Loading...
HomeMy WebLinkAboutPermit M19-0046 - JENNY CRAIG - AIR DISTRIBUTION SYSTEM AND EXHAUST FANJENNY CRAIG 17055 SOUTHCENTER PKWY M19-0046 Parcel No: C City mfTukwila Department of Community Development 6300 SouthcenterBou|evam, Suite#1OW Tukwila, Washington 981G8 Phone: 206'431'3670 Inspection Request Line: 206'438'9350 Web site: http://wm/xv.Tukmvi|aVVA'uon 2623049070 Project Name: JENNY CRAIG MECHANICAL PERMIT Permit Number: K419'0046 Issue Date: 4/19/2019 Permit Expires On: 10/16/2019 Address: Contact Person: Address: Z940FAIRVIEW AVE E,5EATTLE,WA, 98102 6O311ITHSTEAST SUITE ZO1, Contractor: Name EVERGREEN REFRIGERATION LL[ ([ONST) Address: 727 SKENYONST'3EATTLE'WA, 98108 License No: Address: ''' Phone: Q53 9I2-9037 Phone: (206)7631744 Expiration Date: 1/6/2020 DESCRIPTION OF WORK: PARTIAL DEMO OF EXISTING AIR DISTRIBUTION SYSTEM, RE -USE EXISITING RTU, PROVIDE NEW AIR DISTRIBUTION SYSTEM. (2) NEW HIGH EFFICENCY SPLIT SYSTEM AC UNITS FOR FOOD STORAGE ROOM. NEW EXHAUST FAN FOR JANITOR ROOM. Valuation of Work: $41,301.00 Type ofWork: REPLACEMENT Fuel type: ELECT Fees Collected: $779.87 Electrical Service Provided by: PUGETSOUND ENERGY Water District: TUKVV!LA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: VVACities Electrical Code: VVA[296-M6B:WA State Energy Code: N Permit Center Authorized Signature: Date: ^�~.�q —��~��� , " � I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state orlocal laws regulating construction orthe performance cfwork. |amauthorized tosign and obtain this development permit and agree tmthe conditions attached tothis permit. � — Signature:' \ �[�. /(»l Signature: v`~ Date: '/ ^ Print Name: This permit shall become null and void if the work isnot commenced within 18Odays for the date ofissuance, orif the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: I: All mechanical work shall beinspected and approved under aseparate permit issued bythe City ofTukwila Permit Center (206/431-367O). 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: Manufacturers installation instructions shall be available on the job site at the time of inspection. 5: Except for direct -vent appliances that obtain all combustion air directly from the outdoors; fuel -fired appliances shall not belocated in, orobtain combustion air from, any of the following rooms or spaces: Sleeping rooms, bathrooms, toilet rooms, storage closets, surgical rooms. 6: Equipment and appliances having an ignition source and located in hazardous locations and public garages, PRIVATE GARAGES, repair garages, automotive motor -fuel dispensing facilities and parking garages shall be elevated such that the source of ignition is not less than 18 inches above the floor surface on which the equipment orappliance rests. 7: Type 1Hoods, the required grease duct leakage test and light test shall be performed by a special inspection and testing agency inaccordance with iW1I.Chapter S. 8: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 9; All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. lO: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 11' Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based onsatisfactory completion ufthis requirement. 12: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City ofTukwila Building Department (Z06'431'367O). 13: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 14: VALIDITY OFPERMIT: The issuance orgranting ofapermit shall not beconstrued tubeapermit for, oran approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances ofthe City ofTukwila shall not bevalid. The issuance ofapermit based onconstruction documents and other data shall not prevent the Building official from requiring the correction oferrors in the construction documents and other data. 15: ***MECHANICAL PERMIT CONDITIONS' 16: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (ZO6/431-367O). 17: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206)438-9350 0703 W1ECH E[lU|PEFF 1800 MECHANICAL FINAL 0705 REFRIGERATION EQUIP 0701 ROUGH'|NW1[CHAN|[AL CITY OF TUKW Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No, rn I 0044 (to Project No. Date Application Accepted: 3 -2_69 / Date Application Expires: 9 ;261 (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** Site Address: Tenant Name: 17055 Southcenter Pkwy Jenny Craig King Co Assessor's Tax No.: 262304906908 Suite Number: Floor: New Tenant: n Yes LI ..No PROPERTY OWNER Name: KTM Group LLC Address: 2940 Fairview Ave E City: Seattle State: WA Zip: 98102 CONTACT PERSON — person receiving alt project communication Name: Tracy Taylor - Helix Address: 6021 12th St East suite 201 City: Tacoma State: WA Zip: 98424 Phone: (253) 922-9037 Fax: Email: tracyt@helixdesigngroup.net MECHANICAL CONTRACTOR INFORMATION Company Name: TBD Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ 41,301 Describe the scope of work in detail: Partial demo of existing air distribution system. Re -use existing RTU, provide new air distribution system. (2) new high efficiency split system AC units for food storage room. New exhaust fan for janitor room. Use: Residential: New Replacement Commercial: New Replacement LI Fuel Type: Electric Gas Other: 11:1Applicationfforms-Applications On Line \ 201 6 Applications Mechanical Permit Application Revised 1 -4-1 6.docx Revised: January 2016 Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater 2 Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfrn Unit Type Qty Air handling unit >10 000 cfin Evaporator cooler Ventilation fan connected to single. duct 1 Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser 27 Thermostat 1. Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-10PM, Monday through Friday and SAM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; . Construction and property maintenance during the daytime hours (7am-l0pm); • Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days ibllowing the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNERA: Signatu Date: 03/26/2019 Print Name: Tracy Taylor - Helix Design Group Day Telephone: (253) 922-9037 Mailing Address: 6021 1.2th Street East, suite 201 Tacoma WA 98424 City State Zip H:\Applications\Forms-Applications On Line\2016 Applications\Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS ' ACCOUNT QUANTITY PAID PermitTRAK $1,87614 EL19-0255 Address: 17055 SOUTHCENTER PKWY Apn: 2623049070 $1,096.27 Credit Card Fee $31.93 Credit Card Fee R000.369.908.00.00 0.00 $31.93 ELECTRICAL $1,023.40 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $818.72 PLAN CHECK FEE R000.345.832.00.00 0.00 $204.68 TECHNOLOGY FEE $40.94 TECHNOLOGY FEE R000.322.900.04.00 0.00 $40,94 M19-0046 Address: 17055 SOUTHCENTER PKWY Apn: 2623049070 $779.87 Credit Card Fee $22.71 Credit Card Fee R000.369.908.00.00 0.00 $22,71 MECHANICAL $728.04 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $549.28 PLAN CHECK FEE R000.322.102.00.00 0.00 $145.61 TECHNOLOGY FEE $29.12 TECHNOLOGY FEE . TOTAL FEES PAID BY RECEIPT: R17304 R000.322.900.04.00 0.00 $29.12 . $1,876.14 Date Paid: Tuesday, April 02, 2019 Paid By: CARLTON JORDAN Pay Method: CREDIT CARD 05882G •••••••••••••M•11.0•M Printed: Tuesday, April 02, 2019 10:10 AM 1 of 1 SYSTEMS 0 Page 2 of 2 CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA Date: 04/02/2019 10:05:29 AM CREDIT CARD SALE VISA CARD NUMBER: **********4265 K TRAN AMOUNT: $1,876.14 APPROVAL CD: 05882G RECORD 4: 000 CLERK ID: kandace Thank you! Customer Copy httnc•//www mvvirtlialmerchant com/VirtnalMerchant/trancar,tion clrOclicnatchMethncl=nrint 4/2/7019 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 Permit Inspection Request Line (206) 438-9350 Project: „ " f f1/./i Type of Inspection: Address: ps�-S' ��-e Date Called: Special s anted: Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. ENT lnspec Date: S n REINSPECTION FED` REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspecticn. INSPECTION RECORD Retain a copy with permit NSP • NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pro'ect• a oT Inspe on: 1� Address: /7c?- 4.: f- i '' � Date led: --,► Special Instructions: / Date Wanted: a. p-m. Requester- Phone No. 9 qq C ble codes. Corrections required prior to appa°oval. REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Cooler Unit System ChecksumF By HultzlBHU E REVIEWED FOR ODE COMPLIANCE APPROVED Fan Coil COOLING COIL PEAK Peaked at Time: MoJHr: 7 / 20 Outside Air: OADBANBIHR: 73/59 55 Space Plenum Net Percent Total Of Total Btu/h Btu/h Btulh (%) Envelope Loads Skyiite Solar 0 0 0 0 Skylite Cond 0 0 ' 0 01 Roof Cond 0 1,172 1,172 41 Glass Solar 0 0 0 0 Glass/Door Cond 0 0 0 0 Wall Cond 263 78 341 1 Partition/Door 1,160 1,160 41 Floor 0 0 01 Adjacent Floor 0 0 0 01 Infiltration 0 0 0 Sub Total ==> 1,423 1,250 2,673 10 Sens, + Lat. Sens. + Lat Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Adj Jr Trans Heat Dehumid, Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage 512 0 23,050 23,562 92 0 0 0 0 512 0 0 0 23,050 0 23,562 -92 0 0 0 0 0 0 0 0 371 0 0 0 0 0 0 0 2 0 87 89 0 U 0' oi 0 11 0 0 0 1 Grand Total => 25,077 1,158 26,606 100.00 CLG SPACE PEAK Mo/Hr: Sum of OADB: Peaks Space Percent Sensible Of Total Btulh (%) Envelope Loads 0 0 Skylite SOlar 0 0 ! Skylite Cond 0 0 RoofCond 0 0 Glass Solar 0 01 Glass/Door Cond 263 11 Wall Cond 1,160 5 Partition/Door 0 01 Floor 0 0 Adjacent Floor 0 0 Infiltration 1,423 61 Sub Total => Internal Loads 512 2 Lights 0 0 People 23,050 921 Misc 23,562 94 Sub Total ==> 92 01 Ceiling Load 0 6 Ventilation Load 0 0 Adj Air Trans Heat OvlUndr Sizing 0 0 Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat HEATING COIL PEAK Mar: Heating Design OADB: 24 Underflr Sup Ht Pkup Supply Air Leakage 25,077 100.00 Grand Total => Space Peak Space Sens Btu/h 0 Coil Peak Percent Tot Sens Of Total Btulh (%) 0 0.00 0 0.00 0 -3,227 53.46 0 0 0,00 0 0.00 -234 3.88 -2,320 38.44 -255 4.23 0 0 0 0.00 -2,757 -6,036 100.00 0 -182 -2,320 -255 0 0 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -241 0 0.00 0 0 0.00 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0,00 0 0.00 0 0.00 -2,998 -6,036 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWBIHR ton MBh MBh cfm °F °F grfib Main Clg 2.4 29.3 Aux CIg 0,0 0,0 Opt Vent 0.0 0.0 Total 2.4 29.3 29.3 1,253 76,1 59.3 49.6 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0,0 Leave DBIWBIHR °F grllb 55.0 50.8 49.3 0.0 0.0 0.0 0,0 0,0 0.0 CITY AREAS Gross Total Glass ft (%) Floor 345 Part 598 Int Door 0 IVED,8; UKW1A Ext Door 0 0 0 0 Project Name: Dataset Name: TRACE.trc MR ON MAR 2 6 1019 RIOIT CENTER TE Rik! Cooling Heating SADB 55,0 72.2 Ra Pleeity ,„; 67.8 vl wswila67.8 DING SJ Fn BIdTD 0.1 0.0 Fn Frict 0.2 0.0 AIRFLOWS Cooling Heating Diffuser 1,253 1,253 Terminal 1,253 1,253 Main Fan 1,253 1,253 Sec Fan 0 0 Nom Vent 0 0 AHU Vent 0 0 Infil 0 0 MinStoplRh 0 0 Return 1,253 1,253 Exhaust 0 0 Rm Exh 0 0 Auxiliary 0 0 Leakage Dwn 0 0 Leakage Lips 0 0 ENGINEERING CKS Cooling Heating °/0 OA 0,0 0.0 cfmlft2 3.63 3.63 cfmlton 513.93 ftilton 141.46 Btulhr.ft2 84.83 -17.50 No. People 0 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm °F °F Main Htg -6.0 1,253 67.8 72.2 Aux Htg 0.0 0 0.0 0.0 Preheat 0,0 0 0,0 0.0 Humid if 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -6.0 TRACE® 700 v6.3.3 calculated at 03:28 PM on 01121/2019 Alternative - 1 System Checksums Report Page 1 of 1 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 0 Mechanical Summary MECH-SUM 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Information Project Title: Jenny Craig - Tukwila Date 1/28/2019 Applicant Information. Provide contact information for individual who can respond to inquiries about compliance form information provided. For Building Dept. Use Corrany Name: Company Address: Applicant Name: D FOR Applicant Phone: REVIE Project Description Briefly describe mechanical systems in the text box provided ❑ Total Bldg Performance (TBP) This path includes all mandatory provisions per C401.2 Option 2. MECH-SUM, MECH-CHK, and C407 Energy Analysis forms required.