Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit D19-0081 - LA VISTA APARTMENTS - REROOF
LA VISTA APARTMENTS 5555 S 152ND ST BLDG 1 EXPIRED 09/15/2019 D19-0081 Parcel No: Address: City of Tukwila Department of Community Development 6]OU3outhcenterBoulevard, Suite #1q0 Tukwila ,VVashington98108 Phone:Z06'431'367O Inspection Request Line: Z06'438'g35O Web site: http://www.TukwilaWA.gov DEVELOPMENT PERMIT 1157200221 Permit Number: D19-0081 55555152ND5T8LDG1 Project Name: LAVISTA APARTMENTS Issue Date: 3/19/2019 Permit Expires On: 9/15/2019 Owner Name: Address: Contact Person: Name: SEAN PEPPER Phone: (253)8S2-4974 Address: 2S92478THAVE S'KENT,WA, 98032 cpntm'tn,: Name: FIELDS ROOF SERVICE INC Phone: (253)8524974 LA VISTA ESTATESAPT5 3ZOl]AHmAVE NVV#Zl8,G|G HARBOR, WA, 98335 Address: 25924 78TUAVE S,KENT,WA, 98032 -7364 License No: FIELDRS262LI Expiration Date: 9/25/2019 Lender: Name: LAVISTA ESTATES APARTMENTS Address 5555S15ZmD5T,nJKVV|U\WA, 98188 DESCRIPTION OF WORK: CLEAN EXISTING ROOF SYSTEM IN PREPARATION FRO NEW ROOF SYSTEM OVERLAY INSTALLATION, SUPPLY AND INSTALL NEW CARLISLE 1" 20 PSI RIGID PDLYISO OVER ENTIRE ROOF FIELD, SUPPLY AND INSTALL NEW CARLISLE 60 MIL TPO ROOF SYSTEM OVER ENTIRE ROOF FIELDProject Valuation: $85922.00 Type nfFire Protection: Sprinklers: Fire Alarm: Type nfConstruction: VB Electrical Service Provided by: TUKWILA Fees Collected: $2,391.53 Occupancy per IBC: U Water District: TUKYV|L4 Sewer District: TUKVV|LA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code; 2015 2015 2015 2015 2015 National Electrical Code: VVxCities Electrical Code: vVACZ9646B: Code: Public Works Activities: [hanno|izadnn/Strping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: HauUng/OversizeLoad: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Permit Center Authorized Signa Volumes: Cut: O Fill: 8 Number O Date: 311 q /I q |hearbycertify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state orlocal laws regulating construction orthe performance ofwork, |amauthorized tosign and obtain this development permit and agree tothe conditions attached tothis permit. Signature: Date: Print Name: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: 'BUILDING PERMIT O]NDOOONS~** Z: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall bekept atthe site ofwork and shall be open to inspection by the Building Inspector until final inspection approval is granted, 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the Sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based nnsatisfactory completion ufthis requirement. 6: Prior to final inspection for this building permit, a copy of the roof membrane manufacturer's warranty certificate shall beprovided tothe building inspector. 7: VALIDITY OFPERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances nfthe City nfTukwila shall not bevalid. The issuance nfapermit based onconstruction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 0103 PRE-REROOF CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Permit No. 19 - 008 1 Project No. Date Appli ation Accepted: Date Application Expires: l9 (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: 5555 S 152nd Street - Bldg 1 Tenant Name: La Vista. Apartments King Co Assessor's Tax No.: 115720-0221 Suite Number: Floor: New Tenant: El Yes 121.,No PROPERTY OWNER Name: LA VISTA ESTATES APARTMENTS Address: 5555 S 152nd St City: Tukwila State: WA Zip: 98188 CONTACT PERSON - person receiving all project communication Name: Sean Pepper Address: 25924 78th Ave S City: Kent State: WA Zip: 98032 Phone: (253) 852-4974 Fax: (253) 852-4999 Email: seanp@fieldsroofservice.com GENERAL CONTRACTOR INFORMATION Company Name: FIELDS ROOF SERVICE INC Address: 25924 78th Ave S City: Kent State: WA Zip: 98032 Phone: (253) 852-4974 Fax: (253) 852-4999 Contr Reg No.: FIELDRS262L1 Exp Date: 01/20/2020 Tukwila Business License No.: p ,,„ oqg _ "? Z 2_1 ARCHITECT, OF RECORD Company Name: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Company Name: Engineer Name: Address: City: State: Zip: Phone: Fax: Email: I ENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27,095) Name: LA N 1 " i A . q-reS kigCS Address: City: State: Zip: H \Applications\Forms-Applieat ions On Line\201 I Applications\Pertmit Application Revised - 2S-9-I I.doex Revised: August 201 I hh Page I of 4 BUILDING PERMIT INFORMATION — 206-431-3670 Valuation of Project (contractor's bid price): $ 85,922 Existing Building Valuation: $ Describe the scope of work (please provide detailed infonnation): Clean existing roof system in preparation for new roof system overlay installation. Supply and install new Carlisle 1 20psi rigid polyiso over entire roof field. Supply and install new Carlisle 60rni1 TPO roof system over entire roof field. Will there be new rack storage? J Yes l. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Stinare Footage Below Existing Interior Remodel Addition to Existing Structure New Type of Constniction per IBC Type of Occupancy per IBC I g Floor 2nd Floor ---3' Floor Floors thru Bascment Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:. *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ..... Yes El.__ No lf "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: Sprinklers El Automatic Fire Alarm 0 __None 0 ..... ..0ther (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? EJ..„_. Yes ..... No 11"yes', attach list of materials and storage locations on a separate 8-1/2" .v 11" paper including quantities and Material Safety Data Sheets, SEPTIC SYSTEM On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. AppligationsTorms-Applicat inns On Line\ 2011 ApplicationsTerm it Application Revised - 8-9-11.cluot Ituvissit: August 2011 Page 2 of 4 PUBLIC WORKS PERMIT INFORMATION — 206-433-0179 Scope of Work (please provide detailed information): Call before you Dig: 811 Ilease refer to Pubhc Works Bulletin Water District ..• .Tukwila 0...Water District #125 .• „Water Availability Provided Sewer District Ej ...Sewer Use Certificate El Highline 0,.. Valley View 0 .. Renton 0...Sewer Availability Provided Renton El .. Seattle Septic System: 111 On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): El ...Civil Plans (Maximum Paper Size — 22" x 34") ..• .Technical Information Report (Storm Drainage) 0 ...Bond 0.. Insurance 0 .. Easement(s) o .. Geotechnical Report .. Maintenance Agreement(s) 0...Traffic Impact Analysis 0... Hod Harmless — (SAO) 0...Hold Harmless — (ROW) Proposed Activities (mark boxes that apPlY): 0 ...Right-of-way Use - Nonprofit for less than 72 hours Ej .. Right-of-way Use - Profit for less than 72 hours O ...Right-of-way Use - No Disturbance Li .. Right-of-way Use — Potential Disturbance Ei ...Construction/Excavation/Fill - Right-of-way Non Right-of-way El ,.• .Total Cut cubic yards 0 .. Work in Flood Zone 0 _Total Fill cubic yards 0 .. Storm Drainage 0 ...Sanitary Side Sewer Ej .. Abandon Septic Tank 0 Grease Interceptor 0 ...Cap or Remove Utilities 1111 .. Curb Cut 0 Channelization 0 _Frontage Improvements 0 .. Pavement Cut .. Trench Excavation ...Traffic Control 0 .. Looped Fire Line 0 .. Utility Undergrounding O ...I3ackflow Prevention - Fire Protection Irrigation Domestic Water 11 0 _Permanent Water Meter Size... WO # 1:1 ...Temporary Water Meter Size .. WO # 0 _Water Only Meter Size ....... " WO if El ...Deduct Water Meter Size _ 0 ...Sewer Main Extension__ ...... ..Public 0 Private 0 0 ...Water Main Extension Public 0 Private 0 11 FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) 0 ...Water 0...Sewer 0...Sewage Treatment Monthly Service Billing to: Name: Day Telephone: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: City State Zip Day Telephone: City State Zip HAApplinal ions \ Fortns.,Applient ions On Line \ 201 1 ApplicationsWennit Applical ion Revised . I I,docx Reviscd: August 2011 bit Page 3 of 4 PERMIT APPLICATION NOTES — Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall he requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT, BUILDING OWNER OR AUTHORIZED AGENT; Signature: Print Name: Sean Pepper Mailing Address: 25924 78th Ave S Day Telephone: Kent City Date 7- 7-01 (253) 852-4974 WA 98032 State Zip 1-1,‘ApplicaiionsWmais-Appliealions On Line \ 201 I ApplicationslPerinil Application Revised - Revisod: August hh Page 4 of 4 Cash Register Receipt City of Tukwila Receipt Number DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $2,39153 D19-0081 Address: 5555 S 152ND ST BLDG 1 Apn 1157200221 $2,391.53 DEVELOPMENT $2321.93 PERMIT FEE R000.322.100.00.00 0.00 $1,392.08 PLAN CHECK FEE R000.345,830 00.00 0.00 $904.85 WASHINGTON STATE SURCHARGE 8640.237.114 0,00 525.00 TECHNOLOGY FEE 569.60 TECHNOLOGY FEE R000.322.900.04.00 0.00 569.60 TOTAL FEES PAID BY RECEIPT: R17109 $2,391.53 Date Paid: Thursday, March 07, 2019 Paid By: FIELDS ROOF SERVICE Pay Method: CHECK 92778 Printed: Thursday, March 07, 2019 2:55 PM 1 of 1 SYSTEMS REVISIONS No changes shall be made to the scope of work without prior approval of the Tukwila Budding Division. NOTE: Revisions will require a new plan submittal and may Include additional plan review, SEPARATE F+_ ERMIT RE IRED FOR: _IMechanical L ' Electrical L7 / Plumbing [� Gas Piping Cky of Tukwila BUILDING n FILCQPX„ , 1 Pot No. 1<1-OU61 Plan revew approval