Loading...
HomeMy WebLinkAboutPermit EL18-0226 - TCC / BUILDING 6 - EXTERIOR LIGHTING UPGRADETCC- BLDG 6 564 INDUSTRY DR BLDG 06 ELI 8-0226 Parcel No: Address: 0 City of Tukwila a Department of Community Development 00 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov ELECTRICAL OTC PERMIT 0223400010 564 INDUSTRY DR BLDG 06 Project Name: TCC - BLDG 6 Permit Number: EL18-0226 Issue Date: 3/19/2018 Permit Expires On: 9/15/2018 Owner: Name: BKM ANDOVER 118 LLC Address: PO BOX 13287 , NEWPORT BEACH, WA, 92658 Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: ADAM SANGDER 11807 NORTH CREEK PARKWAY 5 SUITE B 103, BOTHELL, WA, 98011 NORTHWEST EDISON INC 11807 NORTH CREEK PARKWAY S SUITE B 103, BOTHELL, WA, 98011 NORTHEI983RD 111 Phone: (425) 273-7171 Phone: (425) 806-9200 Expiration Date: 12/4/2018 DESCRIPTION OF WORK: EXTERIOR LIGHTING UPGRADE Valuation of single family: $0.00 Valuation of mf/comm: $4,421.00 Type of Work: TENANT IMP Fees Collected: $196.41 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 Pt National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: (�Q 2017 2017 2017 2015 Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: /�`��t v� ✓9^yd This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Date: I PERMIT CONDITIONS: 1: ***ELECTRICAL PERMIT CONDITIONS*** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-466 WAC and the Washington Cities Electrical Code. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Electrical Permit No. E L - 0).74 Project No. Date Application Accepted: Date Application Expires: (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION �c King Co Assessor's Tax No.:)(c)/ Site Address: ` 1 1 � k v Suite Number: Floor: Tenant Name: "00 \ �- C9 New Tenant;Yes e � � 0 PROPERTY OWNER Name: I } L /M L �C4I J > , � t 6 l /i Address: Name: Vi4 L j `L Zip: PhonE %,,.t L/ 710/19._ - V 1 ��''�tfF"' Address Email:' q: j City: f Kms? State: /�j j� _ 'tT Zi CONTACT PERSON — person receiving all project communication Name: I } L /M L �C4I J > , � t 6 l /i Address: A at City: State: Zip: PhonE %,,.t L/ 710/19._ - V 1 ��''�tfF"' (.,-Stat Email:' q: ELECTRICAL CON CTOR INFORMATION Company N • t 6 l /i A at , (.,-Stat q: Zip ) v.j. fg p (Mlidi f Kms? L.JtL� �t7 �Fax/:L._ '. • , t t Date: /i SP-- t� Exp J j Tukwila Business License No. / — o/7� Valuation of Project (contractor's bid price): $ ?-( a 0 6 Scope of Work (please provide detailed information Will service be altered? ❑ Yes [ No Adding more than 50 amps? ❑ Yes iNo Type of Use: Type of work: 0 New 0 Addition 0 Service Change 0 Remodel Tenant Improvement 0 Low Voltage ❑ Generator 0 Fire Alarm ❑ Telecommunication 0 Temporary Service Prone S- o b : get Sound Energy 0 Seattle City Light W:\Pemait Center\Applications-Handouts\Pennit Applications\PDFs\Electrical Permit Application Revised 1-1-17.docx Revised: January 2017 bh Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings (including an attached garage) ❑ Garages, pools, spas and outbuildings ❑ Low voltage systems (alarm, furnace thermostat) $155.91 $83.54 ea $61.05 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration (no added/altered circuits) ❑ Service change with added/altered circuits number of added circuits 583.54 583.54 $12.00 ea ❑ Circuits added/altered without service change 555.69 (up to 5 circuits) ❑ Circuits added/altered without service change 555.69 (6 or more circuits) 57.65 ea ❑ Meter/mast repair $69.62 ❑ Low voltage systems $61.05 (alarm, furnace thermostat) MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $66.30 ❑ Temporary service (generator) $82.52 O Manufactured/mobile home service $87.98 (excluding garage or outbuilding) ❑ Carnivals $82.21 Number of concessions $11.02 ea Each ride and generator truck $11.02 ea ***EFFECTIVE JANUARY 1, 2014 EACH PERMIT WILL BE ASSESSED A 5% TECHNOLOGY FEE*** PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature: Date: Print Name: Mailing Address: /1) W \Pamil Carter1Applieabaf -H+odobb\Permil Applications \PDFs Ekctrieal Permit Appliealion Revised 1-1-17.docx Revised: January 2017 bh Day Telephone 717/ City Stafe Zip Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID 7,46 EL18-0218 Address: 631 STRANDER BLVD BLDG A Apn: 0223300020 196. ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35' TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0219 Address: 651 STRANDER BLVD BLDG B Apn: 0223300020 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0220 Address: 679 STRANDER BLVD BLDG C Apn: 0223300020 $196.4. ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0221 Address: 601 STRANDER. BLVD BLDG D Apn: 0223300020 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 I $9.35 EL18-0222 Address: 649 STRANDER BLVD E Apn: 0223300020 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0223 Address: 659 STRANDER BLVD BLDG F Apn: 0223300020 $196.41 ELECTRICAL 5187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 5187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 Date Paid: Monday, March 19, 2018 Paid By: NORTHWEST EDISON INC Pay Method: CHECK 25420 Printed: Monday, March 19, 2018 8:18 AM 1 of 7 CISYSTEMS Cash Register Receipt City of Tukwila -0224 Address: 400 INDUSTRY DR BLDG 02 rt: 0223400010 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0225 Address: 530 INDUSTRY DR BLDG 04 Apn: 0223400010 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 L18-0226 Address: 564 INDUSTRYDR BLDG 06 Apn: 0223400010 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0227 Address: 596 INDUSTRY DR BLDG 08 lApn: 0223400010 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0228 Address: 636 INDUSTRY DR UnitBLDG 10 Apn: 2523049008 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 L18-022' dress: 664 INDUSTRY DR BLDG 12 {Apn: 2523049008 $196.41 ELECTRICAL' $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 Date Paid: Monday, March 19, 2018 Paid By: NORTHWEST EDISON INC Pay Method: CHECK 25420 Printed: Monday, March 19, 2018 8:18 AM 2 of 7 CISYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $7,463.5 EL18-0230 Address: 607 INDUSTRY DR UnitBLDG 13 Apn:2523049008 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0231 Address: 702 INDUSTRY DR UnitBLDG 14 Apn: 2523049008 $196 4. ELECTRICAL 5187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 5187.06 ' TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 59.35 EL18-0232 Address: 641 INDUSTRY DR UnitBLDG 15 Apn: 2523049008 $_ 196 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0233 Address: 742 INDUSTRY DR BLDG 16 Apn: 2523049008 $196.41 ELECTRICAL 5187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0234 Address: 701 INDUSTRY DR BLDG 17 Apn: 2523049008 ` $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0235 Address: 800 INDUSTRY DR BLDG 18 Apn: 2523049015 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 Date Paid: Monday, March 19, 2018 Paid By: NORTHWEST EDISON INC Pay Method: CHECK 25420 Printed: Monday, March 19, 2018 8:18 AM 3 of 7 CAIIPWSYSTEMS DESCRIPTIONS Perm Cash Register Receipt City of Tukwila ACCOUNT QUANTITY PAID 7.463:56 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL 8-0237 `Address: 8 0 INDUSTRY DR BLDG 20 Apn: 2523049015 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 • TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EI IND USTRY;D' $196.41 5187.06 ELECTRIC PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 5187.06 TECHNOLOGY FEE 59.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 8-0239 Address: 900 INDUSTRY DR BLDG 22 Apn: 2523 9015 $196.41 ELECTRICAL. $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 9 INDUSTRY;DR UnitBLDG 2 n' 2523049034 5187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 -0241 Address: 930 INDUSTRY; DR BLDG 24 jApnr2523049015 $196.41 ELECTRIC $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 Date Paid: Monday, March 19, 2018 Paid By: NORTHWEST EDISON INC Pay Method: CHECK 25420 Printed: Monday, March 19, 2018 8:18 AM 4 of 7 CRIYSTEMS Cash Register Receipt City of Tukwila PermitTRAK DESCRIPTIONS ACCOUNT QUANTITY PAID 7,463. E118-0242 Address: 881 INDUSTRY DR BLDG 25 Apn: 2523049034 $196.4 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322,900.04.00 0.00 $9.35 EL18-0243 Address: 950 INDUSTRY DR BLDG 26 Apn: 2523049015 $196.41.:, ELECTRICAL 5187.06 ' PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0244 Address: 903 INDUSTRY DR BLDG 27 Apn: 2523049034 $196.41 r ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 E -0245 Address: 970 INDUSTRY DR BLDG 28 Apn: 2523049015 $196.41 , ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGV FEE 59.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0246 Address: 935 INDUSTRY DR BLDG 29 Apn: 2523049034 196A1 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0247 Address: 1000 INDUSTRY DR BLDG 30 Apn: 2523049071 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 5187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 Date Paid: Monday, March 19, 2018 Paid By: NORTHWEST EDISON INC Pay Method: CHECK 25420 Printed: Monday, March 19, 2018 8:18 AM 5 of 7 TEM S Cash Register Receipt City of Tukwila -02 ress: 965 INDUSTR `£DR BLDG 31 n:2523049034 ....... ......... .196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE` $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 .18=0249' Address: 1018 INDUSTRY DR BLDG 32 Apn: 2523049071 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 cess: 1007 INDUS' inutBLDG 33 3049071 $196.41 $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0251 Address:1036 INDUSTRY DR BLDG 34 Apn• 2523049071 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 res; 1100 SND I51 LDG3 0;1 3049071 