AGENDA ITEM TITLE Allentown Truck Reroute EIS Project Update
CATEGORY
0
Mtg
Discussion
Date 7/24/23
❑ Motion
Mtg Date
❑ Resolution
Mk Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mk Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
SPONSOR ❑ Council ❑ Mayor ❑ Admin Svcs ❑ DCD ❑ Finance ❑ Fire ❑ P&R ❑ Police
11
PW
SPONSOR'S In December 2022, HDR Inc. began work on the Allentown Truck Reroute Environmental
SUMMARY Impact Statement (EIS). Staff is updating Council on progress made to date and next
steps.
REVIEWED BY ❑ Trans&Infrastructure Svcs ❑ Community Svcs/Safety ❑ Finance & Governance ❑ Planning & Community Dev.
❑ LTAC ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: COMMITTEE CHAIR:
RECOMMENDATIONS:
SPONSOR/ADMIN. Department of Public Works
COMMITTEE Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
7/24/23
MTG. DATE
ATTACHMENTS
7/24/23
Informational Memorandum dated 7/17/23
EIS Process Schedule
Five Schematic Alternatives
9
10
City of Tukwila
Allan Ekberg, Mayor
Public Works Department - Hari Ponnekanti, Director/City Engineer
INFORMATIONAL MEMORANDUM
TO: Allentown Truck Reroute Progress Report
FROM: Hari Ponnekanti, Public Works Director
BY: Mark Hafs, EIS Project Director
DATE: July 17, 2023
SUBJECT: Allentown Truck Reroute EIS
Project No. 92110405
Project Update
ISSUE
Report to Council on project progress made to date.
BACKGROUND
In December 2022, HDR Inc. began work on the Allentown Truck Reroute Environmental Impact
Statement (EIS). The project objective is to consider alternative routes for the freight truck traffic that
accesses the Burlington Northern Santa Fe Railroad (BNSF) multi -modal facility through the Allentown
neighborhood, causing adverse effects such as noise, vibration, vehicle emissions, surface water
pollution, and unsafe conditions for pedestrians and bicyclists.
DISCUSSION
Project work to date includes:
• Data collection including: compiling maps, GIS files, and aerial photographs; reviewing and
assessing multiple Allentown truck reroute studies undertaken by the City over a period of
several decades; and assessing site conditions during field inspections.
• Pre -conceptual design including: evaluating previously developed alternatives; developing
new alternatives as per the project contract; preparing schematic -level plans that show both
new and previous alternatives; and evaluating the feasibility of each alternative based on rated
criteria.
• Public involvement including: collecting and processing public and stakeholder comments in
both electronic and printed form, and reviewing and categorizing comments by project
alternative and comment topic, working with City staff to determine public outreach objectives
and approach; preparing a public participation plan; meeting with the public and stakeholders to
establish working collaborations, preparing for and leading public outreach meetings;
developing public outreach materials such as the project website; social media posts, mailers,
flyers, display boards, informational handouts, newspaper notices, PowerPoint presentations,
and content for City publications like newsletters and the Hazelnut. Staff recently met with
BNSF's engineering team to have preliminary discussions on the five options.
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 ■ 206-433-1800 ■ Website: TukwilaWA.gov
11
Info Memo, Page 2
Upcoming work:
• Evaluate the feasibility of alternatives considered to date by the project team, and select those
alternatives that will be considered for further study in the Draft EIS.
• Prepare the Draft EIS, which will include an in-depth description of alternatives, affected
environment, potential environmental impacts, mitigation measures, and significant unavoidable
adverse impacts to the Allentown community. The Draft EIS will also include preliminary
transportation engineering for alternatives, that will aid decision-making and help the project
team understand and manage potential environmental impacts.
• Continue to meet with the public and stakeholders to keep them abreast of project progress,
and continue to rely on the public comments we have collected to guide project decision-
making. In August, the project team will hold a workshop with BNSF to further engineer the five
alternatives.
FINANCIAL IMPACT
HDR's contract is within the Council -approved budget and still has $67,678.10 remaining in potential
contingency.
HDR Contract Costs
HDR Original Contract
$798,603.00
Amendment #1
$49,134.00
Total Encumbered
$847,737.00
Remaining Contingency
$67,678.10
RECOMMENDATION
Information only.
ATTACHMENTS
EIS Process Schedule
Five Schematic Alternatives
Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov
12
EIS PROCESS
71,5
The City held a
formal scoping
period to request
input on alternatives
and issues that
should be analyzed
in the EIS.