• /+ (`} LI CE nh+ psR�V N Syst E � tion system for existing RTU. for food sata rpgi-n. Ain ���� J. 1 �j ting. Clij/ of Tukwf a m Changes ❑ New Building ❑ Building Addition El Tenant Improvem Demo & remove existing diffusers and ductwork. Install new Exhasut fan, ductwork, and grilles. New air distribi Install new (2) new high efficiency split system air conditioner•_ New mop sink & piping (supply, waste & Vent) - Connect toe Design Load Calculations r ' tI ONG DIVISION V the permit documents that includes all applicable required. .�..._ ing or ❑ Load calculation summary MECH-LOAD-CALC Provide design load calculations for all mechanical systems and ventilating needs. if a load calculation summary is provided with compliance information then the MECH-LOAD-CALC form is not Mechanical Schedules Mechanical Plans MECH-EQ Forms (TBD) Indicate location of equipment compliance information. If provided on plans then MECH-EQ forms are not required, however, include on plans all applicable compliance information listed in MECH-EQ tables. Dedicated Outdoor Air System Requirements and High Efficiency VAV Alternate ❑ DOAS is required per C403.6 effective July 1, 2017 (office, retail, All occupied, conditioned areas shall be served by a DOAS that not require space conditioning fan operation. Space conditioning education, library and fire station occupancies), delivers required ventilation air in a manner that does fans cycled off when no heating or cooling is required. in lieu of DOAS (C403.6, Exception 1) system per C403.7 in lieu of DOAS (C403.6, Exception not office, retail, education, library or fire station) increased to 40% per C402.4.1.4 with 100% of MECH-ECONO form. II Ventilation provided via natural ventilation per 2015 IMC • Ventilation and space conditioning provided by a HEVAV 2) ❑ DOAS included in project, although not required (occupancy ❑ DOAS related allowances included in project: Prescriptive vertical fenestration maximum area allowance conditioned floor area in building served by DOAS. Exception to air economizer per C403.3 Exception 1, include Fan Power ❑ Project includes HVAC air distribution systems that provide heating and/or cooling If yes, provide a MECH-FANSYS -SUM form. ❑ For one or more systems, the total fan motor nameplate hp of all fans in HVAC system exceeds 5hp. If yes, provide a seperate MECH-FANSYS form for each HVAC system exceeding the 5 horsepower threshold. Refer to Section C403.2.11 and MECH-FANSYS-DOC for requirements and exceptions. HVAC Hydronic Systems ❑ Hydronic chilled water ❑ Water -loop heat pump El No hydronic systems ❑ Hydronic heating water . Geothermal C406 Additional Efficiency Options - Mechanical ❑ C406.2 More efficient HVAC equipment and fan systems Requires 90% of heating and cooling capacity to be equipment listed in tables C403.2.3(1)-(9) or air -to -water heat pumps and heat recovery chillers. All equipment listed in tables C403.2.3(1)-(7) must be 15% more efficient than minimum requirements. All stand alone supply, retum, and exhaust fans over lhp must have FEQ a. 71 and must be selected within 10% of maximum total or static pressure. ❑ C406.6 Dedicated outdoor air system (DOAS) Requires 90% of conditioned floor area to be served by a DOAS per C403.6 that delivers required ventilation air in a manner that does not require space conditioning fan operation. ❑ C406.7 Reduced energy in service water healing Requires 90% of floor area be in occupancy types listed in C406.7.1 and thaf60% of annual hot water energy use be provided by heat pump, waste heat recovery or solar water -heating systems. rANck• DO 46 RECEIVED CITY OF TUKWILA MAR 262019 PERMIT CENTER 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary, pg. 2 MECH-SUM 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Service Water Heating Systems Equipment Type (s) 0 Hot water heating tank(s) 0 Dedicated boiler Distribution Type (s) 0 Circulation System 0 Instantaneous 0 Heat exchange central hot water/steam from space heat boiler or water systems III No service Ei On -demand Commissioning Commissioning is required for: 111 Mechanical systems per C408.2 Ell Service water heating systems per C408.4 If required, commissioning shall be performed for all applicable systems regardless of individual equipment capacity. Exceptions to commissioning requirements: E Total output capacity of all mechanical space conditioning systems in the building do not exceed 240,000 Btu/h cooling or 300,000 Btu/h heating. Mechanicai systems commissioning not required. 0 Capacity of largest service water heating system in building does not exceed 200,000 Btu/h. Service water heating systems commissioning not required. Low Energy and Semi -Heated Spaces (Note 6 and 7) Space Type Location in Plan(s) Space(s) Served Area Served, square feet Heating Capacity, Btu/h (Note 4) Cooling Capacity, Btu/h (Note 5) Peak Space Conditioning Capacity, Btu/h-sf Compliance Check Notes NA Note 4 - Provide total installed heating output capacity of systems serving Low Energy or Semi -Heated space(s) in btuh. Note 5 - Provide total installed cooling capacity of system serving Low Energy space(s) in Btu/h. Not allowed for semi -heated spaces. Enter 0 if no cooling. Note 6 - Refer to Section C402.1.1 Low Energy Building. Walled peak space conditioning capacity, heating or cooling, may not exceed 3.4 Btulh`sf. Note 7 - Refer to Section C402.1.1.1 and Semi -Heated Space definition in Chapter 2. Total heating output capacity may not exceed 8 Btultr'sf. Only systems without electric resistance heating and no cooling are eligible for the wall insulation exception under semi -heated. 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 1 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January2017 Project Title: Jenny Craig - Tukwila Date 1/28/2019 The following information is necessary to check a permit application for compliancewith the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na Code Section Code Provision Inforrnation Required - Must be in permit documents Location in Documents uilding Depa en Notes Equipment - Sizing, Performance and Type NA C403.1 Exempt process equipment Identify equipment to be used in manufacturing, industrial or commercial processes that do not provide space conditioning; identify provisions applicable to this equipment per 0403.1 exception YES C403.2.1 Load calculations Provide load calculations performed per ASHRAE Std 183 or equivalent, using design parameters per C302 and Appendix C; include bad adjustments to account for energy recovery ATCHD YES 0403.2.2 Equipment and system . . sizing Indicate that output capacities of heating and cooling equipment and systems are no greater than the smallest available equipment size that exceeds the calculated loads; note exceptions taken M1 YES C403.2.3 C403.2.3.2 C403.2.13.1 HVAC equipment performance requirements (efficiency) Provide equipment schedules on plans or complete MECH-EQ forms indicating type, capacity, rated and WSEC minimum efficiencies for all healing and cooling equipment; include supply and OSA cfms and operating hours for all air systems; identify heating and cooling equipment that does not have a corresponding WSEC minimum efficiency (manufacturer rated) M1 NA C405.8 C403.2.14 Electric motor efficiency List all motors a 1/12 hp (that are not integral to a rated piece of equipment) in the mechanicat or electrical equipment schedules on plans; indicate hp, rpm, number of poles and rated effrciency, or exception applied For fractional hp motors 2 - 1 hp), indicate whether they are an electronically commutated motor, have rated efficiency 01 at least 70%, or exception taken NA 0403.2.11.1 Fan power limitation For all HVAC fan systems that provide healing and / or cooing, provide system total nameplatehp in MECH-FANSYS-SUM form For all applicable HVAC systems with total tan motor hp > 5hp, verify fan system motor hp or bhp complies with fan power limits per equations In Table C403.2.11.1(1), provide MECH- FANSYS form for each system NA 0403.2.11.2 Motor nameplate hp For all applicable HVAC systems with total fan motor hp > 5hp, indicate fan motors specified are the smallest available rnotor hp size greater than fan bhp, note exceptions taken NA 0403.2.11.3 Fan efficiency For all applicable HVAC systems with total fan motor hp > 5hp, identify in equipment schedule all fans required to comply with fan efficiency grade and indicate rated FEG is a 67, or exception taken; indicate these fans are sized so total efficiency is within 15% of the fan maximum total efficiency NA C403.2.11.4 Group R occupancy exhaust fan efficacy For all exhaust fans <400 r:fm in Group R occupancies, indicate in equipment schedule the fan flow rate and efficacy (cfm/watt), or exception taken; refer to Table C403.2.11.4 (CE-57) NA C403.2"13 Variable flow capacity - fans For fan motors a 7.5 hp, indicate method of variable flow control (VSD or equivalent method) in equipment schedule, or exception taken; for equivalent method for an HVAC system refer to HVAC System Controls for additional requirements NA C403.2.3 Maximum air cooled chiller capacity For chilled water plants and buildings with > 500 tons of cooling capacity, indicate air-cooled chitter capacity is s 100 tons, or exception taken NA C403.4 Large capacity cooling systems For buildings with a 300 tons of cooling capacity, indicate method of multi -stage or variable capacity control (VSD, multiple staged compressors, or max capacity of any single unit < 