HomeMy WebLinkAboutPermit EL18-0858 - CALKIN RESIDENCE - MOVE AND MODERNIZE ELECTRICAL PANEL AND RELOCATE METERCALKIN RESIDENCE
15626 47 AVE S
EXPIRED
4/3/19
ELI 8-0858
Parcel No:
Address:
Project Name:
City of Tukwila
Deportment of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: htta://www.TukwIlaWA.Rov
ELECTRICAL OTC PERMIT
8108600800 Permit Number: EL18-0858
15626 47TH AVE S
CALKIN RESIDENCE
Issue Date: 10/5/2018
Permit Expires On: 4/3/2019
Owner:
Name:
Address:
Contact Person:
Name:
Address:
Contractor:
Name:
Address:
License No:
Lender:
Name:
Address:
SEBRING SPENCER W+DALILA
15626 47TH AV S , TUKWILA, WA,
98188
JACOB BARR
3623 E MARGINAL WAY 5 , SEATTLE,
WA, 99134
EVERGREEN POWER SYSTEMS, INC
3623 E MARGINAL WAY 5 , SEATTLE,
WA, 98134-1131
EVERGPS950BE
Phone: (206) 423-3916
Phone: (206) 774-1400
Expiration Date: 1/5/2019
DESCRIPTION OF WORK:
MOVE AND MODERNIZE ELECTRICAL PANEL AND RELOCATE METER
Valuation of single family: $5,000.00
Valuation of mf/comm: $0.00
Type of Work: SERV CHNG
Fees Collected: $90.35
Electrical Service Provided by: SEATTLE CITY LIGHT
Water District: HIGHLINE
Sewer District: NONE
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
International Fuel Gas Code:
2015
2015
2015
2015
2015
National Electrical Code:
WA Cities Electrical Code:
WAC 296-46B:
WA State Energy Code:
2017
2017
2017
2015
Permit Center Authorized Signature:
Date:
D --S-1 �i
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development permit and agree to the conditions attached to this permit.
Signature:
Print Name:
Date: lln -5-13
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: ***ELECTRICAL PERMIT CONDITIONS***
2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical
Inspector at each work site.
3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical
Inspector.
4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations,
Chapter 296-46B WAC and the Washington Cities Electrical Code.
5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts
of the building, such equipment shall not be concealed until it has been inspected and approved by the
Electrical Inspector.
6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any
violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related
documentation that presumes to grant this authority are therefore not valid.
7: Any change in the scope of work described by the electrical work permit shall require additional work
permits. Where approved plans have been issued, revisions to the plans and additional review may be
required.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
2100 ELECTRICAL FINAL
7003 ROUGH -IN ELECTRICAL
7002 SERVICE
7001 UNDERGROUND/SLAB
CITY OF TUKWILA
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TakwilaWA.gov
Electrical Permit No. 095-0
Project No.
Date Application Accepted;
Date Application Expires:
(For office use only)
ELECTRICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**Please Print**
SITE LOCATION
Site Address: 15(.07 6 1 -1T -Is Ave 3 ,A1/4„,
Tenant Name: J. -oh if\ v-‘
King Co Assessor's Tax No.:
Suite Number: Floor:
PROPERTY OWNER
Name: ----
j cnC0 6
Name: --
)oVvn
Co.111.2 \ rN
Phone: 2Fax:
4:,(„ -4-7.---30(16
Address:
‘ 5 (oUD
tilb Ave- S
Phone: 20(0_413_ 3s \ (0 Fax:
City:
To Y --w, lc.