Is subfecttoerrors ano omesions Approval of construction documents Does lot authorize the violation of any adopted cone or ordinance Receipt of approved Field Coos and 9pdtbons Is a By. Date: 11 City of Tukwila BUILDING DIVISION Jura )1,Fi to � sow+ issosr *AA; oot Tilegif isritl 12:4, R sOR CODE COMPLIANCE •,, APPROVED MAR 15 2019 A-T Wit City of Tukwila BUILDING DIVISION. RECEIVED CITY OF TUKWILA NM QM PERMIT CENTER bl4brORi Building 1 La Vista Apartments 5555 5.1520° Street Tukwila 98188 NORTH Imog ?EV TA•111 4 1 Scale:110 ft. IJ Description of work and existing roof: - Cleaning existing roof system in preparation for new roof system overlay installation, - Existing roof is 1 thin layer of asphalt roofing, • Supply and install new Carlisle 1" 20psi rigid polyiso over entire roof field, - Supply and install new Carlisle 60mi1 TPO roof system over entire roof field. REVIEWED FOR CODE COMPLIANCE APPROVED h1AR 15 2C19 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA FEAR pYR19 PERMIT CENTER EXPERIENCE THE CARLISLE DIFFERENCE Sure Weld' Reinforced Membrane Overview Carlisle's Sure -Weld TPO reinforced membrane is a premium, heat - weldable, single -ply thermoplastic polyolefin (TPO) sheet designed for new roof construction and re -roofing applications. Sure -Weld High Slope (HS) membrane is formulated with additional flame retardant for higher -slope fire code approvals. Sure -Weld EXTRA is 80 mils thick for significantly higher strength and weatherability. Sure -Weld TPO membranes use advanced polymerization technology that combines the flexibility of ethylene -propylene (EP) rubber with the heat weldability of polypropylene. All Sure -Weld TPO membranes include OctaGuard XT'", an industry -leading, state-of-the-art weathering package. OctaGuard XT technology enables Sure -Weld TPO to withstand the extreme weatherability testing that is intended to simulate exposure to severe climates. Physical properties of the membrane are enhanced by a strong polyester fabric that is encapsulated between the TPO-based top and bottom plies. The combination of the fabric and TPO plies provides high breaking and tearing strength, as well as excellent puncture resistance. The relatively smooth surface of the membrane produces a total surface fusion weld that results in a consistent, watertight, monolithic roof assembly. The membrane is environmentally friendly and safe to install. Carlisle's standard and HS TPO membranes are available in highly reflective white, tan, and gray, in both 45-mil and 60-mil thicknesses. 80-mil Sure -Weld EXTRA (including HS) is also offered in white, gray, and tan colors. Special color Sure -Weld TPO membranes are also available (see Carlisle's TPO Color Palette brochure). Carlisle's TPO is offered in 4-, and 6-ft perimeter sheets and 8-, 10-, and 12-ft Sure -Weld field sheets. Sure -Weld HS and special color TPO membranes are available in limited sizes. Carlisle's tan and white TPO membranes are ENERGY STAR®" -qualified and California Title 24 compliant and can contribute toward LEED® (Leadership in Energy and Environmental Design) credits. t, n rC-- n 0O M m -I = �mm qp� � v -0 -II m 0 C c" o t') _O m m -++ c< ti C �o W& ca �z0 33 1r. Z m� SYNTEC SYSTEM Csp C 26 C. Productivity Boosting Features and Benefits: Optional APEEL7 Protective Film Carlisle's Sure -Weld TPO reinforced membrane is available with an optional APEEL Protective Film, a saving time and labor by eliminating the need for roof cleaning upon project completion. Carlisle's innovative APEEL Protective Film can be left in place for up to 90 days without affecting the integrity of the film, guarding the TPO membrane's surface from scuffs and dirt accumulation during installation. Durable and easy to remove, APEEL Protective Film improves aesthetics and long-term reflectivity and is ideal for re -roofing, re-cover, and new construction projects. OCTRGURRD XT WEATHERING PACKAGE Features and Benefits » v1Ty J�,T1 9. 800 PROTECTIVE FILM Outstanding puncture resistance Excellent fire resistant assemblies Environmentally friendly and stable formulation Excellent resistance to impact and low temperatures Excellent chemical resistance to acids, bases and restaurant exhaust emissions UL 2218 Class 4 hail rating Exceptional resistance to heat, solar UV, ozone and oxidation Manufactured using a hot -melt extrusion process for complete scrim encapsulation 100% recyclable (see Carlisle's Recyclability Statement) Enhanced with the OctaGuard XT weathering package APEEL Protective Film application guards the TPO membrane's surface from scuffs and dirt accumulation during installation, improving the roof system's appearance and long-term performance APEEL Protective Film can be left in place for up to 90 days without degrading due to its excellent heat- and UV -resistance 800-479-6832 I P.O. Box 7000 I Carlisle, PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.corr EXPERIENCE THE CARLISLE DIFFERENCE Sure -Weld Reinforced Membrane Installation 1. Sure -Weld TPO roofing systems are quick to install, as minimal labor and few components are required. TPO systems are installed using an Automatic Heat Welder, making sheet welding fast, clean, consistent, and easy to learn, while reducing strain on the roofing technician. 