was completed; deliverables should align with the detailed budget provided on the Task Costs and Budget Form and the project schedule uploaded on the Project Planning and Schedule Form.) Deliverables Description Deliverable Date Deliverable Budget Ecology Coordination 3/31/2026 $20,000.00 Data Collection 12/31/2024 $55,000.00 Cultural Resources 12/31/2024 $30,000.00 Preliminary Design 3/31/2025 $90,000.00 Detailed Design 12/31/2025 $200,000.00 Bid Period Services 2/28/2026 $10,000.00 Total Deliverable Budget: $405,000.00 Task #: 4 Task Title: Task Cost: Expected Start Date: Expected Finish Date: Describe the work that will be billed to this task. (char 3,500) 07/10/2023 Page 9 of 14 15 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Scope of Work - FOR APPLICATION Deliverables To Add a Row Enter a deliverable When done, click the SAVE button After SAVE a new row will appear Repeat these steps for each deliverable To Delete a Row In the row you want to delete, remove the information in all of the textboxes When done, click the SAVE button After SAVE the row will be deleted Deliverables Table (Deliverables are documents that can be uploaded into EAGL to show that work was completed; deliverables should align with the detailed budget provided on the Task Costs and Budget Form and the project schedule uploaded on the Project Planning and Schedule Form.) Deliverables Description Deliverable Date Deliverable Budget Task #: 5 Task Title: Task Cost: Expected Start Date: Expected Finish Date: Describe the work that will be billed to this task. (char 3,500) Deliverables To Add a Row Enter a deliverable 07/10/2023 Total Deliverable Budget: $0 To Delete a Row In the row you want to delete, remove the information in all of the textboxes Page 10 of 14 16 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Scope of Work - FOR APPLICATION When done, click the SAVE button After SAVE a new row will appear Repeat these steps for each deliverable When done, click the SAVE button After SAVE the row will be deleted Deliverables Table (Deliverables are documents that can be uploaded into EAGL to show that work was completed; deliverables should align with the detailed budget provided on the Task Costs and Budget Form and the project schedule uploaded on the Project Planning and Schedule Form.) Deliverables Description Deliverable Date Deliverable Budget Task #: 6 Task Title: Task Cost: Expected Start Date: Expected Finish Date: Describe the work that will be billed to this task. (char 3,500) Deliverables To Add a Row Enter a deliverable When done, click the SAVE button After SAVE a new row will appear Repeat these steps for each deliverable Total Deliverable Budget: $0 To Delete a Row In the row you want to delete, remove the information in all of the textboxes When done, click the SAVE button After SAVE the row will be deleted Deliverables Table (Deliverables are documents that can be uploaded into EAGL to show that work was completed; deliverables 07/10/2023 Page 11 of 14 17 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Scope of Work - FOR APPLICATION should align with the detailed budget provided on the Task Costs and Budget Form and the project schedule uploaded on the Project Planning and Schedule Form.) Deliverables Description Deliverable Date Deliverable Budget Task #: 7 Task Title: Task Cost: Expected Start Date: Expected Finish Date: Describe the work that will be billed to this task. (char 3,500) Deliverables To Add a Row Enter a deliverable When done, click the SAVE button After SAVE a new row will appear Repeat these steps for each deliverable Total Deliverable Budget: $0 To Delete a Row In the row you want to delete, remove the information in all of the textboxes When done, click the SAVE button After SAVE the row will be deleted Deliverables Table (Deliverables are documents that can be uploaded into EAGL to show that work was completed; deliverables should align with the detailed budget provided on the Task Costs and Budget Form and the project schedule uploaded on the Project Planning and Schedule Form.) Deliverables Description Deliverable Date Deliverable Budget Total Deliverable Budget: $0 07/10/2023 Page 12 of 14 18 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Scope of Work - FOR APPLICATION Task #: 8 Task Title: Task Cost: Expected Start Date: Expected Finish Date: Describe the work that will be billed to this task. (char 3,500) Deliverables To Add a Row Enter a deliverable When done, click the SAVE button After SAVE a new row will appear Repeat these steps for each deliverable To Delete a Row In the row you want to delete, remove the information in all of the textboxes When done, click the SAVE button After SAVE the row will be deleted Deliverables Table (Deliverables are documents that can be uploaded into EAGL to show that work was completed; deliverables should align with the detailed budget provided on the Task Costs and Budget Form and the project schedule uploaded on the Project Planning and Schedule Form.) Deliverables Description Deliverable Date Deliverable Budget Task #: Task Title: 07/10/2023 9 Total Deliverable Budget: $0 Page 13 of 14 19 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Scope of Work - FOR APPLICATION Task Cost: Expected Start Date: Expected Finish Date: Describe the work that will be billed to this task. (char 3,500) Deliverables To Add a Row Enter a deliverable When done, click the SAVE button After SAVE a new row will appear Repeat these steps for each deliverable To Delete a Row In the row you want to delete, remove the information in all of the textboxes When done, click the SAVE button After SAVE the row will be deleted Deliverables Table (Deliverables are documents that can be uploaded into EAGL to show that work was completed; deliverables should align with the detailed budget provided on the Task Costs and Budget Form and the project schedule uploaded on the Project Planning and Schedule Form.) Deliverables Description Deliverable Date Deliverable Budget Total Deliverable Budget: $0 Total Task Costs: $543,580.00 07/10/2023 Page 14 of 14 20 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Scope of Work Summary Task Title Task Cost Grant and Loan Administration $45,000.00 Total Total Eligible Costs (from the General Information Form) 07/10/2023 Page 1 of 1 21 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Task Costs and Budget Describe the process used to estimate the cost of the project. If your process included reviewing similar projects, describe how this review affected your estimate. Tukwila discussed potential design and construction costs for a decant facility with three different consultants who had recent experience providing design on local decant facilities. The final planning level estimate was based on decant facilities of similar size and function. It also took inflation into consideration. Has the proposed project been demonstrated to be the lowest cost solution to the problem? If the proposed project is not the lowest cost, describe the other benefits or considerations such as feasibility, community acceptance, or coordination with other projects that influenced the decision making process. The design of the project will evaluate the lowest cost options for the decant facility. The existing alternative is to continue to dispose of vactor waste at the Renton decant facility. The existing method of disposal has increased green house gas emissions, staffing costs, and reduced efficiencies compared to a new facility within Tukwila. Upload a detailed budget for the project and any supporting documentation, including engineers estimates, cost analysis, etc. Upload Documents Click the Browse button Select your file Click Save, your file will appear in the List of uploaded documents Repeat for each file To Delete a file, select the Delete checkbox next to the file and click SAVE EMP Fee Estimate Decant Facility Design Estimate 07/10/2023 https://ecyeagl/I ntelliGrants_BASE/_Upload/218445_949949-33383 .100TukwilaDecantEMPFeeEstimate.pdf https://ecyeagl/I ntelliGrants_BASE/_Upload/218445_949949_2-Tuk wilaDecantFacility-PlanningDesignEstimate.pdf Page 1 of 10 22 Organization: Tukwila city of - Public Works WATER QUALITY COMBINED FINANCIAL ASSISTANCE Project Team W QC -2024 -Tu kwi I-00085 Fill out the following table to describe your Project Team, including staff, contractors, and partner agencies: Team Member Agency/ Name/and or Title Company Name Mike Ronda City of Tukwila Brittany Robinson City of Tukwila Seong Kim 07/10/2023 City of Tukwila Key Responsibilities Project Manager - Manage consultant, contracts