Loading...
HomeMy WebLinkAboutPermit D19-0104 - HAMAD ADU - CO2 DETECTOR AND CHANGE STATUS TO ADUHAMAD ADU 13001 4ISTAVES 019-0104 �� �� City of Tukwila Department of Community Development 6300 Sowm���B�e��'Suue�� —/ Tukwila Washington 9W188 p�onp.�ns'�a�'a6ro �'���� ���' Inspection Request Line: ZV6-43B-B5O Web site: http://www.TukwilaWA.gov Parcel No: Address: DEVELOPMENT PERMIT C) 7341600215 Permit Number: D19-0104 Project Name: HA[N8DADU Issue Date: 4/29/2819 Permit Expires On: 10/I6/2019 Owner: Address: Contact Person: Name: Contractor: License No: Lender: Name: 4O55Sl30THST,TUKVY|U\WA, 98168 SUF|ANHAMAD 4O55Sl30TMST'TUKVV|UA,WA, 98168 OWNER AFFIDAVIT - HAMAD ''' ''' Phone, (206)331'1524 Phone: Expiration Date: DESCRIPTION OFWORK: ADDING CO2 DETECTOR, NO WORK, CHANGING LEGAL STATUSTO ADU. Project Valuation: $ZZlW Type ofFire Protection: Sprinklers: Fire Alarm: Type of Construction: VO Electrical Service Provided by: TUKWILA Fees Collected: $11922 Occupancy per IBC: R-3 Water, District: 125 5ewerDi5thc: VALUEYV|EVV Current Codes adopted bythe City xfTukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: international Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: VVA[29646V: VVAState Energy Code: 2017 20172017 2015 Public Works Activities: Chan ne|izadon/Sthping: [urb[ut/\oess/Side*a|k: Fire Loop Hydrant: Flood Control Zone: Hau|ing/OvenizeLoad: Land Altering: Landscape Irrigation: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Volumes: Cut: O Fill: 8 Number O No Permit Center Authorized Signature: Date: 0 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions nflaw and ordinances governing this work will becompiled with, whether specified herein urnot. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state orlocal laws neguli3tist cd orthe performance ofwork, |amauthorized tnsign and obtain this development permit pnc,�fiez:d o the conditions attached to this permit. Signature: Print Name: ( �� �-Oc C.' � /1 k^Acl� This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended n,abandoned for aperiod nflOUdays from the last inspection. PERMIT CONDITIONS: l: 'BUILDING PERMIT C0ND[OONS*** Z: Work shall beinstalled inaccordance withtheappruvedconstmctiondocuments,andanychangesmade during construction that are not in accordance with the approved construction documents shall be resubmitted for approval, 3: All permits, inspection record card and approved construction documents shall bekept at the site ofwork and shall be open to inspection by the Building Inspector until final inspection approval is granted, 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City ofTukwila Building Department (286-4]l-367O)� 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center, &: VALIDITY OFPERMIT: The issuance orgranting ofopermit shall not beconstrued tobeapermit for, oran approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances ufthe City ofTukwila shall not bevalid. The issuance ufapermit based nnconstruction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206)438'9350 I700 HU|LD|mGF|NAL* 0606 GLAZING 0502 LATH/GYPSUM BOARD CITY OF TM' A Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwitaWA.gov Building Pe t No. Diq (nog Project No. Date Application Accepted: ii )-1 1 Date Application Expires: CO -?-:-1 1 For o ice use onl CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: Site Address: 1 0 0 11 1-C4 At•)t C • Suite Number: Floor: Tenant Name: New Tenant: El Yes [1].. No 7 -3 t‘ool. PROPERTY OWNER Name: 'STA (1.ctA.,, HcoAik. o 6( Address: ti 04-- g•- cs-, (-2 0 t c ,s1 . City: 7 — i / tt 4 14/,( q State: tthft Zip: fcria CONTACT PERSON - person receiving all project communication Name: ("‘ ) Li f CIA-4 /la kf a a.(1 Address: # 0 4-1/4c- , / City: r-c; 4 14 r 1 i State: evA Zip: ma? Phone,6 3 2/... 4s-4 Fax: Email: (a‘ 4 a L i-a(9 1...