HomeMy WebLinkAboutCOW 2023-07-24 Item 5A - Powerpoint Presentation Shown at Meeting - Allentown Truck Reroute Alternatives2
3
4
5
6
7 1 8
H�2
ISSUE
DATE
DESCRIPTION
PROJECT MANAGER
DESIGNED BY
DESIGNED BY
DRAWN BY
DRAWN BY
CHECKED BY
HDR PROJECT NO.
XXXX
XXXX
XXXX
CITY OF TUKWILA
ALLENTOWN TRUCK REROUTE
ALTERNATIVES OVERVIEW
FILENAME
SCALE
11x17.dwg
XXX
SHEET
01
NEW CHECK-IN\CHECK-OUT
LOCATION OF INTERMODAL
FACILITY
NEW PROPOSED ROADWAY
ALIGNMENT TO AVOID CONFLICT
WITH ABOVE GROUND AND
SURFACE UTILITIES
TRUCKS ROUTE TO 15 WILL
BE THROUGH EAST
MARGINAL WAY AND S
BOEING ACCESS RD
SEATTLE PUBLIC UTILITIES
AND SEATTLE CITY LIGHT
UTILITIES CORRIDOR
HN
PROJECT MANAGER
DESIGNED BY
XXXX
XXXX
DESIGNED BY
DRAWN BY
XXXX
DRAWN BY
CHECKED BY
XXXX
ISSUE
DATE
DESCRIPTION
HDR PROJECT NO.
CITY OF TUKWILA
ALLENTOWN TRUCK REROUTE
ALTERNATIVE 1
S 112TH STREET
FILENAME
11 x17.dwg
SCALE
XXX
SHEET
02
of
D
C
B
A
2
3
TRUCKS ENTER AND EXIT THE FACILITY ONLY TI
THE NORTH OF THE INTERSECTION- TRUCKS
ROUTE TO 15 WILL BE THROUGH S NORFOLK ST,
EAST MARGINAL WAY AND S BOEING ACCESS RD
4
5
6
7
8
NEW PROPOSED
ROADWAY
NEW CHECK-IN\CHECK-OUT
LOCATION OF INTERMODAL
FACILITY
PROJECT MANAGER
DESIGNED BY
XXXX
XXXX
DESIGNED BY
DRAWN BY
XXXX
DRAWN BY
CHECKED BY
XXXX
ISSUE
DATE
DESCRIPTION
HDR PROJECT NO.
CITY OF TUKWILA
ALLENTOWN TRUCK REROUTE
ALTERNATIVE 2
AIRPORT WAY S
FILENAME
11 x17.dwg
SCALE
XXX
SHEET
03
of
CONNECT TO EXISTING
CHECK-IN\CHECK-OUT
LOCATION OF
INTERMODAL FACILITY
S 124TH ST
PROPOSED
NOISE WALL
PROPOSED C111.
LINK FENCE
N�SIGNALIZED
INTERSECTION AT RAILROAD
AVE
' N. PROPOSED NEW
ROADWAY e
V• TWO 12' LANES, 5'
Irk SHOULDERS
PROPOSED ROAD
UNDER S 129TH ST
PROPOSED BRIDGE
PROJECT MANAGER
DESIGNED BY
XXXX
XXXX
DESIGNED BY
DRAWN BY
XXXX
DRAWN BY
CHECKED BY
XXXX
ISSUE
DATE
DESCRIPTION
HDR PROJECT NO.
CITY OF TUKWILA
ALLENTOWN TRUCK REROUTE
ALTERNATIVE 3
IMPROVEMENT TO ALTERNATIVE
48TH AVENUE S
FILENAME
11x17.dwg
SCALE
XXX
SHEET
04
2
3
4
5
6 7
NEW
ROADWAY
PROPOSED RAMP
FROM SR -900 TO !-
SOUTH i
INTERSECTION A
NEW
ROADWAY
S 129ry sr
INTERSECTION B
CONNECT TO EXISTING
CHECK-IN\CHECK-OUT
LOCATION OF
INTERMODAL FACILITY
NEW
ROADWAY
TO BNSF
•
INTERSECTION C
PROPOSED
NOISE WALL
NEW RAMP CONNECTING TO
INTERSECTION
INTERSECTION C
wiy
IMPROVEMNTS TO S 129TH
ST BRIDGE -BRIDGE
WIDENING
es* -Arir:lailla
-XXXX
XXXX
xxxx
XXXX
ED/
PROJECT MANAGER
DESIGNED BY
DESIGNED BY
DRAWN BY
DRAWN BY
CHECKED BY
8
NOTES:
1- REFER TO SHEET 6 FOR
TRUCK ROUTS IN AND OUT
OF THE FACILITY
ISSUE
DATE
DESCRIPTION
HDR PROJECT NO.
CITY OF TUKWILA
ALLENTOWN TRUCK REROUTE
ALTERNATIVE 4
S 129TH ST IMPROVEMENT
FILENAME
11x17.dwg
SCALE
xxx
SHEET
05
of
PROPOSED RAMP
FROM SR -900 TO 1-5
SOUTH
CONNECT TO EXISTING
CHECK-IN\CHECK-OUT
LOCATION OF
INTERMODAL FACILITY
PROPOSED
NOISE WALL
ww
NEW BRIDG
LNTERSECTION A
NEW RAMP CONNECTING TO
BNSF
INTERSECTION B
CONNECTION TO
129TH BRIDGE
8
NOTES :
1- REFER TO SHEET 6 FOR
TRUCK ROUTS IN AND OUT
OF THE FACILITY
INTERSECTION A
NEW
ROADWAY
TO BNSF
S 1277, sr
INTERSECTION B
H�2
PROJECT MANAGER
DESIGNED BY
XXXX
XXXX
DESIGNED BY
DRAWN BY
XXXX
DRAWN BY
CHECKED BY
ISSUE
DATE
DESCRIPTION
HDR PROJECT NO.
CITY OF TUKWILA
ALLENTOWN TRUCK REROUTE
ALTERNATIVE 5
BRIDGE FROM MLK TO S 129TH ST
FILENAME
11x17.dwg
SCALE
XXX
SHEET
06
of