Loading...
HomeMy WebLinkAboutPermit EL18-1030 - KING COUNTY HOUSING AUTHORITY - INSTALL (36) CAT6 CABLESKING COUNTY HOUSING AUTHORITY 700 ANDOVER PARK W EXPIRED 06/01/2019 ELI 8-1030 Parcel No: Address: Project Name: I) City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov ELECTRICAL OTC PERMIT 2623049124 700 ANDOVER PARK W KING COUNTY HOUSING AUTHORITY Permit Number: Issue Date: Permit Expires On: EL18-1030 12/3/2018 6/1/2019 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: KC HOUSING AUTH 600 ANDOVER PARK WEST, SEATTLE, WA, 98188 SLAVA TROFIMCHIK 5614 SEVENTH AVE S , SEATTLE, WA, 98108 VECA ELECTRIC CO INC 5614 SEVENTH AVE S , SEATTLE, WA, 98108 VECAECI542MU '1, Phone: (206) 819-1707 Phone: (206) 436-5200 Expiration Date: 10/31/2019 DESCRIPTION OF WORK: INSTALL (36) CAT6 CABLES Valuation of single family: $0.00 Valuation of mf/comm: $5,000.00 Type of Work: LOW VOLTAGE Fees Collected: $202.30 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Permit Center Authorized Signature: Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this developmept permit and agree to the conditions attached to this permit. Signature: Print Name: DateN y 2 0 �( This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***ELECTRICAL PERMIT CONDITIONS*** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-466 WAC and the Washington Cities Electrical Code. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB CITY OF TUK Community Development Department Permit Center 6300 Sauthcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.Tuk-wilaWA.gov Electrical Permit No. 0- 10 Project No. Date Application Accepted: Date Application Expires: (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: 700 4nci_ OVe/r— Tenant Name: V.,11#5 C..91A.1141 H King Co Assessor's Tax No.: Suite Number: Floor: 31 New New Tenant: 0 Yes PROPERTY OWNER Name: &aa ---v-T-10...v0A.N.._, Address: c (2 i (.1 7+4 Ate s Name: Phonep4 ?I ?—r7' 7._ Fax: Email: Address: City: State: Zip: CONTACT PERSON — person receiving all project comnainication Name: &aa ---v-T-10...v0A.N.._, Address: c (2 i (.1 7+4 Ate s City: '5.ettArkState: uiyi- Zip:7rity.8 Phonep4 ?I ?—r7' 7._ Fax: Email: ELECTRICAL CONTRACTOR INFORMATION Company Name: Address: aotki —pi Ave, kS City: State:V\ 1P z. : 6E108 Phone: Fax(20(9)--w, 4SL Contr Reg No.: vadttEci 5 Exp Date:101511 In Tukwila Business License No.; BS _ hq q 115 i Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): 451.4.11 c(o) QA1-6 cA_ble-s Will service be altered? EJ Yes Eg No Adding more than 50 amps? LJ Yes l No Type of Use: Type of work: 0 New 0 Addition 0 Service Change 0 Remodel 0 Tenant Improvement M Low Voltage 0 Generator Fire Alarm 0 Telecommunication 0 Temporary Service Property Served by: 0 Puget Sound Energy 0 Seattle City Light W:Termit Center\ Applications-HandoutinPermit Applications \PDFalectrical Permit Application Revised 1-1-17.docx Revised: January 2017 bb Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings (including an attached garage) ❑ Garages, pools, spas and outbuildings ❑ Low voltage systems (alarm, furnace thermostat) $155.91 $83.54 ca $61.05 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $83.54 (no added/altered circuits) ❑ Service change with added/altered circuits $83.54 number of added circuits $12.00 ea ❑ Circuits added/altered without service change $55.69 (up to 5 circuits) ❑ Circuits added/altered without service change $55.69 (6 or more circuits) $7.65 ea ❑ Meter/mast repair $69.62 ❑ Low voltage systems $61.05 (alarm, furnace thermostat) MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $66.30 ❑ Temporary service (generator) $82.52 ❑ Manufactured/mobile home service $87.98 (excluding garage or outbuilding) ❑ Carnivals $82.21 Number of concessions $11.02 ea Each ride and generator truck $11.02 ea ***EFFECTIVE JANUARY 1, 2014 EACH PERMIT WILL BE ASSESSED A 5% TECHNOLOGY FEE*** PERMIT APPLICATION NOTES - Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature:v ✓ ` \G� Vin �Date: 12(5 �/ cj 8 Print Name: " - l CSo)m (� — Day Telepho lam`'' ;) 0 I l — Mailing Address: 5 G l _I Ae c�CG27t-1 L' Gv e 'U City State Zip WAPennit CenterMApplinitioos-HandaselPennit Applications\PDFs\Electrical Permit Application Revised t-1-17.docx Revised: January 2017 bit Page 2 of 2 Cash Register Receipt City of Tukwila Receipt Number R15954 QUANTITY PAID EL18-1030 Address: 700 ANDOVER PARK W Apn: 2623049124 $202.30 Credit Card Fee $5.89 Credit Card Fee R000.369.908.00.00 0.00 $5.89 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187,06 TECHNOLOGY FEE $9.35 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R15954 R000.322.900.04.00 0.00 $9.35 $202.30 Date Paid: Monday, December 03, 2018 Paid By: SLAVA TROFIMCHIK Pay Method: CREDIT CARD 084262 Printed: Monday, December 03, 2018 3:38 PM 1 of 1 SYSTEMS CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA 0017340000802374464500 Date: 12/03/2018 03:38:15 PM CREDIT CARD SALE MASTERCARD CARD NUMBER: **********8474 K TRAN AMOUNT: $202.30 APPROVAL CD: 084262 RECORD #: 000 CLERK ID: Bill X (CARDHOLDER'S SIGNATURE) I AGREE TO PAY THE ABOVE TOTAL AMOUNT ACCORDING TO THE CARD ISSUER AGREEMENT (MERCHANT AGREEMENT IF CREDIT VOUCHER) Thank you! Merchant Copy Page 1 of 2 haps://classic.convergepay.com/VirtualMerehant/transaction.do?dispatchMethod=printTra... 12/3/2018 5/2/2019 City of Tukwila Department of Community Development SLAVA TROFIMCHIK 5614 SEVENTH AVE S SEATTLE, WA 98108 RE: Permit No. EL18-1030 KING COUNTY HOUSING AUTHORITY 700 ANDOVER PARK W Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 6/1/2019. Based on the above, you are hereby advised to: I) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 6/1/2019, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Singerely, axle(?). ,0(,1,-) Ka dace Nichols Permit Technician File No: EL18-1030 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 VECA ELECTRIC CO INC nie ESpaliOl Safety & Health Claims & Insurance kWashington State Department of )Labora& Industries [Search L&I A-7, Index Help Page 1 of 3 My 1,8d Workplace Rights Trades & Licensing VECA ELECTRIC CO INC Owner or tradesperson Principals Westerland, Brian L, PRESIDENT FAIRBANKS, THOMAS, VICE PRESIDENT Hood, Jutta C, SECRETARY ALLEN, RON, AGENT Doing business as VECA ELECTRIC CO INC WA UBI No. 601 190 731 5614 7TH AVE S SEATTLE, WA 98108 206-436-5200 KING County Business type Corporation Governing persons THOMAS M FAIRBANKS HERB MEAD; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Electrical Contractor Active. Meets current requirements. License specialties GENERAL License no. VECAECI542MU Effective — expiration 07/31/1946— 10/31/2019 Designated administrator CONTI, KEITH Active. Meets current requirements. License type License no. Master Electrician CONTIK*965D6 Bond Great American Ins Co Bond account no. CA1827907 $4,000.00 Received by L&I Effective date 11/30/2017 01/06/2018 Expiration date Until Canceled Bond history Savings No savings accounts during the previous 6 year period. License Violations Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601190731&LIC=VECAECI542MU&SAW= 12/3/2018 VECA ELECTRIC CO INC Page 2 of 3 Infraction no. Ns. -..... ERUTP00252 Issue date 03/21/2016 Violation city SEATTLE Type of violation ELECTRICAL CITATION Description Covering or concealing installations prior to inspection. Infraction no. EHRAL01328 Issue date 08/05/2015 Violation city SEATTLE Type of violation ELECTRICAL CITATION Description Falling to get an inspection or obtain an electrical/telecommunications work permit or post a provisional electrical work permit prior to beginning the electrical/telecommunication installation or alteration as referenced in WAC 296-46B-901. Infraction no. EHRAL01299 Issue date 02/04/2015 Violation city SEATTLE Type of violation ELECTRICAL CITATION Description Failing to get an inspection or obtain an electrical/telecommunications work permit or post a provisional electrical work permit prior to beginning the electrical/telecommunication installation or alteration as referenced in WAC 296-46B-901. Infraction no. ESHAU00882 Issue date 03/26/2014 Violation city Seattle Type of violation ELECTRICAL CITATION Description Failing to request an inspection within 3 business days after completion of the installation or 1 business day after energizing, whichever occurs first as referenced in WAC 296-46B-901. Failing to request an inspection for EWP 2204138E. Infraction no. EJURT00576 Issue date 10/28/2013 Violation city Satisfied RCW/WAC 19.28.101 RCW Violation amount $250.00 Satisfied RCW/WAC 19.28.101 RCW Violation amount $2,000.00 Satisfied RCW/WAC 19.28.101 RCW Violation amount $2,000.00 Satisfied RCVVNVAC 19.28.101 RCW Violation amount $250.00 Satisfied RCW/WAC 19.28.101 RCW Violation amount Help us improve https://securelni.wa.gov/verify/Detail.aspx?UBI=601190731&LIC=VECAECI542MU&SAW= 12/3/2018