Loading...
HomeMy WebLinkAboutPermit D19-0089 - DHANOA RESIDENCE - REPLACE WINDOWDHANOA RESIDENCE 3811 S 116 ST EXPIRED 10/30/19 D19-0089 0 Parcel No: Address: �~^�»x m�� Tukwila "��~� v�n " ��nxw�Uoa Department mfCommunity Development 63O05outhcenterBoulevard, Suite #1OO Tukwila, Washington 98188 Phone: 206'431,3670 Inspection Request Line: 206'438'9350 Web site: http://www,TukwilaWA.pov O733OUUl]S 3811S116TH5T Project Name: DHANOA RESIDENCE DEVELOPMENT PERMIT Permit Number: D19'0089 Issue Date: 5/3/2019 Permit Expires On: 10/30/2019 Owner: Name: JA[KSONDAVVUDY+PAULAA Address: l6O2S8[NNETT'SEATTLE'WA, 98IO8 Contact person: mannx GURV|NDERDMANOA Phone: (206)883'9191 Address: 38ll5l16ST.TUKVV|L\WA, 98168 Contractor; Name; OWNER AFFIDAVIT GUR|NDER Phone: DHANOA Address: ,'' License No: Expiration Date: Lender: mane: ''' CHANGE WINDOW Project Type of Fire Protection: $ Valuation: 400.00 5phnWpo: Fire Alarm: Type ofConstruction: VH Electrical Service Provided by: TUKVV|LA Fees Collected: $119.22 Occupancy per IBC: R-J Water District: TUKVV|U\ Current Codes adopted bythe City pfTukwila: 15 2015 international Building Code Edition: International Residential Code Edition: international Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: National Electrical Code: VVACities Electrical Code: WA 296-46B: WA State Energy Code: 21 017 2017 2017 2015 Public Works Activities; [hanne|ization/3tMping: [urbCut/Acces$5ide**|k: Fire Loop Hydrant: Flood Control Zone: Hau|in0/OveoizeLoad: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Permit Center Authorized Signatu Volumes: Cut: 0 Fill: 0 Number: O I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions nflaw and ordinances governing this work will becomplied with, whether specified herein nrnot. The granting of this permit does not presume to give authority to violate or cancel the provisions ofany other state o,local laws regulating construction orthe performance ofwork. |umauthorized tosign and obtain this development permit and agree to t�je coridifios attached to this permit. Signature: Date: 4�'` � � ' ( / ��� ��. This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended orabandoned for aperiod ofl8Odays from the last inspection. PERMIT CONDITIONS: 1: 'BUILDING PERMIT [OND0ONS' l� Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval, 3: All permits, inspection record card and approved construction documents shall bekept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted, 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based onsatisfactory completion ofthis requirement. 6: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. Aoopy can beobtained atCity Hal |inthe office ofthe City Clerk. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City nfTukwila Building Department (ZO6'4]l'367O). 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 9: VALIDITY OFPERMIT: The issuance orgranting ofapermit shall not beconstrued tobeapermit for, oran approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila, Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances ofthe City ofTukwila shall not bevalid. The issuance ofapermit based onconstruction documents and other data shall not prevent the Building Official fromequihnCthcoorsctionoferrooin the construction documents and other data. 10: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (2O6/43l,367O). PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (lOG)43D-B50 1700 8U|LD|NGRNAL~* 0409 FRAMING 0606 GLAZING 0601 WALL INSULATION CITY OF TUKCLA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Pit No. I 9- 008? Project No. Date Application Accepted: 031150 Date Application Expires: 9V/5, (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: King Co Assessor's Tax No.: cp1 S t. it)icu) Ict Suite Number: Floor: Tenant Name: (-7' ',RV / N S DA/AN 0 4 PROPERTY OWNER Name: CL__L3 e.N kiv\30 Address: 3cil g th City: State: Zip: ek CONTACT PERSON — person receiving all project communication Name: Gu D b\tkv..„\tok Address: s t k3 14.3 S City: j ck State: to 9 Zip: Phone: h e),3 ‘. Email: use2_0Ne, lic GENERAL CONTRACTOR INFORMATION Company Name: Address: City: State: Zip: Phone: Fax: Conti: Reg No.: Exp Date: Tukwila Business License No.: New Tenant: O..... Yes D..No ARCHITECT OF RECORD Company Name: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Company Name: Engineer Name: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Address: City: State: Zip: FDApplicationsWorrns-Applications On Line \ 2012 ApplicationsTerrnit Application Revised - 2-7- 12.dont Revised: February 2012 bh Page 1 of 4 BUILDING PERMIT INFORMATION 206-431-3670 Valuation of Project (contractor's bid price): $ ( • CT? Existing Building Valuation: Describe the scope of work (please provide detailed information): C JAP\ rLiQ1hj.k )(- Will there be new rack storage? 