State:
kAJA
Zip:1 bt by
CONTACT PERSON - person receiving all project
communication
Name: ----
j cnC0 6
Address:
Address: 3L,..2-3
Phone: 2Fax:
4:,(„ -4-7.---30(16
City: sex,* \ e_ State:
Zip:cico,..i
Phone: 20(0_413_ 3s \ (0 Fax:
Email: :itocar e_eveic,v con ps, irw_f_
New Tenant: E=1 Yes D ..No
ELECTRICAL CONTRACTOR INFORMATION
Company Name: e-
Z_Ve4/ yew% Pou-e.e Sy ken )
Address:
City: seL,... tkic State: ) 16,. Zip:34
Phone: 2Fax:
4:,(„ -4-7.---30(16
Contr Reg No.: Exp Date:
Tukwila Business License No.;
Valuation of Project (contractor's bid price): $5, 00C)
Scope of Work (please provide detailed information): Move._ 2_ pi 0Aer dedeiC.c.lpAykeA wALO
trtioc_c4c. mOrer
Will service be altered? f Yes El No
Adding more than 50 amps? [Zi Yes El No
Type of Use:
Type of work:
O New 0 Addition 0 Service Change 0 Remodel Eq Tenant Improvement
O Low Voltage 0 Generator 0 Fire Alarm 0 Telecommunication 0 Temporary Service
Property Served by:
O Puget Sound Energy Seattle City Light
WitPerinit CentertApplications-Randouts1Permit Applications \PDFsElertrical Pernik Application Revised 1-1-17.docs
ReVISIXI: January 2017
bb
Page 1 of 2
RESIDENTIAL
NEW RESIDENTIAL SERVICE
o New single family dwellings $155.91
(including an attached garage)
❑ Garages, pools, spas and outbuildings $83.54 ea
❑ Low voltage systems
(alarm, furnace thermostat) $61.05 ea
RESIDENTIAL REMODEL AND SERVICE CHANGES
k Service change or alteration $83.54
(no added/altered circuits)
❑ Service change with added/altered circuits $83.54
number of added circuits $12.00 ea
❑ Circuits added/altered without service change $55.69
(up to 5 circuits)
❑ Circuits added/altered without service change $55.69
(6 or more circuits) $7.65 ea
❑ Meter/mast repair $69.62
❑ Low voltage systems $61.05
(alarm, furnace thermostat)
MULTI -FAMILY AND COMMERCIAL
Fees are based on the valuation of the electrical contract.
MISCELLANEOUS FEES
❑ Temporary service (residential) $66.30
❑ Temporary service (generator) $82.52
❑ Manufactured/mobile home service $87.98
(excluding garage or outbuilding)
O Carnivals $82.21
Number of concessions $11.02 ea
Each ride and generator truck $11.02 ea
***EFFECTIVE JANUARY 1, 2014 EACH
PERMIT WILL BE ASSESSED A 5%
TECHNOLOGY FEE***
PERMIT APPLICATION NOTES -
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing
and justifiable cause demonstrated.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR ELECTRICAL CONTRACTOR:
Signature: /I Date: 10150
9`x`1 -cit -Xc12)
Print Name:J \k1.• .
Mailing Address: I Fi IQ 2,112
W:1Permit CentenAppticatiom-HmdoutsWermit Applications\PDFs\Ekctrical Permit Application Revised 1-1-17.docx
Revised: January 2017
bh
Day Telephone:
t.) 1C.
City
N
State Zip
Page 2 of 2
DESCRIPTIONS
PermitTRAK
Cash Register Receipt
City of Tukwila
ACCOUNT
QUANTITY PAID
$90.35
EL18-0858 Address: 15626 47TH AVE S Apn: 8108600800
$90.35
Credit Card Fee
$2.63
Credit Card Fee
R000.369.908.00.00
0.00
$2.63
ELECTRICAL
$83.54
PERMIT FEE SINGLE FAMILY
R000.322.101.00.00
0.00
$83.54
TECHNOLOGY FEE
$4.18
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R15563
R000.322.900.04.00 0.00
$4.18
$90.35
Date Paid: Friday, October 05, 2018
Paid By: JOHN CALKIN
Pay Method: CREDIT CARD 05032B
Printed: Friday, October 05, 2018 2:59 PM 1 of 1
SYSTEMS
CO TUKWILA ETRAKIT
6200 SOUTHCENTER BLVD
TUKWILA, WA 98188
206-433-1870
CITY OF TUKWILA
0017340000802374464500
Date: 10/05/2018 02:59:21 PM
CREDIT CARD SALE
VISA
CARD NUMBER: **********5181 K
TRAN AMOUNT: $90.35
APPROVAL CD: 05032B
RECORD #: 000
CLERK ID: Bill
X
{CARDHOLDER'S SIGNATURE}
I AGREE TO PAY THE ABOVE TOTAL AMOUNT
ACCORDING TO THE CARD ISSUER AGREEMENT
(MERCHANT AGREEMENT IF CREDIT VOUCHER)
Thank you!
Merchant Copy
Page 1 of 2
https: //classic. convergepay. com/V irtualMerchant/transaction. do?dispatchMethod=printTra... 10/5/2018
TO:
FROM:
DATE:
SUBJECT:
MEMORANDUM
Richard Takechi
Rachelle Ripley VY
June 3, 2019
Permit Number EL18-0858
Please credit $70.17 (seventy dollars and seventeen cents) for a credit card transaction
made on October 5, 2018.
The permit has been canceled.
Please provide the refund as follows:
Account 000.322.101.00.00: $
Account 000.322.900.04.00: $
Thank you!