Formal public
comment period:
February 14 through
March 15
—3-4 MONTHS
Scoping
ALTERNATIVES ANALYSIS
The City and consultants
reconsidered technical
feasibility of routing
alternatives evaluated in
the 2016 BNSF study, as
well as new alternatives,
including those
introduced by community
members in the Phase 1
scoping period.
WE ARE HERE
7,15
7Q
PHASE 2
The City will share
technical information
regarding rerouting
alternatives, and host
a second community
meeting.
Formal public
comment period:
May 3 through June 1
J
0 Public Meeting 0 Public Comment 0 Public Hearing
The City will take input from
the Phase 2 scoping meeting
to determine the final set of
alternatives to be analyzed
in the Draft EIS. The Draft EIS
will describe the alternatives,
document environmental
impacts, and identify ways to
mitigate those impacts.
The Draft EIS will be made
available for public and
agency review.
Formal public
comment period:
Dates TBD
The Final EIS will formally
respond to all comments
submitted on the Draft EIS
and make any updates to
the analyses in the EIS
as appropriate.
J
Notice of
Final EIS
The City will present
the Final EIS and final
rerouting alternative
decision to the City
Council and Allentown
community and provide
notice that the final EIS
has been completed.
J
ALLENTOWN TRUCK REROUTE PROJECT
ENVIRONMENTAL REVIEW PROCESS
1
2
3
4
5
6
7
8
ALTERNATIVE 5
ALTERNATIVE 4
F�2
ISSUE
DATE
DESCRIPTION
PROJECT MANAGER
DESIGNED BY
DESIGNED BY
DRAWN BY
DRAWN BY
CHECKED BY
HDR PROJECT NO.
XXXX
XXXX
XXXX
XXXX
CITY OF TUKWILA
ALLENTOWN TRUCK REROUTE
ALTERNATIVES OVERVIEW
FILENAME
SCALE
11x17.dwg
XXX
SHEET
01
2
3
4
S BOEING ACCESS RD
5
6
7
8
NEW CHECK-IN\CHECK-OUT
LOCATION OF INTERMODAL
FACILITY
NEW PROPOSED ROADWAY
ALIGNMENT TO AVOID CONFLICT
WITH ABOVE GROUND AND
SURFACE UTILITIES
TRUCKS ROUTE TO 15 WILL
BE THROUGH EAST
MARGINAL WAY AND S
BOEING ACCESS RD
S 112TH ST
SEATTLE PUBLIC UTILITIES
AND SEATTLE CITY LIGHT
UTILITIES CORRIDOR
F�2
PROJECT MANAGER
DESIGNED BY
XXXX
XXXX
DESIGNED BY
DRAWN BY
XXXX
DRAWN BY
CHECKED BY
XXXX
ISSUE
DATE
DESCRIPTION
HDR PROJECT NO.
CITY OF TUKWILA
ALLENTOWN TRUCK REROUTE
ALTERNATIVE 1
S 112TH STREET
FILENAME
11x17.tlwg
SCALE
XXX
SHEET
02
of
a)
1
2
4
5
6
7
8
TRUCKS ENTER AND EXIT THE FACILITY ONLY TOII
THE NORTH OF THE INTERSECTION- TRUCKS
ROUTE TO 15 WILL BE THROUGH S NORFOLK ST,
EAST MARGINAL WAY AND S BOEING ACCESS RD
NEW PROPOSED 111
ROADWAY
S BOEING ACCESS RD
NEW CHECK-IN\CHECK-OUT
LOCATION OF INTERMODAL
FACILITY
F�2
PROJECT MANAGER
DESIGNED BY
XXXX
XXXX
DESIGNED BY
DRAWN BY
XXXX
DRAWN BY
CHECKED BY
XXXX
ISSUE
DATE
DESCRIPTION
HDR PROJECT NO.
CITY OF TUKWILA
ALLENTOWN TRUCK REROUTE
ALTERNATIVE 2
AIRPORT WAY S
FILENAME
1x17.dwg
SCALE
XXX
SHEET
03
of
CONNECT TO EXISTING
CHECK-IN\CHECK-OUT
LOCATION OF
INTERMODAL FACILITY
PROPOSED
NOISE WALL
NEW SIGNALIZED
INTERSECTION AT RAILROAD '•
AVE
PROPOSED NEW
ROADWAY
"^" TWO 12' LANES, 5'
SHOULDERS
111.11.1111.11.