66% of the total) NA C403.2.3.1 Non-standard water-cooled centrifugal chillers For watencooled centrifugal chillers not designed for operation at standard conditions, provide calculations documenting maximum full load and part load rated equipment performance requirements NA C403.2.13.1 C403.4.3.2 Centrifugal fan open-cIrcuit cooling towers For open -circuit centrifugal fan cooling towers 'th 1 1,100 gpm capacity, indicate cooting towers comply with efficiency requirements for axial fan open circuit cooling towers NA C403.4.2 C403.4.2.5 Large capacity boiler systems For single boilers with > 500,000 Btu/h capacity, indicate multi -stage or modulating bumer For boiler system (single or multiple) with > 1,000,000 Btu/h capacity, indicate tumdown ratio per Table 0403.4.2.5 and method (multiple single input boilers, modulating boilers, or cornbination) NA C403.2.13 Variable flow capacity - pumps For pump motors a 7.5 hp, indicate method of variable flow control (VSD or equivalent method) in equipment schedule, or exception taken; for equivalent method for a hydronic system refer to Hydronic System Controls for additional requirements NA C403.2.3 Gas and oil -fired forced air furnace and unit heaters For forced air furnaces with capacity a 225,000 Btu/h and all unit heaters, indicate in equipment schedule intermittentignition or IID, flue or draft damper, and rated jacket loss NA C403.2.4.8 Combustion heating equipment For combustion heating equipment with output capacity > 225,000 Btu/h, indicate modulating or staged combustion control NA C403.2.3.3 Packaged electric heating / cooling equipment Verify all packaged electric equipment with > 6,000 Btu/h cooling capacity and any amount of heating is a heat pump; include in equipment schedules NA C403.2.12 Heating outside a building Indicate systems providing heating in non -enclosed outdoor occupied spaces are radiant systems; refer to HVAC System Controls for additional requirements NA C403.2.7.1 Kitchen exhaust hoods indicate on plans the type, duty and exhaust air rate of each kitchen hood, refer to I-IVAC System Controls for additional requirements Yes C403.2.4.3 Outdoor suppy air, exhaust and relief dampers Indicate locations of OSA Intake, and exhaust and relief outlet dampers on plans; indicate whether dampers are Class 1 motorized, or gravity and exception taken (include leakage rating, cfm/s1); refer to HVAC System Controls for additional requirements for OSA dampers M4, M5 Yes 0403.2.4.3 Retum air dampers Indicate locations of return air dampers that are integral to economizer operation; verify dampers are motorized; indicate whether dampers are Class 1, or within packaged equipment eligible for leakage rating exception (include leakage rating, cfm/sf) M4 NA C403.2.4.3 Stairway and shaft vent dampers Indicate location of stairway and shaft vent dampers on plans; verify dampers are Class 1 motorized; refer to HVAC System Controls for additional requirements 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 2 of 7 Mechanical Permit Plans Checklist 2015 Washington State Energy Code Compliance Forms for Commercial Buildings includingR2 & R3 over 3 stones and all R1 MECH-CHK Project Title: Jenny Craig i, Tukwila Date 1/2 20 , The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements at Ihe Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C403.2.4.4 Zone isolation dampers For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non-simuttaneously, identify isolation zone areas on plans and locations of associated isolation dampers in HVAC distribution system; refer to HVACSystem Controls for additional requirements NA C40323A Humidification For cooling systems with humidification equipment that are also required to have air economizer, indicate humidifier is adiabatic (direct evaporative or fog atomization), or exception taken Additional Efflciency Package Option, More Efficient HVAC Equipment 131 Fan Performance - Must comply with all 3 provisions to be eligible NA C406.2.1 C403.2.3 HVAC system selection To comply with additional efficiency package option, calculate the percentage of heating and cooling equipment in the project (based on output capacity) that do not have a corres;rionding WSEC listed efficiency, shall be less than 10% to comply NA C406.2.2 C403.2,3 Minimum equipment efficiency To comply with additional efficiency package option, indicate that all listed heating and cooling equipment have a rated efficiency that exceeds WSEC listed efficiency by at least 15% NAMinimum C406.2.3 C403.2.11.3 fan efficiency To comply with additional efficiency package option, indicate rated FEG of stand alone fans is a 71; indicate these fans are sized so the fan efficiency at design conditions is within 10% of the maximum total or static efficiency HVAC System Controls YES C403.2.4,1 Thermostatic controls (thermostats and humidistals) Indicate locations of thermostatic and humidity control devices and the zones they serve on plans, includin erE_p1;11eter:ystem zones M1 Where adjacent (neighboring) zones are controlled by separate thermostats (including perimeter systems used to offset heat gain or loss), and are connected by permanent openings > 10% of either zone sf area, indicate controls configured to prevent adjacent zones from operating in conflicting modes (one in heat, other in cool); applies to adjacent perimeter zones, adjacent nonperimeter zones, and adjacent perimeter and nonperimeter zones If applying Exception 2 to nonperimeter zones adjacent to perimeter zones, indicate that setpoints and deadband settings in these zones are coordinated so cooling in a nonperimeter zone does not occur until the temperature in that zone is 5°F higher than the adjacent perimeter zone temperature in heating NA C403.2.4.1.1 Heat pump supplementary heat Indicate staged heating operation with compression as the first stage of heating and supplemental heating controlled with outdoor lock -out temperature set to 40°F or less Yes C403.2.4.1.2 Deadband Indicate zone thermostatic controls configured with 5F minimum deadband for systems that control both heating and cooling MI NA G403.2.4.1.3 Selpoint overlap restriction (thermostats) If separate heating and cooling systems with separate thermostatic control devices are used 10 serve a zone, indicate locations of both thermostatic control devices and the zone they serve on plans Indicate a limit switch, mechanical stop or DoC controlcoritrot with programmingprogrammirig to preveflt simultaneous healing and cooling YES C403.2.4.2 C403.2.4.2,1 C403.2.4.2,2 Automatic setback and shutdown Indicate zone thermostatic controls configured with required automatic setback and manual override functions, setback temperatures, and control method (automatic time clock or programmable controls); note exceptions taken MI YES C403.2.4.2.3 Automatic (optimum) start Indicate system controls that adjust equipment start time required to bring each area served up to design temperature just prior to scheduled occupancy Mi YES C403.2.4,3 Outdoor supply air dampers Indicate automatic controls configured to close OSA damper during unoccupied equipnent operation; not including economizer cooling, night flush or MC required OSA / exhaust Mi NA C403.2.4,3 Stairway and shaft vent dampers Indicate method of activation of stairway and shaft vent dampers (fire alarm or interruption of power) NA C403.2.4.4 Zone isolation controls For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that are expected to be occupied non -simultaneously; indicate controls that allow for independent space conditioning of isolation zones; or exception taken NA C403.2.12 Heating outside a building Indicate occupancy sensing or timer switch controls configured to automsticatly shut off heating system when area served is unoccupied NA C403.2.4.5 Snow melt systems Indicate automatic controls confgured to shut off system when pavement temperature exceeds 50°F and no precipitation is falling, and when outdoor air temperature exceeds 40°F NA C403.2.4.6 Freeze protection system controts Indicate automatic controls to shut off system when outdoor temperature exceeds 40°F, or conditions protect fluid from freezing NA C403.2.4.9 Group R1 hotel / motel guest rooms For hotels and motels with over 50 guest rooms, indicate automatic controls serving guest rooms that are capable of setback (heating) and set-up (coofing) of temperature setpoint by at least 5°F; indicate control method - activated by room entry or occupancy sensor 2015 Washington State Energy Code Compliance Forms for Commercia R2 and R3 over 3 stories and all R1 - Page 3 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington State Energy Code Complian Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: Jenny Craig - Tukwila Date 1/28/20I9 The following information is necessary to check a permit appkcation for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Infomration Required - Must be in permit documents Location in Documents Building Department Notes NA C403.2.4,10 C403.2.4.11 Group R2 / R3 dwelling units, Group R2 sleeping units For primary space conditioning system, indicate 5-2 programmable thermostats capable of two setback periods per day; for all thermostats indicate purpose (heating only, cooling only, or both), required temperature range and at minimum a 10'F deadband; or exception taken Yes C403.2.6 C403.2.11.4 Ventilation Indicate method of ventilation air delivery (natural or mechanical) for each zone M1 tf mechanically delivered, indicate that systems are configured to provide not more than 150% of, but at least the minimum required volume of outdoor air to each zone per IMC, ASHRAE 62.1 or other applicable code (WAC, OSHA, etc); or exception taken M1 If delivered via natural ventilation, identify required elements per IMC including minimum openable area to the outdoors or qualifying adjoining spaces NA C403.2.6.2 Demand controlled ventilation Identify spaces > 500 sf with occupant load > 25 people/1,000 sf per IMC; for each space indicate whether it is served by an HVAC system with total design OSA > 3,000 cfm, and / or the system has airside economizer or automatic modulating OSA damper; indicate OSA controls are configured to provide demand controlled ventilation or provide supporting documentation for applied exception NA C403.2.6.3 Occupancy sensors For gyms, classrooms, auditoriums and conference rooms > 500 sf, indicate occupancy -based OSA control when space is unoccupied and method (closes OSA damper or shuts -off equipment); or alternate means provided to automatically reduce OSA when space is partially occupied NA C403.2.6.4 C403.2.6.4.1 Enclosed loading dock ventilation For enclosed loading docks, indicate ventilation / exhaust system method of