and project budget; perform quality control review of submittals. Manage project cost controls, as well as grant and contract administration, compliance, and billing. Coordinate with Ecology on grant submittals and requirements. Supervise the Project Manager and assist with project development and budgeting, including Qualifications/ Experience Professional Engineer with over 25 years guiding a variety of projects through all stages, including feasibility, design, and construction. Experience managing projects with complex environmental permitting related to surface water, flood protection, and water quality Brittany is the Public Works Grant Analyst for the City of Tukwila. She currently oversees complex budgets and cost controls for the City of Tukwila's Capital Improvement Program. She has over eight years experience with grant administration and project management. s. Professional Engineer with over 25 years guiding a variety of projects through all stages, including Estimated Total Hours Devoted to the Project 300.0 0 50.00 80.00 Who will take over the person's responsibilities if they are unable to work on the project? Sherry Edquid Griffin Lerner Seong Kim Page 2 of 10 23 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Project Team Sherry Edquid City of Tukwila internal project submittal review. Assist Project Manager with consultant communications, contracts, and quality control review. feasibility, design, and construction. Experience managing projects with complex environmental permitting related to surface water, flood protection, and water quality. Professional Project Manager with over 15 years of working on a variety of Northwest capital projects from project initiation to completion. She has managed several stormwater projects and has ensured environmental compliance while delivering the project on time and within budget. 50.00 Mike Perfetti Describe similar projects that your project team or organization has completed. Note any deviations from the original proposal in scope, budget, or schedule and briefly describe project success and lessons learned. If the project was funded by Ecology, include the Ecology grant or loan number. The City owns and maintains over 100 water quality structures, including the annual inspection and replacement of hundreds of water quality filters. The inclusion of water quality improvements is based on goals developed in the City's Stormwater Comprehensive Plan to provide treatment prior to any outfall that discharges to the Green and Duwamish Rivers. The City recently completed the East Marginal Way South Stormwater Outfalls Project, partially funded by Department of Ecology Grant Agreement No. WQC-2016-Tukwil-00132. This project accomplished the identified goal of efficiently treating roadway runoff from a highly -used arterial roadway that connects the City of Tukwila and the City of Seattle through their industrial cores . The design consisted of a stormwater pump station, permeable pavement, bioretention, Modular Wetland vault, and cast -in-place pipe (CIPP) lining of the existing outfall. Project challenges occurred during construction when two, unidentified utility lines were found during the excavation of the 8' x 12' Modular Wetland 07/10/2023 Page 3 of 10 24 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Project Team underground vault. The result was relocating the vault within the traveled lane. Another deviation was the restoration of the existing sidewalk adjacent to the proposed bioretention cells. The existing asphalt path was in poor shape which made the installation of the cell walls difficult to install. Both elements required change orders that were mostly absorbed by bid items that were included in the bid documents e.g. Resolution of Utility Conflicts or Unexpected Site Changes. Additional funds were provided by the City. Although these changes were done within the Grant Agreement deadline, an extension was requested since Seattle City Light was not able to install service to power the pumps. The biggest takeaway from the project was to communicate with Ecology when changes occur and a coordinated CQAP between the City and Construction Team. The design will provide sufficient base mapping and utility coordination to prevent cost overages . 07/10/2023 Page 4 of 10 25 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Project Planning and Schedule Project Start Date 7/1/2023 The date the actual work will start, or if interim refinance, the date the work started. List and describe the criteria you used to determine the value and feasibility of the project. Examples: useful life, installation cost, site suitability, and environmental justice. The EMP and the design will further evaluate the project feasibility. Briefly describe all project alternatives (including the preferred alternative) considered, and explain how each alternative met or failed to meet the criteria listed above. Use one line for each alternative and click "save" to enter additional alternatives. Description of Alternative The project alternative is to continue with the existing process for disposing of vactor waste, which is to dispose of it at the King County decant facility in Renton. The EMP and the design will evaluate the project and determine if there are other potential alternatives. Criteria Status quo, does not improve water quality List project stakeholders and provide documentation showing key stakeholders have been identified and will support the project. The City of Tukwila does not have existing stakeholders supporting this project. However, King County has expressed interest in partnering on this project moving forward. The site may also serve other jurisdictions, which could provide regional benefits. Describe the steps you have taken to be ready to start the project by May 1, 2024. Provide detailed information and documentation on project elements such as status of designs, permits, interlocal agreements, landowner agreements, easements, other secured funding, staff, or agency approvals. The concept of a Tukwila decant facility began in 2019. It was developed as a part of the Public Works Shops Master Plan , and identified as an important element of the site development. The City has project management and architect consultants already contracted, as they will be working on other elements of the Public Works site. If funding from the Department of Ecology is approved, we can amend the existing contracts to being design of the decant facility. The City also has been in communication with a consultant regarding the EMP, and they are available to begin design as soon as funds are received. 07/10/2023 Page 5 of 10 26 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Project Planning and Schedule Finally, the City has budgeted the necessary grant matching funds in its upcoming 2023-2024 Biennial Budget. For stormwater facility and wastewater facility projects: Do you own or have clear control over the entire project area? Yes No Not Applicable For stormwater facility and wastewater facility projects requiring road cuts: When was the last time the road was resurfaced or reconstructed? This is for informational purposes; no points are associated with this question. Date: Have you reviewed the area of potential effect (APE) in the Washington Information System for Architectural and Archaeological Records Data (WISARRD) database? This is for informational purposes; no points are associated with this question Yes No Not Applicable Upload a project schedule that includes all tasks necessary to complete the project, including tasks that are not part of the funding request. Please ensure your project schedule aligns with the funding cycle schedule found at our website: https://ecology.wa.gov/About-us/How-we-operate/Grants-loans/Find-a-grant-or-loan/ Water -Quality -Combined -Funding -Program Upload any other supporting documentation. Upload Documents https://ecyeagl/I ntelliGrants_BASE/_Upload/216201 ecantEMPSchedule.pdf https://ecyeagl/I ntelliGrants_BASE/_Upload/216201 cantFacility-PlanningDesignSchedule.pdf 07/10/2023 949954-33383.100D 949954 2-TukwilaDe EMP Schedule Decant Facility Design Schedule Page 6 of 10 27 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Water Quality and Public Health Improvements To go to the Water Quality Atlas, follow this link: https://fortress.wa.gov/ecy/waterqualityatlas/StartPage.aspx. Name the specific water body(ies) this project will improve or protect and the parameters it will address. This project will improve or protect the City's receiving waters discharging into the Green /Duwamish River. The city contains several creeks (e.g. Riverton, Southgate, Gilliam, Johnson) which all dump into the Green/Duwamish River basin which flows through the city before discharging into the Puget Sound. Is the project planning, implementation, or a combination? (For facility projects: check "Planning" for planning and design projects; check "Implementation" for construction projects; check "Planning/Implementation" for combined design/construction projects.) Planning Implementation Planning/Implementation What type of plan or regulatory requirement does this project address? TMDL/TM DL Alternative (approved or in development)/Straight to Implementation Wastewater Engineering Report/Sewer Plan Permit Salmon Recovery Plan Watershed Plan Shoreline Master Plan Administrative Order or Other Legal Action Capital Improvement Plan Puget Sound Action Plan Mitigation Other Not Applicable Enter the implementation action and plan reference in the Action Table. If this is a planning -only project, you may enter, "Not applicable, planning -only". 