HomeMy WebLinkAboutTIS 2023-10-16 Item 2D - Grant Applications - Concrete Overlay Repairs with WA State Department of Transportation National Highway System Asset Management ProgramTO:
City of Tukwila
Allan Ekberg, Mayor
Public Works Department - Hari Ponnekanti, Director/City Engineer
INFORMATIONAL MEMORANDUM
Transportation and Infrastructure Services Committee
FROM: Hari Ponnekanti, Public Works Director
BY Catrien de Boer, Public Works Analyst
CC: Mayor Ekberg
DATE: October 16th, 2023
SUBJECT: Grant Applications to fund Concrete Overlay Repairs
WSDOT National Highway System Asset Management Program
ISSUE
Provide information on grant applications to the Washington State Department of Transportation
(WSDOT) for major overlay and pavement repair at three locations.
BACKGROUND
In early 2023, staff noted the concrete overlay over the Boeing Access Road had failed and has
extensive open pattern cracking on and under the deck. The bridge deck was overlayed in 2018
as part of the seismic retrofit project. The repair of this section is beyond the scope of the
Annual Overlay program. Additionally, over the years, several other arterial streets throughout
the City have deteriorated but the cost of overlaying them also exceeds the yearly funding
available in the Annual Overlay budget. Staff has been looking for funding sources to
supplement the overlay budget. Recently, a new grant source has come to the attention of staff
that funds repair and overlay of streets on the National Highway System: the WSDOT National
Highway System Asset Management Grant Program. The objective of this program is to
highlight the importance of preserving the roadway system. Eligible work includes resurfacing,
restoring, rehabilitating, and reconstructing NHS roadways.
DISCUSSION
On October 5th, staff submitted three applications to the WSDOT National Highway System
Asset Management Grant Program: Boeing Access Road, Interurban Avenue S, and Orillia
Road. There is no match requirement for these grants and each application can ask for up to
$10 million.
1) BAR from East Marginal Way S to Martin Luther King Jr Way S - $3,990,000.00
2) Interurban Ave S from East Marginal Way S to S 143rd St - $4,958,000.00
3) Orillia Road S from S 188th St to S 204th St - $1,309,000.00
As of now, none of these sites are included in the Capital Improvement Program (CIP) as
separate projects. New CIP sheets could be developed, or these streets could be incorporated
into the existing Annual Overlay Program as special additionally funded work.
The City will be notified mid -November if any of these projects have been awarded funding.
FINANCIAL IMPACT
No match is required.
RECOMMENDATION
Discussion only.
Attachment: Pictures of the sites
Maps illustrating the relevant sites
75
Boeing Access Road Concrete Overlay Cracking:
King County
International
Airport (BFI)
North Tukwila NOW
Manufacturing/
Industrial Center m d
P 0
N A,
d
S Boeing Access Road Preservation:
East Marginal Way S to MLK Way S
Duwamish
Manufacturing/
Industrial Center
BNSF
Irrtermodal
�Faciiiity -
76
Interurban Ave S Concrete Overlay Cracking:
North Tukwila
Manufacturing/
Industrial Center
SeaTac
International
Airport
Interurban Ave S Preservation:
East Marginal Way S to S 143rd St
Tukwila
Elementary
77
Orillia Rd S Concrete Overlay Cracking:
Internatio
ear,
;
(66 as) s NxH xyti)
Lg-jy- .
Angle Lake
•Light Rail S 200th St
Station
S 188th St
Angle
n-.
S 204th St
Orillia Road S Preservation:
S 188th St to S 204th St
Kent Valley
81 Industrial Area
S 200th St
1N.
mo
S 212th St
Am
Fulfill
Center
78