2. APEEL Protective Film should be removed from within areas that are to be heat -welded together. In areas that do not require heat - welding, the APEEL Protective Film can be left in place for up to 90 days. When the installation of the entire TPO roofing system is complete, remove and discard the APEEL Protective Film. ThtG tide Mechanically Fastened Roof System installation stariy.fastening the insulation with a minimum of 4 fasteners per 4' bnald, The membrane is mechanically fastened to the deck using HP-X`" Fasteners and Piranha Plates- or HP-XTRA Fasteners and Piranha XTRA Plates. Adjoining sheets of membrane are overlapped over the fasteners and plates and joined together with a minimum 11/2"-wide (4 cm) hot-air weld. Typical Properties and Characteristics Physical Property Tolerance on Nominal Thickness, % ASTM D751 test method ASTM 06878 Requirement 45-mil 60-mil 80-mil EXTRA +15, -10 ±10 ±10 ±10 Thickness Over Scrim, in. (mm) ASTM D7635 optical method, average of 3 areas Breaking Strength, Ibf (kN) ASTM D751 grab Elongation Break of Reinforcement, % ASTM D751 grab method Tearing Strength, Ibf (N) ASTM D751 proc. B 8 in. x 8 in. Brittleness Point, °F (°C) ASTM D2137 Linear Dimensional Change, % ASTM D1204, 6 hours at 158°F 0.015 min (0.380) 220 (976 N) min 15 min 0.018 typical (0.457) 225 (1.0) min 320 (1.4) typical 0.024 typical (0.610) 250 (1.1) min 360 (1.6) typical 15 min 15 min 25 typical 25 typical 0.034 typical (0.864) 350 (1.6) min 425 (1.9) typical 15 min 25 typical 55 (245) min -40 (-40) max ± 1 max 55 (245) min 130 (578) typical -40 (-40) max -50 (-46) typical ± 1 max -0.2 typical 55 (245) min 130 (578) typical -40 (-40) max -50 (-46) typical ± 1 max -0.2 typical 55 (245) min 130 (578) typical -40 (-40) max -50 (-46) typical ± 1 max -0.2 typical Ozone Resistance, no cracks 7X ASTM D1149, 100 pphm, 168 hrs PASS Water Absorption Resistance, mass % ASTM D471 top surface only 166 hours at 158°F water Factory Seam Strength, Ibf/in (kN/m) ASTM D751 grab method Field Seam Strength, Ibf/in (kN/m) ASTM D1876 tested in peel PASS PASS PASS ± 3.0 max ± 3.0 max 0.90 typical 3.0 max 0.90 typical ± 3.0 max 0.90 typical 66 (290) min No requirement 66 (290) min 25 (4.4) min 50 (8.8) typical 66 (290) min 25 (4.4) min 60 (10.5) typical 66 (290) min 40 (7.0) min 70 (12.3) typical Water Vapor Permeance, Perms ASTM E96 proc. B Puncture Resistance, Ibf (kN) FTM 101C, method 2031 (see supplemental section) No requirement 0.10 max 0.05 typical 0.10 max 0.05 typical 0.10 max 0.05 typical No requirement 250 (1.1) min 300 (1.3) min 400 (1.8) min 325 (1.4) typical 350 (1.6) typical 450 (2.0) typical Properties After Heat Aging ASTM D573, 32 weeks @ 240°F or 8 weeks @ 275°F PASS No cracking when bent around 3" diameter mandrel No cracking ± 1.5 max Weight Change, % Typical Weights Ib/ft, (kg/m2) PAS% No cr Eking 1.0 ni PASS No cracking 1.0 max PASS No cracking 1.0 max *923 0.29 (1.4) 0.40 (2.0) Typical properties and characteristics are based on samples tested and are not guaranteed for all samples of this prod)tct. TWO data nd information is intended as a guide and does not reflect the specification range for any particular property of this product. C. t I Cst N ris 831N30 1IWd3d Sure -Weld Reinforced Membrane 4. The Carlisle Fully Adhered Roofing System installation begins by fastening the insulation at the required density necessary to meet the appropriate warranty or wind load requirement. The substrate and membrane are then coated with an appropriate Sure -Weld TPO bonding adhesive and the membrane is rolled into place. Review Carlisle specifications and details for complete installation information. Precautions Sunglasses that filter out ultraviolet light are strongly recommended, as tan and white surfaces are highly reflective. Roofing technicians should dress appropriately and wear sunscreen. Surfaces may become slippery due to frost and ice buildup. Exercise caution during cold conditions to prevent falls. Care must be exercised when