0 .... Yes ..No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC I Floor 2"d Floor 3`d Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): tH C Floor area of principal dwelling: 7 (6 0 Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? la__ Yes No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: El Sprinklers 0 Automatic Fire Alarm None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? Yes 0 No If "yes, attach list of materials and storage locations on a separate 8-1/2" x II" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Fonns-Applicalions On Line\2012 ApplicalionskPermit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 UBLIC WORKS PERMIT INFerATION - 206-433-0179 Scope of Work (please provide detailed mformation) Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District o .. Tukwila 0 ...Water District #I25 o .. Water Availability Provided Sewer District o .. Tukwila o .. Sewer Use Certificate 0 Highline 0 ...Valley View El... Renton 0 ...Sewer Availability Provided 0... Renton 0... Seattle Septic System: El On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): 0 .. Civil Plans (Maximum Paper Size —22" x 34") 0 .. Technical Information Report (Storm Drainage) o .. Bond 0... Insurance Easement(s) 0... Geotechnical Report El... Maintenance Agreement(s) Traffic Impact Analysis 0.. Hold Harmless — (SAO) El Hold Harmless — (ROW) Proposed Activities (mark boxes that apply): o .. Right-of-way Use - Nonprofit for less than 72 hours 0... Right-of-way Use - Profit for less than 72 hours 0 .. Right-of-way Use - No Disturbance 0... Right-of-way Use — Potential Disturbance 0 .. Construction/Excavation/Fill - Right-of-way 0 Non Right-of-way El o .. Total Cut cubic yards 0... Work in Flood Zone 0 .. Total Fill cubic yards El... Storm Drainage 0 .. Sanitary Side Sewer 0... Abandon Septic Tank 0... Grease Interceptor O .. Cap or Remove Utilities 0... Curb Cut 0... Channelization O .. Frontage Improvements 0... Pavement Cut 0... Trench Excavation 0 .. Traffic Control 0... Looped Fire Line 0... Utility Undergrounding Backflow Prevention - Fire Protection Irrigation Domestic Water El .. Permanent Water Meter Size (1) " WO # (2) " WO # (3) " WO # CI .. Temporary Water Meter Size (1) " WO # (2) " WO # (3) " WO # 0 .. Water Only Meter Size " WO # 0.. Deduct Water Meter 0 .. Sewer Main Extension Public El Private 0 0.. Water Main Extension Public 0 Private 0 FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) .. Water 0 .. Sewer 0 .. Sewage Treatment Monthly Service Billing to: Name: Day Telephone: Mailing Address: City State Zip Water Meter Refund/Billing: Name: Mailing Address: Day Telephone: City State Zip HAApplicationAFenns-Applications On Line'2012 Applications1Pomit Applicition Revised - 2-7-12.dnex Revised: Febnary 2012 bh Page 3 of 4 PERMIT APPLICATION NOTES — Value of of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and juslifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHO ,2ED AG Signature: Print Name: (10 t\-) )Ei2- Date: Day Telephone: Mailing Address: State Zip City H:kApplicationsWorms•Applicolions On Lin62012 ApplicationsWermit Application Revised - 2-7-12.doct Revised: February 2012 bh Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK .• PAID 9.22 D19-0089 Address: 3811 S 116TH ST Apn: 0733000135 $119.22 DEVELOPMENT $115.90 PERMIT FEE R000.322,100.00.00 0.00 $66.30 PLAN CHECK FEE R000.345.830.00.00 0.00 $43.10 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $6.50 TECHNOLOGY FEE $3.32 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R17171 R000.322.900.04.00 0.00 $3.32 - $119.22 Date Paid: Friday, March 15, 2019 Paid By: HOUSE ZONE LLC Pay Method: CHECK 1065 Printed: Friday, March 15, 2019 12:34 PM 1 of 1 C SYSTEMS E 9 a cir \ck n 0\0 YY\tj \16i-h cti1/4) lq (k) 21q REVIEWED FOR CODE COMPLIANCE APPROVED MAR 22 2019 City of Tukwila BUILDING DIVISION Co s o Az-) JUL \-ctCQ \ou ay,71 n 642_01 yoonn sno(A3y) cy3Os-o CiAre - usy•nci ek 2 -Q-t k31\NacA)0 vis P-Y'00 V\aVeJP. RECEIVEn CITY OF TUKINCLA MAR 1 5 2019 PERMIT CENTER dO s af- V n stiL9 e± /I Pof Y? ncoicAi do u J•g 9 c_ to r Gid-A=L2,d4ui-c) b v(v 06 g 5 i) 14411) Go Y 00861 /05 REVISIONS No changes shall be made to the scope of work witnout prior approval of the Tukwila Building Division, NOTE: Revisions will require a new plan submittal and may include additional plan rev*: FILE Permit No, C P Plan review approval is sublet omissions. Approval of construr on Plume%does not authFroe the violation of any adopted code or ordinance. Receipt of approved Fieb Copy and cordials IS ay. Date !1" jo3 ?ml°r, y of Tukwila BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED MAR 22 2019 City ofTukwia BUILDING DIVISION p19.0099 RECEIVED��lA CITY OF MAR 15 2019 PERMIT CENTER City of Tukwila Department of Community Development 9/3/2019 GURVINDER DHANOA 3811 S 116 ST TUKWILA, WA 98168 RE: Permit No. D19-0089 DHANOA RESIDENCE 3811 S 116 ST Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 10/30/2019. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 10/30/2019, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: DI9-0089 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D19-0089 PROJECT NAME: DHANOA RESIDENCE SITE ADDRESS: 3811 S 116 ST X Original Plan Submittal Response to Correction Letter # DATE: 03/15/19 Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Building Division 111 Public Works V' 1 A —AA AY4., .3.-P-1 AY4 Fire Prevention 11 Planning Division Structural Permit Coordinator 01 PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 03/19/19 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required (corrections entered in Reviews) Notation: Approved with Conditions Denied (ie: Zoning Issues DUE DATE: 04/16/19 REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg [1] Fire El Ping PW El Staff Initials: 12/18/2013 vio V--ro Ku) RECF.I ; CITY OF T UA MAR 15 Z019 PERMIT CENTER C) w S S n o1 v ��>2 fJ 144%J ©II �vr (v n8'? (1•:) CITY OF TUKWILA Department of Community Development 630o Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-367o FAX (206) 431-3665 E-mail: tukplan0ci.tukwila.wa.us Permit Center/Building Division 206 431-367o Public Works Department 206 433-0179 Planning Division 206 431-367o AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION STATE OF WASHINGTON) COUNTY OF KING UV( AJL7FX (please print name ss. , states as follows: PERMIT NO: T)/ 1. I have made application for a permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered wiih the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 1827.090, I consider the work authorized under this permit to be exempt under number / , and will therefore not be performed by a registered contractor. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to persons making electrical installations on their own property or to regularly employed employees working on the premises of their employer. The proposed electrical work is not for the construction of a new building for rent, sale or lease. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. Owner/0 er's Agent* Signed and sworn to before me this day of Residing at Name as commissioned: My commission expires: , 20 02 . and for the State of Washington , County MVe/77-e (.6 18.27.090 Exemptions. The registration provisions of this i. An authorized representative of the United States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The sale of any finished products, materials, or articles of merchandise that are not fabricated into and do not become a part of a structure under the common law of fixtures; 6. Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile/manufactured home retail dealer or manufacturer licensed under chapter 46.7o RCW who shall warranty service and repairs under chapter 46.7o RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9. Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; io. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed chapter do not apply to: by a registered contractor; it An owner* who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; 12.* Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property; 13. An owner* who performs maintenance, repair, and alteration work in or upon his or her own properties, or who uses his or her own employees to do such work; 14. A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician certified under the laws of the state of Washington, or a plumber certified under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the person certified is operating within the scope of his or her certification; 15. Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; 16. Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17. A mobile/manufactured home dealer or manufacturer who subcontracts the installation, set-up, or repair work to actively registered contractors. This exemption only applies to the installation, set-up, or repair of the mobile/manufactured homes that were manufactured or sold by the mobile/manufactured home dealer or manufacturer; 18. An entity who holds a valid electrical contractor's license under chapter 19.28 RCW that employs a certified journeyman electrician, a certified residential specialty electrician, or an electrical trainee meeting the requirements of chapter 19.28 RCW to perform plumbing work that is incidentally, directly, and immediately • appropriate to the like -in -kind replacement of a household appliance or other small household utilization equipment that requires limited electric power and limited waste and/or water connections. An electrical trainee must be supervised by a certified electrician while performing plumbing work. • Per Washington State Department of Labor and Industries lessee has been interpreted to be equivalent to owner for purposes of exemptions.