07/10/2023 Page 7 of 10 28 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Water Quality and Public Health Improvements To add multiple implementation actions: Enter the implementation action and plan reference. When done, click the SAVE button. After SAVE a new row will appear. Repeat these steps for each implementation action. Action Table Action Reference the document that describe the action, including page numbers and where a copy can be obtained. Not applicable, planning -only Not applicable, planning -only Did you discuss this project with Ecology staff? If yes, provide the name of the staff and the last date of contact. Yes, the project was discussed with both Karen Izumoto and Heather Bearnes-Loza on August 25, 2022 via a Microsoft Teams meeting and over the course of several emails. Describe how the project drainage area connects to the water body. Examples: surface flow, ditch, pipe, groundwater, infiltration, and path/distance to outfall/discharge. The concept is for the facility to be constructed within an existing City owned paved parking lot. The decant facility will separate the solids from the liquids. Liquids will be discharged to the sanitary sewer via a piped connection. This concept will be further developed during design along with a Maintenance and Operations Manual. Describe the measure and method that will be used to determine the water quality benefit and overall success of the project. If you need help determining a water quality metric, please refer to the Funding Guidelines for suggested metrics by project type. The Puget Sound Action Agenda (PSAA) outlines that stormwater runoff effects chemical, hydrological and biological processes of receiving waters. Stormwater runoff from stream that drain into the Puget Sound cause pollution , habitat degradation and alter flow regimes, thus degrading both the quality and quantity of water and threatening biological species. In 2011, the Washington Department of Ecology, in coordination with the Puget Sound Partnership and other organizations completed a multi-year study of toxic chemicals in Puget Sound. They selected 17 chemicals to evaluate in the study which were selected based on the threat or known harm to biota, the broad range of conveyance pathways and the availability of monitoring data. The assessment found that vehicle -related releases from wear of vehicle components, combustion of fuel and leaks of motor oil and fuel -contribute large amounts of a variety of contaminants (e.g. copper, zinc, PAHs, dioxins and furans) and stormwater was the primary way that many of these contaminants enter Puget Sound. 07/10/2023 Page 8 of 10 29 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Water Quality and Public Health Improvements The report concluded that high priority should be given first to methods that prevent initial release of contaminants and second to reducing/treating stormwater inputs. This proposed decant facility will allow the City of Tukwila to be more effective and efficient at removing contaminants prior to them entering water bodies. The Enhanced Maintenance Plan (EMP) which is part of this grant and Ecology will review will develop a metric to measure water quality benefits and what success looks like. This grant entails design funding only and water quality benefits cannot be measured until after the facility is built. A possible metric is the disposal volume from stormwater catch basins cleaning pre and post operation of decant facility. Using the method described above, estimate the water quality and public health benefits that will be achieved by the project. The measure of success will be through implementation of the BMP actions detailed in the EMP and the construction of the future decant facility . These benefits entail reducing sediment loading to receiving waters which will result in improving habitat for salmonids, meeting dissolved oxygen (DO) and bacteria. It will also allow for increased efficiency of street sweeping and stormwater/wastewater maintenance activities. It will also reduce greenhouse gas emission by greatly reducing travel distance by large vactor vehicles. How long will the project provide benefits after the funding assistance ends? Who will be responsible for maintaining the benefits during its useful life? The EMP will be used as a roadmap as to ways the City's maintenance activities can improve water quality. The Decant Facility will be maintained and owned by the City of Tukwila as part of their Operations and Maintenance Program . In addition to the design of the facility an Operations and Maintenance Manual will be developed. This project will continue to provide water quality benefits for decades after construction. How will greenhouse gas emissions be reduced or mitigated under this project? And what policies or measures has your organization put in place to reduce greenhouse gas emissions apart from this project? This project will directly reduce greenhouse gasses by reducing vehicle travel and idle time. Current operation requires the City's vactor trucks to dewater storm sewer waste at the County facility in Renton. Are you aware of any Category I or Category II wetlands on the site or downstream from the site? This is for informational purposes; no points are associated with this question. Yes v No Not Applicable Upload a map that shows an aerial view of the project area, an estimated direction of flow for the project area, potential locations for 07/10/2023 Page 9 of 10 30 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works WQC-2024-Tukwil-00085 Water Quality and Public Health Improvements the proposed facility or activity, and how the project connects to the water body named above. The map does not need to be precise, but it should help reviewers with a general understanding of the area. If access to GIS software is not available, screen shots or snips from Google Maps with arrows and text added using a paint program may be used. Upload Documents Click the Browse button Select your file Click Save, your file will appear in the List of uploaded documents Repeat for each file To Delete a file, select the Delete checkbox next to the file and click SAVE https://ecyeagl/I ntelliGrants_BASE/_Upload/216202_9 Vicinity Map 49953-CityofTukwilaVicinityMap.pdf 07/10/2023 Page 10 of 10 31 WATER QUALITY COMBINED FINANCIAL ASSISTANCE Organization: Tukwila city of - Public Works Description EMP scope of work Decant facility cross section and scope SFY24 FINAL LIST LETTER 07/10/2023 Uploads WQC-2024-Tukwil-00085 Upload https://ecyeagl/I ntelliGrants_BASE/_Upload/218454_884773-33383. 