working close to a roof edge when the surrounding area is snow-covered, as the roof edge may not be clearly visible. Use proper stacking procedures to ensure sufficient stability of the rolls. Exercise caution when walking on wet membrane. Membranes may be slippery when wet. Store membrane in the original undisturbed plastic wrap in a cool, shaded area and cover with light-colored, breathable, waterproof tarpaulins. Membrane that has been exposed to the weather must be prepared with Weathered Membrane Cleaner prior to hot-air welding. Take care not to stand or place heavy objects on the edge of folded - over membrane, as this could cause a hard crease in the membrane. Maximum sustained temperature not to exceed 160°F (71°C) for TPO membrane. Do not use razor blades or other sharp tools to cut the APEEL Protective Film while it is still adhered to the TPO membrane as damage to the underlying membrane may occur. Pull the protective film away from the membrane prior to cutting. Remove APEEL Protective Film by pulling towards the center of the roof. Do not remove the film by pulling towards the roof edge. A static electric charge may develop when removing APEEL Protective Film from the surface of the membrane sheet. To avoid the possibility of ignition, lids must be closed on any flammable products and a fire extinguisher should be readily available. Color membranes will 'fade' over time mainly due to the ultraviolet portion of sunlight. Since most roof surfaces are exposed to variable sunlight, some areas will be more susceptible to color changes caused by UV fading. Warranties for color membranes do not cover fading of colors. SYNTEC SYSTEM EXTREME Testing for Severe Climates ASTM Standard D6$Z s. She material specification for Thermoplastic Polyolefin-Based Sheet Roofing. It covers material property requirements for TPO roof sheeting and includes initial and aged properties after heat and xenon -arc exposure. As stated in the scope of the standard, "the tests and property limits used to characterize the sheet are values intended to ensure minimum quality for the intended purpose." Carlisle's goal is to produce TPO that delivers maximum performance for the intended purpose of roofing membranes. Maximum performance requires the membrane to far exceed the requirements of ASTM D6878. Heat Aging accelerates the oxidation rate that roughly doubles for each 18°F (10°C) increase in roof membrane temperature. Oxidation (reaction with oxygen) is one of the primary chemical degradation mechanisms of roofing materials. Carlisle Testing - Heat Aging ASTM TEST 240°F ASTM Requirement Sure -Weld Requirement 32 weeks** >128 weeks **Heat exposure comparable to 3,120 weeks (60 years) at 185°F for 8 hours/day. Test specimen is a 2" by 6" piece of 45-mil membrane unbacked, placed in circulating hot-air oven. Criterion — no visible cracks after bending aged test specimen around 3"-diameter mandrel. Xenon -arc exposes the membrane samples to the combined effect of UV, visible and infrared radiation as well as ozone, heat and water spray to greatly accelerate the effects of outdoor weathering. The radiation dose is measured in kilojoules per square meter (kJ/m2) at 340 nm machine UV wavelength. The irradiance power of the xenon -arc lamp is measured in watts per square meter (W/m2). Carlisle Testing - Xenon -Arc ASTM TEST Sure -Weld Requirements ASTM D6878 Requirement kJ/m2 at 340 nm 10,080 Test specimen is a 2.75" b weathering side facinwrc Av.! r Criterion — no visible &Mdcks wh wrapped around 3"-diliniettltpl 45-mil 60-mil 80-mil >40,000 >50,000 >60,000 ce of membrane, unbacked, ed under 7x magnification while 800-479-6832 I P.O. Box 7000 I Carlisle, PA 17013 I Fax: 745-7053 I www.carlislesyntec.con tH1N3311W 3d EXPERIENCE THE CARLISLE DIFFERENCE Sure -Weld Reinforced Membrane Q-Trac testing combines accelerated weathering with real -world conditions using an array of ten mirrors to reflect and concentrate full spectrum sunlight onto membrane test specimens. The Q-Trac device automatically tracks the sun's path from morning to night. Also, it adjusts to compensate for seasonal changes in the sun's altitude. Eight years in Q-Trac testing is equal to 40 years of real -world exposure. Carlisle requires its Sure -Weld TPO membranes to pass the equivalent of 40 years of exposure in the Q-Trac. Carlisle Testing - Q-Trac ASTM D6878 Requirement Sure -Weld Requirement ASTM TEST N/A N/A Equivalent of 40 years of exposure Environmental Cycling subjects the membrane to repeated cycles of heat aging, hot-water immersion, and xenon -arc exposure. ASTM requirement - none » Carlisle EXTREME test*: - 10 days heat aging at 240°F (116°C) followed by - 5 days water immersion at 158°F (70°C) followed by - 5,040 kJ/m2 (2000 hours at 0.70 W/m2 irradiance) xenon -arc exposure *Test specimen is 2.75" by 5.5" piece of membrane with edges sealed. *Criterion - after 3 complete cycles, test specimens shall remain flexible and not have any cracking under 10x magnification while wrapped around a 3"-diameter mandrel. Supplemental Approvals, Statements and Characteristics: 1. Sure -Weld TPO meets or exceeds the requirements of ASTM D6878 Standard Specification for Thermoplastic Polyolefin-Based Sheet Roofing. 