Loading...
HomeMy WebLinkAboutPermit EL18-0257 - FATIGUE TECHNOLOGY - INSTALL POWER FOR NEW EDMFATIGUE TECHNOLOGY 401 ANDOVER PARK E EXPIRED 9111/18 ELI 8-0257 Parcel No: Address: Project Name: City of Tukwila of-,-'--_''__---_., -_'_-,-'_ 63003outhcemterBoulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431'3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov ELECTRICAL OTC PERMIT 0223400050 Permit Number: EL18'0357 401 ANDOVER PARK E FATIGUE TECHNOLOGY Issue Date: 3/15/2018 Permit Expires On: 9/11/2018 Owner: Name: Address:PO BOX 50268 , SEATTLE, WA, 98015 Contact Person: Name: BRANDON MIKULSKI 401 ANDOVER LLC Address: Contractor: Name: Address: License No: Lender: Name: Address: 828 POPLAR PL S , SEATTLE, WA, 98144 SyW[INC OFSEATTLE 828POPLAR PLS'SEATTLE, WA, 98144-2828 SMEINS*066DB Phone: (206) 391-8271 Phone: (206) 329-2040 Expiration Date: ]/]/2020 DESCRIPTION OF WORK: INSTALL POWER FOR NEW EDM, IN ADDITION NEED TO MOVE EQUIPMENT AND THEIR SOURCE OF POWER TO A DIFFERENT LOCATION WITHIN THE FACILITY. Valuatoti of single family: $0.00 Valuation of mf/comm: $11,000.00 Type of Work: NEW Fees Collected: $310.03 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: lnternational Building Code Edition: International Residential Code Edition: lnternatonaI Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 20152015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Permit Center Authorized Signature: Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: niG Aio, P I �v,1 g0,I Date: /3 -�� This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***ELECTRICAL PERMIT CONDITIONS*** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-46B WAC and the Washington Cities Electrical Code. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB CITY OF TUKWIO Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Electrical Permit No. kJJ 0' G7Cg 7 Project No. Date Application Accepted 03//S l i r Date Application Expires: or i ice use ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: Site Address: 401 Andover Park E Suite Number: New Tenant: Tenant Name: Fatigue Technology PROPERTY OWNER Name: Brandon Mikulski Name: Fatigue Technology Address: 828 Poplar PI S Address: 401 Andover Park E Phone: 206-391-8271 Fax: City: Tukwila State: WA ZIP: 98015 CONTACT PERSON — person receiving all project communication Name: Brandon Mikulski Company Name: SME inc of Seattle Address: 828 Poplar PI S Address: 828 Poplar PI S City: Seattle State: WA Zip:98144 Phone: 206-391-8271 Fax: Phone: 206-329-2040 Fax: Email: Contr Reg No.SMEINS*066DB Exp Date: Floor: 0 Yes j..No ELECTRICAL CONTRACTOR INFORMATION Company Name: SME inc of Seattle Address: 828 Poplar PI S City: Seattle State: WA Zip: 98144 Phone: 206-329-2040 Fax: Contr Reg No.SMEINS*066DB Exp Date: Tukwila Business License No.; Valuation of Project (contractor's bid price): $ 11,000.00 Scope of Work (please provide detailed information): Install power for New EDM in addition need to move equipment and there source of power to a different location within the tacility Will service be altered? ❑ Yes ❑ No Adding more than 50 amps? 0 Yes ( No Type of Use: Type of work ttf New 0 Addition 0 Service Change 0 Remodel 0 Low Voltage 0 Generator 0 Fire Alarm 0 Telecommunication Property Served by: Puget Sound Energy 0 Seattle City Light W:'Pamil cameiApplie,600s-HaneadaTennit Applications \PDFs'Elect ical Permit Application Revised 1-1-17.docx Revised: January 2017 bb ❑ Tenant Improvement ❑ Temporary Service Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE o New single family dwellings (including an attached garage) O Garages, pools, spas and outbuildings O Low voltage systems (alarm, furnace thermostat) $155.91 $83.54 ea $61.05 ea RESIDENTIAL REMODEL AND SERVICE CHANGES O Service change or alteration $83.54 (no added/altered circuits) O Service change with added/altered circuits $83.54 number of added circuits $12.00 ea o Circuits added/altered without service change $55.69 (up to 5 circuits) LI Circuits added/altered without service change $55.69 (6 or more circuits) $7.65 ea O Meter/mast repair $69.62 O Low voltage systems S61.05 (alarm, furnace thermostat) MULTI-FAMIL AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES O Temporary service (residential) $66.30 O Temporary service (generator) $82.52 O Manufactured/mobile home service $87.98 (excluding garage or outbuilding) O Carnivals $82.21 Number of concessions $1 L02 ea Each ride and generator truck $11.02 ea ***EFFECTIVE JANUARY 1, 2014 EACH PERMIT WILL BE ASSESSED A 5% 1hCHNOLOGY FEE* * * PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELEC CAL CONTRACTOR: 3-15-18 Signature: Date: Print Name: Michael Munson Day Telephone:206-391-6884 Mailing Address: WAPermit CentaNApplicalicoaandouls\Permit Applications \PDFAElectrical Permit Application Revised 1-1-17.docx Revised: Jemmy 2017 bb Cash Register Receipt City of Tukwila Receipt Number R14008 DESCRIPTIONS ACCOUNT PermitTRAK EL18-0257 Address: 401 ANDOVER PARK E Apn 0223400050 ELECTRICAL PERMIT FEE MULTI-FAM/COMM TECHNOLOGY FEE TECHNOLOGY FEE R000.322.101.00.00 R000.322.900.04.00 TOTAL FEES PAID BY RECEIPT: R14008 ANTITY PAID Date Paid: Thursday, March 15, 2018 Paid By: SME INC OF SEATTLE Pay Method: CHECK 24764 Printed: Thursday, March 15, 2018 1:37 PM 1 of 1 SYSTEMS 8/1/2018 c City of Tukwila Allan Ekberg, Mayor Department of Community Development BRANDON MIKULSKI 828 POPLAR PL S SEATTLE, WA 98144 RE: Permit No. EL18-0257 FATIGUE TECHNOLOGY 401 ANDOVER PARK E Dear Permit Holder: Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 9/11/2018. Based on the above, you are hereby advised to: I) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 9/11/2018, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, ey Permit Technician File No: ELI8-0257 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 S M E INC OF SEATTLE e Home Espanol Contact Safety & Health Washington State Department of Labor & Industries Page 1 of 3 Search L&I A -Z Index Claims & Insurance Workplace Rights S M E INC OF SEATTLE Owner or tradesperson Principals MARVICH, STEPHEN E PINSKY, ADAM A BAKER, JON T, AGENT Doing business as S M E INC OF SEATTLE WA UBI No. 601 524 252 828 POPLAR PL S SEATTLE, WA 98144 206-329-2040 KING County Business type Corporation Governing persons STEPHEN E MARVICH ADAM A PINSKY; JOHN P WITTMAN; JON T BAKER; JOHN E HARDER; JOHN M STIPE; icense Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Electrical Contractor Active. Meets current requirements. License specialties GENERAL License no. SMEINS*066DB Effective — expiration 03/02/1994— 03/02/2020 Help us improve https://secureini.wa.gov/verify/Detail.aspx?UBI=601524252&LIC=SMEINS*066DB&SAW= 3/15/2018