19641 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18-0253; :" Address: 1130 INDUSTRY DR UnitBLDG 38 Apn: 2523049071 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 Date Paid: Monday, March 19, 2018 Paid By: NORTHWEST EDISON INC Pay Method: CHECK 25420 Printed: Monday, March 19, 2018 8:18 AM 6 of 7 CRIOVSYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT 1 QUANTITY I PAID Perm1tTRAK 7,4634 - EL18-0254 Address: 1138 INDUSTRY DR BLDG 40 Apn: 2523049071 $196;412 - ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE R000.322.900.04.00 0.00 $9.35 EL18 255 Address: 1158 INDUSTRY DR BLDG 42 Apn: 2523049071 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE 1 R000.322.900.04.00 1 0.00 1 $9.35 TOTAL FEES PAID BY RECEIPT: R14026 $7,463.58 Date Paid: Monday, March 19, 2018 Paid By: NORTHWEST EDISON INC Pay Method: CHECK 25420 Printed: Monday, March 19, 2018 8:18 AM 7 of 7 CIIIWSYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION EL18-62/1-6 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3 Project: �.....6, Type of Inspection:�� Address: 56 w Date Called: Special Instructio s: Date Wanted: g/44 a.m. p.m. Requester: Phone No: VAApproved per applicable codes. u Corrections required prior to approval. COMMENTS: k Inspector: 6\ Date: (41021/i REINSPECTION FEE REQUIRED. Prior to next inspection, fee kiust be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 8/1/2018 e City of Tukwila Department of Community Development ADAM SANGDER 11807 NORTH CREEK PARKWAY S SUITE B 103 BOTHELL, WA 98011 RE: Permit No. EL 18-0226 TCC - BLDG 6 564 INDUSTRY DR Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 9/15/2018. Based on the above, you are hereby advised to: I) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 9/15/2018, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, JM achelleRip Permit Technician File No: ELI8-0226 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 NORTHWEST EDISON INC Home Espanol Contact Safety & Health Claims & Insurance 0 Washington State Department of Labor & Industries 0 [Search L&I A -Z Index H elp Workplace Rights NORTHWEST EDISON INC Owner or tradesperson Principals CAMILLERI, DANIEL C, PRESIDENT OWEN, RANDY, VICE PRESIDENT OWEN, RICHARD E, SECRETARY OWEN, RICHARD E, TREASURER OWEN, RANDY M, AGENT OWEN, RICHARD, PRESIDENT (End: 03/06/2012) OWEN, SALI, SECRETARY (End: 03/06/2012) OWEN, RICHARD, AGENT (End: 03/06/2012) Doing business as NORTHWEST EDISON INC WA UBI No. 601 522 062 Parent company INDUSTRIAL LIGHT & ENERGY INC 11807 North Creek Parkway S Ste B103 BOTHELL, WA 98011 425-806-9200 KING County Business type Corporation Governing persons RICHARD OWEN SALI OWEN; RANDY OWEN; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Electrical Contractor Active. Meets current requirements. License specialties GENERAL License no. NORTHEI983R0 Effective — expiration 12/04/2002-12/04/2018 Designated administrator_ OWEN, RANDY MARK License type Electrical Administrator Bond RLI Ins Co Bond account no. LSM0667470 Active. Meets current requirements. License no. OWEN•RM959Q8 $4,000.00 Page 1 of 3 SIE ARCH My 1.2&I Trades & Licensing Help us improve NORTHWEST EDISON INC Received by L&I 10/08/2014 Bond history Savings No savings accounts during the previous 6 year period. License Violations Infraction no. EBANX00358 Issue date 03/18/2014 Violation city WOODINVILLE Type of violation ELECTRICAL CITATION Description Failing to get an Inspection or obtain an electricalftelecommunications work permit or post a provisional electrical work permlt prior to beginning the electrIcalffelecommunication Installation or alteration as referenced in WAC 296-46B-901. FAILURE TO OBTAIN AN ELECTRICAL WORK PERMIT PRIOR TO BEGINNING THE INSTALLATION. Infraction no. ESTAD00513 Issue date 11/16/2012 Violation city WOODINVILLE Type of violation ELECTRICAL CITATION Description Failing to obtain or post an electricalftelecommunications work permit prior to beginning the electricalftelecommunicatIon installation or alteration as referenced In WAC 296-468-900 (3)(6), effective after 12/30/2008 see WAC 296- 46B-901. Effective date 10/26/2014 Expiration date Until Canceled Satisfied RCW/WAC 19.28.101 RCW Violation amount $2,000.00 Satisfied RC VVNVAC 19.28.101 RCW Violation amount 51,000.00 Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. This company has multiple workers' comp accounts. Active accounts L&I Account ID 989,512-00 Doing business as NORTHWEST EDISON Estimated workers reported Quarter 4 of Year 2017 "51 to 75 Workers" L&I account contact TO! DALE MCMASTER (360)902-5617 - Email: MCMS2354tIni.wa.gov Track this contractor 0 Account Is current. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes Page 2 of 3 Help us improve https://securedni.wa.gov/verify/Detail.aspx?UBI=601522062&LIC=NORTHEI983RD&SAW= 3/15/2018