2. Radiative Properties for ENERGY STAR, Cool Roof Rating Council (CRRC) and LEED. 3. Sure -Weld TPO membranes conform to requirements of the US E.P.A. Toxic Leachate Test (40 CFR part 136) performed by an independent analytical laboratory. 4. Sure -Weld TPO was tested for dynamic puncture resistance per ASTM D5635-04 using the most recently modified impact head. 45-mil was watertight after an impact energy of 12.5 J (9.2 ft-Ibf) and 60-mil was watertight after 22.5 J (16.6 ft-Ibf). 80-mil EXTRA was watertight after an impact energy of 30.0 J (22.1 ft-Ibf). 5. NSF-P151 Certification for rainwater catchment system components. - Plant 91/White Only 0 -=l 0152 Sit© 2018 Carlisle. ROR CODE, 600515 - " CCm77 m gv ct Data Sheet" Senatobia, MS Tooele, UT Carlisle, PA Radiative Pro:^rties for ENERGY STAR', and LEED Test Method SYNTEC S'VS TEME White Tan Gray TPO TPO TPO ENERGY STAR - Initial solar Solar Spectrum reflectance Reflectometer 0.79 0.71 N/A ENERGY STAR - Initial solar Solar Spectrum 0.70 0.64 N/A reflectance after 3 years Reflectometer (uncleaned) CRRC - Initial solar reflectance ASTM C1549 0.79 0.71 0.46 CRRC - Solar reflectance ASTM C1549 after 3 years (uncleaned) CRRC - Initial thermal emittance 0.70 0.64 0.43 ASTM C1371 0.90 0.86 0.89 CRRC - Thermal emittance ASTM C1371 after 3 years (uncleaned) 0.86 0.87 0.88 LEED - Thermal emittance PASS 0.90 0.86 0.85 SRI - Initial 99 86 (Solar Reflectance Index) SRI - 3 year aged (Solar Reflectance Index) 53 85 77 48 Solar Reflectance Index (SRI) is calculated per ASTM E1980. The SRI is a measure of the roof's ability to reject solar heat, as shown by a small temperature rise. It is defined so that a standard black (reflectance 0.05, emittance 0.90) is 0 and a standard white (reflectance 0.80, emittance 0.90) is 100. Materials with the highest SRI values are the coolest choices for roofing. Due to the way SRI is defined, particularly hot materials can even take slightly negative values and particularly cool materials can even exceed 100. *ENERGY STAR recommends that using the Roof Savings Calculator (rsc.ornl.gov), which factors in both heating and cooling costs, to determine whether a cool roof will be an energy efficient choice for your geographic climate and building type. LEED Information Pre -consumer Recycled Content 10% Post -consumer Recycled Content 0% Manufacturing Location Solar Reflectance 800-479-6832 I P.O. Box 7000 I Carlisle, PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.corr Carlisle, Sure -Weld, OctaGuard XT. APEEL, Piranha Plates and RP-X are trademarks of Carlisle ENERGY STAR is a registered trademark owned by the U.S. Government. *ENERGY STAR qualification is only valid in the U.S LEED is a registered trademark of the U.S. Green Building Council » EXPERIENCE THE CARLISLE DIFFERENCE SecurShieldTM nsu'ation Overview SecurShield Polyiso is a rigid roof insulation panel composed of a closed cell polyisocyanurate foam core bonded during the manufacturing process to premium performance oated glass facers (CGF). Features and Benefits combustible deck rating at a 1" thickness without the use of a fire -rated slip sheet or the presence of a gypsum coverboard — *Maximum roof slope - 1/2":12" Premium facer improves fire resistance, moisture resistance and dimensional stability Superior bond to the foam core enhances wind -uplift performance Highest R-value per inch of commercially available insulation » Zero ozone -depleting components, CFC free and HCFC free c1 a 111111111.1111111 c-> m z T SYNTEC SYSTEM C. Panel Charactics » Available in 4' x 4' (1220 mm x 1220 mm) and 4' x 8' (1220 mm x 2440 mm) panels in thickness of 1/2" (13 mm) to 4.0" (102 mm) Installation Mechanically Attached Single -Ply Systems Each SecurShield panel must be secured to the roof deck with fasteners and plates (appropriate to the deck type.) Butt edges and stagger joints of adjacent panels. Install the roof membrane according to Carlisle's specifications. Fully Adhered Single -Ply Each SecurShield panel must be secured to the roof