activation (gas detection system for CO and NO2, or occupancy sensors), and control method (staged or modulating) NA C403.2.6.4 C403.2.6.4.2 Enclosed parking garage ventilation For enclosed parking garages, indicate ventilation / exhaust system activated by gas detection system for CO and NO2, and control method (staged or modulating); or exception taken NA C403.2.7.1 Kitchen exhaust hoods Provide calculations that show a balanced accounting of total kitchen exhaust (include all hoods) with % of: supply air, transfer air from adjacent spaces, and make-up air; i1 applicable, indicate that direct make-up air to each hood does not exceed 10% of hood exhaust For kitchens with total hoocl exhaust exceeding 2,000 cfm, indicate exhaust air rate per Table C403.2.7,1 and compliance method (DCV, energy recovery, or transfer air that would otherwise be exhausted) NA C403.2.7.2 Laboratory exhaust systems Refer to Systems Requiring Energy Recovery for requirements NA C403,2.13 Variable flow capacity - HVAC system fans For HVAC fan motors a 7.5 hp, indicate method of variable flow control (VSD, or equivalent control method that reduces design air volume by 50% at 1/3 static design pressure); note exception taken NA C403.3.1 DX air handler variable cooling control (Under Integrated Economizer) For DX air handlers with economizer and cooling capacity z 65,000 Btu/h, indicate number of cooling stages provided and method (multiple compressors and / or variable speed compressors): indicate minimum displacement (capacity reduction) as % of full load Indicate control method (cooling capacity controlled in response to space temperature, space temperature controlled by modulating supply airflow, or both) NA C403.2.11.5 Fan airflow control For DX air handling units with cooling capacity a 65,000 Btu/h and evaporative and chilled water air handling units with fan a 0.25 hp, indicate whether system is single zone or multiple zone and related control method (cooling capacity controlled in response to space temperature, space temperature is controlled by modulating supply airflow, or both) For mechanical cooling systems (includes DX and chilled water coils) that control cooling capacity in response to space temperature - Provide a minimum of two stages of fan control; indicate minimum fan speed is s 66% of full speed drawing s 40% of full speed fan power during periods of low cooling or ventilation only For other mechanical cooling systems (includes DX and chilled water coils) that control space temperature by modulating airflow (in lieu of, or in addition to, controlling capacity in response to space temperature) - Provide fan controls for modulating supply airflow; indicate minimum fan speed is s 50% of full speed drawing 5 30% of full speed fan power during periods of low cooling or ventilation only; or exception taken NA C403.2.4.12 DDC system capabilities Provide central and zone level DDC controls as required based on system application, capacity or size thresholds and other qualification per Table C403.2.4.12.1 Identify all DDC system input / output control points; indicate capability for trending and graphical display Ducting Systems Yes C403.2.8.1 C403.2.8.3 Duct construction Indicate on plans that all ductwork is constructed and sealed per IMC M1 For OSA ductwork, also indicate on plans that ductwork meets air leakage requirements per C402.5 and vapor retarder requirements per the IBC M1 Yes C403.2.8.3 Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans M1 NA C403.2.8.3.3 High pressure duct leakage lest Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 4 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015Washington State EnergyCode Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: Jenny Craig - Tukwila Date 1/2 /20 9 The following information is necessary to check a permit application for compliancecompliarice with the mechanical nd equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes Yes C403.2,8.1 C403.2.8.2 Duct insulation For supply and return ductwork located in unconditioned space or outdoors, indicate R-value of insulation on ductwork n plans; identify climate zone; note exceptions taken M1 For supply ductwork in conditioned space, identify if design supply temperature is < 55°F or > 105°F and indicate R-value of insulation on this ductwork on plans; note exception taken For OSA ductwork, shafts and plenums, indicate R-value of insulation on these elements on plans per Table C402.1.3 for steel -framed walls; note exception taken Piping Systems YES C403.2.9 Piping insulation Indicate design temperature range of fluid conveyed in piping and thickness of insulation (in inches) on hydronic piping plans; or exception taken M1 NA C403.2.9.1 Piping insulation exposed to weather Indicate method of protection of pipe insulation from damage / degradation on hydronic piping plans Economizers NA C403.3 Air economizer required Identify in equipment scheduleson plans or in MECH-EQ forms all ina systems requiring air economizer controls Provide MECH-ECONO form indicating systems utilizing air economizer exceptions, including those with water -side economizer in lieu of air economizer; indicate on plans eligible exception(s) taken and measures to comply with exception(s) NA C403.3.1 Integrated economizer operation - air and water Indicate air and water -side economizers are configured for partial cooling operation even where additional mechanical cooling is required to meet the load NA C403.3.2 Economizer heating system impact - air and water Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation NA C403.3.3.1 Air economizer capacity Indicate modulating OSA and retum air dampers are configured to provide up 10 100% OSA for cooling NA C403.3.1 .3.3. C4032 Integrated air economizer Verify mechanical cooling controls are interlocked with air economizer controls so the outside air damper remains in 100% open position when mechanical cooling is also required to meet the cooling load, until the leaving air temperature is <45°F For systems with cooling capacity a 65,000 Btu/h, verify that control of economizer dampers is not based only on mixed air temperature; or exception taken NA C403.3.3.3 Air economizer high limit controls Indicate high limit shut-off control method and required high limit per Table C403.3,3.3 NA C403.3.4.1 Water economizer capacity For eligible systems where water -side economizer may be provided in lieu of air econo lzer, indicate system is capable of 100% design cooling capacity at 50°F db / 45°F wb OSA temperatures NA . C403.34.2 Water economizer maximum pressure drop Indicate pressure drop across precooling coils and heat exchangers in water economizer system do not exceed pressure drop limit NA C403.3.1 DX air handling equipment control For DX air handlers with economizer and cooling capacity5,000 Btu , refer 10 HVAC System Controls for requirements NA C403.2.4.7 DX equipment economizer fault detection and diagnostics For DX air handlers with economizer and cooling capacity a 54,000 Bluth, provide a fault detection and diagnostics (FDD) system to monitor economizer system operation and report faults Systems Requiring Energy Recovery NA C403.5,1 Energy recovery (ER) - ventilation / exhaust systems For systems with design OSA > 5,000 cfm, or design supply air cfm and % OSA exceeding the values in Tables G403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations For rooms served by multiple systems with aggregate design OSA >5,000 cfm, or aggregate design supply air cfm and % OSA exceeding the values in Tables C403.5.1(1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations Indicate ER rated effectiveness that increases OSA enthalpy by a 50% based on delta between OSA and retum air enthalpies at design conditions NA C403.2.7.2 Laboratory exhaust systems (energy recovery) For buildings with total lab exhaust > 5,000 cfm, indicate method of energy recovery used to pre -condition laboratory make-up air; ER effectiveness (min 25°F); or alternative method per exception (I./AV exhaust, semi -conditioned makeup, or GERM calculation) NA C404.10.4 (under C404.11) Pools and permanent spas exhaust systems (energy recovery) For buildings with pools or spas with water surface area > 200 sf, indicate exhaust air ER method and use of waste heat (preheat ventilation air, pool water or service hot water); or exception taken ndicate ER system has the rated effectiveness and is configured to decrease the exhaust air temperature al design conditions by a 36°F NA C403.5.2 Energy recovery • steam condensate systems For buildings with on -site steam heating systems, indicate condensate wa1er ER For buildings that use off -site generated steam where condensate is not retumed to the source, indicate on -site condensate water ER 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 5 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings ncludinq includingR2 & R3 over 3 stories and all R1 Revised n 2 Project Title: Jenny Craig - Tukwila Date 1/28/2019 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C403.5.3 Energy recovery - cooler / freezer condensers For buildings with food senrice, meat or deli departments that have z 500,000 Btu/h of remote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy (service water heating, space heating, or dehumidification reheating) For buildings with z 40,000 sf conditioned floor area and with Z 1,000,000 Btu/h of remote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy for service water heating and also for space heating, or dehumidification reheating NA C403.5.4 Energy recovery - condenser systems For buildings with 24-hour operation and with > 1,500,000 Btu/h of heat rejection capacity and design service hot water load > 250,000 Btu/h, indicate condenser ER to pre -heat service water; or exception taken. Provide calculations showing the amount of recovered heat that is utilized (60% of peak heat rejection load or pre -heat service water to 85°F). Hydronic System Controls NA C403.2.13 C403.4.2.7 Variable flow control - hydronic system pumps For hydronic system pump motors z 7.5 hp, indicate method of variable flow control (VSD or equivalent method that requires z 30% design wattage at 50% design fluid flow); note exception taken Identify whether hydronic coils have DDC controls and associated manner of pump speed control (differential pressure, zone hydronic demand, etc) NA C403.2.5 C403.4.2.4 Hydronic system setback and part load controls For boilers that provide buillding heating, indicate controls that provide heating water temperature setback based on outdoor temperature For heating and chilled water systems z 300,000 Btu/h, indicate systems are configured to automatically reset supply water temperature based upon