„1, 4 co GENERAL CONTRACTOR INFORMATION Company Name: Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: ARCHITECT OF RECORD Company Name: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Company Name: Engineer Name: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Address: City: State: Zip: KtApplicationfforms-Applications On Line \2012 ApplicationsTerrnit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 1 of 4 UILDING PERMIT JNFORMATIO'2O6431367O Valuation of Project (contractor's bid price): $ Describe the scope of work (please provide detailed information): ad.at'•-,t CO r t-0(9-I'L 0-LO Existing Building Valuation: $ ,r6k1 Will there be new rack storage? LI .... Yes fl ..No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC I si Floor 2"1 Floor 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? 0 Yes 0 No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: Sprinklers .Automatic Fire Alarm ..... None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? El Yes E1 No If "yes', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ,......On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. ItlApplications\Forms-Applications On Line \ 2012 Applications\Permit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 2 of 4 PUBLIC WORKS PERMIT INF TION — 206-433-0179 Scope of Work (please provide detailed information): Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ .. Tukwila 0 ...Water District # 125 ❑ .. Water Availability Provided Sewer District ❑ .. Tukwila ❑ .. Sewer Use Certificate ❑ ... Highline ❑ ...Valley View ❑... Renton ❑ ...Sewer Availability Provided 0... Renton 0... Seattle Septic System: ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ❑ .. Civil Plans (Maximum Paper Size — 22" x 34") ❑ .. Technical Information Report (Storm Drainage) ❑... Geotechnical Report ❑ .. Bond 0...Insurance ❑... Easement(s) 0...Maintenance Agreement(s) Proposed Activities (mark boxes that apply): ❑ .. Right-of-way Use - Nonprofit for less than 72 hours ❑ .. Right-of-way Use - No Disturbance ❑ .. Construction/Excavation/Fill - Right-of-way 0 Non Right-of-way ❑ ❑ .. Total Cut ❑ .. Total Fill cubic yards cubic yards ❑ .. Sanitary Side Sewer ❑ .. Cap or Remove Utilities ❑ .. Frontage Improvements ❑ .. Traffic Control ❑ .. Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ .. Traffic Impact Analysis ❑ .. Hold Harmless — (SAO) ❑ .. Hold Harmless — (ROW) 0...Right-of-way Use - Profit for less than 72 hours 0...Right-of-way Use — Potential Disturbance 0...Work in Flood Zone 0...Storm Drainage El...Abandon Septic Tank ❑... Curb Cut 0... Pavement Cut 0...Looped Fire Line El...Grease Interceptor ❑... Channelization ❑...Trench Excavation ❑... Utility Undergrounding ❑ .. Permanent Water Meter Size (1) WO # (2) __" WO # (3) " WO # ❑ .. Temporary Water Meter Size (1) " WO # (2) __" WO # (3) " WO # ❑ .. Water Only Meter Size WO # ❑ .. Deduct Water Meter Size " ❑ .. Sewer Main Extension Public ❑ Private ❑ ❑ .. Water Main Extension Public ❑ Private 0 FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) ❑ .. Water ❑ .. Sewer ❑ .. Sewage Treatment Monthly Service Billing to: Name: Day Telephone: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: City State Zip Day Telephone: City State Zip H:Applications\Fonns-Applications On Line\2012 Applications\Fetmit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 3 of 4 PERMIT APPLICATION NOTES — 0 Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER 0 Signature: Print Name: crt � t.‘ Ef tA--4 Mailing Address: d J d'- C ' O 6V, IZE ) AGENT: Date: zQ<g Day Telephone: ?cot, i < < r Z City State Zip H:Wpplications\Forms-Applications On Line\2012 Applications\Fermit Application Revised - 2-7-12.docx Revised: February 2012 bh Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK PAID 19.22 D19-0104 Address 1300I41STAVES Apn: 7 41600215 $119.22 DEVELOPMENT $115.90 PERMIT FEE R000.322.100.00.00 0.00 $66.30 PLAN CHECK FEE R000.345.830.00.00 0.00 $43.10 WASHINGTON STATE SURCHARGE 6640.237.114 0.00 $6.50 TECHNOLOGY FEE $3.32 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R17521 R000.322.900.04,00 0.00 $3.32 . $119.22 Date Paid: Monday, April 29, 2019 Paid By: HAMAD Pay Method: CHECK 5589 Printed: Monday, April 29, 2019 1:46 PM 1 of 1 YSTE INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 Permit Inspection Request Line (206) 438-9350 Project: Type of Inspection: Address: Date Called: Special lnst -ucs: AbV - Date a ted:~ p.m. Requester: Phone No: ZP 3 f is zr Approved per applicable codes. II Corrections required prior to approval. 