66.83
3.34
Total: $ 70.17
Kandace Nichols
From: Addie Ca|kin<addievictoha@gmai|znm>
Sent: Wednesday, May 29, 2019 12:54 PM
To: Kandace Nichols
Subject: Electrical Permit Refund 'EL18'08S8
Attachments: EL18'0858.pdf
Hi Kandace,
Nice speaking with you a few minutes ago. I attached a copy of our permit and receipt that we paid in October 2018. We
did not go through with the work and no inspection was needed. | was hoping it would be possible to get a refund in
case we decide later to re -apply and do the work. Thank you very much in advance for the consideration.
Thank you,
Addie (and John) Calkin
CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachmentsor click
Iinks from an unknown or suspicious origin.
/
/
Request for Refund
rT
Appmvx]for full refund
��
Appm�
�d for ° w //o refund of fee(s)
[|Denie'
Signature/Initials
1
Cash Register Receipt
City of Tukwila
DESCRIPTIONS
PermitTRAK
ACCOUNT
1 QUANTITY I
PAID
$90.35
EL18-0858 Address: 15626 47TH AVE S
Apn: 8108600800
$90.35
Credit Card Fee
$2.63
Credit Card Fee
R000.369,908.00.00
0.00
$2.63
ELECTRICAL
$83,54
PERMIT FEE SINGLE FAMILY
R000.322.101.00.00
0.00
$83.54
TECHNOLOGY FEE
$4.18
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R15563
R000.322.900.04.00
0.00
$4.18
$90.35
Date Paid: Friday, October 05, 2018
Paid By: JOHN CALKIN
Pay Method: CREDIT CARD 05032B
Printed: Monday, June 03, 2019 9:45 AM 1 of 1
ett7R011
SYSTEMS
3/1/2019
City of Tukwila
Department of Community Development
JACOB BARR
3623 E MARGINAL WAY S
SEATTLE, WA 99134
RE: Permit No. ELI 8-0858
CALKIN RESIDENCE
15626 47 AVE S
Dear Permit Holder:
Allan Ekberg, Mayor
Jack Pace, Director
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric
Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null
and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if
the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 4/3/2019.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each
inspection creates a new l80 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire.
Address your extension request to the Building Official and state your reason(s) for the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 4/3/2019, your permit will become null and void
and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
Bill Rambo
Permit Technician
File No: EL18-0858
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
EVERGREEN POWER SYSTEMS6C
Washington State Department of
Labor & Industries
Page 1 of 2
Horne Espanol Contact Search L&I
AZ Index Help My IX]
ACH
Safety & Health Claims & Insurance Workplace Rights Trades & Licensing
EVERGREEN POWER SYSTEMS INC
Owner or tradesperson
Principals
MACKEY, JAMES E, PRESIDENT
HOPKINS, JAMES, AGENT
Doing business as
EVERGREEN POWER SYSTEMS INC
WA UBI No.
602 451 324
3623 E MARGINAL WAY S
SEATTLE, WA 98134
206-774-1400
KING County
Business type
Corporation
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Electrical Contractor
License specialties
GENERAL
License no.
EVERGPS950BE
Effective — expiration
01/05/2005— 01/05/2019
Designated administrator
MACKEY, JAMES E
License type
Electrical Administrator
Bond
HARTFORD FIRE INS CO
Bond account no
528SBFC2870
Received by L&I
12/19/2008
Savings
No savings accounts during the previous 6 year period.
License Violations
No license violations during the previous 6 year period.
Active.
Meets current requirements.
Active.
Meets current requirements.
License no.
MACKEJE216JN
$4,000.00
Effective date
01/03/2009
Expiration date
Until Canceled
Workers' comp
Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums.
This company has multiple workers' comp accounts.
Help us improve
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602451324&LIC=EVERGPS950BE&SAW= 10/5/2018
EVERGREEN POWER SYSTEMS JC
Active accounts
L81 Account ID
404,500-02
Doing business as
EVERGREEN POWER SYSTEMS INC
Estimated workers reported
Quarter 2 of Year 2018 "Greater than 100 Workers"
L&I account contact
72 / DALE RIUTTA (360)902-4834 - Email: RIUD235@lni.wa.gov
Track this contractor 0
Account is current.
Public Works Strikes and Debarments
Verify the contractor is eligible to perform work on public works projects.
Contractor Strikes
No strikes have been issued against this contractor.
Contractors not allowed to bid
No debarments have been issued against this contractor.
Workplace safety and health
No inspections during the previous 6 year period.
Page 2 of 2
Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington.
Help us improve
https://securelni.wa.gov/verify/Detail.aspx?UBI=602451324&LIC=EVERGPS950BE&SAW= 10/5/2018