100TukwilaEMPDecantFacilityScopeofWork.pdf https://ecyeagl/I ntelliGrants_BASE/_Upload/218454_884825-Decant FacilityCrossSectionScope.pdf https://ecyeagl/I ntelliGrants_BASE/_Upload/218454_884823-Funde dWQC-2024-Tukwil-00085-FinalListSPLIT-merge_Part107. pdf Page 1 of 1 32 STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47600, Olympia, WA 98504-7600 • 360-407-6000 June 22, 2023 Allan Ekberg, Mayor City of Tukwila - Public Works 6200 Southcenter Blvd Tukwila, Washington 98188 allan.ekberg@tukwilawa.gov Sherry Edquid, Project Manager City of Tukwila - Public Works 6300 Southcenter Blvd, Suite 100 Tukwila, Washington 98188 sherry.edquid@tukwilawa.gov Re: Enhanced Maintenance and Source Control Plan and Decant Facility Design, WQC-2024-Tu kwi I-00085 State Fiscal Year 2024 Final Water Quality Funding Offer List and Intended Use Plan Thank you for your time and effort in applying to Ecology for funding for your water quality project in the State Fiscal Year 2024 (SFY24) Funding Cycle. I am pleased to inform you that your project has been identified for funding. Please review the following information closely for more details. On June 22, 2023, Ecology published the SFY24 Final Water Quality Funding Offer List and Intended Use PIan213 (Final List). The Final List describes the projects and funding for the SFY24 Funding Cycle from the Centennial Clean Water Program (Centennial), the Clean Water Act Section 319 Nonpoint Source Fund (Section 319), the Stormwater Financial Assistance Program (SFAP), the Clean Water State Revolving Fund (CWSRF), and new federal funding provided to the CWSRF through the Bipartisan Infrastructure Law (BIL). On November 15, 2021, President Joe Biden signed the Infrastructure Investment and Jobs Act (IIJA), also known as the Bipartisan Infrastructure Law (BIL), which Ecology estimates could provide nearly $200 million in new funding to Washington's CWSRF over the next five years. For this SFY 2024 Final List, Washington's CWSRF has been allocated a total of $36 million in BIL funds, awarded as part of the CWSRF, and focused on supporting small financially disadvantaged community projects. 213 https://apps.ecology.wa.gov/publications/documents/2310018.pdf 33 Ecology evaluated 151 applications from local governments, tribes, conservation districts, other public entities, and qualified not-for-profit organizations. Funding requests totaled approximately $331 million. To ensure funds are committed to the highest priority projects, Ecology water quality specialists evaluated and scored all eligible project proposals. Scores were compiled, and a statewide priority list was developed. Projects proposed for funding are based upon the priority list, the type of project, and the funding source. After rating and ranking all eligible proposed projects and providing support for three additional small financially disadvantaged community phased projects, Ecology offered approximately $313 million to 126 projects. Detailed information on all proposals received and offered funding can be found in Appendix 1 in the Final List. A record of scores and evaluator comments are provided in the Evaluation Scorecard Report available through Ecology's Administration of Grants and Loans (EAGL) system. Applicants are strongly encouraged to review the report, as it will help applicants understand the strengths and weaknesses of their application. In addition, reviewing the report will help applicants become aware of any concerns about unclear costs or tasks and/or possible ineligible components; unclear costs or tasks and/or ineligible components may significantly delay the development of a funding agreement. To obtain the Evaluation Scorecard Report, follow these steps. • Go into your application in EAGL. • While in the Application Menu, click "View Forms" in the "View, Edit and Complete Forms" section. • Scroll down the list of forms to near the bottom. • Click on "Evaluation Scorecard (External)" in the "Screening/Evaluation/Offer" section. • Follow the prompts for opening or saving a PDF copy of the report. I am pleased to inform you that your project is being offered funding of up to $462,043 including: • A $0 from CWSRF for a term of 0 years at a 0 percent interest rate. • A $0 Forgivable Principal loan from CWSRF that will not be required to be repaid. • A $462,043 grant from SFAP. • A $0 grant from Centennial. • A $0 grant from Section 319. The final funding amount awarded for your project will be based on negotiations between you and Ecology regarding the project scope of work, budget, technical considerations, reasonableness of cost, and eligibility determinations. Based on your application, project type, and fund source, various conditions of funding will apply; these will be addressed during the agreement negotiation process. For information on 34 conditions that may apply, please see Ecology's SFY24 Funding Guidelines214 and the footnotes assigned to your project in Appendix 1 in the Final List. All projects require cultural resources review, and most projects require environmental review. Please be aware of the requirements for your project and implement the project schedule accordingly. If you have specific questions, please contact Environmental and Cultural Resource Coordinator, Liz Ellis, at liz.ellis@ecy.wa.gov or (360) 628-4410 for CWSRF funded projects, Melissa Conger at melissa.conger@ecy.wa.gov or (360) 706-4202 for SFAP funded projects, or Seth Elsen, at seth.elsen@ecy.wa.gov, (564) 999-1177 for Centennial funded projects. Ecology is committed to negotiating and signing a funding agreement no later than January 31, 2024. To meet this timeline and ensure timely use of limited state and federal funds, it is essential that negotiations and funding agreement development begin as soon as possible. Please see the typical negotiation timeline on the last page of this letter. Ecology assigned the following Grant and Loan Project Management Team for your project: Marra Tripodi NWRO Ecology Project Manager (509) 490-0687 Karen Izumoto Headquarters Ecology Financial (360) 870-7524 Office, Lacey Manager Ecology's Project Manager or Financial Manager will contact you soon to schedule agreement negotiations. Ecology appreciates your commitment to improving Washington's water quality and looks forward to working with you to complete this high priority project. If you have any questions or concerns regarding the water quality funding programs, please contact Jeff Nejedly, Water Quality Financial Management Section Manager, at ieffrey.neiedly@ecy.wa.gov or (360) 878-4913. Sincerely, Vincent McGowan, P.E. Water Quality Program Manager 214 https://apps.ecology.wa.gov/publications/documents/2210016.pdf 35 My project has been offered funds. What are my next steps? • • • • • • Attend Grant Recipient Training Workshops Review the FY24 Final Offer List for funding amount and footnotes Review the Evaluation Scorecard in EAGL Update the Recipient Contacts in EAGL Facility projects only: work with your planning department to ensure GMA compliance by Jan 31, 2024 Prepare to meet with Ecology by compiling changes to project scope, schedule, budget, staff, etc. since you submitted the application • • • Ecology will contact you to schedule a meeting If you have questions before then, contact the Ecology Project Manager listed in this letter Meet with Ecology to discuss project details and comments in the Evaluation Scorecard • Negotiate scope, schedule, and budget for draft agreement • Ecology conducts final review and approval of agreement in EAGL • Agreement must be signed and activated in EAGL • final agreement and return to Ecology for signature Simpler projects may be through the process faster and more complex projects may take until Jan 2024. 36 City of Tukwila Allan Ekberg, Mayor Public Works Department - Hari Ponnekanti, Director/City Engineer INFORMATIONAL MEMORANDUM TO: Transportation Infrastructure Committee FROM: Hari Ponnekanti, Public Works Director/City Engineer BY: Adib Altallal, Utilities Engineer CC: Mayor Allan Ekberg DATE: July 14, 2023 SUBJECT: Water Fund — Water Reservoir Site Feasibility Study Project No. 91240102 Consultant Selection and Agreement ISSUE Approve the consultant selection and agreement with Carollo Engineers for the feasibility study of the Water Reservoir Site Feasibility Study Project. BACKGROUND During the City of Tukwila's 2015 Water Comprehensive Plan, the consultant identified that the continued growth within the City no longer meets the Department of Health's water storage requirements. As a result, the Water Reservoir and Pump Station was included in the Capital Improvement Program. During the most recent Water Comprehensive Plan update, the City's water storage deficiencies were highlighted again. Further development throughout the City and especially in the Ryan Hill and Tukwila South areas are likely to be hindered or completely halted due to these water storage deficiencies. Old Fire Station 52 has been identified as a possible future site of the reservoir. The construction of a new reservoir at the site would save the City's General Fund money by taking over the responsibilities of the demolition and mitigation of the building. Further, the project would greatly improve the condition of Hazelnut Park by expanding the area and adding recreational items for the residents' use. Staff most recently discussed this option with Council at the April 17th Transportation and Infrastructure Services Committee meeting and the subsequent April 24th Committee of the Whole. ANALYSIS At the