demand; or exception taken. If system pump motor hp Z 3 hp, also indicate controls automatically reduce flow by Z 50%. For chilled water systems (iZ 300,000 Btu/h, pump motor hp Z 3 hp) that serve water-cooled unitary air conditioners, indicate VSD or staged pumps in chilled water system and heat rejection loop that reduce pump flow so that one control valve is nearly wide open, or to maintain a minimum differential pressure; or exception taken NA C403.4.2 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers NA C403.4.6 Hot gas bypass limitation For cooling equipment with hot gas bypass, provide either multiple step unloading or continuous capacity modulation; indicate bypass capacity per Table C403.4.6 NA C403.4.2.2 Two -pipe changeover systems Indicate changeover deadband (min 15°F), heating / cooling mode scheduling and changeover temperature range (limit 30°F) NA C403.4.2.6 Chiller / boiler plant pump isolation Indicate controls are configured to automatically reduce overall plant flow and shut-off flow through individual chillers and boilers when not in use NA C403.2,13.1.1 C403.4.3.1.1 C403.4.3.1.2 Heat rejection equipment - variable flow control For cooling towers with fan motors z 7.5 hp, indicate VSD and method to adjust fan speed (adjusted based on leaving fluid temperature or condenser temperature / pressure of heat rejection device) For multiple -cell heat rejection equipment with VSD, indicate controls that ramp all fans In unison NA C403.4.3.3 Heat rejection equipment - cooling tower flow tumdown Indicate open -circuit cooling towers with multiple pumps or VSD control are designed so all cells can be run in parallel NA C403.4.2.3.1 Water loop heat pump - deadband Indicate capability of central equipment to provide minimum 20°F water supply temperature deadband between heat rejection and heat addition modes; or exception taken NA C403.4.2.3.2.1 Water loop heat pump - heat rejection equipment, Zone 4 Indicate type of cooling tower (open- or closed-circuit) in equipment schedule; indicate method used to limit system heat loss when heat rejection is not needed NA C403.4.2.3.2.2 Water loop heat pump - heat rejection equipment, Zone 5 For open- or closed-circuit cooling towers, provide a heat exchanger that separates the cooling tower and heat pump loop NA C403.4.2.3.3 Water loop heat pump - isolation valves For hydronic heat pump systems with total system power > 10 hp, indicate 2-way isolation valves on each heat pump ;and variable flow system control Dedicated Outdoor Air Systems (DOAS) - Optional through 6/30/16, Prescriptive 7/1/2016 NA C403.6 C403.6,3 Dedicated outdoor air systems For buildings with office, retail, education, library and fire station spaces, identify these spaces on plans; indicate that ventilation air in each occupied space is provided via a DOAS system; or document compliance with C403.6,3 Impracticality; or exception taken (buildings complying with C402.4.1.4 or C406.6 rnay not utilize exceptions) NA C403.6.1 Energy recovery ventilation with DOAS For all DOAS systems, indicate exhaust air ER method; or exception taken with supporting calculations. Indicate ER rated effectiveness that increases OSA enthalpy by z 50% based on delta between OSA and retum air enthalpies at design conditions. NA C403.6.2 Heating / cooling system controls with DOAS Indicate equipment associated with the delivery of zone level heating and cooling (fans, hydronic pumps, primary air dampers, etc) are configured to shut off, and central equipment is configured to tum down, when there is no call for heating or cooling in the zone they serve If applying Exception to heating / cooling fans used for air mixing in the space during deadband periods, include fan watts per cfm in equipment schedule 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 6 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington Slate Energy Code Compliance Forms for Commercial Buildings scludirig includingR2 & R3 over 3 stories and all R1 Revisednu Project Title: Jenny Craig - Tukwila Gale 1/2 20 9 The following information is necessary to check a permit application for compiancewith the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes NA C402.4.1.4 C403.6 Increased prescriptive maximum vertical fenestration area with DOAS lndicate that all occupied, conditioned spaces are served by a DOAS per C403.6 Addftional Efficiency Package Op Ion, Dedicated Outside Air Systems DOAS NA C406.6 Building provided with DOAS To comply with additional efficiency package option, indicate that 90% or more of all occupied, conditioned spaces are served by a DOAS per C403,6 Multiple Zone Air Systems NA G403.4.4 Air systems serving multiple zones Identify supply air systems serving multiple zones and the zones they serve on plans; in icate whether system is VAV and method of primary air control; or provide supporting documentation for applied exception to VAV NA C403.4.4 VAV systems serving multiple zones Provide equipment schedules on plans or MECH-EQ form that list all VAV air terniinals and types For each air terminal include: maximum airflow rates for primary supply air during zone peak heating and zone peak cooling; maximum airflow during reheating, retooling or mixing; minimum airflow rate to maintain required ventilation, and the basis for these values; if IMC or ASHRAE 62.1 multiple zone equation is basis for minimum flow rates, provide calculation on plans NA C403.4.4.1 Single duct VAV terminal units Indicate single duct terminal units are configured to reduce primary supply air before reheating or recooling NA C403.4.4.2 Dual duct systems - terminal units For systems with separate warm air and cool air ducts, indicate terminal units are configured to reduce the flow from one duct to minimum before mixing with air from the other duct NA C403.4.1.1 C403.4.1.2 VAV system static pressure sensors - sensors and DDC set points Indicate locations of duct static pressure sensors on plans; include at least one sensor per major duct branch; verifyilontroller setpoint pressure al each sensor is s 1.2 inch w.g. For systems with zone level DDC, indicate controls are configured to monitor zone damper positions and reset static pressure setpoint based on the zone requiring most pressure; include control logic that automatically detects and generates an alarm if any zone excessively drives reset logic, and allows building operators to exclude zones from reset logic NA C403.4.4.3 Multiple -zone VAV system ventilation optimization controls For systems with zone level DDC controls, indicate controls are configured to automatically reduce outdoor airflow in response to changes in system ventilation efficiency; or exception taken NA C403.4.4.4 VAV system supply air reset Indicate controls automatically reset supply air temperature in response to building loads or outdoor air temperature; or exception taken MultipleMuttiple Zone HVAC Systems, High Efficiency VAV - Required for systems utilizing C403.6 DOAS Exception 2, must complv with ali 16 provisions NA 7 '' Item1 Air economizer Indicate system is configured for 100% air economizer operation and complies with all related economizer requirements per G403.3 (without economizer exceptions) NA G403.7 Item 2' Direct digital controls (DDC) Provide DDC controls for all components of system; identify all DDC system input/ output control points; indicate capability for trending and graphical display NA C403.7, Item 3 Outdoor airflow measurement and reduction For systems with minimum OSA > 2,500 cfm, indicate outdoor airflow monitoring station that measures OSA intake under all load conditions; indicate control sequence that increases or reduces system OSA cfm based on VAV terminal feedback of ventilation efficiency (per G403.4.4.3 without exceptions) or DCV (per C403.2.6.2) NA C403.7 Item 4' Supply airflow measurement For systems with minimum OSA > 2,500 cfm, indicate supply airflow monitoring station capable of measuring supply air delivered to VAV terminals under all load conditions NA C403.7, Item 5 Zone isolation and maximum area served Verify maximum area served by a single HEVAV system is s 50,000 sf, or one entire floor, whichever is greater; in addition if a system serves > 25,000 sf, that includes areas that are expected to be occupied non -simultaneously, indicate zone isolation controls per C403,2.4.4 NA G403.7, Item 6 Interior / exterior zone design supply air temperature Verify that VAV terminals serving interior cooling driven loads are sized per design supply air temperature that Is 5°F higher than VAV terminals serving exterior zones NA CA03.7, Item 7 Maximum air terminal inlet velocity Identify air terrninals with minimum primary airflow setpoints > 50% of maximum setpoint in equipment schedule or MECH-EQ forrn; indicate air terminal inlet velocity does not exceed 900 fpm NA C403.7 Item 8' Sequence of operation Indicate DDC system sequences of operation are designed andconfigured per ASHRAE GPC 36 NA 11-403.7, Item Maximum allowable system brake horsepower Verify fan system bhp is s 90% ofthe bhp limit per Option 2 equation in Table C403.2. . , provide MECH-FANSYS form for each system NA C403.7, Item 10 Fart -powered terrninal unit motor and control Indicate all series and parallel terminal fans have electronically commutated motors; indicate DDC control system is configured to vary air terminal fan speed as a function of the load; indicate fan speed during periods of low heating, low cooling, or ventilation only is 5 66% of peak design air flow or provide supporting documentation for applied exception 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 7 of 7 Mechanical Permit Plans Checklist MECH-CHK 2015 Washington Slate Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January2017 Project Title: Jenny Craig -Tukwila [Date 1/28/2019 The following information is necessary to check a perrnit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable icyes,no na) Code Section Code Provision Infomiation Required - Must be in permit documents Location in Documents Building Department Notes NA C403.7, Item 11 Application of single duct and fan -powered terrninal units i e VAV terminal types on plans; verify fan -powered terminal units only serve perimeter zones with envelope loads; verify all other zones are served by single duct terminal units NA C403.7, Item 12 Fan -powered terminal unit primary air reset Indicateconfiguredto automatically reset the primary supply air cfm setpoint of all fan -powered terminal units to the minimum required to maintain ventilation during occupied heating or deadband, based upon the VAV air handling unit OSA ventilation fraction NA C403.7, Item 13 High occupancy space controls For spaces > 150 sf with occupant density