0 ENTS: 1 rd� nspecto Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Cali to schedule reinspection., INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 670 Permit Inspection Request Line (206) 438-9350 Project: t %1 M. 'l t.,) Type of Inspection: \Sv/L'G i�'.,14c.-- Address: 1Zr)O! 4 i --r- Atiir; __S Date Called: Special Instructions: .Date Wanted: to }- p.m. Requester: done No:23: ,33/ /3'2.q Approved per applicable codes. COMMENTS: ctions required prior to approval. nspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION (206) 431 670 Project. Type of nspectlon: '; Address: Date Called: Special Instructions: Date Wanted: Requester: Phone No A- n s pec ections required prior to approval. Date: _ 2 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. • INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 6:70 Permit Inspection Request Line (206) 438-9350 Project: Type of nspection Address. Date Called: p c* n uc ns: Date a ed: . . P.. Requester: Phone No: proper app ble codes. USLI-Sr" Corrections required prior to approval. n pecto ate: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO, PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 fJr9 - plat Project: Type of Inspection: Addres : i t I ' l [ 1 Date Called: Special instructions: 2c,, / ggs , --pi ,---- q e Date Wanted: Requester: Phone No: 'Approved per applicable codes. Corrections required prior to approval. COMMENTS: nspecto ate: 00 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. REVIS106 mo t.)e made to orova ;mg DivislY c-p s,0115II require 'nciude .lt0 SEPARATE PERMIT IRED FOR: MecbErricel ectricd Plumbing Gas Piping City of Tu15018 UILDING DIVISION 1st Ave S. 6 .8' Scale 3117,•20 10' 68, 153.3' Existing SFR to remain 11-1/ BligDarisioN 66' 1583 S. 130th Street 11111.1'111 1 Perrrd No. Plan (Kew groo: [s subject io errors Ono Omissions. Approval of cogruclion doameiiS ones io aullmze le violation al any a0oDle0 tole or ordinance Rece07a00r0e0 Fin Cop and On0tWK09WIe0ge0: • By 09: City of Tula SO. , BUILDING DIYISiON 1_ ',Roof over hano ; , 9 \ I, 6' Apple Z••'. 50' 30' cf) These piapbk have been reviewed by the Public Works Deg rtment for conformance with City standar , Acceptance is subject t ad omissions whir do not anthorize violatio 0 adopted strdsror otdiracen,The for the adequacy the design: test lywith the • designer, Additions, stuns or rer'oo 10 thez drawings after thisvoid ocooptaooe;jajfi. and'will require a trou for subsequent approvii Final acceptance led' the Public Works u ' Egepavement %Plan 13004 sl Ave S A 98169 Page 1 REVIEWED FOR CODE COMPLIANCE APPROVED APR 252019 ity of Tukwila DING DIVISION RECEIVED APR PTUtON0 PUBLIC RECEIVED CITY OF TUKWILA APRO2/819 PERMIT CENTER co 0 0 ---UP-- 2'2 50' REVIVED FOR CODE COMPLIANC APPROVE APR 25 'N19 City of tukwila BUILDING DIVISION 5068 5068 5068 Electric wall heaters (typ.) LIVING 31'6 x 19' 0 0 Carbon Monoxide Alarm 2668 0 17'10 5068 EreiP\ (A),JOW BEDROOM 11'2 x9'4 OFFICE 11'2x9'4 1---�1 I 1 4030 4030 3030 32'2 50' 4040 17'10 2nd Floor North.\ Sewer clean outN Connection to side sewer North REVIEWED FOR CODE COMPLIANCE APPROVED AN 25'1019 City of Tukwila BUILDING DIVISION r Water shut off valve Electric Panel 1 r 518 Drywall on ceiling for 1 hour fire separation, hrough out 1 8070 8070 8070 8070 1st Floor PERiviiT COORD COP( PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D19-0104 DATE: 04/02/19 PROJECT NAME: HAMAD ADU SITE ADDRESS: 13001 41ST AVE S X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: PCS Ps-U-t Building Division Jc7 CRP - Public Works AM AO Fire Prevention IN Structural PRELIMINARY REVIEW: Not Applicable (no approval/review required) REVIEWER'S INITIALS: ei/i/ 1671 Planning Division • Permit Coordinator IP DATE: 04/04/19 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved Approved with Conditions Corrections Required (corrections entered in Reviews) Denied (ie: Zoning Issues DUE DATE: 05/02/19 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg El Fire 0 Ping 0 PW 0 Staff Initials: 12/18120 13 CITY OF TUKWILA Department of Community Development 630o Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-367o FAX (206) 431-3665 E-mail: tukplanRci.tukwila.wa.us Permit Center/Building Division 206 431-367o Public Works Department 206 433-0179 Planning Division 206 43i-367o AFFIDAVIT IN LIEU OF CONTRAC1OR REGISTRATION STATE OF WASHINGTON) ) ss. COUNTY OF KING , states as follows: PERMIT NO: lig- sioc/ 1. I have made application for a permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this permit to be exempt under number 13 , and will therefore not be performed by a registered contractor. 5. I understand that the licensing provision of RCW 19.28.16i through 19.28.271 shall not apply to persons making electrical installations on their own property or to regularly employed employees working on the premises of their employer. The proposed electrical work is not for the construction of a new building for rent, sale or lease. I understand that I may be waiving certain rights that I might o erwise have undertate law in any decision to engage an unregistered contractor to perform constructio Owne 1 el.'s gent* Signed and sworn to before me this ( day of aUJt , 2o If TARY PUBLIC in and for the State of Washington Residing at t/ rj , County 6114k 05 - Name Name as commissioned: My commission expires: 1 18.27.090 Exemptions. The registration provisions of this chapter do not apply to: 1. An authorized representative of the United States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The sale of any finished products, materials, or articles of merchandise that are not fabricated into and do not become a part of a structure under the common law of fixtures; 6. Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile/manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW who shall warranty service and repairs under chapter 46.7o RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9. Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; to. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed by a registered contractor; it. An owner* who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; 12.* Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property; 13. An owner* who performs maintenance, repair, and alteration work in or upon his or her own properties, or who uses his or her own employees to do such work; 14. A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician certified under the laws of the state of Washington, or a plumber certified under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the person certified is operating within the scope of his or her certification; 15. Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; 16. Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17. A mobile/manufactured home dealer or manufacturer who subcontracts the installation, set-up, or repair work to actively registered contractors. This exemption only applies to the installation, set-up, or repair of the mobile/manufactured homes that were manufactured or sold by the mobile/manufactured home dealer or manufacturer; 18. An entity who holds a valid electrical contractor's license under chapter 19.28 RCW that employs a certified journeyman electrician, a certified residential specialty electrician, or an electrical trainee meeting the requirements of chapter 19.28 RCW to perform plumbing work that is incidentally, directly, and immediately appropriate to the like -in -kind replacement of a household appliance or other small household utilization equipment that requires limited electric power and limited waste and/or water connections. An electrical trainee must be supervised by a certified electrician while performing plumbing work. • Per Washington State Department of Labor and Industries lessee has been interpreted to be equivalent to owner for purposes of exemptions.