April 24th Committee of the Whole meeting, Council gave consensus to move forward with the feasibility study. Three consultants were contacted and all three submitted proposals to do the feasibility study. Carollo was selected due to their familiarity with the City's system and previous work on the Comprehensive Plan. FINANCIAL IMPACT The contract is for $153,190.00. The project costs are within budget and are 100% funded by the water enterprise fund. Carollo Feasibility Contract Cost Estimate $153,190.00 2023-2024 Budget $750,000.00 RECOMMENDATION Council is being asked to approve the feasibility contract with Carollo Engineers in the amount of $153,190.00 for the Water Reservoir Site Feasibility Study Project and consider this item on the Consent Agenda at the July 24, 2023, Special Meeting. Attachments: 2023 CIP, Page 56 Draft Contract & Scope 37 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2023 to 2028 PROJECT: Water Reservoir and Pump Station Project No. 91240102 DESCRIPTION: Design and construct a new 2.5 MG water reservoir with a pump station. JUSTIFICATION: The Department of Health is requiring the City provide additional water storage. A pump station is needed for fire flow. STATUS: Design funds will be used to update and expand the siting study Carollo completed in 2014 and updated in 2021. MAINT. IMPACT: Additional staff will be needed to provide maintenance for the new reservoir and pumps. COMMENT: FINANCIAL Through Estimated (in $000's) 2021 2022 2023 2024 2025 2026 2027 2028 BEYOND TOTAL EXPENSES Design 7 500 500 1,007 Land (R/VV) 750 1,000 1,750 Const. Mgmt. 500 500 1,000 Construction 2,000 3,600 7,000 12,600 TOTAL EXPENSES 7 0 0 750 1,000 3,000 4,600 0 7,000 16,357 FUND SOURCES Awarded Grant 0 Proposed Grant 1,000 1,000 Bond 750 1,000 3,000 3,600 8,350 Mitigation Expected 0 Utility Revenue 7 0 0 0 0 0 0 0 7,000 7,007 TOTAL SOURCES 7 0 0 750 1,000 3,000 4,600 0 7,000 16,357 Location to be determined. 2023 - 2028 Capital Improvement Program 803-14 38 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Contract Number: PROFESSIONAL SERVICES AGREEMENT (Includes consultants, architects, engineers, accountants, and other professional services) THIS AGREEMENT is entered into between the City of Tukwila, Washington, hereinafter referred to as "the City", and Carollo Engineers, hereinafter referred to as "the Consultant", in consideration of the mutual benefits, terms, and conditions hereinafter specified. 1. Project Designation. The Consultant is retained by the City to perform feasibility and design services in connection with the project titled Tukwila Reservoir Feasibility Study. 2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and supplies. 3. Duration of Agreement; Time for Performance. This Agreement shall be in full force and effect for a period commencing upon execution and ending December 31, 2024, unless sooner terminated under the provisions hereinafter specified. Work under this Agreement shall commence upon written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement no later than December 31, 2024 unless an extension of such time is granted in writing by the City. 4. Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibit "B" attached hereto, provided that the total amount of payment to the Consultant shall not exceed $153,190.00 without express written modification of the Agreement signed by the City. B. The Consultant may submit vouchers to the City once per month during the progress of the work for partial payment for that portion of the project completed to date. Such vouchers will be checked by the City and, upon approval thereof, payment shall be made to the Consultant in the amount approved. C. Final payment of any balance due the Consultant of the total contract price earned will be made promptly upon its ascertainment and verification by the City after the completion of the work under this Agreement and its acceptance by the City. D. Payment as provided in this section shall be full compensation for work performed, services rendered, and for all materials, supplies, equipment and incidentals necessary to complete the work. E. The Consultant's records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City and the state of Washington for a period of three (3) years after final payments. Copies shall be made available upon request. 39 5. Ownership and Use of Documents. All documents, drawings, specifications and other materials produced by the Consultant in connection with the services rendered under this Agreement shall be the property of the City whether the project for which they are made is executed or not. The Consultant shall be permitted to retain copies, including reproducible copies, of drawings and specifications for information, reference and use in connection with the Consultant's endeavors. The Consultant shall not be responsible for any use of the said documents, drawings, specifications or other materials by the City on any project other than the project specified in this Agreement. 6. Compliance with Laws. The Consultant shall, in performing the services contemplated by this Agreement, faithfully observe and comply with all federal, state, and local laws, ordinances and regulations, applicable to the services rendered under this Agreement. 7. Indemnification. The Consultant shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or resulting from the acts, errors or omissions of the Consultant in performance of this Agreement, except for injuries and damages caused by the sole negligence of the City. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Consultant's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. 8. Insurance. The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, or employees. Consultant's maintenance of insurance as required by the agreement shall not be construed to limit the liability of the Consultant to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. A. Minimum Amounts and Scope of Insurance. Consultant shall obtain insurance of the types and with the limits described below: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. Automobile Liability insurance shall cover all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance with limits no less than $2,000,000 each occurrence, $2,000,000 general aggregate. Commercial General Liability insurance shall be at least as broad as ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, stop-gap independent contractors and personal injury and advertising injury. The City shall be named as an additional insured under the Consultant's Commercial General Liability insurance policy with respect to the work performed for the City using an additional insured endorsement at least as broad as ISO endorsement form CG 20 26. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. CA revised May 2020 Page 2 40 4. Professional Liability with limits no less than $2,000,000 per claim and $2,000,000 policy aggregate limit. Professional Liability insurance shall be appropriate to the Consultant's profession. B. Public Entity Full Availability of Contractor Limits. If the Contractor maintains higher insurance limits than the minimums shown above, the Public Entity shall be insured for the full available limits of Commercial General and Excess or Umbrella liability maintained by the Contractor, irrespective of whether such limits maintained by the Contractor are greater than those required by this Contract or whether any certificate of insurance furnished to the Public Entity evidences limits of liability lower than those maintained by the Contractor. C. Other Insurance Provision. The Consultant's Automobile Liability and Commercial General Liability insurance policies are to contain, or be endorsed to contain that they shall be primary insurance with respect to the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Consultant's insurance and shall not be contributed or combined with it. D. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. E. Verification of Coverage. Consultant shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. Upon request by the City, the Consultant shall furnish certified copies of all required insurance policies, including endorsements, required in this Agreement and evidence of all subcontractors' coverage. F. Notice of Cancellation. The Consultant shall provide the City with written notice of any policy cancellation, within two business days of their receipt of such notice. G. Failure to Maintain Insurance. Failure on the part of the Consultant to maintain the insurance as required shall constitute a material breach of contract, upon which the City may, after giving five business days notice to the Consultant to correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset against funds due the Consultant from the City. 9. Independent Contractor. The Consultant and the City agree that the Consultant is an independent contractor with respect to the services provided pursuant to this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer and employee between the parties hereto. Neither the Consultant nor any employee of the Consultant shall be entitled to any benefits accorded City employees by virtue of the services provided under this Agreement. The City shall not be responsible for withholding or otherwise deducting federal income tax or social security or for contributing to the state industrial insurance program, otherwise assuming the duties of an employer with respect to the Consultant, or any employee of the Consultant. 10. Covenant Against Contingent Fees. The Consultant warrants that he has not employed or retained any company or person, other than a bonafide employee working solely for the Consultant, to solicit or secure this contract, and that he has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the City shall have the right to annul this contract without liability, or in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. CA revised May 2020 Page 3 41 11. Discrimination Prohibited. Contractor, with regard to the work performed by it under this Agreement, will not discriminate on the grounds of race, religion, creed, color, national origin, age, veteran status, sex, sexual orientation, gender identity, marital status, political affiliation, the presence of any disability, or any other protected class status under state or federal law, in the selection and retention of employees or procurement of materials or supplies. 12. Assignment. The Consultant shall not sublet or assign any of the services covered by this Agreement without the express written consent of the City. 13. Non -Waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for in this Agreement shall not constitute a waiver of any other provision. 14. Termination. A. The City reserves the right to terminate this Agreement at any time by giving ten (10) days written notice to the Consultant. B. In the event of the death of a member, partner or officer of the Consultant, or any of its supervisory personnel assigned to the project, the surviving members of the Consultant hereby agree to complete the work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar to renegotiations of this Agreement between surviving members of the Consultant and the City, if the City so chooses. 15. Applicable Law; Venue; Attorney's Fees. This Agreement shall be subject to, and the Consultant shall at all times comply with, all applicable federal, state and local laws, regulations, and rules, including the provisions of the City of Tukwila Municipal Code and ordinances of the City of Tukwila. In the event any suit, arbitration, or other proceeding is instituted to enforce any term of this Agreement, the parties specifically understand and agree that venue shall be properly laid in King County, Washington. The prevailing party in any such action shall be entitled to its attorney's fees and costs of suit. Venue for any action arising from or related to this Agreement shall be exclusively in King County Superior Court. 16. Severability and Survival. If any term, condition or provision of this Agreement is declared void or unenforceable or limited in its application or effect, such event shall not affect any other provisions hereof and all other provisions shall remain fully enforceable. The provisions of this Agreement, which by their sense and context are reasonably intended to survive the completion, expiration or cancellation of this Agreement, shall survive termination of this Agreement. 17. Notices. Notices to the City of Tukwila shall be sent to the following address: City Clerk City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Notices to Consultant shall be sent to the following address: Carollo Engineers 1200 Fifth Avenue #900 Seattle, WA 98101 18. Entire Agreement; Modification. This Agreement, together with attachments or addenda, represents the entire and integrated Agreement between the City and the Consultant and supersedes all prior negotiations, representations, or agreements written or oral. No amendment or modification of this Agreement shall be of any force or effect unless it is in writing and signed by the parties. CA revised May 2020 Page 4 42 DATED this day of , 20 CITY OF TUKWILA Allan Ekberg, Mayor CAROLLO ENGINEERS: By: Printed Name: ATTEST/AUTHENTICATED: Title: Christy O'Flaherty, City Clerk APPROVED AS TO FORM: Office of the City Attorney CA revised May 2020 Page 5 43 caroiio June 13, 2023 Mr. Adib Altallal City of Tukwila 6300 Southcenter Boulevard, #200 Tukwila, WA 98188 Subject: Proposal for Professional Engineering Services for the City of Tukwila Hazelnut Park Reservoir Feasibility Project Dear Mr. Altallal: 1200 Fifth Avenue, Suite 900 Seattle, Washington 98101 P 206-684-6532 carollo.com Carollo Engineers Inc. (Consultant) is pleased to submit this proposal to provide Professional Engineering Services for the feasibility study of a new reservoir to potentially be located at 14475 59th Avenue South, Tukwila, WA 98168 (site). The City of Tukwila (City) is considering a proposed 2.5 million -gallon storage reservoir and an accompanying pump station at the site. The proposed reservoir design will evaluate both a partially above ground and a fully below ground design options. In March 2023, Consultant provided a high-level siting study, which showed this site could be a potential location. This feasibility study will take a closer look into the site and provide recommendations before the City moves forward with this location for the new reservoir and pump station. The scope of work will also include a summarized report designed to communicate to City Management the alternatives considered and the recommendations for moving forward with the project. SCOPE OF WORK TASK 1— PROJECT MANAGEMENT 1.1— Project Kick -Off Meeting Prior to beginning work, Consultant will coordinate and participate in a project kick-off meeting with the City to discuss the finalized scope of work, the schedule, the roles and responsibilities, communication protocol, coordination activities between City staff, and other related items. 1.2 — Progress Meetings Consultant will attend monthly progress meetings with the City. We anticipate attending a total of three (3) coordination review and progress meetings during this project. Consultant will prepare and distribute meeting agendas prior to each meeting. Consultant will also prepare and distribute meeting minutes within five (5) days after each meeting. All monthly progress meetings will be held remotely on Microsoft Teams. 1.3 — Project Management This task includes the management responsibilities associated with proper scheduling, budget control, invoice preparation and coordination with the City. Consultant's project manager will review the status of budget, schedule and relevant project issues on a monthly basis. Monthly status updates will be used to confirm work 11866600 / Tukwila -Reservoir Feasibility Study Scope.docx 44 Mr. Adib Altallal City of Tukwila June 13, 2023 Page 2 progress, identify critical information needs, and where appropriate alert the City to any potential issues which may impact the project scope, schedule or budget. Critical needs can also be discussed through a telephone conference call. These monthly project status updates will be supplemented on an as needed basis with monthly project status reports that will be prepared and distributed along with Consultant's invoices. 