a 25 people / 1000 sf, indicate space Is served by a dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint; also indicate occupancy sensor control that automatically reduces minimum ventilation to zero and sets back room heating and cooling setpoints by a 5°F NA C403.7, Item 14 Dedicated HVAC systems For server, electronic equipment, telecom or similar spaces with coohng toads > 5 W/sf, indicate spaces are served by independent HVAC systems that are separate from HPVAV systems serving rest of building; indicate dedicated HVAC systems have air economizer controls or energy recovery per C403.3 Exception 9 NACentral C403.7, Item 15 plant efticiency Indicate whether systems are served by a high efficiency heating water plant, or a high efficiency chilled water plant If complying via high efficiency heating water plant: Indicate all VAV terminals have hydronic healing coils served by healing water system with either gas -fired boiler(s) with thermal efficiency a 90%, air -to -water heat pumps, or heat recovery chillers If complying via high efficiency chilled water plant: Indicate all VAV air handlers have cooling coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least 25% per Table C403.2.3(7) (note water-cooled IPLV is max, all others are min); indicate smallest chiller or compressor in plant is 5 20% of total plant capacity, or provide thermal storage sized for 5 20% of total plant capacity NAmonitor C403.7, Item 16 Fault detection and diagnostics Indicate DDC system includes a fault detection and diagnostics (FDD) system configured to operation and provide fault reporting of required parameters for all VAV air handlers and VAV air terminal units in (he HPVAV system HVAC Equipment Energy Use Metering NA C409.3.1 HVAC equipment energy use metering For new buildings > 50,000 sf and building additions > 25,000 sf, verify energy use metering of all equipment used to provide space heating and cooling, dehumidification and ventilation will be provided per C409; indicate equipment eligible for exception Documentation and System Specific Requirement To Support Commissioning NA C408'2 Scope of mechanical systems commissioning Indicate that all mechanical systems, equipment, and controls for whith the WSEC requires control functions and / or configuration to perform specific functions are required to be commissioned; For buildings with a 240,000 Bluth total output cooling capacity or a 300,000 Btu/h total output heating capacity, indicate that all mechanical systems regardless of individual capacity are required to be commissioned; or provide building heating / cooling capacity calculation demonstrating eligibility for exception NA C403.2.10 C408,1,1 C408.1.2 C408.1.4.2 C103.6 Commissioning requirements in construction documents Eradicate in plans and specifications that Cx per C408 is required for all applicable mechanical systems; Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 including: narrative description of activities, responsibilities of the Cx team, schedule of activities including verification of project close out documentation per C103.6, and conflict of iriterest plan (if required); Include in general summary that a Cx project report or Compliance Checklist (Figure C408.1.4.2) shall be completed by the Certified Cx Professional and provided to the owner prior to the final mechanical inspection. Yes C408.2.2 Air system and hydronic system balancing ndicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances defined in the specifications; indicate systems shall be balanced in a manner to first minimize throttling losses, then adjusted to meet design flow conditions MI Yes C408.2.2.1 Air system balancing devices Indicate devices that provide the capability to balance all supply air outlets, zone terminals and air handling equipment requiring system balancing MI NA 0 .2.2.2 Hydronic system balancing devices Indicate devices that provide the capability to isolate, balance and measure flow across all hydronic equipment requiring system balancing including heating and tooting coils and pumps NA C408.2.3 Functional performance testing criteria Identify in plans and specifications the intended operation of all equipment and controls during all modes of operation, including interfacing between new and existing -to -remain systems Project Close Out Documentation Yes C103.6 Documentation arid project close out submittal requirements Indicate in plans that project close out documentation and training of building operations personnel is required for all mechanical components, equipment and systems govemed by this code; Indicate close out documentation shall include: record documents, O&M manuals, applicable WSEC compliance forms and calculations MI MEMORANDUM TO: Richard Takechi FROM: Rachelle Ripley DATE: May 3, 2019 SUBJECT: Jenny Craig Permit Number EL19-0255 M19-0046 Please credit $1,876.14 (one thousand eight hundred seventy-six dollars and fourteen cents) for a credit card transaction made on April 2, 2019. The credit card was charged twice. Please provide the refund as follows: Account 000.322.100.00.00: $ Account 000.322.101.00.00: $ Account 000.322.102.00.00: $ Account 000.322.900.04.00: $ Account 000.345.832.00.00: $ Account 000.369.908.00.00: $ Thank you! 582.43 818.72 145.61 70.06 204.68 54.64 Total: $ 1,876.14 Rachclle Ripley From: Sent: Swbjex",: HeUoRacheUe. RichardTakech\ Friday, May 3'2O199:UZAK4 RacheUeRip|ey JENNY [RA|GREFUND Reynafrom Jenny Craig called methis morning. This isthe one inwhich their payment of$1,876.14xvaEcharged twice. This occurred on4/2/19and itpertains topermits K419'0O46and EL19'O2S5. Did yoki have a chance to process a refund memo? Thank you. Richard � � 1W PEhivilT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M19-0046 DATE: 04/02/19 PROJECT NAME: JENNY CRAIG SITE ADDRESS: 17055 SOUTHCENTER PKWY X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Peflint Issued DEPARTMENTS: Lk-3-17 Building Division 111 Public Works r w Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 04/04/19 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required (corrections entered in Reviews) Notation: Approved with Conditions Denied (ie: Zoning Issues DUE DATE: 05/02/19 REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg LJ Fire D Ping El PW 0 Staff Initials: 12/18/2013 H 0111C 1::Spari(11 Contact Search L&I Safety & Health Claims & Insurance Washington State Department of Labor & Industries A-Z Index Help Mv 1.,& I Workplace Rights Trades & Licensing EVERGREEN REFRIGERATION Owner or tradesperson Principals PATTON, RODGER, PARTNER/MEMBER PATTON, MATTHEW. PARTNER/MEMBER Patton, Adam, PARTNER/MEMBER Patton, Douglas, PARTNER/MEMBER EVERGREEN REFRIGERATION LLC, PARTNER/MEMBER PATTON, DAVID, PARTNER/MEMBER (End: 01/21/2014) Doing business as EVERGREEN REFRIGERATION LLC WA UBI No 602 512 953 727 S KENYON ST SEATTLE, WA 98108 206-763-1744 KING County Business type Limited Liability Company Governing persons MATTHEW ALAN PATTON ADAM PATTON; DOUGLAS PATTON; RODGER PATTON; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. EVERGRL954R2 Effective — expiration 01/06/2006— 01/06/2020 Bond Merchants Bonding Co (Mutual) Bond account no. WA15097 $12,000.00 Received by L&I Effective date 12/15/2011 01/01/2012 Expiration date Until Canceled Insurance Nationwide Mutual Ins Co $1,000,000.00 Policy no. ACP 3037246151 Help us improve TN Received by L&I 07/24/2018 Nationwide Mutual Ins Co Policy no. ACP 3018338030 Effective date 07/31/2018 Expiration date 07/31/2019 $1,000,000.00 Received by L&I Effective date 07/20/2018 07/31/2018 Expiration date 07/31/2019 ( Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&l tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID Account is current. 422,456-02 Doing business as EVERGREEN REFRIGERATION LLC Estimated workers reported Quarter 4 of Year 2018 "Greater than 100 Workers" L&I account contact T4 / CASSANDRA SMITH (360)902-5632 - Email: SMCA235@ini.wa.gov Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been Issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 10/24/2014 Inspection no. 317607380 Location 207 SW 156TH St Burien, WA 98166 Inspection results date 10/01/2014 Inspection no. 317583862 Location 3411 South 23rd st Tacoma, WA 98405 Violations No violations Help us improve CO Washington Stale Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. Help us improve 0 2 3 L7 5 6 a c O 0 W CD ao W > C� a � U) V) U W L IL o 0 t\ 0 I CO o =" 9 f- Q U UJ O of IL co 0 0 0 0)> � �Q orn 1 CCm o% 10 I „L � o � Q _ IW- � O W J J n i, B I C I D I E F G MECHANICAL, DEMOLITION NOTES MECHANICAL GENERAL NOTES 1. DEMOLITION DRAWINGS ARE INTENDED TO ONLY GIVE A GENERAL REPRESENTATION OF THE 1. MECHANICAL WORK IS NOT LIMITED TO (MECHANICAL DRAWINGS. THERE IS ADDITIONAL MECHANICAL DEMOLITION INVOLVED, AND DO NOT CONSTITUTE A FULL LISTING OF ALL ITEMS REQUIRING REMOVAL. WORK INDICATED ON OTHER DRAWINGS, CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SEE THESE GENERAL NOTES FOR REQUIREMENTS. - SPECIFICATIONS FOR ADDITIONAL MECHANICAL WORK. 2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW SITE CONDITIONS AND TO IDENTIFY ALL 2. ALL ITEMS ARE NEW UNLESS SPECIFICALLY NOTED AS EXISTING. DEMOLITION WORK, AND INCLUDE IN HIS BID ALL COSTS FOR DEMOLITION & DISPOSAL. 3. FIXTURE LOCATIONS: VERIFY LOCATION OF PLUMBING FIXTURES WITH ARCHITECTURAL DRAWINGS 3. ABANDONED ITEMS, ANCHORS, INSERTS, PIPE STUBS, AND OTHER PROJECTIONS NOT BEING BEFORE BEGINNING WORK. ARCHITECTURAL DRAWINGS GOVERN. CONCEALED BY NEW CONSTRUCTION SHALL BE REMOVED TO 1" BELOW THE ADJACENT FINISHED SURFACE, AND THE DISTURBED AREA PATCHED. 4. CLEANOUTS: PROVIDE CLEANOUTS AS REQUIRED BY CODE AND AS INDICATED. 4. PATCH ALL WALUFLOOR/CEILING OPENINGS LEFT BY REMOVAL OF EXISTING ITEMS. PATCH SO AS TO 5. PIPE ROUTING: ALL PIPING SHOWN IS SCHEMATIC, CONTRACTOR SHALL PROVIDE ALL OFFSETS/ELBOWS MATCH FINISH OF ADJACENT UNDISTURBED AREA. AS REQ'D TO ALLOW ROUTING AROUND STRUCTURE, ELECTRICAL, & OTHER INTERFERENCES. ALL PIPING SHALL BE RUN CONCEALED, UNO, 5. REFERENCE ARCHITECTURAL DRAWINGS FOR WHERE CEILINGMALL AND OTHER GENERAL DEMOLITION WORK IS BEING DONE. 6. PIPE SIZES: UNSIZED PLUMBING PIPING SHALL MATCH THE SIZE OF THE LARGEST ADJACENT CONNECTING PIPE SIZE SHOWN, WHERETHE ADJACENT PIPE IS NOT SHOWN (OR NOT CLEAR), THE PIPE SIZE SHALL BE BASED ON THE GPM FLOWING IN THE PIPE (USE FIXTURE UNITS AND CORRESPONDING GPM PER THE UPC FOR DOMESTIC WATER SYSTEMS, USE WASTE FIXTURE UNITS & UPC TABLES FOR WASTENENT SYSTEM), AND A VELOCITY NO GREATER THAN 4 FEET PER SECOND. USE UPC CURVES FOR GPMNELOCITY FOR APPROPRIATE PIPING MATERIAL INVOLVED. 7. ALL DUCTWORK SHOWN IS SCHEMATIC, CONTRACTOR SHALL PROVIDE ALL OFFSETS/ELBOWS AS REQ'D E14E R. GY S TO ALLOW ROUTING AROUND STRUCTURE, ELECTRICAL, & OTHER INTERFERENCES. 