UNDER S 129TH ST
PROPOSED BRIDGE
F)2
PROJECT MANAGER
DESIGNED BY
XXXX
XXXX
DESIGNED BY
DRAWN BY
XXXX
DRAWN BY
CHECKED BY
XXXX
ISSUE
DATE
DESCRIPTION
HDR PROJECT NO.
CITY OF TUKWILA
ALLENTOWN TRUCK REROUTE
ALTERNATIVE 3
IMPROVEMENT TO ALTERNATIVE
48TH AVENUE S
FILENAME
11x17.dwg
SCALE
xxx
SHEET
04
of
1 2 3 4
NEW
ROADWAY
INTERSECTION A
NFW NR IF
5 1 6
r
\\VAA
ti
ON -RAMP
NEW
ROADWAY
INTERSECTION B
PROPOSED RAMP
FROM SR -900 TO !-
SOUTH
CONNECT TO EXISTING
CHECK-IN\CHECK-OUT
LOCATION OF
INTERMODAL FACILITY
PROPOSED
NOISE WALL
NEW
ROADWAY
TO BNSF
INTERSECTION C
S 124TH ST
INTERSECTION B
0
'5,01
INTERSECTION C
IMPROVEMNTS TO S 129TH
ST BRIDGE -BRIDGE
WIDENING
!.i _rt..Sp.
7
8
NOTES :
1- REFER TO SHEET 6 FOR
TRUCK ROUTS IN AND OUT
OF THE FACILITY
ED/
PROJECT MANAGER
DESIGNED BY
XXXX
XXXX
DESIGNED BY
DRAWN BY
XXXX
DRAWN BY
CHECKED BY
XXXX
ISSUE
DATE
DESCRIPTION
HDR PROJECT NO.
CITY OF TUKWILA
ALLENTOWN TRUCK REROUTE
ALTERNATIVE 4
S 129TH ST IMPROVEMENT
FILENAME
11x17.dwg
SCALE
XXX
SHEET
05
0
2
3
4
J
5
6
1
7
8
NOTES :
1- REFER TO SHEET 6 FOR
TRUCK ROUTS IN AND OUT
OF THE FACILITY
PROPOSED RAMP 1
FROM SR -900 TO 1-5
SOUTH
CONNECT TO EXISTING
CHECK-IN\CHECK-OUT
LOCATION OF
INTERMODAL FACILITY
PROPOSED
NOISE WALL
NEW 15 NB
ON-RAMP
INTERSECTION A
PROPOSED RAMP
FROM SR -900 TO
NB 1-5
S 124TH ST_
NEW
ROADWAY
TO BNSF
INTERSECTION A 1
NEW BRIDGE
NEW RAMP CONNECTING TO
BNSF
INTERSECTION B
CONNECTION TO
129TH BRIDGE
S 129TH ST
INTERSECTION B
F�2
PROJECT MANAGER
DESIGNED BY
XXXX
XXXX
DESIGNED BY
DRAWN BY
XXXX
DRAWN BY
CHECKED BY
XXXX
ISSUE
DATE
DESCRIPTION
HDR PROJECT NO.
CITY OF TUKWILA
ALLENTOWN TRUCK REROUTE
ALTERNATIVE 5
BRIDGE FROM MLK TO S 129TH ST
FILENAME
11x17.dwg
SCALE
XXX
SHEET
06
0
2 3 4
5 6 7 8
UTILIZE PROPOSED RAMP
FROM SR -900 TO 1-5 SOUTH
CONNECT TO EXISTING
CHECK-IN\CHECK-OUT
LOCATION OF
INTERMODAL FACILITY
a>r
Lc
CONNECT TO
ALTERNATIVES 4
OR 5
ag Li G.
•
S 124TH ST
•
y" i a Ta ere
•�y:.*..AJ'1 L3a3.-.•
1-5 SB TO BNSF
1-5 NB TO BNSF
BNSF TO 1-5 SB
BNSF TO 1-5 NB
ALTERNATIVE 4
ALTERNATIVE 5
F�2
PROJECT MANAGER
DESIGNED BY
X X X X
X X X X
DESIGNED BY
DRAWN BY
X X X X
DRAWN BY
CHECKED BY
XXXX
ISSUE
DATE
DESCRIPTION
HDR PROJECT NO.
CITY OF TUKWILA
ALLENTOWN TRUCK REROUTE
TRUCK ROUTES
ALTERNATIVES 4 AND 5
FILENAME
11x17.dwg
SCALE
XXX
SHEET
07
of