1.4 — Technical Review and QA/QC Consultant will provide quality assurance and quality control (QA/QC) reviews through the course of the project consistent with City's expectations. Consultant and its quality management procedures establish and maintain a structure for providing reviews of all work products and adherence to industry design standards. All work product deliverables, including detailed checking of work by in-house staff, will be reviewed prior to submittal to the City. Technical reviews will include reviews for code compliance, safety, operability, constructability, and clarity. • The Consultant will develop and maintain: Develop and maintain a Decision Log to record key decisions made by the City and others during the project to document the evolution of the design. • Develop and maintain an Action Log to record action items required by the City and Consultant. • Manage Record of Comments to track City review comments and Consultant's responses for all project deliverables. • Deliverables: • Deliverables for Task 1 will include: 1. Action and Decision Log. 2. Record of Comments Log. TASK 2 — FIELD INVESTIGATIONS 2.1— Boundary and Topographic Survey Consultant will conduct a boundary and topographic survey of the site and provide a base map to the extent required for the design of the new facilities and interconnections with the existing facilities. The survey limits will cover the project site and street frontage out to the centerline. Mapping will include 1 -foot contours and will reference NAD 83 for horizontal control and NAVD 88 for vertical datum. All surface features will be shown and identified, including trees, fences, above -ground piping, and structures. Utility locating will be completed by a private locate firm contracted directly with the surveying subconsultant. Where vaults, manholes, or valve cans can be accessed, the survey will include depths of existing underground utilities. Property boundaries will be determined from existing street monuments, found property corners and recorded plats and surveys. 2.2 — Geotechnical Investigations Consultant will conduct a desktop -level characterization of the subsurface conditions of the site. A geotechnical engineering feasibility memorandum shall include the following findings and recommendations. 45 Mr. Adib Altallal City of Tukwila June 13, 2023 Page 3 • Review of available geologic maps, reports, and other relevant data sources to identify potential geotechnical constraints such as groundwater, loose/soft surface soil, existing fill, compressible soil, expansive soil, liquefiable soil, and lateral spreading. • Desktop review of geological and seismic hazards in the general project area, including the potential for liquefaction, lateral spreading, and qualitative estimated seismically induced settlement. • Develop initial conceptual model of geotechnical constraints, geological hazards and approximate depth to groundwater. • Suitability of site for the proposed improvements. Consultant will also plan and conduct a subsurface exploration program consisting of one (1) drilled soil boring within subject property. The geotechnical boring will be drilled using a limited access track -mounted drilling rig equipped with hollow stem augur drilling equipment to a maximum depth of 35 feet below ground surface or practical refusal, whichever reached earlier. This task will include marking the boring location, submitting public one -call utility notifications, and subcontracting with a private locating service to clear the explorations prior to drilling. Consultant will prepare a Geotechnical Work Plan Memoranda for the proposed fieldwork. The work plan will be submitted to the City for review and approval. The work plan will detail the type, location, and extent of proposed field exploration along with logistics necessary to perform the work. Consultant assumes the required permits or rights of entries will be provided at no cost. • Consultant will observe drilling, log soils, and collect samples. Samples collected will be submitted for laboratory testing. • Consultant will perform engineering analyses to develop conclusions and recommendations for temporary excavation support, construction dewatering, and trenching and backfilling. • Consultant will summarize the results of the studies, explorations, analyses, conclusions, and recommendations in a draft geotechnical engineering feasibility memorandum. The memorandum will include the results of the desktop study and subsurface explorations, exploration logs, figures showing the exploration locations, laboratory results, and geotechnical engineering conclusions and recommendations. • Consultant will provide written responses to all review comments. The written responses will be provided in the form of emails to the design team. Consultant will prepare a final geotechnical engineering feasibility memorandum once review comments are provided. • Deliverables: • Deliverables for Task 2 will include: 1. Topographic survey base maps in CAD. 2. Draft and Final Geotechnical Engineering Feasibility Memorandum. 3. Geotechnical Work Plan Memoranda. TASK 3 — PREPARE ALTERNATIVES AND SITE LAYOUTS 46 Mr. Adib Altallal City of Tukwila June 13, 2023 Page 4 3.1— Attend Site Visits Consultant will conduct site visits to gather information that may be required. For fee estimating purposes, we have assumed two (2) half-day site visits will be performed. 3.2 — Identify Feasibility Criteria Consultant will identify feasibility parameters and provide discussion and recommendations to inform the development of the site layouts in Task 3.2. These parameters may include: • Shoring • Constructability • Hydraulics • Reservoir depth • Code change • Noise limit • Construction costs 3.3 — Prepare Preliminary Site Layouts Consultant will use the survey information prepared under Task 2 — Surveying to develop site layouts. A list of unconfirmed utilities and those not found on the plans will be created. This list could later be utilized for potential potholing locations during the design phase. Consultant will prepare three (3) separate site layouts for three proposed reservoir types. These will include layouts for a rectangular cast -in-place reservoir, a circular pre -stressed concrete reservoir, and a steel tank reservoir. Each site layout will also include the building size and location of the proposed pump station. The features from the topographic survey will be included in the layouts. The site layouts will be submitted to the City for review. 3.4 — Planning -level Cost Assumptions Carollo will develop preliminary opinions of probable construction cost for all (3) separate site layouts. Association for the Advancement of Cost Engineering) AACE Level 4 will be developed. 3.5 — Hydraulic Verification Consultant will use the City's hydraulic model developed as part of the latest Water System Plan to confirm hydraulics for all three (3) separate site layouts. Pressures, velocities, fire flows, and tank turnaround will be checked with the hydraulic model. This may help optimize the size of the reservoir pump stations. 3.6— Comparison and Ranking of Alternatives Consultant will compare and rank the reservoir alternatives including the feasibility of rectangular cast -in-place reservoir, circular pre -stressed concrete reservoir, and steel tank reservoir options. The ranking will also consider 47 Mr. Adib Altallal City of Tukwila June 13, 2023 Page 5 the feasibility of construction within the available area, and construction duration. Consultant will submit the comparison and ranking of alternatives to the City for review in the Feasibility Study Report. Deliverables: Deliverables for Task 3 will include: 1. Preliminary Site Layouts TASK 4 — FEASIBILITY STUDY REPORT 4.1— Prepare Draft and Final Feasibility Study Report Consultant will prepare a Feasibility Study for the Reservoir Facility. Consultant will present the three reservoir layout options and make a recommendation for the most appropriate options based on input from the City on their goals, objectives, and budgetary restraints. The new reservoir will require optimizing storage volume, hydraulic operability, the existing surface area, and capital expenditures. As a minimum, the Feasibility Study Report will cover the following sections: • Section 1: Introduction / Project Overview. • Section 2: Field Investigations / Utility Research. • Section 3: Design Criteria. • Section 4: Reservoir Sizing, Layouts, and Piping. • Section 5: Pump Station Criteria. • Section 6: Planning Level Environmental Permitting Assessment. • Section 7: Construction Cost Estimates. • Section 8: Design and Construction Schedules. • Section 9: Conclusions and Recommendations. 4.2 — Comments Review Meeting Consultant will attend virtual meeting(s) with City staff to discuss and review comments on the draft Feasibility Study Report. Deliverables: Deliverables for Task 4 will include: 1. No hardcopies of the report. 2. One electronic copy of the draft and final report in original Microsoft Word format. 3. One electronic copy of the draft and final report in PDF format. 4. Original copy of all calculations, cost estimates and other documents. 