8. VERIFY LOCATIONS OF ITEMS INSTALLED IN CEILINGS WITH ARCHITECTURAL REFLECTED CEILING PLANS 1. EQUIPMENT HAS BEEN SELECTED PER WSEC REQUIREMENTS. ROOFTOP HEAT PUMP IS EXISTING. PRIOR TO BEGINNING WORK. NOTIFY ARCHITECT/ENGINEER OF DISCREPANCIES. 2. VENTILATION AND THE ABILITY TO :REDUCE OUTSIDE AIR TO IMC MINIMUMS SHALL BE PROVIDED PER 9. SHIFT AIR INLETS/OUTLETS FROM LOCATIONS SHOWN AS REQ'D TO AVOID CONFLICTS W/STRUCTURE & WSEC. OTHER ITEMS. SUCH SHIFTS SHALL MAINTAIN SYMMETRY OF AIR TERMINALS & SHALL HAVE PRIOR APPROVAL OF ARCHITECT/ENGINEER. 3. TEMPERATURE CONTROL SYSTEM SHALL HAVE A MINIMUM DEAD BAND OF 5 DEGREES AS REQUIRED BY WSEC. 10. ALL DUCTWORK SHALL BE RUN CONCEALED, UNO. 5. AUTOMATIC SETBACK AND SHUTDOWN, C403.2.4.2/C403.2.4.2.1/C403.2.4.2.2: HVAC SYSTEMS SHALL BE 11. BUILDING FEATURES AND PIPING AND DUCT LOCATIONS -& SIZES SHOWN ON PLANS ARE APPROXIMATE EQUIPPED WITH AUTOMATIC CONTROLS CAPABLE OF STARTING AND STOPPING THE SYSTEM FOR & ARE BASED ON AS -BUILT DATA PROVIDED BY THE OWNER, A COMPLETE REVIEW IS REQUIRED TO BE SEVEN DIFFERENT DAILY SCHEDULES, AND SHALL HAVE MANUAL OVERRIDE CONFIGURED TO MADE BY THE CONTRACTOR. VERIFY SIZES PRIOR TO BIDDING AND BEGINNING WORK. OPERATE THE SYSTEM FOR 2 HOURS. 12. CONTRACTOR SHALL VERIFY LOCATIONS OF ALL EXISTING EQUIPMENT, PIPING, WALLS, SUPPORTS, 6. AUTOMATIC START, C403.2.4.2.3: AUTOMATIC START CONTROLS SHALL BE PROVIDED FOR EACH HVAC DUCTWORK, ELECTRICAL AND RELATED BUILDING FEATURES AND RELOCATE/REVISE SUCH EXISTING SYSTEM, AND BE CAPABLE OF AUTOMATICALLY ADJUSTING DAILY START TIME IN ORDER TO BRING ITEMS AS NECESSARY TO ALLOW FOR THE WORK INDICATED. EACH SPACE TO THE DESIRED OCCUPIED TEMPERATURE IMMEDIATELY PRIOR TO SCHEDULED OCCUPANCY. 13. PROVIDE PIPING TRANSITIONS AS NECESSARY TO CONNECT TO EXISTING SYSTEMS. SUCH SYSTEMS SHALL BE FIELD REVIEWED FOR SIZE, DIRECTION OF FLOW, LOCATION AND TYPE PRIOR TO 7. OUTDOOR AIR DAMPERS, C403.2.4.3: OUTSIDE AIR INTAKE DAMPERS SHALL AUTOMATICALLY CLOSE ORDERING/FABRICATING SUCH TRANSITIONS BECAUSE OWNER PROVIDED AS -BUILT DRAWINGS THAT WHEN SYSTEM OR SPACES SERVED ARE NOT IN USE OR DURING WARM-UP AND SET BACK. SHOW SUCH INFORMATION ARE CONSIDERED APPROXIMATE. CONTRACTOR SHALL ASSUME IN HIS BID ONE TRANSITION FOR EACH CONNECTION TO EXISTING SYSTEMS. PIPING CONNECTIONS ON EXISTING 8. OUTSIDE AIR INTAKES, EXHAUST OUTLETS, AND RELIEF OUTLETS SHALL BE PROVIDED WITH ITEMS MAY BE ONE PIPE SIZE SMALLER OR LARGER THAN SHOWN. DAMPERS THAT COMPLY WITH WSEC. DAMPER SHALL AUTOMATICALLY CLOSE WHEN SYSTEM OR SPACES SERVED ARE NOT IN USE OR DURING WARM-UP, COOLDOWN, AND SET BACK. DAMPER MAXIMUM LEAKAGE RATE SHALL NOT EXCEED MAXIMUM ALLOWED BY WSEC 9. OUTSIDE AIR INTAKES, EXHAUST OUTLETS, AND RELIEF OUTLETS SHALL BE PROVIDED WITH DAMPERS THAT COMPLY WITH WSEC. DAMPER SHALL AUTOMATICALLY CLOSE WHEN SYSTEM OR SPACES SERVED ARE NOT IN USE OR DURING WARM-UP, COOLDOWN, AND SET BACK. DAMPER MAXIMUM LEAKAGE RATE SHALL NOT EXCEED MAXIMUM ALLOWED BY WSEC. 1. SUBMITTALS: PROVIDE SUBMITTALS FOR ARCHITECT/ENGINEER'S REVIEW PRIOR TO ORDERING 10. ALL DUCTWORK SHALL BE CONSTRUCTED AND SEALED IN ACCORDANCE WITH IMC. WSEC AND IBC MATERIALS. REQUIREMENTS. 2. WORKMANSHIP: ALL WORK SHALL COMPLY WITH CODE AND BEST CONSTRUCTION PRACTICES. CONFIRM EXISTING MATERIALS AND PROVIDE SUITABLE MATERIALS AND TRANSITIONS TO ALLOW NEW 11. DUCTWORK SHALL BE INSULATED TO THE APPROPRIATED R-VALUE AS REQUIRED BY WSEC. TO PROPERLY MATCH UP TO EXISTING. 12. ECONOMIZER CONTROLS SHALL BE SUCH THAT ECONOMIZER OPERATION DOES NOT INCREASE 3. COORDINATION: COORDINATE WORK WITH OTHER TRADES REGARDING ALL ASPECTS OF THE WORK. BUILDING HEATING ENERGY DURING NORMAL OPERATIONS PER WSEC, AND SHALL BE INTEGRATED WITH MECHANICAL COOLING SYSTEM AND BE CAPABLE OF PROVIDING PARTIAL COOLING PER WSEC. 4. PLUMBING PIPING - DOMESTIC WATER: TYPE L COPPER, WITH JOINT TYPE AS ALLOWED BY CODE (I.E. SOLDERED OR PRESS -FIT) OR PEX (AS ALLOWED BY CODE). PROVIDE PRESSURE TESTS AND SYSTEM 13. AIR SYSTEMS SHALL BE BALANCED AS REQUIRED BY THE WSEC. CLEANING/DISINFECTION PER CODE. 5. PLUMBING PIPING WASTENENT: MATERIALS AS ALLOWED BY CODE. PROVIDE PRESSURE TESTS AND 14. PIPING SHALL BE INSULATED AS REQUIRED BY WSEC. SYSTEM CLEANING PER CODE. INSULATION THICKNESS 6. PLUMBING PIPING INSULATION: AS REQUIRED BY THE WSEC BUT NO LESS THAN 1/2-INCH THICK. FLUID OPERATING NOMINAL PIPE SIZE INSULATION SHALL BE THE FIBERGLASS OR ELASTOMERIC TYPE WITH MAXIMUM CONDUCTIVITY OF 0.28 TEMPERATURE <1 1 TO <1-1/2 1-1/2 TO <4 BTU/SF-IN-DEG F, WITH WHITE KRAFT ALL -SERVICE JACKETS. SEAL ALL RAW EDGES OF INSULATION 105-140 (HW) 1.0 1.0 1.5 WITH INSULATION CEMENT/MASTIC. PROVIDE P-TRAP & STOP VALVE INSULATION AT ADA LAWS. ALL CW 0.5" 0.5" 0.5" 7. DUCTWORK: GALVANIZED STEEL, G90, LOCK FORMING QUALITY, FABRICATED AND INSTALLED PER SMACNA STANDARDS. SUPPORT PER SMACNA, MINIMUM 6 FOOT ON CENTER. CONSTRUCT TO 1" 15. PROVIDE COMMISSIONING PLAN & REPORT REQUIREMENTS FOR PRELIMINARY AND FINAL PRESSURE CLASS. COMMISSIONING PER WSEC. PROVIDE SEQUENCE OF OPERATIONS AND TEST PROCEDURES PER WSEC AND SUBMIT COMPLIANCE CHECKLIST. 8. FLEXIBLE DUCTWORK: INSULATED TYPE WITH INNER LINER, STEEL HELIX, MINIMUM R-4 INSULATION AND OUTER VAPOR BARRIER JACKET. ATTACHED WITH NYLON ZIP TIES. SUPPORT WITH NYLON STRAPS (OR 16. THESE "ENERGY CODE NOT ARE LISTED TO SATISFY THE BUILDING DEPARTMENT'S REQUIREMENT EQUIVALENT). THAT CERTAIN INFORMATION BE PLACED ON THE PLANS, BUT DO NOT DIMINISH THE FULL PROJECT 9. CLOSEOUT DOCUMENTS: PROVIDE MARKED UP COPY OF THE PLANS AS AS-BUILTS; O&M MANUALS FOR REQUIREMENTS. PROVIDE ITEMS IN EXCESS OF CODE WHERE NOTED ON DRAWINGS AND IN PLUMBING FIXTURES AND EXHAUST FAN; AND A ONE YEAR WARRANTY STATEMENT. SPECIFICATIONS. 10. EQUIPMENT: COMMERCIAL PRODUCTS AS CALLED OUT IN SCHEDULES ON SHEET M2. I A B C H J 1 MECHANICAL LEGEND SYMBOL DESCRIPTION SYMBOL DESCRIPTION WASTE OR SOIL (W) AFF ABOVE FINISHED FLOOR APPROX APPROXIMATELY - - - - - - VENT (V) ARCH ARCHITECTURAL BLDG BUILDING - COLD WATER (CW) CAP CAPACITY CFM CUBIC FEET PER MINUTE - - HOT WATER (HW) CO CLEANOUT CONN CONNECTION - - - - HOT WATER CIRCULATING (HWC) CONT CONTINUE, CONTINUATION CW COLD WATER c CONDENSATE LINE DEG F, °F DEGREE FAHRENHEIT DIA, 0 DIAMETER RG REFRIGERANT GAS DN DOWN DWG DRAWING RL REFRIGERANT LIQUID EA EACH EC ELECTRONICALLY COMMUTATED -- ISOLATION VALVE ELEC ELECTRICAL, ELECTRIC EXH EXHAUST 20�12 DUCT (FIRST FIGURE, SIDE SHOWN) EXIST, (E) FPM FLEX FL FCO FLA HP HW HWC IN EXISTING FEET PER MINUTE FLEXIBLE FLOOR FLOOR CLEANOUT FULL LOAD AMPS HORSE POWER HOT WATER HOT WATER CIRCULATING INCH R tot RISE (R) OR DROP (D) ARROW IN DIRECTION OF FLOW VOLUME DAMPER (MANUAL) ® SIZE, cFM CEILING OUTLET CFI BOL CEILING INLET FLOOR DRAIN KW KILOWATT MAX MAXIMUM Q FLOOR CLEANOUT (FCO) MECH MFR MECHANICAL MANUFACTURER MIN MINIMUM NO. NUMBER NTS NOT TO SCALE OBD PD OPPOSED BLADE DAMPER PRESSURE DROP P.D.I. PH PLUMBING AND DRAINAGE INST. PHASE RA REF RETURN AIR REFERENCE REQ'D RG REQUIRED REFRIGERANT GAS RL RLA REFRIGERANT LIQUID RATED LOAD AMPS RPM RM REVOLUTIONS PER MINUTE ROOM SHT SO SHEET SCREENED OPENING SS TD STAINLESS STEEL TRANSFER DUCT TG TYP TRANSFER GRILLE TYPICAL UNO V UNLESS NOTED OTHERWISE VENT VTR W VENT THROUGH ROOF WASTE W/ WCO WITH WALL CLEAN OUT 2 DETAIL IDENTIFICATION NUMBER M3 SHEET ON WHICH DETAIL IS SHOWN SEPARil ATE PERMIT REQUIRED FOR: [� Merh I JJR �] Elaatrf I (] Plumbing. s• Gas Piping City of Tukwila BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED APR 112019 City of Tukwila UILDING DIVISION FILE tr FILE COPY PO n'tit No. Plan review approval Is subject to errors ana omissions Approval of construction documents does not auth : ,Ize the violation of any adopted code or ordinance. Receipt of approved Field Copy and ndlt s Is acKnowledgeo: Date:�L� City of Tukwilaa BUILDING DIVISIOr. RECEIVED CITY OF TUKWIL A MAR 2 6 2019 DOqcoo SIGNED 02-01-2019 0 5 n MECHANICAL 7 LEGEND, & NOTES JENNY CRAIG 17055 SOUTH CENTER PARKWAY TUKWILA, WASHINGTON REVISION DATE 9 HULTZ -� BTU e n g i n e e r s i n c 10 1111 Fawcett Ave Suite 100 Tacoma, WA 98402 Phone: (253) 383-3257 Fax: (253) 383-3283 general@hultzbhu.com Job Number: 19-008 D I E F G H J K DATE JOB NO. 02.01.19 a 18-177 PERMIT PHASE M WHITE DRAWING NO. ©HELIX DESIGN GROUP, INC.:A11 rights reserved No part of this document may be reproduced in any form or by any means without permission in writing from Helix Design Group. 2 3 0 5 p 7 a) C O 4 W a� W a� i � 8 i 00 v% w� > > U) U)U w L �a Eo_ I �o ao o N 9 U f- Q U/ w0 019 a_ C 0 o� N I +� Qi L Na --aL cy) -5 orn I mom 10 �i oQ _ rw-� Ow J J n i. AIR CONDITIONER SCHEDULE - SPLIT, SYSTEM P COOLING CAP.* A - INDOOR UNIT*** B - OUTDOOR UNIT*** MAX. MAX, PIPE SIZE BASIS OF DESIGN MIN. SYMBOL MANUFACTURER AREA SERVED FILTER TYPE OA OUTDOOR UNIT INDOOR UNIT REMARKS TOTAL EFFICIENCY FAN TOTAL ELECTRIC FAN ELECTRICAL AND SERIES NO. MBH (SEER) CFM WEIGHT WEIGHT RG RL CFM ESP WATTS MCA MOP VOLTS / PH QTY WATTS MCA MOP VOLTS/PH HP-1 MITSUBISHL- MSY-GL15NA &MUY-GL15NA FOOD ROOM 14 21.6 533 -- 30 1 15 208/1 1 55 9 15 208/1 WASHABLE -- 120 40 1/2 1/4 MITSUBISHI: HP-2 MSY-GL15NA & MUY-GL15NA FOOD ROOM 14 21.6 533 -- 30 1 15 208/1 1 55 9 15 208/1 WASHABLE -- 120 40 1/2 1/4 * COOLING CAPACITY IS AHRI RATING: AT 85' F DB; 660 F WB INDOOR COIL EAT AND 950 F OUTDOOR COIL EAT. ** ON PLANS "A" DESIGNATES INDOOR UNIT, "B" DESIGNATES OUTDOOR UNIT. (E.G. HP-113 IS HP-1 OUTDOOR UNIT). *** CONTRACTOR TO VERIFY RG & RL SIZE REQUIREMENTS. FAN SCHEDULE SYMBOL BASIS OF DESIGN MANUFACTURER AND SERIES NO. TYPE AREA SERVED CFM ESP RPM ELECTRICAL DRIVE CONTROL MAX WEIGHT.. LBS REMARKS WATTS VOLTS / PH EF-1 GREENHECK SP-670 CEILING JANITORIAL CLOSET 50 .25 900 17.1 115/1 DIRECT LIGHT SWITCH W/ TIME DELAY 9 PUMP SCHEDULE BASIS OF DESIGN ELECTRICAL SYMBOL MANUFACTURER TYPE SERVICE GPM FT. HEAD REMARKS AND SERIES NO. H2O MIN. HP VOLTS/PH CPA MAXIBLUE: X87-721 CONDENSATE PUMP HP-1A CONDENSATE 3.5 15 1/50 115/1 W/ RESERVOIR SENSOR: 110V-X87-771; INTERLOCK W/ HP-1 CP-2 MAXIBLUE: X87-721 CONDENSATE PUMP HP-2A CONDENSATE 3.5 15 1/50 115/1 W/ RESERVOIR SENSOR: 110V-X87-771; INTERLOCK W/ HP-2 L 1 G F I XT U RE SC H EDULE SYMBOL DESCRIPTION W V CW HW REMARKS BASIS OF DESIGN MANUFACTUR AND SERIES NO. FIXTURE FAUCET / VALVE / TRIM P-6A SINK 2" 2" 1/2" 1/2" STANDING UTILITY SINK W/ MUSTEE - 28CF BIG TUB 28CF BIG TUB UTILATUB COMBO UTILITY TUB PULL-OUT FAUCET PACKAGE PLUMBING STOPS: QUARTER TURN BALL VALVE; BRASSCRAFT. P-TRAPS: 17 GAUGE SEAMLESS CHROME PLATED BRASS, WITH MINIMUM 2-INCH SEAL; SIZE PER UPC. RISERS: FLEXIBLE BRAIDED STEEL TYPE; RATED FOR 125 PSIG. AIR INLET OUTLET SCHEDULE BASIS OF DESIGN SYMBOL TYPE MANUFACTURER REMARKS AND SERIES NO. CD CEILING DIFFUSER TITUS SERIES TMSA MODULAR CORE, SQUARE NECK CRG CEILING EXHAUST GRILLE TITUS SERIES 50F 1/2"xl/2"xl/2" CUBE CORE CTG CEILING TRANSFER GRILLE TITUS SERIES 50F 1/2"xl/2"xl/2" CUBE CORE NOTES: 1. CEILING DIFFUSERS (CD) SHALL HAVE NO. & DIRECTION OF THROWS AS INDICATED ON PLANS. (E.G. CD-3 = 3 WAY THROW) 2. ALL AIR INLETS/OUTLETS SHALL HAVE FACTORY ENAMEL FINISH,COLOR AS SELECTED BY ARCHITECT, EXCEPT THAT ALL WALL AIR INLET/OUTLETS (INCLUDING WALL TRANSFER GRILLES) WHERE INSTALLED IN WALL (I.E. NOT CONNECTED TO EXPOSED DUCTS) SHALL HAVE CLEAR ANODIZED FINISH. 