deck with fasteners and plates (appropriate to the deck type.) Butt edges and stagger joints of adjacent panels. Install the roof membrane according to Carlisle's specifications. SecurShield 4' x 8' panels can be secured to the roof deck with Carlisle's FAST'" adhesive technology, with either full coverage or bead spacing of no less than 6" on center. Review Carlisle specifications and details for complete installation information. Precautions Insulation must be protected from open flame and kept dry at all times. Install only as much insulation as can be covered the same day by completed roof material. Protect installed product from excessive foot traffic. Carlisle will not be responsible for specific building and roof design by others, for deficiencies in construction or workmanship, for dangerous conditions on the jobsite or for improper storage and handling. Technical specifications shown in this literature are intended to be used as general guidelines only and are subject to change without notice. Call Carlisle for more specific details, or refer to PIMA Technical Bulletin No. 109: Storage & Handling Recommendations for Polyiso Roof Insulation. 800-479-6832 I P.O. Box 7000 I Carlisle, PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.con EXPERIENCE THE CARLISLE DIFFERENCE SecurShield .nsu ation SecurShield Thermal Values Thickness (inches) 0.50 Thickness (MM) LTTR R-value 13 2.8 Flute Spanability 2 5/e" 1.00 25 5.7 2 5/e" 1.50 38 8.6 4%" 2.00 51 11.4 4 3/e" 2.50 64 14.4 4 3/a" 3.00 76 17.4 4 3/a„ 3.50 89 20.5 4 %" SYNTEC SYSTEME T3 Typical Propert s and Characteristics Physical Property Compressive Strength Dimensional Stability Moisture Vapor Transmission Water Absorption Service Temperature Test Method Value ASTM D1621 ASTM C1289 20 psi` minimum (138 kPa, Grade 2) ASTM D2126 2% linear change (7 days) ASTM E96 < 1 perm (57.5ng/(Pa•s•m2)) ASTM C209 < 1 % volume -100° to 250° F (-73°C to 122°C) 4.00 102 23.6 4 3/e" "Also available in 25 PSI Minimum, Grade 3 114 26.8 4 3A" Typical properties and characteristics are based on samples tested and are not guaranteed for all samples of this product. This data and information is intended as a guide and does not reflect the specification range for any particular property of this product. Codes and Compliances » ASTM C1289, Type II, Class 2, Grade 2 (20 psi), Grade 3 (25 psi) International Building Code (IBC) Section 2603 UL Standard 790, 263 and 1256: Component of Class A Roof Systems (refer to UL Roof Materials' system directory) FM® Standards 4450/4470: Class 1 approval for steel roof -deck constructions (refer to FM RoofNav5M) » California Code of Regulations, Title 24, Insulation Quality Standard License #TI-1418 » Third -party certification with the PIMA Quality Mark for Long -Term Thermal Resistance (LTTR) values • CAN/ULC S704, Type 2, Class 2 » Florida Building Code Approval NOTE: Please be aware the Federal Specification HH-I-1972/GEN has been replaced. Z MIIIINNIOF 33 M dm om - 5.19 artSL• Carlisle. m4 INT •r �C603254 - "SecurShield Polyiso Product Data Sheet" Z to 7C m c Foamed plastic as roof deck construction material with FO resistance to an internal fire exposure only for use in construction no.(s) 120 and 123. See UL Directory of Products US Certified for Canada and UL Roofing Materials and Systems Directory. 99DL. PI 411116tyMark The Certified LTTR-volue 800-479-6832 I P.O. Box 7000 I Carlisle, PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.con Carlisle, FAST and SecurShield are trademarks of Carlisle rn '- � gv f= EXPERIENCE THE CARLISLE DIFFERENCE HP-X FastenersTM and Rhino Plates Overview Carlisle HP-X Fasteners are used with Carlisle's TPO or PVC RhinoBond Fastening Plates to secure Sure -Weld® TPO and Sure -Flex— PVC roofing membranes. The HP-X Fastener may be used on 20-gauge (0.91 mm) or 22-gauge (0.76 mm) steel or wood decks (minimum's/2" [12 mm] CDX plywood). The HP-X Fastener is designed to offer an optimum combination of driving performance, back -out and corrosion resistance with excellent pullout values. The RhinoBond TPO or PVC Fastening Plate is designed to attach the roofing membrane from the underside using the RhinoBond induction -welding tool. Features and Benefits » Reduces the number of fasteners and plates compared with conventional mechanically attached applications No perimeter sheets required Faster dry -in time Non -penetrating system Even load distribution across membrane Installation No pre -drilling is necessary for wood and steel decks. Simply insert the HP-X Fastener through the Carlisle RhinoBond plate and install with a standard clutch drive electric screw