5. Electronic copy of the site preliminary layouts in PDF format. BUDGET ESTIMATE 48 Mr. Adib Altallal City of Tukwila June 13, 2023 Page 6 Consultant's estimated budget is presented in Attachment A in the following pages. Consultant proposes to perform the above-described scope of services on a time and material and Not -To -Exceed Fee of XXXXX. ASSUMPTIONS Consultant has identified the following items as a basis in preparing this amendment and fee estimate. • Carollo Engineers and its subconsultants will be referred to as "Consultant" in this document. • The City of Tukwila, Washington and its staff will be referred to as "City" in this document. • All deliverables are provided in electronic PDF format, unless otherwise indicated. Final deliverables will be "wet" signed and/or digitally signed in accordance with the Washington Administrative Code (WAC). • Consultant shall complete the services required hereunder in accordance with the prevailing engineering standard of care by exercising the skill and ability ordinarily required of engineers performing the same or similar services, under the same or similar circumstances, in the State of Washington. • The City shall furnish the Consultant available studies, reports and other data pertinent to the Consultant's services; obtain or authorize the Consultant to obtain or provide additional reports and data as required; furnish to the Consultant services of others required for the performance of the Consultant's services hereunder, and the Consultant shall be entitled to use and rely upon all such information and services provided by the City or others in performing the Consultant's services under this Agreement. • Opinions of probable costs will be based on the level of project definition and expected accuracy range as defined by the American Association of Cost Engineers (AACE) International. • In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for potential projects, the Consultant has no control over cost or price of labor and material; unknown or latent conditions of existing equipment or structures that may affect operation and maintenance costs; competitive bidding procedures and market conditions; time or quality of performance of third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate project cost or schedule. Therefore, the Consultant makes no warranty that the City's actual project costs, financial aspects, economic feasibility, or schedules will not vary from the Consultant's opinions, analyses, projections, or estimates. • The City shall arrange for access to and make all provisions for the Consultant to enter upon public and private property as required for the Consultant to perform services hereunder. • City review comments for deliverables will be received and noted in the original file (e.g., Bluebeam, Word, etc.). Consultant will respond to City review comments in same original file. The original file including City comments and Consultant responses will serve as the Record of Comment for each deliverable. • Hour durations for meetings, workshops, and site visits in this Scope of Services are based on estimated time on-site. Allowances for travel time, as appropriate, are accounted for in the budget in Exhibit B. • All meetings and workshops will be held remotely through Microsoft Teams or a similar video -conferencing platform, unless specifically specified. • The City will provide the Consultant with all available past geotechnical reports in the vicinity of the Project. 49 Mr. Adib Altallal City of Tukwila June 13, 2023 Page 7 • The Consultant shall not be responsible for warranties, guarantees, fitness for a particular purpose, breach of fiduciary duty, loss of anticipated profits or for economic, incidental or consequential damages to the City or any third party arising out of breach of contract, termination, or for any other reason whatsoever. Additionally, the Consultant shall not be responsible for acts and decisions of third parties, including governmental agencies, other than the Consultant's subconsultants, that impact project completion and/or success. • The services to be performed by the Consultant are intended solely for the benefit of the City. No person or entity not a signatory to this Agreement shall be entitled to rely on the Consultant's performance of its services hereunder, and no right to assert a claim against the Consultant by assignment of indemnity rights or otherwise shall accrue to a third party as a result of this Agreement or the performance of the Consultant's services hereunder. • No potholing is anticipated for this project. • Geotechnical boring conducted through pavement will be patched with rapid -setting concrete. No saw cuts and hot mix asphalt patches will be required. • All required rights of entry or permits will be provided by the others at no cost to the Consultant. • Soil samples will be collected from the borings using the Standard Penetration Test at intervals of 2.5 feet. • All non -contaminated drilling spoils and related debris will be drummed on-site and transported off-site for disposal by the drilling subcontractor, unless otherwise mutually agreed upon. If suspected contaminated soils are encountered, the Consultant design team and the County will be notified, and the suspect contaminated soils and decon water will be properly contained on-site (i.e., drummed) for disposal pending laboratory analytical results. The on-site location for storage of suspect materials will be provided by the City. Waste profile paperwork for disposal of suspect soils and/or decon water will be signed by a representative of the City. Estimated Subcontractor effort and IDW disposal costs are for non -hazardous wastes. If analytical results indicate hazardous wastes are present, IDW disposal may incur additional labor and subcontracting costs. • All soil samples will be disposed after 6 months of being collected. Long-term storage of soil samples by the Subcontractor is not included. • Drilling will be accomplished during normal daylight workdays and hours, with at least a minimum 8 hours available per day. SCHEDULE The schedule for performing the above tasks will take approximately eight (8) months to complete. See below for the approximate proposed schedule. • Notice to Proceed: July 2023 • Kick off Meeting: August 2023 • Start Work: August 2023 • Finish Work: March 2024 0 Mr. Adib Altallal City of Tukwila June 13, 2023 Page 8 Sincerely, CAROLLO ENGINEERS Aurelie Nabonnand Senior Planning Engineer/Associate AN:rg 51 c car h',. CITY OF TUKWILA Hazelnut Park Reservoir Feasibility Project PROJECT BUDGET TASK / DESCRIPTION PM APM QM PE Staff Engineer Planning Eng. /GIS DP Nabonnand Waligorski Taylor Thompson Bullough Reilly Varies Varies Total Hours Carollo Labor Cost HWA KPG Psomas Sub 5% Profit Total Sub CostCOST OTHER DIRECT COSTS TOTAL Travel, PECE Shipping and Printing $ 14.00 Total ODC Total Labor Rate $220.00 $280.00 $300.00 $220.00 $175.00 $175.00 $150.00 $120.00 Task 100 .roject Management and Quality Management 2qmmim 18 16 10 4 - - J1 8 60 18,100 - - _ $ - 100 $ -1140 $ 940 $ 19,040 110 Kick-off Meeting 2 4 4 4 14 $ 3,140 $ - $ - $ 100 $ 196 $ 296 $ 3,436 120 Progress Meetings 2 6 6 14 $ 3,440 $ - $ - $ - $ 196 $ 196 $ 3,636 130 Project Management 16 8 8 32 $ 6,720 $ - $ - $ - $ 448 $ 448 $ 7,168 140 Technical Review and QA/QC 16 $ 4,800 $ - $ - $ - $ - $ - $ 4,800 Task 200 - Field Investigations W - 4111111 AWE. - - 20 $ 4,460 $ 42,080 1 $ 12,808 $ 2,744 $ 57,632 - $ 280 $ 280 $ 62,372 210 Topographic Aerial and Field Survey 2 4 6 14 227 $ 1,440 $ 3,020 $ 43,410 $ 42,080 $ - $ 12,808 $ _ 640 $ 13,448 $ - $ 84 $ 84 $ 14,972 $ 47,400 $ 46,888 220 Geotechnical Investigations 2 8 4 $ 2,104 $ 44,184 - $ - $ 196 $ 196 Task 300 - Prepare Alternatives and Site Layouts - 48.11. 9fri. 16 - Ai $ 300 $ 3,178 $ 3,478 310 Attend Site Visits 10 10 10 30 $ 6,750 $ - $ 300 $ 420 $ 720 $ 7,470 320 Identify Feasibility Criteria 2 2 6 8 18 $ 3,720 $ - $ - $ - $ 252 $ 252 $ 3,972 330 Prepare Preliminary Site Layouts 1 4 12 24 40 81 $ 14,180 $ - $ - $ - $ - $ 1,134 $ 1,134 $ 15,314 340 Planning -level Cost Assumptions 1 2 8 24 35 $ 6,740 $ - $ - $ 490 $ 490 $ 7,230 350 Hydraulic Verification 2 16 4 22 $ 3,840 $ - $ - $ - $ 308 $ 308 $ 4,148 360 Comparison and Ranking of Alternatives 1 4 12 24 41 $ 8,180 $ - $ - $ - $ 574 $ 574 $ 8,754 Task 400 - Feasibility Study Report ' - 46 1. - - 16 = 120 $ - $ 1,680 $ 1 1,680 $ 24,890 410 Prepare Draft and Final Feasibility Study Report 4 4 40 40 16 104 $ 19,720 $ - $ - $ - $ - $ 1,456 $ 1,456 $ 224 $ 21,176 $ 3,714 420 Comments Review Meeting 2 4 4 6 16 $ 3,490 $ - $ - $ - $ 224 TOTAL 16 16 44 24 427 $ 89,180 , 57,632 $ 400 $ 5,978 $ 6,378 $ 153,190 Print Date: 6/15/2023 Budget 52 Page 1 of 1 c:\pw_working\projectwise\ewaligorski\d0625187\Tukwila_StorageFeasibility_DRAFT_VerB.xlsx