3. SEE LEGEND FOR TERMINOLOGY USED IN AIR TERMINAL CALL -OUTS ON DRAWINGS. 4. SEE ARCH. FINISH SCHEDULE FOR CEILING TYPES, PROVIDE AIR TERMINALS TO MATCH CEILING CONSTRUCTION INSTALLED IN. A B C I D I E I F I G H K L' 5 b SIGNED 02-01-2019 REVIEWED FOR CODE COMPLIANCE APPROVED APR 112019 City of Tukwila BUILDING DIVISION 7 MECHANICAL SCHEDULES JENNY CRAIG 8 17055 SOUTH CENTER PARKWAY TUKWILA, WASHINGTON REVISION DATE 9 DATE JOB NO. 02.01.10 a 18-177 PERMIT PHASE RECEIVED DO 4(0 CITY OF TUKWiLA HULTZ7B.1. 1T VT R 2 62019 e n g i n e e r s i n c iQ M 2 PERMIT CENTER 1111 Fawcett Ave Suite 100 Tacoma, WA 98402 Phone: (253) 383-3257 Fax: (253) 383-3283 general@hultzbhu.com Job Number: 19-008 WHITE DRAWING NO. ©HELIX DESIGN GROUP, INC.:nii rights reserved. J I K No part of this document may be reproduced in any form or by any means without permission in writing from Helix Design Group. 2 3 ER R 0 7 a� c O CY 8 N� w> CY cY a) � N U w L F_ Q EO_ I I o t` I �rn o 00N Q L U / F- QL U'- O a — co O OCD � L � � L o a orn 1 ,Om 10 .- LL o �- wQ _ r- w F- O w J J 0- LL. CONNECT TO (E) 3"W (E) WASTE TO SEWER - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ -- -_----I ------------- ---------- ��-I � I II II I I II II II II II 2„W UP (3) 7-7 I I li !I I I II II II II � � I � I I it II I I II II II II II I I i l (� II II I I II II II II II L �---=__-' F U n I I (T r I I I I I II i I II II I i 1-------------------- --�� I I I I I-------------------- II I I I I I I I I I I II I I I I I I I i I II I I I I II —------- --- --------— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — --------------------------- L- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — FOUNDATION PLAN AL 0' 2' 8' SCALE: 1/4"=l'-0" NORTH SCALE 1/4" = 1'-0" GENERAL NOTES: 1. SEE GENERAL NOTES SHEET M1. 2. FOR PIPING SIZES TO INDIVIDUAL PLUMBING FIXTURES SEE "PLUMBING FIXTURE SCHEDULE" SHEET M0.2. 3. OFFSET PLUMBING PIPING TO AVOID DUCTWORK AND OTHER OBSTRUCTIONS. 4. CONTRACTOR TO PROVIDE WALL CLEANOUT IN WASTE PIPING BENEATH ALL SINKS. 5. CONNECTING TO (E) PLUMBING MAY REQUIRE. WORKING IN ADJACENT TENANT SPACE. FIELD VERIFY & COORDINATE WORK WITH ADJACENT TENANT. 6. SAWCUT FLOOR TO INSTALL UNDERGROUND PIPING. 7. FIELD FERIFY SIZE & LOCATION OF EXISTING PIPING BEFORE BEGINNING WORK. (E) WH ABOVE 2"V, CONNECT TO CEILING (E) VENT SYSTEM (E) LAV 1.---- ° P-6A I --- REVIEUVED FOR CONNECT TO 1/2"CW, (E) WATER CODE COI'e$PLIANCE (E) 3/4" HW/CW 1/2"HW CLOSET APPROVED I -_.,- --- , APR 112019 -------------..._� . i Clay of Tukwila BUILDING DIVISION 1' 4' I FLOOR PLAN - PLUMBING , 8 SCALE: 1/4"=V-0" NORTH SCALE 1/4" = 1'-0" A I B I C D E G H c Ec sign gr o u p 2 AMERICAN INSTITUTE OF ARCHITECTS 3 SIGNED 02-01-201 El R 0 7 PLUMBING PLANS E'? RECEIVED 9 CITY OF TUKWILA MAR 2 6 2019 PERMIT CENTER AV B . O HULTZ BHU engineers inc 10 1111 Fawcett Ave Suite 100 Tacoma, WA 98402 Phone: (253) 383-3257 Fax: (253) 383-3283 general@hultzbhu.com Job Number: 19-008 J I K JENNY CRAIG 17055 SOUTH CENTER PARKWAY TUKWILA, WASHINGTON REVISION DATE DATE JOB NO. 02.01.19 a 18-177 PERMIT PHASE M3 WHITE DRAWING NO. ©HELIX DESIGN GROUP, INC.:Alldghtsreserved No part of this document may be reproduced in any form or by any means without permission in writing from Helix Design Group. 2 3 0 5 6 7 c O W a D 0 co r` i ao v~i w� > > c� (D � U F- EO I �o n �rn I� ap 0 N U �- O cm O OO N I +� �Q C CT) I \Om N 10 o~ wQ �n Ow J J_ n i. A A B I C I D I E I F DISCONNECT (E) EXHAUST DUCT FROM NEIGHBORING REMOVE (E) BRANCH DUCT BACK TO MAIN BATHROOM 'j� (E) DUCT IN DUCT & CAP OFF; FIELD / NEIGHBORING SPACE VERIFY LOCATIONNo on NNIMEN on NOMON No NONNI No SWOON No WOMEN =010011=01% --- - - ----- ---------- -- --- —------- ._...----- -- ...... --------- -- ------ ----.. ° I DEMO (E) 61'0�� (E) 18"0 DUCT UP f, 3) j ° I � RELOCATE (E) THRU ROOF THERMOSTAT !mil ��^`'����/ �./��\��`,/\ f\�-���\/\ � /t' � C� ■ I DEMO ALL F.cy721 \ / DUCTWORK �YN REMOVE (E) I �►� I DUCT (TYP) ■ IG_�I L_*I I/ IG__*1I (E) RTU ON ROOF ITO REMAIN I I � ■ L -- — J Lonong i ■ SEE PARTIAL DEMO ROOF PLAN FOR WORK ON ROOF ABOVE THIS AREA. SHEET M401 DEMOLITION PLAN SCALE: 1/4"=V-0" 8"0 UP THRU ROOF OTERMINATE W/ GOOSE NECK & SCREEN (E)R`ESTg00O 400 (E) EF - ■ 6x6 CD 50 ■ \ M) ■ D1 R/ ° � I SEE PARTIAL ROOF PLAN FOR WORK ON ROOF ABOVE THIS AREA, SHEET M401 CONDENSATE DN �NER=�P= - HVAC (E) DUCT IN �� NEIGHBORING SPACE FLOOR PLAN - HVAC SCALE: 1 /4"=V-0" B I C D E AL \_ 1 1 •R \_ 1 1 NORTH F G REMOVE (E) INLET/OUTLET (TYP) x�_21 h� h� 1-1-1 `-o- I G H ( J. ; . I K GENERAL NOTES: 1. SEE MECHANICAL GENERAL NOTES ON SHEET M1. 2. (E) RTU DATA: MODEL: 50KCQA06 SIZE: 5 TON VOLTAGE: 208V/3PH HEATER KW: 15 KW RE -BALANCE OA FOR 620 CFM 3. FIELD VERIFY EXISTING BUILDING ITEMS THAT MAY CONFLICT W/ DUCT ROUTING PRIOR TO FABRICATING DUCTWORK. PROVIDE ADDED OFFSETS AS REQUIRED. KEYED NOTES: OCAP (E) DUCT. ORELOCATE & RECONNECT (E) THERMOSTAT TO (E) RTU SERVING THE SPACE OIN LIEU OF DEMOLITION OF (E) ROOF EXHAUST DUCT, PROVIDE NEW 6"0 VENT THRU ROOF WITH ROOF CAP FOR NEW EXHAUST FAN. OCP-1 & CP-2 INSTALLED IN (OR AT) HP-1A & HP-2A RESPECTIVELY. 3 0 5 8 APR 112019 17055 SOUTH CENTER PARKWAY TUKWILA, WASHINGTON City of Tukwila BUILDING DIVISION REVISION DATE 9 RECEIVED CITY OF TUKWILA MAR 2 6 2019 "® PIEIR T CFNTEI4 HULTZ -�BHU e n g i n e e r s i n c 10 1111 Fawcett Ave Suite 100 Tacoma, WA 98402 Phone: (253) 383-3257 Fax: (253) 383-3283 general@hultzbhu.com Job Number:19-008 H I J I K SIGNED 02-01-2019 JENNY CRAIG REVIEWED FOR CODE COMPLIANCE APPROVED DATE JOB NO. 02.01.19 a 18-177 PERMIT PHASE M41 WHITE DRAWING NO. ©HELIX DESIGN GROUP, INC.:AII rights reserved No part of this document may be reproduced in any form or by any means without permission in writing from Helix Design Group. - HVAC (E) DUCT IN �� NEIGHBORING SPACE FLOOR PLAN - HVAC SCALE: 1 /4"=V-0" B I C D E AL \_ 1 1 •R \_ 1 1 NORTH F G REMOVE (E) INLET/OUTLET (TYP) x�_21 h� h� 1-1-1 `-o- I G H ( J. ; . I K GENERAL NOTES: 1. SEE MECHANICAL GENERAL NOTES ON SHEET M1. 2. (E) RTU DATA: MODEL: 50KCQA06 SIZE: 5 TON VOLTAGE: 208V/3PH HEATER KW: 15 KW RE -BALANCE OA FOR 620 CFM 3. FIELD VERIFY EXISTING BUILDING ITEMS THAT MAY CONFLICT W/ DUCT ROUTING PRIOR TO FABRICATING DUCTWORK. PROVIDE ADDED OFFSETS AS REQUIRED. KEYED NOTES: OCAP (E) DUCT. ORELOCATE & RECONNECT (E) THERMOSTAT TO (E) RTU SERVING THE SPACE OIN LIEU OF DEMOLITION OF (E) ROOF EXHAUST DUCT, PROVIDE NEW 6"0 VENT THRU ROOF WITH ROOF CAP FOR NEW EXHAUST FAN. OCP-1 & CP-2 INSTALLED IN (OR AT) HP-1A & HP-2A RESPECTIVELY. 3 0 5 8 APR 112019 17055 SOUTH CENTER PARKWAY TUKWILA, WASHINGTON City of Tukwila BUILDING DIVISION REVISION DATE 9 RECEIVED CITY OF TUKWILA MAR 2 6 2019 "® PIEIR T CFNTEI4 HULTZ -�BHU e n g i n e e r s i n c 10 1111 Fawcett Ave Suite 100 Tacoma, WA 98402 Phone: (253) 383-3257 Fax: (253) 383-3283 general@hultzbhu.com Job Number:19-008 H I J I K SIGNED 02-01-2019 JENNY CRAIG REVIEWED FOR CODE COMPLIANCE APPROVED DATE JOB NO. 02.01.19 a 18-177 PERMIT PHASE M41 WHITE DRAWING NO. ©HELIX DESIGN GROUP, INC.:AII rights reserved No part of this document may be reproduced in any form or by any means without permission in writing from Helix Design Group. 2 3 n 5 6 7 a) c O 41 a� CY s= r 00 w C) C(D � ry (n L U) U w L H Q L� 0 I co 0 r I rn co O N 9 U 0Q U/ O d. 0 00 CV I — O) i CY)�Q Qom 0/ 10 I o � wQ Ow J -j d Li.. A I B C I D H 1s 4' PARTIAL ROOF DEMOLITION PLAN - HVAC 0' 6P=e===E9 ' SCALE: 1/4"=1'-0" NORTH SCALE 1/4" = 1'-0" NEW 8" 0 EXHAUST DUCT; TERMINATE IN GOOSE NECK MATCH DEMO'D DUCTWORK SIZE & RE -USE (E) ROOF PENETRATION (TYP) (E) RTU TO REMAIN 2 HP-2B M6 SLEEPER 2X4 - - CROSS BRACE 2 HPAB 1 LE�) UUtrJU REFRIGERANT M6 PIPING 1' 4' 4"Y- PARTIAL ROOF PLAN- HVAC o' 2' 8' SCALE: 1 /4"=1'-0" NORTH SCALE 1 /4" = 1'-0" E I F I G I H J K GENERAL NOTES: 1. SEE MECHANICAL GENERAL NOTES ON SHEET M1. 2. (E) RTU DATA: MAKE: CARRIER MODEL: 50KCQA06 SIZE: 5 TON VOLTAGE: 208V/31PH HEATER KW: 15 KW RE -BALANCE OA FOR 620 CFM 3. FIELD VERIFY EXISTING BUILDING ITEMS THAT MAY CONFLICT W/ DUCT ROUTING PRIOR TO FABRICATING DUCTWORK. PROVIDE ADDED OFFSETS AS REQUIRED. 4. EXTERIOR DUCTWORK SHALL HAVE 2" THICK INTERIOR LINING. KI SIGNED 02-01-2019 0 R 0 7 ROOF PLANS - HVAC JENNY CRAIG APR 112019 8 17055 SOUTH CENTER PARKWAY City of Tukwila TUKWILA, WASHINGTON BUILDING DIVISION RECEIVED 9 CITY OF TUKWILA MAR 2 6 20119 z\0 �i"It!N►x i HULTZ BHU e`n g i n e e r s i n c 10 1111 Fawcett Ave Suite 100 Tacoma, WA 98402 Phone: (253) 383-3257 Fax: (253) 383-3283 general@huitzbhu.com Job Number: 19-008 J ( K REVIEWED FOR CODE COMPLIANCE APPROVED REVISION DATE DATE JOB NO. 02.01.19 a 18-177 PERMIT PHASE M5 WHITE DRAWING NO. ©HELIX DESIGN GROUP, INC.:Aii rights reserved No part of this document may be reproduced in any form or by any means without permission in writing from HeIN Design Group. 2 3 4 E no 7 C 0 U) W U U) I� i ao ni w� CY U) � U w H Q i=0 T I f to 0 r- I rnrn 0) ryI — W 0 N s U I— Q U/ w O d 0 00 N I+ � L Cna) Q : (,) -D Q orn I N �g �04m 10 -� LL- wQ w � 0 w J J n- D F OUTDOOR A/C UNIT ANCHOR OUTDOOR A/C UNIT TO SLEEPERS 4x6 TREATED WOOD SLEEPER; MIN 4' LONG (TYP) ROOFING MATERIAL MAT, 6" LARGER THAN SLEEPER FOOTPRINT ALL AROUND EXISTING ROOF NOTE: VERIFY ROOF SLOPE. CUT SLEEPERS TO SUIT ROOF SLOPE & ASSEMBLY PROVIDE LEVEL TOP MOUNTING SURFACE. SLEEPERS DETAIL NTS G SHEETMETAL SCREW (TYP) REFRIGERANT LINE SEE SCHEDULE FOR SIZE NOTCHED GALV. SHEETMETAL PIECES TO SEAL OPENING AROUND PIPE PENETRATION SEAL PIPE PENETRATION THROUGH ROOF H I K 1Pi 20 GA. GALV. SHEET METAL ENCLOSURE, SEAL WATERTIGHT d i cg `rl FILL CAVITY WITH FOAM SEALANT g r O U p WELDED 16 GAUGE GALVANIZED STEEL FLASHING ASSEMBLY, 2 L-1 ANCHOR TO ROOF EXTEND UP ROOFING OVER TOP OF CURB & OVER EXIST. ROOFING AMERICAN INSTITUTE OF ARCHITECTS REFRIGERANT PI NTS 3 SIGNED 02-01-2019 0 5 C•l MECHANICAL 7 DETAILS REVIEWED FOR CODE COMPLIANCE APPROVED APR 112019 City of Tukwila JENNY CRAIG BUILDING DIVISION 8 17055 SOUTH CENTER PARKWAY TUKWILA, WASHINGTON REVISION DATE DATE JOB NO. 02.01.19 a 18-177 PERMIT PHASE M6 WHITE DRAWING NO. ©HELIX DESIGN GROUP, INC.:Avirightsreserved No part of this document may be reproduced in any form or by any means without permission in writing from Helix Design Group.