gun (0-2500 rpm). Optimum fastener performance is achieved when the fastener is installed perpendicular to the deck and into the top flutes of a steel deck. Follow RhinoBond System installation instructions to attach the membrane to the installed plate using the RhinoBond portable induction tool. Keep insula fibstrate and membrane clean. Any debris on the top of the insulation rate and/or the membrane should be removed prior to initiating the induction welding process. Use a leaf blower or broom to eliminate any debris from the membrane surface. Keep magnets clean. If a metal shard or other debris from the roof sticks to the magnet, it can cause damage to the membrane surface in the weld area. Periodically ensure there are no contaminants on the bottom side of the magnet. Review Carlisle specifications and details for complete installation information. Precautions » Eye protection is recommended during installation. Use care to avoid over -torquing the fastener. Do not expose plates to UV for extended periods. Typical Properties and Characteristics Size Inch (mm) Weight/Ctn (Kg) 2 (50) 3 (80) 4 (110) 5 (130) 6 (150) , 7 (175) Thread Length Inch (mm) Packaging Fasteners/Ctn. 20 Ibs (9.1) Full 29 lbs (13.1) 3 (75) 38 Ibs (17.2) 4 (100) 47 Ibs (21.3) 4 (100) 56 lbs (25.4) 4 (100) 33 Ibs (15.0) 4 (100) 38 lbs (17.2) 4 (100) 46 Ibs (20.9) 4 (100) 55 lbs (24.9) 4 (100) 1,000 1,000 1,000 500 500 500 500 500 500 65 Ibs (29.5) 4 (100) 500 36 Ibs (16.0) — 500 Steel Deck 22 Gauge or 20 Gauge p`ral Pull-out Value 710 Ibf (3158 N) 22 gauge Wood Deck Min.15/32" 375 Ibf (1668 N) I Uflum Penetration '/a" (19 mm) 1" (25 mm) Maximum Penetration 4" (100 mm) 4" (100 mm) Typical Static Back -out i 15.1 in lbs (1.7 N-m) N/A Typical Drill Times f 1.5 seconds - 20 gauge N/A Typical properties and characteristics are based on samples tested and are not guaranteed for ail samples of this product. This data and information is intended as a guide and does not reflect the specification range for any particular property of this product. !'=.1r1301IINa3d I _ im 800-479-6832 I P.O. Box 7000 I Carlisle, PA 17013 I Fax: 717-245-7053 I www.carlislesyntec.com 02.01.19 ® 2019 Carlisl,1 a-� O Carlisle, HP-X Fasteners, Sure -Flex and Sure -Weld are trademarks of Carlisle. REPRINT DE: 605836i pet asteners.ar9. d Rhina9onOa duct}Data Sheet" RhinoBond is a registered trademark of 0MG, Inc. and is patent protected. =l — - 7. < <73 0 �`' �nl55n Otfl vc c)r OOrr1r o am < o gy p, rPt P., ; rn 5 � `� v D Q m v e City of Tukwila Department of Community Development 8/5/2019 SEAN PEPPER 25924 78TH AVE S KENT, WA 98032 RE: Permit No. D19-0081 LA VISTA APARTMENTS 5555 S 152 ST BLDG 1 Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 9/15/2019. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 9/15/2019, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, f4dereel Kandace Nichols2 Permit Technician File No: D19-0081 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D19-0081 PROJECT NAME: LA VISTA APARTMENTS SITE ADDRESS: 5555 S 152 ST BLDG 1 X Original Plan Submittal Response to Correction Letter # DATE: 3/7/19 Revision # before Permit Issued Revision after Permit Issued DEPARTMENTS: Building Division Public Works A tiN AJM- 1, • Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable (no approval/review required) REVIEWER'S INITIALS: DATE: 3/12/19 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required (corrections entered in Reviews) Approved with Conditions Denied (ie: Zoning Issues) DUE DATE: 4/09/19 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping PW Staff Initials: 12/18/2013 Espanol Contact Safety & Health Claims & Insurance 4111111kk Washington State Department oi / Labor & Industries A-Z Index Help My [,&I: Workplace Rights Trades & Licensing FIELDS ROOF SERVICE INC Owner or tradesperson Principals GILMER, GARY STEVEN, PRESIDENT PATNODE, TERRY MARK, DIRECTOR MANDELAS, MICHAEL J, SECRETARY (End: 08/25/2017) GOEMAN, DALE JESSE, DIRECTOR (End: 08/25/2017) GILMER, THOMAS A, PRESIDENT (End: 12/09/2002) PEAK, DUANE, VICE PRESIDENT (End: 12/09/2002) PEPPER, SCOTT, TREASURER (End: 12/09/2002) Doing business as FIELDS ROOF SERVICE INC 25924 78TH AVE S KENT, WA 98032 253-852-4974 KING County WA UBI No. Business type 600 125 673 Corporation Governing persons GARY GILMER TERRY J PATNODE; ROBERT SERRATO; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties ROOFING License no. FIELDRS262L1 Effective — expiration 06/21/1974— 09/25/2019 Bond CBIC Bond account no. SH3047 $12,000.00 Received by L&I Effective date 03/01/2008 04/04/2008 Expiration date Until Canceled Insurance Help us improve